AC Works - FQP
AC Works - FQP
0 AC Works- FQP DV JR
Rev. No Date Description Prepared Checked
DOCUMENT TITLE
AC Works- FQP
PROJECT DESCRIPTION
Page) -
CONSULTANT
REVISION NUMBER
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
1 INSPECTION OF INCOMING MATERIALS
Supplier's
1.2 Check the proper equipments capacity are used for unloading Visual - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.3 Check whether slings/belts are placed in appropriate place during unloading Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.4 Check the physical damages after unloading Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.5 Check the unloaded material are properly stored in the respective location Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.6 Check all the materials are properly stacked and covered Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.7 Check materails are issued to the contractors with proper issue slip Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.8 Check the proper equipments are used for movement within sites Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.9 Check the material are properly stacked upto erection Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
2 INVERTER
Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/02 MTC P* R R
Inverter Placement:
- Inverter placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/02 IR P W R
- Adequate Inverter Panel Clearance
- Base movement locking (as applicable)
Inverter Identification:
Inverter Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/02 IR P W R
Rating etc.) as per Dwg.
Page 3 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
2.3 ACTIVITIES
Inverter Pre- Commisioning INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Unused holes of gland plate are sealed Visual Torque wrench Each OEM Manual Verification at site ACE/AC/02 IR P* R R
3 TRANSFORMER
Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/03 MTC p* R R
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/03 IR P W R
Visual Inspection of Transformer Visual NA Each Dwg / Spec No Damage ACE/AC/03 IQC P* W R
Transformer Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/03 IR P W R
Visual Inspection:
3.2 Transformer Erection - No Damage, Gasket / Seal Damage
Visual NA 100% OEM Manual Good condition ACE/AC/03 IR P W R
- No Rust, Oil leakage.
- No Loose Fasteners or Loose Parts
Transformer Placement:
- Transformer placement as per dwg Visual NA 100% Dwg / Spec Verification at site ACE/AC/03 IR P W R
- Adequate Clearance available
Transformer Identification:
Name Plate Details (Electrical Rating, Vector Visual NA 100% Dwg / Spec Verification at site ACE/AC/03 IR P W R
Group, IP Rating, etc.)
IS:2026_1, OEM
Magnetic Current Test Measure Clamp meter Each Test OK ACE/AC/03 TR P* W W
Manual
IS:2026_1, OEM
Magnetic Balance Test Measure Multimeter Each Test OK ACE/AC/03 TR P* W W
Manual
IS:2026_1, OEM
Voltage Ratio Test Measure Three phase supply Each Test OK ACE/AC/03 TR P* W W
Manual
IS:2026_1, OEM
Vector Group Test Measure Multimeter Each Test OK ACE/AC/03 TR P* W W
Manual
Oil BDV Test Measure BDV kit Each IS:335, IS:6792 Test OK ACE/AC/03 TR P* W W
Service Setting of OTI & WTI Visual NA Each OEM Manual Raising Alarm ACE/AC/03 TR P* W W
All Accessories are installed as per Dwg Visual NA Each OEM Manual Dwg / Spec ACE/AC/03 IR P W R
Page 4 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Tightness of Test Tap of HV Bushing Visual Torque wrench Each OEM Manual Verification at site ACE/AC/03 IR P* R R
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/04 IR P* W R
Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/04 IQC P W R
Panel & Cabinet Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/04 IR P W R
Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/04 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/04 IR P W R
Rating etc.) as per Dwg.
Page 5 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
NIFPS panel & Signal box Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/04 NA P W RW
N2 Pipeline and assembly Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/04 NA P W RW
Tightness of Pipe connection, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/04 IR P* R R
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/05 IR P W R
Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/05 IQC P* W R
Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/05 IR P W R
Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/05 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)
Page 6 of 51
5.2 LT Panel Erection
Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/05 IR P W R
Rating etc.) as per Dwg.
LT Panel Pre-
5.3 Equipment is clean and insulators are free from
Commisioning Visual NA Each OEM Manual Verification at site ACE/AC/05 IR P* R R
dust/dirt
Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/05 IR P* R R
Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/05 IR P* R R
6 ACDB
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/06 IR P W R
Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/06 IQC P* W R
Panel Installed meets Project Spec Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/06 IR P W R
6.2 Erection
Page 7 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/06 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/06 IR P W R
Rating etc.) as per Dwg.
Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/06 IR P* R R
Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/06 IR P* R R
7 UPSDB
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/07 IR P W R
Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/07 IQC P* W R
Page 8 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/07 IR P W R
Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/07 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/07 IR P W R
Rating etc.) as per Dwg.
Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/07 IR P* R R
Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/07 IR P* R R
Page 9 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/08 MTC P* R R
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/08 IR P W R
Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/08 IQC P* W R
Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/08 IR P W R
Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/08 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/08 IR P W R
Rating etc.) as per Dwg.
Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/08 IR P* R R
Page 10 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/08 IR P* R R
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/09 IR P W R
Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/09 IQC P* W R
Panel Installed meets Project Spec Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/09 IR P W R
Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/09 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/09 IR P W R
Rating etc.) as per Dwg.
Pre-
9.3
Commisioning
Earthing: Cable Gland Earthing and Body
Visual NA Each IS : 3043 verification at site ACE/AC/09 IR P W R
Earthing (2points)
Page 11 of 51
Pre-
9.3
Commisioning
Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/09 IR P* R R
Verify IR Value of Main Bus Visual NA Each Dwg/Spec Verification at site ACE/AC/09 IR P* R R
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/10 IR P W R
Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/10 IQC P* W R
Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/10 IR P W R
Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/10 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/10 IR P W R
Rating etc.) as per Dwg.
Pre-
10.3
Commisioning Page 12 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/10 IR P* R R
Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/10 IR P* R R
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/11 IR P W R
Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/11 IQC P* W R
Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/11 IR P W R
Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/11 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/11 IR P W R
Rating etc.) as per Dwg.
Page 13 of 51
Pre-
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/11 IR P* R R
Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/11 IR P* R R
12 HT PANELS
Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/12 MTC P* R R
Availability of Tools and Equipments and
12.1 Pre-Erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/12 IR P W R
accessories
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/12 IR P W R
Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/12 IQC P* W R
Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/12 IR P W R
Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/12 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/12 IR P W R
Rating etc.) as per Dwg.
IS:2705_1, OEM
CT: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/12 TR P* W W
Manual
IS:2705_1, OEM
CT: Polarity Test Measure Galvanometer Each Test OK ACE/AC/12 TR P* W W
Manual
IS:2705_1, OEM
CT: Ratio Test Measure Primary Injection kit Each Test OK ACE/AC/12 TR P* W W
Manual
Page 14 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
1Ø Variac / Step-up IS:2705_1, OEM
CT: Knee Point Voltage Test(only PS class) Measure Each Test OK ACE/AC/12 TR P* W W
Trafo (0-3KV) Manual
IS:3156_1, OEM
PT: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/12 TR P* W W
Manual
IS:3156_1, OEM
PT: Voltage Ratio Test Measure Primary Injection kit Each Test OK ACE/AC/12 TR P* W W
Manual
IS:3156_1, OEM
CB: Circuit / Operational Checks Measure NA Each Test OK ACE/AC/12 TR P* W W
Manual
IS:3156_1, OEM
CB: Timer Test Measure Time Interval Kit Each Test OK ACE/AC/12 TR P* W W
Manual
IS:3156_1, OEM
