ANNEX - 1

Following are the base prices for selected materials, considered in


deriving the rates in B.S.R. Please note that all the price given
herein are an average indicative price adopted for the rate analysis
and inclusive of a transport cost for bulky items.The prices given
herein are for information only.

PRICE LIST - 2012 Without VAT

BRASS FITTINGS

"UNION" BRAND

Hinges Stainless steel 102 x 76 x 2mm ;Union Brand Model no. -


1 Pair
X8203-BB-2

Hinges Stainless steel 102 x 76 x 3mm ;Union Brand Model no. -


2 Pair
X8203-BB-3

Hinges Stainless steel 127 x 89 x 3mm ;Union Brand Model no. -


3 Pair
X8205-BB-3

4 Mortice door lock single - Union Brand Model no. -678.24.95 CH No.

Mortice door lock double - Raniyo Brand, Model No.-965.41.94


5 No.
CH
6 Night latch lock - Union Brand Model no. -1028 WEPL No.

7 Night latch lock - Union Brand Model no. -1022 SEPL No.

8 Cylindrical door lock - Union Brand Model no. -96300-SS No.

9 Hydraulic door closer - Union Brand Model no. -8823 SIL No.

10 Rim lock - Raniyo Brand Model no. - 1445 No.

11 Male / Female Symbol - Union Brand Model no. -200SS No.

12 Disabled Symbol -SS - Union Brand No.

13 Floor Hinge - Union Brand Model no. - 8300 No.

14 Door closer - Union Brand Model no. - 8573 No.

"M.M.NOORBHOY "

Engineering Organization Price List - Page 1 BSR 2012


4" x 2 1/2" x 2.5mm thick Hinges - Solid Brass with-out ball
15 No.
bearing & inclusive of screws

4" x 3" x 2.5mm thick Hinges - Solid Brass with-out ball bearing &
16 No.
inclusive of screws

5" x 3" x 2.5mm thick Hinges - Solid Brass with-out ball bearing &
17 No.
inclusive of screws

18 Casement fasteners - Solid Brass inclusive of screws No.

19 Casement stay - 6" - Solid Brass inclusive of screws No.

20 Casement stay - 12" - Solid Brass inclusive of screws No.

21 Tower bolt - 4" - Solid Brass inclusive of screws No.

22 Tower bolt - 6" - Solid Brass inclusive of screws No.

23 Tower bolt - 8" - Solid Brass inclusive of screws No.

24 Tower bolt - 10" - Solid Brass inclusive of screws No.

25 Centre pivot 4" - Solid Brass Pair

26 Door or Window pull rings - Small - 1" - Solid Brass No.

27 Door or Window pull rings - Medium - 1 1/4" - Solid Brass No.

28 Door or Window pull rings - Large - 2" - Solid Brass No.

29 Fanlight catch - Solid Brass No.

OTHER FITTINGS

30 4" x 2 1/2" Polished brass Hinges No.

31 4" x 3" Polished brass Hinges No.

32 5" x 2 1/2" Polished brass Hinges No.

33 5" x 3" Polished brass Hinges No.

34 4" Polished brass Barrel Bolt No.

35 6" Polished brass Barrel Bolt No.

36 10" Polished brass Tower Bolt No.

Engineering Organization Price List - Page 2 BSR 2012


37 1 1/4" dia. Polished brass Pull Ring No.

38 Skeleton bolt 12" No.

39 Brass screws 3/4" No.

40 Brass screws 1" No.

41 Brass screws 1 1/2" No.

42 Brass screws 2" No.

43 Brass screws 3" No.

44 Cromium Plated Screws 1" No. 10 No.

45 Cromium plated Clip 1 1/4" dia. No.

46 Cromium plated Clip 1/2" dia. No.

47 Mortice lock - imported - Chinese Set

48 Mortice lock "Yale" - Italian made Set

49 Cupboard Lock - 808 No.

50 Magnent lock No.

51 Pad Lock - 1" No.

52 Pad Lock - 1 1/2" No.

53 Pad Lock - 2" No.

54 Hasp & Staple No.

GLASS

55 Glass panes -5mm thick ordinory Sq.ft.

56 Glass panes 5mm thick tinted Sq.ft.

57 Glass panes -3mm thick ordinary Sq.ft.

58 Glass panes -3mm thick tinted Sq.ft.

59 Glass block 8" x 8" x 4" thick No.

Engineering Organization Price List - Page 3 BSR 2012


MASONARY

60 Slaked lime 25 kg

61 Boiled lime 25 kg

62 River Sand including 16km transport Cube

63 Rubble 6" - 9" including 16km transport Cube

64 Metal 3/4" including 16km transport Cube

65 Metal 1" including 16km transport Cube

66 Metal 1 1/2" including 16km transport Cube

67 Metal 2" including 16km transport Cube

68 Quarry Dust including 16km transport Cube

Aggregare Base Course (ABC) - graded 37.5mm including 16km


69 Cube
transport

Cement - 50Kg bag of "Sanstha" / "Mahaweli marine" / "Nippon" /


70 No.
"Ambuja" / "UltraTech"/ "Singhe"

71 White Cement Lb.

72 Black Cement Lb.

73 Wire cut bricks. No.

74 Bricks Ordinary 1000

75 Ct. Sand hollow block 100 x 190 x 390 mm - SLS Certified No.

76 Ct. Sand hollow block 150 x 190 x 390 mm - SLS Certified No.

77 Ct. Sand hollow block 200 x 190 x 390 mm - SLS Certified No.

78 Ct. Sand Solid block 100 x 190 x 390 mm -SLS Certified No.

79 Ct. Sand Solid block 150 x 190 x 390 mm -SLS Certified No.

80 Ct. Sand Solid block 200 x 190 x 390 mm -SLS Certified No.

Engineering Organization Price List - Page 4 BSR 2012


PRE-CAST ITEMS

81 Cement Grill 1'-0" x 1'-0" No.

82 Pre-cast 4'-0" dia.x 8'-0" septic tank (Manufactured by SEC.) No.

83 Pre-cast 3'-0" dia.x 6'-0" soakage pit No.

Precast Concrete Posts - 7 Strands

84 Intermidiate posts - 5'-9" ht. & (5" x 5") - (3" x 3") No.

85 End posts - 6'-3" ht. & (5" x 5") No.

86 Struts - 6'-5" ht. & (5" x 4") - (3" x 3") No.

Precast Concrete Posts - 8 Strands

87 Intermidiate posts - 6'-9" ht. & (5" x 5") - (3" x 3") No.

88 End posts - 7'-3" ht. & (5" x 5") No.

89 Struts - 7'-5" ht. & (5" x 4") - (3" x 3") No.

Precast Concrete Posts - 9 Strands

90 Intermidiate posts - 7'-9" ht. & (5" x 5") - (3" x 3") No.

91 End posts - 8'-3" ht. & (5" x 5") No.

92 Struts - 8'-5" ht. & (5" x 4") - (3" x 3") No.

Precast Concrete Posts - 12 Strands

93 Intermidiate posts - 7'-7" + 1'-6" ht. & (5" x 5") - (3" x 3") No.

94 End posts - 8'-1" +1'-6" ht. & (5" x 5") No.

95 Struts - 8'-1" +1'-6" ht. & (5" x 4") - (3" x 3") No.

Paving Blocks -( SLS Certified )

97 80mm thick Paving Blocks - UNI III - Natural Colour - 40N/mm 2 No.

96 80mm thick Paving Blocks - UNI III - Natural Colour - 30N/mm 2 No.

Engineering Organization Price List - Page 5 BSR 2012


80mm thick Paving Blocks - UNI II - Natural Colour - 15N/mm 2 No.

80mm thick Paving Blocks - PRIORY III - Natural Colour -


No.
40N/mm2

80mm thick Paving Blocks - PRIORY III - Natural Colour -


No.
30N/mm2

80mm thick Paving Blocks - PRIORY II - Natural Colour -


No.
15N/mm2

97 80mm thick Paving Blocks - UNI III - Coloured - 40N/mm 2 No.

96 80mm thick Paving Blocks - UNI III - Coloured - 30N/mm 2 No.

80mm thick Paving Blocks - UNI II - Coloured - 15N/mm 2 No.

80mm thick Paving Blocks - PRIORY III - Coloured - 40N/mm 2 No.

80mm thick Paving Blocks - PRIORY III - Coloured - 30N/mm 2 No.

80mm thick Paving Blocks - PRIORY II - Coloured - 15N/mm 2 No.

Concrete Curb

98 Curb ( Small ) - 75mm x 175mm x 540mm No.

99 Curb ( Half ) - 125mm x 255mm x 450mm No.

100 Curb ( Full ) - 125mm x 255mm x 915mm No.

Cement Pots

101 Pot - 12" No.

102 Pot - 18" No.

103 Pot - 24" No.

104 Pot - 28" No.

105 Pot - 48" No.

TILES

Floor tiles

Engineering Organization Price List - Page 6 BSR 2012


Floor Tile - Homogeneous Vitreous Porcelain glazed & unglazed
106 No.
8" x 8" - Rocell or equivalant.

Floor Tile - Homogeneous Vitreous Porcelain glazed & unglazed


107 No.
12" x 12" - Rocell or equivalant.

Floor Tile - Homogeneous Vitreous Porcelain glazed & unglazed


108 No.
16" x 16" - Rocell or equivalant.

Floor Tile - Homogeneous Vitreous Porcelain polished 12" x 12" -


109 No.
Rocell or equivalant.

Floor Tile - Homogeneous Vitreous Porcelain polished 16" x 16" -


110 No.
Rocell or equivalant.

111 Floor Tile - Porcelain glazed 18" x 18" - Rocell or equivalant. No.

Floor Tile - Porcelain glazed 24" x 24" - Rocell or equivalant. No.

Floor Tile - Homogeneous Vitreous Porcelain Rectified polished


112 No.
24" x 12" - Rocell or equivalant.

Floor Tile - Homogeneous Vitreous Porcelain Rectified polished


113 No.
24" x 16" - Rocell or equivalant.

Floor Tile - Homogeneous Vitreous Porcelain Rustic 12" x 12" -


114 No.
Rocell or equivalant.

Floor Tile - Homogeneous Vitreous Porcelain Rustic 16" x 16" -


115 No.
Rocell or equivalant.

116 Floor Tile - Ceramic Glazed 12" x 12" - Rocell or equivalant. No.

117 Floor Tile - Ceramic Glazed 13" x 13" - Rocell or equivalant. No.

118 Floor Tile - Ceramic Glazed 16" x 16" - Rocell or equivalant. No.

119 Floor Tile - Ceramic Glazed 18" x 18" - Rocell or equivalant. No.

120 Floor Tile - Ceramic Glazed 24" x 12" - Rocell or equivalant. No.

121 Floor Tile - Ceramic Glazed 24" x 16" - Rocell or equivalant. No.

122 Floor Tile - Ceramic Glazed 24" x 24" - Rocell or equivalant. No.

Bathroom floor tile - Porcelain Rough 8" x 8" - Rocell or


123 No.
equivalant.

Engineering Organization Price List - Page 7 BSR 2012


Bathroom floor tile - Porcelain Rough 12" x 12" - Rocell or
124 No.
equivalant.

Design Floor tiles

Porcelain Polished Design Tile - 32" x 32" - Rocell or equivalant. No.

Porcelain Polished Design Tile - 24" x 24" - Rocell or equivalant. No.

Porcelain Design Tile - 24" x 24" - Rocell or equivalant. No.

Porcelain Design Tile - 20" x 20" - Rocell or equivalant. No.

Porcelain Design Tile - 24" x 16" - Rocell or equivalant. No.

Porcelain Design Tile - 18" x 18" - Rocell or equivalant. No.

Ceramic Design Tile - 16" x 16" - Rocell or equivalant. No.

Wall tiles

Wall Tile - Glazed Porcelain Rectified 24" x 12" - Rocell or


125 No.
equalant.

Ceramic wall tile 8" x 12" -Coloured - lanka wall tile or approved
126 No.
equivalant.

Ceramic wall tile 12" x 16" -Coloured - lanka wall tile or approved
127 No.
equivalant.

GRANITE

128 Polished Granite 1'-0" x 1'-0" for Vanity top - Ab-Black No.

129 Polished Granite Floor Slabs - 1'-0" x 1'-0" - Ab-Black No.

130 Granite Floor Slabs - 1'-0" x 1'-0" -Rough finish No.

131 Granite Floor Slabs - 1'-0" x 1'-0" -Gloss finish No.

132 Granite Floor Slabs - 2'-0" x 1'-0" -Gloss finish No.

Engineering Organization Price List - Page 8 BSR 2012


MISCELLANEOUS

133 Water per Gallon Gal.

134 Basket No.

135 Colour Pigment Lb.

136 Grout kg

137 blue dz

138 Cotton waste Lb.

139 Mould Oil Gal.

140 Rawl plug (P.V.C.) - 1 1/2" No. 10 No.

141 Rawl plug (P.V.C) - 2" No. 10 No.

142 Spur stone No.

143 Hold fast M.S. No.

144 Dowels No.

145 coir brush No.

PLANT

8 Hour
150 Concrete Mixer hire
Day
8 Hour
151 Vibrator hire
Day
8 Hour
152 Welding Plant
Day

153 Diesel Gal.

154 Water Pump - manufactured by " Jinasena" Model no:- N110T/1 No

155 Deep Well Kit - manufactured by" Jinasena" Model no:- Type A No

SANITARY

Engineering Organization Price List - Page 9 BSR 2012


"ROCELL" BRAND

Normal Range

156 Wash Basin with Pedestal - "Urban D" No

157 Close Couple Dual Flush Water Closet - "Urban D" No

158 Water Tank (Cistern) - "Urban D" No

159 Chromium Plated Mixer Tap - "Duca 16495" No

Semi - Luxury Range

160 Wash Basin with Pedestal - "Dune" No

161 Close Couple Dual Flush Water Closet - "Dune" No

162 Water Tank (Cistern) - "Dune" No

163 Chromium Plated Mixer Tap - "Duca 16495" No

Luxury Range

164 Wash Basin with Pedestal - "Intense" No

165 Close Couple Dual Flush Water Closet -"Intense" No

166 Water Tank (Cistern) - "Intense" No

167 Bidet - "Intense" No

168 Chromium Plated Mixer Tap - "Sprint 29500" No

Other Fittings for Normal / Semi-Luxury / Luxury

169 Wall Hung Wash Basin with Half Pedestal - "Dew Point" No

170 Squatting Pan with Foot Rest - SP3F013 No

171 Low Level Plastic Cistern No

172 Urinal with Flush Valve - DP70013 No

173 Chromium Plated Waste Outlet - "A706" No

174 Chromium Plated Bottle Trap "A186" No

Engineering Organization Price List - Page 10 BSR 2012


175 Chromium Plated 1/2" dia. Angle Valve - "A280" No

176 Universal Bend - "Vario Joint" No

Chromium Plated Shower Head with Arm Built-In Shower Mixer -


177 No
"Pony Z -Z6955"

"Rocell " - Bathroom Accessories

178 Chromium Plated Soap Basket - " Charming " No

Chromium Plated Body & Glass Soap Dish - " Charming " - DP
179 No
6703

180 Chromium Plated Body & Glass Tumbler Holder - " Charming " No

181 Chromium Plated Towel Ring - " Charming " No

182 Chromium Plated Robe Hook - " Charming " No

183 Chromium Plated Toilet Paper Holder - " Charming " No

184 Chromium Plated Toilet Cup Holder - " Charming " No

185 Chromium Plated Single Towel Bar - " Charming " No

186 Chromium Plated Double Towel Bars - " Charming " No

187 Chromium Plated Towel Rack - " Charming " No

188 Chromium Plated Glass Shelf - " Charming " No

"AMERICAN STANDARD" BRAND

189 Vanity type Wash Basin - Ceros TF0477 No

190 Wall Hung Corner Wash Basin - New Codie TF 0940 No

191 Chromium plated hand Bidet Spray - A4700 No

192 Chromium plated Pillar Tap - 4604.415.50 No

193 Chromium plated Pillar Tap - A-1500N - Luxary Range No

194 Chromium plated Waste & Plug - A-8006 No

195 Chromium plated 4 Function Shower Head - A-6080 No

Engineering Organization Price List - Page 11 BSR 2012


196 Chromium plated Shower Arm - A-6022-974-845 No

197 Chromium plated Concealed Valve - B JAZZ - A-7002C No

198 Chromium plated Shower Mixer - Saga - 1512.701.50 No

199 Chromium plated Shower Rod - Viola 11 - A-6110-978-777 No

200 Chromium plated Shower with Angle Valve - A-2003-A-MR No

201 Chromium plated Angle Valve - 9113.005.50 No

202 Flexible Hose - 45cm - Apex No

203 Service Sink (Lab) -TF8124 No

204 Laboratory sink - Larch - S594501 No

205 Chroum plated Elbow Operated Pillar Tap - ML30 No

206 Auto matic Hand Dryers - Kingsway - HK1800PA No

Disable Fittings

207 Wall hung wash basin - TF0995 No

208 Disable Water Closet - Ventura 3200.001.09 No

209 Water Tank - Cygnet - PP.4041.020.03 No

210 Seat Cover - 390000N No

211 Hand Grip - Me-tu - MTJT26 No

212 Grip Bar - Apex - AR-065-18S/S No

213 Hand Grip - Shower Angle - Me-tu - MTJT22-5 No

214 Hand Grip - Shower - Me-tu - MTJT22-10 No

Malasian & Indian Brand

215 Wash basin with pedestal -BSWBA 620x470 VCP - by Mascon No.

216 Conner basin -BSWBA16x16CC - by Mascon No.

Engineering Organization Price List - Page 12 BSR 2012


217 High level cistrn - Malasian origin No.

218 Ceramic urinal bowl - Indian origin No.

219 Foot rest Squatting pan - Indian origin No.

220 Wash basin - Indian origin No.

221 Low level cistern - Indian origin No.

222 1 1/4" Bottle trap - Malasian make No.

223 1/2" chromium plated pillar tap - Malasian make No.

224 1/2" chromium plated Angle valve - Malasian make No.

Stainless steel sink 36" x 18" single bowl & single Drain Board -
225 No.
"Sealcore"

226 Stainless steel sink 17" x 18" single bowl - "Sealcore" No.

Chromium Plated & Brass Items

227 Brass wheel valve 1 " dia. - Pegler Brand No.

228 Brass wheel valve 1 1/4" dia. - Pegler Brand No.

229 Brass wheel valve 1 1/2" dia. - Pegler Brand No.

230 Brass wheel valve 2" dia. - Pegler Brand No.

231 Brass Ball Valve - 1/2" dia.- Pegler Brand No.

232 Brass Ball Valve - 3/4" dia.- Pegler Brand No.

233 Brass Ball Valve - 1" dia. - Pegler Brand No.

234 Brass Ball Valve - 1 1/4" dia.- Pegler Brand No.

235 Brass Ball Valve - 1 1/2" dia.- Pegler Brand No.

236 Brass Ball Valve - 2" dia. - Pegler Brand No.

237 Brass Ball Valve - 3" dia. - Pegler Brand No.

238 Brass Ball Valve - 4" dia. - Pegler Brand No.

239 Brass stop cock 1/2" dia. No.

Engineering Organization Price List - Page 13 BSR 2012


240 Brass stop cock 3/4" dia. No.

241 Brass Handle valve 1/2" dia. No.

242 Brass Handle valve 3/4" dia. No.

243 Chromium plated Shower rose 6" dia. No.

Plumber Brand

244 Chromium plated 1/2" Stop cock - " Plumber " - NEC-0405 No.

245 Chromium plated 1/2" Angle cock - " Plumber " - NEC-0507 No.

246 Chromium plated 1/2" Pillar cock - " Plumber " - NEC-0101 No.

247 Chromium plated 1/2" Bib cock - " Plumber " - NEC-0202 No.

Choromium Plated 1/2" Swan-neck Sink cock (CSS) - "Plumber" -


248 No.
NEC-0104

"Water - Tec" Brand

249 1/2" Bib tap - model no:- 6872 No.

250 1/2" Angle valve - model no:- 14548 No.

251 1/2" Pillar Sink tap ( Swan-neck ) - model no:- 14527 No.

252 1/2" Wall Sink tap - model no:- 14516 No.

253 Health Foucet ( Bidet Spray ) - model no:- 10107 No.

254 Shower rose - model no:- 6814 No.

PVC Items

255 Plastishell water tank - 500 Lit. No.

256 Plastishell water tank - 1000 Lit. No.

257 Plastishell water tank - 2000 Lit. No.

258 Plastishell water tank - 5000 Lit. No.

259 PVC Compact Ball Valve - 1/2" dia. No.

Engineering Organization Price List - Page 14 BSR 2012


260 PVC Compact Ball Valve - 3/4" dia. No.

261 PVC Compact Ball Valve - 1" dia. No.

262 PVC Compact Ball Valve - 1 1/4" dia. No.

263 PVC Compact Ball Valve - 1 1/2" dia. No.

264 PVC Compact Ball Valve - 2" dia. No.

265 PVC Compact Ball Valve - 3" dia. No.

266 PVC Union - 1/2" dia. No.

267 PVC Union - 1" dia. No.

Other Items

268 Mirror 20" x 15" with glass shelves No.

269 5mm thick Mirror 24" x 18" with double coated No.

270 Tube flexible hose 18" long (Metal guard ) 1/2" dia. No.

271 Tube flexible hose 12" long (Metal guard ) 1/2" dia. No.

272 Plastic seat cover No.

273 Brass screws with rowl plug No

274 Iron brackets wooden plug No

275 Roll Thread Seal No.

P.V.C. FITTINGS (Confirming to SLS 147)

276 P.V.C. Pipe 1/2" dia. (Type 1000) L.ft.

277 P.V.C. Pipe 3/4" dia. (Type 1000) L.ft.

278 P.V.C. Pipe 1" dia. (Type 1000) L.ft.

279 P.V.C. Pipe 1 1/4" dia. (Type 1000) L.ft.

280 P.V.C. Pipe 1 1/2" dia. (Type 1000) L.ft.

Engineering Organization Price List - Page 15 BSR 2012


281 P.V.C. Pipe 2" dia. (Type 1000) L.ft.

282 P.V.C. Pipe 2 1/2" dia (Type 1000) L.ft.

283 P.V.C. Pipe 3" dia (Type 1000) L.ft.

284 P.V.C. Pipe 4" dia. (Type 1000) L.ft.

285 P.V.C. Pipe 1" dia. (Type 600) L.ft.

286 P.V.C. Pipe 1 1/4" dia. (Type 600) L.ft.

287 P.V.C. Pipe 1 1/2" dia. (Type 600) L.ft.

288 P.V.C. Pipe 2" dia. (Type 600) L.ft.

289 P.V.C. Pipe 2 1/2" dia. (Type 600) L.ft.

290 P.V.C. Pipe 3" dia. (Type 600) L.ft.

291 P.V.C. Pipe 4" dia. (Type 600) L.ft.

292 P.V.C. Pipe 6" dia. (Type 600) L.ft.

293 P.V.C. Pipe 1 1/2" dia. (Type 400) L.ft.

294 P.V.C. Pipe 2" dia. (Type 400) L.ft.

295 P.V.C. Pipe 2 1/2" dia. (Type 400) L.ft.

296 P.V.C. Pipe 3" dia. (Type 400) L.ft.

297 P.V.C. Pipe 4" dia. (Type 400) L.ft.

298 P.V.C. Pipe 4" dia. (Type 250) L.ft.

299 P.V.C. Socket 1/2" dia. (Type 1000) No.

300 P.V.C. Socket 3/4" dia. (Type 1000) No.

301 P.V.C. Socket 1 " dia. (Type 1000) No.

302 P.V.C. Socket 1 1/4" dia. (Type 1000) No.

303 P.V.C. Socket 1 1/2" dia. (Type 1000) No.

304 P.V.C. Socket 2" dia. (Type 1000) No.

305 P.V.C. Socket 2 1/2 " dia. (Type 1000) No.

Engineering Organization Price List - Page 16 BSR 2012


306 P.V.C. Socket 3" dia. (Type 1000) No.

307 P.V.C. Socket 4" dia. (Type 1000) No.

308 P.V.C. Valve Socket 1/2" dia. (Type 1000) No.

309 P.V.C. Valve Socket 3/4" dia. (Type 1000) No.

310 P.V.C. Valve Socket 1 " dia. (Type 1000) No.

311 P.V.C. Valve Socket 1 1/4" dia. (Type 1000) No.

312 P.V.C. Valve Socket 1 1/2" dia. (Type 1000) No.

313 P.V.C. Valve Socket 2" dia. (Type 1000) No.

314 P.V.C. Valve Socket 2 1/2" dia. (Type 1000) No.

315 P.V.C. Valve Socket 3" dia. (Type 1000) No.

316 P.V.C. Valve Socket 4" dia. (Type 1000) No.

317 P.V.C. Faucet Socket 1/2" dia. (Type 1000) No.

318 P.V.C. Faucet Socket 3/4" dia. (Type 1000) No.

319 P.V.C. Faucet Socket 1" dia. (Type 1000) No.

320 P.V.C. Faucet Socket 1 1/4" dia. (Type 1000) No.

321 P.V.C. Faucet Socket 1 1/2" dia (Type 1000) No.

322 P.V.C. Faucet Socket 2" dia. (Type 1000) No.

323 P.V.C. Faucet Socket 2 1/2" dia. (Type 1000) No.

324 P.V.C. Faucet Socket 3" dia. (Type 1000) No.

325 P.V.C. Faucet Socket 4" dia. (Type 1000) No.

326 P.V.C. Elbow 1/2" dia. (Type 1000) No.

327 P.V.C. Elbow 3/4" dia. (Type 1000) No.

328 P.V.C. Elbow 1" dia. (Type 1000) No.

329 P.V.C. Elbow 1 1/4" dia. (Type 1000) No.

330 P.V.C. Elbow 1 1/2" dia. (Type 1000) No.

Engineering Organization Price List - Page 17 BSR 2012


331 P.V.C. Elbow 2" dia. (Type 1000) No.

332 P.V.C. Elbow 2 1/2 " dia. (Type 1000) No.

333 P.V.C. Elbow 3" dia. (Type 1000) No.

334 P.V.C. Elbow 4" dia. (Type 1000) No.

335 P.V.C. Bend 1/2" dia. (Type 1000) No.

336 P.V.C. Bend 3/4" dia. (Type 1000) No.

337 P.V.C. Bend 1" dia. (Type 1000) No.

338 P.V.C. Bend 1 1/4" dia. (Type 1000) No.

339 P.V.C. Bend 1 1/2" dia. (Type 1000) No.

340 P.V.C. Bend 2" dia. (Type 1000) No.

341 P.V.C. Bend 2 1/2 " dia. (Type 1000) No.

342 P.V.C. Bend 3" dia. (Type 1000) No.

343 P.V.C. Bend 4" dia. (Type 1000) No.

344 P.V.C. Equal Tee 1/2" dia. (Type 1000) No.

345 P.V.C. Equal Tee 3/4" dia. (Type 1000) No.

346 P.V.C. Equal Tee 1" dia. (Type 1000) No.

347 P.V.C. Equal Tee 1 1/4" dia. (Type 1000) No.

348 P.V.C. Equal Tee 1 1/2" dia. (Type 1000) No.

349 P.V.C. Equal Tee 2" dia. (Type 1000) No.

350 P.V.C. Equal Tee 2 1/2 " dia. (Type 1000) No.

351 P.V.C. Equal Tee 3" dia. (Type 1000) No.

352 P.V.C. Equal Tee 4" dia. (Type 1000) No.

353 P.V.C. Reducing Socket 2" - 1 1/2" (Type 1000) No.

354 P.V.C. Reducing Socket 2" - 1 1/4" (Type 1000) No.

355 P.V.C. Reducing Socket 2" - 1" (Type 1000) No.

Engineering Organization Price List - Page 18 BSR 2012


356 P.V.C. Reducing Socket 2" - 3/4" (Type 1000) No.

357 P.V.C. Reducing Socket 2" - 1/2" (Type 1000) No.

358 P.V.C. Reducing Socket 1 1/2" - 1 1/4" (Type 1000) No.

359 P.V.C. Reducing Socket 1 1/2" - 1" (Type 1000) No.

360 P.V.C. Reducing Socket 1 1/2" - 3/4" (Type 1000) No.

361 P.V.C. Reducing Socket 1 1/2" - 1/2" (Type 1000) No.

362 P.V.C. Reducing Socket 1 1/4" - 1" (Type 1000) No.

363 P.V.C. Reducing Socket 1 1/4" - 3/4" (Type 1000) No.

364 P.V.C. Reducing Socket 1 1/4" - 1/2" (Type 1000) No.

365 P.V.C. Reducing Socket 1" - 3/4" (Type 1000) No.

366 P.V.C. Reducing Socket 1" - 1/2" (Type 1000) No.

367 P.V.C. Reducing Socket 3/4" - 1/2" (Type 1000) No.

368 P.V.C. Reducing Tee 2" - 1 1/2" (Type 1000) No.

369 P.V.C. Reducing Tee 2" - 1 1/4" (Type 1000) No.

370 P.V.C. Reducing Tee 2" - 1" (Type 1000) No.

371 P.V.C. Reducing Tee 2" - 3/4" (Type 1000) No.

372 P.V.C. Reducing Tee 2" - 1/2" (Type 1000) No.

373 P.V.C. Reducing Tee 1 1/2" - 1 1/4" (Type 1000) No.

374 P.V.C. Reducing Tee 1 1/2" - 1" (Type 1000) No.

375 P.V.C. Reducing Tee 1 1/2" - 3/4" (Type 1000) No.

376 P.V.C. Reducing Tee 1 1/2" - 1/2" (Type 1000) No.

377 P.V.C. Reducing Tee 1 1/4" - 1" (Type 1000) No.

378 P.V.C. Reducing Tee 1 1/4" - 3/4" (Type 1000) No.

379 P.V.C. Reducing Tee 1 1/4" - 1/2" (Type 1000) No.

380 P.V.C. Reducing Tee 1" - 3/4" (Type 1000) No.

Engineering Organization Price List - Page 19 BSR 2012


381 P.V.C. Reducing Tee 1" - 1/2" (Type 1000) No.

382 P.V.C. Reducing Tee 3/4" - 1/2" (Type 1000) No.

383 P.V.C. Reducing Forcet Tee 1" - 3/4" (Type 1000) No.

384 P.V.C. Reducing Forcet Tee 1" - 1/2" (Type 1000) No.

385 P.V.C. Reducing Forcet Tee 3/4" - 1/2" (Type 1000) No.

386 P.V.C. Reducing Elbow 1" - 3/4" (Type 1000) No.

387 P.V.C. Reducing Elbow 1" - 1/2" (Type 1000) No.

388 P.V.C. Reducing Elbow 3/4" - 1/2" (Type 1000) No.

389 P.V.C. Clips 1/2" (Type 1000) No.

390 P.V.C. Clips 3/4" (Type 1000) No.

391 P.V.C. Clips 1" (Type 1000) No.

392 P.V.C. Clips 1 1/4" (Type 1000) No.

393 P.V.C. Clips 1 1/2" (Type 1000) No.

394 P.V.C. Clips 2" (Type 1000) No.

395 P.V.C. Clips 2 1/2" (Type 1000) No.

396 P.V.C. Clips 3" (Type 1000) No.

397 P.V.C. Clips 4" (Type 1000) No.

398 P.V.C. Clips 6" (Type 1000) No.

399 P.V.C. Gutter 4 1/2" square. L.ft.

400 P.V.C Down pipe.3 1/2" L.ft.

401 P.V.C. Gutter Joiners. No.

402 P.V.C. Running Heads No.

403 P.V.C. Mitre joint No.

404 P.V.C. Gutter box No.

405 P.V.C. End Cap. No.

Engineering Organization Price List - Page 20 BSR 2012


406 P.V.C. Gutter Bracket. No.

407 P.V.C. Socket 3 1/2" . No.

408 P.V.C. Bends 3 1/2" No.

409 P.V.C. Elbow 3 1/2" dia. No.

410 P.V.C. Down Pipes Clips No.

411 P.V.C. Solvent Cement (100 grms) bottle No.

CPVC PIPES & FITTINGS ( Hot Water Systems )

412 CPVC Pipe SDR 1/2" dia. L.ft.

413 CPVC Pipe SDR 1" dia. L.ft.

414 CPVC Socket 1/2" dia. No.

415 CPVC Socket 1" dia. No.

416 CPVC Valve Socket 1/2" dia. No.

417 CPVC Valve Socket 1" dia. No.

418 CPVC Faucet Socket 1/2" dia. No.

419 CPVC Faucet Socket 1" dia. No.

420 CPVC Tee 1/2" dia. No.

421 CPVC Tee 1" dia. No.

422 CPVC Elbow 1/2" dia. x 45o No.

423 CPVC Elbow 1/2" dia. x 90o No.

424 CPVC Elbow 1" dia. x 45o No.

425 CPVC Elbow 1" dia. x 90o No.

426 CPVC Reducing Socket 1" x 1/2" No.

427 CPVC Reducing Tee 1" x 1/2" No.

428 CPVC End Cap 1/2" dia. No.

Engineering Organization Price List - Page 21 BSR 2012


429 CPVC End Cap 1" dia. No.

430 CPVC Tap End Plug 1/2" dia. No.

431 CPVC Union 1/2" dia. No.

432 CPVC Elbow Holder 1/2" dia. No.

433 CPVC Elbow Holder 1" dia. No.

434 CPVC Brass Male Adapter 1/2" dia. No.

435 CPVC Brass Female Adapter 1/2" dia. No.

436 CPVC Brass Elbow 1/2" dia. No.

437 CPVC Solvent - 118ml bottale No.

PVC SPECIAL FITTINGS

438 4" (110mm) dia. Double Access Branch with cleaning eye. No.

439 4" (110mm) dia. Single Access Branch with cleaning eye. No.

440 4" (110mm) dia. Single Branch. No.

441 4" (110mm) dia. Swept Bend with cleaning eye. No.

442 4" (110mm) dia. Swept Bend. No.

443 4" (110mm) dia. Swept Tee with cleaning eye. No.

444 4" (110mm) dia. Swept Tee. No.

445 4" (110mm) dia. " P " Trap. No.

446 4" (110mm) dia. " S " Trap. No.

447 4" (110mm) Multi Floor Trap. No.

448 4" (110mm) dia. Tee with cleaning eye. No.

449 4" (110mm) dia. Bend. No.

450 6" (110mm) dia. Bend. No.

451 6" x 4" (160mm x 110mm) Reducing Tee. No.

Engineering Organization Price List - Page 22 BSR 2012


452 1 1/2" (50mm) dia. Swept Tee with cleaning eye. No.

453 1 1/2" (50mm) dia. Swept Tee. No.

454 1 1/2" (50mm) dia. Equal Tee. No.

455 1 1/2" (50mm) dia. Swept Cleaning eye. No.

456 2" (63mm) dia. Vent Cowl (Wire Dome) No.

457 4" (110mm) dia. Vent Cowl (Wire Dome) No.

PAINT

458 Alkali Resistant Primer. 1 Lt.

459 Aluminium paint 1 Lt.

460 Anticorrosive 1Lt

461 Blackboard Paint 1Lt

462 Emulsion Paint 1 Lt.

463 Enamal Paint 1 Lt.

464 Wall Primer 1 Lt.

465 Weather shield 1 Lt.

466 Crack binding primer 4Lt

467 Tharoseal 5 kg can

468 Barralastic 7.2 kg set

469 Barrazinc SP 1 L.can

470 Bitumen Gal.

471 Aqua Tuff 4Lt

472 Floor Paint 1 Lt.

473 Floor Polish 1 Lt.

474 Wax Polish Lbs.

Engineering Organization Price List - Page 23 BSR 2012


475 Salt Lbs.

476 Sand paper No.

477 Snowsem Lbs.

478 Washing blue Lb.

479 Joint Compound Powder/ skim coat 1kg

480 Mineral thinner 4Lt

481 Varnish 1 Lt.

482 Wood Primer 1 Lt.

483 Wood preservatives Gal.

484 Wood Stain 1 Lt.

485 Wood Sealer ( Base coat ) 1 Lt.

486 Wood Sealer ( Lacquer coat ) 1 Lt.

487 Epilack Epoxy Coaltar 1 Lt.

488 Zinc Phospate Primer 1 Lt.

489 Paint Brush 1" No.

490 Paint Brush 1 1/2 " No.

491 Paint Brush 2" No.

492 Paint Brush 3" No.

493 Paint Brush 4" No.

494 Paint Brush 6" No.

495 Paint Scraper No.

ROOFER

496 Corrugated Asbestos sheet Sq.ft.

497 Asbestos ridging No.

Engineering Organization Price List - Page 24 BSR 2012


498 Asbestos Flat ceiling sheets Sq.ft.

499 Roofing Hook,Nuts & Bolts No.

500 Half round covering tiles No.

501 Calicut pattern flat tiles No.

502 Calicut pattern ridge tiles No.

503 B.W.G. sheet 36" wide 22G Sq.ft.

504 Aluminium sheets gauge 24 Sq.ft.

505 Aluminium Macfoil Sq.ft.

506 DSI Tiles - Natural type main tile No.

507 DSI Tiles - Natural type ridge tile No.

508 DSI Tiles - Natural type gable left tile No.

509 DSI Tiles - Natural type gable right tile No.

510 DSI Tiles - Natural type corner tile No.

Engineering Organization Price List - Page 25 BSR 2012


STEEL

511 Steel purling - 25mm x 25mm x 5mm - Angle iron L.ft.

512 Steel purling - 38mm x 38mm x 6mm - Angle iron L.ft.

513 Steel purling - 50mm x 50mm x 6mm - Angle iron L.ft.

514 Steel purling - 65mm x 65mm x 6mm - Angle iron L.ft.

515 Steel purling - 75mm x 75mm x 6mm - Angle iron L.ft.

516 Steel purling - 75mm x 38mm x 6 mm - Channel Iron L.ft.

517 Steel purling - 100mm x 50mm x 6 mm - Channel Iron L.ft.

518 Steel purling - 125mm x 65mm x 6 mm - Channel Iron L.ft.

519 Steel purling - 150mm x 75mm x 6 mm - Channel Iron L.ft.

520 Tor Steel - Including Transport Kg.

521 Mild Steel - Including Transport Kg.

522 Binding wire Lb.

523 Nut & Bolt 3/8" dia. 18" long No.

524 Clout nails Ibs.

525 Wire nails 1" Lb.

526 Wire nails 1 1/2" Lb.

527 Wire nails 2" Lb.

528 Wire nails 3" Lb.

529 Wire nails 5" Lb.

530 10mm thick M.S. Plate Sq.ft

531 12mm thick M.S. Plate Sq.ft

532 GI mesh - 3" x 3" (Gauge 18) Sq.ft

533 Heavy Duty GI Pipe - 1/2" dia. x 3.2mm thick L.ft.

534 Heavy Duty GI Pipe - 3/4" dia. x 3.2mm thick L.ft.

Engineering Organization Price List - Page 26 BSR 2012


535 Heavy Duty GI Pipe - 1" dia. x 4mm thick L.ft.

536 Heavy Duty GI Pipe - 1 1/4" dia. x 4mm thick L.ft.

537 Heavy Duty GI Pipe - 1 1/2" dia. x 4mm thick L.ft.

538 Heavy Duty GI Pipe - 2" dia. x 4.5mm thick L.ft.

539 Heavy Duty GI Pipe - 2 1/2" dia. x 4.5mm thick L.ft.

540 Heavy Duty GI Pipe - 3" dia. x 4.8mm thick L.ft.

541 Medium Duty GI Pipe - 1" dia. x 3.2mm thick L.ft.

542 Medium Duty GI Pipe - 2" dia. x 3.6mm thick L.ft.

543 Medium Duty GI Pipe - 3" dia. x 4mm thick L.ft.

544 Flat Iron - 20mm x 6mm L.ft.

545 Flat Iron - 25mm x 6mm L.ft.

546 Flat Iron - 30mm x 6mm L.ft.

547 Flat Iron - 38mm x 6mm L.ft.

548 M.S.Rod 5mm dia. L.ft.

549 25mm x 25mm x 3mm thick Hollow Section - Heavy Duty L.ft.

550 Chain Link (gauge 10) -2" x 2" PVC coated Sq.ft.

551 Tention cords - PVC coated L.ft.

552 Barbed wire ( Gauge 14 ) 10kg

553 Barbed wire ( Gauge 14 ) 20kg

554 Barbed wire ( Gauge 14 ) 25kg

TIMBER

555 Lunumidella ceiling planks 6" x 3/4" Sq.ft.

556 Cove moulding 2 1/2" x 1 1/2" L.ft.

557 Cover fillet 1 1/2" x 1/2" L.ft.

Engineering Organization Price List - Page 27 BSR 2012


558 Ginisapu 3/4" thick planks Sq.ft.

559 Ginisapu 1" thick planks Sq.ft.

560 Timber 2" x 1" Class II - for shuttering L.ft.

561 Timber 2" x 2" Class II - for shuttering L.ft.

562 Timber 4" x 2" class II - for shuttering L.ft.

563 Timber 45mm x 22mm - Approved varity L.ft.

564 Timber 45mm x 45mm - Approved varity L.ft.

565 Timber 94mm x 45mm - Approved varity L.ft.

566 Timber 94mm x 70mm - Approved varity L.ft.

567 Timber 94mm x 140mm - Approved varity L.ft.

568 Timber 94mm x 190mm - Approved varity L.ft.

569 Timber 70mm x 140mm - Approved varity L.ft.

570 Timber 117mm x 45mm , 117mm x 70mm - Approved varity L.ft.


Timber - Eucailyptus Microcoras
571 Cu.ft.

572 Timber planks - 3/4" thick - Mahogany or Approved Varity Sq.ft.

573 Timber planks - 7/8" thick - Mahogany or Approved Varity Sq.ft.

574 Timber planks - 1" thick - Mahogany or Approved Varity Sq.ft.

575 Timber planks - 1 1/8" thick - Mahogany or Approved Varity Sq.ft.

576 Timber planks - 1 1/4" thick - Mahogany or Approved Varity Sq.ft.

577 Timber planks - 1 1/2" thick - Mahogany or Approved Varity Sq.ft.

578 Coconut rafters 4" x 2" L.ft.

579 Plywood (ordinary) - 12mm Sq.ft.

580 Plywood (ordinary) - 15mm Sq.ft.

581 Plywood door (Marine) - 2'-9" x 6'-9" No.

582 Plywood door (Ordinary) -3'-3" x 6'-9" No.

Engineering Organization Price List - Page 28 BSR 2012


583 Jungle post 3"-4" dia. 10'-0" length No.

584 Bamboo 20'-0" length No.

585 Rubber planks 1" thick - Shuttering Sq.ft.

586 Timber beading 3/8"x 3/8" L.ft.

METAL ROOFING

Material : 55% Aluminium Zinc Alloy coated AZ 150; H1


tensile (grade 550) sheet.

587 Roofing sheet .0.47mm thick Sq.ft.

588 Roofing sheet .0.40mm thick Sq.ft.

589 Gate Cladding - 0.35mm thick Sq.ft.

590 Gate Cladding - 0.40mm thick Sq.ft.

591 Wall Cladding - 0.40mm thick Sq.ft.

592 Wall Cladding - 0.47mm thick Sq.ft.

"C" Purlins - Hi tensile

Tensile strength - 450 MPA (Minimum)

593 100mm x 50mm x 15mm x 2mm thick L.ft.

594 125mm x 60mm x 20mm x 2mm thick L.ft.

595 150mm x 65mm x 20mm x 2mm thick L.ft.

Grith

596 Gutter - Medium 457 Per L.ft

597 Gutter - Small 305 Per L.ft

598 Down Pipe - Medium 457 Per L.ft

599 Down Pipe - Small 305 Per L.ft

600 Ridge Capping - Medium 457 Per L.ft

Engineering Organization Price List - Page 29 BSR 2012


601 Ridge Capping - Small 305 Per L.ft

602 Barge Flashing - Medium 457 Per L.ft

603 Barge Flashing - Small 305 Per L.ft

604 Wall Flashing - Medium 457 Per L.ft

605 Wall Flashing - Small 305 Per L.ft

606 Vally Gutter - Medium 457 Per L.ft

607 Vally Gutter - Large 920 Per L.ft

608 End Cap - Medium 457 No

609 End Cap - Small 305 No

610 Down Pipe Bend - Medium 457 No

611 Down Pipe Bend - Small 305 No

612 Gutter Bend - Medium 457 No

613 Gutter Bend - Small 305 No

614 Down Pipe Bracket - Medium 457 No

615 Down Pipe Bracket - Small 305 No

616 Gutter Bracket - Medium 457 No

PARTITION PANEL

617 Aluminium Composite Panel - 4mm thick - Pvdf Coated Sq.ft.

618 Aluminium Composite Panel - 4mm thick - Poliyester Coated Sq.ft.

619 Emboss Decorative Plywood Board - 3mm thick Sq.ft.

620 Emboss Decorative Plywood Board - 2.5mm thick Sq.ft.

LABOUR

Engineering Organization Price List - Page 30 BSR 2012


8 Hour
621 Skilled Labour - CARPENTER , MASON, BARBENDER
Day
8 Hour
622 Skilled Labour - ELECTRICTION
Day
8 Hour
623 Skilled Labour - PAINTER, PIPE FITTER
Day
8 Hour
624 Un Skilled Labour
Day

ELECTRICAL MATERIAL PRICE LIST

MATERIAL PRICE LIST BASED FOR ESR -2011 WITHOUT


VAT

WIRES

80 P.V.C. Copper 1/.044 cable 1mm2 100m

81 P.V.C. Copper 3/.029 cable single 1.5mm2 100m

82 P.V.C. Copper 3/.036 cable single 1.5mm2 100m

83 P.V.C. Copper 7/.029 cable single 2.5mm2 100m

84 P.V.C. Copper 7/.036 cable single 4mm2 100m

85 P.V.C. Ccopper 7/044 cable single 6mm2 100m

86 P.V.C. Copper 7/.052 cable single 10mm2 100m

87 P.V.C. Copper 7/.064 cable single 16mm2 100m

88 P.V.C. Copper 7/.083 cable single 25mm2 100m

89 P.V.C. Copper 19/.064 cable single 35mm2 100m

90 P.V.C. Copper 19/.103 cable single 95mm2 100m

91 P.V.C. Copper 3/036 cable Twin 100m

92 P.V.C. Copper 7/029 cable Twin 100m

93 P.V.C. Copper 7/036 cable Twin 100m

94 P.V.C. Copper 7/044 cable Twin 100m

95 P.V.C. Copper 7/052 cable Twin 100m

Engineering Organization Price List - Page 31 BSR 2012


96 P.V.C. Copper 7/064 cable Twin 100m

97 PVC Copper earth cable - 2.5mm2 100m

98 PVC Copper earth cable - 4mm2 100m

99 PVC Copper earth cable - 6mm2 100m

100 PVC Copper earth cable - 10mm2 100m

101 PVC Copper earth cable - 16mm2 100m

102 PVC Copper earth cable - 25mm2 100m

103 PVC Copper earth cable - 35mm2 100m

104 PVC Copper earth cable - 50mm3 100m

105 P.V.C. Copper 16/0.20mm flexible cable - 2core - 0.5mm 2 100m

DB/ BAKERS

15 Distribution Boards 4-8 ways No

16 Distribution Boards 8-10 ways No

12 Distribution Boards 10-12 ways No

13 Distribution Boards 14-16 ways No

14 Distribution Boards 16-19 ways No

23 ELCB - Double Pole 40A, 30mA No

22 ELCB - Double Pole 40A, 100mA No

ELCB - Double Pole 40A, 300mA No

28 ELCB - Double Pole 63A, 30mA No

27 ELCB - Double Pole 63A, 100mA No

ELCB - Double Pole 63A, 300mA No

21 ELCB 2P Cover No

25 ELCB - Four Pole 40A, 30mA No

24 ELCB - Four Pole 40A, 100mA No

Engineering Organization Price List - Page 32 BSR 2012


ELCB - Four Pole 40A, 300mA No

30 ELCB - Four Pole 63A, 30mA No

29 ELCB - Four Pole 63A, 100mA No

ELCB - Four Pole 63A, 300mA No

ELCB - Four Pole 100A, 300mA No

26 ELCB 4P Cover No

31 ELCB & MCB Combined 30mA 32A No

57 Main Switch - Double Pole 30Amp No

Main Switch - Four Pole 30Amp No

Main Switch - Four Pole 60Amp No

MCCB - Three Pole 30,40,63,100 Amp , 25KA No

MCCB - Four Pole 30,40,63,100 Amp , 25KA No

MCCB - Four Pole 160Amp , 40KA No

MCCB Enclorser No

62 MCB - Single Pole 6-32 Amp No

MCB - Single Pole 40 Amp No

63 MCB - Single Pole 63 Amp No

64 MCB SP Cover No

60 MCB - Double Pole 6-32 Amp No

MCB - Double Pole 40 Amp No

59 MCB - Double Pole 63 Amp No

61 MCB DP cover No

67 MCB - Three Pole 6-32 Amp No

MCB - Three Pole 40 Amp No

68 MCB - Three Pole 63 Amp No

Engineering Organization Price List - Page 33 BSR 2012


MCB TP cover No

69 MCB - Four Pole 6-32 Amp No

MCB - Four Pole 40 Amp No

MCB - Four Pole 63 Amp No

70 MCB 4P cover No

66 MCB SP/DP/TP 50-100 Amps Enclosure No

Isolator - Double Pole 40 Amp No

Isolator - Double Pole 63 Amp No

Isolator - Double Pole 100 Amp No

Isolator - Three Pole 40 Amp No

Isolator - Three Pole 63 Amp No

Isolator - Three Pole 100 Amp No

Isolator - Four Pole 40 Amp No

Isolator - Four Pole 63 Amp No

Isolator - Four Pole 100 Amp No

Isolator Plastic Enclosure No

SWITCH / SOKETS

121 Switch F/S Type 1 gang 5 Amp No

122 Switch F/S Type 2 gang 5 Amp No

123 Switch F/S Type 3 gang 5 Amp No

124 Switch F/S Type 4 gang 5 Amp No

125 Switch F/S Type 5 gang 5 Amp No

126 Switch F/S Type one gang two way 5 Amp No

127 Switch F/S Type single Way 15 Amp No

Engineering Organization Price List - Page 34 BSR 2012


113 Socket outlet 5 Amp 3 pin with switch No

112 Socket outlet 15 Amp 3 pin with switch No

114 Socket outlet 13 Amp 3 pin squar type with switch No

128 Switch Tumbler No

32 Electrical Bell No

33 Electrical Bell press No

LIGHT FITTINGS & BULBS

"SIMY BRAND"

5" Recess mounted down light - Model No:SIYDL125R No

5" Surface mounted down light - Model No:SIYDL125S No

4" Wall mounted cylindrical light fitting - Model No:SIYWB937 No

Weatherproof wall mounted cylindrical light fitting - Model


No
No:SIYWB3027

Weatherproof wall mounted 2'-0" single fluorescent light fitting


No
Model No:SIYWP120

8" glass globe pendent type light fitting - Model No:SIYWB937 No

Spot light - Model No:SIYSP120PAR No

Recessed Mounted Lovered 2'-0" x 2'-0" , 2 nos lights - Model


No
NoSIYPL220R/S
Recessed Mounted Lovered 2'-0" x 2'-0" , 3 nos lights - Model
No
NoSIYPL320R/S
Recessed Mounted Lovered 2'-0" x 2'-0" , 4 nos lights - Model
No
NoSIYPL420R/S
Recessed Mounted Lovered 2'-0" x 4'-0" , 2 nos lights - Model
No
NoSIYPL240R/S
Recessed Mounted Lovered 2'-0" x 4'-0" , 3 nos lights - Model
No
NoSIYPL340R/S
Recessed Mounted Lovered 2'-0" x 4'-0" , 4 nos lights - Model
No
NoSIYPL440R/S

Fluorescent lamp 36W Single - 4'-0" long , Diffuser Type - Model


45 No
No:SIYBD140BD

Engineering Organization Price List - Page 35 BSR 2012


Fluorescent lamp 36W Twin - 4'-0" long , Diffuser Type - Model
48 No
No:SIYBD240BD

Fluorescent lamp 18W Single - 2'-0" long , Diffuser Type - Model


39 No
No:SIYBD120BD

Fluorescent lamp 18W Twin - 2'-0" long , Diffuser Type - Model


42 No
No:SIYBD220BD

Fluorescent lamp 36W Single - 4'-0" long , Reflector Type - Model


44 No
No:SIYBR140M

Fluorescent lamp 36W Twin - 4'-0" long , Reflector Type - Model


47 No
No:SIYBR240M

Fluorescent lamp 18W Single - 2'-0" long , Reflector Type - Model


38 No
No:SIYBR120M

Fluorescent lamp 18W Twin - 2'-0" long , Reflector Type - Model


41 No
No:SIYBR220M
Fluorescent lamp 36W Single - 4'-0" long , Round Diffuser Type -
No
Model No:SIYBLD140
Fluorescent lamp 36W Twin - 4'-0" long , Round Diffuser Type -
No
Model No:SIYBLD240
Fluorescent lamp 18W Single - 2'-0" long , Round Diffuser Type -
No
Model No:SIYBLD120

Fluorescent lamp 18W Twin - 2'-0" long , Round Diffuser Type -


No
Model No:SIYBLD220

Fluorescent lamp 36W Single - 4'-0" long , Batton Type - Model


46 No
No:SIYBF140

Fluorescent lamp 36W Twin - 4'-0" long , Batton Type - Model


49 No
No:SIYBF240

Fluorescent lamp 18W Single - 2'-0" long , Batton Type - Model


40 No
No:SIYBF120

Fluorescent lamp 18W Twin - 2'-0" long , Batton Type - Model


43 No
No:SIYBF220

20W CFL Lamp - Osram , Philips or Approved eqivelvent No

54 Incandescent Bulb 100W No

136 Mercury Vapour Lamp 125 w clamps with complete No

137 Mercury Vapour Lamp 250W clamps with complete No

Engineering Organization Price List - Page 36 BSR 2012


FANS

7 Ceiling fan (56") No

34 Exhaust Fan (K.D.K.) 12" + B lower 12" No

35 Fan Hook No

134 Exhaust or blower Fan 12" ( K.D.K. or equalent) No

135 Wall mounted Fan 16" (KDK or eqquivalent) No

138 Dimmer Type Fan Regulator No

CONDUITS/ CASINGS

74 P.V.C. Conduit 1 1/2" per lenth

75 P.V.C. Conduit 1 1/4" per lenth

76 P.V.C. Conduit 1 " per lenth

77 P.V.C. Conduit 2" per lenth

78 P.V.C. Conduit 3/4" per lenth

79 P.V.C. Conduit Box No

106 P.V.C. Saddles 1 1/2" No

107 P.V.C. Saddles 1 1/4" No

108 P.V.C. Saddles 1" No

109 P.V.C. Saddles 2" No

110 P.V.C. Saddles 3/4" No

143 3/4" Sockets (PVC) No

144 1" Sockets (PVC) No

145 1 1/4" Sockets (PVC) No

146 1 1/2" Sockets (PVC) No

147 2" Sockets (PVC) No

Engineering Organization Price List - Page 37 BSR 2012


148 3/4" Bend (PVC) No

149 1" Bend (PVC) No

150 1 1/4" Bend (PVC) No

151 1 1/2" Bend (PVC) No

152 2" Bend (PVC) No

133 Plastic casing & Capping 1" L.ft 10

EARTH ELECTRODES

18 Earth Electrode - G.I. Pipe 2" dia. x 3.6mm thick L.ft

19 Earth Electrode Copper Plate - 2'-0"x 2'-0"x 3mm thick No.

ACCESSORIES

6 Brass screws 3/4" No

4 Brass screws 1" No

5 Brass screws 2" No

3 Brass screws 1 1/2" No

2 Brass bolt "X 1/2 " dia with washer & Nut No

9 Ceiling Rose No

10 Connector No

11 Din Rail 1m

17 Dove Tail Plug No

50 Glass Shade No

51 G.I. Chain L.ft

55 Insulation Tape Roll No

111 Rawl Plugs 1 1/2" No

Engineering Organization Price List - Page 38 BSR 2012


115 Solder Lb

116 Spacer bar Saddles 3/4" No

56 Junction Box 3 way with plate No

73 Plastic shade No

119 Sunk Box fixed nut type single plastic No

120 Suspension hook No

129 Wire Clips 1"-2 1/2" 100 Nos

130 Wodden Block No

131 Wodden board No

132 Wodden Plug No

36 Flexible cords 14/0076 2 core 100m

37 Flexible cords 14/0076 3 core 100m

52 Holders batten Type No

53 Holders Pendent Type No

71 Neutral Link 14 Holes No

72 Neutral Link 7 Holes No

117 Spot Bulb 150W White No

118 Spot holder No

139 Spot light lamp holder No

140 Spot light lamp bulb No

141 Water tight lamp holder No

142 Water tight lamp bulb No

Engineering Organization Price List - Page 39 BSR 2012


LABOUR RATES BASED FOR ESR -2011

153 Skilled labour 96.25 Per Hour

154 Un Skilled Labour 78.625 Per Hour

Engineering Organization Price List - Page 40 BSR 2012


Start dated
2012 Aug.
(Rates based on
without VAT.)

