RSPL Group - Soda Ash Division

MR's Office
TITLE: HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA)

Department Name : Mechanical Section / Sub Section : Piping Date of Assessment : 6/17/2022

Assessment carried out by : Uttam Parmar / Tushar Nakum Issue No. : 0

Risk Evaluation

COMPLETION DATE
Legal Requirements -
FURTHER ACTION

Yes or No
Condition
S.No Process/ Sub-Process activities Hazards Risks N/A/E Existing Controls REQUIRED (Work
Instruction / SMP No.)

Risk Rating
Likelihood

Risk Level
Severity
Scaffolding Erection/Dismantling job.

Use of PPEs (Gloves and Goggles,Safety Harness), Use of


1 Erection of Scaffolding Pipe standard Scaffolding
erection.
pipe and its material falling during Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
Area Barrication.

Material movement for erection of Scaffolding pipe and its material can struck with Use of PPEs (Gloves and Goggles,Safety Harness), Use of
2 Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
scaffolding equipment and manpower working near by area. Area Barrication.

Use of PPEs (Gloves and Goggles,Safety Harness), Use of


3 Erection of Kicker lift and cross bracing. Scaffolding pipe and its material falling during Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
erection. Area Barrication.

Use of PPEs (Gloves and Goggles, Safety Harness), Use of


4 Erection of plank with plank clamp. Falling from height Human injury, fatal E Base plate and sole plate as per site condition. Use of No 6 4 24 3
incident ladder to approach for work at height. Use of Area
Barrication.

Use of PPEs (Gloves and Goggles, Safety Harness), Use of


5 Erection of railings and swing gate and Slip and trip from pipe Human injury, fatal A Base plate and sole plate as per site condition. Use of No 6 4 24 3
ladder. incident ladder to approach for work at height. Use of Area
Barrication.
Use of PPEs (Gloves and Goggles, Safety Harness), Use of
Dismantling of railings and swing gate Human injury, fatal Base plate and sole plate as per site condition. Use of
6 and ladder. Slip and trip from pipe incident A ladder to approach for work at height. Use of Area
No 6 4 24 3
Barrication.
Use of PPEs (Gloves and Goggles, Safety Harness), Use of
Human injury, fatal Base plate and sole plate as per site condition. Use of
7 Dismantling of plank with plank clamp. Falling from height E No 6 4 24 3
incident ladder to approach for work at height. Use of Area
Barrication.
Use of PPEs (Gloves and Goggles,Safety Harness), Use of
8 Dismantling of Kicker lift and cross Scaffolding pipe and its material falling during Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
bracing. erection. Area Barrication.

Material movement during Dismantling Scaffolding pipe and its material can struck with Use of PPEs (Gloves and Goggles,Safety Harness), Use of
9 of scaffolding equipment and manpower working near by area. Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
Area Barrication.

Dismantling of Scaffolding Pipe Scaffolding pipe and its material falling during Use of PPEs (Gloves and Goggles,Safety Harness), Use of
10 Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
standard. erection. Area Barrication.

Form No. F-MR-11 Form Rev No. : 0 Form Rev Date : 05.05.2020
RSPL Group - Soda Ash Division
MR's Office
TITLE: HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA)

Department Name : Mechanical Section / Sub Section : Piping Date of Assessment : 6/9/2022

Assessment carried out by : Uttam Parmar / Tushar Nakum Issue No. : 0

Risk Evaluation

COMPLETION
Requirements -
FURTHER ACTION

Yes or No
Condition

DATE
S.No Process/ Sub-Process activities Hazards Risks Existing Controls REQUIRED (Work

Risk Rating
Legal

Likelihood
N/A/E

Risk Level
Instruction / SMP No.)

Severity
Scaffolding erection job.

1 Erection of Scaffolding Pipe Scaffolding pipe and its


material falling during Human injury A
Use of PPEs (Gloves and Goggles,Safety Harness), Use of
Base plate and sole plate as per site condition. Use of No 4 2 8 2
standard
erection. Area Barrication.

Scaffolding pipe and its Use of PPEs (Gloves and Goggles,Safety Harness), Use of
2 Material movement for material can struck with Human injury A Base plate and sole plate as per site condition. Use of No 4 2 8 2
erection of scaffolding equipment and manpower
working near by area. Area Barrication.

3 Erection of Kicker lift and cross Scaffolding pipe and its


material falling during Human injury A
Use of PPEs (Gloves and Goggles,Safety Harness), Use of
Base plate and sole plate as per site condition. Use of No 4 2 8 2
bracing. erection. Area Barrication.

Use of PPEs (Gloves and Goggles, Safety Harness), Use of


4 Erection of plank with plank Falling from height Human injury, fatal E Base plate and sole plate as per site condition. Use of No 6 4 24 3
clamp. incident ladder to approach for work at height. Use of Area
Barrication.

Use of PPEs (Gloves and Goggles, Safety Harness), Use of


Erection of railings and swing Human injury, fatal Base plate and sole plate as per site condition. Use of
5 gate and ladder. Slip and trip from pipe incident A ladder to approach for work at height. Use of Area
No 6 4 24 3
Barrication.

Form No. F-MR-11 Form Rev No. : 0 Form Rev Date : 05.05.2020