AC WORKS - FQP

0 AC Works- FQP DV JR
Rev. No Date Description Prepared Checked

DOCUMENT TITLE
AC Works- FQP

DOCUMENT NUMBER NUMBER OF PAGES (Excluding Title Page) -

PROJECT DESCRIPTION

CLIENT PROJECT MANAGEMENT CONSULTANT

Ace Renewtech Consulting Engineers - Tamil Nadu


KS
Approved

Page) -

CONSULTANT

neers - Tamil Nadu


FIELD QUALITY PLAN (FQP) FOR AC WORKS – PROJECT DESCRIPTION
DOCUMENT NUMBER
DATE OF SUBMISSION

REVISION NUMBER
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
1 INSPECTION OF INCOMING MATERIALS

Project requirements Supplier's


1.1 All incoming materials inspection report before entering the site Visual - Random Test Reports, MDCC & DC ACE/AC/01 P P RW
& Specifications Standards

Supplier's
1.2 Check the proper equipments capacity are used for unloading Visual - Random - - ACE/AC/01 P P RW
Standards

Supplier's
1.3 Check whether slings/belts are placed in appropriate place during unloading Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards

Supplier's
1.4 Check the physical damages after unloading Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.5 Check the unloaded material are properly stored in the respective location Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.6 Check all the materials are properly stacked and covered Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.7 Check materails are issued to the contractors with proper issue slip Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.8 Check the proper equipments are used for movement within sites Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
Supplier's
1.9 Check the material are properly stacked upto erection Visual & Dimensional - Random - - ACE/AC/01 P P RW
Standards
2 INVERTER
Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/02 MTC P* R R

2.1 Pre-Erection Availability of Tools and Equipments and


Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/02 IR P* W R
accessories
Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/02 IR P* W R
Visual Inspection of Inverter Report NA Each Dwg / Spec No Damage ACE/AC/02 IQC P* W R

Availability of Factory test reports, OEM


Visual NA Each OEM Manual Dwg / Spec ACE/AC/02 MTC P* R R
instruction manuals before start of erection

Base Frame - Fabricated as per drawing, check


Visual Auto level 100% Dwg / Spec Dwg / Spec ACE/AC/02 IR P W R
line, same level, painting of Channel
Inverter Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/02 IR P W R

Visually Inspection inside Inverter:


- No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/02 IR P W R
2.2 Inverter Erection - No Loose Fasteners or Loose Parts
- All switches operate, door closing

Inverter Placement:
- Inverter placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/02 IR P W R
- Adequate Inverter Panel Clearance
- Base movement locking (as applicable)

Inverter Identification:
Inverter Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/02 IR P W R
Rating etc.) as per Dwg.

Termination& connection of wire as per wiring


Visual NA 100% OEM Manual Dwg / Spec ACE/AC/02 IR P W RW
connection diagram.

Proper gland termination with bimetallic lugs,


Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/02 IR P W RW
spacing of cables & dressing of cables inside

Tightness of inter Bus-bar connection:


Measure Digital torque wrench 100% IS : 3764 Dwg / Spec ACE/AC/02 IR P W RW
Torqueing & Torque Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/02 IR P W R
cable type
2.3 Inverter Pre- Commisioning

Page 3 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
2.3 ACTIVITIES
Inverter Pre- Commisioning INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Inverter Earthing: Cable Gland Earthing and


Visual NA Each IS : 3043 Verification at site ACE/AC/02 IR P W R
Body Earthing

Equipment is clean and insulators are free from


Visual NA Each OEM Manual Verification at site ACE/AC/02 IR P* R R
dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/02 IR P* R R
with Grid

Unused holes of gland plate are sealed Visual Torque wrench Each OEM Manual Verification at site ACE/AC/02 IR P* R R

3 TRANSFORMER
Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/03 MTC p* R R

Availability of Tools and Equipment and


3.1 Pre-Erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/03 IR P W R
accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/03 IR P W R
Visual Inspection of Transformer Visual NA Each Dwg / Spec No Damage ACE/AC/03 IQC P* W R

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/03 MTC P* R R
instruction manuals before start of erection

C-Channel fixed for placing transformer as per


Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/03 IR P W R
drawing, check line, level, painting of rail

Transformer Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/03 IR P W R

Visual Inspection:
3.2 Transformer Erection - No Damage, Gasket / Seal Damage
Visual NA 100% OEM Manual Good condition ACE/AC/03 IR P W R
- No Rust, Oil leakage.
- No Loose Fasteners or Loose Parts

Transformer Placement:
- Transformer placement as per dwg Visual NA 100% Dwg / Spec Verification at site ACE/AC/03 IR P W R
- Adequate Clearance available

Transformer Identification:
Name Plate Details (Electrical Rating, Vector Visual NA 100% Dwg / Spec Verification at site ACE/AC/03 IR P W R
Group, IP Rating, etc.)

IS:2026_1, OEM
Magnetic Current Test Measure Clamp meter Each Test OK ACE/AC/03 TR P* W W
Manual

IS:2026_1, OEM
Magnetic Balance Test Measure Multimeter Each Test OK ACE/AC/03 TR P* W W
Manual

IS:2026_1, OEM
Voltage Ratio Test Measure Three phase supply Each Test OK ACE/AC/03 TR P* W W
Manual

IS:2026_1, OEM
Vector Group Test Measure Multimeter Each Test OK ACE/AC/03 TR P* W W
Manual

Winding resistance IS:2026_1, OEM


Winding Resistance Test Measure Each Test OK ACE/AC/03 TR P* W W
kit Manual
3.3 Transformer Testing

Megger (5Kv) 1min


IS:2026_1, OEM
IR & PI Test Measure Testing IR, 10min Each Test OK ACE/AC/03 TR P* W W
Manual
Testing PI

Marshalling box IS:2026_1, OEM


Functional check Measure Each Test OK ACE/AC/03 TR P* W W
Control Supply Manual

Oil BDV Test Measure BDV kit Each IS:335, IS:6792 Test OK ACE/AC/03 TR P* W W

Service Setting of OTI & WTI Visual NA Each OEM Manual Raising Alarm ACE/AC/03 TR P* W W

All Accessories are installed as per Dwg Visual NA Each OEM Manual Dwg / Spec ACE/AC/03 IR P W R

Page 4 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables for HV & Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/03 IR P W RW
LV Cable Boxes and Marshalling Box.

Tightness of all connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/03 IR P W RW
Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/03 IR P W R
cable type

Earthing: Main Tank, Marshaling Box & Cable


Visual NA Each IS : 3151 Dwg / Spec ACE/AC/03 IR P W R
Box
Transformer Pre-
3.4
Commisioning
Equipment is clean and insulators are free from
Visual NA Each OEM Manual Verification at site ACE/AC/03 IR P* R R
dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/03 IR P* R R
with Grid

Oil Levels in Main Tank, Conservator, MOG,


Plain Oil Level Gauge, OTI & WTI pockets and Visual NA Each OEM Manual Verification at site ACE/AC/03 IR P* R RW
Breaker

Tightness of Test Tap of HV Bushing Visual Torque wrench Each OEM Manual Verification at site ACE/AC/03 IR P* R R

Lock of Buchholz relay and MOG, Air released


Visual NA Each OEM Manual Verification at site ACE/AC/03 IR P* R R
air vent, keep in Service position

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/03 IR P* R R
unused holes of gland plate are sealed properly

4 NIFPS (NITROGEN INJECTION FIRE PROTECTION SYSTEM)

Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/04 MTC P R R

Availability of Tools and Equipment and


4.1 Pre-Erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/04 IR P W R
accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/04 IR P* W R

Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/04 IQC P W R

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/04 MTC P R R
instruction manuals, before start of erection

Foundation for placing Panels & Control cabinet


as per drawing, check line, level, painting of Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/04 IR P W R
inserts

Panel & Cabinet Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/04 IR P W R

4.2 NIFPS Panel & Control Cabinet Erection


Visual Inspection inside Panel & cabinet:
- No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/04 IR P W R
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/04 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/04 IR P W R
Rating etc.) as per Dwg.

Page 5 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

NIFPS panel & Signal box Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/04 NA P W RW

Control cabinet Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/04 NA P W RW

N2 Pipeline and assembly Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/04 NA P W RW

To be check oil drain pipe connection and


Shutter valve body conection to respective Visual NA 100% NA No Damage ACE/AC/04 NA P W R
Transformer

Earthing: Cable Gland Earthing and Body


Visual NA Each IS : 3043 verification at site ACE/AC/04 IR P W R
Earthing (2points)

NIFPS Panel Pre-


4.3
Commisioning Equipment is clean and insulators are free from
Visual NA Each OEM Manual Verification at site ACE/AC/04 IR P* R R
dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/04 IR P* R R
with Grid

Tightness of Pipe connection, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/04 IR P* R R

Verify Functional test for NIFPS panel and all


Visual NA Each OEM Manual Verification at site ACE/AC/04 IR P* R R
accessories (Sensor, & ARC detector)

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/04 IR P* R R
unused holes of gland plate are sealed properly

5 LT PANELS (If Applicable)

Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/05 MTC P* R R

Availability of Tools and Equipment and


5.1 Pre-Erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/05 IR P W R
accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/05 IR P W R

Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/05 IQC P* W R

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/05 MTC P* R R
instruction manuals, before start of erection

Foundation for placing Panels as per drawing,


Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/05 IR P W R
check line, level, painting of inserts

Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/05 IR P W R

5.2 LT Panel Erection Visual Inspection inside Panel:


- No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/05 IR P W R
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/05 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)

Page 6 of 51
5.2 LT Panel Erection

COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION


SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/05 IR P W R
Rating etc.) as per Dwg.