CB: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/12 TR P* W W
Manual
IS:3156_1, OEM
CB: Contact Resistance Measurement Measure CRM Kit Each Test OK ACE/AC/12 TR P* W W
Manual
IS:3347_1, OEM
Bush Bar: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/12 TR P* W W
Manual
IS:3347_1, OEM
Bush Bar: Contact Resistance measurement Measure CRM Kit Each Test OK ACE/AC/12 TR P* W W
Manual
IS:3231_1, OEM
Relay: CT Ratio Measure Sec. Injection Kit Each Test OK ACE/AC/12 TR P* W W
Manual
IS:3231_1, OEM
Relay: Over Current Protection (3stages) Measure Sec. Injection Kit Each Test OK ACE/AC/12 TR P* W W
Manual
IS:3231_1, OEM
Relay: Earth Fault Protection (2 stages) Measure Sec. Injection Kit Each Test OK ACE/AC/12 TR P* W W
Manual
Check all Equipments Rating as per Dwg Visual NA Each Dwg / Spec Dwg / Spec ACE/AC/12 IR P* R R
Page 15 of 51
HT Panel Pre-
12.4
Commisioning
Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/12 IR P* R R
13 AC CABLING
Trench Dimension: Width & Depth, Cleanliness Measure MS Tape 100% NA Dwg / Spec ACE/AC/13 IR P W RW
Installation of tray & accessories. Measure MS Tape 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W R
Tightness of coupler / fish plate. Visual Torque wrench 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W R
Earthing for Cable Tray Visual NA 100% IS : 3043 Dwg / Spec ACE/AC/13 IR P W R
Continuity
Cable Insulation Resistance Measure Megger Each Drum IS : 1255 ACE/AC/13 TR P* W R
Satisfactory
13.3 LT Cable Laying Cable Laying in Tray with Trefoil Arrangement Measure MS Tape 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W RW
Continuity
Cable Insulation Resistance Measure Megger Each Drum IS : 1255 ACE/AC/13 TR P* W R
Satisfactory
Page 16 of 51
13.4 HT Cable Laying
13.5 LT Cable Testing Insulation Resistance Measure Megger Tester (5Kv) Each IS : 1255 Test OK ACE/AC/13 TR P* W W
Insulation Resistance Measure Megger Tester (5Kv) Each IS : 1255 Test OK ACE/AC/13 TR P* W W
Remove Copper Spiral, Semiconducting Screen Visual NA Each OEM Manual Verification at site ACE/AC/13 IR P W R
14 AUXILLARY TRANSFORMER
Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/14 MTC p* R R
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/14 IR P W R
Visual Inspection of Transformer Visual NA Each Dwg / Spec No Damage ACE/AC/14 IQC P* W R
Transformer Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/14 IR P W R
Transformer Placement:
- Transformer placement as per dwg Visual NA 100% Dwg / Spec Verification at site ACE/AC/14 IR P W R
- Adequate Clearance available
Transformer Identification:
Name Plate Details (Electrical Rating, Vector Visual NA 100% Dwg / Spec Verification at site ACE/AC/14 IR P W R
Group, IP Rating, etc.)
Page 17 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
IS:2026_1, OEM
Voltage Ration Test (in all Tap) Measure Three phase supply Each Test OK ACE/AC/14 TR P* W RW
Manual
IS:2026_1, OEM
Vector Group Test Measure Multimeter Each Test OK ACE/AC/14 TR P* W RW
Manual
Condition of silica gel Visual NA Each OEM Manual Dwg / Spec ACE/AC/14 IR P W R
Silica gel in the breather is active (Blue Color) Visual NA Each OEM Manual Verification at site ACE/AC/14 IR P* R R
15 EARTHING
Trench Dimension: Width & Depth, Cleanliness Measure MS Tape 100% NA Dwg / Spec ACE/AC/15 IR P W R
1.5times of
Conductor Overlapping Joints Measure MS Tape 100% IS : 3043 ACE/AC/15 IR P W R
Conductor width
15.2 Conductor Laying
Welded on three
Conductor Overlapped Joints Welding Visual NA 100% IS : 3043 ACE/AC/15 IR P W R
sides
Page 18 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Earth Pit Dimension: Depth, Diameter Measure MS Tape 100% IS : 3043 Dwg / Spec ACE/AC/15 IR P W R
Fix Chamber of required size with Lid Measure MS Tape 100% IS : 3043 Good condition ACE/AC/15 IR P W R
Earth Resistance Measurement Measure ER Megger Each pit IS : 3043 IS : 3043 ACE/AC/15 IR P W R
Earthing identification on Earth pit chamber Visual NA Each NA verification at site ACE/AC/15 IR P W R
16 CABLE JOINTING
Cable Jointing Kit: Type, size, make Visual NA 100% OEM Manual Approved ACE/AC/16 IQC P* W R
16.1 General
Documents Availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/16 MTC P* W R
Ensure Cable Overlap, mark the reference line Visual NA 100% OEM Manual verification at site ACE/AC/16 IR P W R
Installation of Mechnical Connectors Visual NA 100% OEM Manual verification at site ACE/AC/16 IR P W R
