Professional Documents
Culture Documents
Muhammad Zahiduzzaman
Muhammad Zahiduzzaman
Muhammad Zahiduzzaman
Submitted To Submitted By
Chittagong Plant
a) Management Employees
b) Non-management Employees
For the most part, management and non-management staff have different rules and regulations.
In addition, the HR officer discusses the company's rules, provident fund, and insurance policy.
Management receives two festival bonuses, while non-management personnel receive three.
Other business areas for Transcom Beverages Ltd include newspapers, pharmaceuticals, and
electronics.
During orientation, the HR officer presents me to the heads and managers of each of the plant's
departments.
Plant Administration
Personnel and administrative support for senior executives Mr. Murshedul Huda
introduced me to the company's other sister concern and provided chairman Sir's advice
as well as Sir's accomplishments at the Oslo Business Award 2012. The percentage of
TBL's business share, which is 42-43 percent, was also disclosed. He talked on
maintain the company's reputation, he also urged to love work and be sensitive about
job.
regulatory rules are followed. For both internal and exterior testing, there are numerous
parameters to consider. Water sampling, CO2 testing, preform resin percentage and resin
quality checking, water hardness and alkalinity, as well as required chemical dosing, IPM
management audit, and Food Safety program maintenance, for example, are all carried out in
QC parameter test
1. Bottle fitness test
2. Preform viscosity test
3. Syrup preparation and it’s brix test
4. System CIP and rinse ensure
5. Ready to line for filling
6. Water parameter test
7. Concentrate conformation
8. Closer and its torque check
9. Reagent preparation
10. Internal audit participation
11. FSSC and AIB audit rules maintain
12. Waste water control by ETP
13. Overall cleaning inspection
14. Communicate IPM management
UV tank
ETP (Effluent Treatment Plant)
𝐻
There is a biological ETP at TBL. After treatment 𝑃 will be 7.5. DAP (Di-ammonium Phosphate)
and Urea are used as nutrition. Air or Oxygen is also supplied by the blower.
IPM (Integrated Pest Management)
Electrical Information
No. Generator Pieces Capacity (MW )
01 Gas 06 7.5
02 Diesel 02 2
03 Substation 01 6
Total 15.5
Apart from these, BREB (Bangladesh Rural Electrification Board) and United
Power also provide electricity.
Raw Materials
No. Name
01 Preform Resin
02 Preform
03 Sugar
04 CO2
05 Water
06 Concentrate
07 Closer
08 Label
09 Chlorine
10 Lime
11 Chemical
12 Safety Equipment
13 Shrink Film
14 Stress Film
15 Reagent
16 Preservative
17 Sodium Citrate, Malic Acid
Engineering Store
The Engineering Store is where local and foreign chemicals and spare
parts are acquired and stored.
This store has 8000 elements with a market worth of nearly 16 crore.
The inventory system is likewise under the officer's control. They also
utilize inventory software to keep their records up to date.
They usually try to buy things with cheques. If a corporation or
vendor refuses to take a cheques, they must purchase their goods in
cash.
Internal and External Audit
Every day, husky produces 35 million pieces of performs at PMP (Preform Manufacturing
Plant).
Resin Category
CO2 Storage
Capacity
250 lb/hr 20
500 lb/hr 25
500 kg/hr 50
Co2 Manufacturing Plant
Filter
Civil
For their working purposes, they may require everyday workers at times.
Market Equipment
Related paper for machine: CRF form, Trade License, NID, Picture & peed
acknowledgment.
Distribution & Shipping Operations Flow Chart
No Mushak Rules
01 Mushak 2.1 VAT Registration
02 Mushak 2.3 BIN Certification
03 Mushak 4.3 Price Declaration
04 Mushak 6.1 Purchase Register
05 Mushak 6.3 Vat Challan
06 Mushak 6.2 Sales Register
07 Mushak 6.2.1 Purchase & Sales Register for Trade
08 Mushak 6.7 Credit Note
09 Mushak 6.8 Debit Note
10 Mushak 9.1 Monthly Return
11 Mushak 4.4 RM Destruction
12 Mushak 4.5 FG Destruction