SSP Doc No.

:
GENERAL FIELD INSPECTION AND TEST PLAN
Date :
FOR CEILING WORKS Revision No. :

Project: COAL FIRED POWER PLANT Contract No. :

Owner :
Area of Work : Building - All Areas
Work : Roof and Ceiling Works – Miscellaneous Architectural

INSPECTION
REFERENCE DOCUMENT / ACCEPTANCE VERIFYING RESPONSIBILITY
NO. INSPECTION AND TEST ITEM REMARKS
CODE / STANDARD CRITERIA DOCUMENT
CONSORTIUM PLN
1. Document Review:

Drawings, Tech. Requirements, Approved Drawings, Latest Revision of Daily Report, R R


Product Specification Sheet or Contract Document, Approved Document Weekly Report,
Manual, Manufacturers’ Owner Specifications, and Current or Latest Monthly Report
Installation Instructions , Job British Std., SNI, ISO and Edition of Code or Std.
Standard Practice.
2. Material Receipt and Storage PO, Delivery Receipt
Material Control
2.1 Material Data Record, Procedure and Supplier/ Valid & Complete MIR / MRR and I, V I*, V, R *RFI Apply (Typ.)
2.2 Material Receiving Inspection Manufacturer’s Product Comply w / approved Daily Report
2.3 Material Handling, Information / Data Sheet Procedure (DR)
Lay down / Storage Facility for Handling, Storage &
Use

INSPECTION AND TEST ITEM REFERENCE ACCEPTANCE VERIFYING INSPECTION REMARKS


NO. DOCUMENT /CODE / CRITERIA DOCUMENT RESPONSIBILITY

Page 1 of 6
STANDARD CONSORTIUM PLN

3 Verification of Material & Technical Requirement ,


Permanent Consumables Project Spec., ANSI Std.
Construction and
3.1 Exposed Tee Suspended Architectural Drawings, Inspection I, V I, V
Acoustic Tile Ceiling Material Information Record (IR)
a) Suspension System Sheet and Supplier’s
a.1] Material Recommended Mill finished aluminum
(1)
Supplier’s
a.2] Wall Angle Installation Practices Comply w/ drawing (1) Drawing/Spec
a.3] Clips / Adjuster Interlocking type
(2)
a.4] Suspension Rod / Wire Annealed wire/rod (2) 2.778 mm
a.5] Suspended Frame Galvanized
 Main Frame Annealed
Comply w/drawing (1)
Wire /Rod
 Main Tee Comply w/drawing (1)
 Cross Tees Comply w/drawing (1)
 Furring Channel Comply w/drawing (1)
 Snap Lock
Comply w/drawing (1)
b) Acoustical Tile
b.1] Material Mineral fiber (1)
b.2]Dimensions 60 x 60 x 1,58 (cm) (3)
Incombustible
b.3] Panel Type Lay in/unidirectional (3)
Mineral Fiber
b.4] Panel Design Shadow line design
b.5] Design Pattern Glacier pattern

3.2 Exposed Tee Suspended Inspection I, V I, V


Moisture Resistant Acosutic Record (iR)
Tile Ceiling
a) Suspension System
a.1] Material Mill finished aluminum
a.2] Wall Angle Comply w/ drawing (1)
a.3] Clips / Adjuster Interlocking type

INSPECTION AND TEST ITEM REFERENCE ACCEPTANCE VERIFYING INSPECTION REMARKS

Page 2 of 6
NO. DOCUMENT /CODE / RESPONSIBILITY
CRITERIA DOCUMENT
STANDARD CONSORTIUM PLN

a.4] Suspension Rod / Wire Annealed wire/rod (2)


a.5] Suspended Frame
 Main Frame Comply w/drawing (1)
 Main Tee Comply w/drawing (1)
 Cross Tees Comply w/drawing (1)
 Furring Channel Comply w/drawing (1)
 Snap Lock Comply w/drawing (1)
b) Moisture Resistant
Acoustical Tile – Lay In
Panel
b.1] Material Ceramic
b.2] Dimensions 60 x 60 x 1.58 (cm)
b.3] Panel Type Lay in & washable
b.4] Panel Design “Travertine” design
b.5] Panel Face Finish Matte white finshed

