Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KETERANGAN :

Mutu beton = K.300 nfa

SOG = SLAB ON GROUND


SFL = STRUTUR FINISHING LEVEL
FFL = FLOOR FINISHING LEVEL

GUDANG 36. ESTEGRA

PT.ESTETIKA GRIYA SARANA


Estegra

POTONGAN KUDA-KUDA
SKALA 1 : 15

PT.ESTETIKA GRIYA SARANA


General Contractor

Estegra

SHOP DRAWING

POTONGAN KUDA-KUDA
DETAIL A DETAIL B
SKALA 1 : 10 SKALA 1 : 10

You might also like