NL196 SURVEY 2019v0 CME

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 50

Genesis-TSSR_Rel.v4.

6-2018

GLOBE TELECOM

GENEISIS PROJECT

SITE NAME: IBA

PLA ID: NL196 REGION: NLZ

SITE ADDRESS: # / Building / Street Name: Zone 2,


Barangay: Brgy. Poblacion (Aypa), Town/City: Iba
Province: Zambales
NOMINATION: L2600 MM BB Additional Sector(AAU5271)+L2300(3276)
MDB v 2019V4.0 Additional Scope

TRANSPORT SOLUTION APPROVED DATE:


REMARKS: FULLY APPROVED DATE:
NEW AN

Vendor QA : Name of Vendor Reviewer


RNE / RgPM SOLUTION APPROVED DATE: 03/19/19
REMARKS: FULLY APPROVED DATE:

Repan L26 MM BB Azimuth of S1 to 20


and update antenna proposal layouts

Vendor QA : CRISTINE CANON


FACILITY ENGINEERING SOLUTION APPROVED DATE:
(POWER AND SPACE) FULLY APPROVED DATE: 04/10/19
REMARKS:

OK FOR NEW RS(600AH), MIGRATE LOADS FROM C1-RS1 TO NEW RS. OK TO COLOCEQUIP'T.
OK TO CHANGE-OUT BATT SYS 2 AT RS2 CABIN 2.
ENSURE THAT TRANSFORMER IS AT LEAST 50KVA, IF NOT, PROVIDE UPGRADE

ANTHONY D. GADE

Vendor QA : CQ
FACILITY ENGINEERING SOLUTION APPROVED DATE: 03/28/2019
(STRUCTURAL) FULLY APPROVED DATE:
REMARKS:

OK TO INSTALL

Vendor QA : SHANGHAI
CONTRACTOR: HUAWEI GSC
NAME & MOBILE: SHANGHAI/7100658101

Page 1 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196

Survey Subcon: JEZKA CONSTRUCTION CORPORATION Survey Date: 2018/10/6


CME Engineer: BILLY JOE MENDOZA Mobile No: 09758541652
Telecom Engineer: BENLOR SANTOS Mobile No: 09569779941
RF Engineer: DOMINADOR ANAIN Mobile No: 09759855295
A1. Basic Site Information
Site Lessor Contact No. 9068547037
SDB Coordinates Longitude 119.980694 Latitude 15.327806
Survey Coordinates Longitude 119.980684 Latitude 15.327804
Difference 1.09268 m Location (Accuracy) m

Site Ownership Globe Class Type B1 Site Type Greenfield


Coverage Type Outdoor Room Typ Outdoor No. of Cabin 2
Cabin Location GROUND
Room Access: 8:00AM - 5:00PM Specify Date & Tim
Site Key Location: ON - SITE FO. Name: Jovedick Gonzales Contact No.: 09176881144
Site Security: Unmanned Specify
For Building Site, Need Access /Work Per Yes
If YES, state document required for applying access / work per ACCESS
Contact Person N/A Contact No: N/A
Flood History (as inquired from LGU-RRDMC / neighbors / comm 0 m (with respect to the road)
Site Distance From Coastlin 1,400 m
A2. Tower
A2.1. Tower Leg/Pole Diameter
A2.1.1. Existing Tower/Pole Information
Tower/Pole type: Greenfield SST 4 Legged Remarks
Tower/Leg type: Angular (L) Remarks
Tower/Pole Heig 43 m Building Heigh m
A2.1.2. Tower Leg/Pole Diameter of Proposed Antenna Location
Diameter of Pole/Diameter of Tower Leg/size of Tower Leg (Angl 80X80 mm.
A2.1.3. Tower Leg/Pole Diameter sampling Per section (use Antenna AMB for height reference)
Height (m) Mast/Leg Size or Dia(mm) Tower Leg Distance (m) Remarks
0-18 150X150 N/A Angular (L)
19-31 120X120 N/A Angular (L)
32-43 80X80 N/A Angular (L)

A3.1. Site location &Obstructions

GPS reading w/ elevation( DEG)

Screen shot of actuall site survey location Antenna Blockage XXX ( DEG)

Page 2 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196

A3.2 Pictures of Site and Tower Site Defect Report (that affects project implementation/a

N/A

N/A N/A

Nearest Access Road Obstacle upon Entering the Site Obstacle upon Entering the Site

N/A

Stairs(Rooftop site) Access Door/Gate Front View of Site (Tower)

Page 3 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196

B. Existing RF Antenna Information


G900/U900 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 15.327804 15.327804 15.327804
Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 39 39 39
Antenna Orientation 60 145 270
Down tilt (Mechanical) 1 2 2
Down tilt (Electrical) 0 0 0
Type of Antenna HAUWEI (ADU4516R6v06) HAUWEI (ADU4516R6v06) HAUWEI (ADU4516R6v06)
Number of Antenna Port 4 4 4
Shared Antenna with any technology L700 L700 L700
RRU/Combiner model MRFU MRFU MRFU
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE TUBULAR TUBULAR TUBULAR
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

Picture of Antenna Ports

Picture of AMB

RRU/RFU Location

Overview of Antenna

Page 4 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
L700 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 15.327804 15.327804 15.327804
Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 39 39 39
Antenna Orientation 60 145 270
Down tilt (Mechanical) 1 2 2
Down tilt (Electrical) 0 0 0
Type of Antenna HAUWEI (ADU4516R6v06) HAUWEI (ADU4516R6v06) HAUWEI (ADU4516R6v06)

Number of Antenna Port 4 4 4


Shared Antenna with any technology GU900 GU900 GU900
RRU/Combiner model RRU3268 RRU3268 RRU3268
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE TUBULAR TUBULAR TUBULAR
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

Picture of Antenna Ports

Picture of AMB

RRU/RFU Location

Overview of Antenna

Page 5 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
G1800 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model N/A N/A N/A
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


RRU/RFU Location

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 6 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
U2100DB Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 15.327804 15.327804 15.327804
Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 36 36 36
Antenna Orientation 60 140 280
Down tilt (Mechanical) 2 2 3
Down tilt (Electrical) 0 0 0
Type of Antenna HUAWEI (AMB4520R0) HUAWEI (AMB4520R0) HUAWEI (AMB4520R0)
Number of Antenna Port 4 4 4
Shared Antenna with any technology L1800DB L1800DB L1800DB
RRU/Combiner model RRU3962 RRU3962 RRU3962
RRU shared with/Combiner Type L1800DB L1800DB L1800DB
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE TUBULAR TUBULAR TUBULAR
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

Picture of Antenna Ports

Picture of AMB

RRU/RFU Location

Overview of Antenna

Page 7 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
L1800DB Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 15.327804 15.327804 15.327804
Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 36 36 36
Antenna Orientation 60 140 280
Down tilt (Mechanical) 2 2 3
Down tilt (Electrical) 0 0 0
Type of Antenna HUAWEI (AMB4520R0) HUAWEI (AMB4520R0) HUAWEI (AMB4520R0)
Number of Antenna Port 4 4 4
Shared Antenna with any technology U2100DB U2100DB U2100DB
RRU/Combiner model RRU3962 RRU3962 RRU3962
RRU shared with/Combiner Type U2100DB U2100DB U2100DB
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE TUBULAR TUBULAR TUBULAR
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