BASIC Cost
2012

1790.00

2225.00

2012.00

3644.00

4080.00

5751.00

7495.00

3825.00

4815.00

900.00

975.00

1200.00

21460.00

7065.00

Engineering Organization Price List - Page 41 BSR 2012


BASIC Cost
2012

650.00

785.00

975.00

650.00

450.00

870.00

610.00

800.00

1210.00

1500.00

750.00

200.00

230.00

260.00

690.00

280.00

285.00

525.00

660.00

355.00

560.00

575.00

Engineering Organization Price List - Page 42 BSR 2012


BASIC Cost
2012

425.00

80.00

6.50

8.00

8.50

9.00

12.00

5.00

5.00

3.00

1300.00

1800.00

400.00

50.00

405.00

480.00

850.00

35.00

100.00

135.00

68.00

95.00

295.00

Engineering Organization Price List - Page 43 BSR 2012


BASIC Cost
2012

300.00

300.00

11050.00

4500.00

6250.00

6000.00

5500.00

5500.00

5750.00

8875.00

670.00

80.00

190.00

15.00

9000.00

48.00

70.00

90.00

68.00

90.00

125.00

Engineering Organization Price List - Page 44 BSR 2012


BASIC Cost
2012

50.00

34605.00

11050.00

845.00

1530.00

950.00

1000.00

1940.00

1070.00

1225.00

2220.00

1175.00

1350.00

2525.00

2170.00

36.00

29.00

Engineering Organization Price List - Page 45 BSR 2012


BASIC Cost
2012

24.00

35.00

28.00

23.00

41.00

34.00

30.00

40.00

33.00

29.00

200.00

275.00

520.00

1100.00

2250.00

2675.00

5360.00

7150.00

Engineering Organization Price List - Page 46 BSR 2012


BASIC Cost
2012

72.00

163.00

288.00

266.00

492.00

360.00

560.00

475.00

500.00

152.00

275.00

105.00

143.00

215.00

305.00

375.00

442.00

770.00

70.00

Engineering Organization Price List - Page 47 BSR 2012


BASIC Cost
2012

135.00

2950.00

1340.00

1070.00

760.00

610.00

435.00

255.00

402.00

85.00

210.00

1300.00

1300.00

390.00

390.00

1380.00

Engineering Organization Price List - Page 48 BSR 2012


BASIC Cost
2012

0.50

80.00

210.00

160.00

60.00

40.00

220.00

3.50

4.00

40.00

12.00

15.00

30.00

5000.00

3500.00

1000.00

460.00

15135.00

4000.00

Engineering Organization Price List - Page 49 BSR 2012


BASIC Cost
2012

6610.00

9020.00

4465.00

5425.00

8010.00

10520.00

5400.00

5425.00

15670.00

19195.00

6385.00

13750.00

14465.00

18480.00

2570.00

2150.00

15985.00

1250.00

4020.00

Engineering Organization Price List - Page 50 BSR 2012


BASIC Cost
2012

1075.00

760.00

7235.00

2610.00

1655.00

1655.00

1600.00

1035.00

2450.00

2715.00

3020.00

3715.00

6955.00

2620.00

3825.00

4770.00

5200.00

2200.00

9775.00

1215.00

2790.00

Engineering Organization Price List - Page 51 BSR 2012


BASIC Cost
2012

1485.00

4500.00

6375.00

4225.00

7380.00

1000.00

315.00

11205.00

86365.00

4635.00

15615.00

6550.00

11205.00

5310.00

2835.00

12420.00

1890.00

11700.00

11700.00

5130.00

755.00

Engineering Organization Price List - Page 52 BSR 2012


BASIC Cost
2012

1950.00

1250.00

1250.00

2250.00

5500.00

250.00

850.00

575.00

2170.00

1620.00

1250.00

1455.00

1690.00

4525.00

475.00

870.00

1305.00

1375.00

2730.00

3705.00

9695.00

16280.00

390.00

Engineering Organization Price List - Page 53 BSR 2012


BASIC Cost
2012

650.00

390.00

650.00

600.00

1375.00

760.00

1295.00

1135.00

3000.00

155.00

155.00

660.00

715.00

460.00

375.00

6015.00

11660.00

20470.00

49260.00

110.00

Engineering Organization Price List - Page 54 BSR 2012


BASIC Cost
2012

200.00

215.00

330.00

440.00

705.00

1850.00

85.00

100.00

1200.00

1970.00

275.00

225.00

650.00

12.00

7.00

12.00

13.00

29.00

48.00

65.00

91.00

Engineering Organization Price List - Page 55 BSR 2012


BASIC Cost
2012

160.00

330.00

381.00

568.00

22.00

44.00

59.00

102.00

204.00

244.00

357.00

730.00

42.00

76.00

130.00

162.00

170.00

100.00

14.00

20.00

30.00

44.00

69.00

109.00

268.00

Engineering Organization Price List - Page 56 BSR 2012


BASIC Cost
2012

394.00

632.00

17.00

24.00

28.00

52.00

72.00

120.00

883.00

894.00

1162.00

17.00

24.00

31.00

58.00

80.00

124.00

250.00

480.00

788.00

13.00

24.00

35.00

57.00

97.00

Engineering Organization Price List - Page 57 BSR 2012


BASIC Cost
2012

163.00

610.00

1121.00

2696.00

23.00

31.00

44.00

96.00

155.00

288.00

716.00

1198.00

1905.00

17.00

31.00

48.00

78.00

136.00

207.00

790.00

1364.00

3332.00

100.00

96.00

93.00

Engineering Organization Price List - Page 58 BSR 2012


BASIC Cost
2012

90.00

86.00

73.00

70.00

59.00

52.00

50.00

44.00

38.00

30.00

24.00

19.00

214.00

207.00

205.50

204.50

198.00

127.00

111.00

104.00

89.00

78.00

75.00

57.00

49.00

Engineering Organization Price List - Page 59 BSR 2012


BASIC Cost
2012

44.00

33.00

53.00

41.00

43.00

45.00

40.00

37.00

14.00

15.00

16.00

18.00

23.00

24.00

27.00

70.00

121.00

130.00

68.00

50.00

88.00

203.00

285.00

482.00

73.00

Engineering Organization Price List - Page 60 BSR 2012


BASIC Cost
2012

38.00

86.00

60.00

111.00

20.00

150.00

61.00

120.00

31.00

217.00

40.00

232.00

57.00

297.00

57.00

432.00

44.00

44.00

385.00

336.00

192.00

370.00

27.00

Engineering Organization Price List - Page 61 BSR 2012


BASIC Cost
2012

145.00

41.00

472.00

33.00

41.00

395.00

395.00

170.00

560.00

1030.00

645.00

510.00

580.00

575.00

690.00

360.00

550.00

805.00

295.00

490.00

365.00

540.00

1115.00

Engineering Organization Price List - Page 62 BSR 2012


BASIC Cost
2012

195.00

195.00

160.00

140.00

55.00

80.00

770.00

755.00

525.00

520.00

580.00

645.00

795.00

810.00

3400.00

950.00

2890.00

6475.00

515.00

2900.00

905.00

510.00

210.00

Engineering Organization Price List - Page 63 BSR 2012


BASIC Cost
2012

14.00

20.00

70.00

70.00

100.00

935.00

830.00

680.00

1175.00

1550.00

2250.00

2400.00

1230.00

895.00

180.00

220.00

300.00

450.00

650.00

850.00

80.00

57.00

625.00

Engineering Organization Price List - Page 64 BSR 2012


BASIC Cost
2012

30.00

15.00

25.00

46.00

52.00

120.00

80.00

15.00

105.00

130.00

110.00

110.00

115.00

Engineering Organization Price List - Page 65 BSR 2012


BASIC Cost
2012

70.00

125.00

155.00

220.00

250.00

285.00

450.00

610.00

750.00

129.50

110.00

90.00

60.00

100.00

59.00

61.00

62.00

73.00

82.00

1030.00

1095.00

24.00

65.00

85.00

Engineering Organization Price List - Page 66 BSR 2012


BASIC Cost
2012

130.00

170.00

185.00

265.00

355.00

450.00

100.00

220.00

365.00

52.00

64.00

70.00

75.00

7.00

90.00

45.00

6.00

1350.00

2700.00

3660.00

55.00

45.00

12.00

Engineering Organization Price List - Page 67 BSR 2012


BASIC Cost
2012

130.00

145.00

23.00

50.00

72.00

30.00

55.00

180.00

280.00

660.00

960.00

410.00

360.00

3200.00

140.00

170.00

185.00

205.00

230.00

255.00

75.00

85.00

90.00

3820.00

4220.00

Engineering Organization Price List - Page 68 BSR 2012


BASIC Cost
2012

130.00

250.00

30.00

10.00

142.00

111.00

68.00

103.00

100.00

129.00

205.00

240.00

267.00

150.00

99.00

140.00

100.00

140.00

Engineering Organization Price List - Page 69 BSR 2012


BASIC Cost
2012

65.00

140.00

99.00

144.00

83.00

144.00

244.00

128.00

66.00

556.00

447.00

444.00

332.00

109.00

76.00

45.00

600.00

200.00

24.00

18.00

Engineering Organization Price List - Page 70 BSR 2012


BASIC Cost
2012

770.00

770.00

770.00

629.00

1985.00

4195.00

4555.00

6740.00

10535.00

15270.00

25180.00

38395.00

61610.00

85715.00

236610.00

8660.00

12635.00

19910.00

29065.00

45225.00

Engineering Organization Price List - Page 71 BSR 2012


BASIC Cost
2012

68125.00

5895.00

9955.00

14420.00

23750.00

36875.00

62455.00

80715.00

108395.00

4870.00

###

###

###

###

###

3035.00

4325.00

3200.00

4485.00

4840.00

4840.00

###

4795.00

4795.00

Engineering Organization Price List - Page 72 BSR 2012


BASIC Cost
2012

4795.00

6645.00

6645.00

6670.00

11985.00

###

###

###

###

###

7950.00

10360.00

16075.00

###

400.00

400.00

915.00

###

1090.00

1090.00

2365.00

###

1695.00

1695.00

3615.00

Engineering Organization Price List - Page 73 BSR 2012


BASIC Cost
2012

###

3155.00

3155.00

5560.00

###

895.00

985.00

1100.00

2115.00

1555.00

1705.00

3235.00

2100.00

2285.00

4430.00

225.00

###

###

###

###

###

###

###

###

###

Engineering Organization Price List - Page 74 BSR 2012


BASIC Cost
2012

###

###

###

###

###

###

###

###

600.00

1000.00

1200.00

3600.00

3500.00

1200.00

1450.00

###

###

###

###

###

###

850.00

Engineering Organization Price List - Page 75 BSR 2012


BASIC Cost
2012

1700.00

740.00

1200.00

805.00

1300.00

670.00

1150.00

750.00

950.00

550.00

850.00

475.00

75.00

###

###

Engineering Organization Price List - Page 76 BSR 2012


BASIC Cost
2012

###

###

###

###

###

###

###

###

220.00

19650.00

###

###

6.50

7.50

9.00

8.00

200.00

28.00

2.00

300.00

4.00

210.00

8.00

30.00

3.50

Engineering Organization Price List - Page 77 BSR 2012


BASIC Cost
2012

60.00

1.00

8.00

175.00

20.00

12.00

5.00

2.00

5.00

2.00

###

###

4870.00

7100.00

30.00

30.00

300.00

200.00

450.00

275.00

275.00

490.00

275.00

550.00

Engineering Organization Price List - Page 78 BSR 2012


BASIC Cost
2012

96.25

78.63

Engineering Organization Price List - Page 79 BSR 2012


Site preparation, Clearing site vegetation, removing
B 01 bushes, shrubs & top soil to a depth not exceeding 6"
and removing all debris away from site.

.
Per Sqr.
1 Day unskilled labour 1.000 629.00
1/3 of Basket 0.333 80.00
Rate per sqr.
Add 22%
Total

Manual Excavation over site to reduce level in any


material (except rock requiring blasting) including
B 02 depositing and levelling as directed up to a distance not
exceeding 30'.

Per Cube.
1.5 Day unskilled labour 1.500 629.00
1/3 of Basket 0.333 80.00
Rate per cube
Add 22%
Total

Manual Excavation over site to reduce level in any


material (except rock requiring blasting ) including
B 03 depositing and levelling as directed distance exceeding
30'-0" but not exceeding 1/4 mile.

Per Cube.
1 5/8 Day unskilled labour 1.625 629.00
1/3 of Basket 0.333 80.00
0.25 transport per cube 0.250 190.00
Rate per cube
Add 22%
Total

Manual Excavation for column, wall, staircase


foundations in any material (except rock requiring
B 04 blasting) up to 5'-0" depth, part return fill in and ram and
surplus depositted within site as directed.

Per Cube.
2 1/8 Day unskilled labour 2.125 629.00
1/3 of Basket 0.333 80.00
0.25 transport per cube 0.250 190.00
Rate per cube
Add 22%
Total

Manual Excavation for column, wall, staircase


B 05 foundations in any material (except rock requiring
blasting) depth 5'-0" - 10'-0"…….

Engineering Organization W.P. Page 80 BSR Annalysis


Per Cube.
3 1/4 Day unskilled labour 3.250 629.00
1/3 of Basket 0.333 80.00
0.5 transport per cube 0.500 190.00
Rate per cube
Add 22%
Total

Manual Excavation for column, wall, staircase


B 06 foundations in any material (except rock requiring
blasting) depth 10'-0" - 15'-0"…….

Per Cube.
4 1/4 Day unskilled labour 4.250 629.00
1/3 of Basket 0.333 80.00
0.75 transport per cube 0.750 190.00
Rate per cube
Add 22%
Total

Earth work supports,(Open planking) in trenches total


B 10 depth up to 5'-0", distance between opposing faces not
exceeding 6'-6"

Per 150 Sq. Ft.


18.375 Cuft. class 11 Timber (1/4 use ) 18.375 375.00
1 Day Carpenter 1.000 770.00
3 Days Labour 3.000 629.00
Per 150 Sq.ft.
Per Sq.ft
Add 22%
Total

Earth work supports,(Open planking) in trenches total


B 11 depth exceeding 5'-0" and not exceeding 10'-0", distance
between opposing faces not exceeding 6'-6"

Per 300 Sq. Ft.


36.75 Cuft. class 11 Timber (1/4 use ) 36.750 375.00
2 Day Carpenter 2.000 770.00
4 Days Labour 4.000 629.00
Per 150 Sq.ft.
Per Sq.ft
Add 22%
Total

Earth work supports,(Open planking) in trenches total


B 12 depth exceeding 10'-0" and not exceeding 15'-0",
distance between opposing faces not exceeding 6'-6"

Per 450 Sq. Ft.

Engineering Organization W.P. Page 81 BSR Annalysis


55.125 Cuft. class 11 Timber (1/4 use ) 55.125 375.00
3 Day Carpenter 3.000 770.00
5 Days Labour 5.000 629.00
Per 150 Sq.ft.
Per Sq.ft
Add 22%
Total

Earth work supports,(Close planking) in trenches total


B 13 depth up to 5'-0", distance between opposing faces not
exceeding 6'-6"

Per 150 Sq. Ft.


34.5 Cuft. class 11 Timber (1/4 use ) 34.500 375.00
2 Days Carpenter 2.000 770.00
3 Days Labour 3.000 629.00
Per 150 Sq.ft.
Per Sq.ft
Add 22%
Total

Earth work supports,(Close planking) in trenches total


B 14 depth exceeding 5'-0" and not exceeding 10'-0", distance
between opposing faces not exceeding 6'-6"

Per 150 Sq. Ft.


69 Cuft. class 11 Timber (1/4 use ) 69.000 375.00
3 Days Carpenter 3.000 770.00
4 Days Labour 4.000 629.00
Per 150 Sq.ft.
Per Sq.ft
Add 22%
Total

Earth work supports,(Close planking) in trenches total


B 15 depth exceeding 10'-0" and not exceeding 15'-0",
distance between opposing faces not exceeding 6'-6"

Per 150 Sq. Ft.


103.5 Cuft. class 11 Timber (1/4 use ) 103.500 375.00
4 Days Carpenter 4.000 770.00
5 Days Labour 5.000 629.00
Per 150 Sq.ft.
Per Sq.ft
Add 22%
Total

Engineering Organization W.P. Page 82 BSR Annalysis


Approved hard Earth spreading , leveling watering and
manual compaction, using standered cast iron stamper
B 16
or equivalent and filling in 150 mm thick layers (loose
volume) in respected area (Earth available at site)

Per Cube
1 1/2 Day unskilled labour 1.500 629.00
1/3 of Basket 0.333 80.00
Rate per cube
Add 22%
Total

River Sand supply within 16km from the source (for


distances over 16km, add Rs. 75 per Cube per Killo
Meter) subject to the specific approval by the Divisional
B 19 Engineer. Rate is applicable for loose volume. *** In
case of measurements to be done on compacted volume
multiply the rate by 1.2.

Per Sqr.
1 cube of sand 1.000 11050.00
Rate per cube
Add 22%
Total

Dense graded 37.5mm aggregate base course (ABC)


supplying within 16Km, spreading , leveling , watering in
B 20 225mm thick layers and compaction using machine
Rammer. (loose volume). Rate include hire charges of
the machine rammer.

Per 7 cube
7.00 cube of ABC 7.000 8875.00
400 gallons water 400.000 0.50
1 1/4 day hire of rammer 1.250 1000.00
6 Day unskilled labour 6.000 629.00
Allow 2.5% tools
Rate per 7 cube
Rate per cube
Add 22%
Total

Graded Quarry dust 4.5mm downwords supplying within


16Km, spreading , leveling , watering in 225mm thick
B 21 layers and compaction using machine Rammer.(loose
volume). Rate include hire charges of the machine
rammer.

Per cube
1 cube of Quarry dust 1.000 5750.00
50 gallons water 50.000 0.50
1/3 day hire of rammer 0.330 1000.00

Engineering Organization W.P. Page 83 BSR Annalysis


2 Day unskilled labour 2.000 629.00
Allow 2.5% tools
Rate per cube
Add 22%
Total

Compaction of Earth including watering in 225mm thick


layers (measured on piled volume) using machine
Rammer. Rate include hire charges of the machine
B 22
rammer. *** This rate is applicable for building
construction with earth work not exceeding 50 cubes.
(earth available at site).

Per cube.
2/3 Day unskilled labour 0.667 629.00
1/3 day hire charger for rammer 0.333 1000.00
Rate per cube
Add 22%
Total

Anti-tretement for the new construction with applying


Biflexthrine 10Tc (Biflex ) or approved equivalent ,
Dialuted chemicals 1:200 ratio with water after supplying
B 26 the sealed bottle with lables to the site and should be
followed the manufracture standerds of application
including horizontal & vertical barriers. It should be 10
years warranty on application.

Per 400 S.ft.


Materials
1L - Biflex ---- 400 sq.ft
Biflex 1 L 1.000 4845.00
Labour charges for application - 2 day 2.000 770.00

Rate per 400 Sq.ft.


Rate per Sq.ft.
Add 8%
Total

Anti-tretement for the post construction (Existing


building ) with applying Biflexthrine 10Tc (Biflex ) or
approved equivalent , Dialuted chemicals 1:200 ratio
with water after supplying the sealed bottle with lables
B 27
to the site and should be followed the manufracture
standerds of application including horizontal & vertical
barriers. It should be not less than 5 years warranty on
application.

Per 400 S.ft.


Materials
1L - Biflex ---- 400 sq.ft
Biflex 1.000 4845.00
Labour charges for application - 2 day 2.000 770.00

Engineering Organization W.P. Page 84 BSR Annalysis


Add Aditional for matearial & Labour

Rate per 400 Sq.ft.


Rate per Sq.ft.
Add 8%
Total

Cement concrete 1:3:6 (1 1/2") in foundation under


C 01
column footings (concrete mixer)
Per Cube
Materials
13 Cwt. cement 13.000 670.00
0.53 Cube sand 0.530 11050.00
0.92 Cubs 1 1/2" Metal 0.920 5500.00
1/3 Day hire of concrete mixer 0.333 5000.00
110 gal. Water 110.000 0.50
Sub Total
Labour
1 Days mason 1.000 770.00
6 Days labour 6.000 629.00
Add 2.5% for tools
Sub Total

Rate per cube


Add 22%
Total rate

Cement concrete 1:3:6 (1 1/2") in foundation under


C 02
column footings (lean concrete of 3" thickness)

Rate per 1:3:6(1 1/2") Cement concrete Cube

Rate per Sqr.

Cement concrete 1:3:6 (1") in foundation under column


C 03 Sqr.
footings (lean concrete of 2" thickness)
Per Cube
Materials
11.25 Cwt. cement 11.250 670.00
0.56 Cube sand 0.560 11050.00
1 Cube 1" Metal 1.000 6000.00
110 gal. Water 110.000 0.50
Sub Total
Labour
1 Days mason 1.000 770.00
8 Days labour 8.000 629.00
Sub Total

Engineering Organization W.P. Page 85 BSR Annalysis


Rate per 1 cube
Add 22%
Total rate

Rate per 2" thick sqr.

Cement concrete 1:3:6 (1") in foundation and under


C 04
column footings
Per Cube
Materials
11.25 Cwt. cement 11.250 670.00
0.56 Cube sand 0.560 11050.00
1 Cube 1" Metal 1.000 6000.00
110 gal. Water 110.000 0.50
Sub Total
Labour
1 Days mason 1.000 770.00
8 Days labour 8.000 629.00
Sub Total

Rate per 1 cube


Add 22%
Total rate

Cement concrete 1:2:4 (3/4") footings, beams/lintels and


C 05
columns in ground floor using mixer and vibrator.

Per Cube
Materials
18 Cwt. cement 18.000 670.00
0.50 Cube sand 0.500 11050.00
1 Cube metal 3/4" 1.000 6250.00
120 gal. Water 120.000 0.50
1/3 Day hire of mixer 0.333 5000.00
1/3 Day hire of vibrator 0.333 3500.00
Sub Total
Labour
1 Days mason 1.000 770.00
6 Days labour 6.000 629.00
1 Day labour for curing 1.000 629.00
Add 2.5% for tools
Sub Total
Rate per 1 cube
Add 22%
Total rate per cube

Cement concrete 1:2:4 (3/4") in beams/lintels and


C 06
columns in first floor using mixer and vibrator.
As per Item C05
Add 3%

Engineering Organization W.P. Page 86 BSR Annalysis


Cement concrete 1:2:4 (3/4") in beams/lintels and
C 07
columns in second floor using mixer and vibrator.
As per Item C05
Add 5%

Cement concrete 1:1 1/2:3 (3/4") using mixer and


C 08
vibrator in ground floor.
Per Cube
Materials
23 Cwt. cement 23.000 670.00
0.42 Cube sand 0.420 11050.00
0.82 Cube metal 3/4" 0.820 6250.00
1/3 Day hire of mixer 0.333 5000.00
1/3 Day hire of vibrator 0.333 3500.00
150 gal. water 150.000 0.50
Sub Total
Labour
1 Days mason 1.000 770.00
6 Days labour 6.000 629.00
1 Day labour for curing 1.000 629.00
Add 2.5% for tools
Sub Total

Rate per 1 cube


Add 22%
Total rate per cube

Cement concrete 1:1 1/2:3 (3/4") using mixer and


C 09
vibrator in first floor
As per Item C8
Add 3%

Cement concrete 1:1 1/2:3 (3/4") using mixer and


C 10
vibrator in second floor

As per Item C8
Add 5%

4" Thick R.C.C slab in cement concrete 1:2:4(3/4") in


C 11
first floor using mixer and vibrator.
Per 8 Sqr.
Materials
45 1/3 Cwt. Cement 45.333 670.00
2.4 Cube 3/4" metal 2.400 6250.00
1.6 Cube sand 1.600 11050.00
160 Gln. Water 160.000 0.50

Engineering Organization W.P. Page 87 BSR Annalysis


1 Day mixer 1.000 5000.00
1 Day vibrator 1.000 3500.00
Sub Total
Labour
4 Day Mason 4.000 770.00
24 Days Labourer 24.000 629.00
1 Day Labour for Curing 1.000 629.00
Add 2.5% for tools
Sub Total

Total Per 8 Sqr.


Per Sqr.
Add 22%
Total Rate

4 1/2" thick R.C.C. slab in cement concrete 1:2:4(3/4") in


C 12
first floor using mixer and vibrator.
Per 8 Sqr.
Materials
51 Cwt. Cement 51.000 670.00
2.7 Cube 3/4" metal 2.700 6250.00
1.8 Cube sand 1.800 11050.00
170 Gln. Water 170.000 0.50
1 Day mixer 1.000 5000.00
1 Day vibrator 1.000 3500.00
Sub Total
Labour
4 Day Mason 4.000 770.00
24.5 Days Labourer 24.500 629.00
1 Day Labour for Curing 1.000 629.00
Add 2.5% for tools
Sub Total

Total Per 8 Sqr.


Per Sqr.
Add 22%
Total Rate

5" thick R.C.C. slab in cement concrete 1:2:4(3/4") in


C 13
first floor using mixer and vibrator.
Per 8 Sqr.
Materials
56 2/3 Cwt. Cement 56.667 670.00
3 Cube 3/4" metal 3.000 6250.00
2 Cube sand 2.000 11050.00
180 Gln. Water 180.000 0.50
1 Day mixer 1.000 5000.00
1 Day vibrator 1.000 3500.00
Sub Total
Labour
4 Day Mason 4.000 770.00
25 Days Labourer 25.000 629.00

Engineering Organization W.P. Page 88 BSR Annalysis


1 Day Labour for Curing 1.000 629.00
Add 2.5% for tools
Sub Total

Total Per 8 Sqr.


Per Sqr.
Add 22%
Total

5 1/2" thick R.C.C. slab in cement concrete 1:2:4(3/4") in


C 14
first floor using mixer and vibrator.
Per 8 Sqr.
Materials
64 Cwt. Cement 64.000 670.00
3.7 Cube 3/4" metal 3.700 6250.00
2.2 Cube sand 2.200 11050.00
200 Gln. Water 200.000 0.50
1 Day mixer 1.000 5000.00
1 Day vibrator 1.000 3500.00
Sub Total
Labour
4 Day Mason 4.000 770.00
25.5 Days Labourer 25.500 629.00
1 Day Labour for Curing 1.000 629.00
Add 2.5% for tools
Sub Total

Total Per 8 Sqr.


Per Sqr.
Add 22%
Total

6" Thick R.C.C. slab in first floor using mixer and


C 15
vibrator.
Per 8 Sqr.
Materials
70 Cwt. Cement 70.000 670.00
4 Cube 3/4" metal 4.000 6250.00
2.4 Cube sand 2.400 11050.00
220 Gln. Water 220.000 0.50
1 Day mixer 1.000 5000.00
1 Day vibrator 1.000 3500.00
Sub Total
Labour
4 1/4 Day Mason 4.250 770.00
26 Days Labourer 26.000 629.00
1 Day Labour for Curing 1.000 629.00
Add 2.5% for tools
Sub Total

Total Per 8 Sqr.


Per Sqr.

Engineering Organization W.P. Page 89 BSR Annalysis


Add 22%
Total Rate

Pre cast concreat lintol 9" x 6" R.C.C. 1:2:4(3/4")


including 3 Nos. 10 mm Dia. tor steel and 6mm mild steel
C 16
at c/c 6" with 1" rubber plank timber form work in
ground floor.
Per 10 L. ft ( 2 lintols each 5' 0")
Materials
0.6 Cwt. cement 0.600 670.00
0.02 Cube sand 0.020 11050.00
0.035 Cube metal 3/4" 0.035 6250.00
17.5 Sq,ft. planks (1/3 new cost) 17.500 10.00
5.5 kg. 10 mm tor steel 5.500 129.50
2 kg 6 mm mild steel 2.000 110.00
Allow for nails

Labour
concreating iuncluding curing
2 hrs. mason 0.250 770.00
2 hrs. labour 0.250 629.00
Carpentry
2 hrs. carpenter 0.250 770.00
2 hrs. labour 0.250 629.00
Bar bending
2 hrs. blacksmith 0.250 770.00
Hoisting in position
1 hr.2 labours 0.250 629.00

Rate per 10 L.ft


Rate per Ft.
Add 22%
Total Rate

Pre cast concreat lintol 9" x 6" R.C.C. 1:2:4(3/4")


including 3 Nos. 10 mm Dia. tor steel and 6mm mild steel
C 17
at c/c 6" with 1" rubber plank timber form work in first
floor.

As per Item C16


Add 3%
Total

Pre cast concreat lintol 9" x 6" R.C.C. 1:2:4(3/4")


including 3 Nos. 10 mm Dia. tor steel and 6mm mild steel
C 18
at c/c 6" with 1" rubber plank timber form work insecond
floor.

As per Item C16


Add 5%

Engineering Organization W.P. Page 90 BSR Annalysis


Total

Pre cast concreate lintol 4 1/2" x 6" R.C.C. 1:2:4(3/4")


including 3 Nos. 10 mm Dia. tor sttel and 6mm mild steel
C 19
at c/c 6" with 1" rubber plank timber form work in
Ground floor.
Per 10 L. ft ( 2 lintols each 5' 0")
Materials
0.3 Cwt. cement 0.300 670.00
0.01 Cube sand 0.010 11050.00
0.02 Cube metal 3/4" 0.020 6250.00
14 Sq,ft. planks (1/3 new cost) 14.000 10.00
4 kg. 10 mm tor steel 4.000 129.50
0.5 kg 6 mm mild steel 0.500 110.00
Allow for nails

Labour
concreating iuncluding curing
2 hrs. mason 0.250 770.00
2 hrs. labour 0.250 629.00
Carpentry
2 hrs. carpenter 0.250 770.00
2 hrs. labour 0.250 629.00
Bar bending
2 hrs. blacksmith 0.250 770.00
Hoisting in position
1 hr.2 labours 0.250 629.00

Rate per 10 L.ft


Rate per Ft.
Add 22%
Total Rate

Pre cast concreate lintol 4 1/2" x 6" R.C.C. 1:2:4(3/4")


including 3 Nos. 10 mm Dia. tor sttel and 6mm mild steel
C 20
at c/c 6" with 1" rubber plank timber form work in first
floor.

As per Item C19


Add 3%
Total

Pre cast concreate lintol 4 1/2" x 6" R.C.C. 1:2:4(3/4")


including 3 Nos. 10 mm Dia. tor steel and 6mm mild steel
C 21
at c/c 6" with 1" rubber plank timber form work in first
floor.

As per Item C19


Add 5%
Total

Engineering Organization W.P. Page 91 BSR Annalysis


Pre-cast lintols size 4" x 6" deep in 1:2:4(3/4") cement
concrete, reinforced with 2 nos of 10mm dia. tor steel
C 22
bars and 6mm mild steel stirrups @ 6" c/c including
necessary formwork in ground floor.
Per 10 L. ft ( 2 lintols each 5' 0")
Materials
0.298 Cwt. cement 0.298 670.00
0.008 Cube sand 0.008 11050.00
0.018 Cube metal 3/4" 0.018 6250.00
13.5 Sq,ft. planks (1/3 new cost) 13.500 10.00
4 kg. 10 mm tor steel 4.000 129.50
0.5 kg 6 mm mild steel 0.500 110.00
Allow for nails

Labour
concreating iuncluding curing
2 hrs. mason 0.250 770.00
2 hrs. labour 0.250 629.00
Carpentry
2 hrs. carpenter 0.250 770.00
2 hrs. labour 0.250 629.00
Bar bending
2 hrs. blacksmith 0.250 770.00
Hoisting in position
1 hr.2 labours 0.250 629.00

Rate per 10 L.ft


Rate per Ft.
Add 22%
Total Rate

Pre-cast lintols size 4" x 6" deep in 1:2:4(3/4") cement


concrete, reinforced with 2 nos of 10mm dia. tor steel
C 23
bars and 6mm mild steel stirrups @ 6" c/c including
necessary formwork in first floor.

As per Item C22


Add 3%
Total

Pre-cast lintols size 4" x 6" deep in 1:2:4(3/4") cement


concrete, reinforced with 2 nos of 10mm dia. tor steel
C 24
bars and 6mm mild steel stirrups @ 6" c/c including
necessary formwork in second floor.

As per Item C22


Add 5%
Total

Engineering Organization W.P. Page 92 BSR Annalysis


Pre-cast lintols size 6" x 6" deep in 1:2:4(3/4") cement
concrete, reinforced with 3 nos of 10mm dia. tor steel
C 25
bars and 6mm mild steel stirrups @ 6" c/c including
necessary formwork in ground floor.
Per 10 L. ft ( 2 lintols each 5' 0")
Materials
0.450 Cwt. cement 0.450 670.00
0.013 Cube sand 0.013 11050.00
0.025 Cube metal 3/4" 0.025 6250.00
15 Sq,ft. planks (1/3 new cost) 15.000 10.00
5.5 kg. 10 mm tor steel 5.500 129.50
1 kg 6 mm mild steel 1.000 110.00
Allow for nails

Labour
concreating iuncluding curing
2 hrs. mason 0.250 770.00
2 hrs. labour 0.250 629.00
Carpentry
2 hrs. carpenter 0.250 770.00
2 hrs. labour 0.250 629.00
Bar bending
2 hrs. blacksmith 0.250 770.00
Hoisting in position
1 hr.2 labours 0.250 629.00

Rate per 10 L.ft


Rate per Ft.
Add 22%
Total Rate

Pre-cast lintols size 6" x 6" deep in 1:2:4(3/4") cement


concrete, reinforced with 3 nos of 10mm dia. tor steel
C 26
bars and 6mm mild steel stirrups @ 6" c/c including
necessary formwork in first floor.

As per Item C25


Add 3%
Total

Pre-cast lintols size 6" x 6" deep in 1:2:4(3/4") cement


concrete, reinforced with 3 nos of 10mm dia. tor steel
C 27
bars and 6mm mild steel stirrups @ 6" c/c including
necessary formwork in second floor.

As per Item C25


Add 5%
Total

Engineering Organization W.P. Page 93 BSR Annalysis


Stiffiner columns size 4" x 6" in 1:2:4 (3/4") reinforced
C 28 cement concrete with 2 nos of 10mm dia. Tor steel bars ,
including necessary form work.
Per 10 L. ft
Materials
0.58 Cwt. cement 0.580 670.00
0.016 Cube sand 0.016 11050.00
0.03 Cube metal 3/4" 0.030 6250.00
15 Sq,ft. planks (1/3 new cost) 15.000 10.00
4 kg10 mm tor steel 4.000 129.50
40 l.ft 2" x 2" timber props -10 uses 40.000 5.00
Allow for nails , water & supports - 3%

Labour
concreating iuncluding curing
2 hrs. mason 0.250 770.00
3 hrs. labour 0.375 629.00
Carpentry
2 hrs. carpenter 0.250 770.00
2 hrs. labour 0.250 629.00
Bar bending
1 hrs. blacksmith 0.125 770.00
Allow for Tools 3%

Rate per 10 L.ft


Rate per Ft.
Add 22%
Total Rate

Stiffiner columns size 4 1/2" x 6" in 1:2:4 (3/4")


C 29 reinforced cement concrete with 2 nos of 10mm dia. Tor
steel bars , including necessary form work.
Per 10 L. ft
Materials
0.700 Cwt. cement 0.700 670.00
0.020 Cube sand 0.020 11050.00
0.040 Cube metal 3/4" 0.040 6250.00
15 Sq,ft. planks (1/3 new cost) 15.000 10.00
4 kg10 mm tor steel 4.000 129.50
40 l.ft 2" x 2" timber props -10 uses 40.000 5.00
Allow for nails , water & supports - 3%

Labour
concreating iuncluding curing
2 hrs. mason 0.250 770.00
3 hrs. labour 0.375 629.00
Carpentry
2 hrs. carpenter 0.250 770.00
2 hrs. labour 0.250 629.00
Bar bending
1 hrs. blacksmith 0.125 770.00
Allow for Tools 3%

Engineering Organization W.P. Page 94 BSR Annalysis


Rate per 10 L.ft
Rate per Ft.
Add 22%
Total Rate

Stiffiner columns size 9" x 6" in 1:2:4 (3/4") reinforced


C 30 cement concrete with 2 nos of 10mm dia. Tor steel bars ,
including necessary form work.
Per 10 L. ft
Materials
1.125 Cwt. cement 1.125 670.00
0.031 Cube sand 0.031 11050.00
0.063 Cube metal 3/4" 0.063 6250.00
23 Sq,ft. planks (1/3 new cost) 23.000 10.00
8 kg 10 mm tor steel 8.000 129.50
3 kg 6mm mild steel 3.000 110.00
40 l.ft 2" x 2" timber props -10 uses 40.000 5.00
Allow for nails , water & supports - 3%

Labour
concreating iuncluding curing
2 hrs. mason 0.250 770.00
4 hrs. labour 0.500 629.00
Carpentry
2 hrs. carpenter 0.250 770.00
2 hrs. labour 0.250 629.00
Bar bending
3 hrs. blacksmith 0.375 770.00
Allow for Tools 3%

Rate per 10 L.ft


Rate per Ft.
Add 22%
Total Rate

Copings on the 4 1/2" thick walls, size of 6 1/2" x 3" in


1:2:4 (3/4") reinforced cement concrete with 1 no of
C 31
10mm dia. Tor steel bar, including necessary form work
as per the Drawing No:-
Per 10 L. ft
Materials
0.20Cwt. cement 0.200 670.00
0.006 Cube sand 0.006 11050.00
0.011 Cube metal 3/4" 0.011 6250.00
6 Sq,ft. planks (1/3 new cost) 6.000 10.00
1.9 kg 10 mm tor steel 1.900 129.50
40 l.ft 2" x 2" timber props -10 uses 40.000 5.00
Allow for nails , water & supports - 3%

Engineering Organization W.P. Page 95 BSR Annalysis


Labour
concreating iuncluding curing
1 hrs. mason 0.125 770.00
2 hrs. labour 0.250 629.00
Carpentry
2 hrs. carpenter 0.250 770.00
2 hrs. labour 0.250 629.00
Allow for Tools 3%

1:3 Cement Plastering 14.625 49.56

Rate per 10 L.ft


Rate per Ft.
Add 22%
Total Rate

Copings on the 6" thick walls, size of 8" x 3" in 1:2:4


(3/4") reinforced cement concrete with 2 nos of 10mm
C 32
dia. Tor steel bars and 6mm mild steel @ 6" c/c,
including necessary form work as per the Drawing No:-

Per 10 L. ft
Materials
0.25 Cwt. cement 0.250 670.00
0.007 Cube sand 0.007 11050.00
0.014 Cube metal 3/4" 0.014 6250.00
6 Sq,ft. planks (1/3 new cost) 6.000 10.00
3.8 kg10 mm tor steel 3.800 129.50
0.91 kg 6 mm mild steel 0.910 110.00
40 l.ft 2" x 2" timber props -10 uses 40.000 5.00
Allow for nails , water & supports - 3%

Labour
concreating iuncluding curing
1 hrs. mason 0.125 770.00
2 hrs. labour 0.250 629.00
Carpentry
2 hrs. carpenter 0.250 770.00
2 hrs. labour 0.250 629.00
Bar bending
1 hrs. blacksmith 0.125 770.00
Allow for Tools 3%

1:3 Cement Plastering 16.250 49.56

Rate per 10 L.ft


Rate per Ft.
Add 22%
Total Rate

Engineering Organization W.P. Page 96 BSR Annalysis


Copings on the 9" thick walls, size of 11" x 6" approx. in
1:2:4 (3/4") reinforced cement concrete with 2 nos of
C 33
10mm dia. Tor steel bars and 6mm mild steel @ 6" c/c,
including necessary form work as per the Drawing No:-

Per 10 L. ft
Materials
0.80 Cwt. cement 0.800 670.00
0.02 Cube sand 0.020 11050.00
0.04 Cube metal 3/4" 0.040 6250.00
15 Nos Bricks 15.000 9.00
8 Sq,ft. planks (1/3 new cost) 8.000 10.00
1.9 kg10 mm tor steel 1.900 129.50
0.91 kg 6 mm mild steel 0.910 110.00
40 l.ft 2" x 2" timber props -10 uses 40.000 5.00
Allow for nails , water & supports - 3%

Labour
concreating iuncluding curing
1 hrs. mason 0.250 770.00
2 hrs. labour 0.250 629.00
Carpentry
2 hrs. carpenter 0.250 770.00
2 hrs. labour 0.250 629.00
Bar bending
1 hrs. blacksmith 0.125 770.00
Allow for Tools 3%

1:3 Cement Plastering 20.000 49.56

Rate per 10 L.ft


Rate per Ft.
Add 22%
Total Rate

Cement concrete drains in 1:3:6(1") of 6" wide and 9"


average depth, 3" thick sides and base including 1/2"
C 34
thick 1:3 rendering , without ramp including necessary
formwork.
Per 10 L.ft.
Materials
1.25 Cwt. Cement 1.250 670.00
0.08 Cube 1 1/2" metal 0.080 5500.00
0.06 Cube sand 0.060 11050.00
15 Sq.ft. Timber planks (1/3 new cost ) 15.000 48.33
Sub Total

Labour
1 Day Mason 1.000 770.00
1 1/2 Day Labourer 1.500 629.00
Sub Total

Engineering Organization W.P. Page 97 BSR Annalysis


Rate Per 10 L.ft.
Rate Per L.ft.
Add 22%
Total Rate

Cement concrete drains in 1:3:6(1") of 6" wide and 9"


average depth, 3" thick sides and base including 1/2"
C 35
thick 1:3 rendering , with 3" thick and 1'-6" width
concrete ramp, including necessary formwork.

Per 10 L.ft.

As per item C 34

Materials
0.25 Cwt. Cement 0.250 670.00
0.035 Cube 1 1/2" metal 0.035 5500.00
0.030 Cube sand 0.030 11050.00
10 Sq.ft. Timber planks (1/3 new cost ) 10.000 48.33
Basket 0.025 80.00
water gallon 80.000 0.50
Sub Total

Labour
0.3 Day Mason 0.300 770.00
0.3 Day Labourer 0.300 629.00
Sub Total

Rate Per 10 L.ft.


Rate Per L.ft.
Add 22%
Total Rate

Cement concrete drains in 1:3:6(1") of 6" wide and 9"


average depth, 3" thick sides and base including 1/2"
C 36
thick 1:3 rendering , with 3" thick and 2'-6" width
concrete ramp, including necessary formwork.

As per Item C 35
3.25 C.ft. 1:3:6 1" concrete As in Item C02
Rate Per 10 L.ft.
add 10% for labour slopping
Sub Total
Rate per L.ft..
Add 22%
Total Rate

Engineering Organization W.P. Page 98 BSR Annalysis


Construction of concrete drain 300mm width x 350mm
depth and varies up to 400mm. Consists of necessary
excavation in hard earth, 75mm thick concrete base and
walls in Grade 20 concrete, fair finish internal surface
C 37
with size 450mm wide x 600mm long, 75mm thick
Grade 20 removable cover slabs with side formwork.
Drain and cover slab reinforced with tor steel 10mm at
150m c/c both ways.

Consider 3.0 m length

excavation m3 0.6075 607.74

base con m3 0.1013 13808.27

wall con m3 0.1688 13808.27

F/w m2 2.2500 1321.56

R/f y10 Kg 32.7627 192.95

G-20 slab m3 0.1013 13808.27

F/w m2 0.4275 1321.56

R/f y10 Kg 14.3453 192.95

Rate per 3.00 m


Rate per L.ft..

Construction of concrete drain 300mm width x 350mm


depth and varies up to 400mm. - Do - without cover
C 38
slab. Drain reinforced with tor steel 10mm at 150m c/c
both ways.

Consider 3.0 m length

excavation m3 0.6075 607.74

base con m3 0.1013 13808.27

wall con m3 0.1688 13808.27

F/w m2 2.4 1321.56

R/f y10 Kg 32.763 192.95

Rate per 3.00 m


Rate per L.ft..

Engineering Organization W.P. Page 99 BSR Annalysis


Construction of concrete drain 450mm width x 600mm
minimum depth and varies up to 750mm. Consists of
necessary excavation in hard earth, 100mm thick
concrete base and walls in Grade 20 concrete, fair finish
C 39
internal surface with adequate slope, 75mm thick Grade
20 removable cover slabs with side formwork. Drain and
cover slab reinforced with tor steel 10mm at 150m c/c
both ways.

Consider 3.0 m length

excavation m3 1.5113 607.74

base con m3 0.1950 13808.27

wall con m3 0.4050 13808.27

F/w m2 4.0500 1321.56

R/f y10 Kg 53.6790 192.95

G-20 slab m3 0.1950 13808.27

F/w m2 0.2500 1321.56

R/f y10 Kg 21.1323 192.95

Rate per 3.00 m


Rate per L.ft..

Construction of concrete drain 450mm width x 600mm


minimum depth and varies up to 750mm. Consists of
necessary excavation in hard earth, 100mm thick
C 40 concrete base and walls in Grade 20 concrete, fair finish
internal surface with adequate slope, without
coverslab.with necessary formwork. Drain reinforced
with tor steel 10mm at 150m c/c both ways.

Consider 3.0 m length

excavation m3 1.5113 607.74

base con m3 0.1950 13808.27

wall con m3 0.4050 13808.27

F/w m2 4.0500 1321.56

Engineering Organization W.P. Page 100 BSR Annalysis


R/f y10 Kg 53.6790 192.95

Rate per 3.00 m


Rate per L.ft..

Shuttering for sides and bottom of plinth beams, ground


D 02 beams including dismantling in 15mm thick plywood
board.
Consider 9" x 9" beam of 20' 0" long.
Contact area - 55.0 sq.ft.
(a) Making the Mould
45 sq.ft. 15 mm Plywood 45.000 90.00
24 L.ft. 2" x 1" battens 24.000 23.00
45 L.ft. 2" x 2" ledgers 45.000 50.00
2 lbs wire nails 2.000 61.00
Sub Total
Labour
1/2 day carpenter 0.500 770.00
1 days U/SK labourer 1.000 629.00
Sub Total
Total cost of mould
Assuming 4 uses cost per use
Add 10% for repairs
cost per use
(b) Assembling
Materials
110 L.ft. 4" x 2" vertical props 110.000 72.00
80 L.ft. 2" x2" bracing to mould and head tree 80.000 50.00
50 L.ft. 4" x 2" cross - head to set of props 50.000 72.00
6.0 sq.ft. 1 1/2" timber base plate to props 6.000 140.00
Sub Total
(e) 22 Nos wedges
Cost of materials for assembling
Assuming an average of 10uses
Add 10% of cost of materials for repairs
Total cost of material per use
Consider 75% of the matearial
(c) Labour & Sundries
Labour
1 day carpenter 1.000 770.00
2 days U/SK labourer 2.000 629.00
1/2 gal mould oil 0.500 220.00
1/2 lbs nails 0.500 61.00
Sub Total
Cost per use
Consider 75% of labour
(d) Dismantling & Cleaning
Labour
1/2 day carpenter 0.500 770.00
1 days U/SK labourer 1.000 629.00
Sub Total

Engineering Organization W.P. Page 101 BSR Annalysis


Cost of labour for dismantling per use
Total cost for making the mould assembling
aligning dismantling and cleaning for 55 sq.ft.
per use (A+B+C+D)
Per Sqr.
Add 22%
Total

15 mm plywood formwork for underside of first floor


D 03
slab consider a slab of dimensions 20' 0" x 10' 0"
Contact area = 2.0 Sqrs.
(a) Making panels
Materials
220 Sq.ft. 15 mm Plywood Boards 220.000 85.00
121 L.ft. 4" x 2" per L.ft. runners at 2' 0" centres. 121.000 72.00
4 lbs. wire nails 4.000 61.00
Sub Total
Labour
3/4 days carpenter 0.750 770.00
3/4 days U/SK labourer 0.750 629.00
Sub Total
Total cost of making panels
Assuming 4 uses cost per use.
Add 20% for repairs.
Total cost of panels per use
(b) Assembling
Materials
690L.ft props. 4" x 2" vertical timber props of
10' - 6" ht. 690.000 72.00
60 sq.ft. 1 " Rubber plank per sq.ft. 60.000 30.00
Sub Total
Assuming 10 uses cost of materials for
assembling per use.
Add 20% of above for repairs
Total cost of material for assembling per use
(c) Labour & Sundries for Assembling
1 days carpenter 1.000 770.00
4 days U/SK labourer 4.000 629.00
1 gal mould oil for assembling 1.000 220.00
2 lbs wire nails 2.000 61.00
Sub Total
Total cost per use for assembling
(d) Dismantling & Cleaning
Labour
1/2 day carpenter 0.500 770.00
2 days U/SK labourer 2.000 629.00
Sub Total
Total cost for dismantling per use
Total cost for dismantling per use for
200 sq.ft. ( A+B+C+D )
Per Sqr.
Add 22%
Total Rate

Engineering Organization W.P. Page 102 BSR Annalysis


formwork to 9" x 9" cement concrete column in ground
D 04
floor with 15mm thick plywood..
Per souare ft.
Consider column length of 5' 0"
Contact area - 15.0 sq.ft.
(a) Making Mould
Materials
18.5 Sq.ft. 15 mm thick Plywood 18.500 85.00
17.10 L.ft. 2" x 2" Rubber timber in yokes 17.100 50.00
16.12 L.ft. 2" x 1" Rubber timber battens 16.120 23.00
1 1/2 lb wire nails 1.500 61.00
Sub Total
Fabricating
1/2 day carpenter 0.500 770.00
1/2 days U/SK labourer 0.500 629.00

Sub Total
Allowing 4 uses cost of mould per use

(b) Assembling (per use )


Materials
12 Nos. 16 mm 18" long bolts ( 20 uses ) 12.000 3.00
1/2 litre mould oil 0.500 220.00
35 L.ft. 4" x 2" props ( 10 uses ) 35.000 7.20
Sub Total
Labour
1/4 day carpenter 0.250 770.00
1/4 days U/SK labourer 0.250 629.00
Sub Total
Cost of Assembling per use

(c) Dismantling cleaning & repairing ( per use )


1/4 day carpenter 0.250 770.00
1/4 days U/SK labourer 0.250 629.00
Sub Total
Cost of dismantling per use

Total cost per use (for 15.0 sq.ft.) i.e. (a+b+c)


Per Sqr.
Add 22%
Total

Formwork for concrete beam in ground floor with 15mm


D05
thick plywood.
Consider 9" x 12" beam of 20' 0" long.
Contact area - 55.0 sq.ft.
(a) Making the Mould
60 sq.ft. 15 mm Plywood 60.000 85.00
24 L.ft. 2" x 1" battens 24.000 23.00
45 L.ft. 2" x 2" ledgers 45.000 50.00
20 L.ft. 4" x 2" bearers at bottom of mould 20.000 72.00

Engineering Organization W.P. Page 103 BSR Annalysis


2 lbs wire nails 2.000 61.00
Sub Total
Labour
1/2 day carpenter 0.500 770.00
2 days U/SK labourer 2.000 629.00
Sub Total
Total cost of mould
Assuming 4 uses cost per use
Add 10% for repairs
cost per use
(b) Assembling
Materials
110 L.ft. 4" x 2" vertical props 110.000 72.00
80 L.ft. 2" x2" bracing to mould and head tree 80.000 50.00
50 L.ft. 4" x 2" cross - head to set of props 50.000 72.00
6.0 sq.ft. 1 1/2" timber base plate to props 6.000 140.00
Sub Total
(e) 22 Nos wedges
Cost of materials for assembling
Assuming an average of 10uses
Add 10% of cost of materials for repairs
Total cost of material per use
(c) Labour & Sundries
Labour
1 day carpenter 1.000 770.00
2 days U/SK labourer 2.000 629.00
1/2 gal mould oil 0.500 220.00
1/2 lbs nails 0.500 61.00
Sub Total
Cost per use
(d) Dismantling & Cleaning
Labour
1/2 day carpenter 0.500 770.00
2 days U/SK labourer 2.000 629.00
Sub Total
Cost of labour for dismantling per use
Total cost for making the mould assembling
aligning dismantling and cleaning for 55 sq.ft.
per use (A+B+C+D)
Per Sqr.
Add 22%
Total Rate

15 mm Plywood formwork for underside of first floor


D06 slab consider a slab of dimensions 20' 0" x 10' 0"
support by scaffolding 12' - 0"
Contact area = 2.0 Sqrs.
(a) Making panels
Materials
220 Sq.ft. 15 mm Plywood planks 220.000 85.00
121 L.ft. 4" x 2" per L.ft. runners at
2' 0" centres. 121.000 72.00
4 lbs. wire nails 4.000 61.00

Engineering Organization W.P. Page 104 BSR Annalysis


Sub Total
Labour
3/4 days carpenter 0.750 770.00
3/4 days U/SK labourer 0.750 629.00
Sub Total
Total cost of making panels
Assuming 4 uses cost per use.
Add 20% for repairs.
Total cost of panels per use
(b) Assembling
Materials
690L.ft props. 4" x 2" vertical timber props of
10' - 6" ht. 3840.000 2.88
60 sq.ft. 1 " Rubber plank per sq.ft. 1440.000 30.00
Sub Total
Assuming 10 uses cost of materials for
assembling per use.
Add 20% of above for repairs
Total cost of material for assembling per use
(c) Labour & Sundries for Assembling
1 days carpenter 1.000 770.00
4 days U/SK labourer 4.000 629.00
1 gal mould oil for assembling 1.000 220.00
2 lbs wire nails 2.000 61.00
Sub Total
Total cost per use for assembling
(d) Dismantling & Cleaning
Labour
1/2 day carpenter 0.500 770.00
2 days U/SK labourer 2.000 629.00
Sub Total
Total cost for dismantling per use
Total cost for dismantling per use for
200 sq.ft. ( A+B+C+D )
Per Sqr.
Add 22%
Total

15 mm Plywood formwork for underside of first floor


D 07 slab consider a slab of dimensions 20' 0" x 10' 0"
support by scaffolding 16' - 0"
Contact area = 2.0 Sqrs.
(a) Making panels
Materials
220 Sq.ft. 15 mm Plywood 220.000 85.00
121 L.ft. 4" x 2" per L.ft. runners at
2' 0" centres. 121.000 72.00
4 lbs. wire nails 4.000 61.00
Sub Total
Labour
3/4 days carpenter 0.750 770.00
3/4 days U/SK labourer 0.750 629.00
Sub Total

Engineering Organization W.P. Page 105 BSR Annalysis


Total cost of making panels
Assuming 4 uses cost per use.
Add 20% for repairs.
Total cost of panels per use
(b) Assembling
Materials
690L.ft props. 4" x 2" vertical timber props of
10' - 6" ht. 3840.000 2.88
60 sq.ft. 1 " Rubber plank per sq.ft. 1920.000 30.00
Sub Total
Assuming 10 uses cost of materials for
assembling per use.
Add 20% of above for repairs
Total cost of material for assembling per use
(c) Labour & Sundries for Assembling
1 days carpenter 1.000 770.00
4 days U/SK labourer 4.000 629.00
1 gal mould oil for assembling 1.000 220.00
2 lbs wire nails 2.000 61.00
Sub Total
Total cost per use for assembling
(d) Dismantling & Cleaning
Labour
1/2 day carpenter 0.500 770.00
2 days U/SK labourer 2.000 629.00
Sub Total
Total cost for dismantling per use
Total cost for dismantling per use for
200 sq.ft. ( A+B+C+D )
Per Sqr.
Add 22%
Total

Formwork for concrete beam in ground floor with 15mm


D08
thick plywood support by G.I. jack.
Consider 9" x 12" beam of 20' 0" long.
Contact area - 55.0 sq.ft.
(a) Making the Mould
60 sq.ft. 15 mm Plywood 60.000 85.00
24 L.ft. 2" x 1" battens 24.000 23.00
45 L.ft. 2" x 2" ledgers 45.000 50.00
20 L.ft. 4" x 2" bearers at bottom of mould 20.000 72.00
2 lbs wire nails 2.000 61.00
Sub Total
Labour
1/2 day carpenter 0.500 770.00
2 days U/SK labourer 2.000 629.00
Sub Total
Total cost of mould
Assuming 4 uses cost per use
Add 10% for repairs
cost per use
(b) Assembling

Engineering Organization W.P. Page 106 BSR Annalysis


Materials
vertical props( T & U )- hire charges 840.000 2.88
bracing to mould and head tree(GI) 420.000 4.60
50 L.ft. 4" x 2" cross - head to set of props 50.000 72.00
0. sq.ft. 1 1/2" timber base plate to props 0.000 140.00
Sub Total
(e) 22 Nos wedges
Cost of materials for assembling
Assuming an average of 10uses
Add 10% of cost of materials for repairs
Total cost of material per use
(c) Labour & Sundries
Labour
1.25 day carpenter 1.250 770.00
2 days U/SK labourer 2.000 629.00
1/2 gal mould oil 0.500 220.00
1/2 lbs nails 0.500 61.00
Sub Total
Cost per use
(d) Dismantling & Cleaning
Labour
1/2 day carpenter 0.500 770.00
2 days U/SK labourer 2.000 629.00
Sub Total
Cost of labour for dismantling per use
Total cost for making the mould assembling
aligning dismantling and cleaning for 55 sq.ft.
per use (A+B+C+D)
Per Sqr.
Add 22%
Total Rate

Mild steel reinforcement to slabs, beams, lintols,


E01 columns, footings, etc. bent to shape laid in position
and bind with 16 B.W.G. binding wire
Materials
57.5 kg steel rod 57.500 110.00
1.5 lbs. binding wire 16 B.W.G. 1.500 90.00
Chairs 1.5% steel cost

Labour
1 day Blacksmith 1.000 770.00
1 day unskilled labour 1.000 629.00

Rate per 57.5 kg


Rate per 1 kg
Add 22%
Total rate

E 02 Mild steel rainforcement ……….. At Frist flloor.

