ORSFEL EVOLUTION 1S CONSTANT Rigging Plan Erection Plan & Safety Checks (Erection plan shall be prepared for ereétion & shifting of material more than 3MT) Name of Site Date: ‘Work location Description of the material: L*B*H in MT Weight (WW): Name of the Engineer-In-Charge, giving erection clearance: ‘Review of Rigging preparation When more than 2 sings is used and are net adjustable, then consider Nas 2 Diameter & length of sing (L): No of D shackle/bow shackle with ‘SWL& ID numbers ‘SWL of slings as per marking & TPI: Nos of slings used (N) : ‘What is the stress load arrived on sling (Wx L) : (HxN) Is the sling tension is within its SWL. : Yes/No ‘Does the slinging made considering the load CG: Yes / No ‘Siinglweb sling is protected against sharp edges: Yes / No 1. The maximum operating radius : 2, Total weight of the load’ : 3 Required lifting height : 4. Clear distance head to the hook : 5. Total height: 6. Desired boom angle 7. Boom length required : 8. Capacity of crane at the said position : (ut rigger is fully extended : Yes / No Ground stability is ensured : Yes /No Does 1m clearance is available from boom to job : ‘Any obstructions between crane and load : Yes / No Any obstructions when slewing : Yes / No Wind Speed : QO RPL. EVOLUTION 16 CONSTANT i Rigging Plan Safety precautions: Sl.No Points Observation | Remarks 7 | Whether the crane selected for erection is meeting the safely norms, is the equipment Fitness is obtained? 2 _| Are all the signal men provided whistle / suitable communication device? 3_| Are all the workmen at higher elevation wearing safety harness with their lifeline hooked? 4 _ | Whether the safe access and work platform are made to carry ut structural works on position. Also to unhook the sling. & | Whether precautions have been taken in case of obstructions for load as well as tag line? 6 _ | Whether any load suspension involved? If Yes’, Whether the condition ofthe load suspension method is checked? 7 _ | Does the lifting hook is capable and welding quality is checked by DP test ‘Any standby lifting tools and tackles required and arranged? 8 | Is the fall protection arrangements are adequate? 10 | Adequate ilumination is arranged 11 | Availability of guy rope 72 _| Is the erection area is cleared against movement of people 73 | Whether the weather condition is considered while planning erection. Erection shall be carried out under sunlight only. No ‘erection shall be planned during dark hours. 74 | is the structure painting completed installations of equipment's/ parts are completed before iting? 45 _| Any critical modifications to be done after erection of specified ap job? 46 | Test cerifcates verified for any load bearing members of the equipment like wire ropes, chains, wedge socket, and other tools & tackles 17 | Whether all walkway platforms, staircase, handrails as per fabrication drawing assembled at ground level, verified and certified by QC department 48 | Access platform, staircases, interconnecting platform, completed at ground level or not ‘Work conditions are reviewed and erection is permitted, ‘Safely Engineer Field Engineer Rn,

You might also like