16.2 Installation
Apply mastic tape to produce a smooth tapered
Visual NA 100% OEM Manual verification at site ACE/AC/16 IR P W R
edge between the connector and the insulation
17.1 Incoming Material Conductors and Fasteners Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R
CT, PT & Isolator Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R
Page 19 of 51
17.2 Process
IS:2705_1, OEM
CT: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/17 TR P* W RW
Manual
IS:2705_1, OEM
CT: Polarity Test Measure Galvanometer Each Test OK ACE/AC/17 TR P* W RW
Manual
IS:2705_1, OEM
CT: Ratio Test Measure Primary Injection kit Each Test OK ACE/AC/17 TR P* W RW
Manual
IS:3156_1, OEM
PT: Voltage Ratio Test Measure Primary Injection kit Each Test OK ACE/AC/17 TR P* W RW
Manual
Check all Equipments Rating as per Dwg Visual NA Each Dwg / Spec Verification at site ACE/AC/17 IR P* R R
18.1 Pre-Erection OFC (Single mode), CAT6 & RS485 Cable Visual NA 100% NA Test OK ACE/AC/18 TR p* W RW/R
Trench Dimension: Width & Depth, Cleanliness Measure NA 100% NA Dwg / Spec ACE/AC/18 NA P W RW/R
Page 20 of 51
OFC (Single-Mode), CAT6,control &
18.3
RS485 cable Laying - For AC Side
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Cable Route Marker Available Visual NA Each NA Dwg / Spec ACE/AC/18 IR P W RW/R
Quantity & Quality of cables Report NA 100% Dwg / Spec Dwg / Spec ACE/AC/19 IR P W RW/R
Cable Installation
- Input Cable Installation (Termination /
Connector as applicable)
- Out put Cable Termination (Stripping, Visual Crimping tool 100% NA Dwg / Spec ACE/AC/19 IR P W RW/R
Termination of Street Light Poles &Flood Crimping,Lugs, Clearence)
19.3 - Cable Installed as per Spec
light Fixtures
- Proper Glands used for Termination
19.4 Street Light Testing Cable overlaping should be avoided Visual NA Random NA Verification at site ACE/AC/19 NA P W RW/R
20 Lightning Arrester
20.1 Pre-Erection Civil Works Visual NA 100% BOM/Installation Manual Dwg / Spec ACE/AC/20 DR P* W RW/R
Quantity & Quality of lighting arrester Report NA 100% Dwg / Spec/Installation manual Dwg / Spec ACE/AC/20 MTC P* R RW/R
Quantity & Quality of Earthing cables Report NA 100% Dwg / Spec Dwg / Spec ACE/AC/20 IR P W RW/R
Check Cable /GI Strip Specification Visual/Report NA 100% Spec/Supplier TR Dwg / Spec ACE/AC/20 MTC P* R RW/R
Page 21 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
20.4 Lightning Arrester Testing Cable overlaping should be avoided Visual NA Random NA Verification at site ACE/AC/20 IR P W RW/R
Visual Inspection of UPS System Visual NA Each Dwg / Spec No Damage ACE/AC/21 IQC P* W R
Location for placing UPS System Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/21 IR P W R
Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/21 IR P W R
UPS Identification:
UPS Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/21 IR P W R
Rating etc.) as per Dwg.
UPS System Pre- Tightness of connection Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/21 IR P W RW
21.3
Commisioning
Cable Identification: Cable Size, running details,
Visual NA 100% IS : 7098 part-I, IS-1255 Dwg / Spec ACE/AC/21 IR P W R
cable type
Visual Inspection of Fire Extinguishers Visual NA Each Dwg / Spec No Damage ACE/AC/22 IQC P* W R
Page 22 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
22.2 ACTIVITIES
Fire Protection System Erection INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Visual Inspection ofElectronic IP PBX Visual NA Each Dwg / Spec No Damage ACE/AC/23 IQC P* W R
Location for placing of phones. Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/23 IR P W R
Busduct Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/24 IR P W R
Busduct Placement:
- Busduct placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/24 IR P W R
- Enclosure Check
- Well Supported
Page 23 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
24.3 ACTIVITIES
Busduct Pre- Commisioning INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Winding resistance
IR Test Measure Each OEM Manual Test OK ACE/AC/24 TR P* W RW
kit
24.4 Testing CRM Test Measure NA Each OEM Manual Test OK ACE/AC/24 TR P* W RW
Torque Marking Measure Digital torque wrench Each OEM Manual Test OK ACE/AC/24 TR P* W RW
LEGENDS:
QAP-Quality Assurance Plan, MTC-Material Test Certificate, IR-Inspection Report, TR-Test Report, ELTR-External Lab Test Report, CR-Calibration Report.