Termination & connection of wire as per wiring


Visual NA 100% OEM Manual Dwg / Spec ACE/AC/05 IR P W R
connection diagram.

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables inside the Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/05 IR P W RW
panel.

Tightness of connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/05 IR P W RW
Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/05 IR P W R
cable type

Earthing: Cable Gland Earthing and Body


Visual NA Each IS : 3043 verification at site ACE/AC/05 IR P W R
Earthing (2points)

LT Panel Pre-
5.3 Equipment is clean and insulators are free from
Commisioning Visual NA Each OEM Manual Verification at site ACE/AC/05 IR P* R R
dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/05 IR P* R R
with Grid

Verify CT&PT secondary link & Breaker


Visual NA Each OEM Manual Verification at site ACE/AC/05 IR P* R R
Operation

Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/05 IR P* R R

Verify Space Heater operation & IR Value of


Visual NA Each OEM Manual Verification at site ACE/AC/05 IR P* R R
Main Bus

Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/05 IR P* R R

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/05 IR P* R R
unused holes of gland plate are sealed properly

6 ACDB

Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/06 MTC P* R R

Availability of Tools and Equipment and


6.1 Pre-Erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/06 IR P W R
accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/06 IR P W R

Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/06 IQC P* W R

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/06 MTC P* R R
instruction manuals, before start of erection

Foundation for placing Panels as per drawing,


Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/06 IR P W R
check line, level, painting of inserts

Panel Installed meets Project Spec Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/06 IR P W R

6.2 Erection

Page 7 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Visual Inspection inside Panel:


6.2 Erection - No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/06 IR P W R
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/06 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/06 IR P W R
Rating etc.) as per Dwg.

Termination & connection of wire as per wiring


Visual NA 100% OEM Manual Dwg / Spec ACE/AC/06 IR P W R
connection diagram.

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables inside Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/06 IR P W RW
the panel.

Tightness of connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/06 IR P W RW
Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/06 IR P W R
cable type

Earthing: Cable Gland Earthing and Body


Visual NA Each IS : 3043 verification at site ACE/AC/06 IR P W R
Earthing (2points)
Pre-
6.3
Commisioning
Equipment is clean and insulators are free from
Visual NA Each OEM Manual Verification at site ACE/AC/06 IR P* R R
dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/06 IR P* R R
with Grid

Verify CT&PT secondary link & Breaker


Visual NA Each OEM Manual Verification at site ACE/AC/06 IR P* R R
Operation

Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/06 IR P* R R

Verify Space Heater operation & IR Value of


Visual NA Each OEM Manual Verification at site ACE/AC/06 IR P* R R
Main Bus IF ANY

Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/06 IR P* R R

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/06 IR P* R R
unused holes of gland plate are sealed properly

7 UPSDB

Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/07 MTC P* R R

Availability of Tools and Equipment and


7.1 Pre-Erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/07 IR P W R
accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/07 IR P W R

Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/07 IQC P* W R

Page 8 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/07 MTC P* R R
instruction manuals, before start of erection

Foundation for placing Panels as per drawing,


Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/07 IR P W R
check line, level, painting of inserts

Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/07 IR P W R

Visual Inspection inside Panel:


7.2 Erection - No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/07 IR P W R
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/07 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/07 IR P W R
Rating etc.) as per Dwg.

Termination & connection of wire as per wiring


Visual NA 100% OEM Manual Dwg / Spec ACE/AC/07 IR P W R
connection diagram.

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables inside Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/07 IR P W RW
the panel.

Tightness of connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/07 IR P W RW
Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/07 IR P W R
cable type

Earthing: Cable Gland Earthing and Body


Visual NA Each IS : 3043 verification at site ACE/AC/07 IR P W R
Earthing (2points)
Pre-
7.3
Commisioning
Equipment is clean and insulators are free from
Visual NA Each OEM Manual Verification at site ACE/AC/07 IR P* R R
dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/07 IR P* R R
with Grid

Verify CT&PT secondary link & Breaker


Visual NA Each OEM Manual Verification at site ACE/AC/07 IR P* R R
Operation (IF ANY)

Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/07 IR P* R R

Verify Space Heater operation & IR Value of


Visual NA Each OEM Manual Verification at site ACE/AC/07 IR P* R R
Main Bus(IF ANY)

Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/07 IR P* R R

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/07 IR P* R R
unused holes of gland plate are sealed properly

8 DCDB (If Applicable)

Page 9 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/08 MTC P* R R

Availability of Tools and Equipment and


8.1 Pre-Erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/08 IR P W R
accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/08 IR P W R

Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/08 IQC P* W R

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/08 MTC P* R R
instruction manuals, before start of erection

Foundation for placing Panels as per drawing,


Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/08 IR P W R
check line, level, painting of inserts

Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/08 IR P W R

Visual Inspection inside Panel:


8.2 Erection - No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/08 IR P W R
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/08 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/08 IR P W R
Rating etc.) as per Dwg.

Termination & connection of wire as per wiring


Visual NA 100% OEM Manual Dwg / Spec ACE/AC/08 IR P W R
connection diagram.

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables inside Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/08 IR P W RW
the panel.

Tightness of connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/08 IR P W RW
Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/08 IR P W R
cable type

Pre- Earthing: Cable Gland Earthing and Body


8.3 Visual NA Each IS : 3043 verification at site ACE/AC/08 IR P W R
Commisioning Earthing (2points)

Equipment is clean and insulators are free from


Visual NA Each OEM Manual Verification at site ACE/AC/08 IR P* R R
dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/08 IR P* R R
with Grid

Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/08 IR P* R R

Verify Space Heater operation & IR Value of


Visual NA Each OEM Manual Verification at site ACE/AC/08 IR P* R R
Main Bus

Page 10 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/08 IR P* R R

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/08 IR P* R R
unused holes of gland plate are sealed properly

9 LDB (If Applicable)

Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/09 MTC P* R R

Availability of Tools and Equipment and


9.1 Pre-Erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/09 IR P W R
accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/09 IR P W R

Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/09 IQC P* W R

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/09 MTC P* R R
instruction manuals, before start of erection

Foundation for placing Panels as per drawing,


Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/09 IR P W R
check line, level, painting of inserts

Panel Installed meets Project Spec Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/09 IR P W R

Visual Inspection inside Panel:


9.2 Erection - No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/09 IR P W R
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/09 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/09 IR P W R
Rating etc.) as per Dwg.

Termination & connection of wire as per wiring


Visual NA 100% OEM Manual Dwg / Spec ACE/AC/09 IR P W R
connection diagram.

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables inside Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/09 IR P W RW
the panel.

Tightness of connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/09 IR P W RW
Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/09 IR P W R
cable type

Pre-
9.3
Commisioning
Earthing: Cable Gland Earthing and Body
Visual NA Each IS : 3043 verification at site ACE/AC/09 IR P W R
Earthing (2points)

Equipment is clean and insulators are free from


Visual NA Each OEM Manual Verification at site ACE/AC/09 IR P* R R
dust/dirt

Page 11 of 51
Pre-
9.3
Commisioning

COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION


SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Check all Earthing Connections & Connected
Visual NA Each OEM Manual Verification at site ACE/AC/09 IR P* R R
with Grid

Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/09 IR P* R R

Verify IR Value of Main Bus Visual NA Each Dwg/Spec Verification at site ACE/AC/09 IR P* R R

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/09 IR P* R R
unused holes of gland plate are sealed properly

10 METERING PANEL (If Applicable)

Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/10 MTC P* R R

Availability of Tools and Equipment and


10.1 Pre-Erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/10 IR P W R
accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/10 IR P W R

Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/10 IQC P* W R

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/10 MTC P* R R
instruction manuals, before start of erection

Foundation for placing Panels as per drawing,


Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/10 IR P W R
check line, level, painting of inserts

Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/10 IR P W R

Visual Inspection inside Panel:


10.2 Erection - No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/10 IR P W R
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/10 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/10 IR P W R
Rating etc.) as per Dwg.

Termination & connection of wire as per wiring


Visual NA 100% OEM Manual Dwg / Spec ACE/AC/10 IR P W R
connection diagram.

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables inside Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/10 IR P W RW
the panel.

