Genesis-TSSR_Rel.v4.

6-2018

GLOBE TELECOM

GENESIS PROJECT
SITE NAME: RINCONCMPDVALNCR

PLA ID: NCR5222 REGION: NCR

SITE ADDRESS: # / Building / Street Name: LOT 12 RINCON COMPOUND,


Barangay: BRGY. RINCON, Town/City: VALENZUELA CITY
Province: METRO MANILA
NOMINATION: L1800+RRU5254(L2300+L2600 MOBILE)+L2100(PRE-WORK)
MDB v: 2019 8.1 New Survey

TRANSPORT SOLUTION APPROVED DATE:


REMARKS: FULLY APPROVED DATE:

Vendor QA : Name of Vendor Reviewer


RNE / RgPM SOLUTION APPROVED DATE: 01/14/2020
REMARKS: FULLY APPROVED DATE: 01/14/2020

Vendor QA : CRISTINE CANON


FACILITY ENGINEERING SOLUTION APPROVED DATE:
(POWER AND SPACE) FULLY APPROVED DATE:
REMARKS:

OKAY TO CATER BBU FOR U21. DISREGARD ALL OTHER PROPOSALS.

Vendor QA : Name of Vendor Reviewer


FACILITY ENGINEERING SOLUTION APPROVED DATE:
(STRUCTURAL) FULLY APPROVED DATE:
REMARKS:

Requires Genesis SI prior to antenna installation


REFURBISH POLE

Vendor QA : Name of Vendor Reviewer


CONTRACTOR: JEZKA CONSTRUCTION CORPORATION
NAME & MOBILE: AIRA OPANA / 09754772980

Page 1 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222

Survey Subcon: JEZKA CONSTRUCTION CORPORATION Survey Date: 12/20/2019


CME Engineer: BENLOR SANTOS Mobile No: 09569779941
Telecom Engineer: CATHERINE BAGOTSAY Mobile No: 09057899463
RF Engineer: LAURENCE AGNOTE Mobile No: 09667833451

A1. Basic Site Information


Site Lessor FERMINA ZACARIAS BELTRAN Contact No. 09275208557
SDB Coordinates Longitude 120.960392 Latitude 14.696490
Survey Coordinates Longitude 120.95898 Latitude 14.69682
Difference 156.1236 m Location (Accuracy) m

Site Ownership Globe Class Type C1 Site Type Greenfield


Coverage Type Outdoor Room Type: Outdoor 0
No. of Cabin
Cabin Location: N/A
Room Access: 8:00AM - 5:00PM Specify Date & Time N/A
Site Key Location: ON SITE FO. Name: NO F.O. YET Contact No.: N/A
Site Security: Others: Specify: LESSOR
For Building Site, Need Access /Work Permit? Yes
If YES, state document required for applying access / work permit RAAWA
: / ACCESS LETTER
Contact Person: N/A Contact No: N/A
Flood History (as inquired from LGU-RRDMC / neighbors / community) 0 m (with respect to the road)
Site Distance From Coastline: 1,358 m
A2. Tower
A2.1. Tower Leg/Pole Diameter
A2.1.1. Existing Tower/Pole Information
Tower/Pole type: Greenfield Guyed Mast Pole Remarks: SWE SITE
Tower/Leg type: Tubular (O) Remarks: N/A
Tower/Pole Height: 30 m Building Height: N/A m
A2.1.2. Tower Leg/Pole Diameter of Proposed Antenna Location
92.357 mm.
Diameter of Pole/Diameter of Tower Leg/size of Tower Leg (Angle Steel)
A2.1.3. Tower Leg/Pole Diameter sampling Per section (use Antenna AMB for height reference)
Height (m) Mast/Leg Size or Dia(mm) Tower Leg Distance (m) Remarks
1-10 92.3566879 N/A Tubular (O)
11-20 92.3566879 N/A Tubular (O)
21-30 92.3566879 N/A Tubular (O)

A3.1. Site location &Obstructions

GPS reading w/ elevation( DEG)

N/A

Screen shot of actuall site survey location Antenna Blockage XXX ( DEG)

Page 2 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222

A3.2 Pictures of Site and Tower Site Defect Report (that affects project implementation/acceptance)

NO F.O. RECOMMENDATION

NOT WORKING CABIN

N/A N/A

Nearest Access Road Obstacle upon Entering the Site Obstacle upon Entering the Site

N/A

Stairs(Rooftop site) Access Door/Gate Front View of Site (Tower)

Page 3 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222

B. Existing RF Antenna Information


G900/U900 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 14.69682 14.69682 14.69682
Longitude (DLL) of Antenna 120.95898 120.95898 120.95898
Antenna Height (m) 29 29 29
Antenna Orientation 325 80 240
Down tilt (Mechanical) 2 0 0
Down tilt (Electrical) RET RET RET
Type of Antenna HUAWEI (APE4518R14v06) HUAWEI (APE4518R14v06) HUAWEI (APE4518R14v06)
Number of Antenna Port 10 10 10
Shared Antenna with any technology U2100 U2100 U2100
RRU/Combiner model RRU3959 RRU3959 RRU3959
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE TUBULAR TUBULAR TUBULAR
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

Picture of Antenna Ports

Picture of AMB

RRU/RFU Location

Overview of Antenna

Page 4 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B. Existing RF Antenna Information
L700 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model N/A N/A N/A
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


RRU/RFU Location

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 5 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B. Existing RF Antenna Information
G1800 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model N/A N/A N/A
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


RRU/RFU Location

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 6 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B. Existing RF Antenna Information
U2100 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna 14.69682 14.69682 14.69682
Longitude (DLL) of Antenna 120.95898 120.95898 120.95898
Antenna Height (m) 29 29 29
Antenna Orientation 325 80 240
Down tilt (Mechanical) 2 0 0
Down tilt (Electrical) RET RET RET
Type of Antenna HUAWEI (APE4518R14v06) HUAWEI (APE4518R14v06) HUAWEI (APE4518R14v06)
Number of Antenna Port 10 10 10
Shared Antenna with any technology G900 G900 G900
RRU/Combiner model RRU3826 RRU3826 RRU3826
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE TUBULAR TUBULAR TUBULAR
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

Picture of Antenna Ports

Picture of AMB

RRU/RFU Location

Overview of Antenna

Page 7 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222

Page 8 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B. Existing RF Antenna Information
L1800/L1800DB Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model N/A N/A N/A
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