Picture of Antenna Ports

Picture of AMB

RRU/RFU Location

Overview of Antenna

Page 8 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
L2600 - TDD Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 15.327804 15.327804 15.327804
Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 38 38 38
Antenna Orientation 60 150 290
Down tilt (Mechanical) 2 4 2
Down tilt (Electrical) 2 3 2
Type of Antenna HUAWEI (ATR451714) HUAWEI (ATR451714) HUAWEI (ATR451714)
Number of Antenna Port 6 6 6
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model RRU3939 RRU3939 RRU3939
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE TUBULAR TUBULAR TUBULAR
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

Picture of Antenna Ports

Picture of AMB

RRU/RFU Location

Overview of Antenna

Page 9 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
MIMO-L2600 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A 15.327804 N/A
Longitude (DLL) of Antenna N/A 119.980684 N/A
Antenna Height (m) N/A 38 N/A
Antenna Orientation N/A 170 N/A
Down tilt (Mechanical) N/A 6 N/A
Down tilt (Electrical) N/A 0 N/A
MASSIVE MIMO
Type of Antenna N/A N/A
ANTENNA (AAU5271)
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner Model N/A N/A N/A
RRU/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A TUBULAR N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


RRU/RFU Location

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 10 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
WIMAX Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model N/A N/A N/A
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


RRU/RFU Location

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 11 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B2. Panoramic Antenna Pictures at height 43 meters

0º 30º 60º

90º 120º 150º

180º 210º 240º

270º 300º 330º


B3. Existing MW Antenna Information

Existing MW Antenna Quantity: 8 Pcs

No. Size (m) Height (m) Azimuth (deg) Remark


1 1.20 26 120 FACING BOTOLANTH
2 1.20 30 180
3 0.60 34 20
4 0.60 31.4 180
5 1.80 33 58
6 2.40 35 145
7 0.60 41 45
8 1.80 41 346

Existing MW 1 Existing MW # Existing MW #

Existing MW # Existing MW # Existing MW #

N/A
Existing MW # Existing MW # Existing MW #

Page 12 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B1. RF Antenna Information
B1.1. General Information
Enough space to install RF antenna of this project? Y N New Antenna

Proposal for L2600 MM


Sector 1 Sector 2 Sector 3
BB
Latitude (DLL) of Antenna 15.327804 15.327804 15.327804
Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 38 38 38
Antenna Orientation 60 20 170 290
Down tilt (Mechanical) 2 6 2
Down tilt (Electrical) 2 0 2
MIMO ANTENNA MIMO ANTENNA MIMO ANTENNA
Type/Model of Antenna
(AAU5271) (AAU5271) (AAU5271)
Tech Antenna Shared with N/A N/A N/A
RRU Shared with/Combiner Type N/A N/A N/A
Antenna solution new antenna new antenna new antenna
RRU solution N/A N/A N/A
Sector 1 Sector 2 Sector 3
Shot of Coverage objectives Shot of Coverage objectives Shot of Coverage objectives

N/A N/A

RRU/RFU Location/Overview of Antenna

N/A N/A

Overview of Antenna

N/A N/A

ROPOSE NEW HUAWEI MIMO ROPOSE NEW HUAWEI MIMO


ANTENNA AT SPARE FOR L2600 ANTENNA AT SPARE FOR L2600
MM BB.PROPOSE NEW AMB .
MM BB.PROPOSE NEW AMB .

NEW AMB (specify) NEW AMB (specify) NEW AMB (specify)


SPECIAL AMB SPECIAL AMB SPECIAL AMB
REUSE AMB REUSE AMB REUSE AMB

New Copper lightning arrester (16mm Ø x 1.5m): 0 pcs

Repan L26 MM BB Azimuth of S1 to 20

Page 13 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C8. Cable Interface Proposal for L2600 MM BB
Power Cable: LENGTH
Cable Routing: Single
Single Length of -48V from EPU to RECTIFIER 10 m
Single Length of -48V from EPU to BBU N/A m
Single Length of -48V from RRU/RFU to EPU02D Sector 1 N/A m
Sector 2 N/A m
Sector 3 N/A m
Sector 4 N/A m
Sector 5 N/A m
Sector 6 N/A m

Single Length of -48V from AAU to EPU Sector 1 60 m


Sector 2 N/A m
Sector 3 60 m
Sector 4 N/A m
Sector 5 N/A m
Sector 6 N/A m
PGND Cable:
Single Length of Grounding Cable from L-Rack to Grounding Busbar N/A m
Single Length of Grounding Cable from RRU/RFU to Grounding Busbar N/A m
Single Length of Grounding Cable from AAU to Grounding Busbar 10X2 m
Single Length of Grounding Cable from New Tower Busbar to Test Pit N/A m
Single Length of Grounding Cable from EPU to L-Rack/Busbar 6 m
Signal Cable:
CPRI Cable Single Length of CPRI Cable from BBU to RRU/RFU
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
CPRI Cable Single Length of CPRI Cable from BBU to AAU
Sector 1 60 m Sector 2 N/A m Sector 3 60 m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper CableSingle Length of 1/2" Jumper Cable from RRU/RFU to Antenna
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper CableSingle Length of 1/2" Jumper Cable x 2 from RRU/RFU to Feeder
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper CableSingle Length of 1/2" Jumper Cable x 2 from RRU/RFU to Combiner
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper CableSingle Length of 1/2" Jumper Cable x 2 from Combiner to Feeder
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper CableSingle Length of 1/2" Jumper Cable x 2 from Feeder to Antenna
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
7/8 Feeder Cable Single Length of 7/8" Feeder Cable x 2 from RRU/RFU to Antenna
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
13/8 Feeder CableSingle Length of 13/8" Feeder Cable x 2 from RRU/RFU to Antenna
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
Connector Details
Connector Type of Existing Antenna N/A
Connector Type of Existing RRU/RFU N/A
Connector Type of Existing Combiner N/A
Connector Type of New Combiner N/A

Page 14 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B1. RF Antenna Information
B1.1. General Information
Enough space to install RF antenna of this project? Y N New Antenna

Proposal for L2300 Sector 1 Sector 2 Sector 3

Latitude (DLL) of Antenna 15.327804 15.327804 15.327804


Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 33 33 33
Antenna Orientation 60 150 290
Down tilt (Mechanical) 2 4 2
Down tilt (Electrical) 2 3 2
4 PORTS HUAWEI 4 PORTS HUAWEI 4 PORTS HUAWEI
Type/Model of Antenna
ANTENNA (ADU4518R6) ANTENNA (ADU4518R6) ANTENNA (ADU4518R6)
Tech Antenna Shared with N/A N/A N/A
RRU Shared with/Combiner Type RRU3276 RRU3276 RRU3276
Antenna solution new antenna new antenna new antenna
RRU solution RRU on tower RRU on tower RRU on tower
Sector 1 Sector 2 Sector 3
Shot of Coverage objectives Shot of Coverage objectives Shot of Coverage objectives

RRU/RFU Location

Overview of Antenna

1.PROPOSE NEW 4 PORTS HUAWEI ANTENNA AT NEW AMB FOR L2300.


2.PROPOSE NEW RRU3276 AT THE BACK OF 4 PORTS ANTENNA FOR L2300.

