Decoration Project Qualification Plan Date:

Project name:

content standard requirement Result Sign

Design

General

All drawing must follow GB standard GB code Must follow

All drawing must follow Fire Fighting standard Fire fighting GB code Must follow

All drawing must follow =S= requirement =S= decoration requirement Must follow

GB Code: (but not limited)


GB50222-95《建筑内部装修设计防火规范》, GB50016-2006《建筑设计防火规范》, JGJ 16-2008《民用建筑电气设计规范》, 建筑结构荷载规范(GB50009-2001), GB50325-2001(2006年版)《民用建筑工程室内环境污染
控制规范》, 《建筑照明设计标准》GB50034-2004, 《低压配电设计规范》GB50054-95, 智能建筑设计标准(GB/T50314-2006), 《安全防范工程技术规范》GB 50348, 92DQ《建筑电气通用图集》、《国家建筑标准设计图集》
, 《建筑灭火器配置设计规范》GB50140-2005, 《建筑给水排水设计规范》GB50015-2003, 《给水排水制图标准》GB/T50106-2001, 《自动喷水灭火系统设计规范》GB50084-2001 (2005年版) , << 采暖通风与空气调节设
计规范 >> ( GB50019-2003),

Master Layout design

requirement of surface template Surface template Must satisfied

requirement =S= decoration specification =S= decoration specification qualified

=S= decoration style =S= decoration specification & GB code qualified

people flowing =S= decoration specification & GB code Reasonable

effect drawing =S= decoration specification & GB code qualified

Decoration construction drawing (bidding drawing) design


=S= decoration specification, GB code &
plan drawing (ceiling, flooring, door & window list) qualified
requirement of construction

=S= decoration specification, GB code &


section drawing qualified
requirement of construction

=S= decoration specification, GB code &


detail drawing qualified
requirement of construction

=S= decoration specification, GB code &


electric & lighting drawing qualified
requirement of construction

=S= decoration specification, GB code &


air condition drawing qualified
requirement of construction

=S= decoration specification, GB code &


fire fighting drawing qualified
requirement of construction

=S= decoration specification, GB code &


water supply and drainage drawing qualified
requirement of construction

material list =S= material requirement qualified

effect drawing =S= decoration specification & GB code qualified

Budget control

budget controlling =S= budget less budget 5% ~10%

design schedule

master layout confirming design schedule plan follow the schedule

decoration construction bidding drawing submitting design schedule plan follow the schedule
decoration construction drawing submitting design schedule plan follow the schedule

Decoration Construction

General

All decoration work must follow GB standard GB code qualified

All decoration work must follow GB Safety standard GB safety code qualified

All drawing must follow Fire Fighting standard Fire fighting GB code qualified

All decoration work must follow =S= requirement =S= site management requirement qualified

GB Code: (but not limited)


建筑装饰装修工程质量验收规范(GB 50210--2001), DBJ/T01-26-96-2003《建筑安装分项工程施工工艺规程》,
JGJ81-2002《建筑钢结构焊接技术规程》, 《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002, 《室内管道支吊架》03S402, 《建筑排水用硬聚氯乙烯管道安装》96S406, 《生活饮用水卫生标准》, 《卫生设备安
装》99S304, 《建筑给水钢塑复合管道工程技术规程》( CECS125:2001), << 通风空调工程施工及验收规范 >> ( GB 50243-2002 ), 制冷设备安装工程施工及验收规范(GB50274-98), 机械设备安装工程施工及验收规
范(GB1350231-98), 室内、外消火栓04S202、01S201, 《建筑电气工程 施工质量验收规范word》GB50303-2002, 砌体工程施工质量验收规范(GB50203-2002), 建筑地面工程施工质量验收规范(GB50209-2002), 智能建
筑工程质量验收规范(GB50339-2003), 建筑施工安全检查标准 (JGJ59-99), 建筑施工高处作业安全技术规范 (JGJ80-91), 建筑施工扣件式钢管脚手架安全技术规范(JGJ130-2001), 建筑施工门式钢管脚手架安全技术规
范 (JGJ128-2000), 施工现场临时用电安全技术规范 (JGJ46-88), 建设工程施工现场供用电安全规范 (GB50194-93), 建筑机械使用安全技术规程(JGJ33-2001)

