6-2018
GLOBE TELECOM
GENEISIS PROJECT
OK FOR NEW RS(600AH), MIGRATE LOADS FROM C1-RS1 TO NEW RS. OK TO COLOCEQUIP'T.
OK TO CHANGE-OUT BATT SYS 2 AT RS2 CABIN 2.
ENSURE THAT TRANSFORMER IS AT LEAST 50KVA, IF NOT, PROVIDE UPGRADE
ANTHONY D. GADE
Vendor QA : CQ
FACILITY ENGINEERING SOLUTION APPROVED DATE: 03/28/2019
(STRUCTURAL) FULLY APPROVED DATE:
REMARKS:
OK TO INSTALL
Vendor QA : SHANGHAI
CONTRACTOR: HUAWEI GSC
NAME & MOBILE: SHANGHAI/7100658101
Page 1 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
Screen shot of actuall site survey location Antenna Blockage XXX ( DEG)
Page 2 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
A3.2 Pictures of Site and Tower Site Defect Report (that affects project implementation/a
N/A
N/A N/A
Nearest Access Road Obstacle upon Entering the Site Obstacle upon Entering the Site
N/A
Page 3 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
Picture of AMB
RRU/RFU Location
Overview of Antenna
Page 4 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
L700 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 15.327804 15.327804 15.327804
Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 39 39 39
Antenna Orientation 60 145 270
Down tilt (Mechanical) 1 2 2
Down tilt (Electrical) 0 0 0
Type of Antenna HAUWEI (ADU4516R6v06) HAUWEI (ADU4516R6v06) HAUWEI (ADU4516R6v06)
Picture of AMB
RRU/RFU Location
Overview of Antenna
Page 5 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
G1800 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model N/A N/A N/A
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives
Page 6 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
U2100DB Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 15.327804 15.327804 15.327804
Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 36 36 36
Antenna Orientation 60 140 280
Down tilt (Mechanical) 2 2 3
Down tilt (Electrical) 0 0 0
Type of Antenna HUAWEI (AMB4520R0) HUAWEI (AMB4520R0) HUAWEI (AMB4520R0)
Number of Antenna Port 4 4 4
Shared Antenna with any technology L1800DB L1800DB L1800DB
RRU/Combiner model RRU3962 RRU3962 RRU3962
RRU shared with/Combiner Type L1800DB L1800DB L1800DB
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE TUBULAR TUBULAR TUBULAR
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives
Picture of AMB
RRU/RFU Location
Overview of Antenna
Page 7 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
L1800DB Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 15.327804 15.327804 15.327804
Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 36 36 36
Antenna Orientation 60 140 280
Down tilt (Mechanical) 2 2 3
Down tilt (Electrical) 0 0 0
Type of Antenna HUAWEI (AMB4520R0) HUAWEI (AMB4520R0) HUAWEI (AMB4520R0)
Number of Antenna Port 4 4 4
Shared Antenna with any technology U2100DB U2100DB U2100DB
RRU/Combiner model RRU3962 RRU3962 RRU3962
RRU shared with/Combiner Type U2100DB U2100DB U2100DB
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE TUBULAR TUBULAR TUBULAR
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives
Picture of AMB
RRU/RFU Location
Overview of Antenna
Page 8 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
L2600 - TDD Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 15.327804 15.327804 15.327804
Longitude (DLL) of Antenna 119.980684 119.980684 119.980684
Antenna Height (m) 38 38 38
Antenna Orientation 60 150 290
Down tilt (Mechanical) 2 4 2
Down tilt (Electrical) 2 3 2
Type of Antenna HUAWEI (ATR451714) HUAWEI (ATR451714) HUAWEI (ATR451714)
Number of Antenna Port 6 6 6
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model RRU3939 RRU3939 RRU3939