Engineering Organization W.P. Page 107 BSR Annalysis


As per Item E01
Add 3%
Total

E 03 Mild steel rainforcement ……….. At Second flloor.

As per Item E01


Add 5%
Total

Tor steel reinforcement to slabs, beams, lintols,


E04 columns, footings, etc. bent to shape laid in position
and bind with 16 B.W.G. binding wire
Materials
57.5 kg steel rod 57.500 129.50
1.5 lbs. binding wire 16 B.W.G. 1.500 90.00
Chairs 1.5% steel cost

Labour
1 day Blacksmith 1.000 770.00
1 day unskilled labour 1.000 629.00

Rate per 57.5 kg


Rate per 1 kg
Add 22%
Total rate

E 05 Tor steel rainforcement ……….. At Frist flloor.

As per Item E04


Add 3%
Total

E 06 Tor steel rainforcement ……….. At Second flloor.

As per Item E04


Add 5%
Total

Application of two coats of Corrosion resistant primer of


E 08 "BARRA ZINC SP" or equivalent to all exposed
reinforcements including preparing surfaces.

Per 2 sqr
3 litres Barrazinc sp 3.000 6475.00
Allow for brushes & scaffolding

Engineering Organization W.P. Page 108 BSR Annalysis


Labour
2 1/2 day Painter 2.500 770.00

Rate per 2 Sqr.


Rate per Sq.ft.
Add 22%
Total rate

Brickwork in cement and Sand 1:8 in foundation upto


F 01
D.P.C. level.
Per cube
Materials
1595 Bricks 1595.000 9.00
2 3/4 cwt. cement 2.754 670.00
3/8 cube sand 0.375 11050.00
Water - 150 glns. 150.000 0.50
Sub Total
Labour
03 days mason 3.000 770.00
04 days labour 4.000 629.00
Sub Total

Rate per cube


Add 22%
Total Rate

Brickwork in cement and Sand 1:8 in superstructure in


F 02
ground floor. (9" thick brick work)

Per cube
Materials
1595 Bricks 1595.000 9.00
2 3/4 cwt. cement 2.750 670.00
3/8 cube sand 0.375 11050.00
Water - 150 Glns. 150.000 0.50
Sub Total

Labour
03 days mason 3.000 770.00
05 days labour 5.000 629.00
Allow for scaffolding add 1%
Sub Total

Rate per cube


Add 22%
Total Rate

Engineering Organization W.P. Page 109 BSR Annalysis


Brick work in cement and Sand 1:8 in 1 st floor level (9"
F 03
thick brick work)
As Per item F-02 Per Cube
Add 5%
Total Rate

Brick work in cement and Sand 1:8 in 2nd floor level (9"
F 04
thick brick work)
As Per item F-02 Per Cube
Add 7%
Total Rate

Brickwork in cement and Sand 1:8 in superstructure in


F 05
ground floor. (8" thick brick work)

Per cube
Materials
1250 Bricks 1250.000 9.00
2 1/3 cwt. cement 2.333 670.00
0.3 cube sand 0.300 11050.00
Water - 150 Glns. 150.000 0.50
Sub Total

Labour
03 days mason 3.000 770.00
04 days labour 4.000 629.00
Allow for scaffolding add 1%
Sub Total

Rate per cube


Add 22%
Total Rate

Brick work in cement and Sand 1:8 in 1 st floor level (8"


F 06
thick brick work)
As Per item F-05 Per Cube

Total Rate

Brick work in cement and Sand 1:8 in 2nd floor level (8"
F 07
thick brick work)
As Per item F-05 Per Cube

Total Rate

Brick work in cement and Sand 1:5 in 4 1/2" thick walls


F 08
in ground floor.
Per square
Materials

Engineering Organization W.P. Page 110 BSR Annalysis


550 Bricks 550.000 9.00
Add 10% for Wastage
1.30 Cwt. cement 1.300 670.00
0.10 cube sand 0.100 11050.00
Water - 150 Glns. 150.000 0.50
Sub Total

Labour
2 days mason 2.000 770.00
2 days labour 2.000 629.00
Allow for scaffolding Add 1%
Sub Total

Rate per Sqr


Add 22%
Total rate

Brick work in cement and Sand 1:5 in 4 1/2" thick walls


F 09
in 1 st floor.
As Per item F-08 Per Sqr

Total Rate

Brick work in cement and Sand 1:5 in 41/2" thick walls in


F 10
2 nd floor.
As Per item F-08 Per Sqr

Total Rate

Brick drains in cement and sand 1:5 , 9"wide, 6" - 9"


F 11 average depth including 1:2 cement sand rendering 1/2"
thick without ramp.
Per 10 L.ft.
Materials
110 bricks 110.000 9.00
0.70 Cwt. cement 0.700 670.00
0.04 cube sand 0.040 11050.00
Water - 100 Glns. 100.000 0.50
Sub Total

Labour
1 days mason 1.000 770.00
1 1/4 days labour 1.250 629.00
Sub Total

Rate per 10 L.ft.


Rate per L.ft.
Add 22%
Total rate

Engineering Organization W.P. Page 111 BSR Annalysis


3" Thick brick floor paved in lime mortar 1:5 in ground
F 12
floor.
Per L.ft.
Materials
300 bricks 300.000 9.00
1.20 Cwt. cement 1.200 670.00
0.11 cube sand 0.110 11050.00
40 Gln. Water 40.000 0.50
Sub Total

Labour
1 1/4 days mason 1.250 770.00
2 1/2 days labour 2.500 629.00
Sub Total

Rate per Sqr.


Add 22%
Total rate

4 1/2" thick wire cut brick wall in cement and sand 1:5 in
F 13
ground floor.
Per Sqr.
Materials
550 wire cut bricks 550.000 15.00
Add 2% Wastage
1.20 Cwt. cement 1.200 670.00
0.08 cube sand 0.080 11050.00
Water 30 Gal. 30.000 0.50
Sub Total

Labour
2 days special mason 2.000 770.00
2 days labour 2.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total Rate

4 1/2" thick wire cut brick wall in cement and sand 1:5 in
F 14
first floor.
As Per item F-13 Per Cube

Total Rate

4 1/2" thick wire cut brick wall in cement and sand 1:5 in
F 15
second floor.
As Per item F-13 Per Cube

Total Rate

Engineering Organization W.P. Page 112 BSR Annalysis


9" thick wire cut brick wall in cement and sand 1:5 in
F 16
ground floor.
Per Sqr.
Materials
1080 wire cut bricks 1080.000 15.00
Add 5% Wastage
2.5 Cwt. cement 2.500 670.00
0.18 cube sand 0.180 11050.00
100 Gln. Water 100.000 0.50
Sub Total

Labour
2 1/4 days mason 2.250 770.00
3 3/4 days labour 3.750 629.00
Add 1% scaffolding
Sub Total

Rate per Sqr.


Add 22%
Total rate

9" thick wire cut brick wall in cement and sand 1:5 in
F 17
first floor.
As Per item F-16 Per Cube
Add 5%
Total rate

9" thick wire cut brick wall in cement and sand 1:5 in
F 18
second floor.
As Per item F-16 Per Cube
Add 7%
Total rate

Step 1' - 1 1/2" in brick in cement and sand 1:5 with 1/2"
F 19 thick rendering in cement and sand 1:2 including 6" high
foundation.
Per Sqr.
Materials
120 bricks 120.000 9.00
0.50 Cwt. cement 0.500 670.00
0.05 cube sand 0.050 11050.00
Water 15 Gal. 15.000 0.50
1/5 Lbs colour pigment 0.200 210.00
Sub Total

Labour
1/2 days mason 0.500 770.00
1/2 day 's labour 0.500 629.00
Sub Total

Rate per 10 L.ft.


Rate per L.ft.

Engineering Organization W.P. Page 113 BSR Annalysis


Add 22%
Total rate

F 20 Brick work 1:5 in piers.


Per Cube
Materials
1500 bricks 1500.000 9.00
0.23 cube sand 0.230 11050.00
3.70 Cwt. cement 3.700 670.00
Water - 150 Glns. 150.000 0.50
Sub Total

Labour
4.5 days mason 4.500 770.00
6.25 days labour 6.250 629.00
Allow for scaffolding Add 1%
Sub Total

Rate per cube


Add 22%
Total rate

F 21 Brick piers in cement and sand 1:5 in first floor.


As Per item F- 20 Per Cube
Add 5%
Total Rate

F 22 Brick piers in cement and sand 1:5 in Second floor.


As Per item F-20 Per Cube
Add 7%
Total Rate

8" thick cement sand Cellular block wall (blocks


confirming to S.L.S. 855 and subject to the approval of
G 01
the quality of the blocks) in cement and sand mortar 1:5
in ground floor.
Per Sqr.
10' 0" x 10' 0" axl. ( 8" x 8" x 16" )
Materials
112 Hollow cut block 112.000 90.00
5% wastage
0.75 Cwt Cement 0.750 670.00
0.06 Cube Sand 0.060 11050.00
Sub Total

Labour
1 1/2 day Mason 1.500 770.00
2 1/2 day Labour 2.500 629.00
Add 3%

Engineering Organization W.P. Page 114 BSR Annalysis


Sub Total

Rate per Sqr.


Add 22%
Total rate

6" thick cement sand Cellular block wall (blocks


confirming to S.L.S. 855 and subject to the approval of
G 02
the quality of the blocks) in cement and sand mortar 1:5
in ground floor.

Per Sqr.
10' 0" x 10' 0" axl. ( 6" x 8" x 16" )
Materials
112 Hollow cut block 112.000 70.00
5% wastage
0.6 Cwt Cement 0.600 670.00
0.05 Cube Sand 0.050 11050.00
Sub Total

Labour
1 1/4 day Mason 1.250 770.00
2 1/4 day Labour 2.250 629.00
Add 3%
Sub Total

Rate per Sqr.


Add 22%
Total rate

4" thick cement sand Cellular block wall (blocks


confirming to S.L.S. 855 and subject to the approval of
G 03
the quality of the blocks) in cement and sand mortar 1:5
in ground floor.
Per Sqr.
10' 0" x 10' 0" axl. ( 4" x 8" x 16" )
Materials
112 Hollow cut block 112.000 48.00
5% wastage
0.40 Cwt Cement 0.400 670.00
0.03 Cube Sand 0.030 11050.00
Sub Total

Labour
1 day Mason 1.000 770.00
2 day Labour 2.000 629.00
Add 3%
Sub Total

Rate Per Sqr.


Add 22%
Total rate

Engineering Organization W.P. Page 115 BSR Annalysis


6" thick cement sand Solid block wall (blocks confirming
G 04 to S.L.S. and subject to the approval of the quality of the
blocks) in cement and sand mortar 1:5 in ground floor.

Per Sqr.
10' 0" x 10' 0" axl. ( 8" x 8" x 16" )
Materials
112Sloied cut block 112.000 90.00
5% wastage
0.60 Cwt Cement 0.600 670.00
0.05 Cube Sand 0.050 11050.00
Sub Total

Labour
1 1/2 day Mason 1.500 770.00
2 1/2 day Labour 2.500 629.00
Add 3%
Sub Total

Rate per Sqr.


Add 22%
Total Rate

4" thick cement sand Solid block wall (blocks confirming


G 05 to S.L.S. and subject to the approval of the quality of the
blocks) in cement and sand mortar 1:5 in ground floor.

Per Sqr.
10' 0" x 10' 0" axl. ( 4" x 8" x 16" )
Materials
112Sloied cut block 112.000 68.00
5% wastage
0.40 Cwt Cement 0.400 670.00
0.03 Cube Sand 0.030 11050.00
Sub Total

Labour
1 1/2 day Mason 1.500 770.00
2 1/2 day Labour 2.500 629.00
Add 3%
Sub Total

Rate per Sqr.


Add 22%
Total Rate

G 06 supply and fixing 1'x1' cement grill

Per 16 Sq.ft.
16 No. 1'x1' cement grill 16.000 50.00
alllow for cement & sand

Engineering Organization W.P. Page 116 BSR Annalysis


1/2 day Mason 0.500 770.00
1/2 day Labour 0.500 629.00
Rate Per 16 Sq.ft.
Rate Per Sq.ft.
22 % over head
Total Rate

G 07 supply and fixing glass blocks 8" x 8"

Per 2'x2'=4 sq ft
9 no glass block 9.000 295.00
cement and adishive 3%
1 hr. Mason 1.000 96.25
1 hr. Labour 1.000 78.63
Rate Per 4 sq.ft

Rate Per 1 sq.ft


22 % over head
Total Rate

Random rubble masonry in cement mortar 1:5 in


H 01
foundation.
Per Cube (14" thick)
Materials
1.30 Cubes 6" - 9" rubble 1.300 4500.00
5.0 Cwt. cement 5.000 670.00
0.3 Cubes sand 0.300 11050.00
Water - 100 Glns 100.000 0.50
Sub Total

Labour
04 Days mason 4.000 770.00
06 Days labourer 6.000 629.00
Add 2.5% tools
Sub Total

Rate per cube


Add 22%
Total Rate

3/4" thick DPC , in cement and sand 1:2 finished with 2


J 01
coats hot tar and blinded with sand.
Per Square
Materials
2.25 Cwt. cement 2.250 670.00
0.11 Cube sand 0.110 11050.00
1 1/2 gals bitumen 1.500 515.00
Firewood ( 10 lbs ) 10.000 10.00

Engineering Organization W.P. Page 117 BSR Annalysis


10 gal. water 10.000 0.50
Sub Total
Labour
1 1/4 Days mason 1.250 770.00
2 1/2 Days U/SK labourer 2.500 629.00
Sub Total

Rate per Sqr.


Add 22%
Total value

Rendering 1/2" thick in cement and sand 1:2 in exposed


J 03 concrete surface and garage floors finished smooth with
neat cement slurry.
Per Square
Materials
1.50 Cwt. cement 1.500 670.00
0.05 Cube sand 0.050 11050.00
10 gal. water 10.000 0.50
Sub Total
Labour
1 Day mason 1.000 770.00
1 3/4 Day labour (including curing ) 1.750 629.00
Sub Total

Rate per Sqr.


Add 22%
Total value

J 04 Rendering - do - with colour pigment

Basic rate as per item (J03)


Add 2.5 lbs. powdered pigment 2.500 210.00
Rate per Sqr.
Add 22%
Total rate

Rendering 1/2" thick in cement and sand 1:3 in R.C.C.


J 05 floors and brick paved floors finished smooth with 3/8"
thick neat cement slurry and colour pigment.

Per Square
Materials
1.07 Cwt. cement 1.070 670.00
0.05 Cube sand 0.050 11050.00
2.5 lbs powdered pigment 2.500 210.00
10 gal. water 10.000 0.50
Sub Total
Labour
1 Day mason 1.000 770.00

Engineering Organization W.P. Page 118 BSR Annalysis


1 1/2 Day labour ( including curing ) 1.500 629.00
Sub Total

Rate per Sqr.


Add 22%
Total value

J 06 Rendering 1/2" thick - do -without colour pigment

Basic rate with pigment as per Item No. J.05


Ddt. Amount for Color pigment as per item no. J 05
Basic rate without colour pigment
Add 22%
Total rate per Sqr.

1/2" thick Rendering to the top surface of the sunshade


with cement and sand 1:3 finished smooth and treated
J 07
with two coats of "Aqua Tuff " by M/s Lankem or
approved equivalent and 1:80 slope should be made.

Per 2.4 square


1/2" thick rendering - As per J 05 2.400 3512.90
4 Lit. Aqua Tuff - (1 Lit / 160 sq.ft / onecoat) 1.000 2900.00
1 1/4 day - Skill labour 1.250 770.00
2 nos Brush - 4"(1/10uses) 2.000 65.00

Rate per 2.40 Sqr.


Rate per Sqr.
Add 22%
Total Rate

Skirting 4" x 1/2" thick in cement and sand 1:3 projected


J 08 or flush to walls finished with cement floating including
forming grove.

Per 10 L.ft.
Materials
0.07 Cwt. cement 0.070 670.00
0.002 Cube sand 0.002 11050.00
Sub Total
Labour
5/16 Day mason 0.313 770.00
1/4 Day labour 0.250 629.00
Sub Total

Rate Per 10 L.ft.


Rate per L.ft.
Add 22%
Total Rate

Engineering Organization W.P. Page 119 BSR Annalysis


Skirting 4" x 1/2" thick - do - with colour pigmented neat
J 09
cement.
Per 10 L.ft.
Materials
0.07 Cwt. cement 0.070 670.00
0.002 Cube sand 0.002 11050.00
0.17 lbs Colour pigment 0.170 210.00
Sub Total
Labour
5/16 Day mason 0.313 770.00
1/4 Day labour 0.250 629.00
Sub Total

Rate Per 10 L.ft.


Rate per L.ft.
Add 22%
Total Rate

Skirting 6" x 1/2" thick in cement and sand 1:3 projected


J 10 flush to walls finished with cement floating including
forming grove in neat cement slurry.

Per 10 L.ft.
Materials
0.1 Cwt. cement 0.100 670.00
0.003 Cube sand 0.003 11050.00
Sub Total
Labour
3/8 Day mason 0.375 770.00
5/16 Day labour 0.313 629.00
Sub Total

Rate per 10 L.ft.


Rate per L.ft.
Add 22%
Total Rate

J 11 Skirting - do - with colour pigment.


Per 10 C.ft.
Materials
0.1 Cwt. cement 0.100 670.00
0.003 Cube sand 0.003 11050.00
0.25 lbs Powder pigment 0.250 210.00
Sub Total
Labour
3/8 Day mason 0.375 770.00
5/16 Day labour 0.313 629.00
Sub Total

Rate per 10 L.ft.


Rate per L.ft.

Engineering Organization W.P. Page 120 BSR Annalysis


Add 22%
Total Rate

3" thick brick paving in cement sand 1:8 and 1/2" thick
J 12
cement rendered in 1:3 floated with neat cement.

Per Square
Materials
380 Bricks 380.000 9.00
2.25 Cwt. cement 2.250 670.00
0.325 Cube sand 0.325 11050.00
55 gal. water 55.000 0.50
Sub Total
Labour
2 1/4 Day mason 2.250 770.00
4 Day labour 4.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total Rate

3" thick brick paving - do - neat cement and colour


J 13
pigment.
Per Square
Materials
380 Bricks 380.000 9.00
2.25 Cwt. cement 2.250 670.00
0.325 Cube sand 0.325 11050.00
55 gal. water 55.000 0.50
2.5 lbs colour pigment 2.500 210.00
Sub Total
Labour
2 1/4 Day mason 2.250 770.00
4 Day labour 4.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total Rate

3" thick floor cement concrete in 1:2:4(3/4") and 1/2"


thick rendering in cement sand 1:2 finished smooth with
J 14
neat cement & colour pigment and expansion joints
filled with cement and sand.
Per Square
Materials
6.0 Cwt. cement 6.000 670.00
0.2 Cube sand 0.200 11050.00
0.25 Cubs 1 " Metal 0.250 6000.00
55 gal. Water 55.000 0.50

Engineering Organization W.P. Page 121 BSR Annalysis


2.5 lbs colour pigment 2.500 210.00
Sub Total
Labour
1 1/2 Day mason 1.500 770.00
4 Day labour 4.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total Rate

Brick work in cement 1:5 wearting & throating on 41/2"


J 15
brick wall including 1/2" thick 1:3 cement rendering

Per 100 l.ft


400 Brick 400.000 9.00
5.10 Cwt. cement 5.100 670.00
0.23 Cube Sand 0.230 11050.00
Sub Total
Labour
6 Day Mason 6.000 770.00
6 Day Labour 6.000 629.00
Sub Total

Rate per 100.00 L.ft.


Rate per 1 l.ft
Add 22 %
Total Rate

Brick work in cement 1:5 wearting & throating on 9"


J 16
brick wall including 1/2" thick 1:3 cement rendering

Per 10 l.ft
67 Brick 67.000 9.00
0.72 Cwt. cement 0.720 670.00
0.03 Cube Sand 0.030 11050.00
Sub Total
Labour
3/4 Day Mason 0.750 770.00
3/4 Day Labour 0.750 629.00
Sub Total

Rate per 10.00 L.ft.


Rate per 1 l.ft
Add 22 %
Total Rate

Engineering Organization W.P. Page 122 BSR Annalysis


Water Proofing the inner surface of walls and floor slab
of toilets and balconyes where a waterproofing is
necessary before tiling,Application of "Baralastic"
polymer modified cementitious waterproofing agent
J 17
after cleaning the subtrate all as per manufacturer's
specifications with 10 years warranty on
application.Rate shall include for ponding test for a
300mm water height kept for a period of 48 hours

( Total of 3.6kg/m2 in 2 coats of 1mm thick layer )


Per 2 Sq.m.
Materials
1 set of Barralastic ( 7.2kg) 1.000 2890.00
Labour
1 1/2 day Mason 1.500 770.00
1 1/2 day Labour 1.500 629.00
Sub Total

Rate per 2 Sq.m.


Rate per 1 Sq.m.
Rate per S.ft.
Add 22%
Total

Water proofing treatment to wall using 2 coats of


tharoseal or equalent approved product including
J 18
preparation of surface, all according to manufactures
specification.

( Total of 2.5 kg/m2 mixed material in 2 coats of 1mm thick layer )


Per 1.875 Sq.m. 3.750 1.875
Materials
1 can of tharoseal (5kg) 1.000 950.00
wastage - 5%

Labour
1/2 day Mason 1.750 770.00
1/2 day Labour 1.750 629.00
Sub Total

Rate per 1.875 Sq.m.


Rate per 1 Sq.m.
Rate per S.ft.
Add 22%
Total

Engineering Organization W.P. Page 123 BSR Annalysis


Water proofing concrete slab , water tank ( inside
surface and top edges ) and wet areas using " XYPEX "
J 19
or equalent approved products including preparation of
surfaces all according to manufactures specification.

(1 st coat 1kg/m2 concentrate , and 2nd coat 1kg/m2 modified )


Per 27 sq.m.
Materials
1 no pail of 60lb " XYPES " modificate 1.000 10250.00
1 no. pail of 60lb " XYPES " concentrated. 1.000 14965.00
Sub Total
Labour
27 day skilled 27.000 770.00
27 day U/skilled 27.000 629.00
Sub Total

Rate per 27 Sq.m.


Rate per 1 Sq.m.
Rate per Sq.ft.
Add 22%
Total

Water proofing treatment to expanision joints of R.C.C.


J 20 slabs with feebscal and 12" wide maycoplast 2 layers all
as per manufactures specifications.
Per 40 S.ft.
Materials
6 Kg Mycoplast 6.000 460.00
3 lit. Febmix plus 3.000 280.00
1 litres Aluminium paint 1.000 755.00
wastage 5%
Sub Total
Labour
2 day Mason 2.000 770.00
4 day Labour 4.000 629.00
1 day painter 1.000 770.00
Sub Total

Rate per 40 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

5/8" thick plastering to plinth wall in cement sand 1:3


K.01
including cement floating.
Per Square
Material
1.40 Cwt. Cement (50 Kg bags) 1.400 670.00

Engineering Organization W.P. Page 124 BSR Annalysis


0.06 Cube sand 0.060 11050.00
Water 10 Glns. 10.000 0.50

Labour
1 Day Mason 1.000 770.00
1 1/2 Day Unskilled labourer 1.500 629.00

scaffolding - Add 3%

Rate per Square


Add 22%

Plastering 5/8" thick to walls in cement, lime or


equivelent chemical product (Febmix) and sand 1:1:5
K.02
finished semi-rough with wooden float. (Sand to be
seived).

Per Square
Materials
0.80 Cwt cement 0.800 670.00
42 kg slaked lime 42.000 12.00
0.07 Cube sand 0.070 11050.00
10 Gal. Water 10.000 0.50
Sub total
Labour
1 Day Mason 1.000 770.00
1 1/2 Day Labourer 1.500 629.00
Sub total
Scaffolding 3%

Rate per square


Add 22%
Total rate

Plastering 5/8" thick to reveals width not exceeding 6" in


K.03 cement, lime or equivelent chemical product (Febmix)
and sand 1:1:5 finished semi-rough with wooden float.

Per 18 L.ft.
Cement Cwt. 0.1 0.100 670.00
Lime 2 kg 2.000 12.00
Sand Cube 0.15 0.015 11050.00
Mason Day 1.0 1.000 770.00
Labour Day 0.5 0.500 629.00
Rate per 18 L.ft.

Rate per L.ft.


Add 22%
Total rate

Engineering Organization W.P. Page 125 BSR Annalysis


Plastering 5/8" thick to walls in cement, lime or
K.04 equivelent chemical product (Febmix) and sand 1:1:5
finished smooth with lime putty.
Material
0.80 Cwt. Cement 0.800 670.00
63 kg Slaked lime 63.000 12.00
0.07 Cube sand 0.070 11050.00
Water (10 Glns) 10.000 0.50
Sub total
Labour
1 3/4 Day Mason 1.750 770.00
1 3/4 Day unskilled labour 1.750 629.00

Add 3% scaffolding
Sub total

Rate per square


Add 22%
Total rate

Plastering 5/8" thick to reveals width not exceeding 6"


K.05 in cement, lime or equivelent chemical product (Febmix)
and sand 1:1:5 finished smooth with lime putty.

Per 18 L.ft.
Material
0.10 Cwt Cement 0.100 670.00
2.1kg Lime 2.100 12.00
0.010 Cube Sand 0.010 11050.00
1.250 Day Mason 1.250 770.00
0.500 Day Labour 0.500 629.00
Rate Per 18 L.ft.

Rate per L.ft.


Add 22%
Total rate

Plastering 3/8" thick to soffit of slab, sunshade, sides


K 06 and soffit of beams, stair cases and sides of columns in
cement and sand 1:3 including floating with lime putty.

Per Square
Material
0.80 Cwt. Cement 0.800 670.00
42 kg Slaked lime 42.000 12.00
0.05 Cube sand 0.050 11050.00
Water 15 Glns 15.000 0.50
Sub total
Labour
2 1/2 Day Mason 2.500 770.00

Engineering Organization W.P. Page 126 BSR Annalysis


2 1/2 Day labour 2.500 629.00

Add 3% scaffolding
Sub total

Rate per square


Add 22%
Total rate

Plastering 3/8" thick to soffit of slab, sunshade, sides


and soffit of beams, stair cases and sides of columns in
K 07
cement & sand 1:3 finished semi rough with wooden
float.

Per Square
Material
0.80 Cwt. Cement (50 Kg bags) 0.800 670.00
25 kg Slaked lime 25.000 12.00
0.07 Cube sand 0.070 11050.00
Water 10 Glns. 10.000 0.50
Sub total
Labour
2 3/8 Day Mason 2.375 770.00
2 1/4 Day Unskilled labourer 2.250 629.00

Add Scaffolding 3%
Sub total

Rate per square


Add 22%
Total rate

Forming drip for sunshade edge cement & sand 1: 2


K08
finish semi rough.

Per 100 L.ft.


Material
0.40 Cwt cement 0.400 670.00
0.06 Cwt sand 0.060 11050.00
Water 20 Glns. 20.000 0.50
Sub total
Labour
4 Day Mason 4.000 770.00
4 Day Labour 4.000 629.00

Scaffolding
Sub total

Rate Per 100 L.ft.


Rate per L.ft.
Add 22%
Total rate

Engineering Organization W.P. Page 127 BSR Annalysis


Plastering 3/4" thick to black board in cement & sand 1:3
finish semi rough and Rendering cement floating coat
K 09
using black cement finished smooth with carborandum
stone. Including preparation of border.

Per Square
Material
0.85 Cwt. Cement (50 Kg bags) 0.850 670.00
0.075 Cube sand 0.075 11050.00
Water 10 Glns. 10.000 0.50
20 Lbs. Black cement 20.000 190.00
Sub total
Labour
2 1/2 Day Mason 2.500 770.00
2 1/2 Day Unskilled labourer 2.500 629.00
1/2 Day labourer - grinding with carborandum 0.500 629.00
Add Scaffolding 3%
Allow for carborandum stone
Sub total

Rate per square


Add 22%
Total rate

Plaster bands 6" x 1/2" in cement & sand 1:3 finished


K 10 semi rough, extra over the plastering as per the Drawing
No:- AR/DETAIL DRG/2010/01/10 & Sheet No. 01

Per 19L.ft
Material
0.2 Cwt. Cement 0.200 670.00
0.007 Cube sand 0.007 11050.00
Water (10 Glns) 10.000 0.50
Sub total
Labour
1 1/8 Day Mason 1.125 770.00
1 1/8 Day unskilled labour 1.125 629.00
Add 3% scaffolding
Sub total

Rate Per 100 L.ft.


Rate per L.ft.
Add 22%
Total rate

Plaster bands 9" x 1/2" in cement & sand 1:3 finished


K 11 semi rough, extra over the plastering as per the Drawing
No:- AR/DETAIL DRG/2010/01/10 & Sheet No. 01

Per 20L.ft

Engineering Organization W.P. Page 128 BSR Annalysis


Material
0.30 Cwt. Cement 0.300 670.00
0.01 Cube sand 0.010 11050.00
Water (10 Glns) 10.000 0.50
Sub total
Labour
1 1/2 Day Mason 1.500 770.00
1 1/2 Day unskilled labour 1.500 629.00
Add 3% scaffolding
Sub total

Rate Per 100 L.ft.


Rate per L.ft.
Add 22%
Total rate

Glazed colour tiles 8" x 12" fixed to walls in 1:2 cement


L 01
and sand mortar and pointed with tile grout.
Per Square
Materials
150 glazed Tile 8" x12" 150.00 85.00
Add 10% for wastage on cutting
2 1/2 Cwt. cement 2.500 670.00
0.11 Cube sand 0.110 11050.00
1 Kg grout 1.000 160.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Glazed colour tiles 12" x 16" fixed to walls in 1:2


L 02
cement and sand mortar and pointed with tile grout.
Per Square
Materials
76 glazed Tile 12" x16" 76.00 210.00
Add 10% for wastage on cutting
2 1/2 Cwt. cement 2.500 670.00
0.11 Cube sand 0.110 11050.00
1 Kg grout 1.000 160.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.

Engineering Organization W.P. Page 129 BSR Annalysis


Add 22%
Total

Glazed colour tiles 24" x 12" fixed to walls in 1:2


L 03
cement and sand mortar and pointed with tile grout.
Per Square
Materials
50 glazed Tile 24" x12" 50.00 402.00
Add 5% for wastage on cutting
2 1/2 Cwt. cement 2.500 670.00
0.11 Cube sand 0.110 11050.00
1 Kg grout 1.000 160.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

L 04 1/2" thick rendering in cement and sand 1:3


Per Sq.
Materials
1.07 Cwt. cement 1.070 670.00
0.05 Cube sand 0.050 11050.00
10 Gal water 10.000 0.50
Sub Total
Labour
1 day. mason 1.000 770.00
1.5days. labour 1.500 629.00
Sub Total

Rate per Sqr


Add 22%
Total

Homogeneous vitreous porcelain glazed or unglazed


L 05 floor tile 8" x 8" paving on 1:3 cement & sand bedding
and pointed with tile grout to match the tile.

Per Square
Materials
223 Industrial glazed Tile 8" x 8" 223.000 72.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00

Engineering Organization W.P. Page 130 BSR Annalysis


Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Homogeneous vitreous porcelain glazed or unglazed


L 06 floor tile 12" x 12" paving on 1:3 cement & sand bedding
and pointed with tile grout to match the tile.

Per Square
Materials
100 Industrial glazed Tile 12" x 12" 100.000 163.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Homogeneous vitreous porcelain glazed or unglazed


L 07 floor tile 16" x 16" paving on 1:3 cement & sand bedding
and pointed with tile grout to match the tile.

Per Square
Materials
57 Industrial glazed Tile 16" x 16" 57.000 288.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotten west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.

Engineering Organization W.P. Page 131 BSR Annalysis


Add 22%
Total

Homogeneous vitreous porcelain polished floor tile 12"


L 08 x 12" paving on 1:3 cement & sand bedding and pointed
with tile grout to match the tile.
Per Square
Materials
100 Industrial Tile 12" x 12" 100.000 266.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Homogeneous vitreous porcelain polished floor tile 16"


L 09 x 16" paving on 1:3 cement & sand bedding and pointed
with tile grout to match the tile.
Per Square
Materials
57 Industrial Tile 16" x 16" 57.000 492.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Homogeneous vitreous porcelain rectified floor tile 24"


L 10 x 12" paving on 1:3 cement & sand bedding and pointed
with tile grout to match the tile.
Per Square
Materials
50 Industrial Tile 24" x 12" 50.000 475.00

Engineering Organization W.P. Page 132 BSR Annalysis


Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Homogeneous vitreous porcelain rectified floor tile 24"


L 11 x 16" paving on 1:3 cement & sand bedding and pointed
with tile grout to match the tile.

Per Square
Materials
38 Industrial Tile 24" x 16" 38.000 500.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Homogeneous vitreous porcelain rustic floor tile 12"


L 12 x 12" paving on 1:3 cement & sand bedding and pointed
with tile grout to match the tile.
Per Square
Materials
100 Industrial Tile 12" x 12" 100.000 152.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Engineering Organization W.P. Page 133 BSR Annalysis


Rate per Sqr.
Add 22%
Total

Homogeneous vitreous porcelain rustic floor tile 12"


L 13 x 12" paving on 1:3 cement & sand bedding and pointed
with tile grout to match the tile.
Per Square
Materials
57 Industrial Tile 16" x 16" 57.000 275.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Homogeneous vitreous porcelain glazed floor tile 18" x


L 14 18" paving on 1:3 cement & sand bedding and pointed
with tile grout to match the tile.
Per Square
Materials
45 Industrial Tile 18" x 18" 45.000 360.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

L 15 Supplying & laying 4" high tile skirting

Per 100 L.ft.


Materials

Engineering Organization W.P. Page 134 BSR Annalysis


33 Nos tile 12" x 12" 33.000 163.00
Add 5% for wastage on cutting
0.20 Cwt. cement 0.200 670.00
0.01 Cube sand 0.010 11050.00
0.75 Kg grout 0.750 160.00
Sub Total
Labour
2 Day mason 2.000 770.00
1 1/2 Day labour 1.500 629.00
Sub Total

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total value

L 16 Supplying & laying 4" high tile skirting at staircase

Per 100 L.ft.


Materials
33 Nos tile 12" x 12" 33.000 163.00
Add 15% for wastage on cutting
0.30 Cwt. cement 0.300 670.00
0.02 Cube sand 0.020 11050.00
1.5 Kg grout 1.500 160.00
Sub Total
Labour
2 1/2 Day mason 2.500 770.00
2 1/2 Day labour 2.500 629.00
Sub Total

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total value

Lay Ceramic glazed floor tiles 12"x12" (paving on 1:3


L 18 cement sand bedding and pointed with tile grout to
match the tile.
Per Square
Materials
100 Industrial glazed Tile 12" x 12" 100.000 105.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotten west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Engineering Organization W.P. Page 135 BSR Annalysis


Rate per Sqr.
Add 22%
Total

Lay Ceramic glazed floor tiles 13"x13" (paving on 1:3


L 19 cement sand bedding and pointed with tile grout to
match the tile.
Per Square
Materials
86 Industrial glazed Tile 13" x 13" 86.000 143.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotten weste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Lay Ceramic glazed floor tiles 16"x16" paving on 1:3


L 20 cement sand bedding and pointed with tile grout to
match the tile.
Per Square
Materials
57 Industrial glazed Tile 16" x 16" 57.000 215.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Lay Ceramic glazed floor tiles 18"x18" paving on 1:3


L 21 cement sand bedding and pointed with tile grout to
match the tile.
Per Square

Engineering Organization W.P. Page 136 BSR Annalysis


Materials
45 Industrial glazed Tile 18" x 18" 45.000 305.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Lay Ceramic glazed floor tiles 24"x12" paving on 1:3


L 22 cement sand bedding and pointed with tile grout to
match the tile.
Per Square
Materials
50 Industrial glazed Tile 24" x 12" 50.000 375.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Lay Ceramic glazed floor tiles 24"x16" paving on 1:3


L 23 cement sand bedding and pointed with tile grout to
match the tile.
Per Square
Materials
38 Industrial glazed Tile 24" x 16" 38.000 442.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00

Engineering Organization W.P. Page 137 BSR Annalysis


3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Lay Ceramic glazed floor tiles 2'-0" x 2'-0" paving on 1:3


L 24 cement sand bedding and pointed with tile grout to
match the tile.
Per Square
Materials
25 Industrial glazed Tile 2'-0" x 2'-0" 25.000 770.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Rough porcelain bathroom floor tiles of size 8" x 8" of


L 25 Rocell or equivalent, paving on 1:3 cement sand bedding
and pointed with tile grout to match the tiles.

Per Square
Materials
223 bathroom Tile 8" x 8" 223.000 70.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Engineering Organization W.P. Page 138 BSR Annalysis


Rough porcelain bathroom floor tiles of size 12" x 12" of
L 26 Rocell or equivalent, paving on 1:3 cement sand bedding
and pointed with tile grout to match the tiles.

Per Square
Materials
100 bathroom Tile 12" x 12" 100.000 135.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Polished Granite size 1'-0" x 1'-0" absolutely black for


vanity top of "Ally Weerasinghe" or approved
L 27 equivalent , laid on 1/2" thick cement sand 1:3 screed
level off using cement slurry and 1mm joints to be
absolutely in line and flush and grout.

Per Square
Materials
100 Nos. Granite 1'-0" x 1'-0" 100.000 1300.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Polished Granite floor slabs of size 1'-0" x 1'-0"


absolutely black of "Ally Weerasinghe" or approved
L 28 equivalent , laid on 1/2" thick cement sand 1:3 screed
level off using cement slurry and 1mm joints to be
absolutely in line and flush and grout.

Per Square
Materials

Engineering Organization W.P. Page 139 BSR Annalysis


100 Nos. Granite 1'-0" x 1'-0" 100.000 1300.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Granite floor slabs of size 1'-0" x 1'-0" rough finish of


"Ally Weerasinghe" or approved equivalent , laid on 1/2"
L 29 thick cement sand 1:3 screed level off using cement
slurry and 1mm joints to be absolutely in line and flush
and grout.

Per Square
Materials
100 Nos. Granite 1'-0" x 1'-0" 100.000 390.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Granite floor slabs of size 1'-0" x 1'-0" gloss finish of


"Ally Weerasinghe" or approved equivalent , laid on 1/2"
L 30 thick cement sand 1:3 screed level off using cement
slurry and 1mm joints to be absolutely in line and flush
and grout.

Per Square
Materials
100 Nos. Granite 1'-0" x 1'-0" 100.000 390.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00

Engineering Organization W.P. Page 140 BSR Annalysis


2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Granite floor slabs of size 2'-0" x 1'-0" gloss finish of


"Ally Weerasinghe" or approved equivalent , laid on 1/2"
L 31 thick cement sand 1:3 screed level off using cement
slurry and 1mm joints to be absolutely in line and flush
and grout.

Per Square
Materials
50 Nos. Granite 1'-0" x 1'-0" 50.000 1380.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotton waste 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Porcelain polished design floor tile 32" x 32" paving on


L 32 1:3 cement & sand bedding and pointed with tile grout to
match the tile. ( Heavy duty )
Per Square
Materials
14 polished design Tile 32" x 32" 14.000 2950.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotten west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.

Engineering Organization W.P. Page 141 BSR Annalysis


Add 22%
Total

Porcelain polished design floor tile 24" x 24" paving on


L 33 1:3 cement & sand bedding and pointed with tile grout to
match the tile. ( Heavy duty )
Per Square
Materials
25 polished design Tile 24" x 24" 25.000 1340.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotten west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Porcelain matt & gloss design floor tile 24" x 24" paving
L 34 on 1:3 cement & sand bedding and pointed with tile
grout to match the tile. ( Heavy duty )
Per Square
Materials
25 porcelain design Tile 24" x 24" 25.000 1070.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotten west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Porcelain matt & gloss design floor tile 20" x 20" paving
L 35 on 1:3 cement & sand bedding and pointed with tile
grout to match the tile. ( Heavy duty )
Per Square
Materials
36 porcelain design Tile 20" x 20" 35.000 760.00

Engineering Organization W.P. Page 142 BSR Annalysis


Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotten west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Porcelain matt & gloss design floor tile 24" x 16" paving
L 36 on 1:3 cement & sand bedding and pointed with tile
grout to match the tile. ( Heavy duty )
Per Square
Materials
36 porcelain design Tile 24" x 16" 38.000 610.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotten west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

Porcelain matt & gloss design floor tile 18" x 18" paving
L 37 on 1:3 cement & sand bedding and pointed with tile
grout to match the tile. ( Heavy duty )
Per Square
Materials
45 porcelain design Tile 18" x 18" 45.000 435.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotten west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Engineering Organization W.P. Page 143 BSR Annalysis


Rate per Sqr.
Add 22%
Total

Ceramic design floor tile 16" x 16" paving on 1:3 cement


L 38 & sand bedding and pointed with tile grout to match the
tile. ( Heavy duty )
Per Square
Materials
57 porcelain design Tile 16" x 16" 57.000 255.00
Add 5% for wastage on cutting
1 1/2 Cwt. cement 1.500 670.00
0.07 Cube sand 0.070 11050.00
1.5 Kg grout 1.500 160.00
2 lb cotten west 2.000 40.00
Sub Total
Labour
3 Day mason 3.000 770.00
3 Days labour 3.000 629.00
Sub Total

Rate per Sqr.


Add 22%
Total

White washing walls two coats in single storied building


M 01
including preparing surface.
Per 10 Sqr.
Material
2.5kg boiled lime 2.500 12.00
2 lbs Salt 2.000 14.00
1/2 lb Yellow ochre 0.500 58.00
2 ozs blue 2.000 60.00
6" brush ( 1/3 Use ) 1.000 283.33
Water 10 gals 10.000 0.50
Sub Total
Labour
2 1/2 days painter 2.500 770.00
2 1/2 Days U/SK labour 2.500 629.00

Scaffolding - Add 3%
Sub Total

Rate per 10 Sqr.


Rate per Sqr.
Add 22%
Total

Engineering Organization W.P. Page 144 BSR Annalysis


White washing walls two coats in two storied building
M 02
including preparing surface.
Per 10 Sqr.
( As per above item M01 )
Add 3%
Total

Painting walls with one coat of wall primer including


M 03
preparing surface.
Per Sqr.
Material
0.9 ltr. primer 0.900 770.00
3/8 Day painter 0.375 770.00
Allow for brushes 1.000 85.00
Rate per Sqr.
Add 22%
Total

Painting walls with one coat of emulsion paint including


M 04
preparing surface.
Per Square
Material
1st coat - 0.75 lit.. Emulsion paint 0.750 580.00
0.05 Gln. Water 0.050 0.50
6" Brush (1/10 Use) 0.100 85.00
Sub total
Labour
0.375 Day Painter 0.375 770.00
Scaffolding 3%
Sub total

Rate per Square


Add 22%
Total Rate

M 05 Painting walls with two coats of emulsion paint


including preparing surface.
Per Square
Material
1st Coat - 0.75 lit. Emulsion 0.750 580.00
2 nd Coat -0.639 lit. Emulsion 0.639 580.00
0.10 Gln. water 0.100 0.50
6 " brush 1/10 (Use) 1.000 85.00
Sub Total
Labour
3/4 day painter 0.750 770.00
Scaffolding 3%
Sub Total

Rate per Sqr.


Add 22%

Engineering Organization W.P. Page 145 BSR Annalysis


Total Rate

Painting soffit with one coat of emulsion paint including


M 06
preparing surface..
Per Square
Material
1st coat - 0.75 lit.. Emulsion paint 0.750 580.00
0.05 Gln. Water 0.050 0.50
6" Brush (1/10 Use) 0.100 85.00
Sub total
Labour
1/2 Day Painter 0.500 770.00
Scaffolding 3%
Sub total

Rate per Square


Add 22%
Total Rate

Painting soffit with two coats of emulsion paint


M 07
including preparing surface.
Per Square
Material
1st Coat - 0.75 lit. Emulsion 0.750 580.00
2 nd Coat -0.639 lit. Emulsion 0.639 580.00
0.10 Gln. water 0.100 0.50
6 " brush 1/10 (Use) 1.000 85.00
Sub Total
Labour
1 day painter 1.000 770.00
Scaffolding 3%
Sub Total

Rate per Sqr.


Add 22%
Total Rate

Painting walls with onecoat of weathershield paint


M 08
including preparing surface.
Per Sqr.
Material
1.50 litres weather shield 0.980 810.00
0.10 Gln. water 0.100 0.50
6 " brush 1/10 (Use) 1.000 85.00
Sub Total
Labour
3/8 day painter 0.375 770.00
Scaffolding 3%
Sub Total

Rate per Sqr.

Engineering Organization W.P. Page 146 BSR Annalysis


Add 22%
Total Rate

Painting walls with two coats of weathershield paint


M 09
including preparing surface.
Per Sqr.
Material
1.50 litres weather shield 1.500 810.00
0.10 Gln. water 0.100 0.50
6 " brush 1/10 (Use) 1.000 85.00
Sub Total
Labour
3/4 day painter 0.750 770.00
Scaffolding 3%
Sub Total

Rate per Sqr.


Add 22%
Total Rate

Painting walls & soffits with one coat of crack binder


M 10
primer.
Per 2.4 Sqr.
Material
4 litres crack binding primer ( 1lit.=60sq.ft ) 1.000 3400.00
0.5 Gln. water 0.500 0.50
6 " brush 1/10 (Use) 2.000 85.00

Labour
1 day painter 1.000 770.00
Scaffolding 3%

Rate per 2.4 Sqr.


Rate per Sqr.
Add 22%
Total Rate

Cement washing two coats to walls in single storied


M 11
buildings including preparing surface.
Per 10 Square
Material
5/8 Cwt cement 0.625 670.00
1 - 16" coir brush ( 1/10use ) 1.000 3.00
Water 5 Gals. 5.000 0.50
2 Sand paper 2.000 20.00
Sub Total
Labour
2 days painter 2.000 770.00
2 days labourer 2.000 629.00
Scaffolding add 3%

Engineering Organization W.P. Page 147 BSR Annalysis


Sub Total

Rate per 10 Squares


Rate per Square
Add 22%
Total

Painting walls with one coat of enamel paint including


M 12
preparing surface.
Per Square
Material
0.8 litre. Enamel 0.800 645.00
6 " brush 1/10 (Use) 1.000 85.00
Sub Total
Labour
3/8 days painter 0.375 770.00
Scaffolding 3%
Sub Total

Rate per Square


Add 22%
Total

Painting walls with two coats of enamel paint including


M 13
preparing surface.
Per Square
Material
Enamel paint two coats - 1.5 lit. 1.500 645.00
6" Brush (1/10 Use) 1.000 85.00
Sub total
Labour
1 1/8 Day Painter 1.125 770.00
Scaffolding 3%
Sub total

Rate per Square


Add 22%
Total

Application of plaster coatings of thickness not less


than 2mm using "Joint compound powder / Skimcoat ",
M 14 or approved equivalent to walls, slab, beam, column
facings.Rate shall include for sand papering and surface
preparation.

Per Square
Material
12.5 kg - Joint compound primer 12.500 100.00
1 No. Scraper (1/4 use ) 1.000 80.00
Labour
2 Day Painter 2.000 770.00
Scaffolding 5%

Engineering Organization W.P. Page 148 BSR Annalysis


Rate per Square
Add 22%
Total

Painting black boards with two coats of blackboard


M 15
paint including preparing surface.
Per Square
Material
Black board paint two coats - 1.5 lit. 1.500 520.00
6" Brush (1/10 Use) 1.000 85.00
Sub total
Labour
1 1/4 Day Painter 1.250 770.00
Scaffolding 3%
Sub total

Rate per Square


Add 22%
Total

Preparing and painting old wood work with one coat of


M 16
enamel paint.
Per Square
Material
0.8 litres enamel paint 0.800 645.00
2" brush (1/10 Use) 1.000 30.00
2 Sand paper 2.000 20.00
Sub Total
Labour
1/2 days painter 0.500 770.00
1/4 days labourer 0.250 629.00
Sub Total

Rate per Square


Add 22%
Total Rate

Preparing and painting old wood work with two coats of


M 17
enamel paint.
Per Square
Material
1.5 litres enamel paint 1.500 645.00
2" brush (1/10 Use) 1.000 30.00
2 Sand paper 2.000 20.00
Sub Total
Labour
3/4 days painter 0.750 770.00
1/4 days labourer 0.250 629.00
Sub Total

Rate per Square

Engineering Organization W.P. Page 149 BSR Annalysis


Add 22%
Total Rate

Preparing and painting new wood work with primerand


M 18
two coats of enamel paint.
Per Square
Material
3/4 litre primer 0.750 680.00
1.5 litre enamel paint 1.500 645.00
2" brush (1/5 use) 1.000 60.00
2 Sand paper 2.000 20.00
Sub Total
Labour
3/4 days painter 0.750 770.00
1/4 days labourer 0.250 629.00
Sub Total

Rate per Square


Add 22%
Total Rate

Preparing and application of water based stain and two


M 19 coats of water based sealant to new wood work. Rate
shall include for preparing the surface.

Per Square
Material
1.5 litre wood stain coat 1.500 1550.00
1.0 litre 1st sealer coat 1.000 2250.00
1.0 litre lacquer coat 1.000 2400.00
2" brush (1/5 use) 1.000 60.00
2 Sand paper 2.000 20.00
1/4 day hire of spray gun 0.250 500.00

Labour
2 1/2 days painter 2.500 770.00
1 days labourer 1.000 629.00

Rate per Square


Add 22%
Total Rate

Varnishing two coats with polyurethane varnish after


M 20
sand papering and application of sealer coat.
Per Square
Material
1.8 litres varnish 1.800 830.00
3" brush ( 1/3 use ) 1.000 150.00
1/2 no Sand paper 0.500 20.00
Sub Total
Labour

Engineering Organization W.P. Page 150 BSR Annalysis


1/2 days painter 0.500 770.00
1/2 days labourer 0.500 629.00
Sub Total

Rate per Square


Add 22%
Total Rate

M 22 Wax polishing to timber in panals and floors.


Per Square
Material
3/4 lb. wax polish 0.750 210.00
1/2 sand paper 0.500 20.00
4" brush (1/5 Use) 1.000 130.00
Allow for cloth 1.000 40.00
Sub Total
Labour
3/8 Day labourer 0.375 629.00
Sub Total

Rate per Square


Add 22%
Total Rate

M 23 Apply one coat of floor polish


Per Square
Material
1 litres floor polish 1.000 510.00
3" brush ( 1/3 use ) 1.000 150.00
Sub Total
Labour
3/8 Day labourer 0.375 629.00
Sub Total

Rate per Square


Add 22%
Total Rate

Painting floors with one coat of quick drying floor paint


M 24
including washing, cleaning and drying the surfaces

Per Square
1 Ltr. Floor paint 1.000 905.00
3/8 Day labourer 0.375 629.00
3" brush (1/3 use) 1.000 150.00
Rate per Square
Add 22%
Total Rate

Engineering Organization W.P. Page 151 BSR Annalysis


Painting steel work with one coat of anti-corrosive paint
M 25 with primer including removing corroded scale and wire
brushing.
Per Square
3/4 litre .Anti-corrosive paint 0.750 525.000
5/8 Day Painter 0.625 770.000
Brushes and Sand paper 10%
Rate per Square
Add 22%
Total Rate

Painting steel work with two coats of anti-corrosive


M 26 paint with primer including removing corroded scale and
wire brushing.
Per Square
1.25 litre Anti-corrosive paint 1.250 525.000
7/8 Day Painter 0.875 770.000
Brushes and Sand paper 10%
Rate per Square
Add 22%
Total Rate

Painting steel work with one coat of "EPLACK EPOXY


M 27
COALTAR" as per manufacturer's specifications.

Per Square
1.25 litre "EPLACK EPOXY COALTAR" 1.250 1230.000
5/8 Day Painter 0.625 770.000
2" brush (1/5 use) 1.000 60.000
Allow Sand paper 1%
Rate per Square
Add 22%
Total Rate

Painting steel work with two coats of Zinc phospate


M 28 primer including removing corroded scale and wire
brushing.
Per Square
1.25 litre Anti-corrosive paint 1.250 895.000
1 Day Painter 1.000 770.000
2" brush (1/5 use) 1.000 60.000
Allow Sand paper 1%
Rate per Square
Add 22%
Total Rate

Labour rate for two coats of Emlsion Painting walls


M 29 including scaffolding ( paints and brushes supplied by
the department)

Engineering Organization W.P. Page 152 BSR Annalysis


Per Square
Labour
3/4 day painter 0.750 770.000
Scaffolding 3%
Rate per Sqr.
Add 22%
Total Rate

Labour rate for single coats of Emlsion Painting walls


M 30 including scaffolding ( paints and brushes supplied by
the department)
Per Square
Labour
1/2 day painter 0.500 770.000
Scaffolding 3%
Rate per Sqr.
Add 22%
Total Rate

Labour rate for two coats of Enamel Painting including


M 31 scaffolding ( paints and brushes supplied by the
department)
Per Square
Labour
1 1/8 day painter 1.125 770.000
Scaffolding 3%
Rate per Sqr.
Add 22%
Total Rate

Door flush paneled 1 1/8" thick single sash hung on


3 3/4" x 2 3/4" frame. Rate without brass
N 01 1 1/8" flush panel
furniture, painting and lock.

Per Door 3'-0"x 7'-0" = 21.00 Sq.ft.


1.9 Cu.ft. Timber for frame 1.900 3200.000
14 Sq.ft. Timber planks ( 1 1/4") 14.000 230.000
11 Sq.ft. timber planks (3/4") 11.000 170.000
2 No. Spur stone 2.000 40.000
6 No. Rawl plug and screws 2" 6.000 13.000
12 No. Dowels 12.000 15.000
Sub Total

Allow for sand paper

Labour for sash


4 Days Carpenter ( Excluding Iron mongery fixing) 3.910 770.000
1.25 Day Labourer 1.160 629.000
Labour for frame

Engineering Organization W.P. Page 153 BSR Annalysis


0.750 Day Carpenter 0.750 770.000
0.375 Day labourer 0.375 629.000
Sub Total

Rate per 21.00 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Door glazed and paneled 1 1/8" thick single sash hung


on 3 3/4" x 2 3/4" frame. Rate without brass furniture,
N 02 1 1/8" glazed & paneled
painting and lock.

Per Door 3'0"x 7'0" = 21.00 Sq.ft.


