Professional Documents
Culture Documents
R.C Sample Drawing
R.C Sample Drawing
R.C Sample Drawing
FOR
THREE AND HALF STOREY RESISDENCE
OWNER : DAW JIT TOO MAR ZAW
LOCATION : CORNER OF 65 & 118-A STREETS, MANDALAY
MATT MYANMAR
PROJECT NO. - Z00122
CLIENT - DAW JIT TUU MAR ZAW
RELEASED DATE - JUNE/2022 Design and Construction Company Limited.
NOTE:
18. S-FM.05 SECOND FLOOR LAYOUT PLAN @ LVL. +27'-00" REVISION NO ( - ) DATE ( - )
19. S-FM.06 THIRD FLOOR LAYOUT PLAN @ LVL. +38'-06" REVISION NO ( - ) DATE ( - )
20. S-FM.07 ROOF FLOOR LAYOUT PLAN @ LVL. +50'-00"
OWNER :
21. S-FM.08 ROOF TOP LAYOUT PLAN @ LVL. +61'-06"
22. S-FM.09 PART PLAN OF STAIR CASE
23. S-FM.10 PART PLAN OF FIRST FLOOR (STEEL BEAM FRAMING PLAN & CONNECTION LAYOUT PLAN) DAW JIT TOO MAR ZAW
1'-9"
1'-9"
1'-9"
1'-9"
1'-9"
C
1'-9"
1'-9"
1'-9"
1'-9"
1'-9"
1'-9" 1'-9" 1'-9" 6' 1'-9" 1'-9" 6' 1'-9" 1'-9" 1'-9" 1'-9" 1'-9"
PROJECT :
THREE AND HALF STOREY
RESISDENCE
[CORNER OF 65TH & 110A STREET]
17'-3"
3'-6"
1'-9" 1'-9" 1'-9" 6' 1'-9" 1'-9" 6' 1'-9" 1'-9" 1'-9" BLOCK NO.
LOT NO.
1'-9"
1'-9"
1'-9"
1'-9"
TOWNSHIP CHAN MYA THARSI, MANDALAY
1'-9" 1'-9"
34'-6"
B SUBJECT :
6'
6'
6'
6'
1'-9"
PILE LAYOUT PLAN @ LVL. -03'-08"
1'-9"
1'-9"
1'-9"
1'-9"
SCALE : AS SHOWN SHEET NO :
6'
2PC1A 4PC1 4PC1 2PC1
DATE : JUNE/2022 S-PLO.01
17'-3"
1'-9"
REVISION NO ( - ) DATE ( - )
2PC1
REVISION NO ( - ) DATE ( - )
OWNER :
1'-9" 1'-9" 1'-9" 6' 1'-9" 1'-9" 6' 1'-9" 1'-9" 6' 1'-9"
1'-9"
1'-9"
1'-9"
1'-9"
A
1'-9"
1'-9"
1'-9"
1'-9"
DAW JIT TOO MAR ZAW
1PC1 2PC1 2PC1 2PC1
NOTE:
1. ALL PILE CUT OFF LVL. TO BE -03.667' UNLESS STATED OTHERWISE.
1. ALL PILE CAPS TO BE 48" THICK UNLESS STATED OTHERWISE. L.C :
PILE LAYOUT PLAN @ LVL. -03'-08" 2. ALL PILE CAP TOP LEVEL = 00'-00".
GENERAL NOTE FOR MINI-BORED PILE
1. CONCRETE USED SHALL BE G30(4350PSI) FOR ALL PILES.
1 Scale: 1/8"=1"-0"
PILE CENTER TO CENTER SPACING = 6'
PILE CENTER TO EDGE DISTANCE = 21"
2. CONCRETE COVER TO THE NEAREST REINFORCEMENT SHALL BE 3". ALL DIMENSION ARE TO BE CHECKED AND VERIFIED ON SITE.
3. THE BASE OF THE PILE SHALL BE THOROUGHLY CLEAN, SOUND AND FREE FROM LOOSE SAND DEPOSIT, LAITANCE, SILT PRIOR TO CONCRETING. THE CONTRACTOR SHALL
CLEAN. THE BASE USING AIR LIFT AND/OR OTHER APPROVED METHOD. ALL PILES BASES SHALL BE POST GROUTED AS PER SPECIFICATIONS, IF THE PRELIMINARY PILE LOAD TEST
REQUIRED.
4. MINIMUM REINFORCEMENT LAP SHALL BE 48 TIMES THE BAR DIAMETER.
5. ALL LOAD TESTS ON PILES MUST COMPLY WITH REQUIREMENTS DETAILED IN TECHNICAL SPECIFICATIONS. REINFORCEMENT SCHEDULE FOR PILES R.S.E / P.E (CONSTRUCTION) :
6. LENGTH OF REINFORCING BARS INDICATED ON THE DRAWING ARE STRAIGHT LENGTH ONLY.
7. THE PILE SHALL NOT DEVIATE FROM VERTICAL BY MORE THAN 1 IN, AND SHALL BE MEASURED ON SITE USING A PLUMB LINE AT GROUND LEVEL AND RECHECKED AT THE PILE SIZE ESTIMATED PILE LENGTH PILE REINFORCEMENT
CUT-OFF LEVEL. THE CROSS-SECTIONAL DIMENSION OF THE PILE IS NOT TO BE LESS THAN SPECIFIED. CHECK THE AUGER WIDTH AS REQUIRED AND RECORD FOR EACH PILE TO (DIA. IN) FROM STREET LEVEL(FT) MAIN REIN. SPIRAL LINKS
ENSURE THE SPECIFIED DIAMETER IS ACHIEVED, ALLOW A TOLERANCE OF 5% ON THE AUGER WIDTH.THE PERMISSIBLE TOLERANCE IN THE TRUE CUT-OFF LEVEL WILL BE PLUS OR
MINUS 1", UPON FINAL DRAWING. TOP 6' T10-4IN
24 40 10T20
8. REINFORCING BARS YIELD STRENGTH SHALL BE HRB500(72500PSI). OTHERS T10-6IN
11. PILE LOAD TEST REQUIREMENTS
(a) WORKING PILE LOAD TEST IS TO BE CARRIED OUT FROM GROUND LEVEL.
(b) PILE IS TESTED TO 2.0 TIMES WORKING LOAD. FINAL LOAD TEST ARE LISTED IN TABLE A. TOTAL NUMBER OF PILES 28 NOS
(c) THE ALLOWABLE MAXIMUM SETTLEMENT MEASURED AT THE PILE TOP UNDER FULL TEST LOAD SHALL NOT LARGER THAN 1". R.S.E / P.E (STRUCTURE) :
(d) THE PILE LOADING TEST IS TO BE PERFORMED BY MEANS OF JACK WHICH IT'S REACTION FROM TENSION PILES. ESTIMATED PILE LENGTH 40FT
(e) THE TEST LOAD SHOULD BE APPLIED IN 2 EQUAL INCREMENTS UP TO THE DESIGN PILE WORKING LOAD, THEN RELEASED AND REAPPLIED IN 4 EQUAL INCREMENTS UP TO
THE PILE TEST LOAD (TWICE OF THE MAX. WORKING LOAD) UNDER WORKING LOAD AND MAINTAINED FOR A LEAST 72 HOURS BEFORE REMOVAL. PILE SIZE Ø24"
(f) THE LOAD AT EACH INCREMENTAL STAGE SHOULD BE HELD FOR A PERIOD OF 10 MINUTES OR LONGER UNTIL THE RATE OF SETTLEMENT IS LESS THAN 0.01"/HR. FOR EACH
STAGE THE LOAD OF INCREMENT OF LOAD SHOULD BE APPLIED AS SMOOTHLY AND EXPEDITIOUSLY AS POSSIBLE. PILE ALLOWABLE LOAD 75TONS(SAFETY FACTOR 2)
(g) THE TEST LOAD SHOULD BE MEASURED NY A CALIBRATED LOAD MEASURING DEVICE AND ALSO BY A CALIBRATED PRESSURE GAUGE IN THE HYDRAULIC SYSTEM.
(h) LOADING TEST PROPOSAL SHALL BE PREPARED BY CONTRACTOR AND SUBMITTED TO ENGINEER FOR APPROVAL PRIOR TO TESTING WORKS. PILE WORKING LOAD 150TONS
NOTE:
10T20
F.T.L
T10-4IN
SPIRAL LINKS
MAIN REINFORCEMENT 10T20
SPIRAL LINKS T10-4IN
PILE CUT OFF LEVEL (-03.667')
PILE CAP BASE LEVEL (-04') SECTION 1-1
PROJECT :
THREE AND HALF STOREY
RESISDENCE
2' [CORNER OF 65TH & 110A STREET]
BLOCK NO.
1 LOT NO.
T10-4IN
3xPILE DIAMETER
TOWNSHIP CHAN MYA THARSI, MANDALAY
10T20
6'
T10-6IN SUBJECT :
40FT FROM LVL. 00'
OWNER :
2
DAW JIT TOO MAR ZAW
L.C :
T10-6IN
HEADED SHEAR STUD REINFORCEMENT HEADED STUDS AND HEAED STUD ASSEMBLIES ASTM A1044 PROJECT :
THREE AND HALF STOREY
MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD C31 RESISDENCE
TEST METHOD FOR COMPRESSIVE STRENGTH OF CYLINDRICAL [CORNER OF 65TH & 110A STREET]
C39
CONCRETE SPECIMENS
READY-MIXED CONCRETE C 94 BLOCK NO.
TEST METHOD FOR COMPRESSIVE STRENGTH OF HYDRAULIC CEMENT
C 109 LOT NO.