Quality

decoration material material list, certificate qualified

M&E material material list, certificate qualified

ceiling checking list qualified

wall checking list qualified

glass partition checking list qualified

painting checking list qualified

fixed furniture checking list qualified


door and window checking list qualified

floor checking list qualified

toilet checking list qualified

water supply system checking list qualified

drainage system checking list qualified

electric power panel checking list qualified

electric trench & trunk checking list qualified

electric cable line checking list qualified

lighting checking list qualified

switch board & socket checking list qualified

earthing checking list qualified

air condition, fresh air & exhausting piping system checking list qualified

air condition duct system checking list qualified


air condition, fresh air & exhausting system equipment
checking list qualified
installation
air condition, fresh air & exhausting system testing checking list qualified

fire hydrant system checking list qualified

extinguisher checking list qualified

fire alarm system checking list qualified

sprinkler system checking list qualified

fire system testing checking list qualified


Schedule

enter site schedule plan follow the schedule

intermidia inspection schedule plan follow the schedule

furniture installation schedule plan follow the schedule

contruction work finishing schedule plan follow the schedule

air quality inspection schedule plan follow the schedule

Safety

site safety accident - 0

site house keeping =S= requirement qualified

site cleaning =S= requirement qualified

site ppe safety standard & =S= requirement qualified

site fire proof safety standard & =S= requirement qualified

Document transfer

fire bureau inspection report - getting

as-built drawing - qualified & transferred

as-built documents - qualified & transferred

use manual - qualified & transferred

vender contact list - transferred

key transfer - transferred


Area distribution

Head count SBLV Head count


Social surface(m2) actual capacity actual capacity
Activity Director/JV GM
Department manager
Staff
Sub_total

Head count Head count


Office surface(m2) actual actual
Reception
Pantry (1/F)
Pantry (2/F)
Canteen
Show room
1/F Meeting room (Big)
1/F Meeting room(Medium)
1/F Meeting room(small)
2/F Meeting room (Big)
2/F Meeting room(Medium)
2/F Meeting room(small)
Guest room
1/F Storage room
2/F Storage room
1/F copy room
2/F copy room
2/F MIS room
1/F Locker room (Female worker)
1/F Locker room (Male worker)
1/F Training room
File room for FIN
Smoking room
Sub_total

Total net surface

Total gross surface


Target
driver 1 in 5 years driver 2 in 5 years
name value name value surface Net Surface
Standard 24 capacity 3 72 93.6
Standard 12 capacity 8 96 124.8
Standard 4 capacity 120 480 624
648 842

Target
driver 1 in 5 years driver 2 in 5 years
name name surface
Standard 50 Quantity 0 0 0
Standard 10 Quantity 0 0 0
Standard 10 Quantity 1 10 13
Standard 1.0 Quantity 0 0 0
Standard 350 Quantity 0 0 0
Standard 50 Quantity 1 50 65
Standard 25 Quantity 2 50 65
Standard 12 Quantity 2 24 31
Standard 50 Quantity 1 50 65
Standard 25 Quantity 2 50 65
Standard 12 Quantity 2 24 31
Standard 12 Quantity 0 0 0
Standard 10 Quantity 1 10 13
Standard 10 Quantity 1 10 13
Standard 10 Quantity 1 10 13
Standard 10 Quantity 1 10 13
Standard 50 Quantity 0 0 0
Standard 0.8 Quantity 0 0 0
Standard 0.8 Quantity 0 0 0
Standard 50 Quantity 0 0 0
Standard 30 Quantity 0 0 0
Standard 20 Quantity 1 20 26
298 413

1256

1794
layout details

Master
1.1 Round 50sqm, with company logo on background wall, reception desk
layout

Perspective
1.2 Based on warm white color
layout
Merlin Gerin Sockets on the wall, 1 single phase, 1 3 phases together, space is
1.3 Electricity
4m, around the wall, 3 sockets for the reception desk from background wall

1.4 Cabling sockets see MIS, Layout to be defined later

1.5 Door access Door release button needed,

1.6 Moniter No need

1.7 Air con(H/C) Keep 21-24 centigrade, noise proof

1.8 Fresh air refresh 1.5-2 times per hour,noise proof

Air
1.9 accompany with the fresh air system,noise proof
Reception exhausting

1.10 Water NA

1.11 Glass board NA

1.12 Wood board NA

1.13 Ceiling suspended ceiling with hidden frames

1.14 Floor carpet

1.15 Lightening >350 Lux, decoration lights integrated in ceiling tiles

paper plasterboard with painting in white color, Showroom side made of glass wall
1.16 Partition
+ glass door