NEW AMB (specify) NEW AMB (specify) NEW AMB (specify)


AMB-ANT-LTE RRU-Z1 O AMB-ANT-LTE RRU-Z1 O AMB-ANT-LTE RRU-Z1 O
REUSE AMB REUSE AMB REUSE AMB

New Copper lightning arrester (16mm Ø x 1.5m): pcs

Page 15 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C8. Cable Interface Proposal for L2300
Power Cable: LENGTH
Cable Routing: Single
Single Length of -48V from DCDU to RECTIFIER 8 m
Single Length of -48V from RRU/RFU to DCDU Sector 1 60 m
Sector 2 60 m
Sector 3 60 m
Sector 4 N/A m
Sector 5 N/A m
Sector 6 N/A m

Single Length of -48V from AAU to DCDU Sector 1 N/A m


Sector 2 N/A m
Sector 3 N/A m
Sector 4 N/A m
Sector 5 N/A m
Sector 6 N/A m
PGND Cable:
Single Length of Grounding Cable from L-Rack to Grounding Busbar N/A m
Single Length of Grounding Cable from RRU/RFU to Grounding Busbar 10X3 m
Single Length of Grounding Cable from AAU to Grounding Busbar N/A m
Single Length of Grounding Cable from New Tower Busbar to Test Pit N/A m
Single Length of Grounding Cable from DCDU to L-Rack/Busbar 6 m
Signal Cable:
CPRI Cable Single Length of CPRI Cable from BBU to RRU/RFU
Sector 1 60 m Sector 2 60 m Sector 3 60 m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
CPRI Cable Single Length of CPRI Cable from BBU to AAU
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable from RRU/RFU to Antenna
Sector 1 3 m Sector 2 3 m Sector 3 3 m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from RRU/RFU to Feeder
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from RRU/RFU to Combiner
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from Combiner to Feeder
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from Feeder to Antenna
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
7/8 Feeder Cable Single Length of 7/8" Feeder Cable x 2 from RRU/RFU to Antenna
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
13/8 Feeder CableSingle Length of 13/8" Feeder Cable x 2 from RRU/RFU to Antenna
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
Connector Details
Connector Type of Existing Antenna N/A
Connector Type of Existing RRU/RFU N/A
Connector Type of Existing Combiner N/A
Connector Type of New Combiner N/A

Page 16 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C1. Room & Basepad
C1.1. General Information
Site Location Situation Flat Ground Rolling terrain
Existing Equipment Room Ceiling Height: mm Cable Ladder Height: mm
Concrete Floor Raised Floor Height mm
Existing Basepad Quantity pcs Maximum Height: mm
OUTDOOR (Panoramic Picture from edge to edge)

From the rear edge of Site looking at Site Entrance (Facing the GF Gate/RT roof Access)

From the left edge of Site looking at Right Side (Facing the rear of GF Gate/Rooftop Door Access)

From the front edge of Site looking at Rear of Site (Facing the rear of GF Gate/Rooftop Door Access)

From the right edge of Site looking at Left Side (Facing the rear of GF Gate/Rooftop Door Access)

Page 17 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
TOWER TOP TO GROUND VIEW (While on top of tower take picture looking downwards)

From the top of tower looking down at Site Entrance (Facing the GF Gate/RT roof Access)

From the top of tower looking down at Right Side (Facing the rear of GF Gate/Rooftop Door Access)

From the top of tower looking at Rear of Site (Facing the rear of GF Gate/Rooftop Door Access)

From the top of tower looking at Left Side (Facing the rear of GF Gate/Rooftop Door Access)

Page 18 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
INSIDE CABIN / EQUIPMENT ROOM
CABIN 1

Site General 1 Site General 2 Site General 3

Site General 4 Site General 5 Site General 6


INSIDE CABIN / EQUIPMENT ROOM
CABIN 2

Site General 1 Site General 2 Site General 3

Site General 4 Site General 5 Site General 6


C1.2. Wireless Information
C1.2.2. Pictures of Existing BBU

N/A
2G/3G BBU LTE BBU MIMO BBU

Existing Overall BBU1 Existing Overall BBU2 Existing Overall BBU3

Page 19 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C1.3. Transport Information
C1.3.1. Existing Equipment Type:
Huawei CX600-X8 Huawei CX600-X2 Huawei ATN950B Huawei ATN950 MICROWAVE
Others, Please state total quantity and fill in the detail as below table. Quantity: 2

No Type Vendor Equipment Model


1 MICROWAVE AVIAT CTR8540
2
3
4

C1.3.2. Existing Transport Equipment

Location of Equipment Zoom In Bayface Layout Zoom In Available GE/FE Ports

C2. BBU,DCDU & Cabinet Solution


C.2.1. Pictures of proposed BBU/DCDU location:
2G / 3G L2300 L1800 FDD

COLLOCATE LTE BBU AT


EXISTING TX RACK FOR L2300

BBU Sol'n : BBU Sol'n : Collocate BBU Sol'n :


Cabinet Sol'n : Cabinet Sol'n : collocate Cabinet Sol'n :

PROPOSE NEW DCDU AT


EXISTING TX RACK CABINET FOR
L2300

new DCDU

L700 FDD L2600 MIMO L1800 MIMO

COLLOCATE MIMO BBU AT


EXISTING TX RACK FOR L2600
MIMO

BBU Sol'n : BBU Sol'n : Collocate BBU Sol'n :


Cabinet Sol'n : Cabinet Sol'n : collocate Cabinet Sol'n :

REUSE EXISTING L2600MIMO


EPU02D FOR L2600MIMO
S1.S3
collocate

Page 20 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C.2.3. Cable Ladder
New Indoor Cable Ladder Required: Length: N/A m Width N/A mm
New OD Horizontal Ladder Required: Length: N/A m Width N/A mm Height N/A mm
New OD Vertical Ladder Required: Length: N/A m Width N/A mm
New OD Vertical Ladder Extension clip Required: pcs N/A
Remarks: N/A

CABIN 1

Exixting ID/OD Cable Ladder 1 Exixting ID/OD Cable Ladder 2 Exixting Vertical Cable Ladder 3
CABIN 2

Exixting ID/OD Cable Ladder 1 Exixting ID/OD Cable Ladder 2 Exixting Vertical Cable Ladder 3

N/A N/A N/A

Layers of Feeder Cable on Existing Layers of Feeder Cable on Existing Layers of Feeder Cable on Existing
ID/OD Cable Ladder 1 ID/OD Cable Ladder 2 Vertical Cable Ladder 3

N/A N/A N/A

Proposed ID/OD Cable Ladder 1 Proposed ID/OD Cable Ladder 2 Proposed Vertical Cable Ladder 3

C2.4 Existing and Proposed GPS Antenna Location


New GPS Antenna Reuse GPS Antenna
Clear view of the sky (=> 90o clearance)? Yes No
Type of required mounting bracket? Angular Pole

Existing GPS Location Proposed GPS Location Proposed Surge protector location
GPS cable length : N/A GPS DIVIDER FOR --- : Yes No

Page 21 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C2.5 Busbar
C2.5.1. Grounding Busbar (Proposed for BBU, DCDU, GPS, New Cabinet / Rack) (Indoor)
Reuse Existing Bus Bar Remark: USE AVAILABLE HOLES
New Busbar Required: New Hole's Qty Required: N/A Holes' diameter: N/A mm
Remark: N/A
Proposed 38mm² bare/insulated copper wire: N/A m

