Battery BOX

Quick Installation Manual


SPH3000-6000TL BL-UP Quick Guide
1. Overview 3. Connecting cables
Please prepare the cable before connecting as follows.
Number Cable name Type Recommend module Notice:
1 grounding cable Single multi-core yellow-green copper cable Cable diameter≥AWG10 1.Lithium battery has its own power line and
Two or three different color multi-core copper communication line, so use them.
2 AC output cable Cable diameter≥AWG10 2.Hybrid inverter include the basic
cables
3 PV input cable Photovoltaic dedicated cable(such as PV1-F) 4mm² - 6mm² communication line. So use them directly.
3.Please make sure all the switches off
4 Battery power cable Red and black multi-core copper Cable diameter≥AWG6 before connection. For your safety, please
/ do not operation when power on.
5 Other communication cable CAT5E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
3.1 Grounding 3.2 AC GRID and UPS output connection
1.Front panel 2.Double color LED 3.LCD screen 4.Push button 5.Wall hole
1 2 3
6.Magnetic devices 7.Heat sink 8.PV switch 9.PV connector 10.Grounding screw
11.EPS connector 12.Reserved hole 13.AC grid connector 14.USB port 15.communication ports
16.DIP and Dry connector 17.Batterypower terminal
Pressure Seal Ring Threaded
screw Connection
Note: sleeve
terminal
1. This file will be updated from time to time due to product upgrades or other reasons. Unless otherwise agreed, this document is intended
as a guide only. All information and suggestions do not constitute an express or implied warranty. The final interpretation of the content is at 4 5
Growatt.
2. This document is for quick guidance installation only. For details, please refer to the User Manual.
3. Machine damage caused by failure to follow the content is not covered by the warranty.

Screw up connector Release AC connector

2. Installation
1 2 3
System Overiew 2.1 Installation requirements
The following diagram shows the AC
Hybrid Inverter output terminal of the Australian machine
PV Array
connection steps, EPS output terminal
Battery
≥300mm 565 connection steps consistent with the
188
above steps.

138 532
E PS Grid
4 5 6
mm
DC
≥300mm ≥300 ≥300mm
DC
Breaker
AC
Breaker Breaker 461.5
200
588
AC
Breaker Electrical Gri 16.5
AC
Breaker
Sensor

E PS AC
Load Load ≥300mm

3.3 DC connection
2.2 Wall mounting
L line

CT
5m
3.3.1 PV input terminal installation
10m
1 2 3 Positive metal terminal
L,N
5m
L,N
Positive metal terminal
Electic meter
8- 10 mm
Notes:
Note: Be careful : Avoid water
1.The installation of this hybrid system needs and electricity pipes
to comprehensively consider the position of when punching holes in
the battery and the power collector. the wall, otherwise it may
2.You can choose CT or electric meter to be dangerous. Negative metal terminal
connect to the inverter. If there are strict 8-10 mm Please make sure cable can't put out
Negative metal terminal from terminal after pressing. Pull the PV cable make sure there
requirements on the limited output power, it is
is no loosen or shaking.
recommended to use an electric meter.
4 5

2.3 Monitoring device installation Lock nut to ensure


fastening.
1 2 3

Follow the installation


The Inverter Side
The Inverter Side steps:
Up
1.Remove the USB
waterproof cover.
USB 2.Plug in the
USB Make sure the cable
communication module.
ON
polarity is correct.
3.Lock the communication
module.
3.3.2 Plug in PV terminal
1
5. On off hybrid inverter 6. Status of hybrid inverter
2
Notes: Customer can read more information by push button. Follow are the
PV+ 1.Please make sure the PV input Notes: instruction of button and LED.
voltage/current not beyond the specification
Before power on, please make sure all of the voltage and current
before plug in. Mark Description Explanation
2.When installing the PV terminal, pay are in the range of specification of hybrid inverter. Otherwise it
attention to the distinction between the will be damage to hybrid inverter.
positive and negative terminals and the one- Follow are the steps of turn on actions:
1.Turn on PV switch. Operation of display screen and
to-one correspondence between the Push-button
terminals and hybrid inverter. 2.Turn on the switch between Grid and hybrid inverter.. set system
3.When the terminal is docked, there is a 3.Turn on the switch between battery and hybrid inverter and
PV-
click sound. After the terminal is docked, wake up battery.
gently pull the PV cable to observe whether 4.If need to setup hybrid inverter. Please turn to user manual of Green light on SPH run normally
the terminal is shaking or not. hybrid inverter for detail description.
5.The shutdown steps are opposite to the above order. Red light on Fault state
Status symbol Green light
3.3.3 Battery power line connection of SPH Alarm state
blinking
Installation steps as follow: Red light 1.Bypass state
1.Pass the battery power blinking 2.Software updating
cables through the tightening
nut, waterproof rubber plug
and waterproof cover.
2.Press OT terminal at the end
of cables.
3.Connect the power cable to
hybrid inverter. Be careful the
7. Example diagram of N-wire grounding method
polarity.
4.Be careful not to tighten the
tightening nut at this time. After Diagram A Diagram B
all the communication cables
are installed, tighten them
together.
SPH Inverter SPH Inverter
On grid EPS On grid EPS
3.3.4 Communication cables installation
PE N L PE L N PE N L L N
1 2 3
Rj45 Pressure Threaded Rj45 Battery Battery
termimal screw sleeve termimal E -BAR
ATS
NTC L L
485-1
N N
485-2 PE E -BAR
PE
CAN E -N Link
DRM
VPP
When all the communication E -BAR
Battery wire Seal ring Waterproof cover CT1/METER1 lines are installed, push the
PE N L PE L N
waterproof cover into the PE N L PE L N
4 5 6 bottom, lock the screws fixed Home EPS Home EPS
to the frame, and finally lock Load Load Load Load
the waterproof cap.
SPH3000-6000TL BL -UP wiring diagram SPH3000-6000TL BL -UP wiring diagram

Note: Note:
This diagram A is an example for grid system without special This diagram B is an example for Australian and New Zealand
requirement on electrical wiring connection. grid system where neutral line can't be switched.
Note: Note:
CT1/MERTER1 We suggest you choice the AC breaker of specification You must choose a Type A RCD breaker with the rating residual
40A/230V and the DC breaker of specification 25A/780V(PV) or current more than 300mA.
120A/70V(BAT).

4. Post-installation check

Number Acceptance Criteria Number Acceptance Criteria 8. Service and contact


Shenzhen Growatt New Energy Co., Ltd
shineWiFi-X or shinelink-X or shine4G-X is installed 4-13/F,Building A,Sino-German(Europe) Industrial Park,
1 Hybrid inverter is installed correctly and firmly 2
correctly and firmly. Hangcheng Ave, Bao'an District, Shenzhen, China
T +86 0755 2747 1942
Cable wiring is reasonable, meets the E service@ginverter.com
3 4 The ground wire confirms the connection and is reliable.
requirements, no broken skin, etc. W www.ginverter.com

5 All switches off 6 All wires are correct and securely connected. Download Growatt New Energy
Manual
7 Cable tie port trimming, no sharp corners, etc. 8 All exposed terminals are well protected, no vacant ports.

9 Pay attention to packing all the residual materials.

GR-UM-179-A-02

You might also like