4. Ceiling Installation

4.1 Suspension System Technical Requirement, Daily Report I, V I, V


Construction Scheme SNI, National Building (DR) &
Code, Construction and Full & unrestrained Inspection
a) Perimeter Coverage Architectural Drawings, Record (IR) (4)
Free To Move
b) Interface with Walls Free movement (4)
Quality Control Procedures. @ Intersections
w/ Walls
4.2 Hanger Installation Technical Requirement, DR and IR I, V I, V
a) Hanging Length SNI, National Building
Ample & equal for all
b) No. of Hangers and Pitch Code, Construction and
Comply w/darwings (1)
c) Attachment Point Architectural Drawings,
Supplier’s Installation O/H construction (5)
d) Purpose / Function Hold & secure ceiling (5)
Instructions Sheet & Std Roof underside,
Practice (built up roof),
Beam, Girder or
Joist Members

Page 3 of 6
REFERENCE INSPECTION
ACCEPTANCE VERIFYING RESPONSIBILITY
NO. INSPECTION AND TEST ITEM DOCUMENT /CODE / REMARKS
CRITERIA DOCUMENT
STANDARD CONSORTIUM PLN

4.3 Main Frame (Main Tees) Technical Requirement, DR and IR I, V I*, V


SNI, National Building ≤ 60 cm
a) Tee Spacing
Code, Construction and Comply w/drawing
b) Member Straightness &
Architectural Drawings,
Alignment / Squreness
Supplier’s Installation 20 cm maximum
c) Distance from Wall of
Instructions Sheet & Std
Outer lines (End Tees)
Practice 25 mm, maximum
d) Distance / Gap of Ends
From Wall
e) Length of Installed Tee Continuous w/o splice
Member
f) Use of Spliced or Splicing of Comply w/manufacturer
Tee Members standard splices

4.4 Furring / Cross Tees Technical Requirement, DR and IR I, V I, V


SNI, National Building
a) Instalation Relative to Main At right angle w/main
Code, Construction and
Tees tee
Architectural Drawings,
b) Tee Spacing Comply w/ dwg (6) (6)
Same Spacing
Supplier’s Installation
c) Member Straightness & as Main Tees
Instructions Sheet & Std.
Alignment / Squareness
Practice
c) Attachment / Connection to
Main Tees
c.1] Attachment Point At each crossing
c.2] Tightness of Connections Tight and secured
d) Device / Means Used to Use clips / saddle ties
Connect Furring / Cross
Tees to Main Tees

Page 4 of 6
REFERENCE INSPECTION
ACCEPTANCE VERIFYING RESPONSIBILITY
NO. TEST AND INSPECTION ITEM DOCUMENT /CODE / REMARKS
CRITERIA DOCUMENT
STANDARD CONSORTIUM PLN

4.5 Tile Installation Technical Requirement, DR and IR I, V I, V


SNI, National Building Lay in to frame
a) Method Code, Construction and
b) Gap Between Adjacent Close fit
Architectural Drawings,
Tile Supplier’s Installation
c) Exposed Tile Faces Instructions Sheet, & Std Flat and edges aligned
Alignment & Level Practice
d) Final Cleaning, Use clean cotton rug
Completeness Check
and Punchlist

4.6 Final Acceptance Technical Requirement, QC Installation complete Final Inspection I, V I*, V
Inspection of Ceiling Procedures, Construction & and comply w/dwgs Report and / or
Works Architectural Drawings Certificate

Documents and Records Technical Requirement, Reviewed and Transmittal Slip V, R R, A


5.
Quality Plan and QC approved by PLN or Sheet
5.1 Material / Product Procedures
Information Sheet
5.2 Material Warranty
Certificate – Supplier /
Vendor
5.3 MIR and MAS
5.4 Inspection Records
5.5 Final Acceptance Record

Page 5 of 6
LEGEND: I; Inspect T; Test A; Accept W; Witness R; Review V; Verify By Random Inspection H; Hold Point

HOLD POINT: Specific Work Item or Material or Activity Inspected/Reviewed by Client or Client Representative
or Test and Test Result on this same Work Item or Material or Activity SHALL Have been Accepted or
Approved by Client or Client Representative Before the Immediately Succeeding Work or Activity to
the Inspected / Tested Work or Material or Activity Maybe Started or May Proceed.
NOTICE OF AUTHORIZATION TO COMMENCE:

“The undersigned hereby AGREE and APPROVE site implementation of this Field Inspection and Test Plan (FITP) for the WORKS”.

Prepared By: Date: Approved By: Date:

_____________________________________________ __________ _____________________________ ___________

Page 6 of 6