THERMOFLOW GT MASTER
THERMOFLOW PEACE
THERMOFLOW E-LINK
AGENDA
- GT MASTER in depth
- PEACE
- Green tabs in GT PRO and GT MASTER
- Impact of selection on cost but not on thermodynamics
- Different outputs
- E-LINK
- Connection of all programs to Excel
- Use of E-LINK as alternative to Macros
1
Goal of Computer Model?
• Produce New Design
(Little information few limitations)
• Produce Model like a Proposed Design
(Much information match P,T, m of several
streams )
• Produce Model of Existing Plant
(More information match conditions and
hardware)
• Or ….?
2
Modeling, generally …
3
New Design …
Use GT PRO
4
Existing Plan for Plant …
Use GT PRO
& GT MASTER
5
Existing Plant …
Use GT PRO
& GT MASTER
6
GUIDELINES to AVOID PITFALLS in GT MASTER
GT PRO Preparations
Design in GT PRO at ambient and operating modes close to mean
operating conditions. (You may wish to explore how different the
design might be at other operating conditions.)
Include in your GT PRO design equipment like chillers and duct
burners, even if they are not in operation at the mean operating
condition, so as to provide for their inclusion in GT MASTER.
Perform the GT PRO design with the number of gas turbines that
constitute a block.
Establish all steam turbine ports that might ever be needed within the
GT PRO design, as GT MASTER will not accommodate adding a port.
Ensure that there will be adequate steam flow through all steam turbine
sections at all expected loads.
GTPM Conversion
Use the manual conversion to re-size pipes and steam turbine groups if
you anticipate large changes in their steam flow rates (generally for
cogeneration systems only).
7
Design vs. Simulation (Off-design)
PIPE PRESSURE DROPS
GT PRO P = {pre-set percentage} of P downstream,
initialised by the Wizard, but adjustable in Piping Losses menu.
PEACE Estimates length, diameter, schedule, number & types of fittings,
and selects materials. Estimates labour & costs.
GT MASTER P = k PRC v m2
m = present mass flow rate
v = mean specific volume = ( vin + vout ) / 2
k = unit conversion constant
PRC = {Pipe Resistance Coefficient} quantity with dimensions
of (Length)-4 constant, initialized in GTPM,
user-adjustable in Piping Losses menu
PEACE P = f (Length, Diameter, Number & types of fittings)
all physical parameters may be changed by the user, program finds pressure drop and
cost.
9
RESISTANCE
CHARACTERISTICS
BOILER
CHARACTERISTICS Closing
throttle valve
Operating point
10
STEAM TURBINE RELATIONS
STODOLA’S ELLIPSE
Pexit
2
A
m v/P 1
c Pinlet
dry step m v/ P
f
dry step @design m v / P @design
d r y s te p 1 x
f o r x x W ils o n lin e
11
PRESSURE - FLOW - AREA RELATIONS
In GTPM, solve for A for each group:
m v/P 1
A *
k P
2
1 exit P
inlet
m v/P
FF design m v / P design in units of L2
k
12
P Sliding P Throttle Control
P P
Multiple Valve Controls
Nozzle Control
MVL LVP
M M
13
a
e' d'
b
c
Closing throttle shifts d
Resistance Characteristic
in this direction e
14
GTmaster menu shape is different:
GTMaster (horizontal)
GTPro (vertical)
15
GTMaster has some more items in the “View Menu”
GTMaster GTPro
different name
same function
16
Main HPT V5
bleed process Piping
Desup.
V5 contr ols main HPT
bleed pr essure
Desup. Desup.
First HP Second H P
substrea m substrea m
P2 Piping
V2 P1
HP FW
17
Main LPT V6
bleed process Piping
Desup.
V6 contr ols main LPT
bleed pr essure
Desup. Desup.
First LP T Second L PT
substrea m substrea m
HPT LPT
First IP Second I P
substrea m substrea m HP steam
V13
Desup. Desup. Desup. Control gear
downstream of HPT L
V4 controls LPT inlet
P Piping pressure
V3
IP FW
V3 controls P
IPE IPB IPS and IPB pressue
18
Main LPT V6 V6 contr ols main LPT
bleed process Piping
bleed pr essure
Desup.
V7 used to control P
if uncontrolled LPT inlet
Desup. Desup. pressure is inadequate
First LP T Second L PT V7
substrea m substrea m
HPT LPT
First IP Second I P
substrea m substrea m
HP steam
Desup. Desup. Desup.
V13
V4 V8 V13 controls either LPT inlet
P Piping pressure or Main IP process
presssure
Main IP process V4 fully open V8 controls P
if LPT inlet pressure
is adequate
IP FW
19
Control gear
LPTA1
Desup.