RRU/RFU Location

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 9 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B. Existing RF Antenna Information
L2300 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model N/A N/A N/A
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


RRU/RFU Location

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 10 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B. Existing RF Antenna Information
L2600 - TDD Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model N/A N/A N/A
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


RRU/RFU Location

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 11 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B. Existing RF Antenna Information
MIMO-L2600 Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


RRU/RFU Location

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 12 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B. Existing RF Antenna Information
5G Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 13 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B. Existing RF Antenna Information
WIMAX Sector 1 Sector 2 Sector 3
Latitude (DLL) of Antenna N/A N/A N/A
Longitude (DLL) of Antenna N/A N/A N/A
Antenna Height (m) N/A N/A N/A
Antenna Orientation N/A N/A N/A
Down tilt (Mechanical) N/A N/A N/A
Down tilt (Electrical) N/A N/A N/A
Type of Antenna N/A N/A N/A
Number of Antenna Port N/A N/A N/A
Shared Antenna with any technology N/A N/A N/A
RRU/Combiner model N/A N/A N/A
RRU shared with/Combiner Type N/A N/A N/A
RET IN DEG/Combiner Connector N/A N/A N/A
AMB TYPE N/A N/A N/A
Sector1 Sector2 Sector3
Shot of Coverage Objectives Shot of Coverage Objectives Shot of Coverage Objectives

N/A N/A N/A


Picture of Antenna Ports

N/A N/A N/A


Picture of AMB

N/A N/A N/A


RRU/RFU Location

N/A N/A N/A


Overview of Antenna

N/A N/A N/A

Page 14 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B2. Panoramic Antenna Pictures at height 30 meters

0º 30º 60º

90º 120º 150º

180º 210º 240º

270º 300º 330º


B3. Existing MW Antenna Information

Existing MW Antenna Quantity: 0 Pcs

No. Size (m) Height (m) Azimuth (deg) Remark


1 N/A N/A N/A N/A
2
3
4
5
6
7
8

N/A N/A N/A N/A

Existing MW 1 Existing MW 2 Existing MW 3 Existing MW 4

N/A N/A N/A N/A

Existing MW 5 Existing MW 6 Existing MW 7 Existing MW 8

Page 15 of 60
REGROOMING 20180214

Site Name RINCONCMPDVALNCR

PLA ID NCR5222

Totally Exsting Technology G900/U2100 Remark


Antenna Summary
Existing Antenna Quantity: 3 PCS
Antenna Sharing Antenna Sector Antenna Ports Antenna Height Antenna Brand(Model) Remarks
GU900/U2100 S1 _10ports 29.0 m HUAWEI (APE4518R14v06)
GU900/U2100 S2 _10ports 29.0 m HUAWEI (APE4518R14v06)
GU900/U2100 S3 _10ports 29.0 m HUAWEI (APE4518R14v06)
REGROOMING 20180214

RRU/MRFU Summary existing RRU on tower(not B2B): 0 PCS existing RRU on tower(B2B): 6 PCS

Technology RRU Sector RRU/MRFU type RRU Height RRU/MRFU Location Remarks
GU900 S1 RRU3959 29.0 m at the back of antenna
GU900 S2 RRU3959 29.0 m at the back of antenna
GU900 S3 RRU3959 29.0 m at the back of antenna
U2100 S1 RRU3826 29.0 m at the back of antenna
U2100 S2 RRU3826 29.0 m at the back of antenna
U2100 S3 RRU3826 29.0 m at the back of antenna
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B1. RF Antenna Information
B1.1. General Information
Enough space to install RF antenna of this project? Y N New Antenna

Proposal for L1800 Sector 1 Sector 2 Sector 3

Latitude (DLL) of Antenna 14.69682 14.69682 14.69682


Longitude (DLL) of Antenna 120.95898 120.95898 120.95898
Antenna Height (m) 29 29 29
Antenna Orientation 325 80 240
Down tilt (Mechanical) 2 0 0
Down tilt (Electrical) 0 0 0
Type/Model of Antenna HUAWEI (APE4518R14v06) HUAWEI (APE4518R14v06) HUAWEI (APE4518R14v06)
Tech Antenna Shared with GU900/U2100 GU900/U2100 GU900/U2100
RRU Shared with/Combiner Type SB-RRU SB-RRU SB-RRU
Antenna solution colocate antenna colocate antenna colocate antenna
RRU solution RRU on tower RRU on tower RRU on tower
Sector 1 Sector 2 Sector 3
Shot of Coverage objectives Shot of Coverage objectives Shot of Coverage objectives

RRU/RFU Location / Overview of Antenna

Overview of Antenna

UTILIZE EXISTING 10 PORTS HUAWEI(APE4518R14v06) ANTENNA FOR G900/U2100/L1800.


REUSE EXISTING AMB.
PROPOSE RRU MOUNTING BRACKET @ 27m HEIGHT FOR SB-RRU.

NEW AMB (specify) NEW AMB (specify) NEW AMB (specify)

REUSE AMB REUSE AMB REUSE AMB

New Copper lightning arrester (16mm Ø x 1.5m): 0 pcs

Page 18 of 60
Genesis-TSSR_Rel.v4.6-2018

C8. Cable Interface Proposal for L1800


Power Cable: LENGTH
Cable Routing:
Single Length of -48V from DCDU to RECTIFIER 10 m
Single Length of -48V from RRU/RFU to DCDU Sector 1 50 m
Sector 2 50 m L1800
Sector 3 50 m
Sector 1 m
Sector 2 m
Sector 3 m

Single Length of -48V from AAU to EPU Sector 1 N/A m


Sector 2 N/A m
Sector 3 N/A m
PGND Cable:
Single Length of Grounding Cable from L-Rack to Grounding Busbar N/A m
Single Length of Grounding Cable from RRU/RFU to Grounding Busbar 10X3 m
Single Length of Grounding Cable from AAU to Grounding Busbar N/A m
Single Length of Grounding Cable from New Tower Busbar to Test Pit N/A m
Single Length of Grounding Cable from DCDU to L-Rack/Busbar 10 m
Signal Cable:
CPRI Cable Single Length of CPRI Cable from BBU to RRU/RFU
Sector 1 50 m Sector 2 50 m Sector 3 50 m FOR L1800
Sector 1 m Sector 2 m Sector 3 m
CPRI Cable Single Length of CPRI Cable from BBU to AAU
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable from RRU/RFU to Antenna
Sector 1 6 m Sector 2 6 m Sector 3 6 m FOR L1800
Sector 1 m Sector 2 m Sector 3 m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from RRU/RFU to Feeder
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from RRU/RFU to Combiner
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from Combiner to Feeder
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from Feeder to Antenna
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
7/8 Feeder Cable Single Length of 7/8" Feeder Cable x 2 from RRU/RFU to Antenna
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
13/8 Feeder Cable Single Length of 13/8" Feeder Cable x 2 from RRU/RFU to Antenna
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
Connector Details
Connector Type of Existing Antenna
Connector Type of Existing RRU/RFU
Connector Type of Existing Combiner
Connector Type of New Combiner

