PROJECT

REKAYASA
DESIGN EXECUTION

Activities Expert Judgement


Personnel Bottom – Up Execution
Time Vendor Bid Execution
Deliverables Analogues Execution
Acceptances Parametric Execution
2

PROJECT
REKAYASA
DESIGN EXECUTION

Activities Expert Judgement


Personnel Bottom – Up Execution
Time Vendor Bid Execution
Deliverables Analogues Execution
Acceptances MONEY Parametric Execution
3

Questions
THE PERSONNEL
• How many personnels ?
• What are the competencies ?
• How long the experties ?
• Which are the disciplines ?
• Which are the decision should be taken ?
THE DELIVERABLES
• What kind of deliverables ?
• Which are the list of deliverables ?
• Which are the scopes
DESIGN (REKAYASA) EXECUTION
Oil and Gas, Petrochemical, Power Plant, Infrastructure, Industry etc.

DOCUMENT RESOURCES

1. Personnel
1. Specification (Engineer, Designer, Drafter)
2. Datasheet 2. Facility
3. Procedures INTERDISCIPLINARY (Rate & Software)
3. Expertise
4. Equipment Manual
5. Main Parameters
CHECK (IDC) (Competency & Professional)

DRAWING MTO

1. GA Drawing
1. Steel Structure
2. Modular Drawing (Fabrication)
2. Welding (Consumable, Tools)
3. Assembly Drawing
3. Piping (Pipe, Fitting, Valve)
4. Erection Drawing
4. Electrical (Equipment, Cable, Gland, Junction, Bulk)
5. Piping/Spool Drawing
5. Mechanical (Valve, Equipment)
6. Single Line Diagram
6. Instrumentation (Cable, Gland, Junction, Bulk)
7. Instrument/Control Diagram
7. Corrosion (Cathode Protection)

Muhammad Ade Irfan, ASEAN towards Industry 4.0, AFEO, Beijing 2019
5

DESIGN (REKAYASA) SCOPE


• DESIGN SERVICES (bentuk layanan)
• DELIVERABLE LIST (bentuk keberterimaan)
• PERSONNEL (Designer)
• SCHEDULING (alokasi waktu)
• MANPOWERS (tenaga kerja, etc)
• DESIGN STUDIES (kajian atau riset pendukung)
• DESIGN WARRANTY (jaminan hasil)
• PROJECT MANAGEMENT (tim eksekutor)
• FACILITIES (sarana dan prasana pendukung)
• SOFTWARE
• PC OR NOTEBOOK
• OFFICES
• ACCOMMODATION (COFFEE, TEA, SNACK, LUNCH)
• TRANSPORTATION
• TAX, THRK, BONUS
• INSURANCE BENEFITS (HEALTH, PENTION, WORK ACCIDENT)
• CONSUMPTIONS (PAPERS, INKS)
• OVERTIMES
6

SCHEDULING
7

FACILITIES (INDIRECT COST)


No. DESCRIPTION CONDITION UNIT
01. SOFTWARE RENTAL/LEASING MONTH
02. PC/NOTEBOOK/MAINFRAME OWNED LOT
03. OFFICE RENTAL/OWNED YEAR
04. CONSUMABLE (PAPERS, PURCHASING SHEETS/LOT
COFFEE, TEA, SNACK)
05. INTERNET RENTAL GBYTE
06. SERVER OWNED GBYTE
07. TRANSPORTATION RENTAL/OWNED MONTH
08. PARKING LOT RENTAL OFFICE MONTH
Ʃ IDR
8

WAGE (DIRECT COST)


No. DESCRIPTION CONDITION UNIT
01. TAKE HOME PAY PERSONNEL IDR
02. INCENTIVES PERSONNEL IDR
(TITLES)
03. INCENTIVES PERSONNEL IDR
(PROJECTS)
04. INCENTIVES PERSONNEL IDR
(ABSENCES)
05. INCENTIVES (MEAL) PERSONNEL IDR
06. FAMILIY K1, K2, K3 IDR
Ʃ IDR
9

SURVEYING
• MOB – DEMOB
• TRANSPORTATION
• PERSONNEL (SURVEYOR)
• PRE-LAY SURVEY : SUITABLE ROUTE FOR PIPELINE
• PRE-INSTALLATION SURVEY :
• SURVEY TOPOGRAPHY
• SURVEY BATHIMETRY
• SURVEY SEABED GEOLOGY
• EXISTING FACILITIES
• POST-INSTALLATION SURVEY :
• UNBURIED PIPELINE
• EXACT FINAL LOCATION
• ASBUILT DRAWING
10

DESIGN FLOWS (ALUR REKAYASA)

1. Acceptance Criteria
2. Nonconformance Tolerance
3. Compliance

Basic Criteria Detail


Survey Penawaran
Design Design Design

1. Standard & Code 1. Mechanical Facility


2. Order of Precedence 2. Piping Facility
3. Dimensional 3. Electrical Facility
4. Scope of Work 4. Instrumentation Facility
5. General Reference Data 5. Civil and Structural Facility
6. Processing Facility 6. Specialty Item
7. Supporting Facility
8. Mechanical Facility
9. Piping Facility
10. Electrical Facility
11. Instrumentation Facility
12. Civil and Structural Facility
11

ENGINEERING DOCUMENTS

Document Drawing
Calculation GA Drawing 3D Drawing
Analysis Support Drawing PDMS
Studies Foundation Drawing Aveva
Technical Specification Plot Plan Drawing Ex-Steel
Datasheet Key Plan Drawing
Equipment Lay-out
Cable Tray Routes
Cable Routes
Building
Piping Routes Personnel
Instrument Hook-Up
Competencies
Isometric Piping
SLD Electrical Experience
Loop Diagram
PROJECT
REKAYASA
DESIGN EXECUTION

Activities Expert Judgement


Personnel Bottom – Up Execution
Time Vendor Bid Execution
Deliverables Analogues Execution
Acceptances Parametric Execution