This Quality Assurance Plan outlines tests required for construction of an embankment with revetment and launching apron. For embankment works, tests are required for water content, optimum moisture content, and maximum dry density prior to and during construction, with field density tests during construction. For gabion structures, zinc coating, diameter, and uniformity of gabion wires will be tested, with 3 samples from each lot tested. Tests will be conducted by lab technicians at the lab or on site by site engineers, as specified.
This Quality Assurance Plan outlines tests required for construction of an embankment with revetment and launching apron. For embankment works, tests are required for water content, optimum moisture content, and maximum dry density prior to and during construction, with field density tests during construction. For gabion structures, zinc coating, diameter, and uniformity of gabion wires will be tested, with 3 samples from each lot tested. Tests will be conducted by lab technicians at the lab or on site by site engineers, as specified.
This Quality Assurance Plan outlines tests required for construction of an embankment with revetment and launching apron. For embankment works, tests are required for water content, optimum moisture content, and maximum dry density prior to and during construction, with field density tests during construction. For gabion structures, zinc coating, diameter, and uniformity of gabion wires will be tested, with 3 samples from each lot tested. Tests will be conducted by lab technicians at the lab or on site by site engineers, as specified.
Department of Water Resources and Irrigation People's Embankment Program Field Office No. 6 Lamahi, Dang
QUALITY ASSURANCE PLAN (QAP)
Name of Contract: Construction of Embankment with Revetment and Launching Apron Name of Contractor: Lumbini Jaljala J/V Contract Identification No.: WRRTW/Banke/05/073/074 Management of Tests Specificat Prior ion Quantity as No. of S.No Description of works Unit construction(PC)/During Test Required Frequency of test * At Remarks Clause per BoQ Tests Construction (Site/Lab/Ot Ref. Equipment hers) By Embankment Works Water Content One for each source 2 IS Sieves with lid and Pan Lab Lab Technician Prior and During Optimum Moisture Content(OMC) One for each source 2 Atterberg's limit appratus Lab Lab Technician 1 1201 13670.00 m3 Construction Maximum Dry Density(MDD) One for each source 2 Proctor Test Apparatus Lab Lab Technician Field Density(FD) 30 Appropriate Apparatus Lab Lab Technician Construction of gabion structures; Supply and Filling of 25854.75 m3 boulders into Gabion boxes SS 19-1 including all lead and lift Gabion Wires 1. Zinc Coating 6 Outside Lab Technician As per No. of 2.00 3. Diameter 6 Outside Lab Technician Coils 167850.59 m2 3 Samples from each lot Site Engineer/Sub 6 4. Uniformity Visual Inspection At site Engineer