1.9 Cu.ft. Timber for frame 1.900 3200.000
14.00 Sq.ft. Timber planks ( 1 1/4") 14.000 230.000
4.00 Sq.ft. timber planks (3/4") 4.000 140.000
12.00 L.ft. timber 1 1/2"x 1 1/2" 12.000 55.000
8.00 Sq.ft. Glass pane 3mm) 8.000 68.000
2 No. Spur stone 2.000 40.000
6 No. Rawl plug and screws 2" 6.000 13.000
2 No. Dowels 2.000 15.000
Sub Total

Allow for sand paper

Labour for frame


3/4Days Carpenter 0.750 770.000
3/8 Day Labourer 0.375 629.000
Labour for Sash
4 Day Carpenter ( Excluding Iron mongery fixing) 3.910 770.000
1.5 Day labourer 1.400 629.000
Sub Total

Rate per 21.00 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Door flush paneled 1" thick single sash hung on 3 3/4" x


2 3/4" frame. Rate without brass furniture, painting and
N 03 1" flush panel
lock.

Per Door 3'-0"x 7'-0" = 21.00 Sq.ft.


1.9 Cu.ft. Timber for frame 1.900 3200.000
14 Sq.ft. Timber planks ( 1 1/8") 14.000 205.000
11 Sq.ft. timber planks (3/4") 11.000 140.000
2 No. Spur stone 2.000 40.000
6 No. Rawl plug and screws 2" 6.000 13.000
12 No. Dowels 2.000 15.000
Sub Total

Allow for sand paper

Engineering Organization W.P. Page 154 BSR Annalysis


Labour for Sash
4 Days Carpenter ( Excluding Iron mongery fixing) 4.000 770.000
1.25 Day Labourer 1.160 629.000
Labour for Frame
1 1/8 Day Carpenter 1.125 770.000
5/8 Day labourer 0.625 629.000
Sub Total

Rate per 21.00 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Door glazed and paneled 1" thick single sash hung with
3 3/4" x 2 3/4" frame . Rate without brass furniture,
N 04 1" glazed & paneled
painting and lock.

Per Door 3'0"x 7'0" = 21.00 Sq.ft.


1.9 Cu.ft. Timber for frame 1.900 3200.000
14.00 Sq.ft. Timber planks ( 1 1/8") 14.000 205.000
4.00 Sq.ft. timber planks (3/4") 4.000 140.000
12.00 L.ft. timber 1 1/2"x 1 1/2" 12.000 55.000
8.00 Sq.ft. Glass pane 3mm) 8.000 68.000
2 No. Spur stone 2.000 40.000
6 No. Rawl plug and screws 2" 6.000 13.000
2 No. Dowels 2.000 15.000
Sub Total

Allow for sand paper

Labour for frame


3/4Days Carpenter 0.750 770.000
3/8 Day Labourer 0.375 629.000
Labour for Sash
5 Day Carpenter ( Excluding Iron mongery fixing) 3.910 770.000
1 1/2 Day labourer 1.400 629.000
Sub Total

Rate per 21.00 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Door 30mm thick plywood ordinary sash single hung on


3 3/4" x 2 3/4" frame. Rate without brass furniture,
N 05 30mm plywood door
painting and lock.

Per 3'-3"x 7'0" = 22.75


1.0 Cu.ft. Timber 1.000 3200.000
1 No. Plywwood door 2'-9"x 6'-9" 1.000 4220.000
2 No. Spur stone 2.000 40.000
6 No. hold fast 6.000 12.000
2 No. dowel 2.000 15.000

Engineering Organization W.P. Page 155 BSR Annalysis


Allow for cement and sand 3%

Labour Frame & fixing


1 Day Carpenter 1.000 770.000
1 Day Labourer 1.000 629.000
0.125 Day Mason 0.125 770.000
0.125 Day Labourer 0.125 629.000
Labour sash fixing
0.500 Day Carpenter ( Excluding Iron mongery fixing) 0.410 770.000
0.500 Day Labourer 0.410 629.000

Rate per 22.75 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Door 30mm thick plywood (marine) sash single hung on


3 3/4" x 2 3/4" frame. Rate without brass furniture,
N 06 30mm plywood door - marine
painting and lock.

Per 3'-3"x 7'0" = 22.75


1.60 Cu.ft. Timber 1.000 3200.000
1 No. Plywwood door 2'-9"x 6'-9" 1.000 3820.000
2 No. Spur stone 2.000 40.000
6 No. hold fast 6.000 12.000
2 No. dowel 2.000 15.000
Allow for cement and sand 3%

Labour Frame & fixing


1 Day Carpenter 1.000 770.000
1 Day Labourer 1.000 629.000
0.125 Day Mason 0.125 770.000
0.125 Day Labourer 0.125 629.000
Labour sash fixing
0.500 Day Carpenter ( Excluding Iron mongery fixing) 0.410 770.000
0.500 Day Labourer 0.410 629.000

Rate per 22.75 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Door or window glazed and/or paneled 1 1/8" thick


N 07 double sash hung on 3 3/4" x 2 3/4" frame. Rate without
brass furniture, painting and lock.

Per Door 4"x 7" Double hung = 28 Sq.ft.


2.00 Cu.ft. Timber Special Class for frame 2.000 3200.000

Engineering Organization W.P. Page 156 BSR Annalysis


8.00 Sq.ft. Timber Class I ( 1 1/2") 18.000 255.000
7.00 Sq.ft. timber plank Class 1 (3/4") 7.000 140.000
14.00 L.ft. timber class I (1 1/2"x 1 1/2") 14.000 50.000
45.00 L.ft. Fillets 1/2"x 1/2" 45.000 12.000
10.00 Sq.ft. Glass pane 3mm) 10.000 68.000
2 No. Spur stone 2.000 40.000
6 No. Rawl plug and screws 2" 6.000 13.000
12 No. dowel 12.000 15.000

Allow for sand paper

Labour for frame


3/4 Day Carpenter 0.750 770.000
3/8 Day Labourer 0.375 629.000
Labour for Sash
7 Day Carpenter ( Excluding Iron mongery fixing) 6.875 770.000
2 Day labourer 1.875 629.000
Sub Total 3

Rate per 28.00 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Door/Window ledged, braced & battened with 3 3/4" x 2


3/4" frames and 7/8" thick sash made out of GINISAPU.
N 08 Rate without brass furniture, painting and lock.

Data for 2'-6"x 6'-6" = 16 1/4 Sq.ft.


1.70 Cu.ft. Timber frame 1.700 3200.000
17.00 Sq.ft. 1" Plank 17.000 145.000
24 nos. Brass screwws 1 1/2" 24.000 8.500
2 No. Spur stone 2.000 40.000
6 No. Rawl plugs 2" & screws 6.000 13.000
Allow for dowels 2.000 15.000
Sub Total
Labour for making
3 Day Carpenter 3.000 770.000
1 1/4 Day Labour 1.250 629.000
Sub Total
Allow for sand paper
Sub Total

Rate per16 1/4 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Supply & fixing 1 1/8" thick flush paneled door sash


N 09 only. Rate without brass furnitures, door lock and
painting.

Engineering Organization W.P. Page 157 BSR Annalysis


Data for 2'-3 3/4"x 6'-3 3/4" = 14.6 Sq.ft.
8 Sq.ft. Timber Planks - 1 1/4" 8.000 230.000
13.25 Sq.ft. Timber Planks - 3/4" 13.250 140.000
24 nos. Brass screws 1 1/2" 24.000 8.500
2 nos. Brass screws 1" 2.000 8.000
Sub Total
Labour for making & Fixing
4 Day Carpenter 4.000 770.000
1 1/4 Day Labour 1.250 629.000
Sub Total

Rate per 14.6 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Supply & fixing 1" thick flush paneled door sash only.
N 10
Rate without brass furnitures, door lock and painting.

Data for 2'-3 3/4"x 6'-3 3/4" = 14.6 Sq.ft.


8 Sq.ft. Timber Planks - 1 1/8" 8.000 205.000
13.25 Sq.ft. Timber Planks - 3/4" 13.250 140.000
Sub Total
Labour for making & Fixing
4 Day Carpenter 4.000 770.000
1 1/4 Day Labour 1.250 629.000
Sub Total

Rate per 24.7 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Supply & fixing 1 1/8" thick glazed & paneled door sash
N 11 only. Rate without brass furnitures, door lock and
painting.
Data for pair of sashes 3'-7 1/2" x 6'-9 3/4" =24.7S.ft
18 Sq.ft. Timber Planks - 1 1/8" 18.000 205.000
7 Sq.ft. Timber Planks - 3/4" 7.000 140.000
14.00 L.ft. timber class I (1 1/2"x 1 1/2") 14.000 55.000
45.00 L.ft. Fillets 1/2"x 1/2" 45.000 12.000
10.00 Sq.ft. Glass pane 3mm) 10.000 68.000
24 nos. Brass screws 1 1/2" 24.000 8.500
2 nos. Brass screws 1" 2.000 8.000
Sub Total
Labour for making & Fixing
7 Day Carpenter 7.000 770.000
2 Day Labour 2.000 629.000
Sub Total

Rate per 24.7 Sq.ft.


Rate per Sq.ft.

Engineering Organization W.P. Page 158 BSR Annalysis


Add 22%
Total

Supply & fixing 1" thick glazed & paneled door sash
N 12 only. Rate without brass furnitures, door lock and
painting.
Data for pair of sashes 3'-7 1/2" x 6'-9 3/4" =24.7S.ft
18 Sq.ft. Timber Planks - 1" 18.000 185.000
7 Sq.ft. Timber Planks - 3/4" 7.000 140.000
14.00 L.ft. timber (1 1/2"x 1 1/2") 14.000 55.000
45.00 L.ft. Fillets 1/2"x 1/2" 45.000 12.000
10.00 Sq.ft. Glass pane 3mm) 10.000 68.000
24 nos. Brass screws 1 1/2" 24.000 8.500
2 nos. Brass screws 1" 2.000 8.000
Sub Total
Labour for making & Fixing
7 Day Carpenter 7.000 770.000
2 Day Labour 2.000 629.000
Sub Total

Rate per 24.7 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Supply & fixing 30mm thick plywood door sash only.


N 13
Rate without brass furnitures, door lock and painting.

Data for 3'-3" x 6'-9" = 21.9375 sq.ft.


01 nos plywood door 1.000 4220.000

Labour for Fixing


1/2 Day Carpenter 0.500 770.000
1/2 Day Labour 0.500 629.000
Sub Total

Rate per 16.25 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Door frame 3 3/4" x 2 3/4" in approved timber supplying


N 14
& fixing in position.
Data for 2'-6" x 6'-6" = 16.25 sq.ft.
1.7 cu.ft. Timber 1.700 3200.000
2 nos spur stone 2.000 40.000
hold fast 4.000 12.000
Allow for cement & sand

Labour for making & Fixing

Engineering Organization W.P. Page 159 BSR Annalysis


1 Day Carpenter 1.000 770.000
1/2 Day Labour 0.500 629.000
Sub Total

Rate per 16.25 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Window glazed 1 1/8" sash and 3 3/4" x 2 3/4" frame.


N 15
Rate without brass furniture, painting.

Per Door 4"x 7" Double hung = 28 Sq.ft.


1.90 Cu.ft. Timber Special Class for frame 1.900 3200.000
18.00 Sq.ft. Timber Class I ( 1 1/2") 18.000 230.000
8.00 Sq.ft. timber plank Class 1 (3/4") 8.000 140.000
14.00 L.ft. timber class I (1 1/2"x 1 1/2") 14.000 50.000
45.00 L.ft. Fillets 1/2"x 1/2" 45.000 12.000
10.00 Sq.ft. Glass pane 3mm) 10.000 68.000
2 No. Spur stone 2.000 40.000
6 No. Rawl plug and screws 2" 6.000 4.000
3 No. dowel 3.000 15.000
Sub Total 1
Allow for sand paper
Labour for Frame
0.750 Days Carpenter 0.750 770.000
0.375 Day Labourer 0.375 629.000
Sub Total 2
Labour for Sash
7 Day Carpenter 6.875 770.000
2 Day labourer 1.875 629.000
Sub Total 3

Rate per 28.00 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Window glazed 1" sash and 3 3/4" x 2 3/4" frame. Rate


N 16
without brass furniture, painting.

As per No. 15 Sub total 1


Less 18.00 Sq.ft. Timber Class I ( 1 1/2")

Add 18.00 Sq.ft. Timber Class I ( 1 1/8") 18.000 205.000


Sub Total
Add cost for fittings
Add cost for labour

Rate per 28 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Engineering Organization W.P. Page 160 BSR Annalysis


Window glazed 7/8" sash and 3 3/4" x 2 3/4" frame. Rate
N 17
without brass furniture, painting.

As per No. 15 Sub total


Less 18.00 Sq.ft. Timber Class I ( 1 1/2")

Add 18.00 Sq.ft. Timber Class I ( 7/8") 18.000 170.000


Sub Total
Add cost for fittings
Add cost for labour

Rate per 28 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Timber salts with 3 3/4"x 1 3/4" frames, 1" x 2 1/2"


N 18
vertical salts at 2 1/2" centers.
Data for 24 Sq.ft.
2.00 Cu.ft. 4"x 2" Timber 2.000 3200.000
310 L.ft. 1/2"x 1/2" slats 310.000 4.000
20.00 L.ft. 2"x 1/2" beading 20.000 10.000
1lb. 1" nails 1.000 59.000
1/2 lb. 2" nails 0.500 62.000
4 Day Carpenter 4.000 770.000
1 Day Labourer 1.000 629.000
4 No. Rawl plugs 2" 4.000 4.000
3 No 3" screws 3.000 12.000

Rate for 24 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Supply & fixing 1 1/8" thick glazed window sash only.


N 19
Rate without brass furnitures and painting.
Data for pair of sashes 3'-7 1/2" x 5'-9 3/4" =21S.ft
14 Sq.ft. Timber Planks - 1 1/8" 14.000 205.000
4 Sq.ft. Timber Planks - 3/4" 4.000 140.000
14.00 L.ft. timber class I (1 1/2"x 1 1/2") 14.000 55.000
45.00 L.ft. Fillets 1/2"x 1/2" 45.000 12.000
14 Sq.ft. Glass pane 3mm) 14.000 68.000
24 nos. Brass screws 1 1/2" 24.000 8.500
6 nos. Brass screws 1" 6.000 8.000
Sub Total
Labour for making & Fixing
5 Day Carpenter 5.000 770.000
2 Day Labour 2.000 629.000
Sub Total

Engineering Organization W.P. Page 161 BSR Annalysis


Rate per 21 Sq.ft.
Rate per Sq.ft.
Add 22%
Total

Supply & fixing 1" thick glazed window sash only. Rate
N 20
without brass furnitures and painting.
Data for pair of sashes 3'-7 1/2" x 5'-9 3/4" =21S.ft
14 Sq.ft. Timber Planks - 1 " 14.000 185.000
4 Sq.ft. Timber Planks - 3/4" 4.000 140.000
14.00 L.ft. timber class I (1 1/2"x 1 1/2") 14.000 55.000
45.00 L.ft. Fillets 1/2"x 1/2" 45.000 12.000
14 Sq.ft. Glass pane 3mm) 14.000 68.000
24 nos. Brass screws 1 1/2" 24.000 8.500
6 nos. Brass screws 1" 6.000 8.000
Sub Total
Labour for making & Fixing
5 Day Carpenter 5.000 770.000
2 Day Labour 2.000 629.000
Sub Total

Rate per 21 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Supply & fixing 7/8" thick glazed window sash only. Rate
N 21
without brass furnitures and painting.
Data for pair of sashes 3'-7 1/2" x 5'-9 3/4" =21S.ft
14 Sq.ft. Timber Planks - 1 " 14.000 170.000
4 Sq.ft. Timber Planks - 3/4" 4.000 140.000
14.00 L.ft. timber class I (1 1/2"x 1 1/2") 14.000 55.000
45.00 L.ft. Fillets 1/2"x 1/2" 45.000 12.000
14 Sq.ft. Glass pane 3mm) 14.000 68.000
24 nos. Brass screws 1 1/2" 24.000 8.500
6 nos. Brass screws 1" 6.000 8.000
Sub Total
Labour for making & Fixing
5 Day Carpenter 5.000 770.000
2 Day Labour 2.000 629.000
Sub Total

Rate per 21 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Window frame 3 3/4" x 2 3/4" in approved timber


N 22
supplying & fixing in position.

Engineering Organization W.P. Page 162 BSR Annalysis


Data for 6'-0" x 5'-0" = 30.00 sq.ft.
3.26 cu.ft. Timber 3.260 3200.000
4 nos spur stone 4.000 40.000
4 nos hold fast 4.000 12.000
Allow for cement & sand

Labour for making & Fixing


2 Day Carpenter 2.000 770.000
2 Day Labour 2.000 629.000
1/8 Day mason 0.125 770.000
1/8 Day Labour 0.125 629.000
Sub Total

Rate per 16.25 Sq.ft.


Rate per Sq.ft.
Add 22%
Total

Supply and fixing Stainless Steel hinges of size 102 x 76


P 01 x 2mm of Union Brand & Model no.- X8203-BB-2 or
approved equivalent.

Material
1 pair hinges 1.000 1790.000
16 nos 1" screws 16.000 8.00

Labour
1 hrs Carpenter 1.000 96.250
1 hrs Labour 1.000 78.625

Rate per Pair


Add 22%
Total Rate

Supply and fixing Stainless Steel hinges of size 102 x 76


P 02 x 3mm of Union Brand & Model no.- X8203-BB-3 or
approved equivalent.

Material
1 pair hinges 1.000 2225.000
16 nos 1" screws 16.000 8.00

Labour
1 hrs Carpenter 1.000 96.250
1 hrs Labour 1.000 78.625

Rate per Pair

Engineering Organization W.P. Page 163 BSR Annalysis


Add 22%
Total Rate

Supply and fixing Stainless Steel hinges of size 127 x 89


P 03 x 3mm of Union Brand & Model no.- X8205-BB-3 or
approved equivalent.

Material
1 pair hinges 1.000 2012.000
20 nos 1 1/2" screws 20.000 8.50

Labour
1 hrs Carpenter 1.000 96.250
1 hrs Labour 1.000 78.625

Rate per Pair


Add 22%
Total Rate

Supplying and fixing Night - latch lock of Union Brand &


P 04
Model No. -1028 WEPL or approved equivalent.
Material
1 No. Night latch 1.000 5751.000
6 Nos 1" brass screws 6.000 8.000

Labour
1 day Carpenter 1.000 770.000

Rate per No
Add 22%
Total Rate

Supplying and fixing Night - latch lock of Union Brand &


P 05
Model No. -1022 SEPL or approved equivalent.
Material
1 No. Night latch 1.000 7495.000
6 Nos 1" brass screws 6.000 8.000

Labour
1/4 day Carpenter 0.250 770.000

Rate per No
Add 22%
Total Rate

Engineering Organization W.P. Page 164 BSR Annalysis


Supplying and fixing two lever Mortice door lock for
P 06 single sash of Union Brand & Model no.-678.24.95 CH or
approved equivalent.

Material
1 No. Door Lock 1.000 3644.000

Labour
1/2 day Carpenter 0.500 770.000

Rate per No
Add 22%
Total Rate

Supplying and fixing two lever Mortice door lock for


P 07 double sash of Raniyo Brand & Model no.- 965.41.94 CH
or approved equivalent.

Material
1 No. Door Lock 1.000 4080.000

Labour
1 day Carpenter 1.000 770.000

Rate per No
Add 22%
Total Rate

Supplying and fixing cylindrical door lock of Union


P 08
Brand & Model no. -96300-SS.or approved equivalent

Material
1 No. Door Lock 1.000 3825.000

Labour
1/2 day Carpenter 0.500 629.000

Rate per No
Add 22%
Total Rate

Supplying & fixing rim lock of Raniyo Brand & Model


P 09
no. - 1445 or approved equivalent.

Material
1 No. Door Lock 1.000 900.000
6 Nos 1" brass screws 6.000 8.000

Engineering Organization W.P. Page 165 BSR Annalysis


Labour
1.5 hrs Carpenter 1.500 385.000

Rate per No
Add 22%
Total Rate

Supplying & fixing hydraulic door closer of Union Brand


P 10
& Model no. - 8823 SIL or approved equivalent.

Material
1 no Door closer 1.000 4815.000
6 Nos 1" brass screws 6.000 8.000

Labour
1 hrs Carpenter 1.000 96.250
1 hrs Labour 1.000 78.625

Rate per
Add 22%
Total Rate

Supplying & fixing stainless steel Male or Female


P 11 Symbol of Union Brand & Model no. - 200SS or approved
equivalent.
Material
1 No Symbol 1.000 975.000
2 Nos 3/4" screws 2.000 6.500

Labour
1/5 hrs Carpenter 0.200 96.250

Rate per
Add 22%
Total Rate

Supplying & fixing stainless steel Disabled Symbol of


P 12
Union Brand or approved equivalent.

Material
1 No Symbol 1.000 1200.000
2 Nos 3/4" screws 2.000 6.500

Labour
1/5 hrs Carpenter 0.200 96.250

Engineering Organization W.P. Page 166 BSR Annalysis


Rate per I no
Add 22%
Total Rate

Supplying and fixing 4" x 2 1/2" x 2.5mm thick solid


P 13 brass hinges with-out ball bearing inclusive of brass
screws.

Material
1 pair 4" x 2 1/2" hinges with brass screws 1.000 650.000

Labour
0.75 hrs Carpenter 0.750 96.250
0.75 hrs Labour 0.750 78.625

Rate per Pair


Add 22%
Total Rate

Supplying and fixing 4" x 3" x 2.5mm thick solid brass


P 14
hinges with-out ball bearing inclusive of brass screws.

Material
1 pair 4" x 3" hinges 1.000 785.000

Labour
0.75 hrs Carpenter 0.750 96.250
0.75 hrs Labour 0.750 78.625

Rate per Pair


Add 22%
Total Rate

Supplying and fixing 5" x 3" x 2.5mm thick solid brass


P 15
hinges with-out ball bearing inclusive of brass screws.

Material
1 pair 5" x 3" hinges 1.000 975.000

Labour
0.75 hrs Carpenter 0.750 96.250
0.75 hrs Labour 0.750 78.625

Rate per Pair


Add 22%
Total Rate

Engineering Organization W.P. Page 167 BSR Annalysis


Supplying and fixing heavy duty soild brass casement
P 16
fastener inclusive of brass screws.
Material
1 No Casement fastner 1.000 650.000

Labour
0.75 hrs Carpenter 0.750 96.250

Rate per 1 No.


Add 22%
Total Rate

Supplying and fixing heavy duty solid brass casement


P 17
stay - 6" inclusive of brass screws.
Material
1 No Casement stay - 6" 1.000 450.000

Labour
0.50 hrs Carpenter 0.500 96.250

Rate per 1 No.


Add 22%
Total Rate

Supplying and fixing heavy duty solid brass casement


P 18
stay - 12" inclusive of brass screws.
Material
1 No Casement stay - 12" 1.000 870.000

Labour
0.50 hrs Carpenter 0.500 96.250

Rate per 1 No.


Add 22%
Total Rate

P 19 Supplying and fixing 3" centre pivot - brass oxidized.

Material
3" Centre pivots set of 2 pieces 1.000 750.000

Labour
1 hrs Carpenter 1.000 96.250
1 hrs U/S Labour 1.000 78.625

Rate per set of 4

Engineering Organization W.P. Page 168 BSR Annalysis


set of 2 piece
Add 22%
Total Rate

Supplying and fixing 4" long heavy duty solid brass


P 20
tower bolt inclusive of brass screws
Material
1 Nos 4" tower bolt 1.000 610.000

Labour
1/2 hrs Carpenter 0.500 96.250

Rate per No.


Add 22%
Total Rate

Supplying and fixing 6" long heavy duty solid brass


P 21
tower bolt inclusive of brass screws
Material
1 No 6" tower bolt 1.000 800.000

Labour
1/2 hrs Carpenter 0.500 96.250

Rate per No.


Add 22%
Total Rate

Supplying and fixing 8" long heavy duty solid brass


P 22
tower bolt inclusive of brass screws
Material
1 No 8" tower bolt 1.000 1210.000

Labour
1/2 hrs Carpenter 0.500 96.250

Rate per No.


Add 22%
Total Rate

Supplying and fixing 10" long heavy duty solid brass


P 23
tower bolt inclusive of brass screws
Material
1 No Tower bolt 1.000 1500.000

Engineering Organization W.P. Page 169 BSR Annalysis


Labour
1/2 hrs Carpenter 0.500 96.250

Rate per
Add 22%
Total Rate

Supplying and fixing solid brass Door or Window pull


P 24
ring. ( Small )

Material
1 No door ring 1.000 200.000

Labour
1/5 hrs Carpenter 0.200 96.250

Rate per
Add 22%
Total Rate

Supplying and fixing solid brass Door or Window pull


P 25
ring. (Medium)

Material
1 No door ring 1.000 230.000

Labour
1/5 hrs Carpenter 0.200 96.250

Rate per
Add 22%
Total Rate

Supplying and fixing solid brass Door or Window pull


P 26
ring. (Large)

Material
1 No door ring 1.000 260.000

Labour
1/5 hrs Carpenter 0.200 96.250

Rate per
Add 22%
Total Rate

Engineering Organization W.P. Page 170 BSR Annalysis


P 27 Supplying and fixing fanlight catch brass oxidized.
Material
1 No Fanlight catch 1.000 690.000
4 Nos 1" brass screws 4.000 8.000

Labour
1/2 hrs Carpenter 0.500 96.250

Rate per No.


Add 22%
Total Rate

Supplying & fixing polished brass hinges of 4" x 2 1/2"


P 28 thickness 4.0mm ± 0.2mm with a weight not less than
265g ± 5g with a smooth surface finish.
Material
1 no 4" x 2 1/2" hinge 1.000 280.000
8 nos 3/4" screws 8.000 6.50

Labour
0.75 hrs Carpenter 0.750 96.250
0.75 hrs Labour 0.750 78.625

Rate per I no
Add 22%
Total Rate

Supplying & fixing polished brass hinges of 4" x 3"


P 29 thickness 4.2mm ± 0.2mm with a weight not less than
310g ± 5g with a smooth surface finish.
Material
1 no 4" x 3" hinge 1.000 285.000
8 nos 3/4" screws 8.000 6.50

Labour
0.75 hrs Carpenter 0.750 96.250
0.75 hrs Labour 0.750 78.625

Rate per I no
Add 22%
Total Rate

Supplying & fixing polished brass hinges of 5" x 2 1/2"


P 30 thickness 5.0mm ± 0.2mm with a weight not less than
345g ± 5g with a smooth surface finish.
Material

Engineering Organization W.P. Page 171 BSR Annalysis


1 no 5" x 2 1/2" hinge 1.000 525.000
10 nos 3/4" screws 10.000 6.50

Labour
0.75 hrs Carpenter 0.750 96.250
0.75 hrs Labour 0.750 78.625

Rate per I no
Add 22%
Total Rate

Supplying & fixing polished brass hinges of 5" x 3"


P 31 thickness 4.3mm ± 0.2mm with a weight not less than
380g ± 5g with a smooth surface finish.
Material
1 no 5" x 3" hinge 1.000 660.000
10 nos 3/4" screws 10.000 6.50

Labour
0.75 hrs Carpenter 0.750 96.250
0.75 hrs Labour 0.750 78.625

Rate per I no
Add 22%
Total Rate

Supplying & fixing polished brass barrel bolt of 4" with a


P 32 weight not less than 210g ± 5g with a smooth surface
finish.
Material
1 no 4" barrel bolt 1.000 355.000
6 nos 3/4" screws 6.000 6.50

Labour
0.5 hrs Carpenter 0.500 96.250

Rate per I no
Add 22%
Total Rate

Supplying & fixing polished brass barrel bolt of 6" with a


P 33 weight not less than 300g ± 5g with a smooth surface
finish.
Material
1 no 6" barrel bolt 1.000 560.000
8 nos 3/4" screws 8.000 6.50

Engineering Organization W.P. Page 172 BSR Annalysis


Labour
0.5 hrs Carpenter 0.500 96.250

Rate per I no
Add 22%
Total Rate

Supplying & fixing polished brass tower bolt of 10" with


P 34 a weight not less than 345g ± 5g with a smooth
surface finish.
Material
1 no10" Tower bolt 1.000 575.000
8 nos 3/4" screws 8.000 6.50

Labour
0.5 hrs Carpenter 0.500 96.250

Rate per I no
Add 22%
Total Rate

Supplying & fixing polished brass 1 1/4" dia. Pull ring


P 35 with a weight not less than 100g ± 5g with a smooth
surface finish.
Material
1 no1 1/4" pull ring 1.000 425.000
2nos 3/4" screws 2.000 6.50

Labour
0.2 hrs Carpenter 0.200 96.250

Rate per I no
Add 22%
Total Rate

P 36 Supplying and fixing mortice lock - Imported chinese

Material
1 No. Door Lock 1.000 1300.000

Labour
1/2 day Carpenter 0.500 770.000

Rate per No
Add 22%

Engineering Organization W.P. Page 173 BSR Annalysis


Total Rate

P 37 Supplying and fixing Yale mortice lock-(Italy make)

Material
1 No. Door Lock 1.000 1800.000
6 Nos 1" brass screws 6.000 8.000

Labour
1/2 day Carpenter 0.500 770.000

Rate per No
Add 22%
Total Rate

P 38 Supplying and fixing cupboard door lock - 808

Material
1 No. Door Lock 1.000 400.000

Labour
1 hrs Carpenter 1.000 96.250

Rate per No
Add 22%
Total Rate

P 39 Supplying and fixing magnet lock

Material
1 No. Magnent lock 1.000 50.000

Labour
1/12 hrs Carpenter 0.083 96.250

Rate per No
Add 22%
Total Rate

P 40 Supplying and fixing 1" padlock

Engineering Organization W.P. Page 174 BSR Annalysis


Material
1 No. 1" Pad lock 1.000 405.000

Rate per No
Add 22%
Total Rate

P 41 Supplying and fixing 1 1/2" padlock

Material
1 No. 1 1/2" Pad lock 1.000 480.000

Rate per No
Add 22%
Total Rate

P 42 Supplying and fixing 2" padlock

Material
1 No. 2" Pad lock 1.000 850.000

Rate per No
Add 22%
Total Rate

P 43 Supplying and fixing hasp & staple

Material
1 No. hasp & staple 1.000 35.000
1/12 hrs Carpenter 0.083 96.250
Rate per No
Add 22%
Total Rate

Roof covering with calicut pattern clay tiles in single


Q 01 storeyed building. ( Timber frame work & ridge covering
measured separately )
Per 6 Square
Materiel
750 Tiles 750.000 46.000
Labour
3 days carpenter 3.000 770.000
3 days U/S labourer 3.000 629.000
Sub Total

Engineering Organization W.P. Page 175 BSR Annalysis


Rate per 6 Squares
per Square
Add 22%
Total Rate

Roof covering with corrugated Asbestos sheet roof in


Q 02 single storeyed building ( frame work mesured
separately
Per 3.6 Square
Material
420 sq.ft. Asbestos corrugated sheet 420.000 57.000
72 Nos. roofing screws 4" 72.000 15.000
Sub Total
Labour
1 days carpenter 1.000 770.000
2 days U/S labourer 2.000 629.000
Sub Total

Rate per 3.6 Squares


per Square
Add 22%
Total Rate

Asbestos close fitting ridges fixed complete with roofing


Q 03
screws or hook bolts.
Per 13' - 4" length
Material
4 pairs ridges 3'-8" long 4.000 625.000
16 Nos Roofing screws or bolts 8" 16.000 15.000
Sub Total
Labour
1/4 day carpenter 0.250 770.000
1/4 day Labour 0.250 629.000
Sub Total

Rate per 13' - 4" length


Rate per L.ft.
Add 22%
Total Rate

Ridging with calicut pattern tiles bedded in cement lime


Q 04
sand mortar 1:1:4 and coloured to match the tiles.

Per 12 l.ft.
Material
9 Ridge Tile 9.000 52.000
1/3 Cwt Cement 0.333 670.000
0.02 Cube Sand 0.020 11050.000
14 kg slaked lime 14.000 12.000
1/2 lb colour powder 0.500 210.000

Engineering Organization W.P. Page 176 BSR Annalysis


Sub Total
Labour
1/4 day mason 0.250 770.000
1/4 day U.S. Labour 0.250 629.000
Sub Total

Rate per 12 length


Rate per L.ft.
Add 22%
Total Rate

One layer of half round tiles over existing corrugated


Q 05
sheets.
Per Sqr.
Material
500 half round clay tiles 500.000 25.000
Labour
2 Day Labourer 2.000 629.000
Rate per sqre.
Add 22%
Total

3/4" x 6" wide tongued and grooved lunumidella ceiling


planks fixed to underside of existing rafters with brass
Q 06
screws including leveling with timber strip where
necessary.

Per 1.8Sqr.
Material
220 S.ft. 6" x 3/4" Ceiling Plank 220.000 55.000
40 L.ft. 2" x 1/4" Class 1Timber strips 40.000 30.000
2 lb 3/4" nails 2.000 59.000
4 lb 1 1/2 nails 4.000 61.000
Sub Total
Labour
3 Days Carpenter 3.000 770.000
6 Days Labourer 6.000 629.000
Scaffolding 3%
Sub Total

Rate per 1.8Sqr.


Rate per Sqr.
Add 22%
Total

Asbestos eaves ceiling fixed to underside of existing


Q 07
rafters with Halmilla covers & fillets.
Per 1.95 Sqr.
Material
210 Sq.ft. flat Asbestos ceiling sheet 210.000 30.000
60 L.ft. 2" x 2" Halmilla Cove moulding 60.000 45.000
125 L.ft. 1 1/2" x 1/2" Halmilla beeding 125.000 10.000

Engineering Organization W.P. Page 177 BSR Annalysis


1/4 lb - 1/4" clouct nails 0.250 100.000
8 Doz 1 1/2" brass Screws 8.000 102.000
Sub Total
Labour
1 1/2 Day Carpenter 1.500 770.000
2 Days Labour 2.000 629.000
Scaffolding Add 3%
Sub Total

Total per 1.95 Squares


Per Squre
Add 22%
Total

Q 08 Supplying & fixing finished size 4" x 2" coconut rafters

per 100 l.ft


110 l.ft. 4" x 2" coconut rafters 110.000 75.00
3 lb 3" nails 3.000 73.00
Sub Total
Labour
3/8 Day Carpenter 0.375 770.00
5/8 Day Labour 0.625 629.00
Scaffolding Add 3%
Sub Total

Total per 100.0 L.ft.


Per L.ft.
Add 22%
Total

Supplying & fixing finished size 3 1/2" x 1 1/2" coconut


Q 09
rafters

per 100 l.ft


110 l.ft. 3 1/2" x 1 1/2" coconut rafters 110.000 55.00
3 lb 3" nails 3.000 73.00
Sub Total
Labour
3/8 Day Carpenter 0.375 770.00
1/2 Day Labour 0.500 629.00
Scaffolding Add 3%
Sub Total

Total per 100.0 L.ft.


Per L.ft.
Add 22%
Total

Engineering Organization W.P. Page 178 BSR Annalysis


Roof covering with Natural type main tiles of "Nivasi" or
approved equivelant with approx. size 310mm x 310mm
Q 10
and unit weight of 3.1Kg. (Specified Timber frame work
and ridge covering measured separately)

Per 6 Square
Materiel
145 Tiles 145.000 105.000
Labour
1/2 days carpenter 0.500 770.000
1/2 days U/S labourer 0.500 629.000
Sub Total

per Square
Add 22%
Total Rate

Ridging with Natural type ridge tiles bedded in cement,


Q 11
sand mortar 1:5 and coloured to match the tiles.

Per 12 l.ft.
Material
14 Ridge Tile 14.000 130.000
1/3 Cwt Cement 0.333 670.000
0.02 Cube Sand 0.020 11050.000
1/2 lb colour powder 0.500 210.000
Sub Total
Labour
1/4 day mason 0.250 770.000
1/4 day U.S. Labour 0.250 629.000
Sub Total

Rate per 12 length


Rate per L.ft.
Add 22%
Total Rate

Roof covering with Natural type gable left tiles or


Q 12
approved equivelant .

Per 12 l.ft.
Material
14 Ridge Tile 14.000 110.000
Sub Total
Labour
1/8 day mason 0.125 770.000
1/8 day U.S. Labour 0.125 629.000
Sub Total

Rate per 12 length


Rate per L.ft.
Add 22%

Engineering Organization W.P. Page 179 BSR Annalysis


Total Rate

Roof covering with Natural type corner tiles or approved


Q 14
equivelant .

Per 12 l.ft.
Material
14 Ridge Tile 14.000 115.000
Sub Total
Labour
1/8 day mason 0.125 770.000
1/8 day U.S. Labour 0.125 629.000
Sub Total

Rate per 12 length


Rate per L.ft.
Add 22%
Total Rate

Aluminium Vally gutter of 3' 0" wide in gauge 24 sheets


Q 15 including 3/4" thick Ginisapu timber boarding finished
with two coats of wood preservative.
Per 15 L.ft.
Material
2 Al. sheet ( 8' x 4' ) 2.000 2560.000
1/4 gal wood preservative 0.250 1175.000
0.10 Cwt cement ( 50 Kg Bags ) 0.100 670.000
7 kg slaked lime 7.000 12.000
1.00 Cu.ft. sand 1.000 110.500
50.00 Sq.ft. planks 50.000 130.000
2 lbs 1 1/2" wire nails 2.000 61.000
Sub Total
Labour
a) Fixing boarding and applying wood
preservative
1 Day Carpenter 1.000 770.000
1 Day U/SK Labour 1.000 629.000
Sub Total
b) Making and fixing G.I. sheets
1/2 day tinker 0.500 770.000
1/2 Day U/SK Labour 0.500 629.000
Sub Total
c) Building sides
1/4 day mason 0.250 770.000
1/2 Day U/SK Labour 0.500 629.000
Sub Total

Total per 15 L.ft.


Per L.ft
Add 22%
Total

Engineering Organization W.P. Page 180 BSR Annalysis


Aluminium flashing in gauge 24 sheets including 3/4"
Q 16 thick Ginisapu timber boarding finished with two coats
of wood preservative.
Per 15 L.ft.
Material
1 Al. sheet ( 8' 0" x 4' 0" ) 1.000 2560.000
0.05 Cwt cement ( 50 Kg Bags ) 0.050 670.000
1.00 Cu.ft. sand 1.000 110.500
50.00 Sq.ft. planks 50.000 130.000
2 lbs 1 1/2" wire nails 2.000 61.000
1/4 gal wood preservative 0.250 1175.000
Sub Total
Labour
a) Fixing boarding and applying wood
preservative
1 Day Carpenter 1.000 770.000
1 Day U/SK Labour 1.000 629.000
Sub Total
Cutting bending , soldering & fixing
1/2 day tinker 0.500 770.000
1/8 day mason ( caulking ) 0.125 770.000
3/4 Day U/SK Labour 0.750 629.000
Sub Total

Total per 15 L.ft.


Per L.ft
Add 22%
Total

Aluminium flashing in gauge 24 sheets with out


Q 17
boarding
Per 15 L.ft.
Material
1 Al. sheet ( 8' 0" x 4' 0" ) 1.000 2560.000
0.05 Cwt cement ( 50 Kg Bags ) 0.050 670.000
1.00 Cu.ft. sand 1.000 110.500
Sub Total
Labour
Cutting bending , soldering & fixing
1/2 day tinker 0.500 770.000
1/8 day mason ( caulking ) 0.125 770.000
3/4 Day U/SK Labour 0.750 629.000
Sub Total

Total per 15 L.ft.


Per L.ft
Add 22%
Total

Engineering Organization W.P. Page 181 BSR Annalysis


G.I. Flashing B. W.G. of 1' 6" girth with end laps not less
Q 18 than6", turned and tucked up not less thanto 6" in wall
and pointed in cement motor 1:2
Per 15 L.ft.
Material
1 G.l. sheet ( 8' 0" x 4' 0" ) 1.000 3840.000
0.05 Cwt cement ( 50 Kg Bags ) 0.050 670.000
1.00 Cu.ft. sand 1.000 110.500
Sub Total
Labour
Cutting bending , soldering & fixing
1/2 day tinker 0.500 770.000
1/8 day mason ( caulking ) 0.125 770.000
3/4 Day U/SK Labour 0.750 629.000
Sub Total

Total per 15 L.ft.


Per L.ft
Add 22%
Total

G.I. Vally gutter of 3' 0" wide in gauge 22 sheets


Q 19 including 3/4" thick Ginisapu timber boarding finished
with two coats of wood preservative.
Per 15 L.ft.
Material
2 G.I. sheet ( 8' x 4' ) 2.000 3840.000
1/4 gal wood preservative 0.250 1175.000
0.10 Cwt cement ( 50 Kg Bags ) 0.100 670.000
7 kg slaked lime 7.000 12.000
1.00 Cu.ft. sand 1.000 110.500
50.00 Sq.ft. planks 50.000 130.000
2 lbs 1 1/2" wire nails 2.000 61.000
Sub Total
Labour
a) Fixing boarding and applying wood
preservative
1 Day Carpenter 1.000 770.000
1 Day U/SK Labour 1.000 629.000
Sub Total
b) Making and fixing G.I. sheets
1/2 day tinker 0.500 770.000
1/2 Day U/SK Labour 0.500 629.000
Sub Total
c) Building sides
1/4 day mason 0.250 770.000
1/2 Day U/SK Labour 0.500 629.000
Sub Total

Total per 15 L.ft.


Per Squre
Add 22%
Total

Engineering Organization W.P. Page 182 BSR Annalysis


Zincalum Flashing 0.47mm thick of 1' 6" wide bent to
shape with end laps not less than 6", turned and tucked
Q 20
up not less thanto 6" in wall and pointed in cement
motor 1:2
Per 15 L.ft.
Material
1 no. 0.47mm Zincalum sheet ( 8' 0" x 3' 6" ) 1.000 3976.000
0.05 Cwt cement ( 50 Kg Bags ) 0.050 670.000
1.00 Cu.ft. sand 1.000 110.500
Sub Total

Labour
Cutting bending , soldering & fixing
1/2 day tinker 0.500 770.000
1/8 day mason ( caulking ) 0.125 770.000
3/4 Day U/SK Labour 0.750 629.000
Sub Total

Total per 15 L.ft.


Per L.ft
Add 22%
Total

Zincalum Vally gutter of 3' 0" wide in gauge 20 sheets


Q 21 including 3/4" thick Ginisapu timber boarding finished
with two coats of wood preservative.

Per 15 L.ft.
Material
2 G.I. sheet ( 8' x 3'-6" ) 2.000 3976.000
1/4 gal wood preservative 0.250 1175.000
0.10 Cwt cement ( 50 Kg Bags ) 0.100 670.000
7 kg slaked lime 7.000 12.000
1.00 Cu.ft. sand 1.000 110.500
50.00 Sq.ft. planks 50.000 130.000
2 lbs 1 1/2" wire nails 2.000 61.000
1/2 lit. anti corrosive paint 0.500 525.000
Sub Total
Labour
a) Fixing boarding and applying wood
preservative
1 Day Carpenter 1.000 770.000
1 Day U/SK Labour 1.000 629.000
Sub Total
b) Making and fixing G.I. sheets
1/2 day tinker 0.500 770.000
1/2 Day U/SK Labour 0.500 629.000
Sub Total
c) Building sides
1/4 day mason 0.250 770.000
1/4 Day U/SK Labour 0.250 629.000

Engineering Organization W.P. Page 183 BSR Annalysis


Sub Total

Total per 15 L.ft.


Per L.ft
Add 22%
Total

Roofing with calicut pattern tiles on local Micro


(Eucalyptus Microcoris) or Balau , Bitis or Kempas
timber frame work complete with ridge hips etc.
comprising of 165mm x 45mm ridge plate , 94mm x
Q 22 70mm wall plate , 94mm x 45mm rafters @ 18" c/c and
45mm x 22mm reepers @ 12" c/c. Rate shall include for
applying of wood preservative.

Per 6.0 Sqr.


Frame work
Material
34 Cu.ft. Timber 34.000 3200.000
660 L.ft. 2" x 1" reepers 660.000 30.000
8 lbs wire nails 6" long 8.000 82.000
2 lbs wire nails 2" long 2.000 62.000
Sub Total
Covers
750 Tiles 750.000 46.000
Ridging
45 ridge tiles 45.000 52.000
1 1/2 Cwt cement 1.500 670.000
1.5 bushel slaked lime 1.500 300.000
8 C.ft sand 8.000 110.500
1/2 lb colour pigment 0.500 210.000
Sub Total
Labour
7 Days Carpenter 7.000 770.000
4 Days U/SK Labourer 4.000 629.000
11/2Day Mason 1.500 770.000
1 1/2 Day Labour 1.500 629.000
Sub Total
Covers
3 Days Carpenter 3.000 770.000
3 Days U/SK Labourer 3.000 629.000
Sub Total

Total per 6 Squares


Per Squre
Add 22%
Total

Engineering Organization W.P. Page 184 BSR Annalysis


Roofing with asbestos corrugated sheets on local Micro
(Eucalyptus Microcoris) or Balau , Bitis, or Kempas
timber frame work (Ridging measured
separately).Comprising of 165mm x 45mm ridge plate ,
Q 23 94mm x 70mm wall plate , 94mm x 45mm rafters @ 30"
c/c and 45mm x 45mm battens @ 3'-0" c/c.Rate shall
include for applying of wood preservative.

Per 3.6 Sqr.


Material
13 1/4 Cu.ft. Timber 13.250 3200.000
420 Sq.ft. Asbestos Corrugated sheet 420.000 57.000
72 Nos roofing screws 4" 72.000 15.000
Sub Total

Labour
2 1/2 Days Carpenter 2.500 770.000
3 Days U/SK Labourer 3.000 629.000
1 Day Carpenter 1.000 770.000
2 Days U/SK Labourer 2.000 629.000
Sub Total

Total per 3.6 Squares


Per Squre
Add 22%
Total

Supply and installation of Zn/Alum profile sheets of total


thickness 0.47mm , fixed to the roof timber frame work
comprising of 140mm x 45mm hip rafters/valley rafters,
94mm x 70mm wall plates, 117mm x 94mm purling ,
94mm x 45mm rafters @ 2'-0" spacing and 45mm x
22mm reepers @ 3'-6" spacing including ridge capping ,
end capping and other accessories required to complete
the roof to working order. (Ceiling and thermal
Q 24 installation measured separately.) Rate shall include for
routing , planing and sand papering hip/valley rafters,
purlings and rafters and application of waterbased stain
and two coats of water based sealants. Rate shall
include for applying of wood preservative.

per square
Zn/Al roofing fixing 1.000 17235.057
Timber frame work 1.000 17313.667
Water based paint

Per Squre
Add 22%
Total

Engineering Organization W.P. Page 185 BSR Annalysis


Asbestos flat ceiling fixed with coves & fillets to local
Micro (Eucalyptus Microcoris) or Balau , Bitis or
Kempas timber frame work of 94mm x 45mm @ 4' - 0"
Q 25 c/c , 45mm x 45mm @ 2' - 0" c/c, fillet size to be 1 1/2" x
1/2" and cove moulding size to be 2" x 2". Rate shall
include for applying of wood preservative.

Per 1.95 Square


Material
210 Sq.ft. flat Asbestos sheets 210.000 30.000
60 L.ft. 2" x 2" Halmilla cove moulding 60.000 45.000
125 L.ft. 1 1/2" x 1 1/2" Halmilla beadings 125.000 10.000
1/4 lb - 1/4" clout nails 0.250 100.000
8 dos 1 1/2" brass screws 8.000 102.000
8 C.ft. Timber 8.000 3200.000
1lb 2" nail 1.000 62.000
0.25 cwt cement 0.250 670.000
2 C.ft. Sand 2.000 110.500
2" Brushes ( 1/4 Use ) 0.250 300.000
0.34 Gal. woodpresevatives 0.340 1175.000
26 Nos. plugs 26.000 3.500
Sub Total
Labour
1/2 Day Mason 0.500 770.000
3 1/2 Days Carpenter 3.500 770.000
5 Days U/SK Labourer 5.000 629.000
Scaffolding - Add 3%
Sub Total

Total per 1.95 Squares


Per Squre
Add 22%
Total

Asbestos flat eaves ceiling fixed with coves and fillets


to local Micro (Eucalyptus Microcoris) timber work. or
Q 26 Balau , Bitis or Kempas.fillet size to be 1 1/2" x 1/2" cove
moulding size to be 2" x 2". Rate shall include for
applying of wood preservative.

Per 1.95 Square


Material
210 Sq.ft. flat Asbestos sheets 210.000 30.000
60 L.ft. 2" x 2" Halmilla cove moulding 60.000 45.000
125 L.ft. 1 1/2" x 1 1/2" Halmilla beadings 125.000 10.000
1/4 lb - 1/4" clout nails 0.250 100.000
8 dos 1 1/2" brass screws 8.000 102.000
3 C.ft. Timber Class 1 3.000 3200.000
1lb 2" nail 1.000 62.000
0.25 cwt cement 0.250 670.000
2 C.ft. Sand 2.000 110.500
2" Brushes ( 1/4 Use ) 0.250 300.000
Sub Total
Labour
1/2 Day Mason 0.500 770.000

Engineering Organization W.P. Page 186 BSR Annalysis


4 Days Carpenter 4.000 770.000
3 1/2 Days U/SK Labourer 3.500 629.000
Scaffolding - Add 3%
Sub Total

Total per 1.95 Squares


Per Squre
Add 22%
Total

3/4" thick x 6" wide tongued and grooved lunumidella


ceiling boards fixed flat on 94mm x 45mm local Micro
(Eucalyptus Microcoris) or Balau , Bitis or Kempas.and
Q 27 timber joist at every 2' - 0" c/c. cove moulding size to be
2" x 2". Rate shall include for applying of wood
preservative.

Per 1.95 Square


Material
115 L.ft. 4" x 2" timber joists 115.000 180.000
215 Sq.ft. 6"x3/4" Lunumidella ceiling planks 215.000 55.000
3 lbs cement 3.000 5.982
4 Cu.ft. Sand 4.000 110.500
4 lb 1" wire nails 4.000 59.000
Sub Total
Labour
Making holes , fixing joists & making good-
1 Day mason 1.000 770.000
1 Day Carpenter 1.000 770.000
3 Days U/SK Labourer 3.000 629.000
Sub Total
Fixing ceiling boards
3 Days Carpenter 3.000 770.000
4 Days U/SK Labourer 4.000 629.000
Scaffolding - Add 3%
Sub Total

Total per 1.95 Squares


Per Squre
Add 22%
Total

Supply and fixing of tongued and grooved 3/4"x 6"


lunumidella ceiling planks on top of existing rafters ,
with double sided aluminium foil fixed on top. Rate shall
include for sand papering and smoothing one side of the
Q 28 planks , application of water based staining and two
coats of water based sealant. Rate shall include for
applying of wood preservative.

Per 1.95 Square


Material
215 Sq.ft. 6"x3/4" Lunumidella ceiling planks 215.000 55.000

Engineering Organization W.P. Page 187 BSR Annalysis


2.6 lb 1" wire nails 2.600 59.000
Sub Total
Labour
Fixing ceiling Planks
2 Days Carpenter 2.000 770.000
2 Days U/SK Labourer 2.000 629.000
Scaffolding & Tools - Add 3%
Sub Total

Alu. Mac foil 1.950 2785.852


Water based paint 1.950 9629.000

Total per 1.95 Squares


Per Squre
Add 22%
Total

Supplying and fixing 190mm x 94mm , 165mm x 45mm ,


140mm x 94mm , 140mm x 70mm , 140mm x 45mm ,
117mm x 190mm and 45mm x 190mm local micro or
Q 29 Balau , Kempas or Bitis timber purling , hip/valley rafters
etc. with applying of wood preservative.

100 L.ft of 6"x4" timber


Material
110 L.ft of 6"x4" timber 110.000 660.00
1 lb 3" nails 1.000 73.00
1/2 gal wood preservative 0.500 1175.00
Sub Total
Labour
1 Day Carpenter 1.000 770.00
1 Day Labour 1.000 629.00
Scaffolding Add 3%
Tools Add 3%
Sub Total

Total per 100 L.ft.


Per L.ft.
Per C.ft.
wastage 25%
Rate per C.ft.
Add 22%
Total per C.ft.

Supplying and fixing 117mm x 70mm purling up to 12'-0"


Q 30 length Balau, Kempas , Micro. with applying of wood
preservative.

Per 100 L.ft


Material
110 L.ft. 5" x 3" Local micro ,Balau 110.000 360.00
1 lb 3" nails 1.000 73.00

Engineering Organization W.P. Page 188 BSR Annalysis


1/2 gal wood preservative 0.500 1175.00
Sub Total
Labour
1/2 Day Carpenter 0.500 770.00
1/2 Day Labour 0.500 629.00
Scaffolding & Tools Add 5%
Sub Total

Total per 100 L.ft.


Per L.ft
Add 22%
Total

Supplying and fixing 94mm x 70mm wall plates up to 12'-


Q 31 0" length, Balue, Kempas, Micro. with applying of wood
preservative.

Per 100 L.ft


Material
110 L.ft. 4" x 3" Local micro ,Balau 110.000 280.00
1 lb 3" nails 1.000 73.00
1/2 gal wood preservative 0.500 1175.00
Sub Total
Labour
1/4 Day Carpenter 0.250 770.00
1/4 Day Labour 0.250 629.00
Scaffolding & Tools Add 5%
Sub Total

Total per 100 L.ft.


Per L.ft
Add 22%
Total

Supplying and fixing 117mm x 70mm , 117mm x 45mm ,


94mm x 70mm local Micro (Eucalyptus Microcoris) Balau
Q 32 , Bitis ,Kempas timber purlins, wall plates, rafters etc.
with applying of wood preservative.

Rate of Item Q 30 ( 5"x3" timber purlings)


Per C.ft.
wastage 25%
Rate Per C.ft.
Add 22%
Total Rate Per C.ft.

Supplying and fixing 94mm x 45mm local Micro


(Eucalyptus Microcoris) or Balau Kempas or Bitis
Q 33 timber purling, rafters etc. with applying of wood
preservative.

Engineering Organization W.P. Page 189 BSR Annalysis


Per 100 L.ft
Material
110 L.ft. 4" x 2" Local micro ,Balau 110.000 180.00
1 lb 3" nails 1.000 73.00
1/2 gal wood preservative 0.500 1175.00
Sub Total
Labour
1/4 Day Carpenter 0.250 770.00
1/4 Day Labour 0.250 629.00
Scaffolding & Tools Add 5%
Sub Total

Total per 100 L.ft.


Per L.ft
Add 22%
Total

Supplying and fixing 45mm x 45mm local Micro


Q 34 (Eucalyptus Microcoris) or Balau, Kempas or Bitis
timber bearers. with applying of wood preservative.

Per 100 L.ft


Material
110 L.ft. 2" x 2" Local micro ,Balau 110.000 55.00
1 lb 3" nails 1.000 73.00
1/3 gal wood preservative 0.333 1175.00
Sub Total
Labour
1/4 Day Carpenter 0.250 770.00
1/4 Day Labour 0.250 629.00
Scaffolding & Tools Add 10%
Sub Total

Total per 100 L.ft.


Per L.ft
Add 22%
Total

Supplying and fixing 45mm x 22mmlocal micro


Q 35 (Eucalyptus Microcoris)or Balau, Kempas or Bitis.
timber reapers with applying of wood preservative.

Per 100 L.ft


Material
110 L.ft. 2" x 1" Local micro ,Balau 110.000 30.00
1 lb 1 1/2" nails 1.000 61.00
1/4 gal wood preservative 0.250 1175.00
Sub Total
Labour
1/4 Day Carpenter 0.250 770.00
1/4 Day Labour 0.250 629.00

Engineering Organization W.P. Page 190 BSR Annalysis


Scaffolding & Tools Add 5%
Sub Total

Total per 100 L.ft.


Per L.ft
Add 22%
Total

Q 36 Timber valance/barge board in GINISAPU timber finished


size 9" x 3/4" thick fixed to roof frame with brass screws
and applying of wood preservative.

per 100 L.ft.


Material
75 Sq.ft. 1" Planks 75.000 145.000
Add 5% for wastage
70 Nos. 1 1/2" brass screws 70.000 8.500
Sub Total
Labour
3 Days Carpenter 3.000 770.000
3 Days U/SK Labourer 3.000 629.000
Scaffolding - Add 5%
Sub Total

Total per 100 L.ft.