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE TUBULAR TUBULAR TUBULAR
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives
Picture of AMB
RRU/RFU Location
Overview of Antenna
Page 9 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
MIMO-L2600 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A 15.327804 N/A
Longitude (DLL) of Antenna N/A 119.980684 N/A
Antenna Height (m) N/A 38 N/A
Antenna Orientation N/A 170 N/A
Down tilt (Mechanical) N/A 6 N/A
Down tilt (Electrical) N/A 0 N/A
MASSIVE MIMO
Type of Antenna N/A N/A
ANTENNA (AAU5271)
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner Model N/A N/A N/A
RRU/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A TUBULAR N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives
Page 10 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B. Existing RF Antenna Information
WIMAX Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model N/A N/A N/A
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives
Page 11 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B2. Panoramic Antenna Pictures at height 43 meters
0º 30º 60º
N/A
Existing MW # Existing MW # Existing MW #
Page 12 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B1. RF Antenna Information
B1.1. General Information
Enough space to install RF antenna of this project? Y N New Antenna
N/A N/A
N/A N/A
Overview of Antenna
N/A N/A
Page 13 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C8. Cable Interface Proposal for L2600 MM BB
Power Cable: LENGTH
Cable Routing: Single
Single Length of -48V from EPU to RECTIFIER 10 m
Single Length of -48V from EPU to BBU N/A m
Single Length of -48V from RRU/RFU to EPU02D Sector 1 N/A m
Sector 2 N/A m
Sector 3 N/A m
Sector 4 N/A m
Sector 5 N/A m
Sector 6 N/A m
Page 14 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
B1. RF Antenna Information
B1.1. General Information
Enough space to install RF antenna of this project? Y N New Antenna
RRU/RFU Location
Overview of Antenna
Page 15 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C8. Cable Interface Proposal for L2300
Power Cable: LENGTH
Cable Routing: Single
Single Length of -48V from DCDU to RECTIFIER 8 m
Single Length of -48V from RRU/RFU to DCDU Sector 1 60 m
Sector 2 60 m
Sector 3 60 m
Sector 4 N/A m
Sector 5 N/A m
Sector 6 N/A m
Page 16 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C1. Room & Basepad
C1.1. General Information
Site Location Situation Flat Ground Rolling terrain
Existing Equipment Room Ceiling Height: mm Cable Ladder Height: mm
Concrete Floor Raised Floor Height mm
Existing Basepad Quantity pcs Maximum Height: mm
OUTDOOR (Panoramic Picture from edge to edge)
From the rear edge of Site looking at Site Entrance (Facing the GF Gate/RT roof Access)
From the left edge of Site looking at Right Side (Facing the rear of GF Gate/Rooftop Door Access)
From the front edge of Site looking at Rear of Site (Facing the rear of GF Gate/Rooftop Door Access)
From the right edge of Site looking at Left Side (Facing the rear of GF Gate/Rooftop Door Access)
Page 17 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
TOWER TOP TO GROUND VIEW (While on top of tower take picture looking downwards)
From the top of tower looking down at Site Entrance (Facing the GF Gate/RT roof Access)
From the top of tower looking down at Right Side (Facing the rear of GF Gate/Rooftop Door Access)
From the top of tower looking at Rear of Site (Facing the rear of GF Gate/Rooftop Door Access)
From the top of tower looking at Left Side (Facing the rear of GF Gate/Rooftop Door Access)
