Urban Governance and Devepolment Program, Emerging Towns Project

UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures

Measurements
As per Approved Cross Section As Built
Ch : 0+320 to 0+360 ( Slope Side) Ch : 0+320 to 0+353.50 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)

3.00 17.395 52.185


10 (2.5+3)/2 3.2351 32.351 14.2 0.19 2.698
10 (3+2.5)/2 6.4702 64.702 11.95 (1.82+1.69)/2 (1.05+1.23)/2 23.908
- - (3.0+3.2)/2 15.03 46.593 -61.9296
- - 2.50 12.803 32.008
12.05 - - 0.132 1.5906
Total QTY. 97.053 Total QTY. 158.9826
Drawings
Ch : 0+340to 0+360 Ch : 0+335 to 0+353.50
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures

Measurements
As per Approved Cross Section As Built
Ch : 0+590 to 0+600( Slope Side) Ch : 0+590 to 0+600.7 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 2.01 1.8455 18.455 10.7 11.20 2.45 27.44

-8.985

18.455 Total QTY. 27.44


Drawings
Ch : 0+340to 0+360 Ch : 0+335 to 0+353.50
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures

Measurements
As per Approved Cross Section As Built
Ch : 0+230 to 0+300( Slope Side) Ch : 0+235 to 0+300 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 2.01 1.8455 18.455 10.7 11.20 2.45 27.44

-8.985

18.455 Total QTY. 27.44


Drawings
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures

Ch : 0+340to 0+360 Ch : 0+335 to 0+353.50


Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures

Measurements
As per Approved Cross Section As Built
Ch : 0+230 to 0+300 ( Slope Side) Ch : 0+230 to 0+300 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)

10 2.5 2.7273 27.273 10 2.50 11.87 29.675


10 (2.5+1.5143)/2 2.1208 21.208 12.15 2.60 13.304 34.5904
10 0.9 2 18 20.1 2.7 22.663 61.1901
10 0.9 2 18 5.5 2.675 2.675 7.155625 -48.130125

Total QTY. 84.481 Total QTY. 132.611125


Drawings
Ch : 0+340to 0+360 Ch : 0+335 to 0+353.50
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures

Measurements
As per Approved Cross Section As Built
Ch : 0+320 to 0+360 ( Slope Side) Ch : 0+590 to 0+353.50 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
3.00 17.395 52.185
14.2 0.19 2.698
11.95 (1.82+1.69)/2 (1.05+1.23)/2 23.908
40.00 - - (3.0+3.2)/2 15.03 46.593
- - 2.50 12.803 32.008
12.05 - - 0.132 1.5906
Total QTY. 158.9826
Drawings
Ch : 0+340to 0+360 Ch : 0+335 to 0+353.50
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
0+000 to 0+100 (Slope Side)
Varies
Quantity Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Length (M) Breadth (M) Height (M)
(m3) (M2) (M3)

10 5.21 52.1
10 6.31 63.1
10 1.81 18.1
10 1.54 15.4
10 1.84 18.4
10 0.56 5.6
10 6.31 63.1
10 2.17 21.7
10 4.45 44.5
10 5.75 57.5
10 7.21 72.1
Total QTY. 431.6 Total QTY. 0
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Drawings
0+000 to 0+100 (Slope Side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
0+120 (slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)

10.00 11.0095 110.095

Total QTY. 110.095 Total QTY. 0


Drawings
0+120 (slope side)

Measurements
As per Approved Cross Section As Built
0+150 to 0+200 (slope side)
Varies
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 3.118 31.18
10 1.4 14
10 6.9 69
10 1.84 18.4
10 1.016 10.16
10 1.4013 14.013
Total QTY. 156.753 Total QTY. 0
Drawings
0+150 to 0+200 (slope side)

Measurements
As per Approved Cross Section As Built
0+220 to 0+230 (slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.84 18.4
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
10 6.31 63.1

Total QTY. 81.5 Total QTY. 0


Drawings
0+220 to 0+230 (slope side)

Measurements
As per Approved Cross Section As Built
ch: 0+250 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 3.31 33.1
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Total QTY. 33.1 Total QTY. 0


