Professional Documents
Culture Documents
Metrics Specification Template
Metrics Specification Template
Forecast Changes:
Anticipated Change When
Reviewers:
This document must be reviewed by the following:
Name Signature Title / Responsibility Date Version
Approvals:
This document must be approved by the following:
Name Title / Responsibility Date Version
Distribution:
As Reviewers and Approvers, above.
Document Status:
This is a controlled document.
Related Documents:
These documents will provide additional information.
Contents:
NB. This requirement specification should be read in conjunction with the SPECIALTY Feasibility
Report issued following workshop 2
Screen 1: - top level
Screen 2:
Sample report
Report style
COTE DASHBOARD - GAUGE DEFINITIONS (from workshop requirements document)
Drill down to Drill-
MetricID ScreenID GaugeID Sub-gauge ID screen (S) / down Metric
report (R): target ID
Data item - See note 1 below regarding definition of data timespans Number / percentage Display type Sub-display type DataSourceID
Data Processing
Requirements e.g.
Frequency Data Obtained (Yes/No)
Weighting
algorithm
Notes
Non-Functional Requirments:
Introduction
Requirements
ID Non-functional Category Local Requirement Description
Data Feeds
Anonymisation
Pseudonymisation
Disaster Recovery
Availability
Availability
Performance
Volumes
Volumes
Volumes
Supported Environment & Licensing
Accessibility/Usability
Reference and Meta Data
Security
Error Handling
Audit
Data Retention and ILM
Training
Documentation
Environments
Online Help
Multiple Organisations
SOR Ref Notes
SPECIALTY DASHBOARD - REPORT DEFINITIONS
Drill-down
MetricID ReportID GaugeID Metric Display type
Fields and description
Notes
DataSourceID Area of work
Source data system Load Area
List of Data Sources and the Metrics supported:
If incremental data feed is specified then details of an initial data
load and the spec for this must also be documented if required. If no need then this should be explicitly documented. For consistency all
weekly updates will be processed on the same day.
Pipe delimited Scheduled load via MSBI Details to be confirmed None Incremental
text file Master Load Job
Initial load for go-live -
number of days data Frequency Target load time
Weekly <10 mins