1.17 door Glass door for reception connection,glass door for office connection

1.18 …

Master around 50sqm, 2 white/glass boards, desk according to layout, 3 tel line 10 data
2.1
layout line
Perspective
2.2 Based on warm white color
layout

Merlin Gerin Sockets on the wall, 1 single phase, 1 3 phases together, space is
2.3 Electricity
4m, around the wall, 20 sockets for the meeting table from ground

2.4 Cabling sockets see MIS, Layout to be defined later

2.5 Door access NA

2.6 Moniter NA

2.7 Air con(H/C) Keep 21-24 centigrade, noise proof

2.8 Fresh air refresh 1.5-2 times per hour,noise proof

Air
Big 2.9 accompany with the fresh air system,noise proof
exhausting
meeting
room
2.10 Water NA

2.11 Glass board Side wall,1 big

2.12 Wood board Side wall,1 big

2.13 Ceiling suspended ceiling with hidden frames

2.14 Floor carpet

2.15 Lightening >350 Lux square, fluo tube support integrated in ceiling tiles

paper plasterboard with painting in white color, Dulux paint,achive to ceiling


2.16 Partition
height,with billboard

2.17 Insulation Noise proof

2.18 doors Wood door with glass proof window


Master around 25m2, 1 white board, table according to layout, enough space for
3.1
layout 10>pers>6, movable partition in the middle,
Perspective
3.2 Based on warm white color
layout
Merlin Gerin Sockets on the wall, 1 single phase, 1 3 phases together, space is
3.3 Electricity
3m, around the wall, at least 4. For moveable partition, need 2 per room

3.4 Cabling sockets see MIS, Layout to be defined later

3.5 Door access NA

3.6 Moniter NA

3.7 Air con(H/C) Keep 21-24 centigrade, noise proof

3.8 Fresh air refresh 1.5-2 times per hour,noise proof

Air
Medium 3.9 accompany with the fresh air system,noise proof
exhausting
meeting
room 3.10 Water NA

3.11 Glass board 1

3.12 Wood board NA

3.13 Ceiling suspended ceiling with hidden frames

3.14 Floor carpet

3.15 Lightning >350 Lux, fluo tube support integrated in ceiling tiles

paper plasterboard with painting in warm white color, Dulux paint,achive to ceiling
3.16 Partition
height

3.17 Insulation noise proof

3.18 doors Wood door with glass proof window

Master round 10-12 sqm, with round/small square table with 3 seats + low cabinet can put
4.1
layout telephone on it
Perspective
4.2 Based on white color
layout
Merlin Gerin Sockets on the wall, 1 single phase, 1 3 phases together, space is
4.3 Electricity
3m, around the wall, at least 3

4.4 Cabling sockets see MIS, Layout to be defined later


4.5 Door access NA

4.6 Moniter NA

4.7 Air con(H/C) Keep 21-24 centigrade, noise proof

4.8 Fresh air refresh 1.5-2 times per hour,noise proof

Air
Small 4.9 accompany with the fresh air system,noise proof
exhausting
meeting
room 4.10 Water NA

4.11 Glass board 1 ( or white board)

4.12 Wood board

4.13 Ceiling suspended ceiling with hidden frames

4.14 Floor carpet

4.15 Lightening >350 Lux, fluo tube support integrated in ceiling tiles

paper plasterboard with painting in warm white color, Dulux paint,achive to ceiling
4.16 Partition
height

4.17 Insulation Noise proof

4.18 doors Wood door with glass proof window

5. Guest room

Master
6.1 round 25-30 sqm, glass board needed, wood board needed
layout
Perspective
6.2 Based on warm white color
layout
Merlin Gerin Sockets on the wall, 1 single phase, 1 3 phases together, space is
6.3 Electricity
4m, around the wall, 2 sockets on each side wall should be above table

6.4 Cabling sockets see MIS, Layout to be defined later

6.5 Door access NA

6.6 Moniter NA

6.7 Air con(H/C) Keep 21-24centigrade, noise proof

Director's
room
6.8 Fresh air refresh 1.5-2 times per hour,noise proof

Director's Air
6.9 accompany with the fresh air system,noise proof
room exhausting

