System Integra

S. No Projects Status Team Lead


Completed Proj
1 RapiGuard Bahrain Complete Jamal Rafiq
2 RapiGuard Trials LoC Complete Jamal Rafiq

Active Projects (In P


1 4G Bahrain Implementation In Progress Jamal Rafiq
2 RTMS Bahrain In Progress Jamal Rafiq
3 PAF Tender Accessories In Progress Jamal Rafiq
4 PAF Tender Walkie Talkie Terminals In Progress Jamal Rafiq
5 PAF PoC Trial for MDM & 4G Terminals In Progress Jamal Rafiq
6 PAF PoC 4G eNodeB + HCLOS In Progress Jamal Rafiq
7 4G Core trial for RLMS in office In Progress Jamal Rafiq
8 QA for OwlSense In Progress Jamal Rafiq
9 QA for RTMS User software for Clients In Progress Jamal Rafiq
10 RASS development with new motors + features In Progress Jamal Rafiq
11 ERP Consultant finalization In Progress Jamal Rafiq
12 Connecto Project documents prepration In Progress Jamal Rafiq
13 Erays Scanner Development project In Progress Jamal Rafiq
14 4G Mobile phone Manufacturing License (PTA) In Progress Jamal Rafiq
15 Misc Assignments In Progress Jamal Rafiq
16 HCLOS PAF In Progress Jamal Rafiq

Projects on Ho
1 RTMS Nigeria Pause Jamal Rafiq
2 EVM ECP Pause Jamal Rafiq
3 Tactical Radios Pause Jamal Rafiq
4 iBS Test & Trails Pause Jamal Rafiq
System Integration
Remarks
Completed Projects

Active Projects (In Progress)


7 sites deployed, transmission arranging,
New Site RF Study, arrangement of installation material
Tender submitted, Tech clarification, commercail evaluation
Tender submitted, Tech clarification, commercail evaluation
MDM / Terminals PoC done, few more terminals req and ordered
eNodeB + HCLOS Installation in progress at NSTP roof, waiting for PAF site visit permission
Contract signed, waiting for software solution to install. IT is preparing for infrastructure
Evaluationg OwlSense and preparing QA Report
Data provided to Software team, they are integrating, once done will start evaluation
some additional features such as each degree RSSI, equipment successfully connected etc
Development consultant finalized, negotiating payments and terms, need inhouse developer as well
Connecto documents prepration and review
Antenna design done, antenna fabrication in progress, Software part phase 1 ready, machenical part done
Application submitted, need to ship terminals from china under certain HSS code. Terminals shipped and arrived
New Hiring job interviews, Saminars, administrative issues
Mechanical fitting is done, coding part is in pending state

Projects on Hold
Production R&
S. No Projects Status Team Lead

1 Development of Low Power Ceiling Fan In Progress Umar Arshad

Muhammad Arif

2 Development of UPS System In Progress Umar Arshad


Muhammad Arif
Production R&D
Designation Team Members

Sr. Manager Mujeeb Ur Rehman

Manager Khizer Tehmasap

Ali Hassan

Hamza Khaliq

Azmat Javed

Hassan Aftab
Haroon Iltaf
Muhammad Waqas

Aftab Hussain

Usman Dastagir

Bilal
Parts Supplier
WestLu
Shan Saleem

Sr. Manager Mujeeb Ur Rehman


Manager Shan Saleem

Bilal Umer

Khizer Tehmasap

Ali Hassan

Azmat Javed

Hassan Aftab

Haroon Iltaf
Muhammad Waqas

Aftab Hussain

Hamza Khaliq

Usman Dastagir
Assigned Roles
System study and technical feasibility
Detailed testing and qualification of PCB (PCB)
Integrated testing (Testing)

Bulk BOM Costing


BOM Finalization and Verification (PCB)

Measurement of motor parameters


RPM testing
Protections
RF remote

Design
Manufacturing
Assembly

Assembly (PCB)
Measurement of motor parameters
RPM testing
Protections
Assembly (Mechanical)

Assembly (PCB)
Detailed testing and qualification of PCB
BOM Finalization and Verification
Measurement of motor parameters
RPM testing
Protections

RF remote
Integrating testing

PCB Layout
BOM Order
PCB Manufacturing
PCB Layout designing

System Research and technical feasibility


Detailed testing and qualification of PCB (Control PCB)
Detailed testing and qualification of PCB (Main PCB)
PCB Layout (Control PCB)
PCB Manufacturing (Control PCB)
PCB Layout (Main PCB)
PCB Manufacturing (Main PCB)
PCB Manufacturing (PCB)