Per L.ft.
Add 22%
Total

Applying two coats of wood preservative (Clear) to wood


Q 38 work.
per sqre.
0.45 gal. wood preservative 0.450 1175.00
1/8 Day painter 0.125 770.00
allow for brush 2" (1/10 use ) 0.100 300.00
Rate Per Squre
Add 22%
Total

Supply and fixing 20mm x 6mm x 12" long flat iron


Q 39 bracket for fixing valance board/barge board. Rate shall
include for two coats of anti-corrosive paint.

Matearial
1/2 lb M.S bracket 0.500 51.50
2 nos Brass screws 1 1/2" 2.000 8.50
Sub Total
Labour
making hall
1/3 hrs. smith 0.333 96.25
1/3 hrs. Labour 0.333 78.63
allow for coat (making line) 5%

Engineering Organization W.P. Page 191 BSR Annalysis


fixing to level
1/4 hrs. car 0.250 96.25
1/4 hrs. labour 0.250 78.63
Sub Total

Rate Per No.


Add 22%
Total

PVC eave gutter 4 1/2" square fixed with PVC brackets at


R 01 1'6" c/c including specials

Per 24 L.ft.
Material
2 No. Length 4 1/2" PVC gutter 2.000 816.000
2 No. end cap 2.000 73.000
1/2 No. mitre joint 0.500 285.000
11/2 Nos. gutter joiners 1.500 88.000
17 Nos. P.V.C. gutter brackets 17.000 38.000
1 No. running head 1.000 203.000
50 grm. solvent cement 0.500 150.000
36 nos. 3/4" screws 36.000 6.500
Sub Total
Labour
1/4 Day plumber 0.250 770.000
1/4 Day labourer 0.250 629.000
Add 3% Scaffolding
Sub Total

per 24 L.ft.
per L.ft.
Add 22%
Total

P.V.C. down pipes 3 1/2" dia. fixed with wooden plugs to


R 02 wall including specials.
Per 24 L.ft.
Material
2 length of 3 1/2" Dia P.V.C. pipes 2.000 650.00
1 No. Socket 3 1 /2" P.V.C. at 1.000 86.00
2 No. Bend 3 1/2" P.V.C. 2.000 60.00
2 No. Elbows 3 1/2" P.V.C. 2.000 111.00
4 Nos. wooden plugs 4.000 7.00
8 No. clips 3 1/2" 8.000 20.000
8 nos. brass screws 3/4" 8.000 6.500
50 grs solvent cement 50 grs 0.500 150.000
Sub Total
Labour
1/4 Day plumber 0.250 770.000
1/4 Day labourer 0.250 629.000
1/4 Day mason 0.250 770.000

Engineering Organization W.P. Page 192 BSR Annalysis


1/4 Day Labour 0.250 629.000
Allow for scaffolding 2.5%
Sub Total

Per 24 L.ft.
Per L.ft.
Add 22%
Total

Supply and fix white vitreous china floor standing wash


basin and pedestal with overflow hole and single tap
hole in center of "Rocell" brand & model "Urban D" or
approved equivalent complete to working order
S 01
inclusive of the 1 1/4" chromium plated waste outlet of
"Rocell" brand & model "A706" and 1 1/4" chromium
plated siphon cleanable bottale trap of "Rocell" brand &
model "A186".

Material
1 No - wash basin with pedestal - Urban D 1.000 6610.00
1 No - 1 1/4" tap - Waste outlet- A706 1.000 1250.00
1 No - 1 1/4" C.P. bottle trap - A186 1.000 4020.00
6 No - Roll plugs 6.000 3.50
6 No - 1 1/2" brass screews 6.000 8.50
Allow for Fixing material

Labour
1/2 day mason/Plumber 0.500 770.00
1/2 day labour 0.500 629.00

Per 01 No.
Add 22%
Total

Supply and fix white vitreous china floor standing close


coupled semi back to wall water closet suite with wash
down flushing with 6/3 liters dual flushing has horizontal
S 02 outlet with vario drain bend and two lateral holes for
bottom water connection , cistern with water inlet from
rear of "Rocell" brand & model "Urban D" or approved
equivalent complete to working order.

Material
1 No W/C - Urban D 1.000 9020.00
1 No Water Tank - Urban D 1.000 4465.00
1 No Universal bend 1.000 760.00
4 No - Roll plugs 4.000 3.50
4 No - 1 1/2" brass screews 4.000 8.50

Engineering Organization W.P. Page 193 BSR Annalysis


1 No 1/2" stop cock 1.000 390.00
Allow for Fixing material

Labour
1 day Plumber 1.000 770.00
1 day labour 1.000 629.00

Per 01 No.
Add 22%
Total

Supply and fix Chromium plated piller tap for wash


S 03 basin only cold water of "American Standard" brand
model No. 4604.415.50 or approved equivalent.

Material
1 No - Chromium plated piller tap 1.000 2200.00
Allow for thread seal & etc.

Labour
1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix Chromium plated single level wash basin


mixer tap without pop-up waste with connection flex of
S 04 "Rocell" brand model No.Duca - 16495 or approved
equivalent with 3 year written warranty from the
authorized agent.

Material
1 No - chromium plated mixer tap - Duca 16495 1.000 5425.00
Allow for thread seal & etc.

Labour
1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 194 BSR Annalysis


Supply and fix white vitreous china floor standing wash
basin and pedestal with overflow hole and single tap
hole in center of "Rocell" brand & model "Dune" or
approved equivalent complete to working order
S 05
inclusive of the 1 1/4" chromium plated waste outlet of
"Rocell" brand & model "A706" and 1 1/4" chromium
plated siphon cleanable bottale trap of "Rocell" brand &
model "A186".

Material
1 No - wash basin with pedestal - Dune 1.000 8010.00
1 No - 1 1/4" tap - Waste outlet- A706 1.000 1250.00
1 No - 1 1/4" C.P. bottle trap - A186 1.000 4020.00
6 No - Roll plugs 6.000 3.50
6 No - 1 1/2" brass screews 6.000 8.50
Allow for Fixing material

Labour
1/2 day mason/Plumber 0.500 770.00
1/2 day labour 0.500 629.00

Per 01 No.
Add 22%
Total

Supply and fix white vitreous china floor standing close


coupled semi back to wall water closet suite with wash
down flushing with 6/3 liters dual flushing has horizontal
S 06 outlet with vario drain bend and two lateral holes for
bottom water connection , cistern with water inlet from
rear of "Rocell" brand & model "Dune" or approved
equivalent complete to working order.

Material
1 No W/C - Dune 1.000 10520.00
1 No Water Tank - Dune 1.000 5400.00
1 No Universal bend 1.000 760.00
4 No - Roll plugs 4.000 3.50
4 No - 1 1/2" brass screews 4.000 8.50
1 No 1/2" stop cock 1.000 390.00
Allow for Fixing material

Labour
1 day Plumber 1.000 770.00
1 day labour 1.000 629.00

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 195 BSR Annalysis


Supply and fix white vitreous china floor standing wash
basin and pedestal with overflow hole and single tap
hole in center of "Rocell" brand & model "Intense" or
approved equivalent complete to working order
S 09
inclusive of the 1 1/4" chromium plated waste outlet of
"Rocell" brand & model "A706" and 1 1/4" chromium
plated siphon cleanable bottale trap of "Rocell" brand &
model "A186".

Material
1 No - wash basin with pedestal - Intense 1.000 15670.00
1 No - 1 1/4" tap - Waste outlet- A706 1.000 1250.00
1 No - 1 1/4" C.P. bottle trap - A186 1.000 4020.00
6 No - Roll plugs 6.000 3.50
6 No - 1 1/2" brass screews 6.000 8.50
Allow for Fixing material

Labour
1/2 day mason/Plumber 0.500 770.00
1/2 day labour 0.500 629.00

Per 01 No.
Add 22%
Total

Supply and fix white vitreous china floor standing close


coupled semi back to wall water closet suite with wash
down flushing with 6/3 liters dual flushing has horizontal
S 10 outlet with vario drain bend and two lateral holes for
bottom water connection , cistern with water inlet from
rear of "Rocell" brand & model "Intense" or approved
equivalent complete to working order.

Material
1 No W/C - Intense 1.000 19195.00
1 No Water Tank - Intense 1.000 6385.00
1 No Universal bend 1.000 760.00
4 No - Roll plugs 4.000 3.50
4 No - 1 1/2" brass screews 4.000 8.50
1 No 1/2" stop cock 1.000 390.00
Allow for Fixing material

Labour
1 day Plumber 1.000 770.00
1 day labour 1.000 629.00

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 196 BSR Annalysis


Supply and fix white vitreous china floor standing Bidet
S 11 with overflow hole of "Rocell" brand & model "Intense"
or approved equivalent complete to working order.

Material
1 No Bidet - Intense 1.000 13750.00
4 No - Roll plugs 4.000 4.00
4No - 2" brass screews 4.000 9.00
1 No 1/2" stop cock 1.000 390.00
Allow for Fixing material

Labour
3/4 day Plumber 0.750 770.00
3/4 day labour 0.750 629.00

Per 01 No.
Add 22%
Total

Supply and fix Chromium plated piller tap for wash


S 12 basin only cold water of "American Standard" brand
model No.A-1500N or approved equivalent.

Material
1 No - Chromium plated piller tap - A-1500N 1.000 9775.00
Allow for thread seal & etc.

Labour
1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix Chromium plated single level wash basin


mixer tap with pop-up waste with connection flex of
S 13 "Rocell" brand model No.Sprint - 29500 or approved
equivalent with 5 year written warranty from the
authorized agent.

Material
1 No - chromium plated mixer tap - Sprint 29500 1.000 14465.00
Allow for thread seal & etc.

Labour

Engineering Organization W.P. Page 197 BSR Annalysis


1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix wall hung wash basin with half pedestal
and single tap hole in center of "Rocell" brand model
S 14
No."Dew Point" or approved equivalent complete to
working order.

Material
1 No - wash basin - Dew Point 1.000 18480.00
4 No - Roll plugs 4.000 4.00
4 No - 2" brass screews 4.000 9.00
Allow for Fixing material

Labour
1/2 day mason/Plumber 0.500 770.00
1/2 day labour 0.500 629.00

Per 01 No.
Add 22%
Total

Supply and fix wall hung ceramic corner wash basin of


"American Standard" brand, model New Codie TF 0940
S 15 or approved equivalent complete to working order.Rate
inclusive of brackets and connection to pipe line, but
without tap and bottle trap.

Material
1 No sink 1.000 4770.00
fixing plugs in walls 4 No rall plugs 4.000 4.00
4 Nos - brass screws 2" 4.000 9.00
One pair of Iron brackets 1.000 350.00

Labour
1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00
Fixing sink and tap - 1/8 day plumber 0.125 770.00
1/8 day Labour 0.125 629.00
Making hole in wall and making good - 1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00
Allow for cement & rod lead 5%

Per 01 No.

Engineering Organization W.P. Page 198 BSR Annalysis


Add 22%
Total

Supply and installation of vanity type wash basin of


"American Standard" brand, model Ceros - TF0477 with
A-8006 waste & plug or approved equivalent. On
S 16
concrete vanity slab finished with 3/4" thick approved
polished granite tile in black colour. ( Vanity top
concrete slab & Granite tile laying measured separatly.)

Material
1 No sink 1.000 3825.00
1 No waste & plug 1.000 1215.00

Labour
Fixing sink and tap - 1/8 day plumber 0.125 770.00
1/8 day Labour 0.125 629.00
Allow for cement , screwed & rod lead 3%

Per 01 No.
Add 22%
Total

Supply and fix squatting pan with foot rest "Rocell"


S 17
brand model No. SP3F013 or approved equivalent.

Material
1 No closet squatting with foot rest 1.000 2570.00
1 lba - cement 1.000 5.98

Labour
1/8 day mason 0.125 770.00
1/8 day Plumber 0.125 770.00
1/4 day labour 0.250 629.00

Per 01 No.
Add 22%
Total

Supply and fix low level plastic cistern for squatting pan
of "Rocell" brand model No. SP3F013 or approved
S 18
equivalent including connecting pipe between tank and
squatting pan.

Material
1 No - Low level plastic cistern 1.000 2150.00

Labour

Engineering Organization W.P. Page 199 BSR Annalysis


fixing cistern & making Connection - 1/2 day plumber 0.500 770.00
1/2 day labour 0.500 629.00
Allow for cement , screwed & rod lead 5%

Per 01 No.
Add 22%
Total

Supply and fix ceramic urinal with flush valve of


S 19 "Rocell" brand model DP70013 or approved equivalent
complete to working order.

Material
1 No Urinal 1.000 15985.00
Allow for fixing materials

Labour
1/2 day Plumber 0.500 770.00
1/2 day labour 0.500 629.00

Per 01 No.
Add 22%
Total

Supply and fix Chromium plated 1 1/4" dia.siphon


S 20 cleanable bottale trap of "Rocell" brand model No. A186
or approved equivalent.

Material
1 No - C.P. bottale trap - A 186 1.000 4020.00
2 No - Roll plugs 2.000 3.50
2 No - 1 1/2" brass screews 2.000 8.50
Allow for Fixing material

Labour
1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix Chromium plated 1/2" dia. angle valve


S 21 brass fitting with zink head of "Rocell" brand model
No.A280 or approved equivalent.

Material
1 No - C.P. 1/2" dia. Angle Valve 1.000 1075.00

Engineering Organization W.P. Page 200 BSR Annalysis


Allow for Fixing material

Labour
1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix hand held chromium plated bidet spray of


S 22 "American Standard" brand model A 4700 or approved
equivalent.

Material
1 No bidet spray 1.000 5200.00
1/2 rall of thread seal 0.500 12.00

Labour
1/2 Hrs Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix Chromium plated 4 function shower head


of "American Standard" brand model No. A-6080 with
shower arm of "American Standard" brand model No. A-
S 23
6110-974-845 & concealed valve of "American Standard"
brand model No. A-7002C-B JAZZ or approved
equivalent for cold water.

Material
1 No - Shower head 1.000 2790.00
1 No - Shower Arm 1.000 1485.00
1 No - Conceald Valve 1.000 4500.00
Allow for thread seal & etc.

Labour
1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 201 BSR Annalysis


Supply and fix Chromium plated hand shower of
"American Standard" brand model No. A-2003-A-MR with
adjustable shower rod with soap tray of "American
S 24
Standard" brand model No. Viola 11 - A-6110-978-777 &
angle valve of "American Standard" brand model No.
9113.005.50 or approved equivalent for cold water.

Material
1 No - Hand Shower 1.000 7380.00
1 No - Shower Rod 1.000 4225.00
1 No - Angle Valve 1.000 1000.00
Allow for thread seal & etc.

Labour
1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix Chromium plated shower level built-in-


shower mixer with aut.diverter shower arm jointed
S 25
shower head of "Rocell" brand model No.Pony Z - Z6955
or approved equivalent.

Material
1 No - Shower unit 1.000 7235.00
Allow for Fixing material

Labour
1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix Chromium plated shower mixer of


"American Standard" brand model No. Saga -
S 26 1512.701.50 with adjustable shower rod of "American
Standard" brand model No. Viola 11 - A-6110-978-777 or
approved equivalent.

Material
1 No - Shower unit 1.000 6375.00
1 No - Shower rod 1.000 4225.00
Allow for Fixing material

Engineering Organization W.P. Page 202 BSR Annalysis


Labour
1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix service sink (Lab sink) of "American


S 27 Standard" brand, model TF-8124 or approved equivalent
for the school building complete to working order.

Material
1 No sink 1.000 11205.00
1 No waste & plug 1.000 1215.00

Labour
Fixing sink and tap - 1/8 day plumber 0.125 770.00
1/8 day Labour 0.125 629.00
Making hole in wall and making good - 1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00
Allow for cement , screwed & rod lead 10%

Per 01 No.
Add 22%
Total

Supply and fix fully chemical resistant laboratory sink of


S 28 "American Standard" brand, model Larch - S594501 or
approved equivalent specially for the theatre building.

Material
1 No sink 1.000 86365.00
1 No waste & plug 1.000 1215.00

Labour
Fixing sink and tap - 1/8 day plumber 0.125 770.00
1/8 day Labour 0.125 629.00
Making hole in wall and making good - 1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00
Allow for cement , screwed & rod lead 10%

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 203 BSR Annalysis


Supply and fix brass chromium plated elbow operated
S 29 pillar tap for the operating theatres of "American
Standard" brand, model ML30 or approved equivalent.

Material
1 No - chromium plated elbow operated tap 1.000 4635.00
Allow for fixing materials

Labour
1/8 day Plumber 0.125 770.00

Per 01 No.
Add 22%
Total

Supply and fix automatic hand dryer of "American


S 30 Standard" brand, model Kingsway - HK1800PA or
approved equivalent including electrical connection.

Material
1 No - automatic hand dryer 1.000 15615.00
6 nos 1 1/2" Brass screws 6.000 8.50
6 nos 1 1/2" rall plugs 6.000 4.00
Allow for other fittings - 3%

Labour
1/8 day Plumber 0.125 770.00
1/4 day Electrician 0.250 770.00
3/8 day labour 0.375 629.00

Per 01 No.
Add 22%
Total

Supply and fix 5mm thick mirror of size 18" x 24" double
S 31
coated with pencelage back strecher.

Material
1 No - mirror 1.000 1970.00

Labour
1/4 hrs Skill labour 0.250 96.25
1/4 hrs UnSkill labour 0.250 78.63
Allow for tools,plugs, screwed & etc... 20%

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 204 BSR Annalysis


Supply and fix chromium plated Soap Basket of "Rocell"
S 32 brand & model "Charming" or approved equivalent.
(Normal & Semi-luxuary range )

Material
1 No - chromium plated soap basket 1.000 2610.00
2 nos 1 1/2" Brass screws 2.000 8.50
2 nos 1 1/2" rall plugs 2.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Supply and fix chromium plated brass body and galss


S 33 Soap Tray of "Rocell" brand & model "Charming" or
approved equivalent. ( Luxuary range )

Material
1 No - chromium plated soap tray 1.000 1655.00
2 nos 1 1/2" Brass screws 2.000 8.50
2 nos 1 1/2" rall plugs 2.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Supply and fix chromium plated brass body and galss


S 34 Tumbler Holder of "Rocell" brand & model "Charming"
or approved equivalent.

Material
1 No - chromium plated Tumbler Holder 1.000 1655.00
2 nos 1 1/2" Brass screws 2.000 8.50
2 nos 1 1/2" rall plugs 2.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 205 BSR Annalysis


Supply and fix chromium plated Towel Ring of "Rocell"
S 35
brand & model "Charming" or approved equivalent.

Material
1 No - chromium plated Towel Ring 1.000 1600.00
2 nos 1 1/2" Brass screws 2.000 8.50
2 nos 1 1/2" rall plugs 2.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Supply and fix chromium plated Robe Hook of "Rocell"


S 36
brand & model "Charming" or approved equivalent.

Material
1 No - chromium plated Robe Hook 1.000 1035.00
2 nos 1 1/2" Brass screws 2.000 8.50
2 nos 1 1/2" rall plugs 2.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Supply and fix chromium plated Toilet Paper Holder of


S 37 "Rocell" brand & model "Charming" or approved
equivalent.

Material
1 No - chromium plated Toilet Paper Holder 1.000 2450.00
2 nos 1 1/2" Brass screws 2.000 8.50
2 nos 1 1/2" rall plugs 2.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 206 BSR Annalysis


Supply and fix chromium plated Toilet Cup Holder of
S 38 "Rocell" brand & model "Charming" or approved
equivalent.

Material
1 No - chromium plated Toilet Cup Holder 1.000 2715.00
2 nos 1 1/2" Brass screws 2.000 8.50
2 nos 1 1/2" rall plugs 2.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Supply and fix chromium plated 600mm long Single


S 39 Towel Bar of "Rocell" brand & model "Charming" or
approved equivalent.

Material
1 No - chromium plated Single Towel Bar 1.000 3020.00
2 nos 1 1/2" Brass screws 2.000 8.50
2 nos 1 1/2" rall plugs 2.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Supply and fix chromium plated 600mm long Double


S 40 Towel Bars of "Rocell" brand & model "Charming" or
approved equivalent.

Material
1 No - chromium plated Double Towel Bar 1.000 3715.00
2 nos 1 1/2" Brass screws 2.000 8.50
2 nos 1 1/2" rall plugs 2.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 207 BSR Annalysis


Supply and fix chromium plated 600mm long Towel Rack
S 41 of "Rocell" brand & model "Charming" or approved
equivalent.

Material
1 No - chromium plated Towel Rack 1.000 6955.00
4 nos 1 1/2" Brass screws 4.000 8.50
4 nos 1 1/2" rall plugs 4.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Supply and fix chromium plated brass body 450mm long


S 42 Glass Shelf of "Rocell" brand & model "Charming" or
approved equivalent.

Material
1 No - chromium plated Glass Shelf 1.000 2620.00
4 nos 1 1/2" Brass screws 4.000 8.50
4 nos 1 1/2" rall plugs 4.000 3.50

Labour
1/2 hrs Plumber 0.500 96.25

Per 01 No.
Add 22%
Total

Supply and fix ceramic wall hung wash basin for


S 43 disabled of "American Standard" brand, model Kimera -
TF995 with waste & plug A-8006 or approved equivalent.

Material
1 No sink 1.000 6550.00
fixing plugs in walls 4 No rall plugs 4.000 3.50
4 Nos brass screws 1 1/2" 4.000 8.50

Labour
1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00
Fixing sink and tap - 1/8 day plumber 0.125 770.00
1/8 day Labour 0.125 629.00
Making hole in wall and making good - 1/8 day mason 0.125 770.00

Engineering Organization W.P. Page 208 BSR Annalysis


1/8 day labour 0.125 629.00
Allow for cement , screwed & rod lead 3%

Per 01 No.
Add 22%
Total

Supply and fix white ceramic water closet suite for the
disabled of "American Standard" brand & model
S 44 Ventura - 3200.001.09 , Cygnet tank - PP.4041.020.03C
and Seat and cover - 390000N or approved equivalent
complete to working order.

Material
1 No W/C - Ventura 1.000 11205.00
1 No Water Tank - Cygnet 1.000 5310.00
1 No Seat & cover 1.000 2835.00
4 No - Roll plugs 4.000 3.50
4 No - 1 1/2" brass screews 4.000 8.50
1 No 1/2" stop cock 1.000 390.00
Allow for Fixing material

Labour
1 day Plumber 1.000 770.00
1 day labour 1.000 629.00

Per 01 No.
Add 22%
Total

Supply and fix hand grip rails for disabled of "American


S 45 Standard" brand, model Me-tu -MTJT26 or approved
equivalent.

Material
1 No - Grip rails 1.000 12420.00
6 nos 1 1/2" Brass screws 6.000 8.50
6 nos 1 1/2" rall plugs 6.000 3.50

Labour
1/2 Hrs Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 209 BSR Annalysis


Supply and fix grip bar for disabled of "American
S 46 Standard" brand, model Apex - AR-065-18 S/S or
approved equivalent.

Material
1 No - Grip bar 1.000 1890.00
2 nos 1 1/2" Brass screws 2.000 8.50
2 nos 1 1/2" rall plugs 2.000 3.50

Labour
1/2 Hrs Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix hand grip-shower angle for disabled of


S 47 "American Standard" brand, model Me-tu - MTJT22-5 or
approved equivalent.

Material
1 No - Hand Grip Shower angle 1.000 11700.00
6 nos 1 1/2" Brass screws 6.000 8.50
6 nos 1 1/2" rall plugs 6.000 3.50

Labour
1/2 Hrs Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Supply and fix hand grip-shower angle for disabled of


S 48 "American Standard" brand, model Me-tu - MTJT22-5 or
approved equivalent.

Material
1 No - Hand Grip Shower 1.000 11700.00
6 nos 1 1/2" Brass screws 6.000 8.50
6 nos 1 1/2" rall plugs 6.000 3.50

Labour
1/2 Hrs Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63
.

Per 01 No.
Add 22%

Engineering Organization W.P. Page 210 BSR Annalysis


Total

Supply and fix closet Squatting pan with foot rest -


S 49
square type (Indian make)

Material
1 No closet squatting with foot rest 1.000 1250.00
1 No P trap 1.000 250.00
0.34 cwt - cement 0.340 670.00
Allow for metal & sand

Labour
1/4 day Plumber 0.250 770.00
1/4 day labour 0.250 629.00

Per 01 No.
Add 22%
Total

Supply and fix bowl type glazed ceramic urinals with


S 50
trap …

Material
1 No - Urinal bowl type 1.000 1250.00
2 Nos -Wooden plugs 2.000 2.00

Labour
1/4 day mason 0.250 770.00
1/4 day labour 0.250 629.00
fixing urinal & fixing flush pipe & outlet - 1/2 day plumber 0.500 770.00
1/2 day labour 0.500 629.00
Allow for cement , screwed & rod lead 5%

Per 01 No.
Add 22%
Total

Supply and fix wash basin with pedestal model no.


S 51 BSWBA 620x470 VCP - by Mascon or equilant complete
to work in order. Rate without pillar tap & bottle trap.

Material
1 No - wash basin with pedestal 1.000 5130.00
4 No - Wooden plugs 4.000 7.00
6 No - 1 1/2" brass screews 6.000 8.50
2 lba - cement 2.000 5.98

Labour

Engineering Organization W.P. Page 211 BSR Annalysis


1/2 day mason/Plumber 0.500 770.00
1/2 day labour 0.500 629.00

Per 01 No.
Add 22%
Total

Supply and fix wall hung corner wash basin model


no.BSWBA16x16CC by Mascon or equilant complete to
S 52
work in order. Rate inclusive of brackets and connection
to pipe line, but without pillar tap & bottle trap.

Material
1 No sink 1.000 755.00
fixing plugs in walls 4 No rall plugs 4.000 4.00
4 No - 1 1/2" brass screews 4.000 8.50
Allow for brackets ,cement , screwed & rod lead

Labour
1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00
Fixing sink and tap - 1/8 day plumber 0.125 770.00
1/8 day Labour 0.125 629.00
Making hole in wall and making good - 1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00

Per 01 No.
Add 22%
Total

Supply and fix wash basin only with steel brackets


including 1/2" angle valve and 1/2" pillar tap marketed
S 53
by M/s. "Rajabdeen" or approved equivalent. ( Indian
Origin )

Material
1 No sink 1.000 2250.00
1 No tap 1.000 850.00
1 No Angle valve 1.000 575.00
4 No rall plugs 4.000 3.50
4 No Brass screws 1 1/2" 4.000 8.50
Allow for brackets, cement , screwed & rod lead 5%

Labour
1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00
Fixing sink and tap - 1/8 day plumber 0.125 770.00
1/8 day Labour 0.125 629.00
Making hole in wall and making good - 1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00

Engineering Organization W.P. Page 212 BSR Annalysis


Per 01 No.
Add 22%
Total

Supply and fix low level water closet with cistern of


S 54 Indian Origin with angle valve, "P" or "S" trap, all
complete to working order.

Material
1 No water closet 1.000 5500.00
1 No Angle valve 1.000 575.00
4 No rall plugs 4.000 3.50
4 No Brass screws 1 1/2" 4.000 8.50
Allow for cement , screwed & rod lead 5%

Labour
1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00
Fixing - 1/8 day plumber 0.125 770.00
1/8 day Labour 0.125 629.00

Per 01 No.
Add 22%
Total

High level plastic cistern 9 lit. capacity fixed to wall &


S 55
complete

Material
1 No - High level plastic cistern 1.000 1950.00
4 Nos -Wooden plugs 4.000 7.00
1 No - Stop cock - 3/4" 1.000 650.00

Labour
1/8 day mason 0.125 770.00
1/8 day labour 0.125 629.00
fixing cistern & making Connection - 1/2 day plumber 0.500 770.00
1/2 day labour 0.500 629.00
Allow for cement , screwed & rod lead 10%

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 213 BSR Annalysis


Supply and fix 36" x 18" stainless steel kitchen sink with
single bowl & single drain of "Sealcore" by mascons or
approved equivelant with 5 year written warranty from
S 56
the authorized agent. including PVC bottle trap and
water connection with flexible hose, all complete to
working order. ( Swan neck tap paid separately.)

Material
1 No sink 1.000 2170.00
1 No PVC bottale trap 1.000 250.00
1 No. flexible hose 1.000 275.00
4 Nos. - rawl plug 4.000 4.00
4Nos. - 2" brass screws 4.000 9.00
Allow for brackets,cement , screwed & rod lead 10%

Labour
Fixing sink and tap & connected to the water & waste water
0.500 770.00
connections - 1/2 day plumber
1/2 day Labour 0.500 629.00

Per 01 No.
Add 22%
Total

Supply and fix 17" x 18" stainless steel kitchen sink with
single bowl of "Sealcore" by mascons or approved
equivelant with 5 year written warranty from the
S 57
authorized agent. including PVC bottle trap and water
connection with flexible hose, all complete to working
order. ( Swan neck tap paid separately.)

Material
1 No sink 1.000 1620.00
1 No PVC bottale trap 1.000 250.00
1 No. flexible hose 1.000 275.00
4 Nos. - rawl plug 4.000 4.00
4 Nos. - 2" brass screws 4.000 9.00
Allow for brackets,cement , screwed & rod lead 10%

Labour
Fixing sink and tap & connected to the water & waste water
0.375 770.00
connections - 3/8 day plumber
3/8 day Labour 0.375 629.00

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 214 BSR Annalysis


Supplying and fixing 1 1/4" (40 mm) dia. PVC Bottle
S 58
Trap.

Material
1 No - PVC bottale trap 1.000 250.00
Allow for Fixing material

Labour
1/2 Hrs mason/Plumber 0.500 96.25
1/2 Hrs labour 0.500 78.63

Per 01 No.
Add 22%
Total

Shower rose chromium plated 4" dia. Fixed vertically


S 59
with 1/2" valve socket including water connection.

1 No - 6" PVC shower rose 1.000 600.00


2 No - 1/2" valve socket 2.000 17.00

Labour
1/2 hrs Plumber 0.500 96.25
1/2 hrs labour 0.500 78.63
Allow for thread seal & solvents….

Per 01 No.
Add 22%
Total

S 60 Supply and fixing plastic seat cover

1 No - plastic seat cover 1.000 650.00


1/4 hrs Plumber 0.250 96.25
Per 01 No.
Add 22%
Total

Mirror bevelled rectangular 20" x 15" with hard wood


S 61 back 3/4" with painting with aluminium clips & key hole
including glass shelves

Material
1 No - mirror 1.000 1200.00
2.20 sq.ft 3/4" hard wood 2.200 85.00

Labour
1/4 day Carpenter 0.250 770.00
1/4 day labour 0.250 629.00

Engineering Organization W.P. Page 215 BSR Annalysis


Allow for aluminium clips,plugs, screwed & etc... 20%

Applying two coats of enamel paints - 2.2 sq.ft 2.200 23.12

Per 01 No.
Add 22%
Total

Supplying and fixing 1/2" Bib tap of "Water Tec" brand


T 01
& model no.6872 or approved equivalent.
Materials
1No - 1/2" bib tap 1.000 155.00
thread seal 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supplying and fixing 1/2" Angle valve of "Water Tec"


T 02
brand & model no.14548 or approved equivalent.

Materials
1No - 1/2" angle valve 1.000 155.00
thread seal 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supplying and fixing 1/2" Pillar Sink tap (Swan-neck


T 03 tap) of "Water Tec" brand & model no.14527 or approved
equivalent.
Materials
1No - 1/2" pillar zink tap 1.000 660.00
thread seal 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25

Engineering Organization W.P. Page 216 BSR Annalysis


1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supplying and fixing 1/2" Wall Sink tap of "Water Tec"


T 04 "Water Tec" brand & model no.14156 or approved
equivalent.
Materials
1No - 1/2" wall zink tap 1.000 715.00
thread seal 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supplying and fixing Health foucet (Bidet Spray) of


T 05 "Water Tec" brand & model no.10107 or approved
equivalent.
Materials
1No - bidet shower spray 1.000 460.00
thread seal 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supplying and fixing Shower rose of "Water Tec" brand


T 06
& model no.6814 or approved equivalent.

Materials
1No - shower rose 1.000 375.00
thread seal 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 96.25
Sub Total

Engineering Organization W.P. Page 217 BSR Annalysis


Per 01 No.
Add 22%
Total

Supply and fixing 1/2" dia. chromium plated Concealed


T 07 stop cock of "Plumber" brand & model no: NCE-0405 or
approved equivalent.
Materials
1No - 1/2" Concealed stop cock 1.000 1375.00
1/2 Roll - thread seald 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supply and fixing 1/2" dia. chromium plated Angle cock


T 08 of "Plumber" brand & model no: NCE-0507 or approved
equivalent.
Materials
1No - 1/2" Angle cock 1.000 760.00
1/2 Roll - thread seald 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supply and fixing 1/2" dia. chromium plated Pillar cock ,


T 09 foam flow of "Plumber" brand & model no : NCE-0101 or
approved equivalent.
Materials
1No - 1/2" Piller cock 1.000 1295.00
1/2 Roll - thread seald 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%

Engineering Organization W.P. Page 218 BSR Annalysis


Total

Supply and fixing 1/2" dia. chromium plated Bib cock ,


T 10 foam flow of "Plumber" brand & model no : NCE-0202 or
approved equivalent.
Materials
1No - 1/2" Bib cock 1.000 1135.00
1/2 Roll - thread seald 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supply and fixing 1/2" dia. chromium plated Sink cock


with swivel spout deck mounted, foam flow of "Plumber"
T 11
brand & model no : NCE-0104 or approved equivalent.
(Swan-neck Type)

Materials
1No - 1/2" Sink cock 1.000 3000.00
1/2 Roll - thread seald 0.500 12.00
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supplying and fixing 1" wheel valve "Pegler" Brand or


T 12
approved equivalent.
Materials
1No - 1" wheel valve 1.000 1250.00
Allow for red lead 2%
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 219 BSR Annalysis


Supplying and fixing 1 1/4" wheel valve "Pegler" Brand
T 13
or approved equivalent.
Materials
1No - 1 1/4" wheel valve 1.000 1455.00
Allow for red lead 2%
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supplying and fixing 1 1/2" wheel valve "Pegler" Brand


T 14
or approved equivalent.
Materials
1No - 1 1/2" wheel valve 1.000 1690.00
Allow for red lead 2%
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supplying and fixing 2" wheel valve "Pegler" Brand or


T 15
approved equivalent.
Materials
1No - 2" wheel valve 1.000 4525.00
Allow for red lead 2%
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supply and fixing 1/2" dia Brass Ball valve "Pegler"


T 16
Brand or approved equivalent.
Materials
1No - 1/2" Brass Ball valve 1.000 475.00

Engineering Organization W.P. Page 220 BSR Annalysis


Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supply and fixing 3/4" dia Brass Ball valve "Pegler"


T17
Brand or approved equivalent.
Materials
1No - 3/4" Brass Ball valve 1.000 870.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supply and fixing 1" dia Brass Ball valve "Pegler"


T 18
Brand or approved equivalent.
Materials
1No - 1" Brass Ball valve 1.000 1305.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supply and fixing 1 1/4" dia Brass Ball valve "Pegler"


T 19
Brand or approved equivalent.
Materials
1No - 1 1/4" Brass Ball valve 1.000 1375.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Engineering Organization W.P. Page 221 BSR Annalysis


Per 01 No.
Add 22%
Total

Supply and fixing 1 1/2" dia Brass Ball valve "Pegler"


T 20
Brand or approved equivalent.
Materials
1No - 1 1/2" Brass Ball valve 1.000 2730.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supply and fixing 2" dia Brass Ball valve "Pegler"


T 21
Brand or approved equivalent.
Materials
1No - 2" Brass Ball valve 1.000 3705.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supply and fixing 3" dia Brass Ball valve "Pegler"


T 22
Brand or approved equivalent.
Materials
1No - 3" Brass Ball valve 1.000 9695.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 222 BSR Annalysis


Supply and fixing 4" dia Brass Ball valve "Pegler"
T 23
Brand or approved equivalent.
Materials
1No - 4" Brass Ball valve 1.000 16280.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 24 Supply and fixing 1/2" Stop cock


Materials
1No - 1/2" Stop cock 1.000 390.00
Allow for red lead 2%
Sub Total
Labour
1/4 hrs plumber 0.250 96.25
1/4 hrs labourer 0.250 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 25 Supply and fixing 3/4" Stop cock


Materials
1No - 3/4" Stop cock 1.000 650.00
Allow for red lead 2%
Sub Total
Labour
1/4 hrs plumber 0.250 96.25
1/4 hrs labourer 0.250 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 26 Supply and fixing 1/2" Handle valve


Materials
1No - 1/2" handle valve 1.000 390.00
Allow for red lead 2%
Sub Total
Labour
1/2 hrs plumber 0.500 96.25

Engineering Organization W.P. Page 223 BSR Annalysis


1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 27 Supply and fixing 3/4" Handle valve


Materials
1No - 3/4" handle valve 1.000 650.00
Allow for red lead 2%
Sub Total
Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 28 Supply and fixing 1/2" dia. Flexible hose - 12" length

Materials
1No - 1/2" dia. Flexible hose - 12" length 1.000 225.00
Allow for red lead 2%
Sub Total
Labour
1 hrs plumber 1.000 96.25
1 hrs labourer 1.000 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 29 Supply and fixing 1/2" dia. Flexible hose - 18" length


Materials
1No - 1/2" dia. Flexible hose - 18" length 1.000 275.00
Allow for red lead 5%
Sub Total
Labour
1 hrs plumber 1.000 96.25
1 hrs labourer 1.000 78.63
Sub Total

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 224 BSR Annalysis


T 30 Supply and fixing 1/2" dia PVC Compact Ball valve.

Materials
1No - 1/2" PVC Ball valve 1.000 110.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 31 Supply and fixing 3/4" dia PVC Compact Ball valve.

Materials
1No - 3/4" PVC Ball valve 1.000 200.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 32 Supply and fixing 1" dia PVC Compact Ball valve.

Materials
1No - 1" PVC Ball valve 1.000 215.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 33 Supply and fixing 1 1/4" dia PVC Compact Ball valve.

Materials
1No - 1 1/4" PVC Ball valve 1.000 330.00
Allow for specials - 5%

Engineering Organization W.P. Page 225 BSR Annalysis


Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 34 Supply and fixing 1 1/2" dia PVC Compact Ball valve.

Materials
1No - 1 1/2" PVC Ball valve 1.000 440.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 35 Supply and fixing 2" dia PVC Compact Ball valve.

Materials
1No - 2" PVC Ball valve 1.000 705.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 36 Supply and fixing 3" dia PVC Compact Ball valve.

Materials
1No - 3" PVC Ball valve 1.000 1850.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Engineering Organization W.P. Page 226 BSR Annalysis


Per 01 No.
Add 22%
Total

T 37 Supply and fixing 1/2" dia PVC Union.

Materials
1No - 1/2" PVC Union 1.000 85.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

T 38 Supply and fixing 1" dia PVC Union.

Materials
1No - 1" PVC Union 1.000 100.00
Allow for specials - 5%

Labour
1/2 hrs plumber 0.500 96.25
1/2 hrs labourer 0.500 78.63
Sub Total

Per 01 No.
Add 22%
Total

Supplying and fixing "Plastishell" water tank 500 Lit.


T 39
capacity (fittings paid separately).

Materials
1 No. - water tank 500L 1.000 6015.00
Allow for transport - 5%

Labour
1 Hrs Plumber - hoisting and fixing in position 1.000 96.25
4 hrs Labour 4.000 78.63
2 Hrs Plumber - making connection and fixing fittings 2.000 96.25
2 hrs Labour 2.000 78.63

Rate per No.


Add 22%
Total

Engineering Organization W.P. Page 227 BSR Annalysis


Supplying and fixing "Plastishell" water tank 1000 Lit.
T 40
capacity (fittings paid separately).

Materials
1 No. - water tank 1000L 1.000 11660.00
Allow for transport - 5%

Labour
1 Hrs Plumber - hoisting and fixing in position 1.000 96.25
4 hrs Labour 4.000 78.63
2 Hrs Plumber - making connection and fixing fittings 2.000 96.25
2 hrs Labour 2.000 78.63

Rate per No.


Add 22%
Total

Supplying and fixing "Plastishell" water tank 2000 Lit.


T 41
capacity (fittings paid separately).

Materials
1 No. - water tank 2000L 1.000 20470.00
Allow for transport - 5%

Labour
1 Hrs Plumber - hoisting and fixing in position 1.000 96.25
4 hrs Labour 4.000 78.63
2 Hrs Plumber - making connection and fixing fittings 2.000 96.25
2 hrs Labour 2.000 78.63

Rate per No.


Add 22%
Total

Supplying and fixing "Plastishell" water tank 5000 Lit.


T 42
capacity (fittings paid separately).

Materials
1 No. - water tank 5000L 1.000 49260.00
Allow for transport - 5%

Labour
1 Hrs Plumber - hoisting and fixing in position 1.000 96.25
4 hrs Labour 4.000 78.63
2 Hrs Plumber - making connection and fixing fittings 2.000 96.25
2 hrs Labour 2.000 78.63

Engineering Organization W.P. Page 228 BSR Annalysis


Rate per No.
Add 22%
Total

Supplying laying and / or fixing 1/2" dia. P.V.C. pipes


T 43
TYPE 1000 ( Special paid separately )
Per 10 L.ft.
Materials
13 L.ft. pipes 13.000 13.00
3 Clips 3.000 14.00
2 grms solvent cement 2.000 1.50
Sub Total
Labour
1 hrs. plumber 1.000 96.25
1 hrs. U/SK labourer 1.000 78.63
Sub Total

Rate per 10 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying laying and / or fixing 3/4" dia. P.V.C. pipes


T 44
TYPE 1000 ( Special paid separately )
Per 10 L.ft.
Materials
13 L.ft. pipes 13.000 29.00
3 Clips 3.000 15.00
2 grms solvent cement 2.000 1.50
Sub Total
Labour
1 hrs. plumber 1.000 96.25
1 hrs. U/SK labourer 1.000 78.63
Sub Total

Rate per 10 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying laying and / or fixing 1" dia. P.V.C. pipes


T 45
TYPE 1000 ( Special paid separately )

Per 100 L.ft.


Materials
100 L.ft. pipes 100.000 48.00
Add 5% for wastage
Transport 3% of cost
8 - 1" dia socket 8.000 30.00
32 grms solvent cement 32.000 1.50
35 Clips and nails 35.000 16.00

Engineering Organization W.P. Page 229 BSR Annalysis


Sub Total
Labour
3/4 day plumber 0.750 770.00
3/4 day U/SK labourer 0.750 629.00
Sub Total

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying laying and / or fixing 1 1/4" dia. P.V.C. pipes


T 46
TYPE 1000 ( Special paid separately )

Per 100 L.ft.


Materials
100 L.ft. pipes 100.000 65.00
Add 5% for wastage
8 - 1 1/4" dia socket 8.000 44.00
48 grms solvent cement 48.000 1.50
35 Clips and nails 35.000 18.00
Sub Total
Labour
3/4 day plumber 0.750 770.00
3/4 day U/SK labourer 0.750 629.00
Sub Total

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying laying and / or fixing 1 1/2" dia. P.V.C. pipes


T 47
TYPE 1000 ( Special paid separately )

Per 100 L.ft.


Materials
100 L.ft. pipes 100.000 91.00
Add 5% for wastage
8 - 1 1/2" dia socket 8.000 69.00
64 grms solvent cement 64.000 1.50
35 Clips and nails 35.000 23.00
Sub Total
Labour
3/4 day plumber 0.750 770.00
3/4 day U/SK labourer 0.750 629.00
Sub Total

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total

Engineering Organization W.P. Page 230 BSR Annalysis


Supplying laying and / or fixing 2" dia. P.V.C. pipes
T 48
TYPE 1000 ( Special paid separately )

Per 100 L.ft.


Materials
100 L.ft. pipes 100.000 160.00
Add 5% for wastage
8 - 1" dia socket 8.000 109.00
112 grms solvent cement 112.000 1.50
35 Clips and nails 35.000 24.00
Sub Total
Labour
3/4 day plumber 0.750 770.00
3/4 day U/SK labourer 0.750 629.00
Sub Total

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying and fixing 1 1/4" P.V.C. waste water pipes


T 49
( Type 600 )
Per 100 L.ft.
Materials
100 l.ft. - 1 1/4" dia. P.V.C. pipes (Type 600) 100.000 44.00
Add 10% for wastage & specials
Allow for solvent cement

Labour
2 1/4 day Labour - excavation & filling 2.250 629.00
1 day plumber - Laying, fixing & testing pipes 1.000 770.00
1 day labourer 1.000 629.00

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying and fixing 1 1/2" P.V.C. waste water pipes


T 50
( Type 600 )
Per 100 L.ft.
Materials
100 l.ft. - 1 1/2" dia. P.V.C. pipes (Type 600) 100.000 59.00
Add 10% for wastage & specials
Allow for solvent cement

Labour
2 1/4 day Labour - excavation & filling 2.250 629.00

Engineering Organization W.P. Page 231 BSR Annalysis


1 day plumber - Laying, fixing & testing pipes 1.000 770.00
1 day labourer 1.000 629.00

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying and fixing 2" P.V.C. waste water pipes ( Type


T 51
600 )
Per 100 L.ft.
Materials
100 l.ft. - 2" dia. P.V.C. pipes (Type 600) 100.000 102.00
Add 8% for wastage & specials
Allow for solvent cement

Labour
2 1/4 day Labour - excavation & filling 2.250 629.00
1 day plumber - Laying, fixing & testing pipes 1.000 770.00
1 day labourer 1.000 629.00

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying and fixing 4" P.V.C. waste water pipes ( Type


T 52
600 )
Per 100 L.ft.
Materials
100 l.ft. - 4" dia. P.V.C. pipes (Type 600) 100.000 357.00
Add 5% for wastage & specials
Allow for solvent cement

Labour
2 1/4 day Labour - excavation & filling 2.250 629.00
1 day plumber - Laying, fixing & testing pipes 1.000 770.00
1 day labourer 1.000 629.00

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying and laying 4" dia.P.V.C. sewer pipes (type


600) Including cement concrete surrunding 1:3:6: ( 1")
T 53
as per Drg. No:- WSS 270 - Type I . Excavation paid
separately.

Engineering Organization W.P. Page 232 BSR Annalysis


Per 100 L.ft.
Materials
100 l.ft. - 4" dia. P.V.C. pipes (Type 600) 100.000 357.00
Add 5% for wastage
Allow for solvent cement

Labour
2 1/2 day plumber - Laying, Surface pre. & testing pipes 2.500 770.00
2 1/2 day labourer 2.500 629.00

1:3:6(1") Concrete 1.551 25582.50

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying and laying 6" dia.P.V.C. sewer pipes (type


600) Including cement concrete surrunding 1:3:6: ( 1")
T 54
as per Drg. No:- WSS 270 - Type II . Excavation paid
separately.
Per 100 L.ft.
Materials
100 l.ft. - 4" dia. P.V.C. pipes (Type 600) 100.000 730.00
Add 5% for wastage
Allow for solvent cement

Labour
2.5 day plumber - Laying, Surface pre. & testing pipes 2.500 770.00
2.5 day labourer 2.500 629.00

1:3:6(1") Concrete 2.169 25582.50

Rate per 100 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying and laying 4" dia. sewer pipes ( Type 600 ),


T 55
fixed to wall & floor slab with clips.
Per 20 L.ft.
Materials
20 l.ft. - 4" dia. P.V.C. pipes (Type 600) 20.000 357.00
Add 5% for wastage
Add 2% for transport
6 nos wooden plug 4x2x9" 6.000 10.00
6 nos. pvc clips 6.000 121.00
12 nos. 1 1/4" brass screws 12.000 8.50
Allow for solvent cement

Labour

Engineering Organization W.P. Page 233 BSR Annalysis


0.5 day plumber - Laying, fixing & testing pipes 0.500 770.00
0.5 day labourer 0.500 629.00

Rate per 20 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying and laying 6" dia. sewer pipes ( Type 600 ),


T 56
fixed to wall & floor slab with clips.
Per 20 L.ft.
Materials
20 l.ft. - 6" dia. P.V.C. pipes (Type 600) 20.000 730.00
Add 5% for wastage
Add 2% for transport
6 nos wooden plug 4x2x9" 6.000 10.00
6 nos. pvc clips 6.000 130.00
12 nos. 1 1/4" brass screws 12.000 8.50
Allow for solvent cement

Labour
1/2 day plumber - Laying, fixing & testing pipes 0.500 770.00
1/2 day labourer 0.500 629.00

Rate per 20 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying and laying 4" dia. P.V.C. perforated pipes


T 57 (type 600) with 10mm dia. Holes @ 3" c/c as per details.
Necessary excavation & rubble packing paid seperatly.

Per 20 L.ft.
Materials
20 l.ft. - 4" dia. P.V.C. pipes (Type 600) 20.000 357.00
Add 5% for wastage
1/2 day Hire Charges for Drill 0.500 600.00

Labour
1/2 day plumber - Drilling & Laying 0.500 770.00
1/2 day labourer 0.500 629.00

Rate per 20 L.ft.


Rate per L.ft.
Add 22%
Total

Engineering Organization W.P. Page 234 BSR Annalysis


Supplying & Fixing P.V.C. Specials

Matirial solvent
Per 10 Specials (no) cement (g)

10.00 20.00
14.00 1.50
T 58 1/2" - PVC Socket
140.00 30.00
17.00 1.50
T 59 1/2" - PVC Valve Socket
170.00 30.00
17.00 1.50
T 60 1/2" - PVC Foucet Socket
170.00 30.00
13.00 1.50
T 61 1/2" - PVC Elbow
130.00 30.00
23.00 1.50
T 62 1/2" - PVC Bend
230.00 30.00
17.00 1.50
T 63 1/2" - PVC Equal Tee
170.00 30.00
14.00
T 64 1/2" - PVC Clips
140.00

Matirial solvent
Per 10 Specials (no) cement (g)

10.00 30.00
20.00 1.50
T 65 3/4" - PVC Socket
200.00 45.00
24.00 1.50
T 66 3/4" - PVC Valve Socket
240.00 45.00
24.00 1.50
T 67 3/4" - PVC Foucet Socket
240.00 45.00
24.00 1.50
T 68 3/4" - PVC Elbow
240.00 45.00
31.00 1.50
T 69 3/4" - PVC Bend
310.00 45.00
31.00 1.50
T 70 3/4" - PVC Equal Tee
310.00 45.00
15.00
T 71 3/4" - PVC Clips
150.00

Matirial solvent
Per 10 Specials (no) cement (g)

10.00 40.00
30.00 1.50
T 72 1" - PVC Socket
300.00 60.00
28.00 1.50
T 73 1" - PVC Valve Socket
280.00 60.00
31.00 1.50
T 74 1" - PVC Foucet Socket
310.00 60.00
35.00 1.50
T 75 1" - PVC Elbow
350.00 60.00

Engineering Organization W.P. Page 235 BSR Annalysis


44.00 1.50
T 76 1" - PVC Bend
440.00 60.00
48.00 1.50
T 77 1" - PVC Equal Tee
480.00 60.00
16.00
T 78 1" - PVC Clips
160.00

Matirial solvent
(no) cement (g)
Per 10 Specials
10.00 60.00
44.00 1.50
T 79 1 1/4" - PVC Socket
440.00 90.00
52.00 1.50
T 80 1 1/4" - PVC Valve Socket
520.00 90.00
58.00 1.50
T 81 1 1/4" - PVC Foucet Socket
580.00 90.00
57.00 1.50
T 82 1 1/4" - PVC Elbow
570.00 90.00
96.00 1.50
T 83 1 1/4" - PVC Bend
960.00 90.00
78.00 1.50
T 84 1 1/4" - PVC Equal Tee
780.00 90.00
18.00
T 85 1 1/4" - PVC Clips
180.00

Matirial solvent
(no) cement (g)
Per 10 Specials
10.00 90.00
69.00 1.50
T 86 1 1/2" - PVC Socket
690.00 135.00
72.00 1.50
T 87 1 1/2" - PVC Valve Socket
720.00 135.00
80.00 1.50
T 88 1 1/2" - PVC Foucet Socket
800.00 135.00
97.00 1.50
T 89 1 1/2" - PVC Elbow
970.00 135.00
155.00 1.50
T 90 1 1/2" - PVC Bend
1550.00 135.00
136.00 1.50
T 91 1 1/2" - PVC Equal Tee
1360.00 135.00
23.00
T 92 1 1/2" - PVC Clips
230.00

Matirial solvent
Per 10 Specials (no) cement (g)

10.00 120.00
109.00 1.50
T 93 2" - PVC Socket
1090.00 180.00
120.00 1.50
T 94 2" - PVC Valve Socket
1200.00 180.00
124.00 1.50
T 95 2" - PVC Foucet Socket
Engineering Organization W.P. Page 236 BSR Annalysis
T 95 2" - PVC Foucet Socket
1240.00 180.00
163.00 1.50
T 96 2" - PVC Elbow
1630.00 180.00
288.00 1.50
T 97 2" - PVC Bend
2880.00 180.00
207.00 1.50
T 98 2" - PVC Equal Tee
2070.00 180.00
24.00
T 99 2" - PVC Clips
240.00

Matirial solvent
(no) cement (g)
Per 10 Specials
10.00 160.00
268.00 1.50
T 100 2 1/2" - PVC Socket
2680.00 240.00
883.00 1.50
T 101 2 1/2" - PVC Valve Socket
8830.00 240.00
250.00 1.50
T 102 2 1/2" - PVC Foucet Socket
2500.00 240.00
610.00 1.50
T 103 2 1/2" - PVC Elbow
6100.00 240.00
716.00 1.50
T 104 2 1/2" - PVC Bend
7160.00 240.00
790.00 1.50
T 105 2 1/2" - PVC Equal Tee
7900.00 240.00
27.00
T 106 2 1/2" - PVC Clips
270.00

Matirial solvent
Per 10 Specials (no) cement (g)

10.00 200.00
394.00 1.50
T 107 3" - PVC Socket
3940.00 300.00
894.00 1.50
T 108 3" - PVC Valve Socket
8940.00 300.00
480.00 1.50
T 109 3" - PVC Foucet Socket
4800.00 300.00
1121.00 1.50
T 110 3" - PVC Elbow
11210.00 300.00
1198.00 1.50
T 111 3" - PVC Bend
11980.00 300.00
1364.00 1.50
T 112 3" - PVC Equal Tee
13640.00 300.00
70.00
T 113 3" - PVC Clips
700.00

Matirial solvent
(no) cement (g)
Per 10 Specials
10.00 100.00
100.00 1.50
T 114 2" - 1 1/2" - PVC Reducing Socket
1000.00 150.00

Engineering Organization W.P. Page 237 BSR Annalysis


96.00 1.50
T 115 2" - 1 1/4" - PVC Reducing Socket
960.00 150.00
93.00 1.50
T 116 2" - 1" 1/2 - PVC Reducing Socket
930.00 150.00
90.00 1.50
T 117 2" - 3/4" 1 - PVC Reducing Socket
900.00 150.00
86.00 1.50
T 118 2" - 1/2" 1 - PVC Reducing Socket
860.00 150.00
73.00 1.50
T 119 1 1/2" - 1 1/4" - PVC Reducing Socket
730.00 150.00
70.00 1.50
T 120 1 1/2" - 1" 1/4 - PVC Reducing Socket
700.00 150.00
59.00 1.50
T 121 1 1/2" - 3/4" 1 - PVC Reducing Socket
590.00 150.00
52.00 1.50
T 122 1 1/2" - 1/2" 1 - PVC Reducing Socket
520.00 150.00
50.00 1.50
T 123 1 1/4" - 1" 1/2 - PVC Reducing Socket
500.00 150.00
44.00 1.50
T 124 1 1/4" - 3/4" 1 - PVC Reducing Socket
440.00 150.00
38.00 1.50
T 125 1 1/4" - 1/2" 1 - PVC Reducing Socket
380.00 150.00
30.00 1.50
T 126 1" - 3/4" - PVC Reducing Socket
300.00 150.00
24.00 1.50
T 127 1" - 1/2" - PVC Reducing Socket
240.00 150.00
19.00 1.50
T 128 3/4" - 1/2" - PVC Reducing Socket
190.00 150.00

Matirial solvent
(no) cement (g)
Per 10 Specials
10.00 100.00
214.00 1.50
T 129 2" - 1 1/2" - PVC Reducing Tee
2140.00 150.00
207.00 1.50
T 130 2" - 1 1/4" - PVC Reducing Tee
2070.00 150.00
205.50 1.50
T 131 2" - 1" 1/2 - PVC Reducing Tee
2055.00 150.00
204.50 1.50
T 132 2" - 3/4" 1 - PVC Reducing Tee
2045.00 150.00
198.00 1.50
T 133 2" - 1/2" 1 - PVC Reducing Tee
1980.00 150.00
127.00 1.50
T 134 1 1/2" - 1 1/4" - PVC Reducing Tee
1270.00 150.00
111.00 1.50
T 135 1 1/2" - 1" 1/4 - PVC Reducing Tee
1110.00 150.00
104.00 1.50
T 136 1 1/2" - 3/4" 1 - PVC Reducing Tee
1040.00 150.00
89.00 1.50
T 137 1 1/2" - 1/2" 1 - PVC Reducing Tee
890.00 150.00
78.00 1.50
T 138 1 1/4" - 1" 1/2 - PVC Reducing Tee
780.00 150.00
75.00 1.50
T 139 1 1/4" - 3/4" 1 - PVC Reducing Tee

Engineering Organization W.P. Page 238 BSR Annalysis


T 139 1 1/4" - 3/4" 1 - PVC Reducing Tee
750.00 150.00
57.00 1.50
T 140 1 1/4" - 1/2" 1 - PVC Reducing Tee
570.00 150.00
49.00 1.50
T 141 1" - 3/4" - PVC Reducing Tee
490.00 150.00
44.00 1.50
T 142 1" - 1/2" - PVC Reducing Tee
440.00 150.00
33.00 1.50
T 143 3/4" - 1/2" - PVC Reducing Tee
330.00 150.00

Matirial solvent
(no) cement (g)
Per 10 Specials
10.00 80.00
53.00 1.50
T 144 1" - 3/4" - PVC Reducing Forcet Tee
530.00 120.00
41.00 1.50
T 145 1" - 1/2" - PVC Reducing Forcet Tee
410.00 120.00
43.00 1.50
T 146 3/4" - 1/2" - PVC Reducing Forcet Tee
430.00 120.00

Matirial solvent
(no) cement (g)
Per 10 Specials
10.00 100.00
45.00 1.50
T 147 1" - 3/4" - PVC Reducing Elbow
450.00 150.00
40.00 1.50
T 148 1" - 1/2" - PVC Reducing Elbow
400.00 150.00
37.00 1.50
T 149 3/4" - 1/2" - PVC Reducing Elbow
370.00 150.00

Supplying and fixing 4" (110 mm) dia. Double access


T 150
branch with cleaning eye.
Per 10 nos.
Materials
10 Nos - 4" dia. double branch w. cleaning eye 10.000 1030.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

Supplying and fixing 4" (110 mm) dia Single access


T 151
branch with cleaning eye.