Page 19 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B1. RF Antenna Information
B1.1. General Information
Enough space to install RF antenna of this project? Y N Re-use Antenna

Proposal for L2100 Sector 1 Sector 2 Sector 3

Latitude (DLL) of Antenna 14.69682 14.69682 14.69682


Longitude (DLL) of Antenna 120.95898 120.95898 120.95898
Antenna Height (m) 29 29 29
Antenna Orientation 325 80 240
Down tilt (Mechanical) 2 0 0
Down tilt (Electrical) 0 0 0
Type/Model of Antenna HUAWEI (APE4518R14v06) HUAWEI (APE4518R14v06) HUAWEI (APE4518R14v06)
Tech Antenna Shared with GU900/U2100/L1800 GU900/U2100/L1800 GU900/U2100/L1800
RRU Shared with/Combiner Type N/A N/A N/A
Antenna solution colocate antenna colocate antenna colocate antenna
RRU solution RRU on tower RRU on tower RRU on tower
Sector 1 Sector 2 Sector 3 Antenna Height is from
Shot of Coverage objectives Shot of Coverage objectives Shot of Coverage objectives tower, included the bu
rooftop site, to the cen
antenna

RRU/RFU Location

Overview of Antenna

REUSE EXISTING U2100 ANTENNA & RRU .


SWING U2100 CPRI FROM 2G/3G BBU TO LTE BBU.

NEW AMB (specify) NEW AMB (specify) NEW AMB (specify)

REUSE AMB REUSE AMB REUSE AMB


AMB REFURBISHMENT AMB REFURBISHMENT AMB REFURBISHMENT
New Copper lightning arrester (16mm Ø x 1.5m): 0 pcs
Antenna Height is from

Page 20 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C8. Cable Interface Proposal for L2100 Antenna Height is from
Power Cable: LENGTH tower, included the bu
Cable Routing: rooftop site, to the cen
Single Length of -48V from DCDU to RECTIFIER m antenna
Single Length of -48V from RRU/RFU to DCDU Sector 1 m
Sector 2 m
Sector 3 m
Sector 4 m
Sector 5 m
Sector 6 m

Single Length of -48V from AAU to DCDU Sector 1 m


Sector 2 m
Sector 3 m
Sector 4 m
Sector 5 m
Sector 6 m
PGND Cable:
Single Length of Grounding Cable from L-Rack to Grounding Busbar m
Single Length of Grounding Cable from RRU/RFU to Grounding Busbar m
Single Length of Grounding Cable from AAU to Grounding Busbar m
Single Length of Grounding Cable from New Tower Busbar to Test Pit m
Single Length of Grounding Cable from DCDU to L-Rack/Busbar m
Signal Cable:
CPRI Cable Single Length of CPRI Cable from BBU to RRU/RFU
Sector 1 40 m Sector 2 40 m Sector 3 40 m
Sector 4 m Sector 5 m Sector 6 m
CPRI Cable Single Length of CPRI Cable from BBU to AAU
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable from RRU/RFU to Antenna
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from RRU/RFU to Feeder
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from RRU/RFU to Combiner
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from Combiner to Feeder
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from Feeder to Antenna
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
7/8 Feeder Cable Single Length of 7/8" Feeder Cable x 2 from RRU/RFU to Antenna
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
13/8 Feeder CableSingle Length of 13/8" Feeder Cable x 2 from RRU/RFU to Antenna
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
Connector Details
Connector Type of Existing Antenna
Connector Type of Existing RRU/RFU
Connector Type of Existing Combiner
Connector Type of New Combiner

Page 21 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
B1. RF Antenna Information
B1.1. General Information
Enough space to install RF antenna of this project? Y N New Antenna

Proposal for
Sector 1 Sector 2 Sector 3
L2600+L2300
Latitude (DLL) of Antenna 14.69682 14.69682 14.69682
Longitude (DLL) of Antenna 120.95898 120.95898 120.95898
Antenna Height (m) 29 29 29
Antenna Orientation 325 80 240
Down tilt (Mechanical) 2 2 2
Down tilt (Electrical) 4 4 4
4PORTS HUAWEI 4PORTS HUAWEI 4PORTS HUAWEI
Type/Model of Antenna
ANTENNA(ADU4518R601) ANTENNA(ADU4518R601) ANTENNA(ADU4518R601)
Tech Antenna Shared with N/A N/A N/A
RRU Shared with/Combiner Type RRU5254 RRU5254 RRU5254
Antenna solution new antenna new antenna new antenna
RRU solution RRU on tower RRU on tower RRU on tower
Sector 1 Sector 2 Sector 3 Antenna Height is from
Shot of Coverage objectives Shot of Coverage objectives Shot of Coverage objectives tower, included the bu
rooftop site, to the cen
antenna

RRU/RFU Location / Overview of Antenna

Overview of Antenna

PROPOSE NEW 4PORTS HUAWEI ANTENNA(ADU4518R601) FOR L2600+L2300 WITH RRU5254 AT THE BACK OF
ANTENNA.REUSE SPARE AMB.

