TITLE: HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA)
Department Name : Mechanical Section / Sub Section : Piping Date of Assessment : 6/17/2022
Risk Evaluation
COMPLETION DATE
Legal Requirements -
FURTHER ACTION
Yes or No
Condition
S.No Process/ Sub-Process activities Hazards Risks N/A/E Existing Controls REQUIRED (Work
Instruction / SMP No.)
Risk Rating
Likelihood
Risk Level
Severity
Scaffolding Erection/Dismantling job.
Material movement for erection of Scaffolding pipe and its material can struck with Use of PPEs (Gloves and Goggles,Safety Harness), Use of
2 Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
scaffolding equipment and manpower working near by area. Area Barrication.
Material movement during Dismantling Scaffolding pipe and its material can struck with Use of PPEs (Gloves and Goggles,Safety Harness), Use of
9 of scaffolding equipment and manpower working near by area. Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
Area Barrication.
Dismantling of Scaffolding Pipe Scaffolding pipe and its material falling during Use of PPEs (Gloves and Goggles,Safety Harness), Use of
10 Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
standard. erection. Area Barrication.
Form No. F-MR-11 Form Rev No. : 0 Form Rev Date : 05.05.2020
RSPL Group - Soda Ash Division
MR's Office
TITLE: HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA)
Department Name : Mechanical Section / Sub Section : Piping Date of Assessment : 6/9/2022
Risk Evaluation
COMPLETION
Requirements -
FURTHER ACTION
Yes or No
Condition
DATE
S.No Process/ Sub-Process activities Hazards Risks Existing Controls REQUIRED (Work
Risk Rating
Legal
Likelihood
N/A/E
Risk Level
Instruction / SMP No.)
Severity
Scaffolding erection job.
Scaffolding pipe and its Use of PPEs (Gloves and Goggles,Safety Harness), Use of
2 Material movement for material can struck with Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
erection of scaffolding equipment and manpower
working near by area. Area Barrication.
Form No. F-MR-11 Form Rev No. : 0 Form Rev Date : 05.05.2020