Page 18 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
INSIDE CABIN / EQUIPMENT ROOM
CABIN 1
N/A
2G/3G BBU LTE BBU MIMO BBU
Page 19 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C1.3. Transport Information
C1.3.1. Existing Equipment Type:
Huawei CX600-X8 Huawei CX600-X2 Huawei ATN950B Huawei ATN950 MICROWAVE
Others, Please state total quantity and fill in the detail as below table. Quantity: 2
new DCDU
Page 20 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C.2.3. Cable Ladder
New Indoor Cable Ladder Required: Length: N/A m Width N/A mm
New OD Horizontal Ladder Required: Length: N/A m Width N/A mm Height N/A mm
New OD Vertical Ladder Required: Length: N/A m Width N/A mm
New OD Vertical Ladder Extension clip Required: pcs N/A
Remarks: N/A
CABIN 1
Exixting ID/OD Cable Ladder 1 Exixting ID/OD Cable Ladder 2 Exixting Vertical Cable Ladder 3
CABIN 2
Exixting ID/OD Cable Ladder 1 Exixting ID/OD Cable Ladder 2 Exixting Vertical Cable Ladder 3
Layers of Feeder Cable on Existing Layers of Feeder Cable on Existing Layers of Feeder Cable on Existing
ID/OD Cable Ladder 1 ID/OD Cable Ladder 2 Vertical Cable Ladder 3
Proposed ID/OD Cable Ladder 1 Proposed ID/OD Cable Ladder 2 Proposed Vertical Cable Ladder 3
Existing GPS Location Proposed GPS Location Proposed Surge protector location
GPS cable length : N/A GPS DIVIDER FOR --- : Yes No
Page 21 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C2.5 Busbar
C2.5.1. Grounding Busbar (Proposed for BBU, DCDU, GPS, New Cabinet / Rack) (Indoor)
Reuse Existing Bus Bar Remark: USE AVAILABLE HOLES
New Busbar Required: New Hole's Qty Required: N/A Holes' diameter: N/A mm
Remark: N/A
Proposed 38mm² bare/insulated copper wire: N/A m
C2.5.1.1 Picture of Proposed Busbar (Proposed for BBU, DCDU, GPS, New Cabinet / Rack) (Indoor)
CABIN 1 CABIN 2
N/A
Available holes for use Available holes for use Proposed Busbar
C2.5.2. Grounding Busbar (Proposed for RRU, Cabinet, Cables)(Outdoor)
Reuse Existing Bus Bar Remark: N/A
New Busbar Required: New Hole's Qty Required: Holes' diameter: mm
Remark: PROVIDE NEW TOWER BUSBAR
Proposed 38mm² bare/insulated copper wire: N/A m
N/A
Available holes for use Proposed Outdoor Busbar Proposed Outdoor Busbar
C2.5.2.1b Picture of Proposed Busbar near tower/antenna(Tower)
Existing Feeder Window New Feeder Window (Inside Cabin) New Feeder Window (Outside Cabin)
Page 22 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C3. Power Source (Supply)
C3.1. Primary Power Source
Only commercial Power Commercial Power+DG Only DG
Solar+DG DCB+DG Temporary Tapping to Neighbor/Lessor
C3.2. Transformer Information
Brand: NO DATA Capacity (KVA): NO DATA Single Phase Three Phase
Picture of Transformer
1 SQUARE D 40 2 ACU 1 ON
2 SQUARE D 30 2 REC SPARE ON
3 SQUARE D 40 2 ACU 2 ON
4 SQUARE D 30 2 REC SPARE ON
5 SQUARE D 15 2 ALARM ON
6 SQUARE D 30 2 POWER OFF
7 SQUARE D 15 2 L.O ON
8 SQUARE D 30 2 EM POWER ON
9 SQUARE D 20 2 C.O ON
10 SQUARE D 30 2 EM POWER ON
11 SQUARE D 30 2 SPARE OFF
12 SQUARE D 30 2 REC SPARE ON
Note: Put in "Remark" above for new or existing breaker to be used for proposed equipment
Page 23 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C3.6 ACPDB Load Status
CABIN 2
AC Cable size(mm²) 50
PDB/P Main Breaker Amps. 160 No. of Branches 12
P-BTS Cable Length(m)
1 SQUARE D 70 RECTIFIER 1 ON
2 SQUARE D 40 ACU 1 ON
3 SQUARE D 70 RECTIFIER 2 ON
4 SQUARE D 40 ACU 2 ON
5 SQUARE D 20 C.OUTLET ON
6 SQUARE D 40 ACU 3 ON
7 SQUARE D 20 LIGHT ON
8 SQUARE D 15 ALARM OFF
9 SQUARE D 15 SPARE OFF
