Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Doc. No.

-F03(AL/P/QMS/04)
AARM INDIA Origin Date: 02.08.2021
Rev. No. :00
INTERNAL AUDIT CHECKSHEET
Eff. Date: 02.08.2021
Department: Quality Date: 05.12.2022
Audit No: AI/QA/22/01 Auditee: Bhuwan
Previous NC Status: Auditors: Ravinder

(Judgement)
Sr. No. Clause No. Questions C/OFI/NC/NA Observations

1 i Previous NC's Details with their verification

2 ------- ii Customer Specific requirement

3 iii Internal Complaint Details

Context of the organization

Has the quality department identified external and internal issues that
1 i
can affect customer satisfaction and quality of products and/or services?
4.0

2 iii Are needs & expectations from these interested parties identified and
documented?

Organizational Roles, Responsibilities & Authorities

3 i Are Job descriptions documented with responsibilities to deliver intended


outputs?
5.3

4 ii Roles Responsibility define for every designation in Quality department ?

Actions to Address Risk & Opportunities

5 i Are techniques / methods used to identify risks and opportunities?

6.1
Doc. No.-F03(AL/P/QMS/04)
AARM INDIA Origin Date: 02.08.2021
Rev. No. :00
INTERNAL AUDIT CHECKSHEET
Eff. Date: 02.08.2021
Department: Quality Date: 05.12.2022
Audit No: AI/QA/22/01 Auditee: Bhuwan
Previous NC Status: Auditors: Ravinder

(Judgement)
Sr. No. Clause No. Questions C/OFI/NC/NA Observations
6.1

6 ii Are risks and opportunities categorized per their severity of their impact?

Resources
i Has MSA plan and MSA report is available?

Has the organization define list of instrument, calibration and action


ii
7 7.1 define when instrument are in calibraiton?

iii Has the Quality department Lab scope define ?

Awareness

i
Are employees aware of quality objectives, Policy and requirement
need for Quality department ?
8 7.3

ii
Are employees aware of the impact of nonconformance, Customer
requirement ?

Communication

9 7.4 i
Is internal and external communication define for the
communication ?

Documented Information
Doc. No.-F03(AL/P/QMS/04)
AARM INDIA Origin Date: 02.08.2021
Rev. No. :00
INTERNAL AUDIT CHECKSHEET
Eff. Date: 02.08.2021
Department: Quality Date: 05.12.2022
Audit No: AI/QA/22/01 Auditee: Bhuwan
Previous NC Status: Auditors: Ravinder

Sr. No. Clause No. Questions (Judgement) Observations


C/OFI/NC/NA

10 7.5 i
Are quality system procedures & work instructions documented
and identified?

Release of product and service

i Is control plan available and verfiy their control for part ?

Set up approval report verify for Part no.12010811, Date


Is Process established for incoming , inprocess and final quality -28.11.2022 , Daily inspection report QA/FM39, Hold on
C speed % required - 10+ 2, Actual found - 11, Hold on
inspection ? time required - 1 Sec, Actual - 1 Sec, Cycle time defined -
35 Sec, Actual - 35 Sec. Result found satisfacotry.

11 8.5 & 8.6


Are all personnel, performing monitoring and measurement,
trained and competent?

Customer and supplier property is properly preserved and


identified.

ii Process define for Layout inspection and layout report ?

Control of nonconforming outputs


Doc. No.-F03(AL/P/QMS/04)
AARM INDIA Origin Date: 02.08.2021
Rev. No. :00
INTERNAL AUDIT CHECKSHEET
Eff. Date: 02.08.2021
Department: Quality Date: 05.12.2022
Audit No: AI/QA/22/01 Auditee: Bhuwan
Previous NC Status: Auditors: Ravinder

Sr. No. Clause No. Questions (Judgement) Observations


C/OFI/NC/NA

i
Is there a procedure that defines the marking and identification of
non-conforming material? Is there evidence of compliance?

ii
Process verify for rework and rejection control. Rejection analysis
available for control ?

iii Rework and repair risk are identified in FMEA and control plan ?
12 8.7

Is there a procedure that defines disposition options and conditions


iv of non-conforming material (scrap, rework, return, use as is,
deviate)? Is there evidence of compliance?

Is there a procedure that describes how re-work will be


v accomplished and documented and is there evidence of
compliance?

Performance evaluation
Is there a system / procedure for the collection of manufacturing
13 9.1.3 i performance (i.e., SPC, Internal PPM, defect rate)? Is there
evidence of implementation?

Non conformity and corrective action

i
Are procedures defined as guidelines to handling any complaint
receive from internal or external ?
Doc. No.-F03(AL/P/QMS/04)
AARM INDIA Origin Date: 02.08.2021
Rev. No. :00
INTERNAL AUDIT CHECKSHEET
Eff. Date: 02.08.2021
Department: Quality Date: 05.12.2022
Audit No: AI/QA/22/01 Auditee: Bhuwan
Previous NC Status: Auditors: Ravinder

(Judgement)
Sr. No. Clause No. Questions C/OFI/NC/NA Observations

ii
Does organization have complaint summery report and CAPA/ 8D
for complaint clouser ?
14 10.2

iv
Is there evidence that the corrective action has been fully
documented?

v
Is there evidence that the preventive action has been fully
documented? .

15 10.3 i
Is there evidence for improvement plan or continual
improvement ?

C : Complies
OFI: Opportunity For Improvement
NC: Non Conformance
MNC: Manjor Non conformance
NA: Not Applicable
s

You might also like