Drawings
ch: 0+250 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 0+270 to 0+360 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 3.75 37.5
10 4.45 44.5
10 3.75 37.5
10 5.63 56.3
10 1.84 18.4
10 1.84 18.4
10 1.106 11.06
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
10 3.319 33.19
10 3.319 33.19
10 3.319 33.19
Total QTY. 323.23 Total QTY. 0
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Drawings
ch: 0+270 to 0+360 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 0+ 380 to 0+440 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 1.263 12.63
10 1.266 12.66
10 8.5 85
10 6.612 66.12
10 2.34 23.4
10 4.45 44.5
10 3.97 39.7
Total QTY. 284.01 Total QTY. 0
Drawings
ch: 0+ 380 to 0+440 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 0+470 to 0+530 (Slope side)
Varies
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.266
10 3.97
10 2.17
10 3.75
10 6.9
10 1.266
10 4.213
Total QTY. 23.535 Total QTY. 0
Drawings
ch: 0+470 to 0+530 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 0+560 to 0+590 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 2.174 21.74
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
10 1.54 15.4
10 5.75 57.5
10 2.91 29.1

Total QTY. 123.74 Total QTY. 0


Drawings
ch: 0+560 to 0+590 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 0+640 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 2.911 29.11
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Total QTY. 29.11 Total QTY. 0


Drawings
ch: 0+640 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 0+690 to 0+700 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 0.59 5.9
10 8.84 88.4
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Total QTY. 94.3 Total QTY. 0
Drawings
ch: 0+690 to 0+700 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 0+740 to 0+860 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.54 15.4
10 0.79 7.9
10 1.84 18.4
10 0.9 9
10 3.75 37.5
10 7.21 72.1
10 1.4 14
10 10.09 100.9
10 8.5 85
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
10 3.118 31.18
10 2.174 21.74
10 2.174 21.74
10 2.34 23.4
Total QTY. 458.26 Total QTY. 0
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Drawings
ch: 0+740 to 0+860 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 0+880 to 0+890 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 10.26 102.6
10 0.792 7.92

Total QTY. 110.52 Total QTY. 0


Drawings
ch: 0+880 to 0+890 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 0+950 to 0+960 (Slope side)
Varies
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.266 12.66
10 3.319 33.19

Total QTY. 45.85 Total QTY. 0


Drawings
ch: 0+950 to 0+960 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 1+000 to 1+050 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 0.9 9
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
10 1.54 15.4
10 0.792 7.92
10 1.69 16.9
10 ` 3.319 33.19
10 0.9 9

Total QTY. 91.41 Total QTY. 0


Drawings
ch: 1+000 to 1+050 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 1+070 to 1+080 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.54 15.4
10 2.0067 20.067
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Total QTY. 35.467 Total QTY. 0


Drawings
ch: 1+070 to 1+080 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 1+100 to 1+130 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 2.71 27.1
10 2.91 29.1
10 3.31 33.1
10 1.4 14
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Total QTY. 103.3 Total QTY. 0
Drawings
ch: 1+100 to 1+130 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 1+160 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 0.792 7.92

Total QTY. 7.92 Total QTY. 0


Drawings
ch: 1+160 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 1+190 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 3.53 35.3

Total QTY. 35.3 Total QTY. 0


Drawings
ch: 1+190 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 1+340 to 1+360 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.26 12.6
10 3.31 33.1
10 2.34 23.4

Total QTY. 69.1 Total QTY. 0


Drawings
ch: 1+340 to 1+360 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 1+380 to 1+420 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.137 11.37
10 7.21 72.1
10 0.9 9
10 0.9 9
10 5.75 57.5

Total QTY. 158.97 Total QTY. 0


Drawings
ch: 1+380 to 1+420 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 1+450 to 1+510 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 3.11 31.1
10 3.97 39.7
10 3.53 35.3
10 3.97 39.7
10 0.9 9
10 0.79 7.9
10 1.26 12.6
Total QTY. 175.3 Total QTY. 0
Drawings
ch: 1+450 to 1+510 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 1+670 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 1.26 12.6
0
0
0
0
0
0
Total QTY. 12.6 Total QTY. 0
Drawings
ch: 1+670 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 1+690 to 1+700 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 1.4 14
10 1.3 13

Total QTY. 27 Total QTY. 0


Drawings
ch: 1+690 to 1+700 (Slope side)

Measurements
As per Approved Cross Section As Built
Varies
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
ch: 1+730 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.13 11.3

Total QTY. 11.3 Total QTY. 0


Drawings
ch: 1+730 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 1+750 to 1+780 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
10 2 20
10 2.344 23.44
10 2.34 23.4
10 0.79 7.9