Engineering Organization W.P. Page 239 BSR Annalysis


Per 10 nos.
Materials
10 Nos - 4" dia. single branch w. cleaning eye 10.000 645.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

T 152 Supplying and fixing 4" (110 mm) dia single branch.

Per 10 nos.
Materials
10 Nos - 4" dia. single branch 10.000 510.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

Supplying and fixing 4" (110 mm) dia Swept bend with
T 153
cleaning eye.
Per 10 nos.
Materials
10 Nos - 4" dia. Swept bend with cleaning eye. 10.000 580.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

T 154 Supplying and fixing 4" (110 mm) dia Swept bend.

Engineering Organization W.P. Page 240 BSR Annalysis


Per 10 nos.
Materials
10 Nos - 4" dia. Swept bend. 10.000 575.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

Supplying and fixing 4" (110 mm) dia Swept tee with
T 155
cleaning eye.
Per 10 nos.
Materials
10 Nos - 4" dia. Swept tee with cleaning eye. 10.000 690.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

T 156 Supplying and fixing 4" (110 mm) dia Swept tee.

Per 10 nos.
Materials
10 Nos - 4" dia. Swept tee. 10.000 360.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

T 157 Supplying and fixing 4" (110 mm) dia " P " trap.

Engineering Organization W.P. Page 241 BSR Annalysis


Per 10 nos.
Materials
10 Nos - 4" dia. " P " trap. 10.000 550.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

T 158 Supplying and fixing 4" (110 mm) dia " S " trap.

Per 10 nos.
Materials
10 Nos - 4" dia. " S " trap. 10.000 805.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

T 159 Supplying and fixing 4" (110 mm) Multi floor trap.

Per 10 nos.
Materials
10 Nos - 4" dia. Multi floor trap. 10.000 295.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

Supplying and fixing 4" (110 mm) dia Tee with cleaning
T 160
eye.

Engineering Organization W.P. Page 242 BSR Annalysis


Per 10 nos.
Materials
10 Nos - 4" dia. Tee with cleaning eye. 10.000 490.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

T 161 Supplying and fixing 4" (110 mm) dia.Bend.

Per 10 nos.
Materials
10 Nos - 4" dia. Bend. 10.000 365.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

T 162 Supplying and fixing 6" (160mm) dia. Bend.

Per 10 nos.
Materials
10 Nos - 6" (160mm) dia. Bend. 10.000 540.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

Supplying and fixing Reducing Tee 6" x 4" (160mm x


T 163
110mm)

Engineering Organization W.P. Page 243 BSR Annalysis


Per 10 nos.
Materials
10 Nos - Reducing Tee 6" x 4" (160mm x 110mm) 10.000 1115.00
300 gram Salvent cement 300.000 1.50

Labour
1 1/2 Day Plumber 1.500 770.00
1 1/2 Day Labour 1.500 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

Supplying and fixing 2" (63 mm)dia.Vent Cowl (Wire


T 164
Dome)
Per 10 nos.
Materials
10 Nos - Vent Cowl - 2" 10.000 55.00
50gram Salvent cement 50.000 1.50

Labour
1 Hrs Plumber 1.000 96.25
1 Hrs Labour 1.000 78.63

Per 10 Nos.
Per 01 No.
Add 22%
Total

Supplying and fixing 4" (110mm) dia.Vent Cowl (Wire


T 165
Dome)
Per 10 nos.
Materials
10 Nos - Vent Cowl - 4" 10.000 80.00
50gram Salvent cement 50.000 1.50

Labour
1 Hrs Plumber 1.000 96.25
1 Hrs Labour 1.000 78.63

Per 10 Nos.
Per 01 No.
Add 22%
Total

Supplying and fixing 1 1/2" (50 mm) dia Swept tee with
T 166
cleaning eye.

Engineering Organization W.P. Page 244 BSR Annalysis


Per 10 nos.
Materials
10 Nos - 1 1/2" (50 mm) dia Swept tee 10.000 195.00
100 gram Salvent cement 100.000 1.50

Labour
1 1/4 Day Plumber 1.250 770.00
1 1/4 Day Labour 1.250 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

T 167 Supplying and fixing 1 1/2" (50 mm) dia Swept tee.

Per 10 nos.
Materials
10 Nos - 1 1/2" (50 mm) dia Swept tee. 10.000 195.00
100 gram Salvent cement 100.000 1.50

Labour
1 1/4 Day Plumber 1.250 770.00
1 1/4 Day Labour 1.250 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

T 168 Supplying and fixing 1 1/2" (50 mm) dia Equal tee.

Per 10 nos.
Materials
10 Nos - 1 1/2" (50 mm) dia Equal tee. 10.000 160.00
100 gram Salvent cement 100.000 1.50

Labour
1 1/4 Day Plumber 1.250 770.00
1 1/4 Day Labour 1.250 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

Supplying and fixing 1 1/2" (50 mm) dia Bend with


T 169
cleaning eye.

Engineering Organization W.P. Page 245 BSR Annalysis


Per 10 nos.
Materials
10 Nos - 1 1/2" (50 mm) dia Bend with cleaning eye. 10.000 140.00
100 gram Salvent cement 100.000 1.50

Labour
1 1/4 Day Plumber 1.250 770.00
1 1/4 Day Labour 1.250 629.00

Per 10 Nos.
Per 01 No.
Add 22%
Total

Supplying , laying and/or fixing 1/2" dia. CPVC - SDR


T 170
pipes. (Specials paid separately).
Per 10 L.ft.
Materials
10 L.ft. pipes 10.000 61.00
Allow 5% wastage
3 Clips & nails 3.000 14.00
2 grms solvent cement 2.000 4.75
Sub Total
Labour
1 hrs. plumber 1.000 96.25
1 hrs. U/SK labourer 1.000 78.63
Sub Total

Rate per 10 L.ft.


Rate per L.ft.
Add 22%
Total

Supplying , laying and/or fixing 1" dia. CPVC - SDR


T 171
pipes. (Specials paid separately).
Per 10 L.ft.
Materials
10 L.ft. pipes 10.000 120.00
Allow 5% wastage
3 Clips & nails 3.000 16.00
5 grms solvent cement 5.000 4.75
Sub Total
Labour
1 hrs. plumber 1.000 96.25
1 hrs. U/SK labourer 1.000 78.63
Sub Total

Rate per 10 L.ft.


Rate per L.ft.

Engineering Organization W.P. Page 246 BSR Annalysis


Add 22%
Total

Matirial solvent
Per 10 Specials (no) cement (g)

10.00 20.00
31.00 4.75
T 172 1/2" - CPVC Socket
310.00 94.92
217.00 4.75
T 173 1" - CPVC Socket
2,170.00 189.83
40.00 4.75
T 174 1/2" - CPVC Valve Socket
400.00 94.92
232.00 4.75
T 175 1" - CPVC Valve Socket
2,320.00 189.83
57.00 4.75
T 176 1/2" - CPVC Foucet Socket
570.00 94.92
297.00 4.75
T 177 1" - CPVC Foucet Socket
2,970.00 189.83
57.00 4.75
T 178 1/2" - CPVC Equal Tee
570.00 94.92
432.00 4.75
T 179 1" - CPVC Equal Tee
4,320.00 189.83
44.00 4.75
T 180 CPVC Elbow 1/2" dia. x 45o
440.00 94.92
44.00 4.75
T 181 CPVC Elbow 1/2" dia. x 90o
440.00 94.92
385.00 4.75
T 182 CPVC Elbow 1" dia. x 45o
3,850.00 189.83
336.00 4.75
T 183 CPVC Elbow 1" dia. x 90o
3,360.00 189.83
192.00 4.75
T 184 CPVC Reducing Socket 1" x 1/2"
1,920.00 189.83
370.00 4.75
T 185 CPVC Reducing Tee 1" x 1/2"
3,700.00 189.83
27.00 4.75
T 186 1/2" - CPVC End cap
270.00 94.92
145.00 4.75
T 187 1" - CPVC End cap
1,450.00 189.83
645.00 4.75
T 188 CPVC Tap End Plug 1/2" dia.
6,450.00 94.92
510.00 4.75
T 189 CPVC Union 1/2" dia.
5,100.00 94.92
575.00 4.75
T 190 CPVC Elbow Holder 1/2" dia.
5,750.00 94.92
690.00 4.75
T 191 CPVC Elbow Holder 1" dia.
6,900.00 189.83
360.00 4.75
T 192 CPVC Brass Male Adapter 1/2" dia.
3,600.00 94.92
550.00 4.75
T 193 CPVC Brass Female Adapter 1/2" dia.
5,500.00 94.92
295.00 4.75
T 194 CPVC Brass Elbow 1/2" dia.
2,950.00 94.92

Engineering Organization W.P. Page 247 BSR Annalysis


Supplying and fixing water pump single phase
manufactured by " Jinasena" Model no:- N110T/1 ,size 1"
x 1" , 0.75 H.P. , total head 80'-0" , out put 1000 I.g/hr. as
per manufacturer's specifications. Rate include for fixing
1" dia. Foot valve approved make, Positioning and
T 195 mount the pump on a concrete bed 9" x 9" x 3" thick in
1:2:4(3/4") with 10mm dia. hexagonal bolts to required
lengh , Nuts & Washers 1/16" thick complete in working
order using necessary P.V.C. pipes, specials...etc. &
electrical supply from the ..... DB. Pipes , specials &
electricity connection Paid separatly.

Per 1 nos.
Materials
1 No water pump 1.000 15135.00
1 No foot valve 1.000 300.00
4 No 10mm dia. Hexaganal bolts, Nuts & washers 4.000 80.00
Allow for PVC pipes & specials etc..

Labour
1/2 Day Plumber 0.500 770.00
1/2 Day Labour 0.500 629.00

Concrete bed 0.150 320.31

Per 01 No.
Add 22%
Total

Supplying and fixing 1" Deep Well Kit by " Jinasena"


Model no:- Type A as per manufacturer's specifications
and complete in working order using necessary P.V.C.
T 196
pipes, specials...etc. & electrical supply from the closest
DB. (Pipes , specials & electricity connection paid
separatly.)

Per 1 nos.
Materials
1 No Deep well kit 1.000 4000.00
Allow for PVC pipes & specials etc..

Labour
1/2 Day Plumber 0.500 770.00
1/2 Day Labour 0.500 629.00

Per 01 No.
Add 22%
Total

Engineering Organization W.P. Page 248 BSR Annalysis


Construction of waste water brick manhole internal size
of 1'-0" x 1'-0" & depth upto 1'-3", consist of 3" thick
Grade 15 concrete base and 4 1/2" thick brick masonery
side walls in 1:3 cement sand mix , 1/2" thick cement
rendering in 1:2 to internal & external exposed faces of
U 01 Ref. Drg.No. - WSS/10/01
walls finished smooth with neat cement floating, with 2"
thick Grade 20 RCC cover slab with 6mm dia. M.S. rods
@ 4" c/c both ways. Rate to include for excavation,
necessary formwork , lifting hooks & 3" thick concrete
pad as per Drawing No:-WSS/10/01

Total Length = 1.750


Total Width = 1.750
Average Depth = 1.250

For Manhole

Excavation Cu.ft. 3.828 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 0.766 312.11

4 1/2" thick brick work Sq.ft. 5.500 125.93

Concrete Pad 1:2:4 (3/4"). Cu.ft. 0.516 390.77

Form work Sq.ft. 2.750 137.23

1/2" Rendering Sq.ft. 5.000 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 0.321 390.77

Form work Sq.ft. 0.935 137.23

Rainforcement - Mild kg 0.931 168.80

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 249 BSR Annalysis


Construction of waste water brick manhole internal size
of 1'-3" x 1'-3" & depth upto 2'-0", consist of 3" thick
Grade 15 concrete base and 4 1/2" thick brick masonery
side walls in 1:3 cement sand mix , 1/2" thick cement
rendering in 1:2 to internal & external exposed surfaces
U 02 Ref. Drg.No. - WSS/10/01
of walls finished smooth with neat cement floatings,
with 2" thick Grade 20 RCC cover slab with 6mm dia.
M.S. rods @ 4" c/c both ways. Rate to include for
excavation, necessary formwork , lifting hooks & 3"
thick concrete pad as per Drawing No:- WSS/10/01

Total Length = 2.000


Total Width = 2.000
Average Depth = 2.000

For Manhole

Excavation Cu.ft. 8.000 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 1.000 312.11

4 1/2" thick brick work Sq.ft. 11.375 125.93

Concrete Pad 1:2:4 (3/4"). Cu.ft. 0.609 390.77

Form work Sq.ft. 3.250 137.23

1/2" Rendering Sq.ft. 10.313 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 0.449 390.77

Form work Sq.ft. 1.105 137.23

Rainforcement - Mild kg 1.320 168.80

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 250 BSR Annalysis


Construction of waste water brick manhole internal size
of 1'-6" x 1'-6" & depth upto 3'-0", consist of 3" thick
Grade 15 concrete base and 4 1/2" thick brick masonery
side walls in 1:3 cement sand mix , 1/2" thick cement
rendering in 1:2 to internal & external exposed surfaces
U 03 Ref. Drg.No. - WSS/10/01
of walls finished smooth with neat cement floatings,
with 3" thick Grade 20 RCC cover slab with 10mm dia.tor
steel @ 6" c/c both ways. Rate to include for excavation,
necessary formwork, lifting hooks & 6" thick concrete
pad as per Drawing No:-WSS/10/01

Total Length = 2.250


Total Width = 2.250
Average Depth = 2.500

For Manhole

Excavation Cu.ft. 12.656 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 1.563 312.11

4 1/2" thick brick work Sq.ft. 16.875 125.93

Concrete Pad 1:2:4 (3/4"). Cu.ft. 0.703 390.77

Form work Sq.ft. 3.750 137.23

1/2" Rendering Sq.ft. 15.750 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 0.598 390.77

Form work Sq.ft. 1.275 137.23

Rainforcement - Tor kg 4.938 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 251 BSR Annalysis


Construction of waste water brick manhole internal size
of 2'-0" x 2'-0" & depth very from 2'-0"-3'-0", consist of
4" thick Grade 15 lean concrete base and 9" thick brick
masonery side walls in 1:3 cement sand mix ,1/2" thick
cement sand rendering in 1:2 to all internal surfaces and
U 04 external exposed surfaces of wall finished smooth with Ref. Drg.No. - WSS/10/01
neat cement floting , with 3" thick Grade 20 RCC cover
slab with 10mm dia. tor steel @ 6" c/c both ways.Rate to
include for excavation, necessary formwork, lifting
hooks and 6" thich concreat pad as per Drawing No:-
WSS/10/01

Total Length = 3.500


Total Width = 3.500
Average Depth = 2.500

For Manhole

Excavation Cu.ft. 30.625 17.21

4" thick Screed 1:3:6 (1") Cu.ft. 4.043 312.11

9" thick brick work Cu.ft. 18.563 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 4.125 390.77

Form work Sq.ft. 11.000 137.23

1/2" Rendering Sq.ft. 22.000 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 1.891 390.77

Form work Sq.ft. 2.750 137.23

Rainforcement - Tor kg 7.242 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 252 BSR Annalysis


Construction of waste water concrete manhole internal
size of 1'-0" x 1'-0" & depth up to 1'-6", consist of 4"
thick Grade 20 concrete base and sides ,with 2" thick
Grade 20 RCC cover slab with 6mm dia.M.S. rods @ 4"
U 05 c/c both ways. Rate to include for excavation, necessary Ref. Drg.No. - WSS/10/02
formwork, lifting hooks and 1/2" thick cement sand
rendering in 1:2 mix trowel smooth with neat grey
cement to all internal surfaces and external exposed
surfaces as per Drawing No:-WSS/10/02

Total Length = 1.670


Total Width = 1.670
Average Depth = 1.833

For Manhole

Excavation Cu.ft. 5.112 17.21

Concrete Pad 1:2:4 (3/4"). Cu.ft. 3.554 390.77

Form work Sq.ft. 6.000 137.23

1/2" Rendering Sq.ft. 7.000 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 0.301 390.77

Form work Sq.ft. 0.904 137.23

Rainforcement - Mild kg 0.900 168.80

Allow for MS Lifting hooks

Total Rate

Construction of waste water concrete manhole internal


size of 1'-3" x 1'-3" & depth up to 2'-0", consist of 4"
thick Grade 20 concrete base and sides ,with 2" thick
Grade 20 RCC cover slab with 6mm dia.M.S. rods @ 4"
U 06 c/c both ways. Rate to include for excavation, necessary Ref. Drg.No. - WSS/10/02
formwork, lifting hooks and 1/2" thick cement sand
rendering in 1:2 mix trowel smooth with neat grey
cement to all internal surfaces and external exposed
surfaces as per Drawing No:-WSS/10/02

Total Length = 1.920

Engineering Organization W.P. Page 253 BSR Annalysis


Total Width = 1.920
Average Depth = 2.330

For Manhole

Excavation Cu.ft. 8.589 17.21

Concrete Pad 1:2:4 (3/4"). Cu.ft. 5.388 390.77

Form work Sq.ft. 5.000 137.23

1/2" Rendering Sq.ft. 11.563 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 0.424 390.77

Form work Sq.ft. 1.074 137.23

Rainforcement - Mild kg 1.283 168.80

Allow for MS Lifting hooks

Total Rate

Construction of waste water concrete manhole internal


size of 1'-6" x 1'-6" & depth vary from 2'-0' - 3'-0",
consist of 3" thick Grade15 lean concrete & 5" thick
Grade 20 RCC base and side walls with 10mm dia.tor
steel @ 6" c/c both ways and 3" thick Grade 20 RCC
U 07 cover slab with 10mm dia. tor steel @ 6" c/c both ways. Ref. Drg.No. - WSS/10/02
Rate to include for excavation, necessary formwork,
lifting hooks and 1/2" thick cement sand rendering in 1:2
mix trowel smooth with neat grey cement to all internal
surfaces and external exposed surfaces as per Drawing
No:- WSS/10/02

Total Length = 2.340


Total Width = 2.340
Average Depth = 2.920

For Manhole

Excavation Cu.ft. 17.358 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 1.369 312.11

Concrete Pad 1:2:4 (3/4"). Cu.ft. 11.414 390.77

Engineering Organization W.P. Page 254 BSR Annalysis


Form work Sq.ft. 10.000 137.23

Rainforcement - Tor kg 24.343 192.95

1/2" Rendering Sq.ft. 23.950 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 1.177 390.77

Form work Sq.ft. 2.170 137.23

Rainforcement - Tor kg 4.898 192.95

Allow for MS Lifting hooks

Total Rate

Construction of brick sewer manhole internal size of 2'-


1" x 1'-7" & depth vary from 1'-6" - 3'-0", consist of 6"
thick Grade 15 lean concrete base and 9" thick brick
masonery side walls in 1:3 cement sand mix ,with 3"
thick Grade 20 RCC cover slab with 10mm dia.tor steel
U 08 @ 6" c/c both ways.Rate to include for excavation, Ref. Drg.No. - WSS/10/03
necessary formwork, lifting hooks and 1/2" thick cement
sand rendering in 1:2 mix trowel smooth with neat grey
cement to all internal surfaces , exposed external
surfaces and forming channel with 1:6 benching as per
Drawing No:- WSS/10/03

Total Length = 3.583


Total Width = 3.080
Average Depth = 2.250

For Manhole

Excavation Cu.ft. 24.830 17.21

6" thick Screed 1:3:6 (1") Cu.ft. 5.518 312.11

9" thick brick work Cu.ft. 15.480 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 4.875 390.77

Form work Sq.ft. 10.320 137.23

1/2" Rendering Sq.ft. 19.756 37.09

Allow for benching

Engineering Organization W.P. Page 255 BSR Annalysis


For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 1.342 390.77

Form work Sq.ft. 2.330 137.23

Rainforcement - Tor kg 5.401 192.95

Allow for MS Lifting hooks

Total Rate

Construction of brick sewer manhole internal size of 2'-


6" x 1'-7" & depth vary 2'-0" - 3'-0", consist of 6" thick
Grade 15 lean concrete base and 9" thick brick
masonery side walls in 1:3 cement sand mix ,with 3"
thick Grade 20 RCC cover slab with 10mm dia.tor steel
U 09 @ 6" c/c both ways. Rate to include for excavation, Ref. Drg.No. - WSS/10/03
necessary formwork, lifting hooks and 1/2" thick cement
sand rendering in 1:2 mix trowel smooth with neat grey
cement to all internal surfaces , exposed external
surfaces and forming channel with 1:6 benching as per
Drawing No:- WSS/10/03

Total Length = 4.000


Total Width = 3.080
Average Depth = 2.500

For Manhole

Excavation Cu.ft. 30.800 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 6.160 312.11

9" thick brick work Cu.ft. 20.925 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 5.441 390.77

Form work Sq.ft. 11.160 137.23

1/2" Rendering Sq.ft. 24.350 37.09

Allow for benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 1.560 390.77

Form work Sq.ft. 2.540 137.23

Rainforcement - Tor kg 5.561 192.95


Engineering Organization W.P. Page 256 BSR Annalysis
Allow for MS Lifting hooks

Total Rate

Construction of brick sewer manhole internal size of 3'-4


1/2" x 2'-3" & depth vary 2'-0" - 3'-0", consist of 6" thick
Grade 15 lean concrete base and 9" thick brick
masonery side walls in 1:3 cement sand mix ,with 3"
thick Grade 20 RCC cover slab with 10mm dia. tor steel
U 10 @ 6" c/c both ways.Rate to include for excavation, Ref. Drg.No. - WSS/10/04
necessary formwork, lifting hooks and 1/2" thick cement
sand rendering in 1:2 mix trowel smooth with neat grey
cement to all internal surfaces , exposed external
surfaces and forming channel with 1:6 benching as per
Drawing No:- WSS/10/04

Total Length = 4.875


Total Width = 3.750
Average Depth = 2.500

For Manhole

Excavation Cu.ft. 54.844 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 9.141 312.11

9" thick brick work Cu.ft. 26.719 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 7.040 390.77

Form work Sq.ft. 14.250 137.23

1/2" Rendering Sq.ft. 35.719 37.09

Allow for benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 2.664 390.77

Form work Sq.ft. 3.313 137.23

Rainforcement - Tor kg 10.181 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 257 BSR Annalysis


Construction of brick sewer manhole internal size of 4'-
6" x 2'-7 1/2" & depth vary 2'-0" - 3'-0", consist of 6"
thick Grade 15 lean concrete base and 9" thick brick
masonery side walls in 1:3 cement sand mix ,with 3"
thick Grade 20 RCC cover slab with 10mm dia.tor steel
U 11 @ 6" c/c both ways.Rate to include for excavation, Ref. Drg.No. - WSS/10/05
necessary formwork, lifting hooks and 1/2" thick cement
sand rendering in 1:2 mix trowel smooth with neat grey
cement to all internal surfaces , exposed external
surfaces and forming channel with 1:6 benching as per
Drawing No:- WSS/10/05

Total Length = 6.000


Total Width = 4.125
Average Depth = 2.500

For Manhole

Excavation Cu.ft. 74.250 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 12.375 312.11

9" thick brick work Cu.ft. 32.344 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 10.238 390.77

Form work Sq.ft. 17.250 137.23

1/2" Rendering Sq.ft. 47.438 37.09

Allow for benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 3.906 390.77

Form work Sq.ft. 4.063 137.23

Rainforcement - Tor kg 13.050 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 258 BSR Annalysis


Construction of brick sewer manhole internal size of
4'-6" x 2'-7 1/2" & depth vary 3'-0" - 5'-0", consist of
6" thick Grade 15 lean concrete base and 9" thick brick
masonery side walls in 1:3 cement sand mix ,with 3"
thick Grade 20 RCC cover slab with 10mm dia.tor steel
U 12 @ 6" c/c both ways.Rate to include for excavation, Ref. Drg.No. - WSS/10/05
necessary formwork, lifting hooks and 1/2" thick cement
sand rendering in 1:2 mix trowel smooth with neat grey
cement to all internal surfaces , exposed external
surfaces and forming channel with 1:6 benching as per
Drawing No:- WSS/10/05

Total Length = 6.000


Total Width = 4.125
Average Depth = 4.000

For Manhole

Excavation Cu.ft. 111.375 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 12.375 312.11

9" thick brick work Cu.ft. 51.750 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 10.238 390.77

Form work Sq.ft. 17.250 137.23

1/2" Rendering Sq.ft. 68.813 37.09

Allow for benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 3.906 390.77

Form work Sq.ft. 4.063 137.23

Rainforcement - Tor kg 13.050 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 259 BSR Annalysis


Construction of brick Interceptor manhole internal
size4'-6"x 2'-7 1/2" x 5'-6" depth Consists of 6" thick
Grade 20 conrete base and 9" thick brick masonery side
walls in 1:3 cement sand mix ,with 3" thick Grade 20
RCC cover slab with 10mm dia.tor steel @ 6" c/c both
ways.Rate to include for excavation, necessary
U 13 Ref. Drg.No. - WSS/10/06
formwork, lifting hooks and 1/2" thick cement sand
rendering in 1:2 mix trowel smooth with neat grey
cement to all internal surfaces , exposed external
surfaces including intercepter with stopper and forming
channels with 1:6 benching including working spaces as
per Drawing No:- WSS/10/06

Total Length = 6.000


Total Width = 4.125
Average Depth = 6.000

For Manhole

Excavation Cu.ft. 157.977 17.21

9" thick brick work Cu.ft. 71.156 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 25.315 390.77

Form work Sq.ft. 18.920 137.23

1/2" Rendering Sq.ft. 90.188 37.09

4" dia. Intercepteor 1.000 1000.00

Allow for benching & MS step

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 3.906 390.77

Form work Sq.ft. 4.063 137.23

Rainforcement - Tor kg 13.050 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 260 BSR Annalysis


Construction of brick drop manhole internal size 4'-6"x
2'-7 1/2" and depth up to 5'-0", Consists of 6" thick
Grade 20 conrete base with 10mm dia. tor steel @c/c
bothways on 3"thick Grade 15 lean concrete and 9" thick
brick masonery side walls in 1:3 cement sand mix ,with
3" thick Grade 20 RCC cover slab with 10mm dia. tor
U 14 steel @ 6" c/c both ways. Rate to include for excavation, Ref. Drg.No. - WSS/10/07
necessary formwork, lifting hooks and 1/2" thick cement
sand rendering in 1:2 mix trowel smooth with neat grey
cement to all internal surfaces , exposed external
surfaces and forming channels with 1:6 benching
including P.V.C. specials , M.S. foot steps & working
spaces as per Drawing No:-WSS/10/07

Total Length = 6.000


Total Width = 4.125
Average Depth = 5.000

For Manhole

Excavation Cu.ft. 111.375 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 6.188 312.11

9" thick brick work Cu.ft. 51.750 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 18.844 390.77

Form work Sq.ft. 17.250 137.23

1/2" Rendering Sq.ft. 68.813 37.09

Allow for M.S. Step & benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 3.906 390.77

Form work Sq.ft. 4.063 137.23

Rainforcement - Tor kg 13.050 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 261 BSR Annalysis


Construction of brick drop manhole internal size 4'-6"x
2'-7 1/2" and depth vary 5'-0" - 10'-0", Consists of 6"
thick Grade 20 conrete base with 10mm dia. tor steel
@c/c bothways on 3"thick Grade 15lean concrete and 9"
thick brick masonery side walls in 1:3 cement sand
mix ,with 3" thick Grade 20 RCC cover slab with 10mm
U 15 dia.tor steel @ 6" c/c both ways.Rate to include for Ref. Drg.No. - WSS/10/07
excavation, necessary formwork, lifting hooks and 1/2"
thick cement sand rendering in 1:2 mix trowel smooth
with neat grey cement to all internal surfaces , exposed
external surfaces and forming channel with 1:6
benching including P.V.C. specials, M.S. foot step &
working spaceas per Drawing No:- WSS/10/07

Total Length = 6.000


Total Width = 4.125
Average Depth = 7.500

For Manhole

Excavation Cu.ft. 216.563 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 6.188 312.11

9" thick brick work Cu.ft. 97.031 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 18.844 390.77

Form work Sq.ft. 17.250 137.23

1/2" Rendering Sq.ft. 125.813 37.09

Allow for M.S. Step & benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 3.906 390.77

Form work Sq.ft. 4.063 137.23

Rainforcement - Tor kg 13.050 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 262 BSR Annalysis


Construction of RCC sewer manhole internal size of 2'-
1" x 1'-7" & depth up to 2'-0", consist of 2" thick Grade
15 lean concrete and 6" thick Grade 20 concrete base
and side walls r/f with 10mm dia. tor steel @ 6" c/c
bothways , with 3" thick Grade 20 RCC cover slab with
U 16 10mm dia.tor steel @ 6" c/c both ways.Rate to include Ref. Drg.No. - WSS/10/08
for excavation, necessary formwork, lifting hooks and
1/2" thick cement , sand rendering in 1:2 mix trowel
smooth with neat grey cement to all internal surfaces ,
exposed external surfaces and forming channel with 1:6
benching.as per Drawing No:- .WSS/10/08

Total Length = 3.080


Total Width = 2.580
Average Depth = 2.000

For Manhole

Excavation Cu.ft. 21.217 17.21

2" thick Screed 1:3:6 (1") Cu.ft. 1.351 312.11

Concrete Pad 1:2:4 (3/4"). Cu.ft. 14.298 390.77

Form work Sq.ft. 14.640 137.23

Rainforcement - Tor kg 41.587 192.95

1/2" Rendering Sq.ft. 17.926 37.09

Allow for benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 0.912 390.77

Form work Sq.ft. 1.584 137.23

Rainforcement - Tor kg 4.428 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 263 BSR Annalysis


Construction of RCC sewer manhole internal size of 2'-
6" x 1'-7" & depth vary 2'-0" - 3'-0" , consist of 2" thick
Grade 15 lean concrete and 6" thick Grade 20 concrete
base and side walls r/f with 10mm dia. tor steel @ 6" c/c
bothways , with 3" thick Grade 20 RCC cover slab with
U 17 10mm dia.tor steel @ 6" c/c both ways. Rate to include Ref. Drg.No. - WSS/10/08
for excavation, necessary formwork, lifting hooks and
1/2" thick cement , sand rendering in 1:2 mix trowel
smooth with neat grey cement to all internal surfaces ,
exposed external surfaces and forming channel with 1:6
benching as per Drawing No:- WSS/10/08

Total Length = 3.500


Total Width = 2.580
Average Depth = 2.500

For Manhole

Excavation Cu.ft. 28.625 17.21

2" thick Screed 1:3:6 (1") Cu.ft. 1.535 312.11

Concrete Pad 1:2:4 (3/4"). Cu.ft. 15.931 390.77

Form work Sq.ft. 21.216 137.23

Rainforcement - Tor kg 46.508 192.95

1/2" Rendering Sq.ft. 24.350 37.09

Allow for benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 1.061 390.77

Form work Sq.ft. 1.727 137.23

Rainforcement - Tor kg 4.428 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 264 BSR Annalysis


Construction of RCC sewer manhole internal size of 3'-4
1/2" x 2'-3" & depth vary 2'-0" - 3'-0" , consist of 2" thick
Grade 15 lean concrete and 6" thick Grade 20 concrete
base and side walls r/f with 10mm dia. tor steel @ 6" c/c
bothways , with 3" thick Grade 20 RCC cover slab with
U 18 10mm dia.tor steel @ 6" c/c both ways.Rate to include Ref. Drg.No. - WSS/10/09
for excavation, necessary formwork, lifting hooks and
1/2" thick cement , sand rendering in 1:2 mix trowel
smooth with neat grey cement to all internal surfaces ,
exposed external surfaces and forming channel with 1:6
benching as per Drawing No:-WSS/10/09

Total Length = 4.375


Total Width = 3.750
Average Depth = 2.500

For Manhole

Excavation Cu.ft. 52.008 17.21

2" thick Screed 1:3:6 (1") Cu.ft. 2.789 312.11

Concrete Pad 1:2:4 (3/4"). Cu.ft. 27.310 390.77

Form work Sq.ft. 28.125 137.23

Rainforcement - Tor kg 59.161 192.95

1/2" Rendering Sq.ft. 35.719 37.09

Allow for benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 2.664 390.77

Form work Sq.ft. 3.313 137.23

Rainforcement - Tor kg 9.758 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 265 BSR Annalysis


Construction of RCC sewer manhole internal size of 4'-
6" x 2'-7 1/2" & depth vary 2'-0" - 3'-0" , consist of 2"
thick Grade 15 lean concrete and 6" thick Grade 20
concrete base and side walls r/f with 10mm dia. tor steel
@ 6" c/c bothways , with 3" thick Grade 20 RCC cover
U 19 slab with 10mm dia.tor steel @ 6" c/c both ways.Rate to Ref. Drg.No. - WSS/10/08
include for excavation, necessary formwork, lifting
hooks and 1/2" thick cement , sand rendering in 1:2 mix
trowel smooth with neat grey cement to all internal
surfaces , exposed external surfaces and forming
channel with 1:6 benching as per Drawing No:-WSS/10/08

Total Length = 5.500


Total Width = 3.625
Average Depth = 2.500

For Manhole

Excavation Cu.ft. 63.202 17.21

2" thick Screed 1:3:6 (1") Cu.ft. 3.389 312.11

Concrete Pad 1:2:4 (3/4"). Cu.ft. 34.050 390.77

Form work Sq.ft. 35.625 137.23

Rainforcement - Tor kg 72.634 192.95

1/2" Rendering Sq.ft. 47.438 37.09

Allow for benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 3.906 390.77

Form work Sq.ft. 4.063 137.23

Rainforcement - Tor kg 13.050 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 266 BSR Annalysis


Construction of RCC sewer manhole internal size of 4'-
6" x 2'-7 1/2" & depth vary 3'-0" - 5'-0" , consist of 2"
thick Grade 15 lean concrete and 6" thick Grade 20
concrete base and side walls r/f with 10mm dia. tor steel
@ 6" c/c bothways , with 3" thick Grade 20 RCC cover
U 20 slab with 10mm dia.tor steel @ 6" c/c both ways.Rate to Ref. Drg.No. - WSS/10/10
include for excavation, necessary formwork, lifting
hooks and 1/2" thick cement , sand rendering in 1:2 mix
trowel smooth with neat grey cement to all internal
surfaces , exposed external surfaces and forming
channel with 1:6 benching as per Drawing No:- WSS/10/10

Total Length = 5.500


Total Width = 3.625
Average Depth = 4.000

For Manhole

Excavation Cu.ft. 94.703 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 4.984 312.11

Concrete Pad 1:2:4 (3/4"). Cu.ft. 46.238 390.77

Form work Sq.ft. 57.000 137.23

Rainforcement - Tor kg 95.583 192.95

1/2" Rendering Sq.ft. 68.813 37.09

Allow for benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 3.906 390.77

Form work Sq.ft. 4.063 137.23

Rainforcement - Tor kg 13.050 192.95

Allow for MS Lifting hooks

Total Rate

R.C.C. Manhole cover size approx. 2'-0" x 2'-0" , 3"


U 21 thick 1:2:4 (3/4") G.20 concrete with 10mm dia. Tor steel
Reinforcement @ 100 c/c bothways.

Concrete 1:2:4 (3/4") Cu.ft. 1.000 390.77

Engineering Organization W.P. Page 267 BSR Annalysis


Form work Sq.ft. 6.000 137.23

Rainforcement - Tor kg 5.267 192.95

For placing cover - 1/4 hrs labour 0.500 117.43

Allow for lifting hook

Total per 4 Sq.ft.


Total Rate

Supply and fixing 24" x 18" heavy duty cast iron


U 22
manhole cover with cover frame.

Per No.(24"x18")
Material
7 L.ft. -2" x 2" x 6mm Angle Iron 7.000 155.000
3 Sq.ft. 1/2" MS plate 3.000 1095.000
Allow for wasteage

Labour
1 day Smith 1.000 770.000
1 day Labour 1.000 629.000
allow for coal, levelling & etc…

Rate per No.


Add 22%
Total Rate

Construction of gully internal size of 1'-2" x 1'-2" & depth


up to 1'-4" , consist of 3" thick Grade 20 concrete base
and 4 1/2" thick brick masonery side walls in 1:3 cement
sand mix , with 2" thick Grade 20 RCC cover slab with
6mm dia.M S rods @ 4" c/c both ways.Rate to include
U 24 for excavation, necessary formwork, lifting Ref. Drg.No. - WSS/10/11
hooks,,supplying P.V.C.gully trap infill with grade 20
concreate and 1/2" thick cement&, sand rendering in 1:2
mix trowel smooth with neat grey cement to all internal
surfaces , exposed external surfaces and forming
channel with 1:6 benching as per Drawing No:-WSS/10/11

Total Length = 1.920


Total Width = 1.920
Average Depth = 1.580

For Manhole

Engineering Organization W.P. Page 268 BSR Annalysis


Excavation Cu.ft. 5.825 17.21

Concrete Pad 1:2:4 (3/4"). Cu.ft. 2.766 390.77

Form work Sq.ft. 7.980 137.23

4 1/2" thick brick work Sq.ft. 6.168 103.22

1/2" Rendering Sq.ft. 6.049 37.09

PVC Gully No 1.000 385.00

Allow for benching

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 0.383 390.77

Form work Sq.ft. 1.020 137.23

Rainforcement - Mild kg 1.218 168.80

Allow for MS Lifting hooks

Total Rate

Construction of 4'-0" dia. soakage pit in hard soil.. as


U 25 Ref. Drg.No. - WSS/SP/01
per Drawing No:- WSS/SP/01

5.5 2.75

Excavation Cu.ft. 131.607 17.21

Concrete Pad 1:2:4 (3/4"). Cu.ft. 11.196 390.77

Form work Sq.ft. 22.393 137.23

Rainforcement - Tor kg 19.570 192.95

Rainforcement - Mild kg 4.721 168.80

9" thick brick work Cu.ft. 22.393 307.99

1/2" Rendering Sq.ft. 44.393 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 3.978 390.77

Form work Sq.ft. 3.536 137.23

Engineering Organization W.P. Page 269 BSR Annalysis


Rainforcement - Tor kg 8.277 192.95

Allow for MS Lifting hooks

Total Rate

Construction of 6'-0" dia. soakage pit in hard soil. as


U 26 Ref. Drg.No. - WSS/SP/02
per Drawing No:- WSS/SP/02

7.5 3.75

Excavation Cu.ft. 288.750 17.21

Concrete Pad 1:2:4 (3/4"). Cu.ft. 19.473 390.77

Form work Sq.ft. 46.821 137.23

Rainforcement - Tor kg 42.755 192.95

Rainforcement - Mild kg 9.137 168.80

9" thick brick work Cu.ft. 31.821 307.99

1/2" Rendering Sq.ft. 64.821 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 8.299 390.77

Form work Sq.ft. 5.107 137.23

Rainforcement - Tor kg 16.930 192.95

Allow for MS Lifting hooks

Total Rate

Construction of 8'-0" dia. soakage pit in hard soil. as


U 27 Ref. Drg.No. - WSS/SP/03
per Drawing No:- WSS/SP/03

9.5 4.75

Excavation Cu.ft. 508.750 17.21

Concrete Pad 1:2:4 (3/4"). Cu.ft. 24.938 390.77

Form work Sq.ft. 60.250 137.23

Rainforcement - Tor kg 53.416 192.95

Engineering Organization W.P. Page 270 BSR Annalysis


Rainforcement - Mild kg 11.574 168.80

9" thick brick work Cu.ft. 41.250 307.99

1/2" Rendering Sq.ft. 85.250 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 14.192 390.77

Form work Sq.ft. 6.679 137.23

Rainforcement - Tor kg 28.593 192.95

Allow for MS Lifting hooks

Total Rate

Construction of 4'-0" dia. soakage pit in loose soil.. as


U 28 Ref. Drg.No. - WSS/SP/04
per Drawing No:- WSS/SP/04

6 3.00

Excavation Cu.ft. 325.286 17.21

Concrete Pad 1:2:4 (3/4"). Cu.ft. 16.795 390.77

Form work Sq.ft. 29.857 137.23

Rainforcement - Tor kg 17.249 192.95

Rainforcement - Mild kg 5.938 168.80

9" thick brick work Cu.ft. 123.161 307.99

1/2" Rendering Sq.ft. 44.393 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 3.978 390.77

Form work Sq.ft. 3.536 137.23

Rainforcement - Tor kg 8.277 192.95

Allow for MS Lifting hooks

Total Rate

Engineering Organization W.P. Page 271 BSR Annalysis


Construction of 6'-0" dia. soakage pit in loose soil. as
U 29 Ref. Drg.No. - WSS/SP/05
per Drawing No:- WSS/SP/05

7.5 3.75

Excavation Cu.ft. 508.259 17.21

Concrete Pad 1:2:4 (3/4"). Cu.ft. 27.429 390.77

Form work Sq.ft. 57.429 137.23

Rainforcement - Tor kg 39.352 192.95

Rainforcement - Mild kg 11.493 168.80

9" thick brick work Cu.ft. 175.018 307.99

1/2" Rendering Sq.ft. 64.821 37.09

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 8.299 390.77

Form work Sq.ft. 5.107 137.23

Rainforcement - Tor kg 16.930 192.95

Allow for MS Lifting hooks

Total Rate

Construction of 8'-0" dia. soakage pit in loose soil. as


U 30 Ref. Drg.No. - WSS/SP/06
per Drawing No:- WSS/SP/06

9.5 4.75

Excavation Cu.ft. 815.473 17.21

Concrete Pad 1:2:4 (3/4"). Cu.ft. 35.250 390.77

Form work Sq.ft. 74.000 137.23

Rainforcement - Tor kg 50.012 192.95

Rainforcement - Mild kg 14.557 168.80

9" thick brick work Cu.ft. 226.875 307.99

1/2" Rendering Sq.ft. 85.250 37.09

Engineering Organization W.P. Page 272 BSR Annalysis


For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 14.192 390.77

Form work Sq.ft. 6.679 137.23

Rainforcement - Tor kg 28.593 192.95

Allow for MS Lifting hooks

Total Rate

Construction of 30 person Septic tank (Brick) in hard


U 31 Ref. Drg.No. - WSS/ST/01
soil. as per Drawing No:- WSS/ST/01

Total Length = 9.750 L1


Total Width = 5.000 L2
Average Depth = 7.250 L3

Excavation Cu.ft. 353.438 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 12.188 312.11

Concrete Base 1:2:4 (3/4"). Cu.ft. 24.375 390.77

Rainforcement - Tor kg 27.840 192.95

9" thick brick work Cu.ft. 137.719 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 9.188 390.77

Form work Sq.ft. 24.500 137.23

1/2" Rendering - 2 layers Sq.ft. 380.000 37.09

waterproofing theroseal Sq.ft. 190.000 208.29

6" dia. pipe L.ft. 1.000 912.50

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 8.750 390.77

Form work Sq.ft. 20.480 137.23

Rainforcement - Tor kg 19.187 192.95

Rainforcement - Mild kg 3.601 168.80

Allow for MS Lifting hooks

Engineering Organization W.P. Page 273 BSR Annalysis


Total Rate

Construction of 50 person Septic tank (Brick) in hard


U 32 Ref. Drg.No. - WSS/ST/01
soil. as per Drawing No:- WSS/ST/01

Total Length = 11.750 L1


Total Width = 5.000 L2
Average Depth = 7.250 L3

Excavation Cu.ft. 425.938 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 14.688 312.11

Concrete Base 1:2:4 (3/4"). Cu.ft. 29.375 390.77

Rainforcement - Tor kg 33.672 192.95

9" thick brick work Cu.ft. 157.219 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 10.688 390.77

Form work Sq.ft. 28.500 137.23

1/2" Rendering - 2 layers Sq.ft. 444.000 37.09

waterproofing theroseal Sq.ft. 222.000 208.29

6" dia. pipe L.ft. 1.000 912.50

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 10.750 390.77

Form work Sq.ft. 25.600 137.23

Rainforcement - Tor kg 23.984 192.95

Rainforcement - Mild kg 4.501 168.80

Allow for MS Lifting hooks

Total Rate

Construction of 70 person Septic tank (Brick) in hard


U 33 Ref. Drg.No. - WSS/ST/01
soil. as per Drawing No:- WSS/ST/01

Total Length = 12.750 L1


Total Width = 5.000 L2

Engineering Organization W.P. Page 274 BSR Annalysis


Average Depth = 7.250 L3

Excavation Cu.ft. 462.188 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 15.938 312.11

Concrete Base 1:2:4 (3/4"). Cu.ft. 31.875 390.77

Rainforcement - Tor kg 36.117 192.95

9" thick brick work Cu.ft. 174.281 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 11.813 390.77

Form work Sq.ft. 31.500 137.23

1/2" Rendering - 2 layers Sq.ft. 512.000 37.09

waterproofing theroseal Sq.ft. 256.000 208.29

6" dia. pipe L.ft. 1.000 912.50

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 11.750 390.77

Form work Sq.ft. 30.720 137.23

Rainforcement - Tor kg 28.781 192.95

Rainforcement - Mild kg 5.401 168.80

Allow for MS Lifting hooks

Total Rate

Construction of 100 person Septic tank (Brick) in hard


U 34 Ref. Drg.No. - WSS/ST/01
soil. as per Drawing No:- WSS/ST/01

Total Length = 15.750 L1


Total Width = 5.500 L2
Average Depth = 7.250 L3

Excavation Cu.ft. 628.031 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 20.672 312.11

Concrete Base 1:2:4 (3/4"). Cu.ft. 43.313 390.77

Rainforcement - Tor kg 49.426 192.95

Engineering Organization W.P. Page 275 BSR Annalysis


9" thick brick work Cu.ft. 203.604 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 14.063 390.77

Form work Sq.ft. 37.500 137.23

1/2" Rendering - 2 layers Sq.ft. 611.000 37.09

waterproofing theroseal Sq.ft. 305.500 208.29

6" dia. pipe L.ft. 1.000 912.50

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 16.594 390.77

Form work Sq.ft. 35.840 137.23

Rainforcement - Tor kg 33.578 192.95

Rainforcement - Mild kg 6.301 168.80

Allow for MS Lifting hooks

Total Rate

Construction of 150 person Septic tank (Brick) in hard


U 35 Ref. Drg.No. - WSS/ST/02
soil. as per Drawing No:- WSS/ST/02

Total Length = 19.750 L1


Total Width = 6.000 L2
Average Depth = 7.250 L3

Excavation Cu.ft. 859.125 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 29.625 312.11

Concrete Base 1:2:4 (3/4"). Cu.ft. 59.250 390.77

Rainforcement - Tor kg 65.039 192.95

9" thick brick work Cu.ft. 249.844 307.99

Concrete Pad 1:2:4 (3/4"). Cu.ft. 17.438 390.77

Form work Sq.ft. 46.500 137.23

1/2" Rendering - 2 layers Sq.ft. 786.000 37.09

waterproofing theroseal Sq.ft. 393.000 208.29

Engineering Organization W.P. Page 276 BSR Annalysis


6" dia. pipe L.ft. 1.000 912.50

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 23.438 390.77

Form work Sq.ft. 58.140 137.23

Rainforcement - Tor kg 53.611 192.95

Rainforcement - Mild kg 10.262 168.80

Allow for MS Lifting hooks

Total Rate

Construction of 100 person RCC Septic tank in


U 36 Ref. Drg.No. - WSS/ST/03
hard/loose soil. as per Drawing No:-WSS/ST/03

Total Length = 15.510 L1


Total Width = 5.340 L2
Average Depth = 7.250 L3

Excavation Cu.ft. 600.857 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 20.706 312.11

Concrete Base 1:1 1/2:3 (3/4"). Cu.ft. 41.412 407.30

Rainforcement - Tor kg 49.426 192.95

Concrete walls 1:1 1/2:3 (3/4"). Cu.ft. 200.704 407.30

Form work Sq.ft. 535.210 137.23

Rainforcement - Tor kg 724.944 192.95

Concrete Pad 1:2:4 (3/4"). Cu.ft. 14.063 390.77

Form work Sq.ft. 37.500 137.23

1/2" Rendering - 2 layers Sq.ft. 611.000 37.09

waterproofing theroseal Sq.ft. 305.500 208.29

6" dia. pipe L.ft. 1.000 912.50

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 16.594 390.77

Engineering Organization W.P. Page 277 BSR Annalysis


Form work Sq.ft. 35.840 137.23

Rainforcement - Tor kg 33.578 192.95

Rainforcement - Mild kg 6.301 168.80

Allow for MS Lifting hooks

Total Rate

Construction of 150 person RCC Septic tank in


U 37 Ref. Drg.No. - WSS/ST/04
hard/loose soil. as per Drawing No:- WSS/ST/04

Total Length = 19.510 L1


Total Width = 5.840 L2
Average Depth = 7.250 L3

Excavation Cu.ft. 826.053 17.21

3" thick Screed 1:3:6 (1") Cu.ft. 28.485 312.11

Concrete Base 1:1 1/2:3 (3/4"). Cu.ft. 56.969 407.30

Rainforcement - Tor kg 65.039 192.95

Concrete walls 1:1 1/2:3 (3/4"). Cu.ft. 247.016 407.30

Form work Sq.ft. 658.710 137.23

Rainforcement - Tor kg 880.344 192.95

Concrete Pad 1:2:4 (3/4"). Cu.ft. 17.250 390.77

Form work Sq.ft. 46.000 137.23

1/2" Rendering - 2 layers Sq.ft. 786.000 37.09

waterproofing theroseal Sq.ft. 393.000 208.29

6" dia. pipe L.ft. 1.000 912.50

For cover slab

Concrete 1:2:4 (3/4") Cu.ft. 23.438 407.30

Form work Sq.ft. 58.140 137.23

Rainforcement - Tor kg 53.611 192.95

Rainforcement - Mild kg 10.262 168.80

Engineering Organization W.P. Page 278 BSR Annalysis


Allow for MS Lifting hooks

Total Rate

Supplying and fixing 4'-0" dia.x 8'-0" Pre-cast Septic


tank manufactured by "SEC" or approved equivalent
including excavation depth not exeeding 8'-0" and sand
U 38 fill upto 2'-0" hight sorrounding the tank. Rate shall
include hire charges of boomtruck for placing and
subject to specified approved by the Divisional
Engineer.

01 No. - 4'-0" dia.x 8'-0" Pre-cast septic tank 1.000 34605.00


0.8 cube - sand 0.800 11050.00

1/2 Day mason - placing, levelling & fixing 0.500 770.00


1 day labour 1.000 629.00
1 day labour - sand filling 1.000 629.00

Excavation 3.600 1410.77


Allow for Boom truck

Rate per 01 no.


Add 22%
Total rate

Supplying and fixing 3'-0" internal dia.x 4'-0" depth & 3"
thick walls, Pre-cast Soakage pit with perporated holes
manufactured by "SEC" or approved equivalent
including necessary excavation including working space
U 39
and 6" thick rubble packing sorrounding the tank. Rate
shall include hire charges of boomtruck for placing and
subject to specified approved by the Divisional
Engineer.

01 No. - 3'-0" dia.x 6'-0" Pre-cast soakage pit 1.000 11050.00


0.8 cube - rubble 0.362 4500.00

1/2 Day mason - placing, levelling & fixing 0.500 770.00


1/2 day labour 0.500 629.00
1 day labour - rubble packing 1.000 629.00

Excavation 2.360 1410.77


Allow for Boom truck

Rate per 01 no.

Engineering Organization W.P. Page 279 BSR Annalysis


Add 22%
Total rate

sump 5000 galans Ref. Drg.No. - WSS/ST/04

Total Length = 5.525 L


Total Width = 3.550 W
Average Depth = 2.875 D

Excavation m3 56.390 607.56

3" thick Screed 1:3:6 (1") m3 1.471 11017.36

Concrete Base 1:1 1/2:3 (3/4"). m3 5.884 14377.58

Rainforcement - Tor kg 490.110 192.95

Concrete walls 1:1 1/2:3 (3/4"). M3 14.822 14377.58

Form work m2 131.750 1482.13

Rainforcement - Tor kg 1573.231 192.95

1/2" Rendering - 2 layers m2. 142.000 400.60

waterproofing Xypex m2 92.000 324.63

6" dia. pipe L.ft. 0.000 111.25

For cover slab

Concrete slab 1:1 1/2:3 (3/4"). M3 3.216 14377.58

Form work m2 16.078 1482.13

Rainforcement - Tor kg 324.588 192.95

Allow for MS Lifting hooks

Total Rate

Light point wired through a 5Amp one gang one way


V 01 plate switch using 2x1/1.13(2x1/044) P.V.C. insulated
copper wire in fully concealed/surface P.V.C. conduits.

Rate per Point

Engineering Organization W.P. Page 280 BSR Annalysis


Materials
15m, 2 x (1/.044") cable - (in meters) 30.000 19.85
15m, 3/4" conduit 15.000 0.00
01 No - one gang switches 1.000 0.00
other acessories - 5%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Light points wired through a 5 Amp two gang one way


V 02 plate switch using 2x1/1.13 (2x1/044) P.V.C. insulated
copper wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
20m, 2 x (1/.044") cable - (in meters) 40.000 19.85
20m, 3/4" conduit 20.000 0.00
01 No - two gang switches 1.000 0.00
other acessories - 5%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Light points wired through a 5 Amp three gang one way


V 03 plate switch using 2x1/1.13 (2x1/044) P.V.C. insulated
copper wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
25m, 2 x (1/.044") cable - (in meters) 50.000 19.85
25m, 3/4" conduit 25.000 0.00
01 No - three gang switches 1.000 0.00
other acessories - 5%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Engineering Organization W.P. Page 281 BSR Annalysis


Rate Per Point
Add 22%
Total rate

Light points wired through a 5 Amp four gang one way


V 04 plate switch using 2x1/1.13 (2x1/044) P.V.C. insulated
copper wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
30m, 2 x (1/.044") cable - (in meters) 60.000 19.85
30m, 3/4" conduit 30.000 0.00
01 No - four gang switches 1.000 0.00
other acessories - 5%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Light points-wired through a 5Amp 5 gang one way plate


V 05 switch using 2x1/1.13 (2x1/044) P.V.C. insulated copper
wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
35m, 2 x (1/.044") cable - (in meters) 70.000 19.85
35m, 3/4" conduit 35.000 0.00
01 No - five gang switches 1.000 0.00
other acessories - 5%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5 Amp one gang one way


V 06 plate switch using 2x1/1.13(2x1/044) P.V.C. insulated
copper wire in fully surface plastic casing and capping.

