Cooling Tower Pump P-11445B Inspection Action Plan Report: Contents
Cooling Tower Pump P-11445B Inspection Action Plan Report: Contents
Date: 1/6/2022
Contents:
1- Pump Data
2- Problem Description
3- Our plan for check
4- Inspection Measurement
5- Procedure Plan
6- Tools – Equipment
7- Time Period
8- Manpower Required.
9- Conclusion & Recommended
1-Pump Data
RPM: 1489
Head: 60 M
Flow Rate: 1400 M3 / hr.
Model: 20 ENL-2
Bowl Diameter :20 inch
impeller Type: E (Enclosed)
Bowl Model Type: N
Impeller Model Designation: L
No of Stage: 2
2-Problem:
pump shutoff pressure decreases from 10 bar to 4.5 bar.
3-Our plan to check the following points
Inner diameter of First stage suction bell wear ring
Outer diameter of first stage impeller wear ring
Diameter of housing of Protective collar in first stage
Outer diameter of protective collar in First Stage
Shaft axial play
Fist stage impeller status
Shaft sleeves condition
And the Result of checking will be as the following:
4-Inspection Measurement
1St impeller
inner Diameter
@1 =62.15 Dis
@3 =62.13 Suc
2nd impeller
inner Diameter
@1 =62.02 Dis
@3 =62.02 Suc
Shaft
diameter :61.8
4 mm
corrosion 62-
61.84=.16mm
Shaft
diameter :61.8
4 mm
corrosion 62-
61.84=.16mm
Shaft
diameter :61.8
5 mm
corrosion 62-
61.85=.15mm
2nd bowl sleeve
Discharge side:
69.4mm
69.31mm
Shaft
diameter :61.8
5 mm
corrosion 62-
61.85=.15mm
12 2nd impeller Cracks found
Status in 5 points
intermediate 6
7
2.75
3.17
8.95
8.85
(310 B)
(Thickness
survey)
Corrosion No Suction Discharge side
side
1 7.5 8.9
diffuser 2
3
7.1
6.55
8.3
8.5
vanes in bowl 4
5
7.5
7
8.25
8.8
Top (310 A) 6
7
6.8
6.87
8.69
9.19
At discharge side
6-Tools:
Chain Block :2, Puller, slings :4, hand tools, Micrometer.
Equip:
Mobile Crane 120 Ton
7-Time Period:
2 days (48 hr.)
8-Man power Required:
1 Engineer + 2 Rotary Tech + 1 Helper
So, we need new Wear rings for impeller and bowl at both stage