Tightness of connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/10 IR P W RW
Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/10 IR P W R
cable type

Pre-
10.3
Commisioning Page 12 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Earthing: Cable Gland Earthing and Body


Visual NA Each IS : 3043 verification at site ACE/AC/10 IR P W R
Earthing (2points)
Pre-
10.3
Commisioning
Equipment is clean and insulators are free from
Visual NA Each OEM Manual Verification at site ACE/AC/10 IR P* R R
dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/10 IR P* R R
with Grid

Verify CT&PT secondary link & Breaker


Visual NA Each OEM Manual Verification at site ACE/AC/10 IR P* R R
Operation

Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/10 IR P* R R

Verify Space Heater operation & IR Value of


Visual NA Each OEM Manual Verification at site ACE/AC/10 IR P* R R
Main Bus

Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/10 IR P* R R

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/10 IR P* R R
unused holes of gland plate are sealed properly

11 BATTERY CHARGER WITH BATTERIES (If Applicable)

Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/11 MTC P* R R

11.1 Pre-Erection Availability of Tools and Equipment and


Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/11 IR P W R
accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/11 IR P W R

Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/11 IQC P* W R

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/11 MTC P* R R
instruction manuals, before start of erection

Foundation for placing Panels as per drawing,


Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/11 IR P W R
check line, level, painting of inserts

Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/11 IR P W R

11.2 Erection Visual Inspection inside Panel:


- No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/11 IR P W R
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/11 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/11 IR P W R
Rating etc.) as per Dwg.

Termination & connection of wire as per wiring


Visual NA 100% OEM Manual Dwg / Spec ACE/AC/11 IR P W R
connection diagram.

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables inside the Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/11 IR P W RW
panel.

Tightness of connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/11 IR P W RW
Marking

Page 13 of 51

Pre-
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/11 IR P W R
cable type

Earthing: Cable Gland Earthing and Body


Visual NA Each IS : 3043 verification at site ACE/AC/11 IR P W R
Earthing (2points)

Pre- Equipment is clean and insulators are free from


11.3 Visual NA Each OEM Manual Verification at site ACE/AC/11 IR P* R R
Commisioning dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/11 IR P* R R
with Grid

Verify CT&PT secondary link & Breaker


Visual NA Each OEM Manual Verification at site ACE/AC/11 IR P* R R
Operation

Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/11 IR P* R R

Verify Space Heater operation & IR Value of


Visual NA Each OEM Manual Verification at site ACE/AC/11 IR P* R R
Main Bus

Conduct Functionality check on meter unit Visual NA Each OEM Manual Verification at site ACE/AC/11 IR P* R R

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/11 IR P* R R
unused holes of gland plate are sealed properly

12 HT PANELS
Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/12 MTC P* R R
Availability of Tools and Equipments and
12.1 Pre-Erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/12 IR P W R
accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/12 IR P W R

Visual Inspection of Panel Visual NA Each Dwg / Spec No Damage ACE/AC/12 IQC P* W R

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/12 MTC P* R R
instruction manuals, before start of erection

Foundation for placing Panels as per drawing,


Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/12 IR P W R
check line, level, painting of inserts

Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/12 IR P W R

Visual Inspection inside Panel:


12.2 HT Panel Erection - No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing
Visual NA 100% OEM Manual Good condition ACE/AC/12 IR P W R
- No Loose Fasteners or Loose Parts
- All switches operate, door closing
- Gasket in all couplings & doors are intact

Panel Placement:
- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/12 IR P W R
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
Panel Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/12 IR P W R
Rating etc.) as per Dwg.

IS:2705_1, OEM
CT: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/12 TR P* W W
Manual

Winding resistance IS:2705_1, OEM


CT: Winding Resistance Test Measure Each Test OK ACE/AC/12 TR P* W W
kit Manual

IS:2705_1, OEM
CT: Polarity Test Measure Galvanometer Each Test OK ACE/AC/12 TR P* W W
Manual
IS:2705_1, OEM
CT: Ratio Test Measure Primary Injection kit Each Test OK ACE/AC/12 TR P* W W
Manual

Page 14 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
1Ø Variac / Step-up IS:2705_1, OEM
CT: Knee Point Voltage Test(only PS class) Measure Each Test OK ACE/AC/12 TR P* W W
Trafo (0-3KV) Manual

IS:3156_1, OEM
PT: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/12 TR P* W W
Manual

Winding resistance IS:3156_1, OEM


PT: Secondary Winding Resistance Test Measure Each Test OK ACE/AC/12 TR P* W W
kit Manual

IS:3156_1, OEM
PT: Voltage Ratio Test Measure Primary Injection kit Each Test OK ACE/AC/12 TR P* W W
Manual

Digital Multimeter IS:3156_1, OEM


PT: Polarity Test Measure Each Test OK ACE/AC/12 TR P* W W
(1000V) Manual

Digital Multimeter IS:3156_1, OEM


PT: Continuity Test Measure Each Test OK ACE/AC/12 TR P* W W
(1000V) Manual

Digital Multimeter IS:3156_1, OEM


12.3 HT Panel Testing PT: Functional Test Measure Each Test OK ACE/AC/12 TR P* W W
(1000V) Manual

IS:3156_1, OEM
CB: Circuit / Operational Checks Measure NA Each Test OK ACE/AC/12 TR P* W W
Manual

IS:3156_1, OEM
CB: Timer Test Measure Time Interval Kit Each Test OK ACE/AC/12 TR P* W W
Manual

IS:3156_1, OEM
CB: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/12 TR P* W W
Manual

IS:3156_1, OEM
CB: Contact Resistance Measurement Measure CRM Kit Each Test OK ACE/AC/12 TR P* W W
Manual

IS:3347_1, OEM
Bush Bar: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/12 TR P* W W
Manual

Hi-Pot Kit (upto IS:3347_1, OEM


Bush Bar: Hi-Pot Test Measure Each Test OK ACE/AC/12 TR P* W W
70KV AC/DC) Manual

IS:3347_1, OEM
Bush Bar: Contact Resistance measurement Measure CRM Kit Each Test OK ACE/AC/12 TR P* W W
Manual

IS:3231_1, OEM
Relay: CT Ratio Measure Sec. Injection Kit Each Test OK ACE/AC/12 TR P* W W
Manual

IS:3231_1, OEM
Relay: Over Current Protection (3stages) Measure Sec. Injection Kit Each Test OK ACE/AC/12 TR P* W W
Manual

IS:3231_1, OEM
Relay: Earth Fault Protection (2 stages) Measure Sec. Injection Kit Each Test OK ACE/AC/12 TR P* W W
Manual

Termination & connection of wire: Inter-panel


wiring, Auxillary Supply, Signal Cables & Visual NA 100% OEM Manual Dwg / Spec ACE/AC/12 IR P W R
Communication cables

All Communication Accessories and Surge


Visual NA Each OEM Manual Dwg / Spec ACE/AC/12 IR P W R
Arrestor Rating installed as per Dwg

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables inside the Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/12 IR P W RW
panel.

Tightness of connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/12 IR P W RW
Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/12 IR P W R
cable type

HT Panel Pre- Earthing: Cable Gland Earthing and Body


12.4 Visual NA Each IS : 3043 verification at site ACE/AC/12 IR P W R
Commisioning Earthing (2points)

Check all Equipments Rating as per Dwg Visual NA Each Dwg / Spec Dwg / Spec ACE/AC/12 IR P* R R

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/12 IR P* R R
with Grid

Page 15 of 51
HT Panel Pre-
12.4
Commisioning

COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION


SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Verify CT&PT secondary link & Breaker
Visual NA Each OEM Manual Verification at site ACE/AC/12 IR P* R R
Operation

Tightness of Bushing, Clean & Clearance Visual Torque wrench Each OEM Manual Verification at site ACE/AC/12 IR P* R R

CT start point is formed correctly and earthed at


Visual NA Each OEM Manual Verification at site ACE/AC/12 IR P* R R
one end only as per scheme

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/12 IR P* R R
unused holes of gland plate are sealed properly

13 AC CABLING
Trench Dimension: Width & Depth, Cleanliness Measure MS Tape 100% NA Dwg / Spec ACE/AC/13 IR P W RW

13.1 Cable Trench


Check for presence of Soft/Hard rocks, Stones
Visual NA 100% NA Dwg / Spec ACE/AC/13 IR P W R
and other unwanted materials inside trench

Support Erection for Straight runs of cable with


Visual NA 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W R
proper spacing

Welding of Brackets and Painting for welded


Visual NA 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W R
joints

Removal of Sharp corner, burrs & edges of cable


Visual NA 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W R
trays
13.2 Cable Tray

Installation of tray & accessories. Measure MS Tape 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W R

Tightness of coupler / fish plate. Visual Torque wrench 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W R

Alignment & tier spacing of trays and spacing


Measure MS Tape 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W R
between the parallel routes of cable trays

Earthing for Cable Tray Visual NA 100% IS : 3043 Dwg / Spec ACE/AC/13 IR P W R

Quality of Cables (Cables make, rating, size,


Report NA Each Drum Supplier TR No Damage ACE/AC/13 MTC P* R R
conductor type & no physical damage)

Continuity
Cable Insulation Resistance Measure Megger Each Drum IS : 1255 ACE/AC/13 TR P* W R
Satisfactory

13.3 LT Cable Laying Cable Laying in Tray with Trefoil Arrangement Measure MS Tape 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W RW

Proper Cable Dressing, adequate Looping,


Visual NA 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W R
correct Bend radius