IS-Indian Standard, SOP-Standard Operating Procedure. IQC- Incoming quality check, DR- Deviation report, Client - ,QA-Quality, TPIA-Third Party Inspection Agency, P-Perform, P*-Arrangement, W-Witness, RW-Random Witness, R-Review.
NOTE:
- In case of requirement of any additional activity other than mentioned in this FQP the same will be incorporated with mutual agreement before commencement of the additional activity.
- Quality of Batching and Lab Set-up (Calibration certificates) shall be taken care at site.
- ELTR - External Laboratory engaged for testing work shall be certified by government approved bodies like NABL (in case of India).
- In case of absence of MTC for Raw Materials, testing shall be carried out at NABL approved laboratory and report shall be ensured and reviewed by Quality Person at site.
- Quantum of check: Quality person at site shall check 100% for any component / operation activities started at first time. After good adherance of the first work, QA person shall follows quantum of check as mentioned in QAP.
- RW: could be performed after getting inspection call from Project team. Performed in such a way that it does not affects the construction progress at site.
- W: Test/checks which shall be carried out infornt of Client/Project Manager or his authorized representative and beyond which the work will not proceed
Page 24 of 51
PROTOCOL
INVERTER ERECTION
Location: Drawing:
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
INVERTER TRANSFORMER
Location: Drawing:
Lock of Buchholz relay and MOG, Air released air vent, keep in
16
Service position
Cable Terminals are tightened properly and unused holes of
17
gland plate are sealed properly
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
Location: Drawing:
Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP Rating
etc.) as per Dwg.
Earthing: Cable Gland Earthing and Body Earthing
8
(2points)
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
LT PANEL
Project Name: Client: Date:
Location: Drawing:
S No Item Descriptions Observations Remarks
1 Availability of Tools and Equipment and accessories
2 Completion of Civil Works
3 Foundation for placing Panels as per drawing, check line, level,
painting of inserts
4 Panel Installed meets Project Spec
5 Visual Inspection inside Panel:
6 -Panel
No Damage,
Placement:Gasket / Seal Damage, Rust
7 -Panel
PanelIdentification:
placement as mentioned in dwg
8 Panel Name Plate
Termination Details (Electrical
& connection of wire as Rating, IP
per wiring
9 connection diagram.
Proper gland termination with bimetallic lugs, spacing of
cables & dressing of cables inside
the panel.
10 Tightness of connection: Torqueing & Torque
11 Marking
Cable Identification: Cable Size, running details, cable type
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
ACDB
Location: Drawing:
Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
UPSDB
Location: Drawing:
Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
DCDB
PROJECT NAME: Client: Date:
Location: Drawing:
S No Item Descriptions Observations Remarks
Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
LDB
Location: Drawing:
Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
METERING PANEL
Location: Drawing:
Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
BATTERY
Location: Drawing:
Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
HT PANEL
Location: Drawing:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
Location: Drawing:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
Location: Drawing:
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
AC CABLE LAYING INSPECTION
Location: Drawing:
Section: REF no.
Cable From: Cable To:
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
AUXILIARY TRANSFORMER
Location: Drawing:
Check Flat form for placing transformer as per dwg, check Line,
1
orientation, height and Level
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
EARTHING
Location: Drawing:
Depth
Check Earth Pit
1
Dimension
Diameter
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
CABLE JOINTING INSPECTION
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
SCADA
Location: Drawing:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
Location: Drawing:
1 Civil Works
Cable Installation
- Input Cable Installation (Termination / Connector as
applicable)
4 - Out put Cable Termination (Stripping, Crimping,Lugs,
Clearence)
- Cable Installed as per Spec
- Proper Glands used for Termination
5 Cable Identification
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
LIGHTNING ARRESTOR
Location: Drawing:
2 Foundation of Mast
5 Cable Identification
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
UPS
Location: Drawing:
UPS Identification:
6 UPS Name Plate Details (Electrical Rating, IP Rating
etc.) as per Dwg.
9 Tightness of connection
Cable Identification: Cable Size, running details, cable
10
type
11 Earthing of UPS
Check all Earthing Connections & Connected with
12
Grid
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
Location: Drawing:
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
Location: Drawing:
Observations:
Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
BUSDUCT
Location: Drawing:
Busduct Placement:
- as mentioned in Drawing
4
- Enclosure Check
- Support Check
Signature
CONTRACTOR ACE RENEWTECH CLIENT