MOTORS
ADMIXTURES WATER REDUCTION AND SETTING TIME MODIFICATION ASTM C494 TOWNSHIP CHAN MYA THARSI, MANDALAY
REVISION NO ( - ) DATE ( - )
STANDARD REINFORCING BARS NOMINAL MAXIMUM SIZE OF COARSE AGGREGATE
REVISION NO ( - ) DATE ( - )
< 51 (THE NARROWEST DIMENSION BETWEEN SIDES OF FORMS)
DESIGNATION NOMINAL DIAMETER NOMINAL AREA WEIGHT
OWNER :
< 31 (THE DEPTH OF SLABS)
d(aggregate)
MM IN MM2 IN2 KG/M LB/FT < 3/4( (THE MINIMUM CLEAR SPACING BETWEEN INDIVIDUAL REINFORCING BARS
6 6 0.24 28.27 0.04 0.22 1.61 OR WIRES, BUNDLES O FBARS) DAW JIT TOO MAR ZAW
SUBJECT :
7. HIGH TENSILE STEEL BARS SHALL BE HOT ROLLED DEFORMED AND CONFORMED WITH ASTM A615-617 AND HAVE A GUARANTEE YIELD STRESS GENERAL NOTE
OF 50000PSI AND TENSILE STRENGTH OF 70000PSI FOR HRB400, APPLICABLE TO T10 ~ T18 REBARS.
8. UNLESS NOTED OTHERWISE IN THE DRAWINGS THE CONCRETE COVER TO THE OUTERMOST
SURFACE OF THE STEEL REINFORCEMENT (STIRRUPS,TIES OR SPIRALS IF TRANSVERSE REINFORCEMENT ENCLOSE MAIN BARS; SCALE : SHEET NO :
OUTERMOST LAYER OF BARS IF MORE THAN ONE LAYER IS USED WITHOUT STIRRUPS OR TIES;METAL END FITTING OR DATE : JUNE/2022 S-GN-DT03
DUCT ON POST TENSIONED PRESTRESSING STEEL) SHALL BE OF THAT LISTED BELOW.
REVISION NO ( - ) DATE ( - )
9. ALL DIMENSIONS ARE IN INCHES AND LEVELS IN FEETS.
10.ABBREVIATIONS:- REVISION NO ( - ) DATE ( - )
T1 1ST LAYER AT TOP B.O.W BOTTOM OF WALL U.N.O. UNLESS NOTED OTHERWISE
OWNER :
B1 1ST LAYER AT BOTTOM T.O.B TOP OF BEAM F.F.L. FLOOR FINISH LEVEL
T2 2ND INNER LAYER AT BOTTOM M.H MEASURED HORIZONTALLY S.F.L. STRUCTURAL FINISH LEVEL
B2 2ND INNER LAYER AT BOTTOM M.V MEASURED VERTICALLY RC REINFORCED CONCRETE
DAW JIT TOO MAR ZAW
A.R ALTERNATELY REVERSED N.T.S. NOT TO SCALE PT POST TENSIONED
A.S ALTERNATELY STAGGERED F.T.L. FULL TENSION LAP CL CENTRELINE
A.P ALTERNATELY PLACED F.C.L. FULL COMPRESSION LAP EQ EQUAL
F.F FAR FACE F.T.A. FULL TENSION ANCHORAGE THK THICK CONCRETE fc'=3000 PSI FOR CYLINDER STRENGTH
F.C.A. FULL COMPRESSION ANCHORAGE TYP TYPICAL L.C :
N.F NEAR FACE fcu =3846 PSI. FOR CUBE STRENGTH
S.H.A. STANDARD HOOK ANCHORAGE MAX MAXIMUN LAP & ANCHORAGE LENGTH
E.F EACH FACE REBAR fy=HRB400 (fy = 58000 psi)
B.F BOTH FACE S.S. SINGLE STIPPUP MIN MINMUM
FULL TENSION FULL COMPRESSION FULL TENSION FULL COMPRESSION STANDARD HOOK
E.W EACH WAY D.S. DOUBLE STIPPUP @ AT BAR
LAP(IN) LAP(IN) ANCHORAGE(IN) LAP(IN) ANCHORAGE(IN)
B.W BOTH WAY T.S. TRIPLE STIPPUP
F.R.R FIRE RESISTANCE RATING R.L. REDUCED LEVEL T10 14.5 13 14.5 13 8
11. BAR MARKS INDICATE THE TYPE AND SIZE OF REINFORCEMENT e.g.T10-4IN
T12 17.5 17.5 R.S.E / P.E (CONSTRUCTION) :
15.5 15.5 10
T10 4IN
T16 23 21 23 21 13
STANDARD HOOK (FOR MAIN BARS) STANDARD HOOK (FOR STIRRUPS AND TIES)
3in
4 d ≥2 1/2 " b
b 135° 6d
b ,3inm
r in. PROJECT :
D db r r r THREE AND HALF STOREY
STANDARD HOOK
RESISDENCE
ANCHORAGE
[CORNER OF 65TH & 110A STREET]
db
BLOCK NO.
D = 2r 12db D = 2r
LOT NO.
TOWNSHIP CHAN MYA THARSI, MANDALAY
SUBJECT :
D = MINIMUN INSIDE DIAMETER OF BEND SPLICE DETAILING &
CONCRETE PROTECTION FOR
= 6db FOR 18MM THROUGH 25MM REINFORCEMENT
= 8db FOR 30MM,32MM AND 35MM db db
= 10db FOR 45MM AND 60MM SCALE : SHEET NO :
D = MINIMUN INSIDE DIAMETER OF BEND DATE : JUNE/2022 S-GN-DT04
= 4d FOR 16MM AND SMALLER REVISION NO ( - ) DATE ( - )
b
= 6d FOR 18MM,20MM
COVER b REVISION NO ( - ) DATE ( - )
* PROVIDE A CLREA COVER OF 1.5" FOR BEAMS, 0.75" FOR SLABS AND 3" FOR FOOTING , IF NOT OTHERWISE METIONED.
OWNER :
SPLICE
DAW JIT TOO MAR ZAW
NOTE: L.C :
SPLICE LENGTH
a) REFER TO DETAIL ON DRAWINGS FOR THE LOCATIONS WHERE THESE LAP AND ANCHORAGE LENGTHS ARE TO BE APPLIED.
SPLICE IN TENSION (PLAIN BARS)
b) FOR TENSION LAP AND TENSION BOND VALUES LISTED ABOVE SHALL BE MULTIPLIED BY 1.3 FOR
HORIZONTAL REINFORCEMENT PLACED WHEN THERE IS MORE THAN 300 mm(12 inches) THICK OF FRESH
CONCRETE IS CAST BELOW THE HORIZONTAL REINFORCEMENT.
SPLICE LENGTH c) STAGGERED TENSION LAP IS ALLOWED WHEN 50% OR LESS OF THE TOTAL REINFORCEMENT IS SPLICED
SPLICE IN TENSION (DEFORMED BARS) WITHIN THE REQUIRED LAP LENGTH ONLY ON LOCATIONS AND CONDITIONS INDICATED ON DRAWINGS.
d) NUMBERS IN PARENTHESES ARE TO BE USED FOR SLABS AND WALLS WHERE CLEAR CONCRETE COVER R.S.E / P.E (CONSTRUCTION) :
TO REINFORCEMENT IS LESS THAN BAR DIAMETER.
SPLICE LENGTH e) LAP OR ANCHORAGE LENGTH OF INDIVIDUAL BARS WITHIN A BUNDLE IN TENSION OR COMPRESSION,
TO BE 1.2 TIMES FOR THREE-BAR BUNDLE AND 1.3 TIMES FOR FOUR-BAR BUNDLE IN RESPECT
SPLICE IN COMPRESSION (BOTH PLAIN AND DEFORMED)
TO THE LAP ANCHORAGE LENGTHS SPECIFIED ABOVE.
f) FOR STANDARD HOOK ANCHORAGE LENGTH VALUES LISTED ABOVE SHALL BE MULTIPLIED
BY 1.43 FOR BARS HAVING SIDE COVER LESS THAN 63.5mm(2-1/2inches) OR BARS HAVING COVER ON BAR
EXTENSION BEYOND HOOK OF LESS THAN 51mm(2 inches). R.S.E / P.E (STRUCTURE) :
NOTE:
2h 2h 2h
h
Link 1 Link 2 Link 3
SUBJECT :
STIRRUP SCHEDULE FOR TYPICAL
(FLOOR) MAIN BEAM
2h
THIS SIGN IS TO SHOW CUT OFF POINT ONLY,
BUT NOT TO DO AS SHOWN. ALL OF WHICH ARE IN THE SAME LAYER. SCALE : SHEET NO :
DATE : JUNE/2022 S-GN-DT07
2"
h
2" 2"
COLUMN REVISION NO ( - ) DATE ( - )
COLUMN
2" EXTRA BARS AS SHOWN IN BEAM SCHEDULE REVISION NO ( - ) DATE ( - )
OWNER :
SLOPE FOR DIFFERENT BEAM DEPTH
DAW JIT TOO MAR ZAW
STEEL CUT OFF POINT SIGN DIFFERENT BAR QUANTITIES IN THE SAME LAYER
L.C :
STEELS POSITION DETAIL TORSION STEEL REFERENCE DETAIL FOR TWO-LAYPE MAIN BARS
BEAM COVER=40mm BEAM COVER=40mm
TYPICAL BEAM SECTION DETAIL WITH TORTION BARS R.S.E / P.E (STRUCTURE) :
NOTE:
SPLICE LENGTH
TENSION
LARGER OF X OR Y
20" PROJECT :
Se (REFER COLUMN SCHEDULE) THREE AND HALF STOREY
Se RESISDENCE
[CORNER OF 65TH & 110A STREET]
MAIN BAR
8 x LONGITUDINAL BAR DIAMETER
So
So BLOCK NO.