Cable Identification: Cable Size, running details,


Visual NA Each IS : 1255 Dwg / Spec ACE/AC/13 IR P W R
cable type

Quality of Cables (Cables make, rating, size,


Report NA Each Drum Supplier TR No Damage ACE/AC/13 MTC P* R R
conductor type & no physical damage)

Continuity
Cable Insulation Resistance Measure Megger Each Drum IS : 1255 ACE/AC/13 TR P* W R
Satisfactory

Cable Laying in Trench (Sand Bed, Brick and


Measure MS Tape 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W RW
Backfilling) as per Dwg

13.4 HT Cable Laying


Proper Cable Dressing, adequate Looping,
Visual NA 100% IS : 1255 Dwg / Spec ACE/AC/13 IR P W R
correct Bend radius

Use Cable duct for Cable Laying in case of Road


Measure MS Tape Each IS : 1254 Dwg / Spec ACE/AC/13 IR P W R
Crossing / Drain Culvert & seal ends

Page 16 of 51
13.4 HT Cable Laying

COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION


SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Cable Route Marker Available Visual NA Each NA Dwg / Spec ACE/AC/13 IR P W R

13.5 LT Cable Testing Insulation Resistance Measure Megger Tester (5Kv) Each IS : 1255 Test OK ACE/AC/13 TR P* W W

Insulation Resistance Measure Megger Tester (5Kv) Each IS : 1255 Test OK ACE/AC/13 TR P* W W

13.6 HT Cable Testing


Hi-Pot Kit (upto
Hi-Pot Test Measure Each IS : 1255 Test OK ACE/AC/13 IR P* W W
70KV AC/DC)

IR measurement after preparation for straight


Measure Megger Tester (5Kv) Each IS : 1255 Test OK ACE/AC/13 IR P* W W
joints/End termination

Outer Sheath Cleaning with solvent wipe and


Visual NA Each OEM Manual Verification at site ACE/AC/13 IR P W R
removed

Check Sealant Tape around Outer sheath end,


Cable Bending, no lugs stress & armour Visual NA Each OEM Manual Verification at site ACE/AC/13 IR P W R
arrangement
13.7 HT Cable End Termination

Remove Copper Spiral, Semiconducting Screen Visual NA Each OEM Manual Verification at site ACE/AC/13 IR P W R

Fix Earth Braid, Self Amelgating Semicon Tape,


Stress Cone, Mechanical Lug & Screened Visual Crimping tool Each OEM Manual Verification at site ACE/AC/13 IR P W R
Connector body

Earthing Connections Visual NA Each OEM Manual IS : 3043 ACE/AC/13 IR P W R

1.Cable Identification-Route marker (Shall be


indicated in terms of Voltage Level or HT/LT
13.8 Cable dentification cable) Visual NA Each Cable Details NA ACE/AC/13 IR P W R
2.Ferrules shall be used for LT auxillary cable
identification

14 AUXILLARY TRANSFORMER
Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/14 MTC p* R R

Availability of Tools and Equipment and


Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/14 IR P W R
14.1 Pre-Erection accessories

Completion of Civil Works Visual NA Random Dwg / Spec Verification at site ACE/AC/14 IR P W R

Visual Inspection of Transformer Visual NA Each Dwg / Spec No Damage ACE/AC/14 IQC P* W R

Availability of Factory test reports, OEM


Report NA Each OEM Manual Dwg / Spec ACE/AC/14 MTC P* R R
instruction manuals before start of erection

Flat form for placing transformer as per dwg,


Visual Auto level 100% Dwg / Spec Civil Checklist ACE/AC/14 IR P W R
check Line, orientation, height and Level

Transformer Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/14 IR P W R

14.2 Auxillary Transformer Erection Visual Inspection:


- No Damage, Gasket / Seal Damage
Visual NA 100% OEM Manual Good condition ACE/AC/14 IR P W R
- No Rust, Oil leakage.
- No Loose Fasteners or Loose Parts

Transformer Placement:
- Transformer placement as per dwg Visual NA 100% Dwg / Spec Verification at site ACE/AC/14 IR P W R
- Adequate Clearance available

Transformer Identification:
Name Plate Details (Electrical Rating, Vector Visual NA 100% Dwg / Spec Verification at site ACE/AC/14 IR P W R
Group, IP Rating, etc.)

Page 17 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
IS:2026_1, OEM
Voltage Ration Test (in all Tap) Measure Three phase supply Each Test OK ACE/AC/14 TR P* W RW
Manual

IS:2026_1, OEM
Vector Group Test Measure Multimeter Each Test OK ACE/AC/14 TR P* W RW
Manual

Winding resistance IS:2026_1, OEM


Winding resistance teszt (in all tap Measure Each Test OK ACE/AC/14 TR P* W RW
14.3 Auxillary Transformer Testimg kit Manual

Megger (5Kv) 1min


IS:2026_1, OEM
Insulation Resistance Test Measure Testing IR, 10min Each Test OK ACE/AC/14 TR P* W RW
Manual
Testing PI

Marshalling box IS:2026_1, OEM


Functional check Measure Each Test OK ACE/AC/14 TR P* W RW
Control Supply Manual

Condition of silica gel Visual NA Each OEM Manual Dwg / Spec ACE/AC/14 IR P W R

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables for HV & Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/14 IR P W RW
LV Cable Boxes and Marshalling Box.

Tightness of all connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/14 IR P W RW
Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/14 IR P W R
cable type

Earthing: Main Tank, Marshaling Box & Cable


Visual NA Each IS : 3151 Dwg / Spec ACE/AC/14 IR P W R
Box
Auxillary Transformer Pre-
14.4
Commisioning

Equipment is clean and insulators are free from


Visual NA Each OEM Manual Verification at site ACE/AC/14 IR P* R R
dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/14 IR P* R R
with Grid

Oil Levels in Main Tank, Conservator, MOG,


Visual NA Each OEM Manual Verification at site ACE/AC/14 IR P* R RW
Plain Oil Level Gauge

Silica gel in the breather is active (Blue Color) Visual NA Each OEM Manual Verification at site ACE/AC/14 IR P* R R

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/14 IR P* R R
unused holes of gland plate are sealed properly

15 EARTHING

Trench Dimension: Width & Depth, Cleanliness Measure MS Tape 100% NA Dwg / Spec ACE/AC/15 IR P W R

15.1 Earthing Trench


Check for presence of Stones and other unwanted No Stones /
Visual NA 100% NA ACE/AC/15 IR P W R
materials inside trench Unwanted mat

Quality of Conductor (Size, thickness, Type, No


Report NA Each lot Supplier TR Dwg / Spec ACE/AC/15 MTC p* R R
damage)

1.5times of
Conductor Overlapping Joints Measure MS Tape 100% IS : 3043 ACE/AC/15 IR P W R
Conductor width
15.2 Conductor Laying
Welded on three
Conductor Overlapped Joints Welding Visual NA 100% IS : 3043 ACE/AC/15 IR P W R
sides

Application of Bituminous Paint for underground All Overlap welded


Visual NA 100% IS : 3043 ACE/AC/15 IR P W R
laid conductor Joints

Page 18 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Quality of Earth Pit Material - Electrode and


Chemical Compounds per Spec (Type, Size, Report NA Each Supplier TR Dwg / Spec ACE/AC/15 MTC P* R R
Material)

Earth Pit Dimension: Depth, Diameter Measure MS Tape 100% IS : 3043 Dwg / Spec ACE/AC/15 IR P W R

Termination of Conductor Riser with Electrode Full Tight in


Visual NA 100% IS : 3043 ACE/AC/15 IR P W R
15.3 Earth Pit and its link tightness Termination clamp

Fix Chamber of required size with Lid Measure MS Tape 100% IS : 3043 Good condition ACE/AC/15 IR P W R

Earth Resistance Measurement Measure ER Megger Each pit IS : 3043 IS : 3043 ACE/AC/15 IR P W R

Earthing identification on Earth pit chamber Visual NA Each NA verification at site ACE/AC/15 IR P W R

16 CABLE JOINTING

Cable Jointing Kit: Type, size, make Visual NA 100% OEM Manual Approved ACE/AC/16 IQC P* W R
16.1 General
Documents Availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/16 MTC P* W R

Ensure Cable Overlap, mark the reference line Visual NA 100% OEM Manual verification at site ACE/AC/16 IR P W R

Check adequate Cable Preparation, remove


Visual NA 100% OEM Manual verification at site ACE/AC/16 IR P W R
cable oversheath

Ensure Core Preparation, cut the core, clean and


Visual NA 100% OEM Manual verification at site ACE/AC/16 IR P W R
desgrease the insulation

Installation of Mechnical Connectors Visual NA 100% OEM Manual verification at site ACE/AC/16 IR P W R

16.2 Installation
Apply mastic tape to produce a smooth tapered
Visual NA 100% OEM Manual verification at site ACE/AC/16 IR P W R
edge between the connector and the insulation

Ensure correct installation of Black Stress


control tubing, Black and Red Screened Visual NA 100% OEM Manual verification at site ACE/AC/16 IR P W R
insulation sleeve & Black Outer sleeve

Adequate Shrinking to be done as per


Visual NA 100% OEM Manual verification at site ACE/AC/16 IR P W R
requirement given in manual