10 SQUARE D 30 GLOBE WIFI ON
Note: Put in "Remark" above for new or existing breaker to be used for proposed equipment
TVSS Detail: Brand: Rating: KAIC
N/A
ACPDB TVSS VAC = 235.6 V
The Actual Output Current of ACPDB (Measure by Meter):
N/A
N/A
ACPDB TVSS VAC = 230.8 V
The Actual Output Current of ACPDB (Measure by Meter):
N/A
Page 24 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C4. DC Power
C4.1. Rectifier System Load Breakers/ Fuse CABIN 1
RECTIFIER SYSTEM 1 RECTIFIER SYSTEM 2
Existing Rectifier Specify brand/name : ASCOM N/A
Rectifier System Capacity (@48VDC) 166.6666667 Vdc Vdc
Rectifier Module Capacity (Watts): 1900 W 35.58052 A W A
Installed rectifier modules: 4 N/A
Operational rectifier modules: 4 N/A
Defective rectfier modules: 0 N/A
The number of empty modules space: 0 N/A
Actual Current of DC Load Panel display / clamp meter 4.9 A A
Actual Float Voltage : 54.3 V V
Page 25 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
Page 26 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C4.4. Proposed New Rec Sys Load Breakers/Fuse (HT-TP48200B)
CABIN 1 RECTIIFIER PROPOSAL
No. Brand Rating No. of Load Description Status Remarks
BATTERY
B1 NADER 100 1 BATTERY 1 ON
B2 NADER 100 1 BATTERY 2 ON
B3 NADER 100 1 BATTERY 3 ON
B4 NADER 100 1 BATTERY 4 ON
LLVD
F1 NADER 100 1 MIMO S2 ON
F2 NADER 100 1 SPARE OFF
F3 NADER 80 1 SPARE OFF
F4 NADER 80 1 SPARE OFF
F5 NADER 80 1 SPARE OFF
F6 NADER 80 1 SPARE OFF
PROPOSE TAPPING POINT
F7 NADER 63 1 SPARE OFF
FOR L2300
F8 NADER 63 1 SPARE OFF
F9 NADER 32 1 SPARE OFF
F10 NADER 32 1 SPARE OFF
F11 NADER 32 1 SPARE OFF
F12 NADER 32 1 SPARE OFF
F13 NADER 16 1 SPARE OFF
F14 NADER 16 1 SPARE OFF
BLVD
F15 NADER 63 1 SPARE OFF
F16 NADER 63 1 SPARE OFF
F17 NADER 63 1 SPARE OFF
F18 NADER 63 1 SPARE OFF
F19 NADER 16 1 SPARE OFF
F20 NADER 16 1 SPARE OFF
F21 NADER 16 1 SPARE OFF
F22 NADER 16 1 SPARE OFF
F23 NADER 16 1 SPARE OFF
F24 NADER 16 1 SPARE OFF
F25 NADER 10 1 SPARE OFF
F26 NADER 10 1 SPARE OFF
F27 NADER 10 1 SPARE OFF
F28 NADER 10 1 SPARE OFF
F29 NADER 10 1 SPARE OFF
F30 NADER 10 1 SPARE OFF
Note: Put in "Remark" above for new or existing breaker to be used for proposed equipment
Page 27 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C4.5. Rectifier System-Pic CABIN 1
Existing rectifier system is APM30H, New Rectifier is required
Existing RECTIFIER 1
N/A
RS1 DC DISTRIBUTION BREAKERS 1 RS2 DC DISTRIBUTION BREAKERS 2 Proposed New rectifier1 Location
Existing RECTIFIER 1
N/A
RS1 DC DISTRIBUTION BREAKERS 1 RS2 DC DISTRIBUTION BREAKERS 2 Proposed New rectifier1 Location
Existing RECTIFIER 2
N/A
RS2 DC DISTRIBUTION BREAKERS 1 RS2 DC DISTRIBUTION BREAKERS 2 Proposed New rectifier2 Location
Page 28 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C5. Battery System
Battery Location:
No. Description Battery System 1 Battery System 2
1 Battery brand / Model SHOTO/NADER N/A
2 Battery voltage / capacity (Ah) 12 100 N/A N/A
3 Battery out factory date N/A N/A
4 Battery Start Service date N/A N/A
5 Battery bank, How many group(String) 2 4 N/A N/A
6 Power Cable Size(mm²) N/A N/A
7 Installation Date N/A N/A
No. Description Battery System 1 Battery System 2
1 Battery brand / Model SHOTO MONOLITE
2 Battery voltage / capacity (Ah) 12 100 12 100
3 Battery out factory date N/A N/A
4 Battery Start Service date N/A N/A
5 Battery bank, How many group(String) 4 4 4 4
6 Power Cable Size(mm²) N/A N/A
7 Installation Date N/A N/A
Is There any mark of bumped, broken or crazed? Yes No Remarks: N/A
Battery need change out? Yes No
If Yes (for battery changeout) Rack Cabinet Existing Rect. Cab.
