“Draft for Remarks”

TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LIMITED


From
To
Er. T. Thamotharan., B.E.,MBA.,
The Chief Engineer,
Superintending Engineer,
Hydro, TANGEDCO,
TANGEDCO,
144, Anna Saalai,
Generation Circle, Tirunelveli-11.
Chennai-2.
Er.S. Ananthanarayanan, ME.,MIE.,
Superintending Engineer(I/c),
Hydro/RMU, Coimbatore-12.

Lr No: SE/Hydro/RMU/F. Kodayar PH 1 RMU/EE/Mech/Drg.No 183 /D.No: /2022 Dt:14.12.2022.

Sir,
Sub: TANGEDCO – Hydro – Generation Circle / Tirunelveli - Specification No. HE-2367-
Renovation, Modernization and Up rating (RMU) of Kodayar PH-1 from 1 x 60 MW to
1 x 70 MW– Revised document / Drawing of “Arrangement of Fire Fighting System
for Hydro Generator (Rev:01) / Drawing No. 02500020703 & Calculation for
Fire Fighting System (Hydro Generator) HGE-KOD-CAL-01 Rev:00 Furnished by
M/s BHEL – Scrutinized - Submission of remarks – Regarding.

Ref: 1) Specification No. HE-2367,


2) LOI Lr.No. CE/H/SE/H(E)/EE/HRM/A4/F.LOI-Kodayar PH-I.RMU.HE-2367 / D.No.62 /
2020 dt.09.03.2020,
3) Contract agreement executed on 22.10.2020,
4) Document on “Arrangement of Fire Fighting System” for Hydro Generator (Rev:00) /
Drawing No. 02500020703 Dt: 26.10.2022.
5) Lr. No: CE/H/SE/H(E)/EE/HRM/A4/F. Kodayar PH-I.RMU./ F. 183/ D. 720 / 2022 dt.
17.11.2022
6) E mail from M/s BHEL - “Arrangement of Fire Fighting System for Hydro Generator /
Drawing /Doc No. 02500020703 dt: 10.12.2022 Rev: 01) & Calculation for CO 2 Fire
Fighting System HGE-KOD-CAL-01 Rev:00
***

The revised document & reply for the reference cited (5) and the additional document of
“Calculation for Fire Fighting System”- (Hydro Generator) furnished by M/s BHEL vide
ref (6) were reviewed and the remarks are as follows.

Sl.No. TANGEDCO’s Clarification BHEL’s Reply TANGEDCO’s Remarks

1. In the Legend for layout of CO2 Fire Corrected in Found Correct.


Fighting Equipment, the quantity for revised drawing ACCEPTABLE.
Bleeder Valve is mentioned as 2 Nos,
instead of 4 Nos as shown in the
drawing No. 02500020703
2. The Calculation and control philosophy Calculation In page 3 of 5, A (i) CO 2
with logics and tripping for the CO2 Fire submitted for flooding factor taken as
Fighting system for the Hydro Generator reference 1.33 Kg/m3 from sl no (i)
shall be furnished for further scrutiny. of table -3 in IS-6382 is
not acceptable, as it is for
“Dry electrical wiring
insulation hazards in
general” (ie for cables,
cable galleries etc., in
general).
Sl No. (ii) In table 3 of
IS-6382 “small electrical
machines, wire enclosures
under 57m3 ” is only
applicable . This shall be
taken for calculation.

Hence, M/s. BHEL shall be addressed to submit the revised calculation and drawings as
per IS-6382.

SD/---DT:17.12.2022
Superintending Engineer(i/c), Superintending Engineer,
Hydro-RMU-Coimbatore Generation Circle, Tirunelveli.