BQ Youth Polytechnic Blank
BQ Youth Polytechnic Blank
BQ Youth Polytechnic Blank
(ALL PROVISIONAL)
GENERAL PRELIMINARIES
1.0 Site
Site clearance
1.0 Clear the site off grass, shrubs and all vegetables;
cart away as directed SM 327
Excavation
Filling
Carried to Collection
SUBSTRUCTURES CONTINUED:-
Concrete
Walling
9.0 200mm thick approved local machine cut natural
stone to foundation walling; bedding and jointing in
cement sand (1:3) mortar SM 166
Damp proofing
10.0 Polythene; 1000 gauge, 150mm laps (no allowance
made to laps(, horizontal; 1no. layer laid on murram
blinding SM 250
Carried Forward
Brought Forward
Insitu finishing
SUPERSTRUCTURES
RING BEAM
Insitu concrete; reinforced; class 20/ (20mm);
vibrated
1.0 Beams CM 6
Reinforcement
STEEL COLUMNS.
SUPER-STRUCTURAL WALLING
ROOFING
Carried Forward
Brought Forward
Blinding concrete(1:4:8)
10.0 50mm thick blinding concrete in strip footings SM 5
Carried Forward
Brought Forward
Platform finishes
DOORS
Iron mongery
Supply and fix the following to UNION catalogue
or other equal and approved To softwood,
hardwood or the like fixing with screws.
7.0 Two lever mortice lock complete with set lever
brass handle furniture NO 4
Carried Forward
Brought Forward
FANLIGHT
N. A. C.O or Any other equal and approved
Anadonised Aluminium louvre jambs with blade
carrier for 150mm wide louvre.
WINDOWS
Wrot Cedar
The following in wrot graded cedar.
Glazing
5.0 150mm x5mm thick clear glass louvre fixed to
louvre frames above doors. LM 96
Burglar proofing
FINISHES
Wall finishes
BLACKBOARD
FLOOR FINISHES
Beds and backings
In- situ Finishing's
38mm thick terrazzo paving
Carried Forward
Brought Forward
CEILING FINISHES
Chipboard ceiling.
CONCRETE WORKTOPS
Formwork
Sawn softwood formwork to in-situ concrete as
described:-
Finishes
Floor finishes
6.0 40mm thick cement and sand screed bed mix 1:3
with steel float SM 9.6
Wall finishes
7.0 12mm thick cement,sand render,with wood float
finish SM 7.2
Carried Forward
Brought Forward
LOCKABLE CUPBOARDS
SHELVING
ELECTRICAL INSTALLATIONS
Carried Forward
Brought Forward
(ii) 30Amps,SP NO 3
(iii) 32Amps,TP NO 2
Carried Forward
Brought Forward
4.0 In ramps/step CM 6
Formwork
Carried to Collection
ELEMENT NO. 1
SUBSTRUCTURE
(ALL PROVISIONAL)
Site clearance
5.0 Ditto but from 1.5m but not exceeding 3.0m deep. CM 8
6.0 Ditto but from 3.0m but not exceeding 4.5m deep. CM 8
7.0 Ditto but from 4.5m but not exceeding 6.0m deep. CM 8
Carried Forward
Brought Forward
Disposal of water
1.0 Allow for keeping excavations free from water. ITEM
Hardcore fillings
2.0 Approved hardcore fill 300mm thick ,well watered
and compacted to receive murram blinding(m.s) SM 7
Carried Forward
Brought Forward
Formwork to: SM 8
Carried Forward
Brought Forward
4.0 Plinths SM 9
5.0 Plinth SM 9
ELEMENT NO. 2
1.0 Beams CM 1
ELEMENT NO.3
WALLING SUPERSTRUCTURE
ELEMENT NO. 4
ROOFING
ROOF COVERING
Eaves filling
WROT CYPRESS
ELEMENT NO. 5
DOORS
Ironmongry
Supply and fix the following ironmongery with
screws to match.
3.0 100mm brass butt hinges with matching screws. NO 9
PAINT WORK
Prepare and apply 3 coats of first grade clear
wood varnish
7.0 Surfacess not exceeding 300mm LM 15
DOOR GRILLS
Heavy duty steel Door grilles comprising 16mm
square bar perimeter framing and horizontal
middle rail 12mm square bar ventical infilla st
150mm centres, 16 x 4 mm flat diamond shaped
welded onto square bars primed as per crown
paints primer the whole grille complete with
fixing lugs and including fixing to masonary
walling
Variours sizes SM 5
9.0
ELEMENT NO. 6
FINISHES
Floor finishes
External walls
Carried Forward
Brought Forward
Wall tiles
4.0 3 courses of ceramic wall tiles to internal urinal wall
surfaces SM 2
Copping stone
5.0 Mass concrete copping stone mix (1:3) twice
weathered and throated on top of screen wall LM 6
MISCELLEANOUS
6.0 U.P.V.C golden brown vent pipe 100mm diameter LM 6
EXTERNAL PAVINGS
Paving
4.0 ROOFING
5.0 DOORS
7.0 FINISHES
MAIN SUMMARY
1.0 PRELIMINARIES
TOTAL 1
ADD
TOTAL 2
ADD.
16% V.A.T
DATE
DATE