C5.1 Pictures of Existing Battery System
CABIN 1 CABIN 2
N/A
BATTERY FOR CHANGEOUT EUL TO
4BANKS 100AH AT RECTIFIER
Page 29 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
ACU 1 PLATE / SPECS ACU 2 PLATE / SPECS ACU CONTROLLER
CABIN 2
N/A
N/A
NA NA NA
N/A
Existing DG Existing Fuel Tank New DG propose location
N/A N/A
Existing DG Existing Fuel Tank New DG propose location
Page 30 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
CABIN 2
N/A N/A
N/A
Page 31 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C7. Rectifer Computation
C7.1. EXISTING RECTIFIER
1) EXISTING RECTIFIER SYSTEM BRAND - MODEL ASCOM
2) MAXIMUM RECTIFIER MODULES / INSTALLED 4 4
3) RECTIFIER MODULE RATING, WATTS / AMPS 1900 35.58052434
4) BATTERY BRAND / VOLTAGE RATING SHOTO/NADER 12
5) NUMBER OF BATTERIES in BANKS / CAPACITY per CELL (AH) 2 100
6) PRESENT LOAD READING, PANEL DISPLAY / CLAMP METER (A) 4.9 Ampere
7) RECTIFIER MODULES IN OPERATION 4 modules
8) ACTUAL FLOAT VOLTAGE (V) 54.3 Voltage
C7.2. PROPOSED PDU/DCDU RECTIFIER LOAD SCHEDULE
PROPOSED ADDITIONAL LOAD(S)
Current
Equipment Type Power Rating Cable Size Circuit Breaker
Load No Rating Remarks
(Load Description) (Watts) (AWG) Rating (Amps)
(Amps)
1 N/A 0 0 0
2 N/A 0 0 0
3 N/A 0 0 0
4 N/A 0 0 0
5 N/A 0 0 0
6 N/A 0 0 0
7 N/A 0 0 0
TOTAL: 0 0
Total Full Load Current = Existing Load + Proposed Load (100% of Rated Load) 4.9 Amps
Existing Rectifier Capacity: No. Modules x Ampere Capacity = 142.3221 Amps
Existing Battery Capacity: No. of Batt Banks x Batt Capacity = 200 AH
Available Rectifier Capacity = Existing Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 142.3221 Amps - 4.9 Amps - ( 200 * 0.1) - 35.58052 Amps
Available Rectifier Capacity = 81.84157303 Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) = 3%
BATTERY BACK-UP TIME COMPUTATION:
C7.3. END-STATE SUFFICIENCY COMPUTATION:(applicable only if there will be new Rectifier System or Upgraded Module)
Available Rectifier Capacity = (Future Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity =
Available Rectifier Capacity = Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) =
C7.4. EQUIPMENT FOR DECOMMISION: (Applicable for sites with identified equipment for decomisioning)
1.) WIMAX BTS : Amperes (value from clampmeter reading)
2.) WIMAX TRANSPORT : Amperes (value from clampmeter reading)
TOTAL FOR DECOM : Amperes
Page 32 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C7. Rectifer Computation
C7.1. EXISTING RECTIFIER
1) EXISTING RECTIFIER SYSTEM BRAND - MODEL ELTEK FLATPACK 2
2) MAXIMUM RECTIFIER MODULES / INSTALLED 8 4
3) RECTIFIER MODULE RATING, WATTS / AMPS 2000 37.45318352
4) BATTERY BRAND / VOLTAGE RATING SHOTO 12
5) NUMBER OF BATTERIES in BANKS / CAPACITY per CELL (AH) 4 100
6) PRESENT LOAD READING, PANEL DISPLAY / CLAMP METER (A) 78 Ampere
7) RECTIFIER MODULES IN OPERATION 5 modules
8) ACTUAL FLOAT VOLTAGE (V) 53.95 Voltage
C7.2. PROPOSED PDU/DCDU RECTIFIER LOAD SCHEDULE
PROPOSED ADDITIONAL LOAD(S)
Current
Equipment Type Power Rating Cable Size Circuit Breaker
Load No Rating Remarks
(Load Description) (Watts) (AWG) Rating (Amps)
(Amps)