17 METERING YARD (If Applicable)


Pole Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R

Insulators Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R

17.1 Incoming Material Conductors and Fasteners Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R

CT, PT & Isolator Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R

Mettering Panel Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R

Pole Foundation of excavation, Concrete / coping


Visual NA Each Dwg / Spec Dwg / Spec ACE/AC/17 IR P* R R
/ Pole earthing

Assembly of cross arm alongwith alignment and


Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R
tightening

Stringing of conductor damage/phase


Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R
clearance/Guarding/Fixing of accessories
17.2 Process
Stay/type of stay,number of stay,stay
Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R
marking,Guy insulator fixing

CT & PT erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R

Isolator Erection/Alignment Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R

Page 19 of 51
17.2 Process

COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION


SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT
Metering Panel erection Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/17 IR P W R

IS:2705_1, OEM
CT: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/17 TR P* W RW
Manual

Winding resistance IS:2705_1, OEM


CT: Winding Resistance Test Measure Each Test OK ACE/AC/17 TR P* W RW
kit Manual

IS:2705_1, OEM
CT: Polarity Test Measure Galvanometer Each Test OK ACE/AC/17 TR P* W RW
Manual

IS:2705_1, OEM
CT: Ratio Test Measure Primary Injection kit Each Test OK ACE/AC/17 TR P* W RW
Manual

1Ø Variac / Step-up IS:2705_1, OEM


CT: Knee Point Voltage Test(only PS class) Measure Each Test OK ACE/AC/17 TR P* W RW
Trafo (0-3KV) Manual

17.3 Testing IS:3156_1, OEM


PT: Insulation Resistance Test Measure Megger Tester (5Kv) Each Test OK ACE/AC/17 TR P* W RW
Manual

Winding resistance IS:3156_1, OEM


PT: Secondary Winding Resistance Test Measure Each Test OK ACE/AC/17 TR P* W RW
kit Manual

IS:3156_1, OEM
PT: Voltage Ratio Test Measure Primary Injection kit Each Test OK ACE/AC/17 TR P* W RW
Manual

Digital Multimeter IS:3156_1, OEM


PT: Polarity Test Measure Each Test OK ACE/AC/17 TR P* W RW
(1000V) Manual

Digital Multimeter IS:3156_1, OEM


PT: Continuity Test Measure Each Test OK ACE/AC/17 TR P* W RW
(1000V) Manual

Digital Multimeter IS:3156_1, OEM


PT: Functional Test Measure Each Test OK ACE/AC/17 TR P* W RW
(1000V) Manual
Termination & connection of wire: Inter-panel
wiring, Auxillary Supply, Signal Cables & Visual NA 100% OEM Manual Dwg / Spec ACE/AC/17 IR P W R
Communication cables
Proper gland termination with bimetallic lugs,
spacing of cables & dressing of cables inside the Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/17 IR P W RW
panel.

Tightness of connection: Torqueing & Torque


Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/17 IR P W RW
Marking

Cable Identification: Cable Size, running details,


Visual NA 100% IS : 692 Dwg / Spec ACE/AC/17 IR P W R
cable type
Earthing: Cable Gland Earthing and Body
Visual NA Each IS : 3043 verification at site ACE/AC/17 IR P W R
17.4 Pre-Commisioning Earthing (2points)

Check all Equipments Rating as per Dwg Visual NA Each Dwg / Spec Verification at site ACE/AC/17 IR P* R R

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/17 IR P* R R
with Grid

Verify CT&PT secondary link & Breaker


Visual NA Each OEM Manual Verification at site ACE/AC/17 IR P* R R
Operation

Cable Terminals are tightened properly and


Visual Torque wrench Each OEM Manual Verification at site ACE/AC/17 IR P* R R
unused holes of gland plate are sealed properly

CT start point is formed correctly and earthed at


Visual NA Each OEM Manual Verification at site ACE/AC/17 IR P* R R
one end only as per scheme
18 SCADA-For AC Side

18.1 Pre-Erection OFC (Single mode), CAT6 & RS485 Cable Visual NA 100% NA Test OK ACE/AC/18 TR p* W RW/R

Trench Dimension: Width & Depth, Cleanliness Measure NA 100% NA Dwg / Spec ACE/AC/18 NA P W RW/R

18.2 Cable Trench


Check for presence of Soft/Hard rocks, Stones
Visual NA 100% NA Dwg / Spec ACE/AC/18 IR P W RW/R
and other unwanted materials inside trench

Quality of Cables (Cables make, rating,


Report NA Each Drum Supplier TR No Dameage ACE/AC/18 MTC p* R RW/R
size,conductor type & no physical damage)

Page 20 of 51
OFC (Single-Mode), CAT6,control &
18.3
RS485 cable Laying - For AC Side
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Cable Laying in Trench (Sand Bed, Brick and


Measure NA 100% NA Dwg / Spec ACE/AC/18 IR P W RW/R
Backfilling) as per Dwg

OFC (Single-Mode), CAT6,control &


18.3
RS485 cable Laying - For AC Side Proper Cable Dressing, adequate Looping,correct
Visual NA 100% NA Dwg / Spec ACE/AC/18 IR P W RW/R
Bend radius

Use HDPE pipe for Cable Laying in case of


Measure NA Each NA Dwg / Spec ACE/AC/18 IR P W RW/R
Road Crossing / Drain Culvert & seal ends

Cable Route Marker Available Visual NA Each NA Dwg / Spec ACE/AC/18 IR P W RW/R

19 Array Yard lighting (Outdoor Lighting)


19.1 Pre-Erection Civil Works Visual NA 100% BOM/Installation Manual Dwg / Spec ACE/AC/19 IR P* W RW/R

Quantity & Quality of Street Light Poles &


Report NA 100% Dwg / Spec/Installation manual Dwg / Spec ACE/AC/19 MTC P* R RW/R
Fixtures
19.2 Street Light Installation
Foundation of Support Structure Measure NA 100% NA Dwg / Spec ACE/AC/19 IR P W RW/R

Quantity & Quality of cables Report NA 100% Dwg / Spec Dwg / Spec ACE/AC/19 IR P W RW/R

Check Cable Specification (for compatibility


Visual/Report NA 100% Spec/Supplier TR Dwg / Spec ACE/AC/19 MTC P* R RW/R
with SCADA)

Cable Installation
- Input Cable Installation (Termination /
Connector as applicable)
- Out put Cable Termination (Stripping, Visual Crimping tool 100% NA Dwg / Spec ACE/AC/19 IR P W RW/R
Termination of Street Light Poles &Flood Crimping,Lugs, Clearence)
19.3 - Cable Installed as per Spec
light Fixtures
- Proper Glands used for Termination

Cable Identification Visual NA 100% NA Dwg / Spec ACE/AC/19 IR P W RW/R

Verification of tightness of connection of cables


Visual NA 100% NA Dwg / Spec ACE/AC/19 IR P W RW/R
with every Street Light Poles

19.4 Street Light Testing Cable overlaping should be avoided Visual NA Random NA Verification at site ACE/AC/19 NA P W RW/R

20 Lightning Arrester

20.1 Pre-Erection Civil Works Visual NA 100% BOM/Installation Manual Dwg / Spec ACE/AC/20 DR P* W RW/R

Quantity & Quality of lighting arrester Report NA 100% Dwg / Spec/Installation manual Dwg / Spec ACE/AC/20 MTC P* R RW/R

Foundation of Support Structure Measure NA 100% NA Dwg / Spec ACE/AC/20 IR P W RW/R


20.2 Lightning Arrester Installation
Foundation of Mast Measure NA 100% NA Dwg / Spec ACE/AC/20 IR P W RW/R

Quantity & Quality of Earthing cables Report NA 100% Dwg / Spec Dwg / Spec ACE/AC/20 IR P W RW/R

Check Cable /GI Strip Specification Visual/Report NA 100% Spec/Supplier TR Dwg / Spec ACE/AC/20 MTC P* R RW/R

Cable /GI Strip Installation


- Input Cable Installation (Termination /
Connector as applicable)
- Out put Cable Termination (Stripping,
Visual Crimping tool 100% NA Dwg / Spec ACE/AC/20 IR P W RW/R
Crimping,Lugs, Clearence)
20.3 Termination of Lightning Arrester - Cable Installed as per Spec
- Proper Glands used for Termination
- GI Strip Connection

Cable Identification Visual NA 100% NA Dwg / Spec ACE/AC/20 IR P W RW/R

Verification of tightness of connection of cables


Visual NA 100% NA Dwg / Spec ACE/AC/20 IR P W RW/R
with every Lightning Arrester

Page 21 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
ACTIVITIES INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

20.4 Lightning Arrester Testing Cable overlaping should be avoided Visual NA Random NA Verification at site ACE/AC/20 IR P W RW/R

21 UPS System (Uniterrupted Power Supply)


Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/21 MTC P* R R

21.1 Pre-Erection of UPS


Availability of Tools and Equipment and
Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/21 IR P W R
accessories

Visual Inspection of UPS System Visual NA Each Dwg / Spec No Damage ACE/AC/21 IQC P* W R

Availability of test reports, O&M


Report NA Each OEM Manual Dwg / Spec ACE/AC/21 MTC P* R R
instruction manuals, before start of erection

Location for placing UPS System Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/21 IR P W R

Panel Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/21 IR P W R

Visual Inspection inside UPS System:


21.2 UPS Erection - No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/21 IR P W R
- No Loose Fasteners or Loose Parts

UPS System Placement:


- Panel placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/21 IR P W R
- Adequate Clearance
- Base Grouting (as applicable)

UPS Identification:
UPS Name Plate Details (Electrical Rating, IP Visual NA 100% Dwg / Spec Verification at site ACE/AC/21 IR P W R
Rating etc.) as per Dwg.

