The document provides weight details for a bucket including the weight of the empty bucket, the lifting frame, lifting device, manpower, and expected concrete weight. The total weight during operation with a full 1 cubic meter bucket of concrete is calculated to be 2869.68 kg.
Kontrol Suspension Bridge Panjang = 50 m Lebar = 1.5 m Ukuran kabel (main cable = IWRC 22mm B.J Kayu (asumsi) = 860 kg/m3 Beban Hidup = 100 kg/m2 σijin kayu Kls III = 60 kg/m2
The document provides weight details for a bucket including the weight of the empty bucket, the lifting frame, lifting device, manpower, and expected concrete weight. The total weight during operation with a full 1 cubic meter bucket of concrete is calculated to be 2869.68 kg.
The document provides weight details for a bucket including the weight of the empty bucket, the lifting frame, lifting device, manpower, and expected concrete weight. The total weight during operation with a full 1 cubic meter bucket of concrete is calculated to be 2869.68 kg.
The document provides weight details for a bucket including the weight of the empty bucket, the lifting frame, lifting device, manpower, and expected concrete weight. The total weight during operation with a full 1 cubic meter bucket of concrete is calculated to be 2869.68 kg.
Weigth Bucket (OD) : 20213.67 Kg Leg 4 Unit (H = 1.5 m) : 37.14 Kg Weigth Bucket (ID) : 19950.30 Kg Bracing 4 Unit (L = 1.7 m) : 42.09 Kg Weight Bucket : 237.03 Kg Platform Weight : 39.62 Kg assumption 0.90 % from total cylidrical shape Total Weight Frame : 118.85 Kg
A Shape Lifting Device Manpower Weight
Hollow 10.5 (L = 3 m) : 13.80 Kg 1 Person : 100.00 Kg Total Weight Lifting Device : 13.80 Kg Total Weight Frame : 100.00 Kg
Kontrol Suspension Bridge Panjang = 50 m Lebar = 1.5 m Ukuran kabel (main cable = IWRC 22mm B.J Kayu (asumsi) = 860 kg/m3 Beban Hidup = 100 kg/m2 σijin kayu Kls III = 60 kg/m2