1 N/A 0 0 0
2 N/A 0 0 0
3 N/A 0 0 0
4 N/A 0 0 0
5 N/A 0 0 0
6 N/A 0 0 0
7 N/A 0 0 0
TOTAL: 0 0
Total Full Load Current = Existing Load + Proposed Load (100% of Rated Load) 78 Amps
Existing Rectifier Capacity: No. Modules x Ampere Capacity = 187.2659 Amps
Existing Battery Capacity: No. of Batt Banks x Batt Capacity = 400 AH
Available Rectifier Capacity = Existing Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 187.2659 Amps - 78 Amps - ( 400 * 0.1) - 37.45318 Amps
Available Rectifier Capacity = 31.81273408 Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) = 42%
BATTERY BACK-UP TIME COMPUTATION:
C7.3. END-STATE SUFFICIENCY COMPUTATION:(applicable only if there will be new Rectifier System or Upgraded Module)
Available Rectifier Capacity = (Future Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 187.2659 Amps - 97.85019 Amps - ( 400 * 0.1) - 37.45318 Amps
Available Rectifier Capacity = Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) =
C7.4. EQUIPMENT FOR DECOMMISION: (Applicable for sites with identified equipment for decomisioning)
1.) WIMAX BTS : Amperes (value from clampmeter reading)
2.) WIMAX TRANSPORT : Amperes (value from clampmeter reading)
TOTAL FOR DECOM : Amperes
Page 33 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C7.1. EXISTING RECTIFIER
C7.1. EXISTING RECTIFIER
1) EXISTING RECTIFIER SYSTEM BRAND - MODEL ELTEK FLATPACK 2
2) MAXIMUM RECTIFIER MODULES / INSTALLED 8 7
3) RECTIFIER MODULE RATING, WATTS / AMPS 2000 37.45318352
4) BATTERY BRAND / VOLTAGE RATING MONOLITE 12
5) NUMBER OF BATTERIES in BANKS / CAPACITY per CELL (AH) 4 100
6) PRESENT LOAD READING, PANEL DISPLAY / CLAMP METER (A) 73 Ampere
7) RECTIFIER MODULES IN OPERATION 7 modules
8) ACTUAL FLOAT VOLTAGE (V) 53.93 Voltage
C8.2. PROPOSED PDU/DCDU RECTIFIER LOAD SCHEDULE
PROPOSED ADDITIONAL LOAD(S)
1 N/A 0 0 0 0
2 N/A 0 0 0 0
3 N/A 0 0 0 0
4 N/A 0 0 0 0
5 N/A 0 0 0
6 N/A 0 0 0
7 N/A 0 0 0
TOTAL: 0 0
Total Full Load Current = Existing Load + Proposed Load (100% of Rated Load) = 73 Amps
Existing Rectifier Capacity: No. Modules x Ampere Capacity = 262.1723 Amps
Existing Battery Capacity: No. of Batt Banks x Batt Capacity = 400 AH
Available Rectifier Capacity = Existing Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 262.1723 Amps - 73 Amps - ( 400 * 0.1) - 37.45318 Amps
Available Rectifier Capacity = 111.7191011 Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) = 28%
BATTERY BACK-UP TIME COMPUTATION:
C8.3. END-STATE SUFFICIENCY COMPUTATION: (applicable only if there will be new Rectifier System or Upgraded Module)
Available Rectifier Capacity = (Future Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity =
Available Rectifier Capacity = Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) =
C8.4. EQUIPMENT FOR DECOMMISION: (Applicable for sites with identified equipment for decomisioning)
1.) WIMAX BTS : Amperes (value from clampmeter reading)
2.) WIMAX TRANSPORT : Amperes (value from clampmeter reading)
TOTAL FOR DECOM : Amperes
Page 34 of 50
Genesis-TSSR_Rel.v4.6-2018
GENESIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C8. Proposed Rectifer Computation
