TRA - Rotary Equipment Erection
TRA - Rotary Equipment Erection
Risk Assessment
TASK RISK ASSESSMENT FOR ROTARY EQUIPMENT Sub Cont. Number : JI2037 / 04-02B Revision : O2
Title:
ERECTION AND ALIGNMENT
Potential Risk
(With no controls Residual
Hazards Risk
(Potential to cause Hazard Effects / in place) Legal
Sequence of Ranking
harm (Health, Consequences (The Requireme (with Recovery
Sl. Tasks /Job
Risk Rating
Probability
Injury, Property harm which could nts Measures
(1,2,3,4,5)
(1,2,3,4,5)
Control Measures
Severity
No Steps controls in
damage, possibly occur) (If Any) place)
environment etc.)
1. Collision of Property damage Ministerial SPCM shall be conducted before Site First
Personal Injury Decision No. start of activity Aid
vehicle
Transportatio 286/2008
Overturning, Regulation Approved traffic management plan PSJV &
n of Fatality
run over of shall be communicated to concern Towell
equipment Occupationa personnel LOW
Mechanical Chemical Spillage Emergency
l Safety and 6
and its failure Response
3 3 9 Health for As per overhead clearance necessary
accessories procedure to
Dust Establishme for equipment, the transportation route
Fire & nts shall be selected be followed
Explosions
Make sure the planned transportation Emergency
route is not blocked or diverted before contact:
Fuel / oil spill mobilizing the trailer samar+968
96763927
Vehicle Trailers transporting abnormal size
Collision shall be enclosed by vehicle with
PSJV
Straying of hazard lights
Hotline:
material +968
Transportation of Wide/big load that
Not wearing cause road block /obstruction shall 94804704
seat belt be coordinated and permission must
be taken from relevant authority Medical
emergency:
EPC 2 – DUQM REFINERY PROJECT
MEI Package – 2, PSJV
+968
Ensure vehicle is in a good and road 92726855
worthy condition
Hotline:
Double eye protection- Safety goggles +968
and face shield for extra protection of 94804704
eyes shall be used during chipping
activity Medical
Eye wash station shall be provided emergency:
+968
MSDS shall be available at site 92726855
Ear muff and dust mask shall be used
7. Preservation of Incompetent Property Damage 3 3 9M Conduct “STARRT” meeting prior to Site First
rotary personals start activity Aid
equipment’s Personal Injury Low 4
PSJV &
Pinch point Competent personals only can carry Towell
caught out the task Emergency
between the
rotating parts Response
Appropriate hand gloves shall be
(Manual worn while greasing and oil handling procedure to
EPC 2 – DUQM REFINERY PROJECT
MEI Package – 2, PSJV
rotating) be followed
Oil and Grease “MSDS” shall be
Chemical conveyed to the workforce and placed Emergency
hazards in work area contact:
samar+968
Oil spillage Ensure spill kit readily available at 96763927
work place in case of oil spillage
Defective
tools Use appropriate tools (spanner, PSJV
hammer etc..) for opening flanges Hotline:
Sharp edges and covers +968
94804704
Slip, trip, falls Tools shall be free from oil and
Grease in order to avoid slip
Work At Height Fall from Fatality Shall follow PSJV PTW system
8. on height Site First
( Scaffold Injury Engage only certified Scaffolder, Low 6 Aid
platform / Fall of Ministerial Access ladder shall be at 75 degree,
Decision No.
PSJV &
permanent materials 5 3 15 free of damages, properly secured at
EPC 2 – DUQM REFINERY PROJECT
MEI Package – 2, PSJV
platforms) Property Damage 286/2008 both ends and rungs are oil free Towell
Improper H Regulation Emergency
access and of Use only green tagged & validated
Occupationa Response
egress scaffolds, work on more than 1.8 m procedure to
l Safety and
Health for use double lanyard safety harness,
be followed
In complete Establishme and maintain 100% tie off.
scaffolding nts
Use safety harness along with basic Emergency
Un authorised and other job specific PPE contact:
entry samar+968
Do not allow ill/unhealthy person to 96763927
Loose carry out job on scaffolding
materials PSJV
All tools tied with tag lines, materials Hotline:
stacked properly, scaffold not +968
overloaded 94804704
9. Working on Fall from Personal Injury Man, lift shall be inspected by PSJV Site First
MEWP for height and certified by the third Party Aid
alignment Property Damage 4 3 12 Low
PSJV &
Lifting Lug & Collision Operator shall be certified by the third- Towell
Sling removal Fatality M party certifying authority. 6
Emergency
Overturn
Response
ear plug and ear muff should use to
Falling object prevent the hearing loss procedure to
be followed
Mechanical Mobile phone on working at height is
Failure of prohibited for workers Emergency
Equipment contact:
samar+968
Sharp Edges 96763927
of Thread Operatives must wear Full body harness
during Work. with double lanyard anchored to basket
PSJV
with 100% tie off at safe anchor
Hotline:
High noise designated point.