Total QTY. 74.74 Total QTY. 0


Drawings
ch: 1+750 to 1+780 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 1+800 to 1+820 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.4 14
10 2 20
10 0.59 5.9
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Total QTY. 39.9 Total QTY. 0


Drawings
ch: 1+800 to 1+820 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 1+860 to 1+890 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.061 10.61
10 1.266 12.66
10 1.3 13
10 1.26 12.6
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Total QTY. 48.87 Total QTY. 0


Drawings
ch: 1+860 to 1+890 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 2+110 to 2+190 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.03 10.3
10 2.17 21.7
10 1.98 19.8
10 2.46 24.6
10 2.91 29.1
10 8.17 81.7
10 8.17 81.7
10 3.75 37.5
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
10 0.96 9.6

Total QTY. 316 Total QTY. 0


Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Drawings
ch: 2+110 to 2+190 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 2+230 to 2+250 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 1.84 18.4
10 1.84 18.4
10 1.13 11.3

Total QTY. 48.1 Total QTY. 0


Drawings
ch: 2+230 to 2+250 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 2+310 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 1.4 14

Total QTY. 14 Total QTY. 0


Drawings
ch: 2+230 to 2+250 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 2+340 to 2+350 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 2.17 21.7
10 4.45 44.5
Total QTY. 66.2 Total QTY. 0
Drawings
ch: 2+230 to 2+250 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 2+390 to 2+410 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 1.016 10.16
10 2.174 21.74
10 1.54 15.4
Total QTY. 47.3 Total QTY. 0
Drawings
ch: 2+390 to 2+410 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 2+460 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 0.9 9

Total QTY. 9 Total QTY. 0


Drawings
ch: 2+460 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 2+510 to 2+540 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 2.17 21.7
10 2 20
10 3.75 37.5
10 2.17 21.7
Total QTY. 100.9 Total QTY. 0
Drawings
ch: 2+510 to 2+540 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 2+570 to 2+590 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.69 16.9
10 1.13 11.3
10 0.9 9
Total QTY. 37.2 Total QTY. 0
Drawings
ch: 2+570 to 2+590 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 2+610 to 2+6300 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 3.11 31.1
10 3.75 37.5
10 1.54 15.4
Total QTY. 84 Total QTY. 0
Drawings
ch: 2+610 to 2+6300 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 2+670 to 2+700 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 3.31 33.1
10 2.34 23.4
10 1.4 14
10 1.4 14
Total QTY. 84.5 Total QTY. 0
Drawings
ch: 2+670 to 2+700 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 2+750 to 2+780 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 5.75 57.5
10 1.26 12.6
10 1.4 14
10 3.52 35.2

Total QTY. 119.3 Total QTY. 0


Drawings
ch: 2+750 to 2+780 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 2+800 to 2+8500 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 1.03 10.3
10 1.69 16.9
10 3.53 35.3
10 6.9 69
10 1.84 18.4
10 1.13 11.3

Total QTY. 161.2 Total QTY. 0


Drawings
ch: 2+800 to 2+8500 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 2+890 to 2+900 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 3.11 31.1
10 2.71 27.1

Total QTY. 58.2 Total QTY. 0


Drawings
ch: 2+890 to 2+900 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 2+980 to 2+990 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 6.9 69
10 1.54 15.4

Total QTY. 84.4 Total QTY. 0


Drawings
ch: 2+980 to 2+990 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 3+020 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 1.26 12.6

Total QTY. 12.6 Total QTY. 0


Drawings
ch: 2+890 to 2+900 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 3+070 to 3+080 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 6.03 60.3
10 6.03 60.3

Total QTY. 120.6 Total QTY. 0


Drawings
ch: 3+070 to 3+080 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 3+220 to 3+230 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 2.35 23.5
10 0.9 9

Total QTY. 32.5 Total QTY. 0


Drawings
ch: 2+890 to 2+900 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 3+250 to 3+260 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.13 11.3
10 2.25 22.5

Total QTY. 33.8 Total QTY. 0


Drawings
ch: 3+070 to 3+080 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 3+280 to 3+350 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 1.84 18.4
10 4.69 46.9
10 4.45 44.5
10 4.69 46.9
10 2.71 27.1
10 3.118 31.18
10 3.75 37.5
10 4.45 44.5
Total QTY. 296.98 Total QTY. 0
Drawings
ch: 3+280 to 3+350 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 3+380 to 3+400 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 2.35 23.5
10 2.174 21.74
10 2.006 20.06
Total QTY. 65.3 Total QTY. 0
Drawings
ch: 3+380 to 3+400 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 3+450 to 3+460 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 0.69 6.9
10 1.84 18.4

