| Project : | | | | Material | Labour | |
| -------------------- ----------------- ---------------------------- | Item | QTY | | Unit ------------------ - -------------- - ------------- - -------------- | Note |
| Work name : CONCRETE DRAINAGE | | | | Rate | Amount | Rate | Amount | |
| -------------------- ----------------- ---------------------------- - ------------------------------------- - -------------------
-- - ----- ------------------ - -------------- - ------------- - -------------- - ------------------------- -
| Unit price : Rp. 856,400 /M | | | | | 0 | | 0 | |
| -------------------- ----------------- ---------------------------- | -Excavation | 1.750 | | M3 | 0 | 45,000 | 78,750 | |
| Note : | -Soil disposal | 0.980 | | M3 | 0 | 36,000 | 35,280 | |
| OPEN TYPE DW-1 | -Back fill | 0.770 | | M3 | 0 | 15,000 | 11,550 | |
| -------------------- ----------------- ---------------------------- | | | | | 0 | | 0 | |
| W= 800.00 mm | | | | | 0 | | 0 | |
| D= 600.00 mm | -Rubble stone | 0.130 | | M3 223,000 | 28,990 | | 0 | |
| H= 900.00 mm | | | | | 0 | | 0 | |
| t1 (Wall) = 120.00 mm | | | | | 0 | | 0 | |
| t2 (Slab) = 150.00 mm | -Lean concrete | 0.070 | | M3 545,000 | 38,150 | | 0 | |
| Tulangan utama 1 0.617 | -Concrete | 0.300 | | M3 645,000 | 193,500 | | 0 | |
| Rebar dia- 10.00 mm | -Rebar | 16.060 | | KG 12,000 | 192,720 | | 0 | |
| Jarak = 200.00 mm | -Form | 2.700 | | M2 90,000 | 243,000 | | 0 | |
| Tulangan bagi 1 0.617 | | | | | 0 | | 0 | |
| Rebar dia- 10.00 mm | | | | | 0 | | 0 | |
| Jarak = 200.00 mm | -Concrete steel trowel finish | 0.800 | | M2 | 0 | 5,000 | 4,000 | |
| Rubble stone t- 100.00 mm | | | | | 0 | | 0 | |
| Lean concrete t- 50.00 mm | -Concrete support | 0.800 | | M 38,100 | 30,480 | | 0 | |
| GL-top concrete 0.00 mm | | | | | 0 | | 0 | |
| Concrete support | | | | | 0 | | 0 | |
| d1 = 150.00 mm | | | | | 0 | | 0 | |
| d2 = 200.00 mm | | | | | 0 | | 0 | |
| Jarak = 2,000.00 mm | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | ------------------------------------- - -------------------
-- - ----- ------------------ - -------------- - ------------- - -------------- | |
| | | Sub total | 726,840 | Sub total | 129,580 | |
| | | ------------------ - -------------- - ------------- - -------------- | |
| | | Total | 856,420 | |
= ============ ========== ================= = ====================== = =========== = === = =========== = ========= = ======== = ========= = =============== =
BREAK DOWN OF UNIT RATE
= ============ ========== ================= = ====================== = =========== = = === =========== = ========= = ======== = ========= = =============== =
| Project : | | | | Material | Labour | |
| -------------------- ----------------- ---------------------------- | Item | QTY | | Unit ------------------ - -------------- - ------------- - -------------- | Note |
| Work name : CONCRETE DRAINAGE | | | | Rate | Amount | Rate | Amount | |
| -------------------- ----------------- ---------------------------- - ------------------------------------- - -------------------
-- - ----- ------------------ - -------------- - ------------- - -------------- - ------------------------- -
| Unit price : Rp. 1,367,500 /M | | | | | 0 | | 0 | |
| -------------------- ----------------- ---------------------------- | -Excavation | 3.450 | | M3 | 0 | 45,000 | 155,250 | |
| Note : | -Soil disposal | 1.880 | | M3 | 0 | 36,000 | 67,680 | |
| BOX TYPE DW-1a | -Back fill | 1.570 | | M3 | 0 | 15,000 | 23,550 | |
| -------------------- ----------------- ---------------------------- | | | | | 0 | | 0 | |
| W= 900.00 mm | | | | | 0 | | 0 | |
| D= 850.00 mm | -Rubble stone | 0.230 | | M3 223,000 | 51,290 | | 0 | |