24 x TIE BAR DIAMETER
Lo
LOT NO.
FLOOR LEVEL So≤ 0.5 x (SMALLER OF X OR Y)
TOWNSHIP CHAN MYA THARSI, MANDALAY
6" SUBJECT :
So
GIVEN SPACING REFER COLUMN SCHEDULE SPLICE DETAIL FOR COLUMN
Lo
So
So SCALE : SHEET NO :
DATE : JUNE/2022 S-GN-DT08
X
FLOOR TO FLOOR HEGHT
Y
OWNER :
TIE BAR @ 4" c/c
SECTION A-A
L1
FLOOR LEVEL
NOTE: R.S.E / P.E (CONSTRUCTION) :
-COLUMN CLEAR COVER 3IN FOR THE CONCRETE CAST AGAINST
AND PERMANENTLY EXPOSED TO EARTH. OTHERWISE 1.5IN UOS.
-COLUMN MAIN STEEL MUST BE SPLICED ONLY IN MIDDLE HALF OF COLUMN HEIGHT.
-SPLICED LENGTHS ARE TO BE USED ACCORDING TO DESIGN SECTIONS.
-NUMBER OF TIES AND SPACING IN DISTANCE L0 AND L1 ARE SHOWN IN COLUMN SCHEDULE.
COLUMN TYPICAL DETAILS -135° HOOK MUST BE USED AT THE END OF ALL TIE BARS.
-TIE SPACING IN THE SPLICE LENGTH AT THE MIDDLE HALF OF THE COLUMN HEIGHT IS 4IN c/c.
-DO NOT SPLICE MORE THAN 50% OF THE TOTAL COLUMN LONGITUDINAL STEEL ANY WHERE.
R.S.E / P.E (STRUCTURE) :
NOTE:
BEAM DEPTH
F.T.A.
BC
(H)
F.T.A.
d e g f d e g 2" f d e g 2" f d g e
2" 2" 2" STIRRUPS(TYP.) 2" 2"
PROJECT :
L1/8 L2/8 L2/8 L3/8 THREE AND HALF STOREY
RESISDENCE
[CORNER OF 65TH & 110A STREET]
BLOCK NO.
L1 L2 L3 L4
LOT NO.
TYPICAL CONTINUOUS BEAM DETAIL
TOWNSHIP CHAN MYA THARSI, MANDALAY
F.T.A.
TOP BARS
d
BARS
OWNER :
(H)
F.T.A.
F.T.A.
d
DAW JIT TOO MAR ZAW
d e g f
D/S
STIRRUPS STIRRUPS 20"
BOT. BARS (TYP.)
L/8 L/8
FACE OF SUPPORT EXTRA BARS
4d(MIN.) E.F. (TYP.) L.C :
L/4 L/2 L/4
LIMIT L0CATION
OF PIPE SLEEVE
L L
≤SLAB THK
1.MATERIAL STRENGTH FOR STRUCTURAL MEMBERS:
≥2"
0.3LX 0.3LY f'c = 3000psi(G20.69) FOR BEAM & SLAB
0.15 LX F.T.A f'c = 3000psi(G20.69) FOR COLUMN, WALL & PILECAP
MIN120 fy = 58000psi(HRB400) For ALL REINFORCING BARS
≤50
AND ALL CAST-IN REBAR
0.15 LY SLAB THICKNESS 2.ALL STRUCTURAL DRAWINGS SHALL BE READ IN
CONJUCTION WITH THE ARCHITECTURAL DRAWINGS
SLAB DROP ACROSS MAIN SPAN
1 F.T.A
≤SLAB THK
10
10"
MIN120
LX LY LX LY
1.5h
WHEN SLAB DROP ≤50 SLAB DROP ≥SLAB THICKNESS TA
SLAB DROP OVER BEAM SLAB DROP ACROSS MAIN SPAN PROJECT :
THREE AND HALF STOREY
RESISDENCE
MIN 0.3( L1 OR L2)OR LAP
REINF ARRANGEMENT IN SLAB DROP [CORNER OF 65TH & 110A STREET]
SPAN L1
SPAN L2 SPAN L3 BLOCK NO.
SPAN L1 SPAN L2
MIN 0.25 L1 OR LAP MIN 0.3( L1 OR L2)OR LAP MIN 0.3( L2 OR L3)OR LAP
(NOT LESS THAN 45 DIA) WHICHEVER IS GREATER WHICHEVER IS GREATER LAP T2 LEFT HAND 'L' BAR . LAP LOT NO.
(NOT LESS THAN 45 DIA) (NOT LESS THAN 45 DIA)
WHICHEVER IS GREATER
(NOT LESS THAN 45 DIA) T1 LEFT HAND T1 MID-SPAN BAR.
EXTEND LAP LENGTH CRANK OVER BEAM TOP
'U' BAR
T1 T2
LAP LAP T1 LAP
T2
BOTTOM REIN SEE
T1 LAP INTO BEAM T2 8" 14" STEEL AS SHOWN T1 T2 RIGHT HAND BAR TOWNSHIP CHAN MYA THARSI, MANDALAY
SCHEDULES
SUBJECT :
t
t
t>=8" B1 B2 GENERAL DETAIL - 1
B2 B2
B1 BOTTOM REINF SEE 2" 2"
B1 BOTTOM REINF SEE 2" LAP B1 B2
2" SCHEDULES SCHEDULES
L1 L4 SCALE : SHEET NO :
L1 TYPICAL SOLID SLAB BALCONY CANTILEVER SLAB DATE : JUNE/2022 S-GN-DT10
NOT TO SCALE
REVISION NO ( - ) DATE ( - )
45DIA
REVISION NO ( - ) DATE ( - )
MAIN BARS
OWNER :
45DIA
45DIA
NOTE:
45DIA DAW JIT TOO MAR ZAW
45DIA
SPAN L1 SPAN L2
1.5L1 OR 0.3L2 OR 100 DIA
TOP REINF AS SHOWN
ON FLOOR PLANS OR LAP 0.25L 0.5L 0.25L
SCHEDULES T1 T2 T2
t
REINFORCEMENT
REINFORCEMENT
2.ALL STRUCTURAL DRAWINGS SHALL BE READ IN
(TYP)
24"
24"
CONJUCTION WITH THE ARCHITECTURAL DRAWINGS
(TYP)
TEMPORARY OPENING
L1/3
24"MIN. 24"MIN. LAP DISTRIBUTION TOP
BAR Y-DIRECTION
LAP 24"MIN.
24"MIN.
END BAY
LAP
L1/3
LAP
0.2L1
L TRIMMERS
0.1 L2
REINFORCEMENT PROJECT :
L2/3
LAP
0.1 L2 THREE AND HALF STOREY
INTERNAL BAY
LAP
0.2 L2 LOT NO.
0.1 L3
DISTRIBUTION TOP
INTERNAL BAY
L3/3
LAP
BAR Y-DIRECTION FLOOR OPENING DETAILS TOWNSHIP CHAN MYA THARSI, MANDALAY
GENERAL DETAIL - 2
LAP
24"MIN.
SCALE : SHEET NO :
BARS MAY BE DISPLACED NO ADDITIONAL
NOTE: REFT NECESSARY JUNE/2022
1. DISTRIBUTION BARS SHOULD BE LAPPED, ANCHORED & SPLICE SIMILAR TO ORDINARY TOP BAR & DATE : S-GN-DT11
TRIMMER BARS
BOTTOM BAR REQUIREMENT FOR R.C. SLABS.
2. LAP SPLICE FOR TOP /BOTTOM BAR SHOULD BE LOCATED AS INDICATED ON REVISION NO ( - ) DATE ( - )
PLAN ABOVE 30 X DIAMETER 0F REBAR FOR CCMPRESSION BAR AND 40 x DIAMETER
t
FOR TENSION BAR. REVISION NO ( - ) DATE ( - )
LAP U-BARS OF THE SAME LAP
DIAMETER AS THE BARS OWNER :
TYPICAL SLAB LAYOUT OF DISTRIBUTION BARS
ON TO WHICH THEY LAP TYPICAL
NOT TO SCALE
b TRIMMING OF HOLES IN SLAB
NOTE: NOT TO SCALE DAW JIT TOO MAR ZAW
(TOP) 2-16mm0(IF t<12IN)
b=12IN IF t<12IN.
2-18mm0(IF t>=12IN) b=20IN IF t>=12IN.
tDROP
24"(TYP.)
SLAB
THICKNESS L TO MATCH L.C :
24"(TYP.)
BEAM
R8mm0 @4IN (IF t<12IN)
12mm0 @4IN (IF t>=12IN) 2-16mm0(IF t<12IN)
ADJACENT TOP BARS
(BOTTOM) 2-18mm0(IF t>=12IN)
L
FOLD AT SUNK SLAB
REFER TO BAR TABLE
NOT TO SCALE
R.S.E / P.E (CONSTRUCTION) :
FLOOR OPENING(L) ADD BARS
LESS THAN 10" 2-12mm0 T&B
L=>10"<20" 2-16mm0 T&B
L=>20"<40" 3-16mm0 T&B
NOTE:
1.FOR OPENING LESS THAN 8"x8".SLAB REBARS TO BE ADJUSTED
AROUND OPENING.
2.FOR OPENINGS GREATER THAN 40"x40".REFER TO SLAB PLANS. R.S.E / P.E (STRUCTURE) :
3.LOCATION OF OPENINGS TO THE APPROVAL OF THE ENGINEER.
