Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Page 1 of 1

ULTRASONIC TEST REPORT

Inspection Date :23 February 2020 Report no : IES-Metrocem-UT-02


Project Name : Metrocem Cement Factory UT Equipment :Soundwel SUB-100
Location : Mukterpur, Munshiganj. Range : 0-500
Inspection Request No. : N/A Search unit : 45⁰ ,8*9mm ,4Mhz
Drawing Reference (S) : N/A Calibration block : IIW V2 Block, Reference block
Materials : N/A Test Specimen : Ball Mill-02
Dia : 4M , r : 2M
Surface Condition : As Smooth Couplent : Gear Oil

SL. No. Test Specimen Depth mm Maxm. Echo Defect Location for Surface Result Defect Type
Actual Depth Mes. Depth Amplitude % HSH W E N S
01. BALL MILL-02 Wave 50+70=120 30.00 100% -60 40 +20 -30 Rejected Crack

Defect Code: CR- Crack IP-Incomplete Penetration IF– Incomplete Fusion SL- Slag P- Porosity EP-Excess Penetration CP- Cluster Porosity CON – Concavity BSR – Before Stress Relief ASR – After Stress Rel
TESTED BY: MSM Witness Shah Cement Witness
Name: Md.Shadikul huq Shezan Name:Rasel AAhmed
IES: ASNT Level –II (Ultrasonic Test) Superviser

Signature: Signature:

Date:13/09/2020 Date: 13/09/2020


TEST CARRIED OUT AS PER CODE & STANDARD OF API Standard 1104

TESTED BY IES-INDUSTRIAL ENGINEERING SERVICES


House # 64, (1st Floor), Road # 06, Block # A, Sec # 12, Mirpur, Dhaka-1216, Phone : +8804477972245, 01710134359, 01711834576,
E-mail: iesbd2000@gmail.com, ahies.bd@gmail.comashik@iesndt.com, amit@iesndt.com, Web: www.iesndt.com

You might also like