| H= 1,500.00 mm | | | | | 0 | | 0 | |
| t1 (Wall) = 150.00 mm | | | | | 0 | | 0 | |
| t2 (Slab) = 250.00 mm | -Lean concrete | 0.080 | | M3 545,000 | 43,600 | | 0 | |
| t3 (Cover) = 200.00 mm | -Concrete | 0.800 | | M3 645,000 | 516,000 | | 0 | |
| Tulangan utama 2 0.617 | -Rebar | 53.760 | | KG | 0 | 700 | 37,632 | |
| Rebar dia- 10.00 mm | -Form | 5.200 | | M2 90,000 | 468,000 | | 0 | |
| Jarak = 200.00 mm | | | | | 0 | | 0 | |
| Tulangan bagi 2 0.617 | | | | | 0 | | 0 | |
| Rebar dia- 10.00 mm | -Concrete steel trowel finish | 0.900 | | M2 | 0 | 5,000 | 4,500 | |
| Jarak = 200.00 mm | | | | | 0 | | 0 | |
| Rubble stone t- 150.00 mm | | | | | 0 | | 0 | |
| Lean concrete t- 50.00 mm | | | | | 0 | | 0 | |
| GL-top concrete 0.00 mm | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | ------------------------------------- - -------------------
-- - ----- ------------------ - -------------- - ------------- - -------------- | |
| | | Sub total | 1,078,890 | Sub total | 288,612 | |
| | | ------------------ - -------------- - ------------- - -------------- | |
| | | Total | 1,367,502 | |
= ============ ========== ================= = ====================== = =========== = === = =========== = ========= = ======== = ========= = =============== =
BREAK DOWN OF UNIT RATE
= ============ ========== ================= = ====================== = =========== = === = =========== = ========= = ======== = ========= = =============== =
| Project : | | | | Material | Labour | |
| -------------------- ----------------- ---------------------------- | Item | QTY | Unit| ------------------ - -------------- - ------------- - -------------- | Note |
| Work name : CONCRETE DRAINAGE | | | | Rate | Amount | Rate | Amount | |
| -------------------- ----------------- ---------------------------- - ------------------------------------- - ------------------- - -----
-- ------------------ - -------------- - ------------- - -------------- - ------------------------- -
| Unit price : Rp. 682,700 /M | | | | | 0 | | 0 | |
| -------------------- ----------------- ---------------------------- | -Excavation | 1.530 | M3 | | 0 | 45,000 | 68,850 | |
| Note : | -Soil disposal | 0.680 | M3 | | 0 | 36,000 | 24,480 | |
| OPEN TYPE DW-2 | -Back fill | 0.850 | M3 | | 0 | 15,000 | 12,750 | |
| -------------------- ----------------- ---------------------------- | | | | | 0 | | 0 | |
| W= 400.00 mm | | | | | 0 | | 0 | |
| D= 600.00 mm | -Rubble stone | 0.180 | M3 | 223,000 | 40,140 | | 0 | |
| H= 1,000.00 mm | | | | | 0 | | 0 | |
| t1 (Wall) = 100.00 mm | | | | | 0 | | 0 | |
| t2 (Slab) = 150.00 mm | -Lean concrete | 0.050 | M3 | 545,000 | 27,250 | | 0 | |
| Tulangan utama 1 0.617 | -Concrete | 0.210 | M3 | 645,000 | 135,450 | | 0 | |
| Rebar dia- 10.00 mm | -Rebar | 13.280 | KG | 9,000 | 119,520 | 700 | 9,296 | |
| Jarak = 200.00 mm | -Form | 2.700 | M2 | 90,000 | 243,000 | | 0 | |
| Tulangan bagi 1 0.617 | | | | | 0 | | 0 | |
| Rebar dia- 10.00 mm | | | | | 0 | | 0 | |
| Jarak = 200.00 mm | -Concrete steel trowel finish | 0.400 | M2 | | 0 | 5,000 | 2,000 | |
| Rubble stone t- 200.00 mm | | | | | 0 | | 0 | |
| Lean concrete t- 50.00 mm | -Concrete support | 0.800 | M | 47,500 | | | 0 | |
| GL-top concrete 0.00 mm | | | | | 0 | | 0 | |
| Concrete support | | | 0 | |
| d1 = 150.00 mm | | | 0 | |
| d2 = 200.00 mm | | | | | 0 | | 0 | |
| Jarak = 2,000.00 mm | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | ------------------------------------- - ------------------- - ----- -- ------------------ - -------------- - ------------- - -------------- | |
| | | Sub total | 565,360 | Sub total | 117,376 | |
| | | ------------------ - -------------- - ------------- - -------------- | |