NEW AMB (specify) NEW AMB (specify) NEW AMB (specify)

REUSE AMB REUSE AMB REUSE AMB


AMB REFURBISHMENT AMB REFURBISHMENT AMB REFURBISHMENT
New Copper lightning arrester (16mm Ø x 1.5m): 0 pcs
Antenna Height is from

Page 22 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C8. Cable Interface Proposal for L2600+L2300 Antenna Height is from
Power Cable: LENGTH tower, included the bu
Cable Routing: rooftop site, to the cen
Single Length of -48V from DCDU to RECTIFIER 10 m antenna
Single Length of -48V from RRU/RFU to DCDU Sector 1 50 m
Sector 2 50 m
Sector 3 50 m
Sector 4 m
Sector 5 m
Sector 6 m

Single Length of -48V from AAU to DCDU Sector 1 N/A m


Sector 2 N/A m
Sector 3 N/A m
Sector 4 m
Sector 5 m
Sector 6 m
PGND Cable: N/A
Single Length of Grounding Cable from L-Rack to Grounding Busbar N/A m
Single Length of Grounding Cable from RRU/RFU to Grounding Busbar 10X3 m
Single Length of Grounding Cable from AAU to Grounding Busbar N/A m
Single Length of Grounding Cable from New Tower Busbar to Test Pit N/A m
Single Length of Grounding Cable from DCDU to L-Rack/Busbar 10 m
Signal Cable:
CPRI Cable Single Length of CPRI Cable from BBU to RRU/RFU
Sector 1 50 m Sector 2 50 m Sector 3 50 m
Sector 4 m Sector 2 m Sector 3 m
CPRI Cable Single Length of CPRI Cable from BBU to AAU
Sector 1 N/A m Sector 2 N/A m Sector 3 N/A m
Sector 4 N/A m Sector 5 N/A m Sector 6 N/A m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable from RRU/RFU to Antenna
Sector 1 2 m Sector 2 2 m Sector 3 2 m
Sector 4 m Sector 5 m Sector 6 m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from RRU/RFU to Feeder
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from RRU/RFU to Combiner
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from Combiner to Feeder
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
1/2 Jumper Cable Single Length of 1/2" Jumper Cable x 2 from Feeder to Antenna
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
7/8 Feeder Cable Single Length of 7/8" Feeder Cable x 2 from RRU/RFU to Antenna
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
13/8 Feeder CableSingle Length of 13/8" Feeder Cable x 2 from RRU/RFU to Antenna
Sector 1 m Sector 2 m Sector 3 m
Sector 4 m Sector 5 m Sector 6 m
Connector Details
Connector Type of Existing Antenna
Connector Type of Existing RRU/RFU
Connector Type of Existing Combiner
Connector Type of New Combiner

Page 23 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
1. OUTDOOR (Panoramic Picture from edge to edge)

From the rear edge of Site looking at Site Entrance (Facing the GF Gate/RT roof Access)

From the left edge of Site looking at Right Side (Facing the rear of GF Gate/Rooftop Door Access)

From the front edge of Site looking at Rear of Site (Facing the rear of GF Gate/Rooftop Door Access)

From the right edge of Site looking at Left Side (Facing the rear of GF Gate/Rooftop Door Access)

Page 24 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
2. TOWER TOP TO GROUND VIEW (While on top of tower take picture looking downwards)

From the top of tower looking down at Site Entrance (Facing the GF Gate/RT roof Access)

From the top of tower looking down at Right Side (Facing the rear of GF Gate/Rooftop Door Access)

From the top of tower looking at Rear of Site (Facing the rear of GF Gate/Rooftop Door Access)

From the top of tower looking at Left Side (Facing the rear of GF Gate/Rooftop Door Access)

Page 25 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
3. Cw- Cabin information
Site Location Situation Flat Ground Rolling terrain
Existing Equipment Room 1 Ceiling Height: N/A mm Cable Ladder Height: N/A mm
Shelter Dimension (L x W x H): L= N/A mm W= N/A mm H= N/A mm
Concrete Floor Raised Floor Height 760 mm
Thickness of Wall: N/A m Material Use for Shelter: N/A
General Room1

Cabin1 General 1 Cabin1 General 2 Cabin1 General 3

N/A N/A

Cabin1 General 5 Cabin1 General 6 Cabin1 General 7


Existing Equipment Room 2 Ceiling Height: mm Cable Ladder Height: mm
Shelter Dimension (L x W x H): L= mm W= mm H= mm
Concrete Floor Raised Floor Height mm
Thickness of Wall: mm Material Use for Shelter:
General Room2

N/A N/A N/A

Cabin2 General 1 Cabin2 General 2 Cabin2 General 3

N/A N/A N/A

Cabin2 General 4 Cabin2 General 5 Cabin2 General 6

Page 26 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
3. Existing Basepad(outdoor part) Quantity 1 pcs Maximum Height: 760 mm

Basepad no. type Height(mm) L(mm) W(mm) Spare space(L:mm) remark


1 760_RECTI+TMC 760 3050 2070 1060
2
3
4
5
6
7
8

N/A N/A N/A

Basepad 1 pic. Basepad 2 pic. Basepad 3 pic. Basepad 4 pic.

N/A N/A N/A N/A

Basepad 5 pic. Basepad 6 pic. Basepad 7 pic. Basepad 8 pic.

4. Wireless Information

N/A N/A

2G/3G BBU
Existing Overall BBU1 Existing Overall BBU2 Existing Overall BBU3
5. Transport Information
5.1. Existing Equipment Type:
Huawei CX600-X8 Huawei CX600-X2 Huawei ATN950B Huawei ATN950 MICROWAVE
Others, Please state total quantity and fill in the detail as below table. Quantity: 1

No Type Vendor Equipment Model


1 FIBER OPTIC HUAWEI ATN950C
2
3
4

5.2. Existing Transport Equipment

Location of Equipment Zoom In Bayface Layout Zoom In Available GE/FE Ports

Page 27 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
5.3 Full Bayface Space&Picture of Equipment Cabinets/Rack
EQUIPMENT TYPE available space for new equipments(U) Remark
TMC 0u N/A

N/A

BTS3900L TMC RECTIFIER

N/A N/A N/A

TMC "indicate equipment" "indicate equipment"

Page 28 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C2. BBU,DCDU & Cabinet Solution
C.2.1. Pictures of proposed BBU/DCDU location:
L26 + L23 L1800 L2100

N/A
SWING U2100 CPRI FROM 2G/3G BBU
PROPOSE NEW LTE BBU AT NEW TMC COLOCATE LTE BBU AT NEW TMC TO NEW LTE BBU.