Termination & connection of wire as per wiring


Visual NA 100% OEM Manual Dwg / Spec ACE/AC/21 IR P W R
connection diagram.

Proper gland termination with bimetallic lugs,


spacing of cables & dressing of cables inside the Visual Crimping tool 100% OEM Manual Req. Torque applied ACE/AC/21 IR P W RW
UPS.

UPS System Pre- Tightness of connection Measure Digital torque wrench 100% IS : 1367 Dwg / Spec ACE/AC/21 IR P W RW
21.3
Commisioning
Cable Identification: Cable Size, running details,
Visual NA 100% IS : 7098 part-I, IS-1255 Dwg / Spec ACE/AC/21 IR P W R
cable type

Earthing of UPS Visual NA Each IS : 3043 verification at site ACE/AC/21 IR P W R

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/21 IR P* R R
with Grid

22 Fire Protection and Control System


Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/22 MTC P* R R
22.1 Pre-Erection of Fire Protection system
Availability of Tools and Equipment and
Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/22 IR P W R
accessories

Visual Inspection of Fire Alaram & Control


Visual NA Each Dwg / Spec No Damage ACE/AC/22 IQC P* W R
Panel

Visual Inspection of Fire Extinguishers Visual NA Each Dwg / Spec No Damage ACE/AC/22 IQC P* W R

Availability of test reports, O&M


Report NA Each OEM Manual Dwg / Spec ACE/AC/22 MTC P* R R
instruction manuals, before start of erection

Location for placing Fire Alaram Panel & Fire


Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/22 IR P W R
22.2 Fire Protection System Erection Extinguishers

Page 22 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
22.2 ACTIVITIES
Fire Protection System Erection INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Visual Inspection insideFire AlaramPanel:


- No Damage, Rust
Visual NA 100% OEM Manual Good condition ACE/AC/22 IR P W R
- Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts

Fire Alaram Panel & Fire Extinguisher


Placement:
- Panel & fire Extinguidsher placement as
Visual NA 100% Dwg / Spec Verification at site ACE/AC/22 IR P W R
mentioned in dwg
- Adequate Clearance

23 Voice and Data Communication System (If Applicable)


Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/23 MTC P* R R

Availability of Tools and Equipment and


Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/23 IR P W R
accessories

Visual Inspection ofElectronic IP PBX Visual NA Each Dwg / Spec No Damage ACE/AC/23 IQC P* W R

Visual Inspection of Software, hardware, Cable


Visual NA Each Dwg / Spec No Damage ACE/AC/23 IQC P* W R
Interface for Communication System
23.1 Placing of Voice & Communication system

Availability of test reports, O&M


Report NA Each OEM Manual Dwg / Spec ACE/AC/23 IR P* R R
instruction manuals, before start of connection.

Location for placing of phones. Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/23 IR P W R

Visual Inspection inside Handsets, IP PBX:


- No Damage, Rust
Visual NA 100% O&M Manual Good condition ACE/AC/23 IR P W R
- Clean
- No Loose Parts

24 BUSDUCT (If Applicable)


Document availability Visual NA 100% Supplier TR Dwg / Spec ACE/AC/24 MTC P* R R
24.1 Pre-Erection Availability of Tools and Equipments and
Visual NA 100% Dwg / Spec Dwg / Spec ACE/AC/24 IR P* W R
accessories
Visual Inspection of Busduct Report NA Each Dwg / Spec No Damage ACE/AC/24 IQC P* W R

Availability of Factory test reports, OEM


Visual NA Each OEM Manual Dwg / Spec ACE/AC/24 MTC P* R R
instruction manuals before start of erection

Base Frame - Fabricated as per drawing, check


Visual Auto level 100% Dwg / Spec Dwg / Spec ACE/AC/24 IR P W R
line, same level, painting of Channel

Busduct Installed meets Project Spec Visual NA 100% OEM Manual Dwg / Spec ACE/AC/24 IR P W R

24.2 Busduct Erection


Visually Inspection inside Busduct:
- No Damage, Gasket / Seal Damage, Rust
- Clean, Dry, Good Cable Routing Visual NA 100% OEM Manual Good condition ACE/AC/24 IR P W R
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Busduct Placement:
- Busduct placement as mentioned in dwg
Visual NA 100% Dwg / Spec Verification at site ACE/AC/24 IR P W R
- Enclosure Check
- Well Supported

Termination& connection of wire as per wiring


Visual NA 100% OEM Manual Dwg / Spec ACE/AC/24 IR P W RW
connection diagram.

Tightness of inter Bus-bar connection:


Measure Digital torque wrench 100% IS : 3764 Dwg / Spec ACE/AC/24 IR P W RW
Torqueing & Torque Marking
24.3 Busduct Pre- Commisioning

Page 23 of 51
COMPONENT /OPERATION CHARACTERISTICS / TYPE OF QUANTUM FORMAT INSPECTION
SL.NO INSTRUMENT REF DOCUMENT ACCEPTANCE FORMAT OF RECORD REMARKS
24.3 ACTIVITIES
Busduct Pre- Commisioning INSPECTION PARAMETERS CHECK OF CHECK OF CONTRACTOR ACE CLIENT

Equipment is clean and insulators are free from


Visual NA Each OEM Manual Verification at site ACE/AC/24 IR P* R R
dust/dirt

Check all Earthing Connections & Connected


Visual NA Each OEM Manual Verification at site ACE/AC/24 IR P* R R
with Grid

Winding resistance
IR Test Measure Each OEM Manual Test OK ACE/AC/24 TR P* W RW
kit

24.4 Testing CRM Test Measure NA Each OEM Manual Test OK ACE/AC/24 TR P* W RW

Torque Marking Measure Digital torque wrench Each OEM Manual Test OK ACE/AC/24 TR P* W RW

LEGENDS:

QAP-Quality Assurance Plan, MTC-Material Test Certificate, IR-Inspection Report, TR-Test Report, ELTR-External Lab Test Report, CR-Calibration Report.
IS-Indian Standard, SOP-Standard Operating Procedure. IQC- Incoming quality check, DR- Deviation report, Client - ,QA-Quality, TPIA-Third Party Inspection Agency, P-Perform, P*-Arrangement, W-Witness, RW-Random Witness, R-Review.

NOTE:

- In case of requirement of any additional activity other than mentioned in this FQP the same will be incorporated with mutual agreement before commencement of the additional activity.
- Quality of Batching and Lab Set-up (Calibration certificates) shall be taken care at site.
- ELTR - External Laboratory engaged for testing work shall be certified by government approved bodies like NABL (in case of India).
- In case of absence of MTC for Raw Materials, testing shall be carried out at NABL approved laboratory and report shall be ensured and reviewed by Quality Person at site.
- Quantum of check: Quality person at site shall check 100% for any component / operation activities started at first time. After good adherance of the first work, QA person shall follows quantum of check as mentioned in QAP.
- RW: could be performed after getting inspection call from Project team. Performed in such a way that it does not affects the construction progress at site.
- W: Test/checks which shall be carried out infornt of Client/Project Manager or his authorized representative and beyond which the work will not proceed

Page 24 of 51
PROTOCOL

INSPECTION OF INCOMING MATERIALS

Project Name: Client: Date:


Quantity
Date of Heat No. / Batch Invoice /
SL.NO. Material Description/ Specification Item Code Unit (Recvd IRN / MTC No. Remarks
Receipt no. Challan No.
/Accepted)

Inspection Activity at site / Store


1 Quantity verified & found in order 4. Co-related w.r.t. IRN/ MTC/Lab Test Report 7. As per drawing
8. Material sent for
2 Material Condition is good 5. Dimensionally checked
lab testing
3 Heat No. / Batch No. mentioned on material 6. Colour coding done
REVIEW / VERIFICATION OF DOCUMENTS
1. Lab Test Report No. / Verification of test report e.r.t.QAP 3. IRN Comments
2. Manufacturer’s Test Certificate
Based on the above verification, the material are acceptable
Signature
For For ACE
PROTOCOL

INVERTER ERECTION

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

Check Base Frame - Fabricated as per drawing, check line,


1
same level, painting of Channel

2 Check Inverter Spec as per drawing

Check Visual Inspection inside Inverter like


3
damage,rust,loose connections etc.