4.EQUIVALENT OPENINGS AREA SHALL APPLY THE DETAILS SHOWN ABOVE.
5.EQUIVALENT OPENINGS AREA SHALL INCLUDE RECTANGLE,TRIANGLE AND
POLYGON SHAPE.
NOTE:
1 2 3 4 5
58'-6"
12' 17'-3" 17'-3" 12'
PROJECT :
THREE AND HALF STOREY
1PC1 2PC1A 2PC1A 1PC1 1PC1 RESISDENCE
[CORNER OF 65TH & 110A STREET]
1'
1'
1'
1'
1'
C
3'-6"
3'-6"
3'-6"
3'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
C1 C2 C3 C4 C5
1' 2'-6" 4'-11" 4'-7" 4'-9" 4'-9" 1'-11" 1'-7" 1'-11" 1'-7" BLOCK NO.
3'-6" 9'-6" 3'-6" 3'-6"
9'-6"
LOT NO.
TOWNSHIP CHAN MYA THARSI, MANDALAY
17'-3"
SUBJECT :
3'-6" 9'-6" 9'-6" 3'-6" PILE CAP LAYOUT PLAN
1' 2'-6" 5' 4'-6" 4'-9" 4'-9" 1'-11" 1'-7" @LVL. +00'-00"
5'
5'
5'
B1 B2 B3 B4 1'-11" 1'-7" DATE : JUNE/2022 S-FM.01
34'-6"
9'-6"
9'-6"
9'-6"
9'-6"
B REVISION NO ( - ) DATE ( - )
4'-6"
4'-6"
4'-6"
4'-6"
B5 REVISION NO ( - ) DATE ( - )
9'-6"
2PC1A 4PC1 4PC1 2PC1 OWNER :
17'-3"
A1 A2 A3 A4 L.C :
1'-7" 1'-11"
1'-7" 1'-11"
1'-7" 1'-11"
2'
3'-6"
3'-6"
3'-6"
A
1'-6"
NOTE:
1. ALL PILE CAPS TO BE 48" THICK UNLESS STATED OTHERWISE.
2. ALL PILE CAP TOP LEVEL = 00'-00".
PILE CENTER TO CENTER SPACING = 6'
PILE CENTER TO EDGE DISTANCE = 21"
ALL DIMENSION ARE TO BE CHECKED AND VERIFIED ON SITE.
R.S.E / P.E (STRUCTURE) :
NOTE:
1 2 3 4 5
B A
58'-6"
12' 17'-3" 17'-3" 12'
PROJECT :
THREE AND HALF STOREY
RESISDENCE
C5 [CORNER OF 65TH & 110A STREET]
C
C1 C2 C3 C4
BLOCK NO.
LOT NO.
TOWNSHIP CHAN MYA THARSI, MANDALAY
17'-3"
SUBJECT :
RETAINING WALL LAYOUT PLAN
B REVISION NO ( - ) DATE ( - )
B5 REVISION NO ( - ) DATE ( - )
OWNER :
17'-3"
A1 A2 A3 L.C :
A
A4
1 2 3 4 5
58'-6"
12' 17'-3" 17'-3" 12'
8.25'
BLOCK NO.
GB1 T.L +1.5' LOT NO.
GMB1 T.L +1.5'
SUBJECT :
GB1 T.L +1.5'
GMB3
GMB2
GMB2
GMB1
GROUND FLOOR LAYOUT PLAN
@ LVL. +02'-06"
B UP
REVISION NO ( - ) DATE ( - )
GMB5 T.L +1.5'
B5 REVISION NO ( - ) DATE ( - )
OWNER :
T.L +1.5'
GMB3
GMB2
GMB2
17'-3"
GMB1
B2
GM
T.L +1.5'
GCB2
GCB1
GCB1
1'-10"
3'-6"
2"
SC1
SEE DETAILS AT SC1 STEEL
COLUMN BASE PLATE
CONNECTION
NOTE:
ALL R.C. BEAM TOP LEVEL TO BE +2.5' UNLESS OTHERWISE STATED.
1 2 3 4 5
58'-6" 5'-6"
12' 17'-3" 17'-3" 12'
PROJECT :
THREE AND HALF STOREY
C2 RESISDENCE
C1 FMB7 FMB2 C3 FMB2 C4 FMB4 C5 FCB2 [CORNER OF 65TH & 110A STREET]
C
LS1 BLOCK NO.
21'
LOT NO.
TOWNSHIP CHAN MYA THARSI, MANDALAY
17'-3"
S2 S2 S1 S1
SUBJECT :
FMB2
FMB3
FMB3
FMB3
FMB1
FB1
FIRST FLOOR LAYOUT PLAN
@ LVL. +15'-00"
B UP
REVISION NO ( - ) DATE ( - )
FB1
S1 S1 REVISION NO ( - ) DATE ( - )
5'-9"
B5
FMB4 FCB2
OWNER :
CS1
FMB3
FMB3
FMB3
S1 S2 S2
17'-3"
FMB2
9"
DAW JIT TOO MAR ZAW
FCB1
S1
SFB1
FB2
3'-10"
S1 S1
A1 A2 FMB2 A3 FMB2 A4 FCB1 L.C :
FB2
FMB2
A
FCB2
FCB2
2'-3"
SFB1
S1 S1
FB1 SC1
6'-3" 5'-9" SFB1
SEE DETAIL AT
PART PLAN OF
FFL
NOTE:
ALL R.C. BEAM & SLAB TOP LEVEL TO BE +15' UNLESS OTHERWISE STATED.
1 2 3 4 5
58'-6"
12' 17'-3" 17'-3" 12' 5'-6"
7'-10" PROJECT :
THREE AND HALF STOREY
C2 RESISDENCE
C1 SMB6 SMB2 C3 SMB2 C4 SMB4 C5 SCB3 [CORNER OF 65TH & 110A STREET]
C
LS1
S1
BLOCK NO.
SB3
7'-9"
26.67'
32.75'
26.5' LOT NO.
S1 S2 S1
SUBJECT :
SMB2
SMB3
SMB3
SMB3
SMB1
26.83'
SB3
SECOND FLOOR LAYOUT PLAN
@ LVL. +27'-00"
SB4
9'-6"
T.L 26.83'
SB3
UP B2 26.83' S1
B1 SMB6 SMB3 B3 SMB3 B4 SMB5 DATE : JUNE/2022 S-FM.05
34'-6"
B REVISION NO ( - ) DATE ( - )
S1 S1 S1
5'-9"
B5 REVISION NO ( - ) DATE ( - )
S1 SB1 SB1 SMB4 SCB3
OWNER :
1'-9.5" 2'
9"
S1 S1 CS1
S1 S1
SMB3
SMB3
SB4 SB2 SCB4
17'-3"
SB4 SB4
SMB2
SB2
T.L +26.5'
DAW JIT TOO MAR ZAW
S1 S1
SCB1
SB3
SB3
26.83' S1 S1 S1
8'-8"
S1 SMB9 S1
7'-6"
26.67' 26.67' 26.5'
26.67'
A2 A3 L.C :
A1 SMB6 T.L +26.67' SMB7 T.L +26.67' T.L +26.67' SMB8 A4 SCB2 T.L +26.5'
A
SCB4
SCB5
SCB5
S1 S1 S1
SCB3
SCB3
SCB3
3'-6"
3'-6"
S1 S1 S1 S1 26.5'
26.67' 26.67' 26.67'
NOTE:
ALL R.C. BEAM & SLAB TOP LEVEL TO BE +27' UNLESS OTHERWISE STATED.
1 2 3 4 5
58'-6"
12' 17'-3" 17'-3" 12' 4'-6"
TB2
S1 TOWNSHIP CHAN MYA THARSI, MANDALAY
TB3 T.L38.33' S1
17'-3"
S2
T.L 38'
TMB2
TMB1
TMB1
38'
4'-4.5"
TMB1
THIRD FLOOR LAYOUT PLAN
S1
@ LVL. +38'-06"
TB3
38.167'
TB3 38'
S1
SCALE : AS SHOWN SHEET NO :
4'-10"
38.33'
UP S1
LS1
B1 B2 TMB1 B3 TMB1 B4 TMB3 T.L38' DATE : JUNE/2022 S-FM.06
34'-6"
B REVISION NO ( - ) DATE ( - )
TMB5 S1
5'-9"
S1 38' B5 REVISION NO ( - ) DATE ( - )
S1
TMB3 T.L38' TCB3 T.L38'
TB2 OWNER :
S1 S1
TMB1
TMB2
TMB1
TMB1
S2
17'-3"
6'
DAW JIT TOO MAR ZAW
TB3 T.L38' TCB5 T.L38'
S1
T.L 38'
S1 S1
38'
TB3
6'
A1 TMB5 A2 TMB2 A3 TMB2 A4 TCB1 T.L38' L.C :
A
TCB2
3'-6"
S1 S1 S1
3'
38'
NOTE:
ALL R.C. BEAM & SLAB TOP LEVEL TO BE +38.5' UNLESS OTHERWISE STATED.