BBU Sol'n : New installation BBU Sol'n : Collocate BBU Sol'n : Collocate
Cabinet Sol'n : new TMC Cabinet Sol'n : collocate Cabinet Sol'n : collocate

PROPOSE NEW DCDU AT NEW TMC PROPOSE NEW DCDU AT NEW TMC REUSE EXISTING U2100 DCDU

new DCDU new DCDU collocate

N/A N/A N/A

BBU Sol'n : BBU Sol'n : BBU Sol'n :


Cabinet Sol'n : Cabinet Sol'n : Cabinet Sol'n :

N/A N/A N/A

Page 29 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
6.1 Cable Ladder
existing indoor cable ladder height: mm width: mm
existing outdoor cable ladder Length 35 m width: 300 mm
New Indoor Cable Ladder Required: Length: N/A m Width N/A mm
New OD Horizontal Ladder Required: Length: N/A m Width N/A mm Height N/A mm
New OD Vertical Ladder Required: Length: N/A m Width N/A mm
New OD Vertical Ladder Extension clip Required: pcs N/A
Remarks: REUSE EXISTING CABLE LADDER

Exixting ID/OD Cable Ladder 1 Exixting ID/OD Cable Ladder 2 Exixting Vertical Cable Ladder 3

N/A

Layers of Feeder Cable on Existing Layers of Feeder Cable on Existing Layers of Feeder Cable on Existing
ID/OD Cable Ladder 1 ID/OD Cable Ladder 2 Vertical Cable Ladder 3

N/A N/A N/A

Proposed ID/OD Cable Ladder 1 Proposed ID/OD Cable Ladder 2 Proposed Vertical Cable Ladder 3

6.2 Existing and Proposed GPS Antenna Location


New GPS Antenna Reuse GPS Antenna
Clear view of the sky (=> 90o clearance)? Yes No
Type of required mounting bracket? Angular Pole

N/A
PROPOSE NEW GPS FOR L2600+L2300 PROPOSAL
Existing GPS Location Proposed GPS Location Proposed Surge protector location
GPS cable length : 10m GPS DIVIDER FOR --- : Yes No

Page 30 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
6.3 Busbar
6.3.1. Grounding Busbar (Proposed for BBU, DCDU, GPS, New Cabinet / Rack) (Indoor)
Reuse Existing Bus Bar Remark:
New Busbar Required: New Hole's Qty Required: Holes' diameter: mm
Remark:
Proposed 38mm² bare/insulated copper wire: m

6.3.2 Picture of Proposed Busbar (Proposed for BBU, DCDU, GPS, New Cabinet / Rack) (Indoor)

N/A N/A N/A

Available holes for use Proposed Busbar Proposed Busbar


6.3.3. Grounding Busbar (Proposed for RRU, Cabinet, Cables)(Outdoor)
Reuse Existing Bus Bar Remark:
New Busbar Required: Qty Required: 1 Holes' diameter: 10 mm
Remark: PROVIDE NEW TOWER BUSBAR
Proposed 38mm² bare/insulated copper wire: 35 m

6.3.4a. Picture of Proposed Busbar (Proposed for RRU, Cabinet, Cables)(Outdoor)

N/A N/A

Available holes for use Proposed Outdoor Busbar Proposed Outdoor Busbar
6.3.4b Picture of Proposed Busbar near tower/antenna(Tower)

N/A N/A

Available holes for use Tower Busbar

Page 31 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
7.1 Feeder Window Information
Reuse Existing Feeder Window Available Holes:
New Feeder Window is required Qty Required:
Remark: OUTDOOR / NO REQUIREMENT
7.2 Picture of Existing and Proposed Feeder Window

N/A N/A N/A

Existing Feeder Window New Feeder Window (Inside Cabin) New Feeder Window (Outside Cabin)

8. DC Power
8.1. Rectifier System Load Breakers/ Fuse
Cabin/Outdoor 1 RECTIFIER SYSTEM 1 RECTIFIER SYSTEM 2
Existing Rectifier Specify brand/name : ELTEK FLATPACK 2 (3000) N/A
Rectifier System Capacity 224.7191011 Vdc #VALUE! Vdc
Rectifier Module Capacity (Watts): 3000 W 56.17978 A 0 W 0 A
Installed rectifier modules: 4 N/A
Operational rectifier modules: 4 N/A
Defective rectfier modules: 0 N/A
The number of empty modules space: 4 N/A
Actual Current of DC Load Panel display / clamp meter 30.9 A N/A A
Actual Float Voltage : 54 V N/A V

Cabin/outdoor # RECTIFIER SYSTEM 3 RECTIFIER SYSTEM 4


Existing Rectifier Specify brand/name : N/A N/A
Rectifier System Capacity(@48VDC) #VALUE! Vdc #VALUE! Vdc
Rectifier Module Capacity (Watts): 0 W 0 A 0 W 0 A
Installed rectifier modules: N/A N/A
Operational rectifier modules: N/A N/A
Defective rectfier modules: N/A N/A
The number of empty modules space: N/A N/A
Actual Current of DC Load Panel display / clamp meter N/A A N/A A
Actual Float Voltage : N/A V N/A V

Page 32 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
8.2.1. Rectifier System-1 (EXISTING RECTIFIER 1)
Existing RECTIFIER 1

EXISTING RECTIFIER 1 RECTIFEIR 1 MODULES RS1 ACTUAL LOAD READING

RS1 DC DISTRIBUTION BREAKERS 1 N/A

RS2 DC DISTRIBUTION BREAKERS 2 Proposed New rectifier1 Location


8.2.1. Rectifier System 1 Load Breakers/Fuse
No. Brand Rating No. of Pole Load Description Status Remarks
BATTERY
B1 NADER 125 1 BATTERY 1 ON
B2 NADER 125 1 BATTERY 2 ON
B3 NADER 125 1 BATTERY 3 ON
B4 NADER 125 1 BATTERY 4 ON
LLVD
PROPOSE TAPPING POINT FOR
F1 NADER 100 1 SPARE OFF L2300+L2600. UTILIZE BREAKER.