V9 LP induction
LP process
Piping
D/A
V10
LP FW
20
V14 controls LP process presssure
V14
LPTA1
Desup.
V9 V10 LP extraction
P LP process
D/A
V11
LP FW
21
GT MASTER Bar Menu
22
GTPro and GTMASTER Help
Just in GTPro: check for new release
Entire manual
23
GT MASTER Outputs (similar to GTPro)
Graphics Output
PEACE Output
Multiple Runs
Re-design in GT-PRO
24
GTPM (Transition Module)
25
GTPM (Transition Module)
26
GTPM (Transition Module)
Clicking on items:
27
GTPM (Transition Module)
28
GTPM (Transition Module) - 2
29
GTPM (Transition Module)
30
GTPM (Transition Module)
31
GTPM (Transition Module)
32
GTPM (Transition Module)
33
GTPM (Transition Module)
34
Result from GTPM (Transition Module)
Compute in order
to freeze data
35
GT MAST ER 25.0 T F-User Net Power 48354 kW
LHV Net Heat Rate 8335 kJ/kWh
LHV Net Efficiency 43.19 %
0.99 p
30 T 1X Siemens SGT -800-47 425.5 m 73.53 %N2
60 %RH (Physical Model #449) 13.06 %O2
1.01 p
417.4 m 3.363 %CO2
18.41 p 17.67 p 561 T
40265 kW 9.158 %H2O
450 T 1281 T 425.5 M
0.8856 %Ar
0.98 p
30 T
417.4 m
9113 kW
CH4 8.053 m
LHV= 111950 kWth 69 p
82 T 25 T 535 T
72.49 M 55.44 M
95 T 1.209 p
105 T
1.367 M
1.361 M
72.48 M
55.44 M
4.905 p 209 T
70.56 p 537 T
4.5 p 148 T 72.14 M V4
4.14 M
V8
5.253 p 105 T
4.14 M
74.51 p
151 T
LT E LPB IPE2 IPB HPE2 IPS1 HPE3 HPB1 HPS0 HPS1 HPS3
Plant Criteria
Miscellaneous Assumptions
37
GT MASTER “Plant criteria” Menu
Main Steam Piping Losses
38
GT MASTER GT Inputs
GT Main Inputs
Reselect GT: the load of the new GT must be between 75%-
125% of the load of the original GT !!
Part load must be carefully considered
Steam injection (if existing in GT PRO) may be modified
Pressure drops correction factors may be modified
39
GT MASTER - ST Inputs
ST Main Inputs
ST Leaks
Generator
40
GT MASTER - ST Process
Radiant Boiler
41
GT MASTER - HRSG Process
42
GT MASTER - Water Circuits
Pumps
Water Accounting
43
GT MASTER - Cooling System
Condenser Hardware
Condensate Options
44
GT MASTER Control Loop
1p
16 T
506 m
31605 kW
CH4 9.273 m
LHV= 128910 kWth 55 p
39 T 25T 28 T 485 T
107.4 M 102.6 M
95 T 0.0689 p
1.209 p 39 T
105 T
106.2 M
0.8786 x
2.038 M
2.018 M
107.3 M
0.02 M
3.71 M
5.9 p 222 T
56.92 p 487 T
39 T
6.762 p 105 T
60.68 p FW
159 T
LT E LPB IPE2 IPB HPE2 IPS1 HPE3 HPB1 HPS0 HPS1 HPS3
88 T 546 T
516.9 M 515.2 M
1.047 m^3/kg1.209 p 1.209 p 6.566 p 6.566 p 59.55 p 6.313 p 58.92 p 58.92 p 58.1 p 57.49 p 56.92 p 2.314 m^3/kg
150.3 m^3/s 95 T 105 T 157 T 162 T 232 T 224 T 269 T 274 T 345 T 416 T 487 T 331.2 m^3/s
107.4 M 2.018 M 107.3 M 3.71 M 103.6 M 3.71 M 103.6 M 102.6 M 102.6 M 102.6 M 102.6 M
134 134 142 142 186 200 200 260 261 294 294 575 617 617 648 648 677
Includes DB CH4
1.664M
p[bar], T [C], M[t/h], Steam Properties: IAPWS-IF97 46
LHV 23135 kWth
1987 09-03-2015 14:15:21 file=C:\T F\Прочее\T raining Seminars\2015 Singapore\GT P-GT M\GT P2101.GT P
2
1p
16 T
506 m
31601 kW
CH4 9.273 m
LHV= 128910 kWth 55 p
39 T 25T 28 T 485 T
107.4 M 102.6 M
95 T 0.0692 p
1.203 p 39 T
105 T
106.3 M
0.8786 x
2.028 M
2.008 M
107.4 M
0.02 M
3.759 M
5.903 p 222 T
56.92 p 487 T
39 T
6.635 p 105 T
0.011 M
0.011 M
60.68 p FW
159 T
LT E LPB IPE2 IPB HPE2 IPS1 HPE3 HPB1 HPS0 HPS1 HPS3
88 T 546 T
516.9 M 515.2 M
1.046 m^3/kg1.203 p 1.203 p 6.438 p 6.438 p 59.64 p 6.332 p 58.91 p 58.91 p 58.38 p 57.71 p 56.92 p 2.314 m^3/kg