4 Check Inverter Placement as per drawing

5 Check adequate space clearance for inverter panels

6 Check base movement locking(as applicable)

Termination& connection of wire as per wiring


7
connection diagram.
Proper gland termination with bimetallic lugs, spacing of
8
cables & dressing of cables inside
Tightness of inter Bus-bar connection:
9
Torqueing & Torque Marking
Cable Identification: Cable Size, running details,
10
cable type
Inverter Earthing: Cable Gland Earthing and Body Earthing
11
(2points)
Equipment is clean and insulators are free from
12
dust/dirt

13 Check all Earthing Connections & Connected with Grid

14 Unused holes of gland plate are sealed

Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
INVERTER TRANSFORMER

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

Check C-Channel fixed for placing transformer as per drawing,


1
check line, level, painting of rail

2 Check Transformer Installed meets Project Spec

3 Check Visual Inspection for damage,rust,loose connections etc.

4 Check Transformer Placement as per drawing

5 Check adequate space clearance available

6 Check Transformer wheel stopper placement

Check Transformer Name Plate Details (Electrical Rating,


7
Vector Group, IP Rating, etc.)
Proper gland termination with bimetallic lugs,
8 spacing of cables & dressing of cables for HV &
LV Cable Boxes and Marshalling Box.
Tightness of all connection: Torqueing & Torque
9
Marking

10 Cable Identification: Cable Size, running details, cable type

11 Earthing: Main Tank, Marshaling Box & Cable Box

12 Equipment is clean and insulators are free from dust/dirt

13 Check all Earthing Connections & Connected with Grid

Oil Levels in Main Tank, Conservator, MOG, Plain Oil Level


14
Gauge, OTI & WTI pockets and Breaker

15 Tightness of Test Tap of HV Bushing

Lock of Buchholz relay and MOG, Air released air vent, keep in
16
Service position
Cable Terminals are tightened properly and unused holes of
17
gland plate are sealed properly
Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

NIFPS (Nitrogen Injection Fire Protection System)

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories

2 Completion of Civil Works

Foundation for placing Panels & Control cabinet as per


3
drawing, check line, level, painting of inserts

4 Panel & Cabinet Installed meets Project Spec

Visual Inspection inside Panel & cabinet:


- No Damage, Gasket / Seal Damage, Rust
5 - Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)
Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP Rating
etc.) as per Dwg.
Earthing: Cable Gland Earthing and Body Earthing
8
(2points)

9 Equipment is clean and insulators are free from dust/dirt

10 Check all Earthing Connections & Connected with Grid

11 Tightness of Pipe connection, Clean & Clearance

Verify Functional test for NIFPS panel and all accessories


12
(Sensor, & ARC detector)

Cable Terminals are tightened properly and unused holes


13
of gland plate are sealed properly

Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

LT PANEL
Project Name: Client: Date:
Location: Drawing:
S No Item Descriptions Observations Remarks
1 Availability of Tools and Equipment and accessories
2 Completion of Civil Works
3 Foundation for placing Panels as per drawing, check line, level,
painting of inserts
4 Panel Installed meets Project Spec
5 Visual Inspection inside Panel:
6 -Panel
No Damage,
Placement:Gasket / Seal Damage, Rust
7 -Panel
PanelIdentification:
placement as mentioned in dwg
8 Panel Name Plate
Termination Details (Electrical
& connection of wire as Rating, IP
per wiring
9 connection diagram.
Proper gland termination with bimetallic lugs, spacing of
cables & dressing of cables inside
the panel.
10 Tightness of connection: Torqueing & Torque
11 Marking
Cable Identification: Cable Size, running details, cable type

12 Earthing: Cable Gland Earthing and Body Earthing (2points)

13 Equipment is clean and insulators are free from dust/dirt


14 Verify CT&PT secondary link & Breaker Operation
15 Tightness of Bushing, Clean & Clearance
16 Verify Space Heater operation & IR Value of Main Bus
17 Conduct Functionality check on meter unit
18 Cable Terminals are tightened properly and unused holes of
gland plate are sealed properly
Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
ACDB

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories

2 Completion of Civil Works

Foundation for placing Panels as per drawing, check line,


3
level, painting of inserts
4 Panel Installed meets Project Spec

Visual Inspection inside Panel:


- No Damage, Gasket / Seal Damage, Rust
5 - Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg

Termination & connection of wire as per wiring


8
connection diagram.
Proper gland termination with bimetallic lugs, spacing of
9 cables & dressing of cables inside
the panel.
Tightness of connection: Torqueing & Torque
10
Marking
Cable Identification: Cable Size, running details,
11
cable type
Earthing: Cable Gland Earthing and Body Earthing
12
(2points)
Equipment is clean and insulators are free from
13
dust/dirt

14 Verify CT&PT secondary link & Breaker Operation

15 Tightness of Bushing, Clean & Clearance

16 Verify IR Value of Main Bus

17 Conduct Functionality check on meter unit

Cable Terminals are tightened properly and unused holes


18
of gland plate are sealed properly
Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
UPSDB

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories

2 Completion of Civil Works

Foundation for placing Panels as per drawing, check line,


3
level, painting of inserts
4 Panel Installed meets Project Spec

Visual Inspection inside Panel:


- No Damage, Gasket / Seal Damage, Rust
5 - Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg

Termination & connection of wire as per wiring


8
connection diagram.
Proper gland termination with bimetallic lugs, spacing of
9 cables & dressing of cables inside
the panel.
Tightness of connection: Torqueing & Torque
10
Marking
Cable Identification: Cable Size, running details,
11
cable type
Earthing: Cable Gland Earthing and Body Earthing
12
(2points)
Equipment is clean and insulators are free from
13
dust/dirt

Cable Terminals are tightened properly and unused holes


14
of gland plate are sealed properly
Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

DCDB
PROJECT NAME: Client: Date:

Location: Drawing:
S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories

2 Completion of Civil Works

Foundation for placing Panels as per drawing, check line,


3
level, painting of inserts
4 Panel Installed meets Project Spec

Visual Inspection inside Panel:


- No Damage, Gasket / Seal Damage, Rust
5 - Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg

Termination & connection of wire as per wiring


8
connection diagram.
Proper gland termination with bimetallic lugs, spacing of
9 cables & dressing of cables inside
the panel.
Tightness of connection: Torqueing & Torque
10
Marking
Cable Identification: Cable Size, running details,
11
cable type
Earthing: Cable Gland Earthing and Body Earthing
12
(2points)
Equipment is clean and insulators are free from
13
dust/dirt

14 Verify CT&PT secondary link & Breaker Operation

15 Tightness of Bushing, Clean & Clearance

16 Verify Space Heater operation & IR Value of Main Bus

17 Conduct Functionality check on meter unit

Cable Terminals are tightened properly and unused holes


18
of gland plate are sealed properly
Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
LDB

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories

2 Completion of Civil Works

Foundation for placing Panels as per drawing, check line,


3
level, painting of inserts
4 Panel Installed meets Project Spec

Visual Inspection inside Panel:


- No Damage, Gasket / Seal Damage, Rust
5 - Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg

Termination & connection of wire as per wiring


8
connection diagram.
Proper gland termination with bimetallic lugs, spacing of
9 cables & dressing of cables inside
the panel.
Tightness of connection: Torqueing & Torque
10
Marking
Cable Identification: Cable Size, running details,
11
cable type
Earthing: Cable Gland Earthing and Body Earthing
12
(2points)
Equipment is clean and insulators are free from
13
dust/dirt

Cable Terminals are tightened properly and unused holes


14
of gland plate are sealed properly
Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
METERING PANEL

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories

2 Completion of Civil Works

Foundation for placing Panels as per drawing, check line,


3
level, painting of inserts
4 Panel Installed meets Project Spec

Visual Inspection inside Panel:


- No Damage, Gasket / Seal Damage, Rust
5 - Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg

Termination & connection of wire as per wiring


8
connection diagram.
Proper gland termination with bimetallic lugs, spacing of
9 cables & dressing of cables inside
the panel.
Tightness of connection: Torqueing & Torque
10
Marking
Cable Identification: Cable Size, running details,
11
cable type
Earthing: Cable Gland Earthing and Body Earthing
12
(2points)
Equipment is clean and insulators are free from
13
dust/dirt

14 Verify CT&PT secondary link & Breaker Operation

15 Tightness of Bushing, Clean & Clearance

16 Verify Space Heater operation & IR Value of Main Bus

17 Conduct Functionality check on meter unit

Cable Terminals are tightened properly and unused holes


18
of gland plate are sealed properly
Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
BATTERY

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories

2 Completion of Civil Works

Foundation for placing Panels as per drawing, check line,


3
level, painting of inserts
4 Panel Installed meets Project Spec

Visual Inspection inside Panel:


- No Damage, Gasket / Seal Damage, Rust
5 - Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts
- All switches operate, door closing

Panel Placement:
- Panel placement as mentioned in dwg
6
- Adequate Panel Clearance
- Base Grouting (as applicable)

Panel Identification:
7 Panel Name Plate Details (Electrical Rating, IP
Rating etc.) as per Dwg

Termination & connection of wire as per wiring


8
connection diagram.
Proper gland termination with bimetallic lugs, spacing of
9 cables & dressing of cables inside
the panel.
Tightness of connection: Torqueing & Torque
10
Marking
Cable Identification: Cable Size, running details,
11
cable type
Earthing: Cable Gland Earthing and Body Earthing
12
(2points)
Equipment is clean and insulators are free from
13
dust/dirt

14 Verify CT&PT secondary link & Breaker Operation

15 Tightness of Bushing, Clean & Clearance

16 Verify Space Heater operation & IR Value of Main Bus

17 Conduct Functionality check on meter unit

Cable Terminals are tightened properly and unused holes


18
of gland plate are sealed properly
Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
HT PANEL

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

Check Foundation for placing Panels as per drawing, check line,


1
level, painting of inserts

2 Check Panel Installed meets Project Spec

Check Visual Inspection inside equipment like


3
damage,rust,loose connections etc.