C8.1. PROPOSED RECTIFIER
1) EXISTING RECTIFIER SYSTEM BRAND - MODEL HT-TP48200B
2) MAXIMUM RECTIFIER MODULES / INSTALLED 6 4
3) RECTIFIER MODULE RATING, WATTS / AMPS 3000 56.17977528
4) BATTERY BRAND / VOLTAGE RATING SHOTO 12
5) NUMBER OF BATTERIES in BANKS / CAPACITY per CELL (AH) 4 100
6) PRESENT LOAD READING, PANEL DISPLAY / CLAMP METER (A) 4.9 Ampere
7) RECTIFIER MODULES IN OPERATION 4 modules
8) ACTUAL FLOAT VOLTAGE (V) 53.6 Voltage
C8.2. PROPOSED PDU/DCDU RECTIFIER LOAD SCHEDULE
PROPOSED ADDITIONAL LOAD(S)
Equipment Type Power Rating Current Rating Cable Size Circuit Breaker
Load No Remarks
(Load Description) (Watts) (Amps) (AWG) Rating (Amps)
Total Full Load Current = Existing Load + Proposed Load (100% of Rated Load) = 93.064794 Amps
Existing Rectifier Capacity: No. Modules x Ampere Capacity = 224.7191 Amps
Existing Battery Capacity: No. of Batt Banks x Batt Capacity = 400 AH
Available Rectifier Capacity = Existing Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 224.7191 Amps - 93.06479 Amps - ( 400 * 0.1) - 56.17978 Amps
Available Rectifier Capacity = 35.47453184 Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) = 41%
BATTERY BACK-UP TIME COMPUTATION:
C8.3. END-STATE SUFFICIENCY COMPUTATION: (applicable only if there will be new Rectifier System or Upgraded Module)
C8.4. EQUIPMENT FOR DECOMMISION: (Applicable for sites with identified equipment for decomisioning)
1.) WIMAX BTS : Amperes (value from clampmeter reading)
2.) WIMAX TRANSPORT : Amperes (value from clampmeter reading)
TOTAL FOR DECOM : Amperes
Page 35 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C9. Antenna Mounting Bracket or Pole
Remarks :
Remarks :
Page 36 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C9. Antenna Mounting Bracket or Pole
Remarks :
Remarks :
Page 37 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
C9. Antenna Mounting Bracket or Pole
Remarks :
L2600-TDD Sector 1 Sector 2 Sector 3
Length of Pole (mm) 3000 3000 3000
Diameter of Pole (mm) 70 70 70
Size of Bolts (mm) 20 20 20
Size of U-Bolts (mm) 20 20 20
Distance of pole to tower leg /
200 200 200
building wall (mm)
L2600-TDD Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts
Remarks :
Page 38 of 50
Genesis-TSSR_Rel.v4.6-2018
Page 39 of 50
Genesis-TSSR_Rel.v4.6-2018
Page 40 of 50
Genesis-TSSR_Rel.v4.6-2018
Page 41 of 50
Genesis-TSSR_Rel.v4.6-2018
D4. Proposed Room Layout (with cable routing layout) Drawing File Name NL196-IBA
Page 42 of 50
Genesis-TSSR_Rel.v4.6-2018
D5. Proposed Layout Outdoor cable routing (from cabin to antenna) Drawing File Name NL196-IBA
Page 43 of 50
Genesis-TSSR_Rel.v4.6-2018
D6. Existing Tower Elevation and Tower Loading Drawing File Name NL196-IBA
Page 44 of 50
Genesis-TSSR_Rel.v4.6-2018
D7. Proposed Antenna Layout(with Proper Northing) Drawing File Name NL196-IBA
Page 45 of 50
Genesis-TSSR_Rel.v4.6-2018
Page 46 of 50
Genesis-TSSR_Rel.v4.6-2018
Page 47 of 50
Genesis-TSSR_Rel.v4.6-2018
Page 48 of 50
Genesis-TSSR_Rel.v4.6-2018
Page 49 of 50
Genesis-TSSR_Rel.v4.6-2018
GENEISIS PROJECT
Technical Site Survey Report
Site Name IBA
PLA ID NL196
E. Revision History