1 2 3 4 5
58'-6"
12' 17'-3" 17'-3" 12'
RMB2 T.L49.5'
S1
T.L49.5'
17'-3"
S2
SUBJECT :
RMB6
RMB5
S1
RB3
49.5'
RMB5
49.5' ROOF FLOOR LAYOUT PLAN
RB2
@ LVL. +50'-00"
10'
S1
SCALE : AS SHOWN SHEET NO :
LS1 DN B2
B1 RMB1 B3 RMB1 T.L49.5' B4 RCB2 T.L49.5' DATE : JUNE/2022 S-FM.07
34'-6"
B REVISION NO ( - ) DATE ( - )
RMB3
REVISION NO ( - ) DATE ( - )
OWNER :
T.L49.5'
RB2 T.L49.5'
RMB5
RMB6
RMB5
S2 S1
17'-3"
RMB2
S1 S2 49.5' 49.5'
DAW JIT TOO MAR ZAW
RCB4 T.L49.5'
RCB5
S1
RCB3
RCB1
RCB1
T.L49.5'
3'-6"
3'-6"
S1 S1 S1 49.5' 49.5'
RCB5
RB1 RB1 RB2 T.L49.5' T.L49.5'
NOTE:
ALL R.C. BEAM & SLAB TOP LEVEL TO BE +50' UNLESS OTHERWISE STATED.
1 2 3 4 5
58'-6"
12' 17'-3" 17'-3" 12'
5'-6" PROJECT :
THREE AND HALF STOREY
RTB2 C2 RESISDENCE
C1 RTB1 C3 [CORNER OF 65TH & 110A STREET]
C
BLOCK NO.
LOT NO.
TOWNSHIP CHAN MYA THARSI, MANDALAY
RTB1
RTB1
RTB1
CS1
17'-3"
S1 S2 SUBJECT :
ROOF TOP LAYOUT PLAN
@ LVL. +61'-06"
B REVISION NO ( - ) DATE ( - )
5'-9"
S1 CS1 REVISION NO ( - ) DATE ( - )
RSB1 OWNER :
RTB1
RTB1
RTB1
17'-3"
S1 S2
5'
DAW JIT TOO MAR ZAW
RSB1
3'-10"
CS1
6'-6"
S2
3'-6"
CS1 CS1
NOTE:
ALL R.C. BEAM & SLAB TOP LEVEL TO BE +61.5' UNLESS OTHERWISE STATED.
LS1 LS1
5'-6"
5'
8.25' 21'
PROJECT :
17'-3"
17'-3"
THREE AND HALF STOREY
SS1
SS1
SS1
SS1
RESISDENCE
[CORNER OF 65TH & 110A STREET]
BLOCK NO.
LOT NO.
TOWNSHIP CHAN MYA THARSI, MANDALAY
B1 B2 B1 B2
FMB6 SUBJECT :
B UP B UP PART PLAN OF STAIR CASE
GMB5
3
PART PLAN OF STAIR CASE AT LEVEL +8.25' PART PLAN OF STAIR CASE AT LEVEL +21' SCALE : 16"=1" SHEET NO :
DATE : JUNE/2022 S-FM.09
REVISION NO ( - ) DATE ( - )
REVISION NO ( - ) DATE ( - )
1 2 1 2 OWNER :
12' 12'
LS1 LS1
5'-6"
5'-6"
L.C :
32.75' 44.25'
17'-3"
17'-3"
SS1
SS1
SS1
SS1
UP UP LS1
2'-3"
2'-3"
B1 LS1 27' B2 B1 B2
38.5'
B B
R.S.E / P.E (STRUCTURE) :
SMB6 TMB5
PART PLAN OF STAIR CASE AT LEVEL +32.75' PART PLAN OF STAIR CASE AT LEVEL +44.25'
NOTE:
FCB2
FCB2
B5 CS1 B5 4 CS1
PROJECT :
FCB1
THREE AND HALF STOREY
RESISDENCE
FCB1
SFB1
SFB1
[CORNER OF 65TH & 110A STREET]
BLOCK NO.
A4 A4
LOT NO.
FCB1 FCB1
A A
TOWNSHIP CHAN MYA THARSI, MANDALAY
4
SFB1
SUBJECT :
SFB1
PART PLAN OF FIRST FLOOR
2 3 (STEEL BEAM FRAMING PLAN &
SFB1 CONNECTION LAYOUT PLAN)
SC1 SFB1 SC1 1
3
SCALE : 16"=1" SHEET NO :
DATE : JUNE/2022 S-FM.10
PART PLAN OF FIRST FLOOR (STEEL BEAM LAYOUT PLAN) PART PLAN OF FIRST FLOOR (CONNECTION LAYOUT PLAN)
REVISION NO ( - ) DATE ( - )
REVISION NO ( - ) DATE ( - )
STEEL COLUMN & BEAM SCHEDULE FOR HOT ROLLED SECTION
OWNER :
tf
bf
JIS SS400 Fy 36,000 PSI
Fu 58,000 PSI I SECTION h
2 bf
MARK SIZE H(MM) B(MM) Tw(MM) Tf (MM) SECTIONAL AREA(CM ) UNIT MASS (KG/M) tw
tw DAW JIT TOO MAR ZAW
tf
h
SC1 250x125x6x9 250 125 6 9 37 29.6
SFB1 250x125x6x9 250 125 6 9 37 29.6
L.C :
1.25"
4/16 SS400
16MM THK; PLATE
2.75" SS400 f'c = 3000psi(G20.69) FOR COLUMN, WALL & PILECAP
4/16 PL 0.63x5 1/4x14.34
16MM THK; PLATE
Hole type (connector):Standard (STD) 4/16 1.25" 1.25" PL 0.63x5 1/4x14.34 fy = 58000psi(HRB400) For ALL REINFORCING BARS
Bolts:M16 G_8_8 3/16 4/16
1.25"
AND ALL CAST-IN REBAR
1"
2.8543"
4/16 2.ALL STRUCTURAL DRAWINGS SHALL BE READ IN
4/16 CONJUCTION WITH THE ARCHITECTURAL DRAWINGS
14.34"
1.25"
2.75"
4/16
5"
6.6339"
14.34"
4/16 4/16
10" SFB1
H250X125 SFB1 4/16
H250X125
2.8543"
1.25"
SC1
H250X125 5.25"
1"
5.25"
SC1
H250X125
PROJECT :
2. SC1 250x125x6x9 COLUMN & SFB1 250x125x6x9 BEAM WEB SHEAR CONNECTION THREE AND HALF STOREY
RESISDENCE
4/16 [CORNER OF 65TH & 110A STREET]
4/16 Hole type (beam):Standard (STD) 2.3425" 2"
1.5"
1.5"
1.5"
Hole type (connector):Standard 1.5" 1.5"
(STD) 6Bolts:M16 G_8_8 BLOCK NO.
2.57"
1.5" 2" 1.5"
2x2.35 in=4.7
2x2.35 in=4.7
9.1338"
LOT NO.
7.7"
7.7"
10"
0.7169"
TOWNSHIP CHAN MYA THARSI, MANDALAY
SFB1
H250X125 SFB1 0.394 in
SC1 5" H250X125 SUBJECT :
H250X125 SS400 SS400
SC1 10MM THK; PLATE 10MM THK; PLATE STEEL CONNECTION DETAILS - 1
H250X125 PL 0.394x5x7.7 PL 0.394x5x7.7
3
SCALE : 4 "=1' SHEET NO :
TOP VIEW SIDE VIEW FRONT VIEW PLATE DETAIL
DATE : JUNE/2022 S-SCD.01
REVISION NO ( - ) DATE ( - )
3. SFB1 250x125x6x9 GIRDER & SFB1 250x125x6x9 BEAM SHEAR CONNECTION
REVISION NO ( - ) DATE ( - )
1.5" 3/16
2.35" 3/16 OWNER :
0.75"
1.5"
2.57"
1.5"
2x2.35 in=4.7
1.5"
7.7"
2.57"
7.7"
DAW JIT TOO MAR ZAW
2.35 in
SFB1 SFB1 0.256 in
H250X125 SFB1 3.85"
H250X125 Hole type (beam):Standard (STD) 3.85"
H250X125
SS400 Hole type (connector):Standard (STD)
6.5 MM THK; PLATE 3Bolts:M16 G_8_8 SS400
SFB1 PL 0.256x3.85x7.7 6.5 MM THK; PLATE
H250X125 PL 0.256x3.85x7.7 L.C :
1.5"
GMS PL 0.7874x10x10 SS400
5/16 5/16 20 MM THK; PLATE
7.7"
5/16 5/16 GMS PL 0.7874x10x10
1.5" 3/16 10"
3/16
3.85"
2"
2.57"
2"
1.5"
2x2.35 in=4.7
3"
SS400
6"
7.7"
10"
2.35 in
2.57"
23"
2"
H250X125 23"
0.5"
3.85"
SFB1 0.256 in
H250X125
SS400 Hole type (beam):Standard (STD)
6.5 MM THK; PLATE Hole type (connector):Standard (STD)
PL 0.256x3.85x7.7 3Bolts:M16 G_8_8
M-16
SC1 SC1
3.01"
3.83"
20" H250X125 H250X125
18"
1.18
SS 400
15.01"
M-16
3'
30MM THK; PLATE
12"
PL10x18x1.18
PROJECT :
2.5"
RESISDENCE
5"
3"
20"x20" 20"x20"
TOWNSHIP CHAN MYA THARSI, MANDALAY
SUBJECT :
TOP VIEW FRONT VIEW SIDE VIEW ANCHOR DETAIL STEEL CONNECTION DETAILS - 2
(BASE PLATE CONNECTION)
3
SCALE : 4 "=1' SHEET NO :
DATE : JUNE/2022 S-SCD.02
REVISION NO ( - ) DATE ( - )
REVISION NO ( - ) DATE ( - )
OWNER :
L.C :
FMB1 12x18 9T18 4T18 9T18 4T18 5T18 4T18 - T10-3IN D.S T10-6IN D.S T10-3IN D.S SMRF
BLOCK NO.
FMB2 12x18 5T18 3T18 5T18 3T18 5T18 3T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S SMRF
LOT NO.