4 Check Panel Placement as per drawing

5 Check adequate space clearance for panels

6 Check allignment and tightness

7 Check base movement locking(as applicable)

Check Panel Name Plate Details (Electrical Rating, IP Rating


8
etc.) as per Dwg.
Termination & connection of wire: Inter-panel wiring, Auxillary
9 Supply, Signal Cables &
Communication cables
All Communication Accessories and Surge Arrestor Rating
10
installed as per Dwg

Proper gland termination with bimetallic lugs, spacing of cables


11 & dressing of cables inside
the panel.

Tightness of connection: Torqueing & Torque


12
Marking

13 Earthing: Cable Gland Earthing and Body Earthing (2points)

14 Check all Equipments Rating as per Dwg

15 Check all Earthing Connections & Connected with Grid

16 Verify CT&PT secondary link & Breaker Operation

17 Tightness of Bushing, Clean & Clearance

CT start point is formed correctly and earthed at one end only as


18
per scheme
Cable Terminals are tightened properly and unused holes of
19
gland plate are sealed properly
Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

AC WORKS - LT/HT CABLE TESTING

Project Name: Client: Date: Test Start Time:


Location # / No of Drum : Testing Equipment #: Test End Time:
DRUM No: IR VALUE : Total Length :

CABLE DESCRIPTION LAID


S.NO Length Observation/Remark
TYPE / SIZE FROM TO

Observations: (*) denotes Critical Activity

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

CABLE TRENCH EXCAVATION INSPECTION

Project Name: Client: Date:

Location: Drawing:

Section: REF no.

S No Item Descriptions Observations Remarks

1 Type of Cable trench i.e. AC/DC/Others

2 Check dimensions (Depth & Width) of cable trench*

3 Ensure No unwanted materials in trench

Ensure No Hard Material like Rocks, Stones etc., inside the


4
trench

5 Check Requirement of Dewatering

Observations: Mention Numeral Value for (*) Asterisk marked items.

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

HT CABLE LAYING INSPECTION

Project Name: Client: Date:

Location: Drawing:

Section: REF no:


Cable From: Cable To:

S No Item Descriptions Observations Remarks

1 Quality of Cable (Cables Make,rating, size, conductor type)

2 Cable Insulation Resistance

3 Thickness of sand bed bottom layer

4 Proper cable dressing and proper bend radius

5 Check Cable Duct at road crossings

6 Adequate looping at the termination ends

Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
AC CABLE LAYING INSPECTION

Project Name: Client: Date:

Location: Drawing:
Section: REF no.
Cable From: Cable To:

S No Item Descriptions Observations Remarks

Quality of Cables (Cables make, rating, size, conductor type & no


1
physical damage)
2 Cable Insulation Resistance
Cables should firmly & uniformly bedded in sand, free of stones,
3
rocks or hard items to prevent damage
4 Cable Laying in Tray with Trefoil Arrangement

5 Proper Cable Dressing, adequate Looping, correct Bend radius

6 Adequate looping at the termination ends

7 Cable Identification: Cable Size, running details, cable type

8 Cables should Resealed/Insulated at the ends (in open condition)

Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
AUXILIARY TRANSFORMER

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

Check Flat form for placing transformer as per dwg, check Line,
1
orientation, height and Level

2 Check Transformer Installed meets Project Spec

3 Check Visual Inspection for damage,rust,loose connections etc.

4 Check Transformer Placement as per drawing

5 Check and adequate space clearance available

Check Transformer Name Plate Details (Electrical Rating,


6
Vector Group, IP Rating, etc.)

Proper gland termination with bimetallic lugs, spacing of cables


7
& dressing of cables for both primary and secondary side

Tightness of all connection: Torqueing & Torque


8
Marking
Cable Identification: Cable Size, running details,
9
cable type
10 Earthing: Body(Both side) and neutral
Equipment is clean and insulators are free from
11
dust/dirt

12 Check all Earthing Connections & Connected with Grid

Cable Terminals are tightened properly and unused holes of


13
gland plate are sealed properly

Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

EARTHING

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

Depth
Check Earth Pit
1
Dimension
Diameter

2 Check Earth Electrode Dimension

3 Check Chemical Component used

4 Check Earth pits are installed as per the installation details

Check Sizes of earthing conductors shall be according to


5
specified drawings.

6 Check Number of Earth Pits Erected

Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
CABLE JOINTING INSPECTION

Project Name: Client: Date:

Location: Cable size:


INDOOR OUTDOOR STRAIGHT THROUGH

S No Item Descriptions Observations Remarks

1 Ensure Cable Overlap, mark the referance line

2 Check adequate Cable Preparation, remove cable oversheath

Ensure Core Preparation, cut the core, clean and desgrease


3
the insulation

4 Installation of Mechnical Connectors

Apply mastic tape to produce a smooth tapered edge


5
between the connector and the insulation

Ensure correct installation of Black Stress control tubing,


6 Black and Red Screened insulation sleeve & Black Outer
sleeve

Adequate Shrinking to be done as per requirement given in


7
manual

Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

SCADA

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

Check for presence of Soft/Hard rocks, Stones and other


1
unwanted materials inside trench

Cable Laying in Trench (Sand Bed, Brick and Backfilling)


2
as per Dwg

Proper Cable Dressing, adequate Looping,correct Bend


3
radius

Use HDPE pipe for Cable Laying in case of Road


4
Crossing / Drain Culvert & seal ends

5 Cable Route Marker Available


Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

ARRAY YARD LIGHTING

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Civil Works

2 Foundation of Support Structure

3 Quantity & Quality of cables

Cable Installation
- Input Cable Installation (Termination / Connector as
applicable)
4 - Out put Cable Termination (Stripping, Crimping,Lugs,
Clearence)
- Cable Installed as per Spec
- Proper Glands used for Termination

5 Cable Identification

Verification of tightness of connection of cables with every


6
Street Light Poles

Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

LIGHTNING ARRESTOR

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Foundation of Support Structure

2 Foundation of Mast

3 Quantity & Quality of Earthing cables

Cable /GI Strip Installation


- Input Cable Installation (Termination / Connector as
applicable)
- Output Cable Termination (Stripping, Crimping,Lugs,
4
Clearence)
- Cable Installed as per Spec
- Proper Glands used for Termination
- GI Strip Connection

5 Cable Identification

Verification of tightness of connection of cables with every


6
Lightning Arrester

7 Cable overlaping should be avoided


Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL
UPS

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories

2 Location for placing UPS System

3 Panel Installed meets Project Spec

Visual Inspection inside UPS System:


- No Damage, Gasket / Seal Damage, Rust
4
- Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts

UPS System Placement:


- Panel placement as mentioned in dwg
5
- Adequate Clearance
- Base Grouting (as applicable)

UPS Identification:
6 UPS Name Plate Details (Electrical Rating, IP Rating
etc.) as per Dwg.

Termination & connection of wire as per wiring


7
connection diagram.
Proper gland termination with bimetallic lugs, spacing
8 of cables & dressing of cables inside
the UPS.

9 Tightness of connection
Cable Identification: Cable Size, running details, cable
10
type
11 Earthing of UPS
Check all Earthing Connections & Connected with
12
Grid
Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

FIRE PROTECTION AND CONTROL SYSTEM

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories


Location for placing Fire Alaram Panel & Fire
2
Extinguishers

Visual Inspection insideFire AlaramPanel:


- No Damage, Rust
3
- Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts

Fire Alaram Panel & Fire Extinguisher Placement:


- Panel & fire Extinguidsher placement as mentioned in
4
dwg
- Adequate Clearance

Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

VOICE & DATA COMMUNICATION

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories


2 Availability of test reports, O&M instruction manuals,
before start of connection.
3 Location for placing of phones.
Visual Inspection inside Handsets, IP PBX:
- No Damage, Rust
4 - Clean
- No Loose Parts

Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT
PROTOCOL

BUSDUCT

Project Name: Client: Date:

Location: Drawing:

S No Item Descriptions Observations Remarks

1 Availability of Tools and Equipment and accessories

2 Location for placing

Visual Inspection inside Busduct:


- No Damage, Rust
3
- Clean, Dry, Good Cable Routing
- No Loose Fasteners or Loose Parts

Busduct Placement:
- as mentioned in Drawing
4
- Enclosure Check
- Support Check

5 Check the termination & connection


Tightness of Inter Busbar Connection:
6
Torqueing & Torque marking

7 Check the equipment is clean and are free from dust/dirt

8 Check all Earthing Connections & Connected with Grid


Observations:

Signature
CONTRACTOR ACE RENEWTECH CLIENT