Bulk BOM Costing in pending


BOM Finalization and Verification (Control PCB) in pending
BOM Order (Control PCB) in pending
BOM Finalization and Verification (Main PCB) in pending
BOM Order (Main PCB) in pending
BOM Finalization and Verification (PCB) in pending
BOM Order (PCB) in pending

Understanding of inputs and outputs


Testing with load and no load
Inverter section
Charging section
Testing with load, no load and protections
Understanding of inputs and outputs
Testing with load and no load
Programming and debugging
Integrated testing

Assembly (Control PCB)


Assembly (Main PCB)
Assembly (Mechanical)
Circuit Schematic Reversing (PCB)
Assembly (PCB Layout)

Assembly (Control PCB)


Circuit Schematic Reversing (Main PCB)
Assembly (Main PCB)
Detailed testing and qualification of PCB (Main PCB)
Testing with load, no load and protections (Testing)
Assembly (PCB)
Detailed testing and qualification of PCB (PCB)

Detailed testing and qualification of PCB (Control PCB)


Detailed testing and qualification of PCB (Main PCB)
Detailed testing and qualification of PCB (PCB)
Circuit Schematic Reversing (Control PCB)
BOM Finalization and Verification (Control PCB)
Circuit Schematic Reversing (Main PCB)
BOM Finalization and Verification (Main PCB)
Circuit Schematic Reversing (PCB)
BOM Finalization and Verification (PCB)

Assembly (Control PCB)


Assembly (Main PCB)
Assembly (PCB)

LCD / Other parts selection


Chasis Design
Prototype Manufacturing
Assembly

Understanding of inputs and outputs (Software)


Testing with load and no load (Software)
Programming and debugging (Software)
Integrated testing (Testing)
Defence R&D
Active Projects (In Progress)
S. No Project Project status Team Lead Team Members
1 Scanner Project
1.1 In Progress Ayaz Zakir M. Umair Akhtar

1.2 Memoona Farooq

1.3 Usman Qazi


1.4 Huzaifa
1.5 Babar (FPGA Consultant)
1.6 Sajid Javed

1.7 Hamza Khaliq (Mechanical)

1.8 Bilal Umer (PCB)


1.9
2 Connecto Project In Progress Ayaz Zakir Asfandyar

2.1 Falah

2.2 Nazim

2.3 Mohsin

2.4 Rizwan

2.5 M. Umair Akhtar

2.6 Zawar khan


2.7 Hamza Khaliq
2.8 hassan, Waqas, Azmat
2.9 Irfan Ullah
2.11 Usman Qazi

2.10 Bilal Umer (PCB)

3 DF Antenna In Progress Ayaz Zakir Dr Umar Khan

Memoona Farooq

4 Spoofer Design In Progress Ayaz Zakir Irfan Ullah

Pause Projects
1 Radio LCLOS Design Pause Ayaz Zakir
2 Rapiguard Upgrade Pause Ayaz Zakir
Completed Projects
1 RTMS Completed Ayaz Zakir Muhammad Umair
Dr Umar Khan
Assigned Roles

RF Switch Design

Antenna design GPS, WIFI

PCB Reverse/design
Algo Designer
Embedded Designer
Algo Designer

CAD designer

PCB designer

Embedded Designer Lead

Vocoder Section

MCU code designer

GUI designer

RTOS Implementation

Transceiver, PA designer

Network design
CAD designer
Assembly
Network design (Part time)
Network design

PCB designer

Team Lead

Antenna Array designer

Spoofer design
WG Filter design
9-Dec-2022
Status

Switch design complete but not tested yet


WIFI antenna received, and tested successfully
GPS Antennas ordered but not received yet
Schematic Prepared but verification pending

Freq Scanning & DF algos verified on Matlab


Implementation on FPGA is in progress

Antenna Arms Fabrication done and received


Mechanical Assembly febrication in process
Dpending on Sr. No. 1.3 Output

Team lead
Compression / Decompression of voice
Dev board implementation completed
STM32 integration is in process
RF section verification with transceiver througn STM32 code done
Documentation of transciever radio driver code

UI/UX integration with STM32 code implemented and testing done


Icons, Key board embedding in STM32 code in process

Basic RTOS understanding and implementation done


Real time sensors integration in STM32 through RTOS in process
Transceiver and PA testing completed. Both functioning successfully
Testing report prepration is in process
Customised network stack design in progress
Chassis design of Connecto Radio first prototype completed
Assisting in assembly and integration, soldering in process
Physical layer in network stack implementation completed
802.11AH implementation in Matlab in Process
Connecto 1st prototype PCB Version 1 completed
Connecto 1st Protoype PCB Version 1.1 in Design Process

Antenna designed completed


Antenna febrication in process
Calibration data generation in process

Satellite signal generation through USRP in process