Action Y N NA Remarks

LOAD CALCULATION
Collect the following Building Data
Arch. Plan (Furniture preferred)

Building component schedule (Doors, Windows, … ETC)

Building elevation to verify the wall heights


Ceiling height for each space
Walls, roof, partitions composition (U-Value for each if
possible)
Building orientation (North direction)
Building schedule for people, lighting & Equipment
Design climate as per building location

Check the following for Each space:-


Internal required temperature and humidity
Lighting & Equipment heat dissipation
Occupancy & degree of activity
Required FA as per activity
Exposed wall data (Direction, area, type & components'
data)
Exposed roof data (Direction, Slope, type, area &
components' data)
Partition data (Type, area … ETC)
Exhaust Value (if required)
Location inside building (@ GF, above or below
conditioned or un conditioned space)
Plenum data
Check Pressurization value (If required)
Connected system (AHU)

Check the following for Each HVAC Unit (Equipment):-

System type (CW-DX-VRV-district-hot water-steam)

Equipment Type (package-ducted-ductless-decorative-


ceiling-floor)
Zoning
Ventilation control (constant-DCV-scheduled-
propotional)
Economizer exists?
Humidifier exists?
Dehumidifier exists?
Equipment Type (Constant flow or variable flow)

Method of excess supply air (Re-heat, reserve or adjust)


Action Y N NA Remarks
Supply fan type (Draw through, blow through or Package
fan)
Zone exhaust exceeding supply ?
Leaving Temp. for cooling & heating
Fan efficiency & SP
Applied schedule for people, lighting & equipment
Safety Factor
Chilled water Temp. Difference
Calculation Method (Cooling only or heating either)
People Diversity factor
Ventilation value
infiltration value
Action Y N NA Remarks
Duct Temp. change OR Heat gain percentage
Plenum or ducted return?
Duct leakage
Pre-treated OA type
Pre-treated air Temp.
Heat recovery status
HR SER
Value of any additional Miscellaneous load

* Verify that the AHU results (Supply CFM, OA CFM & cooling load capacity) are available in market
by vendors, otherwise re-distribute connected spaces till you reach the max. values available

** Incase of following the non dedicate smoke removal method, verify that AHU serving only spaces
in the same fire zone
Chilled water Temp. Difference
Calculation Method (Cooling only or heating either)
People Diversity factor
Ventilation value
infiltration value
Duct Temp. change
Pre-treated OA type
Pre-treated air Temp.
Heat recovery status
HR SER
Value of any additional Miscellaneous load

* Verify that the AHU results (Supply CFM, OA CFM & cooling load capacity) are available in market
by vendors, otherwise re-distribute connected spaces till you reach the max. values available

** Incase of following the non dedicate smoke removal method, verify that AHU serving only spaces
in the same fire zone
Action Y N NA Remarks

DESIGN DRAWING
General Before Starting (Verify the following)
Arch. Plans are comply with the latest edition
Mechanical shafts' size are suitable for duct riser as per
load calculation result

Inside each space verify the following


Air flow complying the load calc. result
No. of air outlet suitable for air flow required
Flexible diameter for each outlet
Space HVAC data written (CFM, Flex. Diameter, No. &
size of air outlet)
Exhaust system required ?
Value of supply & Return CFM achieving the pressure
difference?

Duct works (Supply & Return), check the following

Duct height that connected to flex. Is more than flex. Dia.


(2" minimum)
VAV installed for each individual zone
Main duct height that connected to branch duct has height
more than the branch height (2" more minimum)
VD is installed for all branches
Duct height is suitable to space plenum

Duct routing not conflicting with beams, columns, ….. ETC

Fire damper installed on duct paths through fire zone walls

Fire damper installed on opening of free return air paths


through fire zone walls
Duct text (Size & Flow) is written to each part
Duct riser Text data written (CFM, Connected AHU)
Fire damper installed at main duct connected to riser
Bell mouth is there for free return system
Duct distance (From AHU to the first fitting) at roof comply
with min. distance allowed by code
All dampers installed to duct

* Continue verifying the summation of CFM after each branch to the AHU
* Continue Verifying that duct Velocity for any duct portion comply with the max. velocity restriction by code
Action Y N NA Remarks

Chilled water pipes works (Supply & Return), check


the following
CHWP S&R connected to each AHU

Water flow rate (GPM) comply with load calculation result

Pipe Hookup shown at pipes connected to AHU, Pumps &


chillers
Pipe text (size & Flow GPM) written to each pipe
Pipe network don’t blocking pathway at any area
Pipe Hookup shown at ETS is correct
Provision for future expansion is shown?

* Continue verifying the summation of GPM after each branch to the chiller (CUP)
* Continue Verifying that pipe Velocity for any pipe portion comply with the max. velocity restriction by code

HVAC Equipment, check the following


Chillers Qty. & capacity are enough for the required cooling
load calculated

Equipment furnisher at roof aren't blocking any pathway

Each equipment physical dimension comply true dimension


as per selection
Spacing between equipment, walls & roof comply with
manfacturer recommendation
Chilled water pumps' Qty. & Capacity are the same of
chiller quantity & Capacity

Exhaust fans are away from any FA duct intake and FAF

Exhaust fans' qty. & capacity comply with calculation


SRFs are installed in correct location
SRFs Capacity are comply with calculations
FAFs are installed in correct location
FAFs Capacity are comply with calculations
SCPFs are serving all escaping stair case
SCPFs Capacity are comply with calculations
Expansion Tank are installed in correct location

Expansion Tank Capacity are comply with calculations

Buffer Tank are installed in correct location


Buffer Tank Capacity are comply with calculations

Chemical Dosing Pot are serving all escaping stair case


Action Y N NA Remarks
Chemical Dosing Pot Capacity are comply with calculations

Makeup Source are serving all escaping stair case

Makeup Source Capacity are comply with calculations

HVAC Equipment Schedule, confirm the following

AHU
Cooling capacity comply with the load caculation
Tag No. comply with drawings
Location comply with drawings
Supply CFM comply with the load caculation
FA CFM comply with the load caculation
Type comply with the load caculation
Ambient Temp. comply with the load caculation
ESP comply with caculation
Chilled water Temp. comply with the load caculation
Chilled water Flow comply with the load caculation

Chiller
Cooling capacity comply with the load caculation
Qty. comply with drawings
Tag No. comply with drawings
Location comply with drawings
Type comply with selection
Chilled water Temp. comply with the load caculation
Chilled water Flow comply with the load caculation
Ambient Temp. comply with the selection

Pump
Qty. comply with drawings
Tag No. comply with drawings
Location comply with drawings
Type comply with selection
Chilled water Flow comply with the load caculation
Pump Head comply with the caculation

VAV
Qty. comply with drawings
Tag No. comply with drawings
Flow CFM comply with the Tag. No.
NC comply with code

Fans
Tag No. comply with drawings
Action Y N NA Remarks
Qty. comply with drawings
Flow CFM comply drawings
Type comply with selection
Location comply with drawings
ESP comply with caculation

Riser Diagram, Verify the following


All Risers are shown
All equipment are shown in correctfloor as per plans
Size at riser comply with size on plan.
Size of each floor entrance comply with size on plan.
SRF & FAF are connected to main duct
Equipment data comply with equipment schdule

General, Verify the following


Title block comply with the project title project of other
departments
Project name is comply with tender project name
Drawing Title is comply with drawing list template
Drawing No. is complying drawing list template

General Details, Verify the following


Detail covers all project items
Item installation comply with project specs.
Item values shown in details comply with values in project
Detail No. refere to item in plans
Action Y N NA Remarks