C2.5.1.1 Picture of Proposed Busbar (Proposed for BBU, DCDU, GPS, New Cabinet / Rack) (Indoor)
CABIN 1 CABIN 2

N/A

Available holes for use Available holes for use Proposed Busbar
C2.5.2. Grounding Busbar (Proposed for RRU, Cabinet, Cables)(Outdoor)
Reuse Existing Bus Bar Remark: N/A
New Busbar Required: New Hole's Qty Required: Holes' diameter: mm
Remark: PROVIDE NEW TOWER BUSBAR
Proposed 38mm² bare/insulated copper wire: N/A m

C2.5.2.1a Picture of Proposed Busbar (Proposed for RRU, Cabinet, Cables)(Outdoor)

N/A

Available holes for use Proposed Outdoor Busbar Proposed Outdoor Busbar
C2.5.2.1b Picture of Proposed Busbar near tower/antenna(Tower)

Available holes for use


C2.6 Feeder Window Information
Reuse Existing Feeder Window Available Holes:
New Feeder Window is required Qty Required:
Remark: USE AVAILABLE HOLES
C2.6.1 Picture of Existing and Proposed Feeder Window
CABIN 2
CABIN 1

Existing Feeder Window New Feeder Window (Inside Cabin) New Feeder Window (Outside Cabin)

Page 22 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C3. Power Source (Supply)
C3.1. Primary Power Source
Only commercial Power Commercial Power+DG Only DG
Solar+DG DCB+DG Temporary Tapping to Neighbor/Lessor
C3.2. Transformer Information
Brand: NO DATA Capacity (KVA): NO DATA Single Phase Three Phase

Picture of Transformer

C3.3. MDP Information


The Main CB input of commercial Power: 225 Amps
The AC Cable Size input of commercial Power: mm²
The AC Out of commercial Power Type:
Single Phase Three Phase
C3.4 Picture of MDP and Details

MDP 55.17 A 59.19 Amp


C3.5 ECB Information
The Actual current of ECB(Measure by Meter):
Main ECB Rating: 225 A Cable Size: 100 mm²

VAC = 223.3 V L1 = 59.19 L2 = 59.2


Actual Voltage Output ACTUAL CURRENT OUTPUT LINE1 ACTUAL CURRENT OUTPUT LINE2
C3.6 ACPDB Load Status CABIN 1
AC Cable size(mm²) 38
PDB/P Main Breaker Amps. 125 No. of Branches 12
P-BTS Cable Length(m)

Cable size Cable lenth


no. Brand Rating No. of Pole Load Description Status
AWG (m)

1 SQUARE D 40 2 ACU 1 ON
2 SQUARE D 30 2 REC SPARE ON
3 SQUARE D 40 2 ACU 2 ON
4 SQUARE D 30 2 REC SPARE ON
5 SQUARE D 15 2 ALARM ON
6 SQUARE D 30 2 POWER OFF
7 SQUARE D 15 2 L.O ON
8 SQUARE D 30 2 EM POWER ON
9 SQUARE D 20 2 C.O ON
10 SQUARE D 30 2 EM POWER ON
11 SQUARE D 30 2 SPARE OFF
12 SQUARE D 30 2 REC SPARE ON
Note: Put in "Remark" above for new or existing breaker to be used for proposed equipment

Page 23 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C3.6 ACPDB Load Status
CABIN 2
AC Cable size(mm²) 50
PDB/P Main Breaker Amps. 160 No. of Branches 12
P-BTS Cable Length(m)

Cable size Cable lenth


no. Brand Rating No. of Pole Load Description Status
AWG (m)

1 SQUARE D 70 RECTIFIER 1 ON
2 SQUARE D 40 ACU 1 ON
3 SQUARE D 70 RECTIFIER 2 ON
4 SQUARE D 40 ACU 2 ON
5 SQUARE D 20 C.OUTLET ON
6 SQUARE D 40 ACU 3 ON
7 SQUARE D 20 LIGHT ON
8 SQUARE D 15 ALARM OFF
9 SQUARE D 15 SPARE OFF
10 SQUARE D 30 GLOBE WIFI ON
Note: Put in "Remark" above for new or existing breaker to be used for proposed equipment
TVSS Detail: Brand: Rating: KAIC

C3.7 Pictures of ACPDB and Details CABIN 1

N/A
ACPDB TVSS VAC = 235.6 V
The Actual Output Current of ACPDB (Measure by Meter):

N/A

L1 = 12.1 A L2 = 11.94 A L3 = N/A A

C3.7 Pictures of ACPDB and Details CABIN 2

N/A
ACPDB TVSS VAC = 230.8 V
The Actual Output Current of ACPDB (Measure by Meter):

N/A

L1 = 54.66 A L2 = 54.37 A L3 = N/A A

Page 24 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C4. DC Power
C4.1. Rectifier System Load Breakers/ Fuse CABIN 1
RECTIFIER SYSTEM 1 RECTIFIER SYSTEM 2
Existing Rectifier Specify brand/name : ASCOM N/A
Rectifier System Capacity (@48VDC) 166.6666667 Vdc Vdc
Rectifier Module Capacity (Watts): 1900 W 35.58052 A W A
Installed rectifier modules: 4 N/A
Operational rectifier modules: 4 N/A
Defective rectfier modules: 0 N/A
The number of empty modules space: 0 N/A
Actual Current of DC Load Panel display / clamp meter 4.9 A A
Actual Float Voltage : 54.3 V V

C4.1. Rectifier System Load Breakers/ Fuse CABIN 2


RECTIFIER SYSTEM 1 RECTIFIER SYSTEM 2
Existing Rectifier Specify brand/name : ELTEK FLATPACK 2 ELTEK FLATPACK 2
Rectifier System Capacity (@48VDC) 166.6666667 Vdc 291.6666667 Vdc
Rectifier Module Capacity (Watts): 2000 W 37.45318 A 2000 W 37.4532 A
Installed rectifier modules: 4 7
Operational rectifier modules: 4 7
Defective rectfier modules: 0 0
The number of empty modules space: 4 1
Actual Current of DC Load Panel display / clamp meter 78 A 73 A
Actual Float Voltage : 53.95 V 53.93 V

C4.2. Rectifier System 1 Load Breakers/Fuse CABIN 1


No. Brand Rating No. of Pole Load Description Status Remarks

F1 MERLN GERN 125 1 BATERY RACK 1 ON


F2 NADER 80 1 SPARE OFF
F3 NADER 80 1 SPARE OFF
F4 MERLN GERN 16 1 INTERLINK OFF
F5 MERLN GERN 16 1 INTERLINK OFF
PROPOSED LOC. TAPPING PT.
F6 NADER 63 1 FOR GLOBE LTE PROJECT
OFF