| | | Total | 682,736 | |
= ============ ========== ================= = ====================== = =========== = === = =========== = ========= = ======== = ========= = =============== =
BREAK DOWN OF UNIT RATE
= ============ ========== ================= = ====================== = =========== = = === =========== = ========= = ======== = ========= = =============== =
| Project : | | | | Material | Labour | |
| -------------------- ----------------- ---------------------------- | Item | QTY | | Unit ------------------ - -------------- - ------------- - -------------- | Note |
| Work name : CONCRETE DRAINAGE | | | | Rate | Amount | Rate | Amount | |
| -------------------- ----------------- ---------------------------- - ------------------------------------- - -------------------
-- - ----- ------------------ - -------------- - ------------- - -------------- - ------------------------- -
| Unit price : Rp. 804,900 /M | | | | | 0 | | 0 | |
| -------------------- ----------------- ---------------------------- | -Excavation | 2.880 | | M3 | 0 | 20,000 | 57,600 | |
| Note : | -Soil disposal | 1.370 | | M3 | 0 | 9,500 | 13,015 | |
| BOX TYPE DW-2a | -Back fill | 1.510 | | M3 | 0 | 12,500 | 18,875 | |
| -------------------- ----------------- ---------------------------- | | | | | 0 | | 0 | |
| W= 500.00 mm | | | | | 0 | | 0 | |
| D= 650.00 mm | -Rubble stone | 0.180 | | M3 160,000 | 28,800 | | 0 | |
| H= 1,450.00 mm | | | | | 0 | | 0 | |
| t1 (Wall) = 200.00 mm | | | | | 0 | | 0 | |
| t2 (Slab) = 300.00 mm | -Lean concrete | 0.060 | | M3 415,000 | 24,900 | | 0 | |
| t3 (Cover) = 300.00 mm | -Concrete | 0.800 | | M3 481,000 | 384,800 | | 0 | |
| Tulangan utama 2 0.617 | -Rebar | 41.740 | | KG 600 | 25,044 | | 0 | |
| Rebar dia- 10.00 mm | -Form | 4.300 | | M2 58,000 | 249,400 | | 0 | |
| Jarak = 200.00 mm | | | | | 0 | | 0 | |
| Tulangan bagi 2 0.617 | | | | | 0 | | 0 | |
| Rebar dia- 10.00 mm | -Concrete steel trowel finish | 0.500 | | M2 | 0 | 5,000 | 2,500 | |
| Jarak = 200.00 mm | | | | | 0 | | 0 | |
| Rubble stone t- 150.00 mm | | | | | 0 | | 0 | |
| Lean concrete t- 50.00 mm | | | | | 0 | | 0 | |
| GL-top concrete 0.00 mm | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | ------------------------------------- - -------------------
-- - ----- ------------------ - -------------- - ------------- - -------------- | |
| | | Sub total | 712,944 | Sub total | 91,990 | |
| | | ------------------ - -------------- - ------------- - -------------- | |
| | | Total | 804,934 | |
= ============ ========== ================= = ====================== = =========== = === = =========== = ========= = ======== = ========= = =============== =
BREAK DOWN OF UNIT RATE
= ============ ========== ================= = ====================== = =========== = = === =========== = ========= = ======== = ========= = =============== =
| Project : | | | | Material | Labour | |
| -------------------- ----------------- ---------------------------- | Item | QTY | | Unit ------------------ - -------------- - ------------- - -------------- | Note |
| Work name : MASONRY DRAINAGE | | | | Rate | Amount | Rate | Amount | |
| -------------------- ----------------- ---------------------------- - ------------------------------------- - -------------------
-- - ----- ------------------ - -------------- - ------------- - -------------- - ------------------------- -
| Unit price : Rp. 734,800 /M | | | | | 0 | | 0 | |
| -------------------- ----------------- ---------------------------- | -Excavation | 1.380 | | M3 | 0 | 22,000 | 30,360 | |
| Note : | | | | | 0 | | 0 | |
| DW-3 | -Soil disposal | 1.380 | | M3 | 0 | 24,500 | 33,810 | |