FMB4 12x16 5T18 4T18 5T18 4T18 4T18 4T18 - T10-3IN D.S T10-6IN D.S T10-3IN D.S SMRF
TOWNSHIP CHAN MYA THARSI, MANDALAY
FMB5 12x16 4T18 2T18 4T18 2T18 3T18 2T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S SMRF
SUBJECT :
FCB1,TCB2 12x18 5T18 5T18 5T18 4T18 4T18 4T18 - T10-3IN D.S T10-3IN D.S T10-3IN D.S CANTILEVER
RCB1 R.C DETAIL FOR BEAM - 1
FCB2 12x16 5T18 5T18 5T18 4T18 4T18 4T18 - T10-3IN D.S T10-3IN D.S T10-3IN D.S CANTILEVER
FCB3,SCB3 12x16 4T18 4T18 4T18 3T18 3T18 3T18 - T10-3IN S.S T10-3IN S.S T10-3IN S.S CANTILEVER SCALE : SHEET NO :
TCB3 JUNE/2022 S-RBD.01
DATE :
FB1 10x16 2T18 2T18 2T18 2T18 3T18 2T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S
REVISION NO ( - ) DATE ( - )
FB2 10x12 2T18 2T18 2T18 2T18 2T18 2T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S
REVISION NO ( - ) DATE ( - )
SMB1 12x24 8T18 4T18 8T18 4T18 5T18 4T18 2T12 E.F T10-4IN D.S T10-6IN D.S T10-4IN D.S SMRF
OWNER :
SMB2 12x18 4T18 2T18 4T18 3T18 5T18 3T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S SMRF
SMB4,TMB3 12x16 4T18 2T18 4T18 3T18 3T18 3T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S SMRF
SMB5 12x16 3T18 2T18 3T18 2T18 3T18 2T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S SMRF DAW JIT TOO MAR ZAW
SCB1 12x24 7T18 7T18 7T18 4T18 4T18 4T18 2T12 E.F T10-4IN D.S T10-4IN D.S T10-4IN D.S CANTILEVER
SCB2 12x18 7T18 7T18 7T18 4T18 4T18 4T18 - T10-3IN D.S T10-3IN D.S T10-3IN D.S CANTILEVER
SCB4 12x16 3T18 3T18 3T18 3T18 3T18 3T18 - T10-3IN S.S T10-3IN S.S T10-3IN S.S CANTILEVER L.C :
SB1 12x16 4T18 2T18 4T18 3T18 3T18 3T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S
SB2,TB2 12x16 3T18 2T18 3T18 2T18 3T18 2T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S
SB3,RTB1 10x16 3T18 2T18 3T18 2T18 3T18 2T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S
SCB5 10x16 3T18 3T18 3T18 3T18 3T18 3T18 - T10-3IN S.S T10-3IN S.S T10-3IN S.S CANTILEVER
TMB2 12x18 4T18 2T18 4T18 2T18 3T18 2T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S SMRF R.S.E / P.E (CONSTRUCTION) :
TCB1 12x22 7T18 7T18 7T18 5T18 5T18 5T18 - T10-4IN D.S T10-4IN D.S T10-4IN D.S CANTILEVER
TCB4 12x18 4T18 4T18 4T18 3T18 3T18 3T18 - T10-3IN S.S T10-3IN S.S T10-3IN S.S CANTILEVER
TB1 10x18 3T18 2T18 3T18 2T18 3T18 2T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S
TCB5,RCB4 10x12 3T18 3T18 3T18 2T18 2T18 2T18 - T10-3IN S.S T10-3IN S.S T10-3IN S.S CANTILEVER
RMB1 12x16 5T18 4T18 5T18 4T18 5T18 4T18 - T10-3IN D.S T10-6IN D.S T10-3IN D.S SMRF
R.S.E / P.E (STRUCTURE) :
RMB2 10x16 4T18 2T18 4T18 2T18 3T18 2T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S SMRF
RMB6 10x18 4T18 2T18 4T18 2T18 3T18 2T18 - T10-3IN S.S T10-6IN S.S T10-3IN S.S SMRF
RCB2 12x14 4T18 4T18 4T18 3T18 3T18 3T18 - T10-3IN S.S T10-3IN S.S T10-3IN S.S CANTILEVER
NOTE:
PROJECT :
REINFORCEMENT SCHEDULE FOR LANDING BEAM THREE AND HALF STOREY
RESISDENCE
SIZE TOP REINFORCEMENT BAR BOTTOM REINFORCEMENT BAR [CORNER OF 65TH & 110A STREET]
MARK SIDE BAR(g) LINKS 1 LINKS 2 LINKS 3 TYPE
(BxD) LEFT(a) MID(b) RIGHT(c) LEFT(a) MID(b) RIGHT(c)
LB1 12x14 4T18 2T18 4T18 3T18 3T18 3T18 - T10-4IN S.S T10-6IN S.S T10-4IN S.S LANDING BLOCK NO.
LB2 12x14 3T18 2T18 3T18 2T18 3T18 2T18 - T10-4IN S.S T10-6IN S.S T10-4IN S.S LANDING LOT NO.
TOWNSHIP CHAN MYA THARSI, MANDALAY
SUBJECT :
R.C DETAIL FOR BEAM - 2
TOP REINFORCEMENT
SCALE : SHEET NO :
DATE : JUNE/2022 S-RBD.02
REVISION NO ( - ) DATE ( - )
REVISION NO ( - ) DATE ( - )
L.C :
STIRRUP TYPES
NOTE: FOR SEISMIC RESISTING FRAME BEAMS, THE FOLLOWING ARE TO BE PROVIDED:
-ALL TRANSVERSE REINFORCEMENT IS TO BE CLOSED HOOP.
-LAP SPLICES, IF REQUIRED, ARE TO BE EQUAL TO F.T.L FOR BOTH TOP AND BOTTOM R.S.E / P.E (CONSTRUCTION) :
REINFORCEMENT.
-LAP SPLICES SHALL NOT TO BE USED:
(A) WITHIN THE JOINTS
(B) WITHIN A DISTANCE OF TWICE THE MEMBER DEOTH FROM THE FACE OF THE
JOINT.
-SPLICING OF REINFORCEMENT SHALL BE LIMITED TO 50% OF THE TOTAL AMOUNT OF
REINFORCEMENT AT THE SECTION.
-ALL BOTTOM REINFORCEMENT IS TO BE ANCHORED TO THE SUPPORT OF A LENGTH
OF F.T.A MAXIMUM.
-IF THERE ARE MORE THAN FIVE TOP REINFORCEMENT IN THE UPPER LAYER OF THE R.S.E / P.E (STRUCTURE) :
BEAM, THE REMAINING REINFORCEMENTS MUST BE ADDED TO THE SECOND LAYER.
-MINIMUM CLEAR DISTANCE BETWEEN BARS IN LAYERS IS 1 IN.
-ALL CONCRETE WORK SHALL CONFORM TO ACI 318-14 BUILDING CODE.
-F'c = 3000PSI(G20.6) @ 28 DAYS MAX AGGREGATE SIZE = 34 IN .
-REINFORCING STEEL SHELL CONFORM TO 50000PSI(HRB400).
-PLACE MAIN REINFORCING REBAR SO THAT REBAR IS 1.5 IN CLEAR IN BEAM.
NOTE:
F.T.L
4T18 4T18 4T18
4T18 4T18 4T18
T10-3IN D.S T10-3IN S.S T10-5IN S.S T10-3IN S.S T10-3IN D.S T10-3IN D.S T10-5IN D.S T10-3IN D.S T10-3IN D.S
18"
18"
18"
BLOCK NO.
14"
14"
14"
LOT NO.
SECTION 1-1 SECTION 2-2 SECTION 3-3 SECTION 4-4 SECTION 5-5 SECTION 6-6 TOWNSHIP CHAN MYA THARSI, MANDALAY
OWNER :
4T18 4T18
4T18
T10-3IN D.S T10-3IN D.S T10-5IN D.S T10-3IN D.S
14"
18"
18"
18"
18"
RMB5 STIRRUPS: T10-3IN D.S STIRRUPS: T10-6IN D.S
STIRRUPS: T10-3IN D.S STIRRUPS: T10-6IN D.S
BOTTOM REIN: 4T18 BOTTOM REIN: 5T16 BOTTOM REIN: 4T18 BOTTOM REIN: 5T18
PROJECT :
THREE AND HALF STOREY
GMB2 FMB2
18"
18"
18"
18"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S RESISDENCE
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S [CORNER OF 65TH & 110A STREET]
BOTTOM REIN: 3T18 BOTTOM REIN: 3T18 BOTTOM REIN: 3T18 BOTTOM REIN: 5T18
BLOCK NO.
12" 12"
LOT NO.