F7 MERLN GERN 10 1 PROPOSED FOR AVIAT OFF


F8 MERLN GERN 16 1 SPARE OFF
F9 MERLN GERN 32 1 HUAWEI SOURCE B ON
F10 NADER 80 1 ULTRA OFF
F11 MERLN GERN 16 1 FIU19 OFF
F12 MERLN GERN 16 1 NO LABEL ON
F13 MERLN GERN 16 1 RESERVED OFF
F14 MERLN GERN 16 1 RESERVED OFF
F15 MERLN GERN 16 1 RESERVED OFF
F16 MERLN GERN 16 1 SPARE OFF
F17 MERLN GERN 10 1 NO LABEL ON
F18 MERLN GERN 10 1 SPARE OFF
F19 MERLN GERN 32 1 NO LABEL ON
F20 MERLN GERN 4 1 NO LABEL ON
F20 MERLN GERN 4 1 NO LABEL ON
C4.2. Rectifier System 1 Load Breakers/Fuse
CABIN 2
No. Brand Rating No. of Pole Load Description Status Remarks

F1 NADER 100 1 NO LABEL ON


F2 NADER 80 1 NO LABEL ON
F3 NADER 63 1 CX600 A1 MAIN ON
F4 NADER 63 1 CX600 A2 MAIN ON
F5 NADER 50 1 SPARE OFF
F6 NADER 50 1 SPARE OFF
F7 NADER 50 1 SPARE OFF
F8 NADER 40 1 SPARE OFF
F9 NADER 40 1 SPARE OFF
F10 NADER 32 1 SPARE OFF
F11 NADER 32 1 SPARE OFF
F12 NADER 16 1 IBA FACING BOTOLAWST OFF
F13 NADER 16 1 AVIAT CTR MAIN ON
F14 NADER 10 1 IBAZ-MG3-001 ON
F15 NADER 6 1 FADED LABEL ON

Page 25 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196

F1 NADER 100 1 SPARE OFF


F2 NADER 80 1 SPARE OFF
F3 NADER 63 1 LTE L2600 ON
F4 NADER 63 1 NO LABEL ON
F5 NADER 50 1 SPARE OFF
F6 NADER 50 1 SPARE OFF
F7 NADER 50 1 SPARE OFF
F8 NADER 40 1 SPARE OFF
F9 NADER 40 1 SPARE OFF
F10 NADER 32 1 SPARE OFF
F11 NADER 32 1 NO LABEL ON
F12 NADER 16 1 AVIAT CTR MAIN ON
F13 NADER 16 1 HUWEI RTN905 ON
F14 NADER 10 1 RAWLING MODEM ON
F15 NADER 6 1 NO LABEL ON
Note: Put in "Remark" above for new or existing breaker to be used for proposed equipment
C4.3. Rectifier System 2 Load Breakers/Fuse CABIN 2
No. Brand Rating No. of Load Description Status Remarks

F1 NADER 100 1 SPARE OFF


F2 NADER 80 1 SPARE OFF
F3 NADER 63 1 NO LABEL ON
F4 NADER 63 1 U21/L18 DCDU ON
F5 NADER 50 1 SPARE OFF
F6 NADER 50 1 SPARE OFF
F7 NADER 50 1 SPARE OFF
F8 NADER 40 1 SPARE OFF
F9 NADER 40 1 SPARE OFF
F10 NADER 32 1 SPARE OFF
F11 NADER 32 1 DIR PALAUIG ON
F12 NADER 16 1 NO LABEL ON
F13 NADER 16 1 AVIAT CTR RDNT ON
F14 NADER 10 1 VICE GOV MODEM ON
AM VIRTUAL SOURCING
F15 NADER 6 1 HUAWEI RTN905
ON

F1 NADER 100 1 SPARE OFF


F2 NADER 80 1 NO LABEL ON
F3 NADER 63 1 CX600 REDUNDANT ON
F4 NADER 63 1 CX600 REDUNDANT ON
F5 NADER 50 1 SPARE OFF
F6 NADER 50 1 SPARE OFF
F7 NADER 50 1 SPARE OFF
F8 NADER 40 1 SPARE OFF
F9 NADER 40 1 SPARE OFF
F10 NADER 32 1 UXM TRANSPORT TAPPING OFF
F11 NADER 32 1 UXM TRANSPORT TAPPING OFF
F12 NADER 16 1 FACING DANACBUNGA ON
HUAWEI RTN905 FACING
F13 NADER 16 1 PHILHEM
ON
F14 NADER 10 1 PSBANK IBA HUAWEI RNT905 ON
F15 NADER 6 1 AVIAT CTR RDNT ON
Note: Put in "Remark" above for new or existing breaker to be used for proposed equipment

Page 26 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C4.4. Proposed New Rec Sys Load Breakers/Fuse (HT-TP48200B)
CABIN 1 RECTIIFIER PROPOSAL
No. Brand Rating No. of Load Description Status Remarks
BATTERY
B1 NADER 100 1 BATTERY 1 ON
B2 NADER 100 1 BATTERY 2 ON
B3 NADER 100 1 BATTERY 3 ON
B4 NADER 100 1 BATTERY 4 ON
LLVD
F1 NADER 100 1 MIMO S2 ON
F2 NADER 100 1 SPARE OFF
F3 NADER 80 1 SPARE OFF
F4 NADER 80 1 SPARE OFF
F5 NADER 80 1 SPARE OFF
F6 NADER 80 1 SPARE OFF
PROPOSE TAPPING POINT
F7 NADER 63 1 SPARE OFF
FOR L2300
F8 NADER 63 1 SPARE OFF
F9 NADER 32 1 SPARE OFF
F10 NADER 32 1 SPARE OFF
F11 NADER 32 1 SPARE OFF
F12 NADER 32 1 SPARE OFF
F13 NADER 16 1 SPARE OFF
F14 NADER 16 1 SPARE OFF
BLVD
F15 NADER 63 1 SPARE OFF
F16 NADER 63 1 SPARE OFF
F17 NADER 63 1 SPARE OFF
F18 NADER 63 1 SPARE OFF
F19 NADER 16 1 SPARE OFF
F20 NADER 16 1 SPARE OFF
F21 NADER 16 1 SPARE OFF
F22 NADER 16 1 SPARE OFF
F23 NADER 16 1 SPARE OFF
F24 NADER 16 1 SPARE OFF
F25 NADER 10 1 SPARE OFF
F26 NADER 10 1 SPARE OFF
F27 NADER 10 1 SPARE OFF
F28 NADER 10 1 SPARE OFF
F29 NADER 10 1 SPARE OFF
F30 NADER 10 1 SPARE OFF
Note: Put in "Remark" above for new or existing breaker to be used for proposed equipment

Page 27 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C4.5. Rectifier System-Pic CABIN 1
Existing rectifier system is APM30H, New Rectifier is required
Existing RECTIFIER 1

EXISTING RECTIFIER 1 RECTIFEIR 1 MODULES RS1 ACTUAL LOAD READING

CHANGE-OUT NOKIA ASCOM ON CABIN 1 AND


TAP MIMO @ NEW RS ON CABIN 1.