Engineering Organization W.P. Page 282 BSR Annalysis


Rate per Point
Materials
15m, 2 x (1/.044") cable - (in meters) 30.000 19.85
15m, 1" plastic casing & capping 15.000 0.00
01 No - one gang switches 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light points wired through a 5 Amp two gang one way


V 07 plate switch using 2x1/1.13(2x1/044) P.V.C. insulated
copper wire in fully surface plastic casing and capping.

Rate per Point


Materials
20m, 2 x (1/.044") cable - (in meters) 40.000 19.85
20m, 1" plastic casing & capping 20.000 0.00
01 No - two gang switches 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light points wired through a 5 Amp three gang one way


V 08 plate switch using 2x1/1.13(2x1/044) P.V.C. insulated
copper wire in fully surface plastic casing and capping.

Rate per Point


Materials
25m, 2 x (1/.044") cable - (in meters) 50.000 19.85
25m, 1" plastic casing & capping 25.000 0.00
01 No - three gang switches 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Engineering Organization W.P. Page 283 BSR Annalysis


Rate Per Point
Add 22%
Total rate

Light points wired through a 5 Amp four gang one way


V 09 plate switch using 2x1/1.13(2x1/044) P.V.C. insulated
copper wire in fully surface plastic casing and capping.

Rate per Point


Materials
30m, 2 x (1/.044") cable - (in meters) 60.000 19.85
30m, 1" plastic casing & capping 30.000 0.00
01 No - four gang switches 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light points-wired through a 5 Amp 5 gang one way


V 10 plate switch using 2x1/1.13 (2x1/044) P.V.C. insulated
copper wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
35m, 2 x (1/.044") cable - (in meters) 70.000 19.85
35m, 1" plastic casing & capping 35.000 0.00
01 No - five gang switches 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5 Amp one gang one way


plate switch using 2x1/1.13 ( 2x1/044)P.V.C. insulated
V 11
copper wire first half in surface plastic casing & capping
and other half in conduit.

Engineering Organization W.P. Page 284 BSR Annalysis


Rate per Point
Materials
15m, 2 x (1/.044") cable - (in meters) 30.000 19.85
7.5m, 1" plastic casing & capping 7.500 0.00
7.5m, 3/4" conduit 7.500 0.00
01 No - one gang switches 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light points wired through a 5 Amp two gang one way


using 2x1/1.13 ( 2x1/044)P.V.C. insulated copper wire
V 12
first half in surface plastic casing & capping and other
half in conduit.

Rate per Point


Materials
20m, 2 x (1/.044") cable - (in meters) 40.000 19.85
10m, 1" plastic casing & capping 10.000 0.00
10m, 3/4" conduit 10.000 0.00
01 No - two gang switches 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light points wired through a 5 Amp three gang one way


using 2x1/1.13 ( 2x1/044)P.V.C. insulated copper wire
V 13
first half in surface plastic casing & capping and other
half in conduit.

Rate per Point


Materials
25m, 2 x (1/.044") cable - (in meters) 50.000 19.85
12.5m, 1" plastic casing & capping 12.500 0.00
12.5m, 3/4" conduit 12.500 0.00
01 No - three gang switches 1.000 0.00
other acessories - 5%

Engineering Organization W.P. Page 285 BSR Annalysis


Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light points wired through a 5 Amp four gang one way


plate switch using 2x1/1.13 ( 2x1/044)P.V.C. insulated
V 14
copper wire first half in surface plastic casing & capping
and other half in conduit.

Rate per Point


Materials
30m, 2 x (1/.044") cable - (in meters) 60.000 19.85
15m, 1" plastic casing & capping 15.000 0.00
15m, 3/4" conduit 15.000 0.00
01 No - four gang switches 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light points wired through a 5 Amp. five gang one way


plate switch using 2x1/1.13 ( 2x1/044)P.V.C. insulated
V 15
copper wire first half in surface plastic casing & capping
and other half in conduit.

Rate per Point


Materials
35m, 2 x (1/.044") cable - (in meters) 70.000 19.85
17.5m, 1" plastic casing & capping 17.500 0.00
17.5m, 3/4" conduit 17.500 0.00
01 No - five gang switches 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Engineering Organization W.P. Page 286 BSR Annalysis


Light point wired through a 5Amp one gang two way
V 16 plate switch using 2x1/1.13 (2x1/044) P.V.C. insulated
copper wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
15m+20m, 2 x (1/.044") cable - (in meters) 35.000 19.85
15m, 3/4" conduit 15.000 0.00
02 No - two way switches 2.000 0.00
other acessories - 5%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp one gang two way


V 17 plate switch using 2x1/1.13(2x1/044) P.V.C. insulated
copper wire in fully surface plastic casing and capping.

Rate per Point


Materials
15m+20m, 2 x (1/.044") cable - (in meters) 35.000 19.85
15m, 1" plastic casing & capping 15.000 0.00
02 No - two way switches 2.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp one gang two way


plate switch using 2x1/1.13 ( 2x1/044)P.V.C. insulated
V 18
copper wire first half in surface plastic casing & capping
and other half in conduit.

Rate per Point


Materials
15m+20m, 2 x (1/.044") cable - (in meters) 35.000 19.85
7.5m, 1" plastic casing & capping 7.500 0.00

Engineering Organization W.P. Page 287 BSR Annalysis


7.5m, 3/4" conduit 7.500 0.00
02 No - two way switches 2.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Electric Bell with Bell press switch using 2x1/1.13mm


V 19 (2x1.044) PVC/insulated copper wire in fully concealed/
surface PVC conduits.

Rate per Point


Materials
15m, 2 x (1/.044") cable - (in meters) 30.000 19.85
15m, 3/4" conduit 15.000 0.00
1 No - Electrical bell 1.000 0.00
1 No - Electrical bell press 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Electric Bell with bell press switch using flexible wire


V 20 (twisted twin wire) only in the table legs and floor
crossings.

Rate per Point


Materials
15m, 2 x (1/.044") cable - (in meters) 30.000 19.85
7.5m, 1" plastic casing & capping 7.500 0.00
1 No - Electrical bell 1.000 0.00
1 No - Electrical bell press 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point

Engineering Organization W.P. Page 288 BSR Annalysis


Add 22%
Total rate

Light point wired through a 5Amp one gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 21
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
15m, 2 x (1/.044") cable - (in meters) 30.000 19.85
15m, 7/0.67 earth cable - (in meters) 15.000 58.95
15m, 3/4" conduit 15.000 0.00
01 No - one gang switches 1.000 0.00
other acessories - 3%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp two gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 22
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
20m, 2 x (1/.044") cable - (in meters) 40.000 19.85
20m, 7/0.67 earth cable - (in meters) 20.000 58.95
20m, 3/4" conduit 20.000 0.00
01 No - two gang switches 1.000 0.00
other acessories - 3%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Engineering Organization W.P. Page 289 BSR Annalysis


Light point wired through a 5Amp three gang one way
plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 23
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
25m, 2 x (1/.044") cable - (in meters) 50.000 19.85
25m, 7/0.67 earth cable - (in meters) 25.000 58.95
25m, 3/4" conduit 25.000 0.00
01 No - three gang switches 1.000 0.00
other acessories - 3%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp four gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 24
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
30m, 2 x (1/.044") cable - (in meters) 60.000 19.85
30m, 7/0.67 earth cable - (in meters) 30.000 58.95
30m, 3/4" conduit 30.000 0.00
01 No - four gang switches 1.000 0.00
other acessories - 3%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp five gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 25
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully concealed/surface P.V.C. conduits.

Engineering Organization W.P. Page 290 BSR Annalysis


Rate per Point
Materials
35m, 2 x (1/.044") cable - (in meters) 70.000 19.85
35m, 7/0.67 earth cable - (in meters) 35.000 58.95
35m, 3/4" conduit 35.000 0.00
01 No - five gang switches 1.000 0.00
other acessories - 3%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp one gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 26
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully surface plastic casing and capping.

Rate per Point


Materials
15m, 2 x (1/.044") cable - (in meters) 30.000 19.85
15m, 7/0.67 earth cable - (in meters) 15.000 58.95
15m, 1" plastic casing & capping 15.000 0.00
01 No - one gang switches 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp two gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 27
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully surface plastic casing and capping.

Rate per Point


Materials
20m, 2 x (1/.044") cable - (in meters) 40.000 19.85
20m, 7/0.67 earth cable - (in meters) 20.000 58.95
20m, 1" plastic casing & capping 20.000 0.00
01 No - two gang switches 1.000 0.00

Engineering Organization W.P. Page 291 BSR Annalysis


other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp three gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 28
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully surface plastic casing and capping.

Rate per Point


Materials
25m, 2 x (1/.044") cable - (in meters) 50.000 19.85
25m, 7/0.67 earth cable - (in meters) 25.000 58.95
25m, 1" plastic casing & capping 25.000 0.00
01 No - three gang switches 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp four gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 29
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully surface plastic casing and capping.

Rate per Point


Materials
30m, 2 x (1/.044") cable - (in meters) 60.000 19.85
30m, 7/0.67 earth cable - (in meters) 30.000 58.95
30m, 1" plastic casing & capping 30.000 0.00
01 No - four gang switches 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Engineering Organization W.P. Page 292 BSR Annalysis


Rate Per Point
Add 22%
Total rate

Light point wired through a 5Amp five gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 30
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully surface plastic casing and capping.

Rate per Point


Materials
35m, 2 x (1/.044") cable - (in meters) 70.000 19.85
35m, 7/0.67 earth cable - (in meters) 35.000 58.95
35m, 1" plastic casing & capping 35.000 0.00
01 No - five gang switches 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp one gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 31 copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire first half in surface plastic casing & capping and
other half in conduit.

Rate per Point


Materials
15m, 2 x (1/.044") cable - (in meters) 30.000 19.85
15m, 7/0.67 earth cable - (in meters) 15.000 58.95
7.5m, 1" plastic casing & capping 7.500 0.00
7.5m, 3/4" conduit 7.500 0.00
01 No - one gang switches 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Engineering Organization W.P. Page 293 BSR Annalysis


Light point wired through a 5Amp two gang one way
plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 32 copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire first half in surface plastic casing & capping and
other half in conduit.

Rate per Point


Materials
20m, 2 x (1/.044") cable - (in meters) 40.000 19.85
20m, 7/0.67 earth cable - (in meters) 20.000 58.95
10m, 1" plastic casing & capping 10.000 0.00
10m, 3/4" conduit 10.000 0.00
01 No - two gang switches 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp three gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 33 copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire first half in surface plastic casing & capping and
other half in conduit.

Rate per Point


Materials
25m, 2 x (1/.044") cable - (in meters) 50.000 19.85
25m, 7/0.67 earth cable - (in meters) 25.000 58.95
12.5m, 1" plastic casing & capping 12.500 0.00
12.5m, 3/4" conduit 12.500 0.00
01 No - three gang switches 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Engineering Organization W.P. Page 294 BSR Annalysis


Light point wired through a 5Amp four gang one way
plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 34 copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire first half in surface plastic casing & capping and
other half in conduit.

Rate per Point


Materials
30m, 2 x (1/.044") cable - (in meters) 60.000 19.85
30m, 7/0.67 earth cable - (in meters) 30.000 58.95
15m, 1" plastic casing & capping 15.000 0.00
15m, 3/4" conduit 15.000 0.00
01 No - four gang switches 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp five gang one way


plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 35 copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire first half in surface plastic casing & capping and
other half in conduit.

Rate per Point


Materials
35m, 2 x (1/.044") cable - (in meters) 70.000 19.85
35m, 7/0.67 earth cable - (in meters) 35.000 58.95
17.5m, 1" plastic casing & capping 17.500 0.00
17.5m, 3/4" conduit 17.500 0.00
01 No - four gang switches 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Engineering Organization W.P. Page 295 BSR Annalysis


Light point wired through a 5Amp one gang two way
plate switch using 2x1/1.13mm(2x1/044) P.V.C. insulated
V 36
copper wire & & 1x7/0.67 P.V.C. insulated copper earth
wire in fully concealed/surface P.V.C. conduits.

Rate per Point


Materials
15m+20m, 2 x (1/.044") cable - (in meters) 35.000 19.85
15m, 7/0.67 earth cable - (in meters) 15.000 58.95
15m, 3/4" conduit 15.000 0.00
02 No - two way switches 2.000 0.00
other acessories - 5%

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ labour 1.000 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp one gang two way


V 37 plate switch using 2x1/1.13(2x1/044) P.V.C. insulated
copper wire in fully surface plastic casing and capping.

Rate per Point


Materials
15m+20m, 2 x (1/.044") cable - (in meters) 35.000 19.85
15m, 7/0.67 earth cable - (in meters) 15.000 58.95
15m, 1" plastic casing & capping 15.000 0.00
02 No - two way switches 2.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Light point wired through a 5Amp one gang two way


plate switch using 2x1/1.13 ( 2x1/044)P.V.C. insulated
V 38
copper wire first half in surface plastic casing & capping
and other half in conduit.

Rate per Point


Materials

Engineering Organization W.P. Page 296 BSR Annalysis


15m+20m, 2 x (1/.044") cable - (in meters) 35.000 19.85
15m, 7/0.67 earth cable - (in meters) 15.000 58.95
7.5m, 1" plastic casing & capping 7.500 0.00
7.5m, 3/4" conduit 7.500 0.00
02 No - two way switches 2.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Electric Bell with Bell press switch using 2x1/1.13mm


V 39 (2x1.044) PVC/insulated copper wire in fully concealed/
surface PVC conduits.

Rate per Point


Materials
15m, 2 x (1/.044") cable - (in meters) 30.000 19.85
15m, 7/0.67 earth cable - (in meters) 15.000 58.95
15m, 3/4" conduit 15.000 0.00
1 No - Electrical bell 1.000 0.00
1 No - Electrical bell press 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

5 Amp Switch socket outlet wired using 2x1/1.13mm


(2x1/044) P.V.C. insulated copper wire & 1x7/0.67(7/029)
V 40
copper earth wire in fully concealed/surface P.V.C.
conduits.

Rate per Point


Materials
15m 2 x (1/.044") cable - (in meters) 30.000 19.85
15m, 7/0.67 earth cable - (in meters) 15.000 58.95
15m, 3/4" conduit 15.000 0.00
01 No - switch socket 5 A 1.000 0.00
other acessories - 5%

Labour

Engineering Organization W.P. Page 297 BSR Annalysis


1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

5 Amp Switch socket outlet wired using 2x1/1.13mm


(2x1/044) P.V.C. insulated copper wire &
V 41
1x7/0.67(7/029)copper earth wire in fully surface plastic
casing and capping.

Rate per Point


Materials
15m 2 x (1/.044") cable - (in meters) 30.000 19.85
15m, 7/0.67 earth cable - (in meters) 15.000 58.95
15m, 1" plastic casing & capping 15.000 0.00
01 No - switch socket 5 A 1.000 0.00
other acessories - 5%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

15 Amp switch socket outlet wired using


2x7/0.67(2x7/029) insulated copper wire &
V 42
1x7/0.67(7/029) copper earth wire in fully
concealed/surface P.V.C. conduits.

Rate per Point


Materials
24m 2 x (7/.029") cable - (in meters) 24.000 67.40
12m, 7/0.67 earth cable - (in meters) 12.000 58.95
12m, 3/4" conduit 12.000 0.00
01 No - switch socket 5 A 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Engineering Organization W.P. Page 298 BSR Annalysis


15 Amp switch socket outlet wired using
2x7/0.67(2x7/029) insulated copper wire &
V 43
1x7/0.67(7/029) copper earth wire in surface plastic
casing and capping.

Rate per Point


Materials
24m 2 x (7/.029") cable - (in meters) 24.000 67.40
12m, 7/0.67 earth cable - (in meters) 12.000 58.95
12m, 1" plastic casing & capping 12.000 0.00
01 No - switch socket 5 A 1.000 0.00
other acessories - 3%

Labour
1 1/2 hrs Skilled labour 1.500 96.25
1 1/2 hrs U/ labour 1.500 78.63

Rate Per Point


Add 22%
Total rate

Supply & Fixing heavy duty 3/4" dia. x 3.2mm thick GI


pipes to extend the ceiling fan rod with applying 2 coats
V 60 of anti-corrosive paint and one coat of "EPILACK EPOXY
COALTAR" or approved equivalent as per
manufacturer's specifications.

Rate per 10 L.ft


Materials
10 L.ft 3/4" GI Pipe 10.000 85.00
4 No - 6mm dia. Nut & Bolt 4.000 20.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Anticorrosive Paint - 2Coats 3.100 14.36

Engineering Organization W.P. Page 299 BSR Annalysis


Epilac Paint 3.100 21.00

Rate per 10L.ft


Rate per L.ft
Add 22%
Total rate

Supply & Fixing heavy duty 3/4" dia. x 3.2mm thick GI


pipes to extend the ceiling fan rod with applying 2 coats
V 61 of anti-corrosive paint and one coat of "EPILACK EPOXY
COALTAR" or approved equivalent as per
manufacturer's specifications.

Rate per 10 L.ft


Materials
10 L.ft 3/4" GI Pipe 10.000 130.00
4 No - 6mm dia. Nut & Bolt 4.000 20.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Anticorrosive Paint - 2Coats 3.700 14.36


Epilac Paint 3.700 21.00

Rate per 10L.ft


Rate per L.ft
Add 22%
Total rate

Supplying and wiring 2 x 2.5mm2 (7/.029") PVC/PVC/Cu


V 62 cable + 2.5mm2 (7/.029) earth wire to working order
excluding conduit.

Per 50 L.Ft (15.0m)


Materials
30.0 m (7/.029") cable - (in meters) 30.000 67.40
15.0 m Earth Wire - (in meters) 15.000 58.95

Labour
3 hrs Skilled labour 3.000 96.25
3 hrs U/ Labour 3.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Engineering Organization W.P. Page 300 BSR Annalysis


Supplying and wiring 2 x 6mm2 (7/.044") PVC/PVC/ Cu
V 63 cable + 6mm2 (7/.044") earth wire complete to working
order excluding conduit/casing

Per 50 L.Ft (15.0m)


Materials
30.0 m (7/.044") cable - (in meters) 30.000 152.70
15.0 m Earth Wire - (in meters) 15.000 144.20

Labour
4 1/2 hrs Skilled labour 4.500 96.25
4 1/2 hrs U/ Labour 4.500 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 2 x 6mm2 (7/.044") PVC/PVC/ Cu


V 64 cable complete to working order excluding
conduit/casing

Per 50 L.Ft (15.0m)


Materials
30.0m (7/.044") cable - (in meters) 30.000 152.70
Rate per meter

Labour
4 1/2 hrs Skilled labour 4.500 96.25
4 1/2 hrs U/ Labour 4.500 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 4 x 6mm2 (7/.044") PVC/PVC/ Cu


V 65 cable + 6mm2 (7/.044") earth wire complete to working
order excluding conduit/casing

Per 50 L.Ft (15.0m)


Materials
60.0 m (7/.044") cable - (in meters) 60.000 152.70
15.0 m Earth Wire - (in meters) 15.000 144.20

Engineering Organization W.P. Page 301 BSR Annalysis


Labour
6 hrs Skilled labour 6.000 96.25
6 hrs U/ Labour 6.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 2 x 10mm2 (7/.052") PVC/PVC/ Cu


V 66 cable + 10mm2 (7/.052") earth wire complete to working
order excluding conduit/casing

Per 50 L.Ft (15.0m)


Materials
30.0m (7/.052") cable - (in meters) 30.000 251.80
15.0 m Earth Wire - (in meters) 15.000 237.50

Labour
6 hrs Skilled labour 6.000 96.25
6 hrs U/ Labour 6.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 4 x 10mm2 (7/.052") PVC/PVC/ Cu


V 67 cable + 10mm2 (7/.052") earth wire complete to working
order excluding conduit/casing

Per 50 L.Ft (15.0m)


Materials
60.0m (7/.052") cable - (in meters) 60.000 251.80
15.0 m Earth Wire - (in meters) 15.000 237.50

Labour
7 hrs Skilled labour 7.000 96.25
7 hrs U/ Labour 7.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Engineering Organization W.P. Page 302 BSR Annalysis


Supplying and wiring 2 x 16mm2 (7/.064") PVC/PVC/ Cu
V 68 cable + 16mm2 (7/.064") earth wire complete to working
order excluding conduit/casing

Per 50 L.Ft (15.0m)


Materials
30.0m (7/.064") cable - (in meters) 30.000 383.95
15.0 m Earth Wire - (in meters) 15.000 368.75

Labour
7 hrs Skilled labour 7.000 96.25
7 hrs U/ Labour 7.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 4 x 16mm2 (7/0.064") PVC/PVC/ Cu


V 69 cable + 16mm2 (7/.064") earth wire complete to working
order excluding conduit/casing

Per 50 L.Ft (15.0m)


Materials
60.0m (7/.064") cable - (in meters) 60.000 383.95
15.0 m Earth Wire - (in meters) 15.000 368.75

Labour
9 hrs Skilled labour 9.000 96.25
9 hrs U/ Labour 9.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 2 x 25mm2 PVC/PVC/Cu cable + 16


V 70 mm2 earth wire complete to working order excluding
conduit/casing.

Per 50 L.Ft (15.0m)


Materials
30.0m (7/.083") cable - (in meters) 30.000 616.10
15.0 m Earth Wire - (in meters) 15.000 368.75

Engineering Organization W.P. Page 303 BSR Annalysis


Labour
9 hrs Skilled labour 9.000 96.25
9 hrs U/ Labour 9.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 4 x 25mm2 PVC/PVC/Cu cable + 16


V 71 mm2 earth wire complete to working order excluding
conduit/casing.

Per 50 L.Ft (15.0m)


Materials
60.0m (7/.083") cable - (in meters) 60.000 616.10
15.0 m Earth Wire - (in meters) 15.000 368.75

Labour
11 1/2 hrs Skilled labour 11.500 96.25
11 1/2 hrs U/ Labour 11.500 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 4 x 35mm2 PVC/PVC/Cu cable + 16


V 72 mm2 earth wire complete to working order excluding
conduit/casing.

Per 50 L.Ft (15.0m)


Materials
60.0m (19/.064") cable - (in meters) 60.000 857.15
15.0 m Earth Wire - (in meters) 15.000 368.75

Labour
14 hrs Skilled labour 14.000 96.25
14 hrs U/ Labour 14.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Engineering Organization W.P. Page 304 BSR Annalysis


Supplying and wiring 4 x 95mm2 PVC/PVC/Cu cable + 50
V 73 mm2 earth wire complete to working order excluding
conduit/casing.

Per 50 L.Ft (15.0m)


Materials
60.0m (19/.103") cable - (in meters) 60.000 2366.10
15.0 m Earth Wire - (in meters) 15.000 1083.95

Labour
17 hrs Skilled labour 17.000 96.25
17 hrs U/ Labour 17.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

V 74 Supplying and fixing 2 core flexible (0.5mm2) .

Per 50 L.Ft (15.0m)


Materials
15.0m (0.5mm2 ) flexible cable- (in meters) 15.000 48.70

Labour
1 hrs Skilled labour 1.000 96.25
1 hrs U/ Labour 1.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 2.5mm2 (7/.029") earth wire


V 75
complete to working order excluding conduit/casing.
Per 50 L.Ft (15.0m)
Materials
15.0m Earth Wire - (in meters) - 2.5mm2 15.000 58.95

Labour
1 1/4 hrs Skilled labour 1.250 96.25
1 1/4 hrs U/ Labour 1.250 78.63
Tools 3%

Engineering Organization W.P. Page 305 BSR Annalysis


Rate per 50.0 L.Ft
Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 6 mm2 (7/.044") earth wire


V 76
complete to working order excluding conduit/casing.
Per 50 L.Ft (15.0m)
Materials
15.0m Earth Wire - (in meters) - 6mm2 15.000 144.20

Labour
1 1/4 hrs Skilled labour 1.250 96.25
1 1/4 hrs U/ Labour 1.250 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 10 mm2 (7/.052") earth wire


V 77
complete to working order excluding conduit/casing.
Per 50 L.Ft (15.0m)
Materials
15.0m Earth Wire - (in meters) - 10mm2 15.000 237.50

Labour
1 1/4 hrs Skilled labour 1.250 96.25
1 1/4 hrs U/ Labour 1.250 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 16 mm2 (7/.064") earth wire


V 78
complete to working order excluding conduit/casing.

Per 50 L.Ft (15.0m)


Materials
15.0m Earth Wire - (in meters) - 16mm2 15.000 368.75

Engineering Organization W.P. Page 306 BSR Annalysis


Labour
1 1/4 hrs Skilled labour 1.250 96.25
1 1/4 hrs U/ Labour 1.250 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 1mm2 (1/.044") PVC/PVC/ Cu two


V 79 wire complete to working order excluding
conduit/casing.

Per 50 L.Ft (15.0m)


Materials
30.0m (1/.044") cable - (in meters) 30.000 19.85

Labour
1 3/4 hrs Skilled labour 1.750 96.25
1 3/4 hrs U/ Labour 1.750 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring 2.5mm2 (7/.029") PVC/PVC Cu two


V 80 wire complete to working order excluding
conduit/casing.

Per 50 L.Ft (15.0m)


Materials
30.0m (7/.029") cable - (in meters) 30.000 67.40

Labour
2 1/4 hrs Skilled labour 2.250 96.25
2 1/4 hrs U/ Labour 2.250 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Engineering Organization W.P. Page 307 BSR Annalysis


Supplying and wiring with 4mm2 (7/.036") PVC/PVC/Cu
V 81 two wire complete to working order excluding
conduit/casing.

Per 50 L.Ft (15.0m)


Materials
30.0m (7/.036") cable - (in meters) 30.000 105.35

Labour
2 3/4 hrs Skilled labour 2.750 96.25
2 3/4 hrs U/ Labour 2.750 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring with 2 x 4mm2 (7/.036")


V 82 PVC/PVC/Cu cable+4mm2(7/.036) earth wire complete to
working order excluding conduit/casing.

Per 50 L.Ft (15.0m)


Materials
30.0m (7/.036") cable - (in meters) 30.000 105.35
15.0m Earth Wire - (in meters) 15.000 99.55

Labour
3 1/2 hrs Skilled labour 3.500 96.25
3 1/2 hrs U/ Labour 3.500 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring with 4 x 4mm2 (7/.036")


V 83 PVC/PVC/Cu cable+4mm2(7/.036) earth wire complete to
working order excluding conduit/casing.

Per 50 L.Ft (15.0m)


Materials
60.0m (7/.036") cable - (in meters) 60.000 105.35
15.0m Earth Wire - (in meters) 15.000 99.55

Labour
4 1/2 hrs Skilled labour 4.500 96.25

Engineering Organization W.P. Page 308 BSR Annalysis


4 1/2 hrs U/ Labour 4.500 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

Supplying and wiring with 4 x 2.5mm2(7/.029") PVC/


V 84 PVC/Cu cable+2.5mm2(7/.036) earth wire complete to
working order excluding conduit/casing.

Per 50 L.Ft (15.0m)


Materials
60.0m (7/.029") cable - (in meters) 60.000 67.40
15.0m Earth Wire - (in meters) 15.000 58.95
Rate per meter

Labour
4 hrs Skilled labour 4.000 96.25
4 hrs U/ Labour 4.000 78.63
Tools 3%

Rate per 50.0 L.Ft


Rate per L.Ft
Add 22%
Total rate

V 111 40Amp, 30 mA Double Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 3035.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 112 40Amp, 100 mA Double Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 4325.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

Engineering Organization W.P. Page 309 BSR Annalysis


V 113 40Amp, 300 mA Double Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 3200.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 114 63Amp, 30 mA Double Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 4485.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 115 63Amp, 100 mA Double Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 4840.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 116 63Amp, 300 mA Double Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 4840.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 117 40Amp, 30 mA Four Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 4795.00

Engineering Organization W.P. Page 310 BSR Annalysis


1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 118 40Amp, 100 mA Four Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 4795.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 119 40Amp, 300 mA Four Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 4795.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 120 63Amp, 30 mA Four Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 6645.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 121 63Amp, 100 mA Four Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 6645.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

Engineering Organization W.P. Page 311 BSR Annalysis


V 122 63Amp, 300 mA Four Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 6670.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 123 63Amp, 300 mA Four Pole ELCB (RCCB)

Per No
1 no RCCB 1.000 11985.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 124 30 Amp Double Pole Main Switch

Per No
1 no Main Switch 1.000 0.00
1/2 Hrs. Electrician 0.500 96.25
1/2 Hrs. U/Sk Labour 0.500 78.63

Rate per No
Add 22%
Total rate

V 125 30 Amp Four Pole Main Switch

Per No
1 no Main Switch 1.000 0.00
1/2 Hrs. Electrician 0.500 96.25
1/2 Hrs. U/Sk Labour 0.500 78.63

Rate per No
Add 22%
Total rate

V 126 60 Amp Four Pole Main Switch

Per No

Engineering Organization W.P. Page 312 BSR Annalysis


1 no Main Switch 1.000 0.00
1/2 Hrs. Electrician 0.500 96.25
1/2 Hrs. U/Sk Labour 0.500 78.63

Rate per No
Add 22%
Total rate

30,40,60,100 Amp , 25KA Three Pole MCCB with metal


V 127
enclosure.
Per No
1 no MCCB 1.000 7950.00
1 no Metal Enclosure 1.000 0.00
1/2 Hrs. Electrician 0.500 96.25
1/2 Hrs. U/Sk Labour 0.500 78.63

Rate per No
Add 22%
Total rate

30,40,60,100 Amp , 25KA Three Pole MCCB without


V 128
metal enclosure.
Per No
1 no MCCB 1.000 7950.00
1/2 Hrs. Electrician 0.500 96.25
1/2 Hrs. U/Sk Labour 0.500 78.63

Rate per No
Add 22%
Total rate

30,40,60,100 Amp , 25KA Four Pole MCCB with metal


V 129
enclosure.
Per No
1 no MCCB 1.000 10360.00
1 no Metal Enclosure 1.000 0.00
1/2 Hrs. Electrician 0.500 96.25
1/2 Hrs. U/Sk Labour 0.500 78.63

Rate per No
Add 22%
Total rate

30,40,60,100 Amp , 25KA Four Pole MCCB without metal


V 130
enclosure.
Per No
1 no MCCB 1.000 10360.00
1/2 Hrs. Electrician 0.500 96.25
1/2 Hrs. U/Sk Labour 0.500 78.63

Engineering Organization W.P. Page 313 BSR Annalysis


Rate per No
Add 22%
Total rate

V 131 160 Amp , 25KA Four Pole MCCB with metal enclosure.

Per No
1 no MCCB 1.000 16075.00
1 no Metal Enclosure 1.000 0.00
3/4 Hrs. Electrician 0.750 96.25
3/4 Hrs. U/Sk Labour 0.750 78.63

Rate per No
Add 22%
Total rate

160 Amp , 25KA Four Pole MCCB without metal


V 132
enclosure.
Per No
1 no MCCB 1.000 16075.00
3/4 Hrs. Electrician 0.750 96.25
3/4 Hrs. U/Sk Labour 0.750 78.63

Rate per No
Add 22%
Total rate

V 133 6 - 32 Amp Single Pole MCB

Per No
1 no MCB 1.000 400.00
1/5 Hrs. Electrician 0.200 96.25
1/5 Hrs. U/Sk Labour 0.200 78.63

Rate per No
Add 22%
Total rate

V 134 40 Amp Single Pole MCB

Per No
1 no MCB 1.000 400.00
1/5 Hrs. Electrician 0.200 96.25
1/5 Hrs. U/Sk Labour 0.200 78.63

Rate per No
Add 22%
Total rate

Engineering Organization W.P. Page 314 BSR Annalysis


V 135 63 Amp Single Pole MCB

Per No
1 no MCB 1.000 915.00
1/5 Hrs. Electrician 0.200 96.25
1/5 Hrs. U/Sk Labour 0.200 78.63

Rate per No
Add 22%
Total rate

V 136 6 - 32 Amp Double Pole MCB

Per No
1 no MCB 1.000 1090.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 137 40 Amp Double Pole MCB

Per No
1 no MCB 1.000 1090.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 138 63 Amp Double Pole MCB

Per No
1 no MCB 1.000 2365.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 139 6 - 32 Amp Three Pole MCB

Per No
1 no MCB 1.000 1695.00
1/4 Hrs. Electrician 0.250 96.25

Engineering Organization W.P. Page 315 BSR Annalysis


1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 140 40 Amp Three Pole MCB

Per No
1 no MCB 1.000 1695.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 141 63 Amp Three Pole MCB

Per No
1 no MCB 1.000 2365.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 142 6 - 32 Amp Four Pole MCB

Per No
1 no MCB 1.000 3155.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 143 40 Amp Four Pole MCB

Per No
1 no MCB 1.000 3155.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

Engineering Organization W.P. Page 316 BSR Annalysis


V 144 63 Amp Four Pole MCB

Per No
1 no MCB 1.000 5560.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 145 40 Amp Double Pole Isolator with plastic enclosure.

Per No
1 no Isolater 1.000 985.00
1 no Plastic Enclosure 1.000 225.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 146 63 Amp Double Pole Isolator with plastic enclosure.

Per No
1 no Isolater 1.000 1100.00
1 no Plastic Enclosure 1.000 225.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 147 100 Amp Double Pole Isolator with plastic enclosure.

Per No
1 no Isolater 1.000 2115.00
1 no Plastic Enclosure 1.000 225.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

Engineering Organization W.P. Page 317 BSR Annalysis


V 148 40 Amp Three Pole Isolator with plastic enclosure.

Per No
1 no Isolater 1.000 1555.00
1 no Plastic Enclosure 1.000 225.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 149 63 Amp Three Pole Isolator with plastic enclosure.

Per No
1 no Isolater 1.000 1705.00
1 no Plastic Enclosure 1.000 225.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 150 100 Amp Three Pole Isolator with plastic enclosure.

Per No
1 no Isolater 1.000 3235.00
1 no Plastic Enclosure 1.000 225.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 151 40 Amp Four Pole Isolator with plastic enclosure.

Per No
1 no Isolater 1.000 2100.00
1 no Plastic Enclosure 1.000 225.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

Engineering Organization W.P. Page 318 BSR Annalysis


V 152 63 Amp Four Pole Isolator with plastic enclosure.

Per No
1 no Isolater 1.000 2285.00
1 no Plastic Enclosure 1.000 225.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

V 153 100 Amp Four Pole Isolator with plastic enclosure.

Per No
1 no Isolater 1.000 4430.00
1 no Plastic Enclosure 1.000 225.00
1/4 Hrs. Electrician 0.250 96.25
1/4 Hrs. U/Sk Labour 0.250 78.63

Rate per No
Add 22%
Total rate

Inner diameter of 5" recess mounted down light with


V 154 polished aluminum reflector of "Simy" Brand & Model
No:SIYDL125R or approved equivalent.

Rate per No
Materials
01 No. Light fitting 1.000 600.00

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate Per No.


Add 22%
Total rate

Inner diameter of 5" surface mounted down light with


V 155 polished aluminum reflector of "Simy" Brand & Model
No:SIYDL125S or approved equivalent.

Rate per No
Materials
01 No. Light fitting 1.000 1000.00

Labour
1/2 hrs Skilled labour 0.500 96.25

Engineering Organization W.P. Page 319 BSR Annalysis


1/2 hrs U/ labour 0.500 78.63

Rate Per No.


Add 22%
Total rate

Inner diameter of 4" wall mounted cylindrical shaped


V 156 upward light fitting of "Simy" Brand & Model
No:SIYWB937 or approved equivalent.

Rate per No
Materials
01 No. Light fitting 1.000 1200.00

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate Per No.


Add 22%
Total rate

Weatherproof IP65 rated wall mounted cylindrical


V 157 shaped up down ward light fitting of "Simy" Brand &
Model No:SIYWB3027 or approved equivalent.

Rate per No
Materials
01 No. Light fitting 1.000 3600.00

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate Per No.


Add 22%
Total rate

Weatherproof IP65 rated wall mounted 2'-0" single


V 158 fluorescent light fitting with 18W bulb of "Simy" Brand &
Model No:SIYWP120 or approved equivalent.

Rate per No
Materials
01 No. Light fitting 1.000 3500.00

Labour

Engineering Organization W.P. Page 320 BSR Annalysis


1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate Per No.


Add 22%
Total rate

8" clear transparent glass globe pendent type light


V 159 fitting of "Simy" Brand & Model No:SIYWB937 or
approved equivalent.

Rate per No
Materials
01 No. Light fitting 1.000 1200.00

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate Per No.


Add 22%
Total rate

Spot light with bulbs of "Simy" Brand & Model


V 160
No:SIYSP120PAR or approved equivalent.

Rate per No
Materials
01 No. Light fitting 1.000 1450.00

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate Per No.


Add 22%
Total rate

20W CFL lamp with one year warranty - Osram , Philips


V 162
or Approved Equivelant.

Rate per No
Materials
01 No. Bulb 1.000 475.00
1/10 hrs Skilled labour 0.100 96.25

Rate Per No.

Engineering Organization W.P. Page 321 BSR Annalysis


Add 22%
Total rate

Mercury Vapour Lamp bracket complete 125 watts with


V 163
clamps (equivalent to Siemens SNA 395)

Rate per No
Materials
01 No. Light fitting 1.000 0.00

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate Per No.


Add 22%
Total rate

Mercury Vapour Lamp bracket complete 250 watts with


V 164
clamps (equivalent to Siemens SNA 395)

Rate per No
Materials
01 No. Light fitting 1.000 0.00

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate Per No.


Add 22%
Total rate

4'-0" long single fluorescent lamp fitting , suspension -


opal white/diamond cut diffuser with 1 no of 36W
V 165
fluorescent bulb of "Simy" Brand & Model
No:SIYBD140BD or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 850.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.

Engineering Organization W.P. Page 322 BSR Annalysis


Add 22%
Total rate

4'-0" long Twin fluorescent lamp fitting , suspension -


opal white/diamond cut diffuser with 2 nos of 36W
V 166
fluorescent bulbs of "Simy" Brand & Model
No:SIYBD240BD or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 1700.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" long single fluorescent lamp fitting , suspension -


opal white/diamond cut diffuser with 1 no of 18W
V 167
fluorescent bulb of "Simy" Brand & Model
No:SIYBD120BD or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 740.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" long Twin fluorescent lamp fitting , suspension -


opal white/diamond cut diffuser with 2 nos of 18W
V 168
fluorescent bulbs of "Simy" Brand & Model
No:SIYBD220BD or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 1200.00
other acessories - 5%

Engineering Organization W.P. Page 323 BSR Annalysis


Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

4'-0" long single fluorescent lamp fitting , suspension -


polished aluminium reflector with 1 no of 36W
V 169
fluorescent bulb of "Simy" Brand & Model
No:SIYBR140M or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 805.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

4'-0" long Twin fluorescent lamp fitting , suspension -


polished aluminium reflector with 2 nos of 36W
V 170
fluorescent bulbs of "Simy" Brand & Model
No:SIYBR240M or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 1300.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

Engineering Organization W.P. Page 324 BSR Annalysis


2'-0" long single fluorescent lamp fitting , suspension -
polished aluminium reflector with 1 no of 18W
V 171
fluorescent bulb of "Simy" Brand & Model
No:SIYBR120M or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 670.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" long Twin fluorescent lamp fitting , suspension -


polished aluminium reflector with 2 nos of 18W
V 172
fluorescent bulbs of "Simy" Brand & Model
No:SIYBR220M or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 1150.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

4'-0" long single fluorescent lamp fitting , suspension -


round prismatic diffuser with 1 no of 36W fluorescent
V 173
bulb of "Simy" Brand & Model No:SIYBLD140 or
approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 0.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Engineering Organization W.P. Page 325 BSR Annalysis


Rate per No.
Add 22%
Total rate

4'-0" long Twin fluorescent lamp fitting , batton type with


V 174 2 nos of 36W fluorescent bulbs of "Simy" Brand & Model
No:SIYBF240 or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 0.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" long single fluorescent lamp fitting , suspension -


round prismatic diffuser with 1 no of 18W fluorescent
V 175
bulb of "Simy" Brand & Model No:SIYBLD120 or
approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 0.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" long Twin fluorescent lamp fitting , suspension -


round prismatic diffuser with 2 nos of 18W fluorescent
V 176
bulbs of "Simy" Brand & Model No:SIYBLD220 or
approved equivalent.

Rate per No
Materials

Engineering Organization W.P. Page 326 BSR Annalysis


01 No. Fluoresent lamp 1.000 0.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

4'-0" long single fluorescent lamp fitting , batton type


V 177 with 1 no of 36W fluorescent bulb of "Simy" Brand &
Model No:SIYBF140 or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 750.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

4'-0" long Twin fluorescent lamp fitting , batton type with


V 178 2 nos of 36W fluorescent bulbs of "Simy" Brand & Model
No:SIYBF240 or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 950.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

Engineering Organization W.P. Page 327 BSR Annalysis


2'-0" long single fluorescent lamp fitting , batton type
V 179 with 1 no of 18W fluorescent bulb of "Simy" Brand &
Model No:SIYBF120 or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 550.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" long Twin fluorescent lamp fitting , batton type with


V 180 2 nos of 18W fluorescent bulbs of "Simy" Brand & Model
No:SIYBF220 or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp 1.000 850.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" x 2'-0" Recessed mounted fluorescent lamp fittings


with full parabolic polished aluminium mirror louver and
V 181
2 nos of 18W fluorescent bulbs of "Simy" Brand & Model
No:SIYPL220R/S or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp - louverd 1.000 0.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Engineering Organization W.P. Page 328 BSR Annalysis


Rate per No.
Add 22%
Total rate

2'-0" x 2'-0" Recessed mounted fluorescent lamp fittings


with full parabolic polished aluminium mirror louver and
V 182
3 nos of 18W fluorescent bulbs of "Simy" Brand & Model
No:SIYPL320R/S or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp - louverd 1.000 0.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" x 2'-0" Recessed mounted fluorescent lamp fittings


with full parabolic polished aluminium mirror louver and
V 183
4 nos of 18W fluorescent bulbs of "Simy" Brand & Model
No:SIYPL420R/S or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp - louverd 1.000 0.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" x 4'-0" Recessed mounted fluorescent lamp fittings


with full parabolic polished aluminium mirror louvered
V 184
diffuser and 2 nos of 36W fluorescent bulbs of "Simy"
Brand & Model No:SIYPL240R/S or approved equivalent.

Engineering Organization W.P. Page 329 BSR Annalysis


Rate per No
Materials
01 No. Fluoresent lamp - louverd 1.000 0.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" x 4'-0" Recessed mounted fluorescent lamp fittings


with full parabolic polished aluminium mirror louvered
V 185
diffuser and 3 nos of 36W fluorescent bulbs of "Simy"
Brand & Model No:SIYPL340R/S or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp - louverd 1.000 0.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.


Add 22%
Total rate

2'-0" x 4'-0" Recessed mounted fluorescent lamp fittings


with full parabolic polished aluminium mirror louvered
V 186
diffuser and 4 nos of 36W fluorescent bulbs of "Simy"
Brand & Model No:SIYPL440R/S or approved equivalent.

Rate per No
Materials
01 No. Fluoresent lamp - louverd 1.000 0.00
other acessories - 5%

Labour
1/2 hrs Skilled labour 0.500 96.25
1/2 hrs U/ labour 0.500 78.63

Rate per No.

Engineering Organization W.P. Page 330 BSR Annalysis


Add 22%
Total rate

Provide an earth electrode copper plate 2'-0" x 2'-0"x


3mm thick at 3.0m depth including excavation and
backfilling. Rate shall include connection to the main
V 187
panel, sub main, earth clips & etc. with 1'-0" x 1'-0" x 1'-
0" earth pit consist of 4 1/2" brick work , 3" thick G20
concrete cover slab.( Earth wire paid separetly )

Excavation dig plate Cu.ft. 90.000 14.11


Excavation pit Cu.ft. 3.063 14.11
Brick work 4 1/2" Sq.ft. 9.938 103.22
Plastering Sq.ft. 5.000 35.13
2 x 2 Copper plate No 1.000 19650.00

Cover Slab
Concrete Cu.ft. 0.442 320.31
Form work Sq.ft. 1.330 42.00
Reinforcement Kg 0.677 138.36

Labour U/Sk for fixing Plate Hrs. 1.000 78.63

Rate per no
Add 22%
Total rate

Provide an earth electrode 6'-0" long , 2" dia. x 3.6mm


thick medium duty GI pipe. Rate shall include
connection to the main panel, sub main, earth clips&
V 188
etc. with 1'-0" x 1'-0" x 1'-0" earth pit consist of 4 1/2"
brick work , 3" thick G20 concrete cover slab.( Earth
wire paid separetly )

Excavation Cu.ft. 3.063 14.11


Brick work 4 1/2" Sq.ft. 9.938 103.22
Plastering Sq.ft. 5.000 35.13
GI Pipe L.ft. 6.000 220.00

Cover Slab
Concrete Cu.ft. 0.442 320.31
Form work Sq.ft. 1.330 42.00
Reinforcement Kg 0.677 138.36

Labour U/Sk for fixing Gi pipe Hrs. 1.000 78.63

Rate per No
Add 22%
Total rate

Engineering Organization W.P. Page 331 BSR Annalysis


Supplying & fixing heavy duty floor hinge of Union
W 63
Brand & Model no. - 8300 or approved equivalent.
Material
1 Nos Floor Hinge 1.000 21460.000

Labour
1/2 hrs Carpenter 1.000 96.250

Rate per No.


Add 22%
Total Rate

Supplying & fixing heavy duty door closer of Union


W 64 Brand & Model no. - 8823 SIL or approved
equivalent.***This is necessary where floor hinge used.

Material
1 Nos Door closer 1.000 7065.000

Labour
1/2 hrs Carpenter 1.000 96.250

Rate per No.


Add 22%
Total Rate

Supply , fabrication and installation of welded Diamond


shaped Iron grill, consisting 20mm x 6mm flat iron frame
and 5mm dia M.S. rods at 3" centers to form 3" x 6"
W 67 diamond shape grill. Rate shall include for fixing with
No.10, 1" counter sunk iron screws and application of
two coats of anti- Corrosive paint. (Based on 2'-0"x4'-0"
area)

flat iron = 2*2+4*2=12L.ft.


Ms5mm = 2((2(7+14+20+27+34+40+48)+54)) = 72.35 L.ft 868

Per 8 s.ft.
Materials
12 L.ft. - 20mm x 6mm Flat Iron 12.000 52.00
75 L.ft. - 5mm dia. M.S.rod 75.000 7.00
Wastage - 10%
12 nos - 1 1/2" Rawl plugs 12.000 3.50
12 nos - 1" sunk iron screws 12.000 5.00

Engineering Organization W.P. Page 332 BSR Annalysis


Allow for welding rods,

Labour
1/2 Day Smith 0.500 770.00
1/2 Day Labour 0.500 629.00
Allow for Tools & Cutting plants & Grills

Plant
1/4 Day hire of welding plant 0.250 1000.00

Allow for Painting two coats of Anti-corrosive

Per 8 sq.ft
Per 1 sq.ft
Add 22%
Total

Welded Diamond shaped iron grill, consisting 20mm x


6mm flat iron frame without joints, 20mm x 6mm
mullions without joints, 20mm x 6mm isolated mid rails,
6mm dia. M.S. rods welded to form 3" x 6" diamond
W 68
shaped isolated paneles. Rate shall include for fixing
with No.10, 1" counter sunk iron screws and applying
two coats of anti- Corrosive paint. (Based on 9'-0"x6'-0"
area)

flat iron = 9*3+6*4=51L.ft. 51


Ms6mm = 3(2(2(5+12+18+25+31+38+45+51+58+64+71+78)) = 72.35 L.ft 5952
Per 54 s.ft.
Materials
51 L.ft. - 20mm x 6mm Flat Iron 51.000 52.00
500 L.ft - 5mm m.s. 500.000 7.00
Wastage - 10%
32 nos - 1 1/2" Rawl plugs 32.000 4.00
32 nos - 1" sunk iron screws 32.000 5.00
Allow for welding rods,

Labour
2 Day Smith 2.000 770.00
2 1/2 Day Labour 2.500 629.00
Allow for Tools & Cutting plants & Grills

Plant
1 1/2 Day hire of welding plant 1.500 1000.00

Allow for Painting two coats of Anti-corrosive

Per 54 sq.ft
Per 1 sq.ft
Add 22%
Total

Engineering Organization W.P. Page 333 BSR Annalysis


W 69 Iron grill with door …………….. As description

Area = 3*9+6*6.25 = 64.5ft2


Door
Angle Iron = 9.5*2+3*2 = 25L.ft 25
Hollow section = 6.75x2+3x4=25.5L.ft 25.5
Ms6mm = 2(6+13+19+26+33+39+46+49*4+43+36+29+23+16+10+3) 1076
Ms6mm = 2(5+11+18+24+27x8+21+14+8+1) 636

Window
Flat Iron = 6*2+6*4 36
Ms6mm =3 /2/2(4+11+17+24+30+37+44+50+54+54) 325 467.67

Per 27s.ft.
Materials
25 L.ft. - 38mm x 38mm x 6mm Angle Iron 25.000 125.00
26 L.ft. - 25mm x 25mm x 3mm hollow 26.000 90.00
36 L.ft. - 20mm x 6mm Flat iron 36.000 52.00
475 L.ft - 5mm m.s. 475.000 7.00
9 Sq.ft - Gauge 22 GI Sheet 9.000 120.00
Wastage - 10%
30 nos - 1 1/2" Rawl plugs 30.000 4.00
30 nos - 1" sunk iron screws 30.000 5.00
3nos - 4" x 3" hinges 3.000 100.00
Allow for Hasp and staple, welding rods & others

Labour
3 Day Smith 3.000 770.00
3.50 Day Labour 3.500 629.00
Allow for Tools & Cutting plants & Grills

Plant
2 Day hire of welding plant 2.000 1000.00

Allow for Painting two coats of Anti-corrosive


Concrete pad 0.563 320.31

Per 64 sq.ft
Per 1 sq.ft
Add 22%
Total

W 69a Iron door …………….. As description

Area = 3*9 = 27ft2


Door
Angle Iron = 9.5*2+3*2 = 25L.ft 25
Hollow section = 6.75x2+3x4=25.5L.ft 25.5

Engineering Organization W.P. Page 334 BSR Annalysis


Ms6mm = 2(6+13+19+26+33+39+46+49*4+43+36+29+23+16+10+3) 1076
Ms6mm = 2(5+11+18+24+27x8+21+14+8+1) 636

Window
Flat Iron = 6*2+6*4 36
Ms6mm =3 /2/2(4+11+17+24+30+37+44+50+54+54) 325 467.67

Per 27s.ft.
Materials
25 L.ft. - 38mm x 38mm x 6mm Angle Iron 25.000 125.00
26 L.ft. - 25mm x 25mm x 3mm hollow 26.000 90.00
475 L.ft - 5mm m.s. 145.000 7.00
9 Sq.ft - Gauge 22 GI Sheet 9.000 120.00
Wastage - 10%
30 nos - 1 1/2" Rawl plugs 12.000 4.00
30 nos - 1" sunk iron screws 12.000 5.00
3nos - 4" x 3" hinges 3.000 100.00
Allow for Hasp and staple, welding rods & others

Labour
1.5 Day Smith 1.500 770.00
1.5 Day Labour 1.500 629.00
Allow for Tools & Cutting plants & Grills

Plant
2 Day hire of welding plant 1.000 1000.00

Allow for Painting two coats of Anti-corrosive


Concrete pad 0.563 320.31

Per 64 sq.ft
Per 1 sq.ft
Add 22%
Total

Welded Iron grill of rectangular pattern , consisting of a


flat Iron frame of 25mm x 6mm with out intermediate
joints, 2 nos of 25mm x 6mm horizontal members ,
12mm dia. M.S. round bars as vertical members @ 4" c/c
, vertical round bars to be drilled through horizontal flat
W 70
Irons, fixed complete with counter sunk screws and rawl
plugs to the masonry opening or timber. Rate shall
include for applying two coats of anti-corrosive paint
and two coats of enamal paint. ( for window openings of
size 4'-0" x 2'-0" )

Per 8 s.ft.
Materials
16 L.ft. - 25mm x 6mm Flat Iron 16.000 64.00
20 L.ft - 12mm round bar (20L.ft) 20.000 35.00
16 nos - 1 1/2" Rawl plugs 16.000 3.50

Engineering Organization W.P. Page 335 BSR Annalysis


16 nos - 1 1/2" Brass screws 16.000 8.50
Allow for welding rods,

Labour
1 Day Smith 1.000 770.00
1 Day Labour 1.000 629.00
Allow for Tools & Cutting plants & Grills

Plant
1/4 Day hire of welding plant 0.250 1000.00

Allow for Painting two coats of Anti-corrosive

Per 8 sq.ft
Per 1 sq.ft
Add 22%
Total

Supplying , fabricating & fixing mild steel and timber


hand rail, consisting of 16mm M.S. round bars @ 4" c/c
as vertical members fixed to steps with the 8" x 1 1/2" x
1/2" thick M.S. plate connecting with 2 nos 10mm anchor
bolts, 4" x 2" approved timber rail fixed to 32mm x 6mm
flat iron aling to the stair & 20mm x 6mm flat iron as the
W 75 horizontal members to connecting the two vertical
members finished smooth and work complete in order
with necessary nuts & bolts. Rate Shall include for
applying two coats of anti-corrosive paint and two coats
of enamel paints. All sizes and details as per drawing no
........ Type 1-A

Per 10 L.ft.
Materials
15 L.ft. - 4" x 2" Timber rail 15.000 180.00
15 L.ft. - 32 x 6 Flat Iron 15.000 70.00
60 L.ft - 16mm round bar 60.000 50.00
5 L.ft. - 20 x 6 Flat Iron 5.000 52.00
1 S.ft - 1/2" MS Plate 1.000 1095.00
20 Nos - Anchor bolts 20.000 50.00
Allow for welding rods
Wastage 5%
Allow for nut & bolts

Labour
2.5 Day Skill 2.500 770.00
2.0 Day Labour 2.000 629.00
Allow for Tools & Cutting plants & Grills

Plant
1/2 Day hire of welding plant 0.500 1000.00

Engineering Organization W.P. Page 336 BSR Annalysis


Allow for Painting two coats of Anti-corrosive 0.500 3381.14

Per 10 L.ft
Per 1 L.ft
Add 22%
Total

Supplying , fabricating & fixing mild steel and timber


hand rail, consisting of 16mm M.S. round bars @ 4" c/c
as vertical members fixed to steps with the 8" x 1 1/2" x
1/2" thick M.S. plate connecting with 2 nos 10mm anchor
bolts, 4" x 2" approved timber decorative rail fixed to
32mm x 6mm flat iron aling to the stair & 20mm x 6mm
W 76
flat iron as the horizontal members to connecting the
two vertical members finished smooth and work
complete in order with necessary nuts & bolts. Rate
Shall include for applying two coats of anti-corrosive
paint and two coats of enamel paints. All sizes and
details as per drawing no ........ Type 1-B

Per 10 L.ft.
Materials
15 L.ft. - 4" x 3" Timber rail 15.000 280.00
15 L.ft. - 32 x 6 Flat Iron 15.000 70.00
60 L.ft - 16mm round bar 60.000 50.00
5 L.ft. - 20 x 6 Flat Iron 5.000 52.00
1 S.ft - 1/2" MS Plate 1.000 1095.00
20 Nos - Anchor bolts 20.000 50.00
Allow for welding rods
Wastage 5%
Allow for nut & bolts

Labour
2.5 Day Skill 2.500 770.00
2 Day Labour 2.000 770.00
Allow for Tools & Cutting plants & Grills

Plant
1/2 Day hire of welding plant 0.500 1000.00

Allow for Painting two coats of Anti-corrosive 0.550 3381.14

Per 10 L.ft
Per 1 L.ft
Add 22%
Total

Engineering Organization W.P. Page 337 BSR Annalysis


Supplying , fabricating & fixing GI pipe hand rail,
consisting of 2" dia. GI pipe as hand rail and 3/4" dia. GI
pipes @ 11" c/c as vertical members fixed to steps with
the 4" x 1 1/2" x 1/2" thick M.S. plate connecting with 2
W 77 nos 10mm anchor bolts, work complete in order with
necessary nuts & bolts. Rate Shall include for applying
two coats of anti-corrosive paint and two coats of
enamel paints. All sizes and details as per drawing
no ........ Type 2

Per 10 L.ft.
Materials
15 L.ft. - 2" dia. GI Pipe 15.000 265.00
30L.ft. - 3/4" dia. GI Pipe 30.000 130.00
0.6 S.ft - 1/2" MS Plate 0.600 1095.00
20 Nos - Anchor bolts 20.000 50.00
Allow for welding rods
Wastage 5%

Labour
1.25 Day Skill 1.250 770.00
1.25 Day Labour 1.250 629.00
Allow for Tools & Cutting plants & Grills

Plant
3/8 Day hire of welding plant 0.375 1000.00

Allow for Painting two coats of Anti-corrosive 0.550 3381.14

Per 10 L.ft
Per 1 L.ft
Add 22%
Total

Supplying , fabricating & fixing GI pipe hand rail top of


the 9" thick brick wall ( Brick work measured
separately ) consisting of 2" dia. GI pipe as hand rail and
fixed to wall with 32mm x 6mm flat iron @ 18" c/c work
W 78 complete in order. Rate Shall include for applying two
coats of anti-corrosive paint and two coats of enamel
paints. All sizes and details as per drawing no ........ Type
3

Per 10 L.ft.
Materials
10 L.ft. - 2" dia. GI Pipe 10.000 265.00
10 L.ft. - 32 x 6 mm Flat iron 10.000 70.00
Allow for welding rods
Wastage 5%

Labour

Engineering Organization W.P. Page 338 BSR Annalysis


1/2 Day Skill 0.500 770.00
1/2 Day Labour 0.500 629.00
Allow for Tools & Cutting plants & Grills

Plant
1/4 Day hire of welding plant 0.250 1000.00

Allow for Painting two coats of Anti-corrosive 0.300 3381.14

Per 10 L.ft
Per 1 L.ft
Add 22%
Total

Supplying and fixing 50mm x 50mm x 6mm thick angle


iron purling at maximum spacing of 4'-0" centers upto
Y 01 maximum span of 10'-0" including nuts, necessary
bolds & washers etc. and application of two coats of
Anti-Corrosive paint.