150.2 m^3/s 95 T 105 T 157 T 162 T 232 T 224 T 269 T 274 T 346 T 416 T 487 T 331.2 m^3/s
107.4 M 2.008 M 107.4 M 3.759 M 103.6 M 3.759 M103.6 M 102.5 M 102.5 M 102.5 M 102.6 M
134 134 142 142 185 200 200 260 261 294 294 575 617 617 648 648 677
Includes DB CH4
1.664M
p[bar], T [C], M[t/h], Steam Properties: IAPWS-IF97 LHV 23135 kWth
1987 09-03-2015 14:20:17 file=C:\T F\Прочее\T raining Seminars\2015 Singapore\GT P-GT M\GT P2101.GT M
51
Return to Inputs – “Control loops” menu
55,000 kW net – New “Results” window
52
New “Results” window
53
Now select “Diverted exhaust” as lower control
Again 55000 kW net
54
New “Results” window
Save file as GTP2103.gtm
55
PEACE - A member of a comprehensive family!
PDE
PDE
GT
GT PRO
PRO Imports heat balance design from:
>> PDE
>> GT PRO
GT
GT MASTER
MASTER >> GT MASTER
PEACE
PEACE
56
PEACE COST ESTIMATION
HEAT BALANCE INPUTS &
RESULTS
PEACE INPUTS
Location & Site Preliminary
Information engineering
calculations to size
Technical Options equipment and
& Features estimate materials
In GT PRO In GT MASTER
• Find preliminary engineering & cost • Find preliminary cost & details
details of fully defined plant (with
• Identify unreasonable projects & controls etc)
optimise good ones • Find Cost and Engineering
• Export Bill of quantities and Costs details of modifications and
to Excel for the basis of definitive effect on heat balance
lists • Specify and optimise full detail
• Cross-check other estimates of pipework, pumps &
• Find cost of extra features at the performance effects
concept stage- e.g. dual fuel • Note: Specify added features
capability in GT PRO first (e.g.duct
• Note: every run with changed burner)
conditions is re-designed
58
INTENDED USE OF GT PRO & GT MASTER with PEACE
REVISE
Plant Performance & Cost
Plant Type
Nominal Ambient Conditions Plant Performance at
GT PRO Design Point
Gas Turbine Selection
Desired Process Steam Flows
Other User Specifications
PEACE Inputs
INITIAL PLANT DESIGN
Refine and “Freeze” Hardware
in GTPM
REVISE
EVALUATE AND REVISE
THE PLANT DESIGN USING A SERIES
Plant Performance at
OF SIMULATIONS COVERING : GT MASTER Specified Conditions
Controls to Satisfy Power and/or Process
Expected Range of Process Steam Flows
Expected Range of Ambient Conditions Plant Performance & Cost
PEACE Inputs
In “GT Inputs”
In “HRSG Inputs”
In “Cooling system”
In “ST Input”
IN “Economics”
60
PEACE
Load file GTP0601 Focus on PEACE results
- Schematics
(2D and 3D) Preliminary Engineering
- Equipment data
- Cost report
Financial
- Cash flow
61
PEACE
Schematics (2D and 3D)
1 2 3 4 5 6 7 8
FOR QUALITATIVE INDICATION ONLY
E
A A
B B
C A C
D D
B
E E
D C
Thermoflow, Inc. Company: DSENERGY S.R.L.
User: dr.ing. Aldo de'Bonis -D820-
SHAPE, DIMENSIONS & SCALE ARE APPROXIMATE GAS TURBINE PACKAGE
ELEVATION
F Drawing No:
F
11.9 m 3.4 m 8.5 m 3.5 m 12.7 m - - - - -
1 2 3 4 5 6 7 8
PEACE/GT PRO 18.0.2 dr.ing. Aldo de'Bonis -D820-
File = G:\01 Milano 16-20 giugno 2008\01 GTP-GTM-PCE training\FILES GTP-GTM-PCE Milan June 08\GTP0601.gtp
62
PEACE
Equipment data
63
PEACE
Cost report
64
PEACE
- Cash flow
65
Focus on Link to Excel
66
Other sources of help
• The Guidance window at the bottom of the screen
• The GT PRO and GT MASTER manuals
• HELP: press <F1> or Help on menu bar
• Tutorials – visit our web site www.thermoflow.com
• Contact THERMOFLOW