This 3 sentence summary provides the key information from the electro-fusion joint inspection report:
The electro-fusion joint inspection report documents the inspection of 20 electro-fusion joints on a pipeline project, recording details of each joint such as pipe dimensions, alignment, batch numbers, welding and cooling times, and visual observations. The report identifies the client, contractor, third party inspection agency, and welder information for quality control and validation purposes. Inspection results are summarized and the report is signed by representatives of the contractor and inspection agency.
This 3 sentence summary provides the key information from the electro-fusion joint inspection report:
The electro-fusion joint inspection report documents the inspection of 20 electro-fusion joints on a pipeline project, recording details of each joint such as pipe dimensions, alignment, batch numbers, welding and cooling times, and visual observations. The report identifies the client, contractor, third party inspection agency, and welder information for quality control and validation purposes. Inspection results are summarized and the report is signed by representatives of the contractor and inspection agency.
This 3 sentence summary provides the key information from the electro-fusion joint inspection report:
The electro-fusion joint inspection report documents the inspection of 20 electro-fusion joints on a pipeline project, recording details of each joint such as pipe dimensions, alignment, batch numbers, welding and cooling times, and visual observations. The report identifies the client, contractor, third party inspection agency, and welder information for quality control and validation purposes. Inspection results are summarized and the report is signed by representatives of the contractor and inspection agency.
This 3 sentence summary provides the key information from the electro-fusion joint inspection report:
The electro-fusion joint inspection report documents the inspection of 20 electro-fusion joints on a pipeline project, recording details of each joint such as pipe dimensions, alignment, batch numbers, welding and cooling times, and visual observations. The report identifies the client, contractor, third party inspection agency, and welder information for quality control and validation purposes. Inspection results are summarized and the report is signed by representatives of the contractor and inspection agency.
Eff Date: 12/20/2021 Project Client Contractor TPIA PO No GA : Date: Report No: City / Town / Village : Location : EF Machine Details Pipe Fitting Detail Heating Cooling Sr. Locatio Welder Name & Training Pipe O.D. Alignment Batch No./ Machine Sr Calibration Joint No Time Time Visual Observation No. n Make Make Model No Validity Dt. Clamp Used Lot No. No Due Dt Sec. Min. 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Remarks Contractor TPIA AG&P Sign Name Date