+968
due to the
torqueing Full body harness required periodic 94804704
machines. inspection and colour coded
Medical
Never exceed the SWL of lift emergency:
(Including numbers of workers. +968
92726855
material and tools)
tools and Improper ear Hearing Ensure air compressor is inspected by Emergency
equipment( Exa thing impairment PSJV. Response
mple-Air 4 3 12 procedure to
Electrocution
Compressor) Defective Fire extinguisher should place with air be followed
for Steel Portable Power compressor
structural Bolt tools
Tightening Emergency
activity contact:
Defective Flash arrestor and safety pin (F pin)
should provide for each and every samar+968
Electrical
Equipment hose connection which connect with 96763927
(Welding the air compressor
machine, PSJV
Generator, Ensure the air hoses must be colour Hotline:
tower light etc.,) coded +968
94804704
High Noise Ensure diesel generator and welding
generator inspected by PSJV. Medical
Unauthorized emergency:
power tools. Do not use any faulty electrical +968
equipment. 92726855
High Voltage
Never use any power
tools/equipment
with defective or incomplete
guards/protective covers
12. Opening of Falling 4 3 12 Obtain PTW prior to start work Low Site First
floor/grating personals Personal Injury H 6 Aid
“STARRT” meeting to be conducted PSJV &
Falling objects Property Damage before starting to work at Site Towell
Emergency
Unsecured Musculoskeletal Response
openings disorders Evacuate the people from underneath
of the floor opening area procedure to
Pinch point be followed
Fatality
Ensure barricade and signage
Carry over underneath of floor opening area prior Emergency
load to start work contact:
samar+968
Awkward Wear full body harness maintain 96763927
position while 100% tie off and hock at proper
opening anchorage point
PSJV
Hotline:
Slip, trip, falls Once floor opened, protect the floor
+968
opened area by hard barricade and
place appropriate signage 94804704
Ergonomic
effects Medical
Protect pinch point while opening and emergency:
manual handling +968
92726855
EPC 2 – DUQM REFINERY PROJECT
MEI Package – 2, PSJV
13. Painting Improper Sickness 3 3 M Paint, solvents and toxic substances LOW 4
(manually by handling 9 shall be store in proper ventilated and Site First
brush and Personal designated area Aid
roller) Air borne Injury PSJV &
particulates MSDS shall be display at the storage Towell
Respiration area Emergency
Exposure to problem
Response
paint products, Place fire extinguisher at paint storage
solvents, lead areas procedure to
Skin/eye be followed
and other toxic irritation
substances Fire extinguisher shall be third party
certified Emergency
EPC 2 – DUQM REFINERY PROJECT
MEI Package – 2, PSJV
flammable or contact:
combustible Fire extinguisher shall be monthly Pritam:
materials inspect and colour code by the +968 9201
accordance of PSJV 2562
Skin and eye
irritant MSDS shall be follow while handling the
paint materials
PSJV
Fumes
Hotline:
Personals shall be undergo chemical
fire handling training +968
94804704
Appropriate mask shall be wear
Medical
Do not paint on hot surface emergency:
+968
Maintain housekeeping and 92726855
ensure combustible and flammable
materials should not available on
painting area
M
Proper storage area shall be provided
to keep all tools and materials
1 2 3 4 5
SEVERITY Never Heard of in Incident has Happens Happens several
heard EPC industry occurred in several times times per year in
People Assets Environment Reputation
of in EPC tesco projects per year in a location
industry tesco
projects
EPC 2 – DUQM REFINERY PROJECT
MEI Package – 2, PSJV
4
Minor health Minor Minor Limited LOW RISK
2 2 6 8 10
effect / injury damage effect impact
9
Major health Localised Localised Considerable MEDIUM RISK
3 3 6 12 15
effect / injury damage effect impact
Permanent total
disability or Major Major National 12 16
4 1 fatality 4 8 20
damage effect impact (ALARP) HIGH RISK
Permanent total
disabilities or Extensive Massive International
5 multiple fatality 5 10 15 20 25
damage effect impact
Reputation
EPC 2 – DUQM REFINERY PROJECT
MEI Package – 2, PSJV
2 Limited impact Some local public concern. Some local media and political attention may effect company’s operations
Regional public concern. Extensive adverse local media attention. Adverse stance of local government / action
3 Considerable impact
groups.
National public concern. Extensive adverse attention in national media. Regional / national policies with
4 National impact
potentially restrictive measures and impact on grant of licenses etc
International public concern. Extensive adverse attention in international media. National / international
5 International impact
policies with potentially severe impact on access to new areas, grant of licenses etc
EPC 2 – DUQM REFINERY PROJECT
MEI Package – 2, PSJV
LOW RISK Acceptable, however task should be reviewed to establish if risk can be reduced further
(1-6)
HIGH RISK Task must not proceed. The hazard should be eliminated or further control measures put in a place to reduce the risk to
(15-25) tolerable level. The controls should be re-assessed for adequacy prior to task commencement.
EPC 2 – DUQM REFINERY PROJECT
MEI Package – 2, PSJV
LIST OF ATTENDEES