| -------------------- ----------------- ---------------------------- | | | | | 0 | | 0 | |
| W1 = 1,200.00 mm | -Sand fill | 0.080 | | M3 215,000 | 17,200 | | 0 | |
| W2 = 800.00 mm | | | | | 0 | | 0 | |
| W3 = 900.00 mm | -Masonry stone | 0.46 | | M3 650,000 | 299,000 | | 0 | |
| D= 800.00 mm | | | | | 0 | | 0 | |
| t1 = 150.00 mm | -Mortar decorative | 1.400 | | M2 45,000 | 63,000 | | 0 | |
| t2 = 300.00 mm | | | | | 0 | | 0 | |
| Concrete support | -Mortar finish | 1.600 | | M2 36,000 | 57,600 | | 0 | |
| d1 = 150.00 mm | | | | | 0 | | 0 | |
| d2 = 200.00 mm | -Sconing | 6.000 | | M | 0 | 3,000 | 18,000 | |
| Jarak = 1,000.00 mm | | | | | 0 | | 0 | |
| sand fill t 100.00 mm | -Half Concrete Pipe | 1.000 | | M | 0 | 95,000 | 95,000 | |
| | | | | | 0 | | 0 | |
| | -Concrete support | 0.800 | | M 67,500 | 54,000 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | ------------------------------------- - -------------------
-- - ----- ------------------ - -------------- - ------------- - -------------- | |
| | | Sub total | 490,800 | Sub total | 177,170 | |
| | | ------------------ - -------------- - ------------- - -------------- | |
| | | Total | 667,970 | |
= ============ ========== ================= = ====================== = =========== = === = =========== = ========= = ======== = ========= = =============== =
= ============ ========== ================= = ====================== = =========== = === = =========== = ========= = ======== = ========= = =============== =
| Project : | | | | Material | Labour | |
| -------------------- ----------------- ---------------------------- | Item | QTY | Unit| ------------------ - -------------- - ------------- - -------------- | Note |
| Work name : PAVING ROAD | | | | Rate | Amount | Rate | Amount | |
| -------------------- ----------------- ---------------------------- - ------------------------------------- - ------------------- - -----
-- ------------------ - -------------- - ------------- - -------------- - ------------------------- -
| Unit price : Rp. 239,700 / M2 | | | | | 0 | | 0 | |
| -------------------- ----------------- ---------------------------- | -Excavation | 0.270 | M3 | | 0 | 45,000 | 12,150 | |
| Note : | -Soil disposal | 0.120 | M3 | | 0 | 36,000 | 4,320 | |
| | -Back fill | 0.150 | M3 | | 0 | 15,000 | 2,250 | |
| -------------------- ----------------- ---------------------------- | -Plastic Sheet | 1.000 | M2 | | 0 | 3,500 | 3,500 | |
| T-Concrete = 120.00 mm | | | | | 0 | | 0 | |
| | -Sirtu | 0.000 | M3 | 165,000 | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | -Macadam | 0.150 | M3 | 223,000 | 33,450 | | 0 | |
| | | | | | 0 | | 0 | |
| | -Concrete | 0.120 | M3 | 645,000 | 77,400 | | 0 | |
| Tulangan single 0.617 | -Rebar | 6.900 | KG | 12,000 | 82,800 | | 0 | |
| Rebar dia- 10.00 mm | -Form | 0.080 | M2 | 90,000 | 7,200 | | 0 | |
| Jarak = 200.00 mm | -Canal for relat | 0.67 | M | 10,000 | 6,667 | | 0 | |
| | | | | | 0 | | 0 | |
| | -Concrete steel trowel grove fini| 1.000 | M2 | | 0 | 10,000 | 10,000 | |
| | | | | | 0 | | 0 | |
| Sirtu t- mm | | | | | 0 | | 0 | |
| Macadam t- 150.00 mm | | | | | 0 | | 0 | |
| GL-top concrete 0.00 mm | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | | | | | 0 | | 0 | |
| | ------------------------------------- - ------------------- - -----
-- ------------------ - -------------- - ------------- - -------------- | |
| | | Sub total | 207,517 | Sub total | 32,220 | |
| | | ------------------ - -------------- - ------------- - -------------- | |
| | | Total | 239,737 | |
= ============ ========== ================= = ====================== = =========== = === = =========== = ========= = ======== = ========= = =============== =