6.10 Water NA

6.11 Glass board 1

6.12 Wood board 1

6.13 Ceiling Mineral wool, ceiling tile

6.14 Floor carpet

6.15 Lighting >350 Lux, fluo tube support integrated in ceiling tiles

paper plasterboard with painting in white color, Dulux paint, achive to ceiling
6.16 Partition
height,

6.17 Insulation Noise proof

Master
7.1 round 10-12 sqm, glass board needed, wood board needed
layout
Perspective
7.2 Based on warm white color
layout
Merlin Gerin Sockets on the wall, 1 single phase, 1 3 phases together, 2 sockets
7.3 Electricity
on each side wall should be above table
7.4 Cabling sockets see MIS, Layout to be defined later

7.5 Door access NA

7.6 Moniter NA

7.7 Air con(H/C) Keep 21-24 centigrade, noise proof

7.8 Fresh air refresh 1.5-2 times per hour,noise proof


Manager's Air
7.9 accompany with the fresh air system,noise proof
room exhausting
7.10 Water NA

7.11 Glass board 1

7.12 Wood board 1

7.13 Ceiling Mineral wool, ceiling tile on hidden frame

7.14 Floor carpet


7.15 Lighting >350 Lux, fluo tube support integrated in ceiling tiles
paper plasterboard with painting in warm white color, Dulux paint, achive to ceiling
7.16 Partition
height
7.17 Insulation Noise proof

Master
8.1 50 sqm, open 1
layout

Perspective
8.2 Based on warm white color
layout

Merlin Gerin Sockets on the wall, 1 single phase, 1 3 phases together, space is
8.3 Electricity
4m, around the wall,

8.4 Cabling sockets see MIS, Layout to be defined later

8.5 Door access NA

8.6 Moniter NA

8.7 Air con(H/C) Keep 21-24 centigrade, noise proof

8.8 Fresh air refresh 1.5-2 times per hour,noise proof

Air
Showroom 8.9 accompany with the fresh air system,noise proof
exhausting

8.10 Water NA

8.11 Glass board NA

8.12 Wood board NA

8.13 Ceiling mineral wool, ceiling tiles on hidden frame

8.14 Floor carpet

8.15 Lightening >350 Lux, decoration lights integrated in ceiling tiles

paper plasterboard with painting in warm white color, Dulux paint,achive to ceiling
8.16 Partition
height,with billboard, partition connected with reception in glass wall

8.17 Insulation NA
9.Training room

10.Storage room

Master
11.1 2 water bassin, 1 table, 1 water machine, refrigerator needed
layout
Perspective
11.2 Based on warm white color
layout

11.3 Electricity 2 Merlin Gerin Sockets on the wall, 1 single phase, 1 3 phases together,

11.4 Cabling sockets see MIS, Layout to be defined later

11.5 Door access NA

11.6 Moniter NA

11.7 Air con(H/C) Keep 21-24 centigrade, noise proof

11.8 Fresh air refresh 1.5-2 times per hour,noise proof

Air
Pantry 11.9 accompany with the fresh air system,noise proof
exhausting
room &
Copy room 11.10 Water

11.11 Glass board NA

11.12 Wood board NA

11.13 Ceiling Mineral wool, ceiling tile on hidden frame

11.14 Floor Carpet

11.15 Lightening >350 Lux, fluo tube support integrated in ceiling tiles

11.16 Partition NA

11.17 Insulation

11.18 …

Master No change for the original, hand-paper, coat-hanged should be considered,hand-


12.1
layout dryer, water heater
Perspective
12.2 Based on warm white color
layout
12.3 Electricity 2 Merlin Gerin Sockets on the wall, 1 single phase, 1 3 phases together,

12.4 Cabling NA

12.5 Door access NA

12.6 Moniter NA

12.7 Air con(H/C) Keep 21-24 centigrade, noise proof

12.8 Fresh air


Air
12.9 need
Men's exhausting
toilet
12.10 Water Electricit water heater with tank should be considered, sink needed, urinal sensor

12.11 Glass board NA

12.12 Wood board NA

12.13 Ceiling suspended ceiling with hidden frames

12.14 Floor White tiles


>250 Lux, Fluo tube support integrated in ceiling tiles, sufficient light level in seat
12.15 Lightening
toilets
12.16 Partition Modular partition for urinal and seat toilets