12" 12"
TOP REIN: 5T18 TOP REIN: 4T18
TOP REIN: 5T18 TOP REIN: 4T18 TOWNSHIP CHAN MYA THARSI, MANDALAY
18"
GMB3,FMB3
16"
16"
R.C DETAIL FOR BEAM - 4
SMB3,TMB1 STIRRUPS: T10-3IN D.S STIRRUPS: T10-6IN D.S STIRRUPS: T10-3IN D.S STIRRUPS: T10-6IN D.S
BOTTOM REIN: 4T18 BOTTOM REIN: 5T18 BOTTOM REIN: 4T18 BOTTOM REIN: 4T18 1
SCALE : 2 "=1' SHEET NO :
DATE : JUNE/2022 S-RBD.04
12" 12"
12" 12" REVISION NO ( - ) DATE ( - )
TOP REIN: 4T18 TOP REIN: 2T18
TOP REIN: 3T18 TOP REIN: 2T18
GMB4, FMB7, REVISION NO ( - ) DATE ( - )
TMB5, RMB3 FMB5
16"
16"
14"
14"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S OWNER :
BOTTOM REIN: 2T18 BOTTOM REIN: 3T18 BOTTOM REIN: 2T18 BOTTOM REIN: 3T18
FCB1,TCB2 L.C :
18"
18"
GMB5, SMB6
14"
14"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S STIRRUPS: T10-3IN D.S STIRRUPS: T10-3IN D.S
RCB1
BOTTOM REIN: 3T18 BOTTOM REIN: 3T18 BOTTOM REIN: 4T18 BOTTOM REIN: 4T18
12" 12"
12" 12"
TOP REIN: 5T18 TOP REIN: 5T18
TOP REIN: 5T18 TOP REIN: 5T18
18"
16"
16"
STIRRUPS: T10-3IN D.S STIRRUPS: T10-3IN D.S STIRRUPS: T10-3IN D.S STIRRUPS: T10-3IN D.S
BOTTOM REIN: 4T18 BOTTOM REIN: 4T18 BOTTOM REIN: 4T18 BOTTOM REIN: 4T18
12" 12"
10" 10"
TOP REIN: 4T18 TOP REIN: 4T18
TOP REIN: 3T18 TOP REIN: 2T18
GB1,SB4,RB3 R.S.E / P.E (STRUCTURE) :
FCB3,SCB3
TB3,RMB4,
16"
16"
12"
12"
24"
24"
16"
16"
SIDE BARS : 2T12 (E.F) SIDE BARS : 2T12 (E.F)
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S
STIRRUPS: T10-4IN D.S STIRRUPS: T10-4IN D.S
12" 12"
TOP REIN: 5T18 TOP REIN: 5T18
10" 10"
TOP REIN: 2T18 TOP REIN: 2T18 PROJECT :
ADD. TOP REIN: 2T18 ADD. TOP REIN: 2T18 THREE AND HALF STOREY
FB2 SCB2
18"
18"
RESISDENCE
12"
12"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S STIRRUPS: T10-3IN D.S STIRRUPS: T10-3IN D.S [CORNER OF 65TH & 110A STREET]
BOTTOM REIN: 2T18 BOTTOM REIN: 2T18 BOTTOM REIN: 4T18 BOTTOM REIN: 4T18
BLOCK NO.
16"
16"
R.C DETAIL FOR BEAM - 5
24"
24"
SIDE BARS : 2T12 (E.F) SIDE BARS : 2T12 (E.F) STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S
REVISION NO ( - ) DATE ( - )
SMB2 SB1
18"
18"
16"
16"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S OWNER :
BOTTOM REIN: 3T18 BOTTOM REIN: 5T18 BOTTOM REIN: 3T18 BOTTOM REIN: 3T18
16"
16"
16"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S
BOTTOM REIN: 3T18 BOTTOM REIN: 3T18 BOTTOM REIN: 2T18 BOTTOM REIN: 3T18
16"
16"
16"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S
BOTTOM REIN: 2T18 BOTTOM REIN: 3T18 BOTTOM REIN: 3T18 BOTTOM REIN: 3T18
16"
TMB2
18"
18"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S
22"
SIDE BARS : 2T12 (E.F) SIDE BARS : 2T12 (E.F)
14"
14"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S
STIRRUPS: T10-4IN D.S STIRRUPS: T10-4IN D.S
18"
18"
18"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S
[CORNER OF 65TH & 110A STREET]
BOTTOM REIN: 3T18 BOTTOM REIN: 3T18 BOTTOM REIN: 3T18 BOTTOM REIN: 3T18 BLOCK NO.
LOT NO.
10" 10" 9" 9"
TOP REIN: 3T18 TOP REIN: 2T18 TOP REIN: 3T18 TOP REIN: 2T18 TOWNSHIP CHAN MYA THARSI, MANDALAY
SUBJECT :
TB1 RB1 R.C DETAIL FOR BEAM - 6
18"
18"
18"
18"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S
1
BOTTOM REIN: 2T18 BOTTOM REIN: 2T18 BOTTOM REIN: 2T18 BOTTOM REIN: 3T18 SCALE : 2 "=1' SHEET NO :
DATE : JUNE/2022 S-RBD.06
REVISION NO ( - ) DATE ( - )
10" 10" 9" 9"
TOP REIN: 3T18 TOP REIN: 3T18 TOP REIN: 3T18 TOP REIN: 2T18
REVISION NO ( - ) DATE ( - )
TCB5,RCB4 RB2
OWNER :
12"
12"
12"
12"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S
BOTTOM REIN: 2T18 BOTTOM REIN: 2T18 BOTTOM REIN: 2T18 BOTTOM REIN: 3T18
DAW JIT TOO MAR ZAW
12" 12"
TOP REIN: 5T18 TOP REIN: 4T18 9" 9"
TOP REIN: 3T18 TOP REIN: 3T18
RMB1 RCB5 L.C :
16"
16"
12"
12"
STIRRUPS: T10-3IN D.S STIRRUPS: T10-6IN D.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S
BOTTOM REIN: 4T18 BOTTOM REIN: 5T18 BOTTOM REIN: 2T18 BOTTOM REIN: 2T18
10" 10"
TOP REIN: 4T18 TOP REIN: 2T18 9" 9"
TOP REIN: 2T18 TOP REIN: 2T18 R.S.E / P.E (CONSTRUCTION) :
RMB2 RSB1
16"
16"
12"
12"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S
BOTTOM REIN: 2T18 BOTTOM REIN: 3T18 BOTTOM REIN: 2T18 BOTTOM REIN: 3T18
20" 20"
10" 10"
TOP REIN: 6T18 TOP REIN: 6T18
TOP REIN: 4T18 TOP REIN: 2T18
RMB6 R.S.E / P.E (STRUCTURE) :
GCB2
20"
20"
SIDE BARS : 2T12 (E.F) SIDE BARS : 2T12 (E.F)
18"
18"
BOTTOM REIN: 2T18 BOTTOM REIN: 3T18 BOTTOM REIN: 4T18 BOTTOM REIN: 4T18
NOTE:
LANDING BEAM CROSS SECTION DETAIL
1.MATERIAL STRENGTH FOR STRUCTURAL MEMBERS:
BEAM TYPE f'c = 3000psi(G20.69) FOR BEAM & SLAB
AT END SUPPORT AT MID SPAN f'c = 3000psi(G20.69) FOR COLUMN, WALL & PILECAP
fy = 58000psi(HRB400) For ALL REINFORCING BARS
AND ALL CAST-IN REBAR
2.ALL STRUCTURAL DRAWINGS SHALL BE READ IN
12" 12"
CONJUCTION WITH THE ARCHITECTURAL DRAWINGS
TOP REIN: 4T18 TOP REIN: 2T18
LB1
14"
14"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S
12" 12"
TOP REIN: 3T18 TOP REIN: 2T18 PROJECT :
THREE AND HALF STOREY
LB2 RESISDENCE
[CORNER OF 65TH & 110A STREET]
14"
14"
STIRRUPS: T10-3IN S.S STIRRUPS: T10-6IN S.S
SUBJECT :
R.C DETAIL FOR BEAM - 7
1
SCALE : 2 "=1' SHEET NO :
DATE : JUNE/2022 S-RBD.07
REVISION NO ( - ) DATE ( - )
REVISION NO ( - ) DATE ( - )
OWNER :
L.C :
COLUMN STRIP
CONJUCTION WITH THE ARCHITECTURAL DRAWINGS
T10-6IN
T10-6IN
0.25L
0.25L
T16-8IN(B) Additional
MIDDLE STRIP
MIDDLE STRIP
PARTITION WALL
t+8"
T10-6IN
T10-6IN
t
T & B REINFORCEMENT
SCHEDULE
COLUMN STRIP
COLUMN STRIP
T10-6IN
T10-6IN
0.25L
0.25L
PROJECT :
THREE AND HALF STOREY
SHORT SPAN (L) RESISDENCE
TO BE ONE SIZE BIGGER [CORNER OF 65TH & 110A STREET]
THAN AS SHOWN IN SLAB
T10-6IN T10-3IN T10-6IN T10-6IN T10-6IN T10-6IN
TYPICAL TOP REINFORCEMENT PLAN TYPICAL BOTTOM REINFORCEMENT PLAN BLOCK NO.
ADDITIONAL SLAB REINFORCEMENT UNDER PARTITION WALL
LOT NO.
TOWNSHIP CHAN MYA THARSI, MANDALAY
SUBJECT :
R.C DETAIL FOR SLAB & STAIR - 1
0.3 GRATER "L"
0.3(L1) 1
F.T.A SCALE : 2 "=1' SHEET NO :
. A
2" CLR
REVISION NO ( - ) DATE ( - )
4"
3
THICK REINFORCEMENT
T
MARK NESS LAYER SHORTER DIRECTION LONGER DIRECTION REMARK L.C :
(IN) COLUMN STRIP MIDDLE STRIP COLUMN STRIP MIDDLE STRIP
TOP T10-6IN T10-6IN T10-6IN T10-6IN
S1 5 TWO WAY
BOTTOM T10-6IN T10-6IN T10-6IN T10-6IN
TOP T10-6IN T10-3IN T10-6IN T10-3IN MAIN REINFORCEMENT
S2 5 TWO WAY
BOTTOM T10-6IN T10-6IN T10-6IN T10-6IN DISTRIBUTED REINFORCEMENT
TOP T10-3IN T10-3IN T10-3IN T10-3IN
CS1 5 CANTILEVER
BOTTOM T10-6IN T10-6IN T10-6IN T10-6IN
TYPICAL STAIR SECTION R.S.E / P.E (CONSTRUCTION) :
REINFORCEMENT SCHEDULE FOR LANDING SLAB
THICK REINFORCEMENT
MARK NESS MAIN REINFORCEMENT DISTRIBUTION REINFORCEMENT REMARK
(IN) (EACH FACE) (EACH FACE)
LS1 6 T12-6IN T12-6IN -
FLIGHT-2 FLIGHT-2
FOR CLARITY
FLIGHT-2 BLOCK NO.
