TIME SHEET FOR WORK ON SITE

KREF/WBS/ JOB REFERENCE : KYF5


CUSTOMER : M/S ELENSER & M/S GE T&D
SITE : GE PALLAVARAM FAT
ENGINEER ‘S NAME: MONTH : September YEAR : 2021
Mr. ANE DAWOOD IBRAHIM
JOB UNDERTAKEN :TESTING OF BCU AND MFM COMMUNICATION WITH C264

DATE WORKING TIME OVERTIME ACTIVITY PERFORMED


FROM TO HRS FROM TO HRS
Reported to KPTCL Talagunda site and Co-ordinated with Customer
02/09/2021 09:00 18:30 09:30 and Un-mounted the BCU’s in the presence of Customer and Shipped
to Customer Office
Reported to GE Pallavaram & Updated the Following activities
1.Powered ON the RuggedCom Switch but it didn't get powered up
2. Powered Up all the BCU and Ensured that Power Supply is fine for
06/09/2021 09:00 18:30 09:30 all BCU'S
3. checked the MFM'S by configuring in PORT-1, PORT-2, PORT-3,
PORT-4 respectively but it is not communicating
Even Checked with the Same Project Setup
1. Powered Up the BCU-2 & Injected the Current and Voltage Values
Using Omicron Kit and Observed that MFM Values are reporting to
BCU-2
2. After Changing the MFM Register Address the MFM Started to
Communicate with BCU for both the Ports in the BCU-2
3. Powered Up the BCU-1 and Connected the 4 MFM by Port-1 by
09:00 18:30 Keep the Modbus Id similar in SCE & Accord MFM -
07/09/2021 09:30
The MFM didn't get reported to BCU-1, Swapped the CPU card from
BCU-2 to BCU-1 and Checked the Reporting but Not Reporting to BCU-
1
Changed the Database and MFM's id in SCE & Accord MFM and even
changed N/W Name & IP Address using flash boot then also MFM not
reported to BCU

Raised RMA for both the Materials BCU & Rugged Com Ethernet Fibre
Switch and Handover to CRC Mr. Palanivel
09:00 18:30 Contacted Mr.Palanivel for the BCU it will be given shortly
08/09/2021 09:30
Awaiting for the BCU to continue and test the MFM after receiving
from CRC

Powered Up the BCU-1 & Injected the Current and Voltage Values
09/09/2021 09:00 18:30 09:30 Using Omicron Kit and Observed that MFM Values are reporting to
BCU-2

10/09/2021 09:00 18:30 09:30 Travel To Office

For M/s Oasis Automation For M/s GE T&D


Engineer Name : Mr. Ane Dawood Ibrahim Name :Mr. Venkatesh
Designation: SAS Engineer Designation: SAS Co-ordinator
Date: 10/09/2021 Date:

Signature: Signature: