2" CONDENSATE FROM CO-GEN

2" DEMIN WATER FOR PUMP 3&4 2"


2" STEAM (20 bar) FROM HEADER

4" CONDENSATE FROM CP PLANT 4" DEAERATOR

2" STEAM (20 barg) FROM HEADER


TP

3" COND. FROM Bx PLANT

TP
2" CONDENSATE FROM POWERGEN

1"
2" WATER FROM RO

2" WATER FROM WTP (Bx)

DEAERATOR DEAERATOR
3" STEAM (1.7 barg)

3" STEAM (20 barg) STORAGE TANK


13.6 TE/HR 4"

3"

DRAIN
STORAGE TANK STORAGE TANK
20 TE/HR 12 TE/HR

1"

4"
TP
DRAIN DRAIN

TP
2" TO POWERGEN

2" TO BOILER-5

TO POWER GEN 2"


4" TO CO-GEN

TO BOILER-4 2"
2" TO BOILER-6

TO BOILER-3 2"
TP TP TP
TO BOILER-2 2"

4"x2" 3"x2"
2" 4" 2" TO BOILER-7

TP
TO BOILER-1 2" 2"

RO RO RO RO 2" 2" 2"

TP

A B C D 3" A 3" B 3" C


6" 8"x4"
3" 3" 3" 3"
4"
4"x6" TP TP TP
TP
BOILER FEED WATER PUMPS (Bx)
4"

BOILER FEED WATER PUMPS (CP)

NOTES:
ICI Pakistan Limited
Corporate Technical & Engineering Department
POLYESTER BUSINESS AREA
POWER CO-GEN PROJECT
P & ID - BFW DISTRIBUTION

0214-PID-002 0 1/1