STEP REINFORCEMENT
3T10
FLIGHT-1 STEP REINFORCEMENT
LOT NO.
LB2 LVL. (+32'-09")
T10-8IN
STAIR-3 TOWNSHIP CHAN MYA THARSI, MANDALAY
SUBJECT :
5'-9"
MAIN REINFORCEMENT
T12-6IN
6'
FLIGHT-1
LB1
LVL. (+15'-00")
L.C :
FMB7 FMB6
BEAM REINFORCEMENT
NOT SHOWN FOR CLARITY
6'-9"
FLIGHT-2
MAIN REINFORCEMENT
T12-6IN
LVL. (+8'-03")
LB1 DISTRIBUTION REINFORCEMENT
LB1 T12-6IN
STAIR-1
STEP REINFORCEMENT
R.S.E / P.E (CONSTRUCTION) :
3T10
BEAM REINFORCEMENT STEP REINFORCEMENT
NOT SHOWN FOR CLARITY T10-8IN
6'-9"
FLIGHT-1
FLIGHT-1
LVL. (+01'-06")
GMB4 S-RBD.03
1'-6"
BEAM REINFORCEMENT
STAIR SECTION NOT SHOWN
1 Scale: 3/16 " = 1'-0"
FOR CLARITY
STAIR-2 DETAILS
SCALE : 14 "=1'
NOTE:
FLIGHT-2
LB2
PROJECT :
BEAM REINFORCEMENT
NOT SHOWN FOR CLARITY
THREE AND HALF STOREY
RESISDENCE
[CORNER OF 65TH & 110A STREET]
MAIN REINFORCEMENT
LB2 T12-6IN
DISTRIBUTION REINFORCEMENT BLOCK NO.
T12-6IN
LOT NO.
STEP REINFORCEMENT
3T10
BEAM REINFORCEMENT TOWNSHIP CHAN MYA THARSI, MANDALAY
NOT SHOWN FOR CLARITY STEP REINFORCEMENT
T10-8IN
SUBJECT :
FLIGHT-1 R.C DETAIL FOR SLAB & STAIR - 3
1
SCALE : 4" = 1' SHEET NO :
SMB6 DATE : JUNE/2022 S-RSD.03
BEAM REINFORCEMENT REVISION NO ( - ) DATE ( - )
NOT SHOWN
FOR CLARITY
REVISION NO ( - ) DATE ( - )
OWNER :
STAIR 3 & 4 DETAILS
L.C :
6"
CONJUCTION WITH THE ARCHITECTURAL DRAWINGS
12"
C
6"
10"
8"
C
10"
A A B
8"
6"
6"
6"
COLUMN SIZE 14"x14" COLUMN SIZE 14"x14" COLUMN SIZE 16"x16" COLUMN SIZE 16"x16" COLUMN SIZE 16"x18"
SECOND FLOOR LEVEL MAIN BAR 8-T18 MAIN BAR 8-T18 MAIN BAR 8-T18 MAIN BAR 8-T18 MAIN BAR 10-T18
TIE BAR, So T10@4IN TIE BAR, So T10@4IN TIE BAR, So T10@4IN TIE BAR, So T10@4IN TIE BAR, So T10@4IN
LVL. +27'-00"
TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN
PROJECT :
SECOND FLOOR LEVEL THREE AND HALF STOREY
1 2 2 2 RESISDENCE
LVL. +27'-00" 1
[CORNER OF 65TH & 110A STREET]
6" 10" 10" 6" 10" 6" 12" 6"
6" 10"
6"
BLOCK NO.
12"
12"
C
10"
6"
C LOT NO.
1'
A A B
10"
6"
6"
6"
TOWNSHIP CHAN MYA THARSI, MANDALAY
SUBJECT :
COLUMN SIZE 16"x16" COLUMN SIZE 16"x16" COLUMN SIZE 16"x18" COLUMN SIZE 16"x18" COLUMN SIZE 18"x18" R.C DETAIL FOR COLUMN - 1
PILE CAP TOP LEVEL MAIN BAR 10-T18 MAIN BAR 10-T18 MAIN BAR 10-T18 MAIN BAR 10-T18 MAIN BAR 16-T18
TIE BAR, So T10@4IN TIE BAR, So T10@4IN TIE BAR, So T10@4IN TIE BAR, So T10@4IN TIE BAR, So T10@4IN
LVL. 00'-00" 1
TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN SCALE : 2 "=1' SHEET NO :
LEVEL/FLOOR DATE : JUNE/2022 S-RCD.01
C1 A1 C2 A2 B2
COLUMN NO. REVISION NO ( - ) DATE ( - )
REVISION NO ( - ) DATE ( - )
ROOF TOP LEVEL
3 OWNER :
LVL. +61'-06"
8" 8"
B
6"
L.C :
COLUMN SIZE 16"x16"
THIRD FLOOR LEVEL MAIN BAR 12-T18
TIE BAR, So T10@4IN
LVL. +38'-06"
TIE BAR, Se T10@6IN
THIRD FLOOR LEVEL THIRD FLOOR LEVEL 5
3 5
LVL. +38'-06" LVL. +38'-06"
B 10" 6"
3'-9"
C
10"
2'
B
6"
6"
10"
10"
C
B A
10"
6"
6"
COLUMN SIZE 16"x16" COLUMN SIZE 16"x16" COLUMN SIZE 16"x16"
PILE CAP TOP LEVEL MAIN BAR 12-T18 MAIN BAR 10-T18 MAIN BAR 10-T18
TIE BAR, So T10@4IN TIE BAR, So T10@4IN TIE BAR, So T10@4IN
LVL. 00'-00"
TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN
PROJECT :
LEVEL/FLOOR THREE AND HALF STOREY
B1 C3 A3 RESISDENCE
COLUMN NO. [CORNER OF 65TH & 110A STREET]
12"
C 10" SUBJECT :
10"
6"
1
SCALE : 2 "=1' SHEET NO :
COLUMN SIZE 16"x16" COLUMN SIZE 16"x20" COLUMN SIZE 16"x18"
PILE CAP TOP LEVEL MAIN BAR 12-T18 MAIN BAR 14-T18 MAIN BAR 14-T18 DATE : JUNE/2022 S-RCD.02
TIE BAR, So T10@4IN TIE BAR, So T10@4IN TIE BAR, So T10@4IN
LVL. 00'-00" REVISION NO ( - ) DATE ( - )
TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN TIE BAR, Se T10@6IN
LEVEL/FLOOR REVISION NO ( - ) DATE ( - )
C4 A4 B4
COLUMN NO. OWNER :
L.C :
1 2
PROJECT :
3'-6" THREE AND HALF STOREY
9'-6"
RESISDENCE
1'-9" 1'-9" 1'-9" 6' 1'-9" [CORNER OF 65TH & 110A STREET]
1'-9"
1'-9"
BLOCK NO.
3'-6"
3'-6"
A A
1'-9"
1'-9"
LOT NO.
TOWNSHIP CHAN MYA THARSI, MANDALAY
1 2
3
SCALE : 16"=1" SHEET NO :
DATE : JUNE/2022 S-PC.01
T22-5IN
T22-6IN
A A
REVISION NO ( - ) DATE ( - )
T22-5IN T22-6IN
REVISION NO ( - ) DATE ( - )
OWNER :
1PC1 (TOP REINFORCEMENT PLAN) 2PC1 (TOP REINFORCEMENT PLAN)
T22-5IN
L.C :
T22-5IN
A A
T22-5IN T22-5IN
F.T.L
40D
40D
F.T.L
F.T.L
F.T.L
4'
4'
3"
4"
4"
T22-5IN T22-5IN
3IN THK; LEAN CONCRETE 3IN THK; LEAN CONCRETE
6IN THK; HARD CORE 6IN THK; HARD CORE
Ø24IN MINI-BORED PILE Ø24IN MINI-BORED PILE
1PC1 (SECTION) 2PC1 (SECTION)
NOTE:
1'-9"
1'-9"
C
3'-6"
1'-9"
9'-6"
6'
B
1'-9"
RESISDENCE
[CORNER OF 65TH & 110A STREET]
A
T22-5IN SUBJECT :
R.C DETAIL FOR PILE CAP - 2
T22-6IN
REVISION NO ( - ) DATE ( - )
2
OWNER :
T22-6IN
T22-5IN
RC COLUMN
COLUMN TIE (MIN4IN)
RC COLUMN T22-6IN
COLUMN TIE (MIN4IN) TIE BAR T12-5IN
T22-5IN
R.S.E / P.E (CONSTRUCTION) :
TIE BAR T12-5IN STREET LEVEL (00'-00")
STREET LEVEL (00'-00")
F.T.L
B
T22-5IN
40D
F.T.L
F.T.L
4'
F.T.L
40D
F.T.L
F.T.L
4'
3"
4"
3"
4"
T22-5IN T22-5IN
3IN THK; LEAN CONCRETE
6IN THK; HARD CORE
T22-5IN
3IN THK; LEAN CONCRETE Ø24IN MINI-BORED PILE
R.S.E / P.E (STRUCTURE) :
6IN THK; HARD CORE
Ø24IN MINI-BORED PILE
4PC1 (BOTTOM REINFORCEMENT PLAN) 4PC1 (SECTION)
2PC1A (SECTION)