F2 NADER 100 1 SPARE OFF


F3 NADER 80 1 SPARE OFF
F4 NADER 80 1 SPARE OFF
F5 NADER 80 1 SPARE OFF
F6 NADER 80 1 SPARE OFF
PROPOSE TAPPING POINT FOR
F7 NADER 63 1 SPARE OFF L1800. UTILIZE BREAKER.
F8 NADER 63 1 SPARE OFF
F9 NADER 63 1 SPARE OFF
F10 NADER 63 1 SPARE OFF
BLVD
F11 NADER 63 1 NO LABEL ON
REUSE U2100 TAPPING
F12 NADER 63 1 NO LABEL ON
F13 NADER 63 1 SPARE OFF
F14 NADER 63 1 SPARE OFF
F15 NADER 63 1 SPARE OFF
F16 NADER 63 1 SPARE OFF
F17 NADER 63 1 SPARE OFF
F18 NADER 63 1 SPARE OFF
F19 NADER 32 1 SPARE OFF
F20 NADER 32 1 SPARE OFF
F21 NADER 32 1 SPARE OFF
F22 NADER 32 1 SPARE OFF
F23 NADER 32 1 SPARE OFF
F24 NADER 32 1 SPARE OFF
F25 NADER 16 1 ATN950C MAIN ON
F26 NADER 16 1 ATN950C RDNT ON
F27 NADER 16 1 SPARE OFF
F28 NADER 16 1 SPARE OFF
F29 NADER 10 1 SPARE OFF
F30 NADER 10 1 SPARE OFF
F31 NADER 10 1 SPARE OFF
F32 NADER 10 1 SPARE OFF
F33 NADER 10 1 SPARE OFF
F34 NADER 10 1 SPARE OFF

Page 33 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
Note: Put in "Remark" above for new or existing breaker to be used for proposed equipment
8.2.2. Rectifier System 2 (EXISTING RECTIFIER 2)
8.2.3. Rectifier System3 (EXISTING RECTIFIER 3)
8.2.4. Rectifier System 4 (EXISTING RECTIFIER 4)
IF NEW RS SOLUTION, New RS type
New RS solution
8.2.5. Proposed Rectifier System Load Breakers/Fuse (HT-TP48400B) ID TYPE RS: 600mm x 600mm x 2000mm
ID TYPE RS: 442mm x 360mm x 480mm
8.2.5. Proposed Rectifier System Load Breakers/Fuse (HT-MINI RECTIFIER)
8.2.5. Proposed Rectifier System Load Breakers/Fuse (HT-MTS9513A) OD TYPE RS: 815mm x 815mm x 2340mm
8.2.5. Proposed Rectifier System Load Breakers/Fuse (HT-TP48200A) OD TYPE RS: 600mm x 600mm x 2200mm
8.2.5. Proposed Rectifier System Load Breakers/Fuse (HT-TP4860C) OD TYPE RS: 450mm x 300mm x 630mm
9.0. Battery System
Battery Location: Inside Rectifier Cabinet
No. Description Battery System 1 Battery System 2
1 Battery brand / Model LEOCH 12V 100AH
2 Battery voltage / capacity (Ah) 12 100
3 Battery out factory date N/A
4
5
Battery Start Service date
Battery bank, How many group(String) 4
N/A
4 N/A
6 Power Cable Size(mm²) N/A
7 Installation Date N/A
Battery Location:
No. Description Battery System 3 Battery System4
1 Battery brand / Model
2 Battery voltage / capacity (Ah)
3
4
5
Battery out factory date
Battery Start Service date
Battery bank, How many group(String)
N/A N/A
6 Power Cable Size(mm²)
7 Installation Date
Is There any mark of bumped, broken or crazed? Yes No Remarks:
Is There any mark of acid leakage? Yes No Remarks:
Battery need change out? Yes No
If Yes (for battery changeout) Rack Cabinet Existing Rect. Cab.

Page 34 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
9.1 Pictures of Existing and propose Battery System

N/A N/A N/A

Battery System 1 Battery System 2 Battery System 3 Battery System 4

9.2 Battery solutions for proposal

N/A N/A N/A

Upgrade Battery Upgrade battery Propose Battery pictures


Batterry Solution summary:

10. Grounding System and Aircraft Obstruction Light

Lightning Arrester Earthing Test PIT Aircraft Obstruction Light

N/A

Page 35 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C3. Power Source (Supply)
C3.1. Primary Power Source
Only commercial Power Commercial Power+DG Only DG
Solar+DG DCB+DG Temporary Tapping to Neighbor/Lessor
Commercial Power Provider : MERALCO
Electrical Connectivity: Permanent_Common

C3.2. Transformer Information Share with? Yes


Brand: PHILEC Capacity (KVA): 50 KVA Single Phase Three Phase
size:
DROP WIRE(from transformer to service entrance): 60 mm2 length: 25 m Type of cable: Triplex
TRANSFORMER - 14.697278,120.959095

Picture of Transformer zoom in picture for Capacity Drop Wire pictures

KWHR Meter(service entrance to ECB): Class: CL200 Cable Size: 60 Cable Length: 12 m STATUS: In-Good-Condition
ATS: Brand: N/A Capacity: AT Cable Size: mm 2 Cable Length: m STATUS:
MTS: Brand: SCHNEIDER Capacity: 100 AT Cable Size: 60 mm 2 Cable Length: 2 m STATUS: In-Good-Condition
KWHR - 14.697023,120.959159 MTS - 14.696805,120.959048

N/A N/A

KWHR SN: 108FA004667 ATS: MTS V: 235 MTS L1: 8.76 MTS L2: 8.82 MTS L3:

C3.3. MDP Information


The Main CB: N/A Amps STATUS:

The AC Cable Size input of commercial Power: mm² Cable Length: m

Single Phase Three Phase


C3.4 Picture of MDP and Details

N/A N/A N/A

MDP MDP breakers MDP Output voltage v

N/A N/A N/A

L1 = A L2 = A L3 = A

Page 36 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C3.5 ECB Information ECB NEAR KWHR ECB - 14.697023,120.959159
The Actual current of ECB(Measure by Meter):
Main ECB Rating: 125 A Cable Size: 60 mm²
STATUS: In-Good-Condition Cable length: 20 m

N/A

VAC = 255.9 V L1 = 7.3 A L2 = 7.38 A L3 = A


Actual Voltage Output CURRENT OUTPUT LINE1 CURRENT OUTPUT LINE2 CURRENT OUTPUT LINE3

ACPDB(No.1) Details
C3.5 ECB Information ECB - 14.696805,120.959048
The Actual current of ECB(Measure by Meter):
Main ECB Rating: 75 A Cable Size: 60 mm²
STATUS: In-Good-Condition Cable length: 2 m

N/A

VAC = 235.4 V L1 = 8.16 A L2 = 8.29 A L3 = A


Actual Voltage Output CURRENT OUTPUT LINE1 CURRENT OUTPUT LINE2 CURRENT OUTPUT LINE3

ACPDB - 14.696853,120.958991

Page 37 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
ACPDB(No.1) Details ACPDB - 14.696853,120.958991

