GENERAL FIELD INSPECTION AND TEST PLAN
Date :
FOR CEILING WORKS Revision No. :
Owner :
Area of Work : Building - All Areas
Work : Roof and Ceiling Works – Miscellaneous Architectural
INSPECTION
REFERENCE DOCUMENT / ACCEPTANCE VERIFYING RESPONSIBILITY
NO. INSPECTION AND TEST ITEM REMARKS
CODE / STANDARD CRITERIA DOCUMENT
CONSORTIUM PLN
1. Document Review:
Page 1 of 6
STANDARD CONSORTIUM PLN
Page 2 of 6
NO. DOCUMENT /CODE / RESPONSIBILITY
CRITERIA DOCUMENT
STANDARD CONSORTIUM PLN
4. Ceiling Installation
Page 3 of 6
REFERENCE INSPECTION
ACCEPTANCE VERIFYING RESPONSIBILITY
NO. INSPECTION AND TEST ITEM DOCUMENT /CODE / REMARKS
CRITERIA DOCUMENT
STANDARD CONSORTIUM PLN
Page 4 of 6
REFERENCE INSPECTION
ACCEPTANCE VERIFYING RESPONSIBILITY
NO. TEST AND INSPECTION ITEM DOCUMENT /CODE / REMARKS
CRITERIA DOCUMENT
STANDARD CONSORTIUM PLN
4.6 Final Acceptance Technical Requirement, QC Installation complete Final Inspection I, V I*, V
Inspection of Ceiling Procedures, Construction & and comply w/dwgs Report and / or
Works Architectural Drawings Certificate
Page 5 of 6
LEGEND: I; Inspect T; Test A; Accept W; Witness R; Review V; Verify By Random Inspection H; Hold Point
HOLD POINT: Specific Work Item or Material or Activity Inspected/Reviewed by Client or Client Representative
or Test and Test Result on this same Work Item or Material or Activity SHALL Have been Accepted or
Approved by Client or Client Representative Before the Immediately Succeeding Work or Activity to
the Inspected / Tested Work or Material or Activity Maybe Started or May Proceed.
NOTICE OF AUTHORIZATION TO COMMENCE:
“The undersigned hereby AGREE and APPROVE site implementation of this Field Inspection and Test Plan (FITP) for the WORKS”.
Page 6 of 6