12.17 Insulation NA

12.18 …

Master No change for the original, hand-paper, coat-hanged should be considered,hand-


13.1
layout dryer, water heater

Perspective
13.2 Based on warm white color
layout

13.3 Electricity 2 Merlin Gerin Sockets on the wall, 1 single phase, 1 3 phases together,

13.4 Cabling NA

13.5 Door access NA

13.6 Moniter NA

13.7 Air con(H/C) Keep 21-24 centigrade, noise proof

13.8 Fresh air

Women's
toilet
Air
13.9 need
Women's exhausting
toilet
13.10 Water Electricit water heater with tank should be considered, sink needed, urinal sensor

13.11 Glass board NA

13.12 Wood board NA

13.13 Ceiling suspended ceiling with hidden frames

13.14 Floor White tiles

>250 Lux, Fluo tube support integrated in ceiling tiles, sufficient light level in seat
13.15 Lightening
toilets

13.16 Partition Modular partition for urinal and seat toilets

13.17 Insulation NA

13.18 …

other rooms
Main passage No less than 1800mm
Branch passage No less than 800mm
staff Workstation 1400x1400, L type with partition with curved shape, 1 low
Open space office
cabinet, 1 desktop tray

Server room According to IT requirements

side stairs room, with Fresh air and exhausting system, 2 data lines, high round
Smoking area
table, same lighting as common space
900x400 locker cabinet in 2 levels (3 locker/level)

warm white painting, mineral wool and ceiling tiles on hidden frames, carpet,
Locker area
lighting >250 Lux, need Aircon and extraction/ air refresh system

locker interspace 1200


warm white painting, tile floor, mineral wool and ceiling tiles on hidden frames,
ligthing >250 Lux, need Aircon and extraction/ air refresh system. Need prepare
Canteen
food preparation room ( no less than 6.5mx2.5m) and trash disposal room (no less
than 2x2m, external door required for food vendor access/ delivery.
Generality
Steel/ aluminum with glass broken proof window ,Change to same type as internal
External doors doors, door-closer and stopper(without magnetic) needed, security system needed
refer to drawing
Entrance door Broken proof glass slide doors, light detector needed, security system needed,

wood, door closer need, door-stopper(without magnetic) needed, security system


internal doors
needed, light wood color, nameplate needed

Window Double window needed for noise-proof and energy saving, window curtain

Central Aircon, Size calculated and qty based on open space layout,individual
Air-con
control for rooms

Electricity Ladder cabling tray, PVC piping, Yuandong Cable, =S= products, 3phases 5 lines

Water NA

Instrumentation =S= products , 24hrs safety-guard, Fire-proof monitor system

According to Government requirements, emergency drawings needed in each


Spinkler and smoke detector
closing area, open area also

Floor carpet

Ceiling suspended ceiling


ll, reception desk

ses together, space is


om background wall

ater

oof

e proof

ling tiles

side made of glass wall

office connection

yout, 3 tel line 10 data


ses together, space is
ble from ground

ater

oof

e proof

n ceiling tiles

aint,achive to ceiling
, enough space for
ddle,

ses together, space is


n, need 2 per room

ater

oof

e proof

eiling tiles

x paint,achive to ceiling

ts + low cabinet can put

ses together, space is

ater
oof

e proof

iling tiles

x paint,achive to ceiling

oard needed

ses together, space is


uld be above table

ater
oof

e proof

iling tiles

aint, achive to ceiling

oard needed

ses together, 2 sockets


ble
ater

oof

e proof

me
iling tiles
x paint, achive to ceiling

ses together, space is

ater

oof

e proof

me

ling tiles

x paint,achive to ceiling
tion in glass wall
rator needed

3 phases together,

ater

oof

e proof

me

iling tiles

ld be considered,hand-
3 phases together,

k needed, urinal sensor

icient light level in seat

lets

ld be considered,hand-

3 phases together,
k needed, urinal sensor

icient light level in seat

lets

curved shape, 1 low

data lines, high round


e
r/level)

dden frames, carpet,


refresh system

es on hidden frames,
system. Need prepare
disposal room (no less
access/ delivery.
o same type as internal
security system needed