AC Cable size(mm²) 30
PDB/P Main Breaker Amps. 75 No. of Branches 6
P-BTS Cable Length(m) 15

Load Amp
no. Brand Rating No. of Pole Load Description Status Remark
L1(A) L2(A)
1 SQUARE D 70 2 RECTIFIER 8.78 8.62 ON
2 SQUARE D 70 2 SPARE N/A N/A ON NO CABLE WIRE
3 SQUARE D 20 2 SPARE N/A N/A ON NO CABLE WIRE
4 SQUARE D 20 2 NO LABEL 0 0 ON
5 SQUARE D 20 2 NO LABEL 0 0 ON
6 SQUARE D 20 2 NO LABEL 0 0 ON
Note: Put in "Remark" above for special case if there is
TVSS Detail: Brand: Rating: KAIC

C3.7 Pictures of ACPDB and Details

N/A

ACPDB TVSS VAC = 234.4 V


The Actual Output Current of ACPDB (Measure by Meter):

N/A

L1 = 8.32 A L2 = 8.29 A L3 = A

Page 38 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
ACPDB(No.2) Details

AC Cable size(mm²)
PDB/P Main Breaker Amps. No. of Branches
P-BTS Cable Length(m)

Load Amp
no. Brand Rating No. of Pole Load Description Status Remark
L1(A) L2(A)
1
2
3
4
5
6
7
N/A
8
9
10
Note: Put in "Remark" above for special case if there is
TVSS Detail: Brand: Rating: KAIC

C3.7 Pictures of ACPDB and Details

N/A N/A N/A

ACPDB TVSS VAC = V


The Actual Output Current of ACPDB (Measure by Meter):

N/A N/A N/A

L1 = A L2 = A L3 = A

Page 39 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C6.3. AIR CONDITIONING UNIT(Indoor Site)
CABIN 1 TEMPERATURE: N/A 0
C OUTDOOR/NO REQUIREMENT
AIR CONDITIONING UNIT (ACU): ACU 1 Brand: ACU 2 Brand:
ACU 1 Rating: HP ACU 2 Rating: HP
CABIN 2 TEMPERATURE: N/A 0
C
AIR CONDITIONING UNIT (ACU): ACU 1 Brand: ACU 2 Brand:
ACU 1 Rating: HP ACU 2 Rating: HP

Pictures of ACU Details AT CABIN1

N/A

N/A N/A

N/A

PHOTO OF ACTUAL ACU LOCATION ACU BRAND ROOM TEMPERATURE DISPLAY

N/A N/A N/A

ACU 1 PLATE / SPECS ACU 2 PLATE / SPECS ACU CONTROLLER


Pictures of ACU Details AT CABIN2

N/A

N/A N/A

N/A

PHOTO OF ACTUAL ACU LOCATION Room2 ACU BRAND Room2 TEMPERATURE DISPLAY

N/A N/A N/A

ACU 1 PLATE / SPECS Room2 ACU 2 PLATE / SPECS Room2 ACU CONTROLLER

Page 40 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C7. Genset and Fuel Tank
C7.1. DG available on site? Yes No
No Genset Capacity Fuel Tank capacity Brand Date of Manufacture
1 NO GENSET NO FUEL TANK

C7.2. Picture of existing Genset

N/A N/A N/A


Existing DG Existing Fuel Tank Pictures with basepad for DG and fuel tank

Page 41 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C8.1 EXISTING SINGLE LINE DIAGRAM SITE NAME: RINCONCMPDVALNCR

Page 42 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C8.3 EXISTING SITE CABLE ROUTE AND LAYOUT SITE NAME: RINCONCMPDVALNCR

Page 43 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C7. Rectifer1 Computation
C7.1. EXISTING RECTIFIER
1) EXISTING RECTIFIER SYSTEM BRAND - MODEL ELTEK FLATPACK 2 (3000)
2) MAXIMUM RECTIFIER MODULES / INSTALLED 8 4
3) RECTIFIER MODULE RATING, WATTS / AMPS 3000 56.17977528
4) BATTERY BRAND / VOLTAGE RATING LEOCH 12V 100AH 12
5) NUMBER OF BATTERIES in BANKS / CAPACITY per CELL (AH) 4 100
6) PRESENT LOAD READING, PANEL DISPLAY / CLAMP METER (A) 30.9 Ampere
7) RECTIFIER MODULES IN OPERATION 4 modules
8) ACTUAL FLOAT VOLTAGE (V) 54 Voltage
C7.2. PROPOSED PDU/DCDU RECTIFIER LOAD SCHEDULE
PROPOSED ADDITIONAL LOAD(S)

Equipment Type Power Rating Current Rating Cable Size Circuit Breaker
Load No Remarks
(Load Description) (Watts) (Amps) (AWG) Rating (Amps)

1 RRU5254 (L2300+L2600) S1,S2,S3 3300 61.79775281 100

2 L1800 S1,S2,S3 902 16.89138577 63

3 LTE BBU 638 11.94756554 0

4 N/A 0 0 NA

5 N/A 0 0 NA

6 N/A 0 0 NA

7 N/A 0 0 NA

TOTAL: 77.0411985

Total Full Load Current = Existing Load + Proposed Load (100% of Rated Load) = 96.385019 Amps
Existing Rectifier Capacity: No. Modules x Ampere Capacity = 224.7191 Amps
Existing Battery Capacity: No. of Batt Banks x Batt Capacity = 400 AH

RECTIFIER SUFFICIENCY COMPUTATION:

Available Rectifier Capacity = Existing Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity = 224.7191 Amps - 96.38502 Amps - ( 400 * 0.05) - 0 Amps
Available Rectifier Capacity = 108.3340824 Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) = 43%
BATTERY BACK-UP TIME COMPUTATION:

BBUT = BATTERY CAPACITY (AMPERE-HOUR) / FUTURE TOTAL LOAD (AMPERE)


BBUT = 4.150023 Hours

C7.3. END-STATE SUFFICIENCY COMPUTATION: (applicable only if there will be new Rectifier System or Upgraded Module)
Available Rectifier Capacity = (Future Rectifier Capacity - (Total Full Load Current) - (10% of Battery Capacity)
- Rectifier Module Current Rating
Available Rectifier Capacity =
Available Rectifier Capacity = Amperes (if result value is negative, provision of additional module is required)
Percent Utilization (TLC/Existing Rectifier Capacity) =

BATTERY BACK-UP TIME COMPUTATION:

BBUT = BATTERY CAPACITY (AMPERE-HOUR) / FUTURE TOTAL LOAD (AMPERE)


BBUT = 4.15 Hours

C7.4. EQUIPMENT FOR DECOMMISION: (Applicable for sites with identified equipment for decomisioning)
1.) WIMAX BTS : Amperes (value from clampmeter reading)
2.) WIMAX TRANSPORT : Amperes (value from clampmeter reading)
TOTAL FOR DECOM : Amperes

DC POWER SUFFICIENCY ASSESSMENT AND PROPOSAL:

OKAY TO CATER PROPOSED LOADS.

