Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

BASAVA ENGINEERING MFG.

PROCESS AUDIT REPORT QA-F-15 (00/08-09-2021)


PROCESS: AUDITEE: AUDITOR: Date:
Part Name /Part No. & Rev. No. Control Plan/Process Plan: WI. Shift:

NO PARAMETER/CHECK POINTS AUDITOR’S OBSERVATION/COMMENTS RESULT

1. In put material condition

Out put
2. (Process/product Monitoring
records.)
Operator competency , Process
3. /Product & Customer requirement
awareness
Monitoring & measuring Equipment
4. calibration status & physical
condition
Production Tooling/ Jig-fixture status
5.
& Physical condition

6. Process Validation ( if applicable)

Related Documents availability near


7.
work point & legibility

8. House keeping (Work environment)

9. Equipment/Machine condition.

10. Operator safety & ergonomics.

Material Identification ,Storage &


11.
Packing
Critical Process /Product Parameters
12.
(Mention evidence)

Auditee Sign: Auditor Sign: Total NCs: Re-audit Date(If Required):

You might also like