Total QTY. 25.3 Total QTY. 0


Drawings
ch: 3+450 to 3+460 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 3+480 to 3+510 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 0.69 6.9
10 3.31 33.1
10 2 20
10 1.26 12.6
Total QTY. 72.6 Total QTY. 0
Drawings
ch: 3+480 to 3+510 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 3+560 to 3+580 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 0.69 6.9
10 0.59 5.9
10 1.01 10.1

Total QTY. 22.9 Total QTY. 0


Drawings
ch: 3+560 to 3+580 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 3+700 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 4.95 49.5

Total QTY. 49.5 Total QTY. 0


Drawings
ch: 3+700 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 3+730 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 1.84 18.4

Total QTY. 18.4 Total QTY. 0


Drawings
ch: 3+730 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Measurements
As per Approved Cross Section As Built
ch: 3+750 to 3+760 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 1.01 10.1
10 2.006 20.06

Total QTY. 30.16 Total QTY. 0


Drawings
ch: 3+750 to 3+760 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 3+810 to 3+830 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M)
(M2) (M3)
10 2.91 29.1
10 1.84 18.4
10 6.31 63.1

Total QTY. 110.6 Total QTY. 0


Drawings
ch: 3+810 to 3+830 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 3+880 to 3+900 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 2.71 27.1
10 4.45 44.5
10 6.6 66

Total QTY. 137.6 Total QTY. 0


Drawings
ch: 3+880 to 3+900 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 3+970 to 3+980 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 0.79 7.9
10 6.31 63.1

Total QTY. 71 Total QTY. 0


Drawings
ch: 3+970 to 3+980 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM

Measurements
As per Approved Cross Section As Built
ch: 4+030 to 4+050 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 7.22 72.2
10 4.95 49.5
10 0.9 9

Total QTY. 130.7 Total QTY. 0


Drawings
ch: 4+030 to 4+050 (Slope side)

Measurements
As per Approved Cross Section As Built
ch: 4+070 (Slope side)
Varies
Area Av. Quantity
Length(m) Breadth (M) Height (M) Area ( m2) Quantity (m3)Length (M) Breadth (M) Height (M) (M2) (M3)
10 0.79 7.9

Total QTY. 7.9 Total QTY. 0


Drawings
ch: 4+070 (Slope side)
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Site Inventory Report of Retaining Structures
Thulsuwara to SIM
Urban Governance and Devepolment Program, Emerging Towns Project
UGDP/BAG/W/ICB/01
Baglung Municipality
Summary for Site Inventory Report of Retaining Structures
Section: Municipality Acess Road
Chainage As per design As per Build Varying Quantity
Remarks
From To Quantity (m3) Quantity (m3) (m3)
0+020 0+040 62.54 62.54 Work to commenced
0+110 0+120 10.44 10.44 Work to commenced
0+180 0+190 62 62 Work to commenced
0+340 0+360 62.09 158.982 -96.892
0+540 0+590 92.1008 28.799 63.3018
Total 289.1708 187.781 101.3898
Section: Municipality to Bholatakura
Chainage As per design As per Build Varying Quantity
Remarks
From To Quantity (m3) Quantity (m3) (m3)
0+030 52.59 52.59 Work to commenced
0+210 22.94 22.94 Work to commenced
0+240 0+320 71.885 161.765 -89.88
0+380 18 18 Work to commenced
0+440 0+460 57.9 57.9 Work to commenced
0+510 0+550 163.6 163.6 Work to commenced
0+680 43.6 43.6 Work to commenced
1+000 1+030 21.9 45.3 -23.4
1+060 15 15 Work to commenced
1+180 1+210 84.6 61.1 23.5
1+380 22.9 22.9 Work to commenced
1+430 1+440 20.3 20.3 Work to commenced
1+490 28.5 28.5 Work to commenced
1+520 7.5 7.5 Work to commenced
1+560 11.4 11.4 Work to commenced
1+590 1+600 40 40 Work to commenced
1+670 1+680 9.9 64.5 -54.6
1+760 1+820 64.7 212 -147.3
1+850 8.7 8.7 Work to commenced
1+880 1+911 34.3 94.5 -60.2
Total 800.215 639.165 161.05