N/A

RS1 DC DISTRIBUTION BREAKERS 1 RS2 DC DISTRIBUTION BREAKERS 2 Proposed New rectifier1 Location
Existing RECTIFIER 1

EXISTING RECTIFIER 1 RECTIFEIR 1 MODULES RS1 ACTUAL LOAD READING

N/A

RS1 DC DISTRIBUTION BREAKERS 1 RS2 DC DISTRIBUTION BREAKERS 2 Proposed New rectifier1 Location

Existing RECTIFIER 2

Existing RECTIFIER 2 RECTIFEIR 2 MODULES RS2 ACTUAL LOAD READING

N/A

RS2 DC DISTRIBUTION BREAKERS 1 RS2 DC DISTRIBUTION BREAKERS 2 Proposed New rectifier2 Location

Page 28 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C5. Battery System
Battery Location:
No. Description Battery System 1 Battery System 2
1 Battery brand / Model SHOTO/NADER N/A
2 Battery voltage / capacity (Ah) 12 100 N/A N/A
3 Battery out factory date N/A N/A
4 Battery Start Service date N/A N/A
5 Battery bank, How many group(String) 2 4 N/A N/A
6 Power Cable Size(mm²) N/A N/A
7 Installation Date N/A N/A
No. Description Battery System 1 Battery System 2
1 Battery brand / Model SHOTO MONOLITE
2 Battery voltage / capacity (Ah) 12 100 12 100
3 Battery out factory date N/A N/A
4 Battery Start Service date N/A N/A
5 Battery bank, How many group(String) 4 4 4 4
6 Power Cable Size(mm²) N/A N/A
7 Installation Date N/A N/A
Is There any mark of bumped, broken or crazed? Yes No Remarks: N/A
Battery need change out? Yes No
If Yes (for battery changeout) Rack Cabinet Existing Rect. Cab.
C5.1 Pictures of Existing Battery System

CABIN 1 CABIN 2

N/A
BATTERY FOR CHANGEOUT EUL TO
4BANKS 100AH AT RECTIFIER

Battery System 1 Battery System 2 Battery System 3

PROPOSED BATTERY Battery System 2 Battery System 3


C6. Ventilation of Equipment Room
C6.1. Room / Cabin Details

Shelter Dimension (L x W x H): L= 3 m W= 2.8 m H= 3 m


Thickness of Wall: 0.1 m
Material Use for Shelter:

C6.3. For FCS+CTBC (if available)


CABIN 1
Pictures of ACU Details

PHOTO OF ACTUAL ACU LOCATION ACU BRAND ROOM TEMPERATURE DISPLAY

N/A N/A N/A

Page 29 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
ACU 1 PLATE / SPECS ACU 2 PLATE / SPECS ACU CONTROLLER
CABIN 2

N/A

N/A

PHOTO OF ACTUAL ACU LOCATION ACU BRAND ROOM TEMPERATURE DISPLAY

NA NA NA

ACU 1 PLATE / SPECS ACU 2 PLATE / SPECS ACU CONTROLLER

C7. Genset and Fuel Tank


C7.1. DG available on site? Yes No
No Genset Capacity Fuel Tank capacity Brand Date of Manufacture
1 50KVA 1000L POWER CITY N/A
2

C7.2. Picture of existing Genset

N/A
Existing DG Existing Fuel Tank New DG propose location

N/A N/A
Existing DG Existing Fuel Tank New DG propose location

C9. Full Bayface Picture of Equipment Cabinets/Rack


CABIN 1

BATTERY CABINET TRN Rack TRN Rack

Page 30 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196

CABIN 2

BTS3900L TRN Rack L-Rack

N/A N/A

Rectifier1 "indicate equipment" "indicate equipment"

C10. Grounding System and Aircraft Obstruction Light

Lightning Arrester Earthing Test PIT Aircraft Obstruction Light

N/A

Page 31 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C7. Rectifer Computation
C7.1. EXISTING RECTIFIER
1) EXISTING RECTIFIER SYSTEM BRAND - MODEL ASCOM
2) MAXIMUM RECTIFIER MODULES / INSTALLED 4 4
3) RECTIFIER MODULE RATING, WATTS / AMPS 1900 35.58052434
4) BATTERY BRAND / VOLTAGE RATING SHOTO/NADER 12
5) NUMBER OF BATTERIES in BANKS / CAPACITY per CELL (AH) 2 100
6) PRESENT LOAD READING, PANEL DISPLAY / CLAMP METER (A) 4.9 Ampere
7) RECTIFIER MODULES IN OPERATION 4 modules
8) ACTUAL FLOAT VOLTAGE (V) 54.3 Voltage
C7.2. PROPOSED PDU/DCDU RECTIFIER LOAD SCHEDULE
PROPOSED ADDITIONAL LOAD(S)

Current
Equipment Type Power Rating Cable Size Circuit Breaker
Load No Rating Remarks
(Load Description) (Watts) (AWG) Rating (Amps)
(Amps)
1 N/A 0 0 0
2 N/A 0 0 0
3 N/A 0 0 0
4 N/A 0 0 0
5 N/A 0 0 0
6 N/A 0 0 0
7 N/A 0 0 0
TOTAL: 0 0

Total Full Load Current = Existing Load + Proposed Load (100% of Rated Load) 4.9 Amps
Existing Rectifier Capacity: No. Modules x Ampere Capacity = 142.3221 Amps
Existing Battery Capacity: No. of Batt Banks x Batt Capacity = 200 AH

RECTIFIER SUFFICIENCY COMPUTATION:

Available Rectifier Capacity = Existing Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 142.3221 Amps - 4.9 Amps - ( 200 * 0.1) - 35.58052 Amps
Available Rectifier Capacity = 81.84157303 Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) = 3%
BATTERY BACK-UP TIME COMPUTATION:

BBUT = BATTERY CAPACITY (AMPERE-HOUR) / FUTURE TOTAL LOAD (AMPERE)


BBUT = 40.81633 Hours

C7.3. END-STATE SUFFICIENCY COMPUTATION:(applicable only if there will be new Rectifier System or Upgraded Module)
Available Rectifier Capacity = (Future Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity =
Available Rectifier Capacity = Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) =

BATTERY BACK-UP TIME COMPUTATION:

BBUT = BATTERY CAPACITY (AMPERE-HOUR) / FUTURE TOTAL LOAD (AMPERE)


BBUT = 40.816 Hours

C7.4. EQUIPMENT FOR DECOMMISION: (Applicable for sites with identified equipment for decomisioning)
1.) WIMAX BTS : Amperes (value from clampmeter reading)
2.) WIMAX TRANSPORT : Amperes (value from clampmeter reading)
TOTAL FOR DECOM : Amperes

DC POWER SUFFICIENCY ASSESSMENT AND PROPOSAL:

PROPOSE NEW RECTIFIER. MIGRATE ALL LOADS TO NEW RS.

Page 32 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C7. Rectifer Computation
C7.1. EXISTING RECTIFIER
1) EXISTING RECTIFIER SYSTEM BRAND - MODEL ELTEK FLATPACK 2
2) MAXIMUM RECTIFIER MODULES / INSTALLED 8 4
3) RECTIFIER MODULE RATING, WATTS / AMPS 2000 37.45318352
4) BATTERY BRAND / VOLTAGE RATING SHOTO 12
5) NUMBER OF BATTERIES in BANKS / CAPACITY per CELL (AH) 4 100
6) PRESENT LOAD READING, PANEL DISPLAY / CLAMP METER (A) 78 Ampere
7) RECTIFIER MODULES IN OPERATION 5 modules
8) ACTUAL FLOAT VOLTAGE (V) 53.95 Voltage
C7.2. PROPOSED PDU/DCDU RECTIFIER LOAD SCHEDULE
PROPOSED ADDITIONAL LOAD(S)

Current
Equipment Type Power Rating Cable Size Circuit Breaker
Load No Rating Remarks
(Load Description) (Watts) (AWG) Rating (Amps)
(Amps)
1 N/A 0 0 0
2 N/A 0 0 0
3 N/A 0 0 0
4 N/A 0 0 0
5 N/A 0 0 0
6 N/A 0 0 0
7 N/A 0 0 0
TOTAL: 0 0

Total Full Load Current = Existing Load + Proposed Load (100% of Rated Load) 78 Amps
Existing Rectifier Capacity: No. Modules x Ampere Capacity = 187.2659 Amps
Existing Battery Capacity: No. of Batt Banks x Batt Capacity = 400 AH

RECTIFIER SUFFICIENCY COMPUTATION:

Available Rectifier Capacity = Existing Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 187.2659 Amps - 78 Amps - ( 400 * 0.1) - 37.45318 Amps
Available Rectifier Capacity = 31.81273408 Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) = 42%
BATTERY BACK-UP TIME COMPUTATION:

BBUT = BATTERY CAPACITY (AMPERE-HOUR) / FUTURE TOTAL LOAD (AMPERE)


BBUT = 5.128205 Hours

C7.3. END-STATE SUFFICIENCY COMPUTATION:(applicable only if there will be new Rectifier System or Upgraded Module)
Available Rectifier Capacity = (Future Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 187.2659 Amps - 97.85019 Amps - ( 400 * 0.1) - 37.45318 Amps
Available Rectifier Capacity = Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) =

BATTERY BACK-UP TIME COMPUTATION:

BBUT = BATTERY CAPACITY (AMPERE-HOUR) / FUTURE TOTAL LOAD (AMPERE)


BBUT = Hours

C7.4. EQUIPMENT FOR DECOMMISION: (Applicable for sites with identified equipment for decomisioning)
1.) WIMAX BTS : Amperes (value from clampmeter reading)
2.) WIMAX TRANSPORT : Amperes (value from clampmeter reading)
TOTAL FOR DECOM : Amperes

DC POWER SUFFICIENCY ASSESSMENT AND PROPOSAL:

SEE REMARKS AT NEW RS

Page 33 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C7.1. EXISTING RECTIFIER
C7.1. EXISTING RECTIFIER
1) EXISTING RECTIFIER SYSTEM BRAND - MODEL ELTEK FLATPACK 2
2) MAXIMUM RECTIFIER MODULES / INSTALLED 8 7
3) RECTIFIER MODULE RATING, WATTS / AMPS 2000 37.45318352
4) BATTERY BRAND / VOLTAGE RATING MONOLITE 12
5) NUMBER OF BATTERIES in BANKS / CAPACITY per CELL (AH) 4 100
6) PRESENT LOAD READING, PANEL DISPLAY / CLAMP METER (A) 73 Ampere
7) RECTIFIER MODULES IN OPERATION 7 modules
8) ACTUAL FLOAT VOLTAGE (V) 53.93 Voltage
C8.2. PROPOSED PDU/DCDU RECTIFIER LOAD SCHEDULE
PROPOSED ADDITIONAL LOAD(S)

Equipment Type Power Rating Current Cable Size Circuit Breaker


Load No Remarks
(Load Description) (Watts) Rating (Amps) (AWG) Rating (Amps)

1 N/A 0 0 0 0
2 N/A 0 0 0 0
3 N/A 0 0 0 0
4 N/A 0 0 0 0
5 N/A 0 0 0
6 N/A 0 0 0
7 N/A 0 0 0
TOTAL: 0 0

Total Full Load Current = Existing Load + Proposed Load (100% of Rated Load) = 73 Amps
Existing Rectifier Capacity: No. Modules x Ampere Capacity = 262.1723 Amps
Existing Battery Capacity: No. of Batt Banks x Batt Capacity = 400 AH

RECTIFIER SUFFICIENCY COMPUTATION:

Available Rectifier Capacity = Existing Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 262.1723 Amps - 73 Amps - ( 400 * 0.1) - 37.45318 Amps
Available Rectifier Capacity = 111.7191011 Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) = 28%
BATTERY BACK-UP TIME COMPUTATION:

BBUT = BATTERY CAPACITY (AMPERE-HOUR) / FUTURE TOTAL LOAD (AMPERE)


BBUT = 5.479452 Hours

C8.3. END-STATE SUFFICIENCY COMPUTATION: (applicable only if there will be new Rectifier System or Upgraded Module)

Available Rectifier Capacity = (Future Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity =
Available Rectifier Capacity = Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) =

BATTERY BACK-UP TIME COMPUTATION:


BATTERY FOR CHANGEOUT TO 4BANKS 100AH AT REC.
BBUT = BATTERY CAPACITY (AMPERE-HOUR) / FUTURE TOTAL LOAD (AMPERE)
BBUT = 5.4795 Hours

C8.4. EQUIPMENT FOR DECOMMISION: (Applicable for sites with identified equipment for decomisioning)
1.) WIMAX BTS : Amperes (value from clampmeter reading)
2.) WIMAX TRANSPORT : Amperes (value from clampmeter reading)
TOTAL FOR DECOM : Amperes

DC POWER SUFFICIENCY ASSESSMENT AND PROPOSAL:

SEE REMARKS AT NEW RS


BATTERY FOR CHANGEOUT TO 4BANKS 100AH AT REC.

Page 34 of 50
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C8. Proposed Rectifer Computation
C8.1. PROPOSED RECTIFIER
1) EXISTING RECTIFIER SYSTEM BRAND - MODEL HT-TP48200B
2) MAXIMUM RECTIFIER MODULES / INSTALLED 6 4
3) RECTIFIER MODULE RATING, WATTS / AMPS 3000 56.17977528
4) BATTERY BRAND / VOLTAGE RATING SHOTO 12
5) NUMBER OF BATTERIES in BANKS / CAPACITY per CELL (AH) 4 100
6) PRESENT LOAD READING, PANEL DISPLAY / CLAMP METER (A) 4.9 Ampere
7) RECTIFIER MODULES IN OPERATION 4 modules
8) ACTUAL FLOAT VOLTAGE (V) 53.6 Voltage
C8.2. PROPOSED PDU/DCDU RECTIFIER LOAD SCHEDULE
PROPOSED ADDITIONAL LOAD(S)

Equipment Type Power Rating Current Rating Cable Size Circuit Breaker
Load No Remarks
(Load Description) (Watts) (Amps) (AWG) Rating (Amps)

L2600 MASSIVE MIMO S2


1 655 12.2659176 0
(1CC) ON AIR
2 EPU02D 150 2.80898876 100
3 BBU MIMO 405 7.58426966 0
4 L2300 S1.S2.S3 1596 29.8876404 0
5 L2600 MIMO S1.S3 1902 35.6179775 0
6 N/A 0 0 0
7 N/A 0 0 0
TOTAL: 4708 88.164794

Total Full Load Current = Existing Load + Proposed Load (100% of Rated Load) = 93.064794 Amps
Existing Rectifier Capacity: No. Modules x Ampere Capacity = 224.7191 Amps
Existing Battery Capacity: No. of Batt Banks x Batt Capacity = 400 AH

RECTIFIER SUFFICIENCY COMPUTATION:

Available Rectifier Capacity = Existing Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 224.7191 Amps - 93.06479 Amps - ( 400 * 0.1) - 56.17978 Amps
Available Rectifier Capacity = 35.47453184 Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) = 41%
BATTERY BACK-UP TIME COMPUTATION:

BBUT = BATTERY CAPACITY (AMPERE-HOUR) / FUTURE TOTAL LOAD (AMPERE)


BBUT = 4.298081 Hours

C8.3. END-STATE SUFFICIENCY COMPUTATION: (applicable only if there will be new Rectifier System or Upgraded Module)

PROVIDE 1 ADDITIONAL MODULE


Available Rectifier Capacity = (Future Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 280.8989 Amps - 93.06479 Amps - ( 400 * 0.1) - 56.17978 Amps
Available Rectifier Capacity = 91.6543071 Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) = 33.13%
BATTERY BACK-UP TIME COMPUTATION:

BBUT = BATTERY CAPACITY (AMPERE-HOUR) / FUTURE TOTAL LOAD (AMPERE)


BBUT = 4.2981 Hours

C8.4. EQUIPMENT FOR DECOMMISION: (Applicable for sites with identified equipment for decomisioning)
1.) WIMAX BTS : Amperes (value from clampmeter reading)
2.) WIMAX TRANSPORT : Amperes (value from clampmeter reading)
TOTAL FOR DECOM : Amperes

DC POWER SUFFICIENCY ASSESSMENT AND PROPOSAL:

PROVIDE 1 ADDITIONAL MODULE

Page 35 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C9. Antenna Mounting Bracket or Pole

GU900/GUL900 Sector 1 Sector 2 Sector 3


Length of Pole (mm) 3000 3000 3000
Diameter of Pole (mm) 70 70 70
Size of Bolts (mm) 10 10 10
Size of U-Bolts (mm) 10 10 10
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
GU900/GUL900 Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

Remarks :

L700 Sector 1 Sector 2 Sector 3


Length of Pole (mm) 3000 3000 3000
Diameter of Pole (mm) 70 70 70
Size of Bolts (mm) 10 10 10
Size of U-Bolts (mm) 10 10 10
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
L700 Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

Remarks :

Page 36 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C9. Antenna Mounting Bracket or Pole

G1800 Sector 1 Sector 2 Sector 3


Length of Pole (mm) N/A 3000 N/A
Diameter of Pole (mm) N/A 80 N/A
Size of Bolts (mm) N/A 20 N/A
Size of U-Bolts (mm) N/A 20 N/A
Distance of pole to tower leg /
N/A 540 N/A
building wall (mm)
G1800 Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

Remarks :

U2100DB Sector 1 Sector 2 Sector 3


Length of Pole (mm) 3000 3000 3000
Diameter of Pole (mm) 80 80 80
Size of Bolts (mm) 20 20 20
Size of U-Bolts (mm) 20 20 20
Distance of pole to tower leg /
540 540 540
building wall (mm)
U2100DB Sector 4 Sector 5 Sector 6
Length of Pole (mm) 3000 3000 3000
Diameter of Pole (mm) 80 80 80
Size of Bolts (mm) 20 20 20
Size of U-Bolts (mm) 20 20 20
Distance of pole to tower leg /
540 540 540
building wall (mm)
Pole Bolts U Bolts

Remarks :

Page 37 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C9. Antenna Mounting Bracket or Pole

L1800/L1800DB Sector 1 Sector 2 Sector 3


Length of Pole (mm) 3000 3000 3000
Diameter of Pole (mm) 80 80 80
Size of Bolts (mm) 20 20 20
Size of U-Bolts (mm) 20 20 20
Distance of pole to tower leg /
540 540 540
building wall (mm)
L1800/L1800DB Sector 4 Sector 5 Sector 6
Length of Pole (mm) 3000 3000 3000
Diameter of Pole (mm) 80 80 80
Size of Bolts (mm) 20 20 20
Size of U-Bolts (mm) 20 20 20
Distance of pole to tower leg /
540 540 540
building wall (mm)
Pole Bolts U Bolts

Remarks :
L2600-TDD Sector 1 Sector 2 Sector 3
Length of Pole (mm) 3000 3000 3000
Diameter of Pole (mm) 70 70 70
Size of Bolts (mm) 20 20 20
Size of U-Bolts (mm) 20 20 20
Distance of pole to tower leg /
200 200 200
building wall (mm)
L2600-TDD Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

Remarks :

Page 38 of 50
Genesis-TSSR_Rel.v4.6-2018

D1. Existing Site development layout Drawing File Name NL196-IBA

Page 39 of 50
Genesis-TSSR_Rel.v4.6-2018

D2. Proposed Site development layout Drawing File Name NL196-IBA

New Ant/RRU MIMO New ODC New Feeder/CPRI New Pad


New Ant/RRU Tech 2 New RRU Pole New Power Cable Others
New Ant/RRU Tech 3 New Ladder/Stacking New Grounding Others

Repan L26 MM BB Azimuth of S1 to 20


and update antenna proposal layouts

Page 40 of 50
Genesis-TSSR_Rel.v4.6-2018

D3. Existing Room Layout Drawing File Name NL196-IBA

Page 41 of 50
Genesis-TSSR_Rel.v4.6-2018

D4. Proposed Room Layout (with cable routing layout) Drawing File Name NL196-IBA

New Ant/RRU MIMO New ODC New Feeder/CPRI New Pad


New Ant/RRU Tech 2 New RRU Pole New Power Cable Others
New Ant/RRU Tech 3 New Ladder/Stacking New Grounding Others

Page 42 of 50
Genesis-TSSR_Rel.v4.6-2018

D5. Proposed Layout Outdoor cable routing (from cabin to antenna) Drawing File Name NL196-IBA

New Ant/RRU MIMO New ODC New Feeder/CPRI New Pad


New Ant/RRU Tech 2 New RRU Pole New Power Cable Others
New Ant/RRU Tech 3 New Ladder/Stacking New Grounding Others

Page 43 of 50
Genesis-TSSR_Rel.v4.6-2018

D6. Existing Tower Elevation and Tower Loading Drawing File Name NL196-IBA

Page 44 of 50
Genesis-TSSR_Rel.v4.6-2018

D7. Proposed Antenna Layout(with Proper Northing) Drawing File Name NL196-IBA

New Ant/RRU MIMO New ODC New Feeder/CPRI New Pad


New Ant/RRU Tech 2 New RRU Pole New Power Cable Others
New Ant/RRU Tech 3 New Ladder/Stacking New Grounding Others

Repan L26 MM BB Azimuth of S1 to 20


and update antenna proposal layouts

Page 45 of 50
Genesis-TSSR_Rel.v4.6-2018

D8. Top View of the Antenna Drawing File Name NL196-IBA

Repan L26 MM BB Azimuth of S1 to 20


and update antenna proposal layouts

Page 46 of 50
Genesis-TSSR_Rel.v4.6-2018

1.WHOLE SITE SKETCH-DRAWINGS Drawing File Name NL196-IBA

Page 47 of 50
Genesis-TSSR_Rel.v4.6-2018

2.CABIN SKETCH-DRAWINGS ON SITE Drawing File Name NL196-IBA

Page 48 of 50
Genesis-TSSR_Rel.v4.6-2018

3. CABLE ROUTING(ESPECIALLY ROOFTOP SITE) Drawing File Name NL196-IBA

Page 49 of 50
Genesis-TSSR_Rel.v4.6-2018

GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196

E. Revision History

Rev. No Date Name Remarks

Page 50 of 50

You might also like