curity system needed,

eeded, security system


eded

ing, window curtain

pace layout,individual

oducts, 3phases 5 lines

onitor system

wings needed in each


装 饰 材 料 表 Material list

编号Code 区域Area 说明或品牌型号Description


墙面油性乳胶漆 油性乳胶漆 Oil latex painting
Wall paint

卫生间吊顶 多孔铝扣板 Aluminium board


Toilet ceiling

玻璃隔墙 办公隔墙 Office partition 12mm二次钢化安全清玻璃


Glass partition 12mm two times tempered safety clear glass

玻璃白板 会议室白板 White board 5mm清玻璃背面喷白漆


Glass white board 5mm back painting glass

玻璃背景墙 大厅造型墙 8mm清玻璃背面喷白漆


Glass logo wall Lobby logo wall 8mm back painting glass

镜子 卫生间 Toilet mirror 8mm清镜


Mirror 8mm mirror

玻璃门 玻璃门 Glass door 防火玻璃


Glass door fireproof glass

不锈钢 各局位 General 1.2mm 拉丝不锈钢 SUS304


Stainless steel 1.2mm SUS304 stainless steel glossy surface

铝合金 办公区 1.6mm 铝合金门框、隔断框


Aluminium Office 1.6mm, door frame, partition frame

吊顶矿棉板、龙骨 天花 600*600 矿棉板、镀锌龙骨


False ceiling False ceiling

木皮wood board

防火板 卫生间洗手柜 富美家防白橡木皮防火板


Formica 茶水间厨柜 富美家 Formica
Cabinet

软木 办公室及小会议室墙面
cork mgr. & meeting room wall
人造石 卫生间、茶水间台面
Synthetic stone Toilet, pantry

瓷片 地面 防滑 (洗手间、餐厅、办公区)
Ceramic tile Floor Non-slip for toilet, canteen, office

瓷片 洗手间墙面
Ceramic tile Toilet wall

环氧自流平 地面 3mm 厚灰或绿色哑光环氧自流平地面


Epoxy self-leveling Floor 3mm gray or green self-leveling epoxy paint
floor painting 70~80 RMB/M2

抗静电架空地板 机房 抗静电架空地板
anti-static raised floor MIS room anti-static raised floor

地毯 2楼办公室地面 防滑
Carpet 2F office floor anti-slip

卫生间地面 防滑
地砖 toilet floor anti-slip
floor tile

门锁
door lock
茶水间龙头
faucet
闭门器
door closer
五金 hardware
合页
铰链

地弹簧 玻璃门
floor spring glass door

窗帘
curtain
墙面龙骨
Partition structure

石膏板
Gypsum board
材 料 表 Material list 工程名称:
图别: 阶段:
工程编号: 日期:
品牌 Brand 供货期Delivery 图例 Legend
多乐士,立邦
Dulux, Nippon

洛玻,耀华
Luoyang, Yaohua

洛玻,耀华
Luoyang, Yaohua

洛玻,耀华
Luoyang, Yaohua

洛玻,耀华
Luoyang, Yaohua

洛玻,耀华
Luoyang, Yaohua

西飞 Xifei
忠旺 Zhongwang
坚美 Jianmei

阿姆斯壮 Armstrong
可耐福 Knauf
龙牌 Longpai

富美家 Formica
普丽 Print Abet
富美家 Formica
杜邦 Dupont
三星 LG

冠军 Champion
东鹏 Dongpeng
萨米特 Summit

冠军 Champion
东鹏 Dongpeng
萨米特 Summit

档次为中档
middling class

档次为中档
middling class

GMT

摩恩 Moen

GMT

GMT

拉法基 Lafage
龙牌 LongPai
泰山 Taishan
KNAUF
拉法基 Lafage
安装材料表 M&E Material list

编号Code 区域Area 说明或品牌型号Description 供应商Supply


电线管 electric tube
线槽 cable trunk

配电箱 electric panel 电器元件施耐德 =S= 施耐德所述品牌 =S=


箱体施耐德

电线、电缆 cable , wire 远东 Yuandong

开关、插座 socket & switch 施耐德所属品牌 =S=

出口指示灯 exit lighting 飞利浦 Philips

灯盘、灯管 Lighting 飞利浦 Philips

空调 Air Condition 分体空调 divided air con. 青岛日立,松下


Hitachi, Panasonic

卫生间洁具及五金 惠达,和成 Huida, Hecheng


sanitation & hardware

干手器 hand dryer


工程名称:
图别: 阶段:
工程编号: 日期:
供货期Delivery 图例 Legend