COLUMN :1 1/2"(40mm)
W1
3. TOP ROD BEAM :1"(25mm)
SLAB :3/4"(20mm)
8. LAP LENGTH OF BARS : 50Ø, AT COLUMN LAPPING PROVIDE 4"
D1 D1 D1 SPACING OF TIES, NO LAPPING ALLOWED AT BEAM-COLUMN JOINT.
2 9. DEVELOPMENT LENGTH (Ld) FOR REINFORCEMENT BARS
E IN COMPRESSION : 40Ø E
28'
IN TENSION : 50Ø
10. IN CASE OF BEAM REINFORCEMENT, NO LAPPING SHALL BE ALLOWED
3' 3' B/5 B/10 IN FOLLOWING PLACES
1'-3"
(a) TOP ROD NEAR COLUMN, L/4 ON EITHER SIDES OF COLUMN
(b) TOP ROD OF CANTILEVER BEAM ALONG THE LENGTH AND
D1
3' B/3 B/10
c
W1
16'-3"
c/3
S3
c/5
3'
11. REMOVAL OF SHUTTERING / FORM WORK
℄ (a) COLUMN : 24 HOURS
b/5
(b) BEAM SIDES : 24 HOURS
b/3
3'
W1
(c) BEAM BOTTOM : LESS THAN 6M SPAN : 14 DAYS
3' : MORE THAN 6M SPAN: 28 DAYS
1'-3"
(d) SLAB : LESS THAN 20'SPAN : 14 DAYS
b
W1 : MORE THAN 20'SPAN : 28 DAYS
b/3
1 MD
b/5
W1 HOWEVER 7 DAYS STRENGTH OF CONCRETE SHOULD BE 65% OF THE
℄ TARGET STRENGTH, TO REMOVE FORM WORK.
D 12. THIS BUILDING IS DESIGNED FOR GROUND FLOOR. D
a/5
B/10
a/3
3' B/3
3'
a
UP
3' 3' B/5 B/10
1'-3"
22'-1012"
a/10
a/10
3'
8'-9"
℄
A B1'-3"
℄ ℄ ℄
TERRACE FLOOR SLAB LAYOUT
TYPICAL ONE WAY SLAB REINFORCEMENT DETAILING
LINTEL BEAM TO DETAIL
Y8@8"c/c
2Y10 Y8@5"c/c
C C
6"
3"
3'
CONTRACTOR
TYPICAL SECTION OF LOFT / LINTEL
CUM SUNSHADE DETAILS
b
b/3
b/3
b/3
b/5
b/5
b/5
B CLIENT B
a/5
a/5
a/5
a/3
a/3
a/3
SCHEDULE OF SLABS FIRST FLOOR SLAB LAYOUT & REINFORCEMENT
DETAIL
DETAILS
SLAB NO THICKNESS SHORTER SPAN LONGER SPAN A/10 A/5 B/3 B/5 C/3 C/10
REMARKS
REINFORCEMENT REINFORCEMENT Er.Y.BOOPATHI M.E(Struct), M.I.S.T.E,
a
a/10
a/10
a/10
a/10
a/10
DRAWN CHECKED APPROVED
A Date 16-06-2021 A
AS KR Y.BOOPATHI Paper A3
A B C Size
Rev.no R0
℄ ℄ ℄ ℄
DRAWING NO:- YB-210xx-ST-01
Sheet.no (01 OF 02)
TYPICAL TWO WAY SLAB REINFORCEMENT DETAILING
1 2 3 4 5 6 7 8 9 10