Page 44 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C9. Antenna Mounting Bracket or Pole

GU900/GUL900 Sector 1 Sector 2 Sector 3


Length of Pole (mm) 3000 3000 3000
Diameter of Pole (mm) 70 70 70
Size of Bolts (mm) 10 10 10
Size of U-Bolts (mm) 120 120 120
Distance of pole to tower leg /
400 400 400
building wall (mm)
GU900/GUL900 Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

Remarks : REUSE EXISTING AMB FOR L2600+L2300+L1800 PROPOSAL

L700 Sector 1 Sector 2 Sector 3


Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
L700 Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

N/A N/A N/A


Remarks :

Page 45 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C9. Antenna Mounting Bracket or Pole

G1800 Sector 1 Sector 2 Sector 3


Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
G1800 Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

N/A N/A N/A


Remarks :

U2100 Sector 1 Sector 2 Sector 3


Length of Pole (mm) 3000 3000 3000
Diameter of Pole (mm) 70 70 70
Size of Bolts (mm) 10 10 10
Size of U-Bolts (mm) 120 120 120
Distance of pole to tower leg /
400 400 400
building wall (mm)
U2100 Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

Remarks : REUSE EXISTING AMB FOR L2100 PROPOSAL

Page 46 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C9. Antenna Mounting Bracket or Pole

L1800/L1800DB Sector 1 Sector 2 Sector 3


Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
L1800/L1800DB Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

N/A N/A N/A


Remarks :
L2600-TDD Sector 1 Sector 2 Sector 3
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
L2600-TDD Sector 4 Sector 5 Sector 6
Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

N/A N/A N/A


Remarks :

Page 47 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222
C9. Antenna Mounting Bracket or Pole

L2300 Sector 1 Sector 2 Sector 3


Length of Pole (mm) N/A N/A N/A
Diameter of Pole (mm) N/A N/A N/A
Size of Bolts (mm) N/A N/A N/A
Size of U-Bolts (mm) N/A N/A N/A
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

N/A N/A N/A


Remarks :

SPARE AMB Sector 1 Sector 2 Sector 3


Length of Pole (mm) 2000 2000 2000
Diameter of Pole (mm) 70 70 70
Size of Bolts (mm) 10 10 10
Size of U-Bolts (mm) 100 100 100
Distance of pole to tower leg /
N/A N/A N/A
building wall (mm)
Pole Bolts U Bolts

Remarks :

Page 48 of 60
Genesis-TSSR_Rel.v4.6-2018

D1. Existing Site development layout Drawing File Name : NCR5222-RINCONCMPDVALNCR

Page 49 of 60
Genesis-TSSR_Rel.v4.6-2018

D2. Proposed Site development layout Drawing File Name : NCR5222-RINCONCMPDVALNCR

New Ant/RRU MIMO New ODC New Feeder/CPRI New Pad


New Ant/RRU Tech 2 New RRU Pole New Power Cable Others
New Ant/RRU Tech 3 New Ladder/Stacking New Grounding Others

Page 50 of 60
Genesis-TSSR_Rel.v4.6-2018

D3. Existing Room Layout Drawing File Name : NCR5222-RINCONCMPDVALNCR

Page 51 of 60
Genesis-TSSR_Rel.v4.6-2018

D4. Proposed Room Layout (with cable routing layout) Drawing File Name : NCR5222-RINCONCMPDVALNCR

New Ant/RRU MIMO New ODC New Feeder/CPRI New Pad


New Ant/RRU Tech 2 New RRU Pole New Power Cable Others
New Ant/RRU Tech 3 New Ladder/Stacking New Grounding Others

Page 52 of 60
Genesis-TSSR_Rel.v4.6-2018

D5. Proposed Layout Outdoor cable routing (from cabin to antenna) Drawing File Name : NCR5222-RINCONCMPDVALNCR

New Ant/RRU MIMO New ODC New Feeder/CPRI New Pad


New Ant/RRU Tech 2 New RRU Pole New Power Cable Others
New Ant/RRU Tech 3 New Ladder/Stacking New Grounding Others

Page 53 of 60
Genesis-TSSR_Rel.v4.6-2018

D6. Existing Tower Elevation and Tower Loading Drawing File Name : NCR5222-RINCONCMPDVALNCR

Page 54 of 60
Genesis-TSSR_Rel.v4.6-2018

D7. Proposed Antenna Layout(with Proper Northing) Drawing File Name : NCR5222-RINCONCMPDVALNCR

New Ant/RRU MIMO New ODC New Feeder/CPRI New Pad


New Ant/RRU Tech 2 New RRU Pole New Power Cable Others
New Ant/RRU Tech 3 New Ladder/Stacking New Grounding Others

Page 55 of 60
Genesis-TSSR_Rel.v4.6-2018

D8. Top View of the Antenna Drawing File Name : NCR5222-RINCONCMPDVALNCR

Page 56 of 60
Genesis-TSSR_Rel.v4.6-2018

1.WHOLE SITE SKETCH-DRAWINGS Drawing File Name : NCR5222-RINCONCMPDVALNCR

Page 57 of 60
Genesis-TSSR_Rel.v4.6-2018

2.CABIN SKETCH-DRAWINGS ON SITE Drawing File Name : NCR5222-RINCONCMPDVALNCR

Page 58 of 60
Genesis-TSSR_Rel.v4.6-2018

3. CABLE ROUTING(ESPECIALLY ROOFTOP SITE) Drawing File Name : NCR5222-RINCONCMPDVALNCR

Page 59 of 60
Genesis-TSSR_Rel.v4.6-2018

GENESIS PROJECT
Technical Site Survey Report
Site Name RINCONCMPDVALNCR
PLA ID NCR5222

E. Revision History

Rev. No Date Name Remarks

Page 60 of 60