Per 10 L.ft.
Materials
10 L.ft. - 2"x2"x5mm Angle Iron Purling 10.000 155.00
Allow for Nuts & Bolts - 5%
Allow for Hoisting - 5%

Labour
1/4 Day Smith 0.250 770.00
1/4 Day Labour 0.250 629.00

Allow for Painting two coats of Anti-corrosive

Per 10 L.ft.
Per 01 L.ft.
Add 22%
Total

Supplying and fixing 65mm x 65mm x 6mm thick angle


iron purling at maximum spacing of 4'-0" centers
maximum span of 11'-0" (not less than 10'-0") for a
Y 02 asbestos purling roof without covering tiles on top.
Rate shall include for necessary nuts, bolds &
washers,etc. and applying two coats of Anti-Corrosive
paint.

Per 10 L.ft.
Materials
10 L.ft. - 2 1/2"x2 1/2"x5mm Angle Iron Purling 10.000 220.00

Engineering Organization W.P. Page 339 BSR Annalysis


Allow for Nuts & Bolts - 3%
Allow for Hoisting - 3%

Labour
1/4 Day Smith 0.250 770.00
1/4 Day Labour 0.250 629.00

Allow for Painting two coats of Anti-corrosive

Per 10 L.ft.
Per 01 L.ft.
Add 22%
Total

Supplying and fixing 75mm x 75mm x 6mm thick angle


iron purling at maximum spacing of 4'-0" centers
maximum span of 12'-0" (not less than 11'-0") for a
Y 03
asbestos purling roof without covering tiles on top.
Rate shall include necessary nuts, olds & washers etc,
and applying two coats of Anti -Corrosive paint.

Per 10 L.ft.
Materials
10 L.ft. - 3"x3"x5mm Angle Iron Purling 10.000 250.00
Allow for Nuts & Bolts - 3%
Allow for Hoisting - 3%

Labour
1/4 Day Smith 0.250 770.00
1/4 Day Labour 0.250 629.00

Allow for Painting two coats of Anti-corrosive

Per 10 L.ft.
Per 01 L.ft.
Add 22%
Total

Supplying and fixing 100mm x 50mm x 6mm thick


channel Iron purling up to 14'-0" span at 4'-0" c/c. Rate
Y 04
shall include for applying two coats of anti-corrosive
paint.

Per 10 L.ft.
Materials
10 L.ft. - 4"x2"x5mm Channel Iron Purling 10.000 450.00
Allow for Nuts & Bolts - 3%
Allow for Hoisting - 3%

Labour

Engineering Organization W.P. Page 340 BSR Annalysis


3/8 Day Smith 0.375 770.00
3/8 Day Labour 0.375 629.00

Allow for Painting two coats of Anti-corrosive

Per 10 L.ft.
Per 01 L.ft.
Add 22%
Total

Supplying and fixing 125mm x 65mm x 6mm thick


channel Iron purling up to 16'-0" span at 4'-0" c/c. Rate
Y 05
shall include for applying two coats of anti-corrosive
paint.

Per 10 L.ft.
Materials
10 L.ft. - 5"x2 1/2"x5mm Channel Iron Purling 10.000 610.00
Allow for Nuts & Bolts - 3%
Allow for Hoisting - 5%

Labour
3/8 Day Smith 0.375 770.00
3/8 Day Labour 0.375 629.00

Allow for Painting two coats of Anti-corrosive

Per 10 L.ft.
Per 01 L.ft.
Add 22%
Total

Supplying and fixing 150mm x 75mm x 6mm thick


channel Iron purling up to 18'-0" span at 4'-0" c/c. Rate
Y 06
shall include for applying two coats of anti-corrosive
paint.

Per 10 L.ft.
Materials
10 L.ft. - 5"x2 1/2"x5mm Channel Iron Purling 10.000 750.00
Allow for Nuts & Bolts - 3%
Allow for Hoisting - 5%

Labour
3/8 Day Smith 0.375 770.00
3/8 Day Labour 0.375 629.00

Allow for Painting two coats of Anti-corrosive

Engineering Organization W.P. Page 341 BSR Annalysis


Per 10 L.ft.
Per 01 L.ft.
Add 22%
Total

Supply, installation and fixing of angle iron sleepers


over the walls to support purlins formed with 50mm x
50mm x 6mm thick angles welded back to back with
75mm x 50mm x 10mm thick seperators @ 2'-0" c/c,
Y 07
fixed to the concrete pad laid on the wall with 9" x 6" x
10mm thick base plate and 2 No. 10mm dia. bolts @ 6'-0"
c/c. Rate shall include for applying two coats of anti-
corrosive paint and one coat of enamel paint.

Plate= 50/75x50 2.125


Plate= 17/9"x 6" 6.375
8.5
Per 100 L.ft.
Material
200 L.ft. -50mm x 50mm x 6mm Angle Iron 200.000 155.000
9 Sq.ft. -10mm thick M.S.Plate 9.000 1030.000
34 Nos. - Nut and bolt3/8" 34.000 60.000
Wastage 10%

Labour
3 day Smith 3.000 770.000
1 1/2 day carpenter 1.500 770.000
4 day Labour 4.000 629.000
allow for coal & levelling

Add 10% for painting

Rate per 100'-0' L.ft.


Rate per L.ft.
Add 22%
Total Rate

Supply, installation and fixing of angle iron sleepers


over the walls to support purlins formed with 65mm x
65mm x 6mm thick angles welded back to back with
75mm x 65mm x 10mm thick seperators @ 2'-0" c/c,
Y 08
fixed to the concrete pad laid on the wall with 9" x 6" x
10mm @ 6'-0" c/c. thick base plate and 2 No. 10mm dia.
bolts. Rate shall include for applying two coats of anti-
corrosive paint and one coat of enamel paint.

Plate= 50/75x65 2.625


Plate= 17/9"x 6" 6.375
9
Per 100 L.ft.
Material

Engineering Organization W.P. Page 342 BSR Annalysis


200 L.ft. -65mm x 65mm x 6mm Angle Iron 200.000 220.000
9.2 Sq.ft. -10mm thick M.S.Plate 9.200 1030.000
34 Nos. - Nut and bolt3/8" 34.000 60.000
Wastage 10%

Labour
3 day Smith 3.000 770.000
1 1/2 day carpenter 1.500 770.000
4 day Labour 4.000 629.000
allow for coal & levelling

Add 10% for painting

Rate per 100'-0' L.ft.


Rate per L.ft.
Add 22%
Total Rate

Supply, installation and fixing of angle iron sleepers


over the walls to support purlins formed with 75mm x
75mm x 6mm thick angles welded back to back with
75mm x 75mm x 10mm thick seperators @ 2'-0" c/c,
Y 09
fixed to the concrete pad laid on the wall with 9" x 6" x
10mm thick base plate @ 6'-0" c/c.and 2 No. 10mm dia.
bolts. Rate shall include for applying two coats of anti-
corrosive paint and one coat of enamel paint.

Plate= 50/75x75 3.125


Plate= 17/9"x 6" 6.375
9.5
Per 100 L.ft.
Material
200 L.ft. -75mm x 75mm x 6mm Angle Iron 200.000 250.000
9.5 Sq.ft. -10mm thick M.S.Plate 9.500 1030.000
34 Nos. - Nut and bolt3/8" 34.000 60.000
Wastage 10%

Labour
3 day Smith 3.000 770.000
1 1/2 day carpenter 1.500 770.000
4 day Labour 4.000 629.000
allow for coal & levelling

Add 10% for painting

Rate per 100'-0' L.ft.


Rate per L.ft.
Add 22%
Total Rate

Engineering Organization W.P. Page 343 BSR Annalysis


Mild steel Roof truss for Calicut tile roofing 20'-0" (6.0m)
span centre to centre, Maximum spacing 10'-0" , 250
pitch maximum and 180 pitch minimum, with 4'-0" wide
eaves at both sides. Consisting of 2 Nos. 50mm x 50mm
x 6mm angles as top and bottom chords, 1 No. 50mm x
Y 10 50mm x 6mm angles as struts & ties, 10mm thick gusset
plates, base plates & sole plates, mild steel rag bolts,
purling cleats, etc.. & all details as per the Drawing no:-
WP/TYPE/STR/2011/RT1. Rate shall include for
fabricating , transporting , hoisting , fixing in position
and applying two coats of Zinc Phosphate paint.

Angle Iron
Bottom - 2/6.325 12.65
Top 2/2/4.7 18.8
branch - 2/.536 1.072
2/1.115 2.23
2/1.06 2.12
2/1.5 3
in Meters 39.872
in L.ft 130.78016

MS Plate
Base plate = 2/225 x 225 0.101
Sole plate = 2/225 x 225 0.101
Gusset Plate = 2/225 x 180 0.081
nodes = 2/280x 150 0.084
nodes = 2/270x 150 0.081
nodes = 2/170x 150 0.051
nodes = 2/295x 160 0.094
nodes = 1/330x 200 0.066
seperators = 30/75x50 0.113
in Sq. Meters 0.772
in Sq. ft 8.314

Materials
50x50x6mm Angle Iron L.ft 132.00 155.00
10mm thick Base plate Sq.ft 9.00 1030.00
Add 10% wastage
20mm dia. Rag bolt No 4.00 350.00
Allow for welding rod

Labour
1 Day Smith - Cutting 1.00 770.00
1 Day Un/Sk 1.00 629.00
1 Day Smith - Fabricating 1.00 770.00
2 Day Un/Sk 2.00 629.00
2 Day Smith - Hoisting & Fixing 2.00 770.00
2 Day Un/Sk 2.00 629.00
Add 5% Tools

Painting Zink Pospate Paint Sq 1.50 1968.24


Welding Plant Day 1.00 1000.00

Rate per No.


Add O/H & P - 22%

Engineering Organization W.P. Page 344 BSR Annalysis


Total Rate

Mild steel Roof truss for Asbestos roofing 20'-0" (6.0m)


span centre to centre, Maximum spacing 10'-0", 120 pitch
with 4'-0" wide eaves at both sides. Consisting of 2 Nos.
50mm x 50mm x 6mm angles as top and bottom chords,
1 No. 50mm x 50mm x 6mm angles as struts & ties,
Y 11 10mm thick gusset plates, base plates & sole plates,
mild steel rag bolts, purling cleats, etc.. & all details as
per the Drawing no:- WP/TYPE/STR/2011/RT2. Rate shall
include for fabricating , transporting , hoisting , fixing in
position and applying two coats of Zinc Phosphate
paint.

Angle Iron
Bottom - 2/6.325 12.65
Top 2/2/4.36 17.44
branch - 2/.207 0.42
2/.43 0.86
2/.75 1.5
2/.97 1.94
in Meters 34.81
in L.ft 114.1768

MS Plate
Base plate = 2/225 x 225 0.101
Sole plate = 2/225 x 225 0.101
Gusset Plate = 2/225 x 150 0.068
nodes = 2/350x 140 0.098
nodes = 2/320x 140 0.090
nodes = 2/215x 140 0.062
nodes = 2/500x 160 0.160
nodes = 1/410x 180 0.074
seperators = 28/75x50 0.105
in Sq. Meters 0.858
in Sq. ft 9.236

Materials
50x50x6mm Angle Iron L.ft 115.00 155.00
10mm thick Base plate Sq.ft 9.50 1030.00
Add 10% wastage
20mm dia. Rag bolt No 4.00 350.00
Allow for welding rod

Labour
1 Day Smith - Cutting 1.00 770.00
1 Day Un/Sk 1.00 629.00
1 Day Smith - Fabricating 1.00 770.00
2 Day Un/Sk 2.00 629.00
2 Day Smith - Hoisting & Fixing 2.00 770.00
2 Day Un/Sk 2.00 629.00
Add 5% Tools

Painting Zink Pospate Paint Sq 1.50 1968.24


Welding Plant Day 1.00 1000.00

Rate per No.

Engineering Organization W.P. Page 345 BSR Annalysis


Add O/H & P - 22%
Total Rate

Mild steel Roof truss for Calicut tile roofing 25'-0" (7.5m)
span centre to centre, Maximum spacing 10'-0", 250 pitch
maximum and 180 pitch minimum, with 4'-0" wide eaves
at both sides. Consisting of 2 Nos. 50mm x 50mm x 6mm
angles as top and bottom chords, 1 No. 50mm x 50mm x
Y 12 6mm angles as struts & ties, 10mm thick gusset plates,
base plates & sole plates, mild steel rag bolts, purling
cleats, etc.. & all details as per the Drawing no:-
WP/TYPE/STR/2011/RT3. Rate shall include for
fabricating , transporting , hoisting , fixing in position
and applying two coats of Zinc Phosphate paint.

Angle Iron
Bottom - 2/7.85 15.7
Top 2/2/5.551 22.204
branch - 2/.642 1.284
2/1.37 2.74
2/1.3 2.6
2/1.87 3.74
in Meters 48.268
in L.ft 158.31904

MS Plate
Base plate = 2/225 x 225 0.101
Sole plate = 2/225 x 225 0.101
Gusset Plate = 2/225 x 180 0.068
nodes = 2/325x 160 0.123
nodes = 2/250x 150 0.090
nodes = 2/200x 140 0.050
nodes = 2/380x 160 0.160
nodes = 1/330x 180 0.090
seperators = 35/75x50 0.131
in Sq. Meters 0.915
in Sq. ft 9.847

Materials
50x50x6mm Angle Iron L.ft 160.00 155.00
10mm thick Base plate Sq.ft 10.25 1030.00
Add 10% wastage
20mm dia. Rag bolt No 4.00 350.00
Allow for welding rod

Labour
1 Day Smith - Cutting 1.00 770.00
1 Day Un/Sk 1.00 629.00
1 Day Smith - Fabricating 1.00 770.00
2 Day Un/Sk 2.00 629.00
2 Day Smith - Hoisting & Fixing 2.00 770.00
2 Day Un/Sk 2.00 629.00
Add 5% Tools

Painting Zink Pospate Paint Sq 1.60 1968.24


Welding Plant Day 1.00 1000.00

Engineering Organization W.P. Page 346 BSR Annalysis


Rate per No.
Add O/H & P - 22%
Total Rate

Mild steel Roof truss for Asbestos roofing 25'-0" (7.5m)


span centre to centre, Maximum spacing 10'-0", 120 pitch
with 4'-0" wide eaves at both sides. Consisting of 2 Nos.
50mm x 50mm x 6mm angles as top and bottom chords,
1 No. 50mm x 50mm x 6mm angles as struts & ties,
Y 13 10mm thick gusset plates, base plates & sole plates,
mild steel rag bolts, purling cleats, etc.. & all details as
per the Drawing no:- WP/TYPE/STR/2011/RT4. Rate shall
include for fabricating , transporting , hoisting , fixing in
position and applying two coats of Zinc Phosphate
paint.

Angle Iron
Bottom - 2/7.85 15.7
Top 2/2/5.15 20.6
branch - 2/.26 0.52
2/.96 1.92
2/.54 1.08
2/1.22 2.44
in Meters 42.26
in L.ft 138.6128

MS Plate
Base plate = 2/225 x 225 0.101
Sole plate = 2/225 x 225 0.101
Gusset Plate = 2/225 x 150 0.068
nodes = 2/385x 160 0.123
nodes = 2/300x 150 0.090
nodes = 2/180x 140 0.050
nodes = 2/500x 160 0.160
nodes = 1/500x 180 0.090
seperators = 33/75x50 0.124
in Sq. Meters 0.907
in Sq. ft 9.767

Materials
50x50x6mm Angle Iron L.ft 140.00 155.00
10mm thick Base plate Sq.ft 10.00 1030.00
Add 10% wastage
20mm dia. Rag bolt No 4.00 350.00
Allow for welding rod

Labour
1 Day Smith - Cutting 1.00 770.00
1 Day Un/Sk 1.00 629.00
1 Day Smith - Fabricating 1.00 770.00
2 Day Un/Sk 2.00 629.00
2 Day Smith - Hoisting & Fixing 2.00 770.00
2 Day Un/Sk 2.00 629.00
Add 5% Tools

Painting Zink Pospate Paint Sq 1.60 1968.24

Engineering Organization W.P. Page 347 BSR Annalysis


Welding Plant Day 1.00 1000.00

Rate per No.


Add O/H & P - 22%
Total Rate

Mild steel Roof truss for Calicut tile roofing 30'-0" (9.0m)
span centre to centre, Maximum spacing 10'-0", 250 pitch
maximum and 180 pitch minimum, with 4'-0" wide eaves
at both sides. Consisting of 2 Nos. 65mm x 65mm x 6mm
angles as top and bottom chords, 2 Nos. 50mm x 50mm
x 6mm angles as struts , 1 No. 65mm x 65mm x 6mm
Y 14
angles as ties, 10mm thick gusset plates, base plates &
sole plates, mild steel rag bolts, purling cleats, etc.. & all
details as per the Drawing no:- WP/TYPE/STR/2011/RT5.
Rate shall include for fabricating , transporting , hoisting
, fixing in position and applying two coats of Zinc
Phosphate paint.

Angle Iron - 65x65x6


Bottom - 2/9.375 18.75
Top 2/2/6.37 25.48
Ties - 2/1.71 3.42
Ties - 2/2.25 4.5
in Meters 52.15
in L.ft 171.052

Angle Iron - 50x50x6


Struts - 2/2/.782 3.128
Tie - 2/2/1.56 6.24
in Meters 9.368
in L.ft 30.72704

MS Plate
Base plate = 2/225 x 225 0.101
Sole plate = 2/225 x 225 0.101
Gusset Plate = 2/225 x 180 0.081
nodes = 2/260x 160 0.083
nodes = 2/225x 150 0.068
nodes = 2/200x 140 0.056
nodes = 2/310x 160 0.099
nodes = 1/430x 180 0.077
seperators = 52/75x50 0.195
in Sq. Meters 0.862
in Sq. ft 9.276

Materials
65x65x6mm Angle Iron L.ft 175.00 220.00
50x50x6mm Angle Iron L.ft 33.00 155.00
10mm thick Base plate Sq.ft 11.00 1030.00
Add 10% wastage
20mm dia. Rag bolt No 4.00 350.00
Allow for welding rod

Labour
1 Day Smith - Cutting 1.00 770.00

Engineering Organization W.P. Page 348 BSR Annalysis


1 Day Un/Sk 1.00 629.00
2 Day Smith - Fabricating 2.00 770.00
4 Day Un/Sk 4.00 629.00
2 Day Smith - Hoisting & Fixing 2.00 770.00
4 Day Un/Sk 4.00 629.00
Add 10% Tools

Painting Zink Pospate Paint Sq 2.20 1968.24


Welding Plant Day 2.00 1000.00

Rate per No.


Add O/H & P - 22%
Total Rate

Mild steel Roof truss for Asbestos roofing 30'-0" (9.0m)


span centre to centre, Maximum spacing 10'-0", 120
pitch, with 4'-0" wide eaves at both sides. Consisting of
2 Nos. 65mm x 65mm x 6mm angles as top and bottom
chords, 2 Nos. 50mm x 50mm x 6mm angles as struts , 1
Y 15 No. 65mm x 65mm x 6mm angles as ties, 10mm thick
gusset plates, base plates & sole plates, mild steel rag
bolts, purling cleats, etc.. & all details as per the
Drawing no:- WP/TYPE/STR/2011/RT6. Rate shall include
for fabricating , transporting , hoisting , fixing in position
and applying two coats of Zinc Phosphate paint.

Angle Iron - 65x65x6


Bottom - 2/9.375 18.75
Top 2/2/5.91 23.64
Ties - 2/1.25 2.5
Ties - 2/1.5 3
in Meters 47.89
in L.ft 157.0792

Angle Iron - 50x50x6


Struts - 2/2/.31 1.24
Tie - 2/2/.64 2.56
in Meters 3.8
in L.ft 12.464

MS Plate
Base plate = 2/225 x 225 0.101
Sole plate = 2/225 x 225 0.101
Gusset Plate = 2/225 x 150 0.068
nodes = 2/355x 160 0.114
nodes = 2/300x 150 0.090
nodes = 2/180x 170 0.061
nodes = 2/505x 160 0.162
nodes = 1/470x 175 0.082
seperators = 43/75x50 0.161
in Sq. Meters 0.940
in Sq. ft 10.117

Materials
65x65x6mm Angle Iron L.ft 160.00 220.00
50x50x6mm Angle Iron L.ft 14.00 155.00

Engineering Organization W.P. Page 349 BSR Annalysis


10mm thick Base plate Sq.ft 10.50 1030.00
Add 10% wastage
20mm dia. Rag bolt No 4.00 350.00
Allow for welding rod

Labour
1 Day Smith - Cutting 1.00 770.00
1 Day Un/Sk 1.00 629.00
2 Day Smith - Fabricating 2.00 770.00
4 Day Un/Sk 4.00 629.00
2 Day Smith - Hoisting & Fixing 2.00 770.00
4 Day Un/Sk 4.00 629.00
Add 10% Tools

Painting Zink Pospate Paint Sq 2.20 1968.24


Welding Plant Day 2.00 1000.00

Rate per No.


Add O/H & P - 22%
Total Rate

Supplying & fixing colour bonded zincalum standerd


Y 17
ridge cap.

Per 3' - 8" length


Material
3'-8" L.ft. ridges 3.670 140.000
6 Nos Roofing screws or bolts 8" 6.000 15.000
Sub Total
Labour
1/4 day carpenter 0.250 770.000
1/4 day Labour 0.250 629.000
Sub Total

Rate per 13' - 4" length


Rate per L.ft.
Add 22%
Total Rate

Supplying & fixing zincalum gutter connected with


Y 18
brackets including painting…………

Per 20'-0" length


Material
21 L.ft. Gutter 21.000 150.000
15 Nos iron brackets 15.000 93.000
2 Nos End cap 2.000 244.000
Allow for screws,running joints & solvents

Labour
1 day Smith - making the Iron brackets 1.000 770.000
1 day Labour 1.000 629.000
1 day carpenter - fixing the gutter 1.000 770.000
1 day Labour 1.000 629.000

Engineering Organization W.P. Page 350 BSR Annalysis


Sub Total

Allow for painting

Rate per 20'-0' length


Rate per L.ft.
Add 22%
Total Rate

Supplying & fixing zincalum Down pipe connected with


Y 19
brackets including painting…………
Per 24 L.ft.
Material
2 length of Sq. down pipes 2.000 1820.00
1 No. Socket 1.000 447.00
2 No. Bend 2.000 556.00
2 No. Elbows 2.000 556.00
8 No. clips 8.000 109.000
16 nos brass screws 1" 16.000 8.000
Allow for conecting material
Sub Total
Labour
1/2 Day Skill 0.500 770.000
1/2 Day Labour 0.500 629.000
Allow for scaffolding 2.5%
Sub Total

Per 24 L.ft.
Per L.ft.
Add 22%
Total

Color bonded wall cladding 0.40mm thick fixed to


external wall boxed out at down pipes including sills,
Y 20 flashing, removable sections at access points such as
cleaning eyes etc. completely covering the surface as
directed by the Engineer.

Per Square
Material
110 Sq.ft. - wall cladding 110.00 100.00
40 L.ft. - U channel 40.00 205.00
Allow for Screws & Solvents

Labour
4 day carpenter 4.00 770.00
4 day Labour 4.00 629.00

Rate per Square


Rate per Sq.ft.
Add 22%

Engineering Organization W.P. Page 351 BSR Annalysis


Total Rate

Supply and lay 3mm thick double sided aluminium foil


heat reflecting material to underside of roof, supported
Y 22
with Gauge 18, 3" x 3" GI mesh and complete to working
order. Rate shall include for scaffolding.

Per Square
Material
100 Sq.ft. - Aluminium Macfoil 100.00 15.00
100 Sq.ft. - 3" x 3" mesh 100.00 24.00
Allow 10% for wastage

Labour
1/2 day carpenter 0.50 770.00
1/2 day Labour 0.50 629.00
Allow 3% for Tools

Allow for transport & scaffolding

Rate per Square


Add 22%
Total Rate

Supply and fix zinc alum profile sheet (minimum base


metalthickness of 0.4mm and minimum thickness of
0.47mm laid on existing purlin of joints to be properly
Y 23
connected with an adequate side slope and to ensure
water tightness along the entire length amd complete to
working order.

Per 3.5 Sqr.


Material
385 Sq.ft. - Zn/Al roofing sheet 385.000 142.000
60 Nos roofing screws 4" 60.000 15.000
Allow for Solvents

Labour
3 day carpenter 3.000 770.000
3 day Labour 3.000 629.000

Total per 3.5 Squares


Per Square
Add 22%
Total Rate

Supply and fixing high tensile Galvanized iron "C"


Y 24
channels of 100 x 50 x 15 x 2.0mm thick

Engineering Organization W.P. Page 352 BSR Annalysis


Per 100 L.ft.
Material
110 L.ft. -100 x 50 x 15 x 2.0mm thick "C" purlings 110.000 205.000
25 Nos. - Nut and bolt3/8" 25.000 60.000

Labour
2 day Smith - 2.000 770.000
1 day carpenter 1.000 770.000
2 day Labour 2.000 629.000
allow for coal & levelling

Rate per 100'-0' L.ft.


Rate per L.ft.
Add 22%
Total Rate

Supply and fixing high tensile Galvanized iron "C"


Y 25
channels of 125 x 60 x 20 x 2.0mm thick

Per 100 L.ft.


Material
110 L.ft. -125 x 50 x 20 x 2.3mm thick "C" purlings 110.000 240.000
25 Nos. - Nut and bolt3/8" 25.000 60.000

Labour
2 day Smith - 2.000 770.000
1 day carpenter 1.000 770.000
2 day Labour 2.000 629.000
allow for coal & levelling

Rate per 100'-0' L.ft.


Rate per L.ft.
Add 22%
Total Rate

Supply and fixing high tensile Galvanized iron "C"


Y 26
channels of 150 x 65 x 20 x 2.0mm thick

Per 100 L.ft.


Material
110 L.ft. -150 x 65 x 20 x 2.0mm thick "C" purlings 110.000 267.000
25 Nos. - Nut and bolt3/8" 25.000 60.000

Labour
2 day Smith - 2.000 770.000
1 day carpenter 1.000 770.000
2 day Labour 2.000 629.000
allow for coal & levelling

Engineering Organization W.P. Page 353 BSR Annalysis


Rate per 100'-0' L.ft.
Rate per L.ft.
Add 22%
Total Rate

Demolishing reinforced cement concrete in suspended


floors 4" thick , removing reinforcement and clearing
Z 01 debris.

Per sq.
digging
6 day Labourer 6.000 629.00

Collecting & transport


1/2 day Labourer 0.500 629.00

per 1/3 cube


per cube
Add O/H & P
Total Rate

Z 02 Demolishing cement concrete and clearing debris in 6"


thick floors.

Per cub.
digging
4 day Labourer 4.000 629.00

Collecting & transport


1/2 day Labourer 0.500 629.00

per 1/2 cube


per cube
Add O/H & P
Total Rate

Z 05 Demolishing brick piers, stacking brick and clearing


debris away.

per cube
1 1/4 day Labourer 1.250 629.00
scaffolding
per cube
Add O/H & P
Total Rate

Demolishing 9" thick brick in cement" stacking brick


Z 06 and clearing debris away.

per cube
1 1/2 day Labourer 1.500 629.00

Engineering Organization W.P. Page 354 BSR Annalysis


scaffolding
per cube
Add O/H & P
Total Rate

Demolishing 4 1/2" thick brick in cement stacking brick


Z 07 and clearing debris away.

per cube
1.5 day Labourer 1.500 629.00
scaffolding 3%
per cube
per sqr
Add O/H & P
Total Rate

Demolishing 3" thick floors brick paved and clearing


Z 08 debris away.

per sq.
1/4 cube demolition as in item Z06, less scaffolding
1/2 day Labourer 0.500 629.00
add 50% for extra difficulty
per sq.
Add O/H & P
Total Rate

Z 09 Demolishing drains and clearing debris away.

per 10 L.ft
0.25 day Labourer 0.250 629.00
per 10 L.ft
per L.ft
Add O/H & P
Total Rate

Demolishing rubble masonry is cement. Stacking rubble


Z 10 and clearing debris

per cube
2 day Labourer 2.000 629.00
scaffolding 3%
per cube
Add O/H & P
Total Rate

Z 11 Demolishing floor tiles and clearing debris away.

per Sqr
1 3/4 day Labourer 1.750 629.00
per sqr
Add O/H & P

Engineering Organization W.P. Page 355 BSR Annalysis


Total Rate

Z 12 Demolishing wall tiles and clearing debris away.

per Sqrs
1 3/8 day Labourer 1.375 629.00
scaffolding 3%
per sqr
Add O/H & P
Total Rate

Chipping cement rendering and clearing debris away.


Z 13

per Sqrs
1.125 day Labourer 1.125 629.00
per sqr
Add O/H & P
Total Rate

Chipping cement plastering and clearing debris away.


Z 14

per Sqrs
3/4 day Labourer 0.750 629.00
scaffolding 3%
per sqr
Add O/H & P
Total Rate

Z 15 Chipping lime plastering and clearing debris away.

per Sqrs
0.375 day Labourer 0.375 629.00
scaffolding 3%
per sqr
Add O/H & P
Total Rate

Chipping cement plaster in soffits and clearing debris


Z 16 away.

per Sqrs
1.125 day Labourer 1.125 629.00
scaffolding 3%
per sqr
Add O/H & P
Total Rate

4 1/2" thick brick work in cement and sand 1:5 up to a 1


Z 17
square.
Per square

Engineering Organization W.P. Page 356 BSR Annalysis


Materials
550 Bricks 550.000 9.00
Add 10% for Wastage
1.30 Cwt. cement 1.300 670.00
0.10 cube sand 0.100 11050.00
Water - 150 Glns. 150.000 0.50
Sub Total

Labour
2 1/2 days mason (2 x 25%) 2.500 770.00
2 1/2 days labour 2.500 629.00
Allow for scaffolding Add 1%
Sub Total

Rate per Sqr


Add 22%
Total rate

1/2" thick Rendering in cement and sand 1:3 up to a 1


Z 18 square finished smooth with neat cement slurry and
colour pigments.
Per Square
Materials
1.07 Cwt. cement 1.070 670.00
0.05 Cube sand 0.050 11050.00
2.5 lbs powdered pigment 2.500 210.00
10 gal. water 10.000 0.50
Sub Total
Labour
1 1/4 Day mason (1*25%) 1.250 770.00
1 7/8 Day labour 1.875 629.00
Sub Total

Rate per Sqr.


Add 22%
Total value

Plastering 5/8" thick to walls in cement, lime and sand


Z 19
1:1:5 finished semi-rough with wooden float.
Per Square
Materials
0.80 Cwt cement 0.800 670.00
42 kg slaked lime 42.000 12.00
0.07 Cube sand 0.070 11050.00
10 Gal. Water 10.000 0.50
Sub total
Labour
1 1/4 Day Mason 1.250 770.00
1 7/8 Day Labourer 1.875 629.00
Scaffolding 3%

Engineering Organization W.P. Page 357 BSR Annalysis


Rate per square
Add 22%
Total rate

5/8" Thick plastering to walls in lime cement and sand


Z 20
1:1:5 finished smooth with lime putty floating
Material
0.80 Cwt. Cement 0.800 670.00
63 kg Slaked lime 63.000 12.00
0.07 Cube sand 0.070 11050.00
Water (10 Glns) 10.000 0.50
Sub total
Labour
2 1/8 Day Mason 2.125 770.00
2 1/8 Day unskilled labour 2.125 629.00
Add 3% scaffolding
Sub total

Rate per square


Add 22%
Total rate

Removing and stacking tile calicut or half round from


Z 21 roof of single storyed building.

per sq.
1/2 day labourer 0.500 629.00
per sq.
Add O/H & P
Total Rate

Removing and Stacking tile Calicut or half round from 2


Z 22 Storyed building.

per sq.
1/2 day labourer 0.500 629.00
add 2labour,1hour
1/4 day labourer 0.250 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Removing and Stacking tile Calicut or half round from 3


Z 23 Storyed building.

per sq.
1/2 day labourer 0.500 629.00
add 2labour,1hour for one stair
1/2 day labourer 0.500 629.00
scaffolding 3%
per sq.

Engineering Organization W.P. Page 358 BSR Annalysis


Add O/H & P
Total Rate

Removing and stacking corrugated asbestos sheet from


Z 24 roof in single storied building.

persq.
3/8 day labourer 0.375 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Removing and stacking corrugated asbestos sheet from


Z 25 roof in 2 storied building.

persq.
3/8 day labourer 0.375 629.00
add 2labour,1/2hour for one stair
1/8 day labourer 0.125 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Removing and stacking corrugated asbestos sheet from


Z 26 roof in 3 storied building.

persq.
3/8 day labourer 0.375 629.00
add 2labour,1/2hour for one stair
1/4 day labourer 0.250 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Removing roof tiles/asbestos sheets and timber frame


work, stacking serviceable materials and clearing debris
Z 27 away in single storied building.

persq.
1 day labourer 1.000 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Removing roof tiles/asbestos sheets and timber frame


work, stacking serviceable materials and clearing debris
Z 28 away in 2 storied building.

Engineering Organization W.P. Page 359 BSR Annalysis


persq.
1.25 day labourer 1.250 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Removing roof tiles/asbestos sheets and timber frame


work, stacking serviceable materials and clearing debris
Z 29 away in 2 storied building.

persq.
1.5 day labourer 1.500 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Z 30 Removing and stacking calicut ridge tile.

per 20 L.ft
0.3 day labourer 0.300 629.00
scaffolding 3%
per 20 L.ft
per L.ft
Add O/H & P
Total Rate

Z 31 Removing and stacking asbestos ridging.

per 20 L.ft
1/4 day labourer 0.250 629.00
scaffolding 3%
per 20 L.ft
per L.ft
Add O/H & P
Total Rate

Removing 2" x 1" reepers , 2" x 2" battens ,stacking at


site and clearing debris away in single storied building.
Z 32

Per 50 l.ft
1 hrs 2 labourer 2.000 78.625
Allow scaffolding
per 50 L.ft.
per L.ft.
Add O/H & P
Total Rate

Engineering Organization W.P. Page 360 BSR Annalysis


Removing 2" x 1" reepers , 2" x 2" battens ,stacking at
site and clearing debris away in two storied building.
Z 33

Per 50 l.ft
1 1/2 hrs 2 labourer 3.000 78.625
Allow scaffolding
per 50 L.ft.
per L.ft.
Add O/H & P
Total Rate

Removing 2" x 1" reepers , 2" x 2" battens ,stacking at


site and clearing debris away in three storied building.
Z 34

Per 50 l.ft
2 hrs 2 labourer 4.000 78.625
Allow scaffolding
per 50 L.ft.
per L.ft.
Add O/H & P
Total Rate

Removing 2" x 4" rafters , 4" x 3" wall plates , stacking


at site and clearing debris away in single storied
Z 35 building.

Per 50 l.ft
2 hrs 2 labourer 4.000 78.625
Allow scaffolding
per 50 L.ft.
per L.ft.
Add O/H & P
Total Rate

Removing 2" x 4" rafters , 4" x 3" wall plates , stacking


at site and clearing debris away in two storied building.
Z 36

Per 50 l.ft
2 1/2 hrs 2 labourer 5.000 78.625
Allow scaffolding
per 50 L.ft.
per L.ft.
Add O/H & P
Total Rate

Removing 2" x 4" rafters , 4" x 3" wall plates , stacking


at site and clearing debris away in three storied
Z 37 building.

Engineering Organization W.P. Page 361 BSR Annalysis


Per 50 l.ft
3 hrs 2 labourer 6.000 78.625
Allow scaffolding
per 50 L.ft.
per L.ft.
Add O/H & P
Total Rate

Removing 5" x 3" / 5" x 2" purlings , stacking at site and


Z 38 clearing debris away in single storied building.

Per 50 l.ft
3 hrs 2 labourer 6.000 78.625
Allow scaffolding
per 50 L.ft.
per L.ft.
Add O/H & P
Total Rate

Removing 5" x 3" / 5" x 2" purlings , stacking at site and


Z 39 clearing debris away in two storied building.

Per 50 l.ft
3 1/2 hrs 2 labourer 7.000 78.625
Allow scaffolding
per 50 L.ft.
per L.ft.
Add O/H & P
Total Rate

Removing 5" x 3" / 5" x 2" purlings , stacking at site and


Z 40 clearing debris away in three storied building.

Per 50 l.ft
4 hrs 2 labourer 8.000 78.625
Allow scaffolding
per 50 L.ft.
per L.ft.
Add O/H & P
Total Rate

Removing and stacking valance, Barge board materials


and clearing debris away in single storeyed building.
Z 41

per 40 l.ft.
3/8 day labourer 0.375 629.00
scaffolding 3%
per l.ft
Add O/H & P
Total Rate

Engineering Organization W.P. Page 362 BSR Annalysis


Removing and stacking valance, Barge board materials
and clearing debris away in 2 storeyed building.
Z 42

per 40 l.ft.
1/2 day labourer 0.500 629.00
scaffolding 3%
per l.ft
Add O/H & P
Total Rate

Removing and stacking gutter, eaves from roof of single


Z 43 stroyed buildings.

per 40 l.ft.
1/2 day labourer 0.500 629.00
scaffolding 3%
per l.ft.
Add O/H & P
Total Rate

Removing and stacking gutter, eaves from roof of 2


Z 44 stroyed buildings.

per 40 l.ft.
3/4 day labourer 0.750 629.00
scaffolding 3%
per l.ft.
Add O/H & P
Total Rate

Removing and stacking down pipes from roof of single


Z 45 storied building.

per 40 l.ft.
1/2 day labourer 0.500 629.00
per l.ft.
Add O/H & P
Total Rate

Removing and stacking down pipes from roof of single


Z 46 storied building.

per 40 l.ft.
5/8 day labourer 0.625 629.00
scaffolding 3%
per l.ft.
Add O/H & P
Total Rate

Engineering Organization W.P. Page 363 BSR Annalysis


Removing and stacking G.I. Valley gutter and flashing.
Z 47

per 20 l.ft.
1/2 day labourer 0.500 629.00
scaffolding 3%
per l.ft.
Add O/H & P
Total Rate

Re-laying available calicut tiles on the roof in single


Z 48 storied building.

per sqr
1/2 day labourer 0.500 629.00
scaffolding 3%
per l.ft.
Add O/H & P
Total Rate

Re-laying available calicut tiles on the roof in 2 storied


Z 49 building.

per sqr
5/8 day labourer 0.625 629.00
scaffolding 3%
per l.ft.
Add O/H & P
Total Rate

Re-laying available calicut tiles on the roof in 3 storied


Z 50 building.

per sqr
3/4 day labourer 0.750 629.00
scaffolding 3%
per l.ft.
Add O/H & P
Total Rate

Re-laying available asbestos sheets on the roof in single


Z 51 storied building.

per sqr
1/4 day carpenter 0.250 770.000
1/2 day labourer 0.500 629.000
scaffolding 3%
per l.ft.
Add O/H & P
Total Rate

Engineering Organization W.P. Page 364 BSR Annalysis


Re-laying available asbestos sheets on the roof in 2
Z 52 storied building.

per sqr
2 1/2/8 day carpenter 0.313 770.000
5/8 day labourer 0.625 629.000
scaffolding 3%
per l.ft.
Add O/H & P
Total Rate

Re-laying available asbestos sheets on the roof in 3


Z 53 storied building.

per sqr
3/8 day carpenter 0.375 770.000
3/4 day labourer 0.750 629.000
scaffolding 3%
per l.ft.
Add O/H & P
Total Rate

Z 54 Fixing available Reepers with wire nails.

per 50 l.ft
1/8 day carpenter 0.125 770.000
1/8 day labourer 0.125 629.000
scaffolding 3%
0.125 lb nails 0.125 61.00
per l.ft.
Add O/H & P
Total Rate

Fixing sorted out & cut to required size available timber


Z 55 to roof or other carpentry work.

per 10 l.ft 4" x 3" = 5/6 C.ft.


3/8 day carpenter 0.375 770.000
1/8day labourer 0.125 629.000
Allow for wire nails & spikes
per C.ft.
Add O/H & P
Total Rate

Fixing available corrugated asbestos sheet with hooks ,


Z 56 nuts and bolts to roofing.

per 3.6 sqr


2 day carpenter 2.000 770.000
2.75 day labourer 2.750 629.000
hooks & nuts & bolts 26.000 15.00
scaffolding 3%

Engineering Organization W.P. Page 365 BSR Annalysis


per sqr
Add O/H & P
Total Rate

Supply and fixing hooks, nuts & bolts for existing


Z 57 asbestos roof.

per 26 nos
1/8 day carpenter 0.125 770.000
1/8 day labourer 0.125 629.000
hooks & nuts & bolts 26.000 15.00
scaffolding 3%
per 1 no
Add O/H & P
Total Rate

Ridge tile bedded in lime cement motor 1:1:4 and


Z 58 coloured to match tiles.( Ridge tile available at site )

per 12 l.ft
0.02 Cu.ft sand 0.020 11050.000
5 kg lime (5/25) 0.200 300.000
.333 cwt cement 0.333 670.000
1/4 day mason 0.250 770.000
1/4 day labourer 0.250 629.000
Allow for colouring powder
scaffolding 3%
per l.ft
Add O/H & P
Total Rate

Fixing of available barge/Valance boards & fascia


Z 59 including cutting and minor repairs.

per 100 L.ft (7"x3/4")=58sq.ft


4 dz screws 2" 4.000 108.000
1 day carpenter 1.000 770.000
1/2 day labourer 0.500 629.000
per l.ft
Add O/H & P
Total Rate

Refixing existing G.I. Valley gutter and flashing


Z 60 including making good.

per 14 L.ft.
1/2 day carpenter 0.500 770.000
1/2 day labourer 0.500 629.000
per l.ft
Add O/H & P
Total Rate

Engineering Organization W.P. Page 366 BSR Annalysis


Fixing of existing gutter and down pipe with making
Z 61 goods and including brackets.

per 13 L.ft.
8 nos screws 2" 8.000 9.000
4 nos brackets 4.000 20.000
1/8 day carpenter 0.125 770.000
1/8 day labourer 0.125 629.000
per l.ft
Add O/H & P
Total Rate

Removing ceiling asbestos including timber frame work,


stacking serviceable materials and clearing debris away
Z 62 in single storeyed building.

per sq.
1/8 day carpenter 0.125 770.00
1 day labourer 1.000 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Removing ceiling asbestos including timber frame work,


stacking serviceable materiel and clearing debris away
Z 63 in two storeyed building.

per sq.
1/8 day carpenter 0.125 770.00
1 day labourer 1.000 629.00
add extra labour in lowering sheets & timber
1/2 day labourer 0.500 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Removing ceiling timber frame work,(with out asbestos


sheet) stacking serviceable materiel and clearing debris
Z 64 away in single storied buildings.

per sq.
1/8 day carpenter 0.125 770.00
1/8 day labourer 0.125 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Engineering Organization W.P. Page 367 BSR Annalysis


Removing ceiling timber frame work,(with out asbestos
sheet) stacking serviceable materiel and clearing debris
Z 65 away in 2 storied buildings.

per sq.
1/8 day carpenter 0.125 770.00
1/4 day labourer 0.250 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Removing existing ceiling sheet stacking materials at


Z 66 the site and clearing debris away.

per sq.
1/8 day carpenter 0.125 770.00
1/2 day labourer 0.500 629.00
scaffolding 3%
per sq.
Add O/H & P
Total Rate

Renewing in small quantities of 6" x 5/8" - 3/4"


lunumidella ceiling including scaffolding up to 30'-0"
Z 67 hight.

per 15 L.ft.
17 l.ft. lunumidella planks 17.000 27.500
1/8 day carpenter 0.125 770.00
1/8 day labourer 0.125 629.00
scaffolding 5%
per L.ft
Add O/H & P
Total Rate

Fixing available lunumidella ceiling planks with new wire


Z 68 nails.

per sqr
0.75 lb 1 1/2" wire nails 0.750 61.000
1 day carpenter 1.000 770.00
1 day labourer 1.000 629.00
scaffolding 3%
per L.ft
Add O/H & P
Total Rate

Supplying and fixing 1 1/2" x 1/2" thick Beading ,


Halmilla or equilant, planing & chamfering complete with
Z 69 brass screws.

Engineering Organization W.P. Page 368 BSR Annalysis


per 100 L.ft
105 l.ft. Beading 1 1/2" x 1/2" 105.000 12.000
4 dz brass screws 4.000 102.000
1/2 day carpenter 0.500 770.00
1/2 day labourer 0.500 629.00
scaffolding 3%
per L.ft
Add O/H & P
Total Rate

Removing and stacking door sash only up to 40 S.ft


Z 70 from existing walls.

per sash
1/2 hr. carpenter 0.500 96.25
1/2 hr. labourer 0.500 78.63
per sash
Add O/H & P
Total Rate

Removing and stacking door sash only over 40 S.ft from


Z 71 existing walls.

per sash
3/4 hr. carpenter 0.750 96.25
3/4 hr. labourer 0.750 78.63
per sash
Add O/H & P
Total Rate

Removing and stacking door frame size up to 40 S.ft


Z 72 from existing walls.

per door or window


1 day Labourer 1.000 629.00
per No.
Add O/H & P
Total Rate

Removing and stacking door frame size over 40 S.ft


Z 73 from existing walls.

per No.
1 1/2 day Labourer 1.500 629.00
per No.
Add O/H & P
Total Rate

Removing and stacking window sash only up to 40 S.ft


Z 74 from existing walls.

Engineering Organization W.P. Page 369 BSR Annalysis


per sash
1/2 hr. carpenter 0.500 96.25
1/2 hr. labourer 0.500 78.63
per sash
Add O/H & P
Total Rate

Removing and stacking window sash only over 40 S.ft


Z 75 from existing walls.

per sash
3/4 hr. carpenter 0.750 96.25
3/4 hr. labourer 0.750 78.63
per sash
Add O/H & P
Total Rate

Z 76 Removing and stacking trellis work

per 8 sq.ft
1/2 hr. carpenter 0.500 96.25
1/4 hr. labourer 0.250 78.63
per sq.ft.
Add O/H & P
Total Rate

Removing and stacking glass panes in doors and


Z 77 windows and fanlight.

per 8 panes or 6 sq.ft.


2 hr. carpenter 2.000 78.63
per sq.ft.
Add O/H & P
Total Rate

Renewing in short lengths with approved timber in


Z 78 existing door or window frames .

per 10 L.ft
11 l.ft. approved 4" x 3" 11.000 280.000
3/4 day carpenter 0.750 770.00
3/4 day labourer 0.750 629.00
Allow for nails 3%
per L.ft
Add O/H & P
Total Rate

Door or window frame altering existing rebate fillet


using approved quality timber with screws and fixing
Z 79 available sashes.

Engineering Organization W.P. Page 370 BSR Annalysis


per no
21 l.ft. approved 1 1/4" x 1/2" 21.000 12.000
12 screws 1 1/2" 12.000 8.500
1 day carpenter 1.000 770.00
1/2 day labourer 0.500 629.00
Allow for nails 3%
per No
Add O/H & P
Total Rate

Removing damage sashes of door or window and


Z 82 preparing & re-fixing.
.
per sash
1 1/4 day carpenter 1.250 770.00
1 1/4 day labourer 1.250 629.00
Allow for nails 2%
per sash
Add O/H & P
Total Rate

Supply and fixing Trellis work 1/2" x 1/2" laths with 2"
apart diagonally, horizontally or vertically on existing
Z 83 timber framing.

per 24 sq.ft.
310 l.ft. trelis 310.000 10.000
2 day carpenter 2.000 770.00
1/2 day labourer 0.500 629.00
Allow for nails & others 5%
per sq.ft.
Add O/H & P
Total Rate

Supply and fixing 3mm thick glass panes for the existing
door / window or fanlight sashes with approved timber
Z 84 beading.

per 6 panes (8" x 10") = 3.33sq.ft.


3.67 sq.ft 3mm glass panes 3.670 68.000
20 l.ft timber beading 20.000 10.000
1.5 hrs carpenter 1.500 96.250
Allow for nails & others 5%
per sq.ft.
Add O/H & P
Total Rate

Removing wash basin , sink or urinals including all


Z 85 fittings and making walls good.

Per No
removing basin, bracket and pipe

Engineering Organization W.P. Page 371 BSR Annalysis


3/8 day plumber 0.375 770.000
3/8 day Labourer 0.375 629.000
making good to walls & floors
1/8 day mason 0.125 770.000
1/8 day Labourer 0.125 629.000
Allow for cement & others
per No
Add O/H & P
Total Rate

Removing squatting & standing types water closet with


plugging sewer connection and reparing the wall & floor.
Z 86

Per No
1/2 day plumber 0.500 770.000
1/2 day Labourer 0.500 629.000
1/4 cwt cement 0.250 670.000
per No
Add O/H & P
Total Rate

Disconnecting flushing cistern and removing with


plugging water connection and making good of all
Z 87 damaged walls, floors & etc.

Per No
1/2 day plumber 0.500 770.000
1/2 day Labourer 0.500 629.000
1 no - 1/2" Pvc plug 1.000 14.000
Allow for solvent cement & others
per No
Add O/H & P
Total Rate

Z 88 Removing 1/2" to 1 1/2" dia. bib tap or stop cock.

Per No
1/6 hrs plumber 0.167 96.250
1/6 hrs Labourer 0.167 78.625
per No
Add O/H & P
Total Rate

Z 89 Fixing available ball valve.

Per No
1/2 hrs plumber 0.500 96.250
1/2 hrs Labourer 0.500 78.625
per No
Add O/H & P
Total Rate

Engineering Organization W.P. Page 372 BSR Annalysis


Fixing lavatory type basin to existing brackets. ( Tap ,
Z 90 waste pipe and basin are available)

Per No
1/2 day plumber 0.500 770.000
1/2 day Labourer 0.500 629.000
Allow for screws & others
per No
Add O/H & P
Total Rate

Fixing of wash basin, leveling and connecting to


existing water connections and making good (Basin,
Z 91 bracket and fittings are available)

Per No
fixing basin & tap
1/2 day plumber 0.500 770.000
1/2 day Labourer 0.500 629.000
4 no roll plug 4.000 4.00
4 no screws 2" 4.000 9.00
making good to walls & floors
1/8 day mason 0.125 770.000
1/8 day Labourer 0.125 629.000
Allow for cement & others
per No
Add O/H & P
Total Rate

Repairing bib taps and stop cocks by fixing leather


Z 92 washers.

Per No
1/2 hrs plumber 0.500 96.250
1/2 hrs Labourer 0.500 78.625
Allow for washer & others
per No
Add O/H & P
Total Rate

Removing & repairing pillar tap and re-fixing to the


Z 93 wash basin carefully without any damaged.

Per No
1 1/2 hrs plumber 1.500 96.250
Allow for thred seal & others
per No
Add O/H & P
Total Rate

Engineering Organization W.P. Page 373 BSR Annalysis


Supply & fixing Universal bend of "Rocell" brand &
Z 94 model "Vario Joint".

Per No
1 no universal bend 1.000 760.000
1/2 hrs plumber 0.500 96.250
Allow for thred seal & others
per No
Add O/H & P
Total Rate

Removing painting from walls and clearing debris away.


Z 95

Per sqr
1/2 day labour 0.500 629.000
Allow for sand paper & others
per sqr
Add O/H & P
Total Rate

Removing enamel paint from door or window frame and


Z 96 clearing debris away.

Per sqr
1 day labour 1.000 629.000
Allow for sand paper & others
per sqr
Add O/H & P
Total Rate

Removing paint from painted glass panes with caustic


Z 97 soda solution or other paint remover.

Per 5 panes 15" x 8" = 4.17sq.ft


1/8 day labour 0.125 629.000
Allow for paint romover & others
per sq.ft
Add O/H & P
Total Rate

Removing water proof treatment or hot bitumen from


Z 98 floors or flat roof and clearing debris away.

Per sqr
2 day labour 2.000 629.000
per sqr
Add O/H & P
Total Rate

Engineering Organization W.P. Page 374 BSR Annalysis


Painting ceiling beading with two coats of enamal paint.
Z 99

Per 100 L.ft 20.833


Material
0.375 litres enamel paint 0.375 645.00
1" brush (1/10 Use) 1.000 18.00
Sub Total
Labour
4 hrs painter 4.000 96.25
1 hrs labourer 1.000 78.63
Scaffolding 5%
Sub Total

Rate per 100 l.ft


Rate per l.ft
Add 22%
Total Rate

Painting existing ceiling fan with one coat of anti-


corrosive paint & two coats of enemel paint including
removing corroded scale and wire brushing.
Z 100

Per 12 nos
material
1.5 lit. Enamel paint 1.500 645.00
0.75 lit. Anticorrosive paint 0.750 525.00
0.75 lit. Thinner 0.750 233.75
02 nos sand paper 2.000 20.00

Labour
4 day Painter 4.000 770.00
Add 3% tools

Rate per 12 nos


Rate per no.
Add O/H & P
Total Rate

Z 109 Supplying and placing 4" dia. PVC wheep holes.

Per 10 nos 2'-6" l.ft = 25 l.ft


25 l.ft. 4" pvc pipe 25.000 100.000
Add wastage 5%
1/8 day labour 0.125 629.000

Rate per 25 l.ft.


Rate per L.ft.
Add O/H & P
Total Rate

Engineering Organization W.P. Page 375 BSR Annalysis


Z 110 Supplying and placing 2" dia. PVC wheep holes.

Per 10 nos 2'-6" l.ft = 25 l.ft


25 l.ft. 2" pvc pipe 25.000 76.000
Add wastage 5%
1/8 day labour 0.125 629.000

Rate per 25 l.ft.


Rate per L.ft.
Add O/H & P
Total Rate

Removing existing mortice lock repairing and re-fixing.


Z 111

Per No
3/8 day skill labour 0.375 770.000
per No
Add O/H & P
Total Rate

Removing and stacking partitions at site including


Z 112 making good to walls & floors.

Per 15' x 7' = 105 sq.ft.


1/2 day skill labour 0.500 770.000
1 day labour 1.000 629.000
Allow for grout or finishing matearial 2%
Rate per 105 sq ft
per sq.ft
Add O/H & P
Total Rate

Supplying & fixing PVC coated G.I. chain link fence (2" x
2") of gauge 10 height of 8'-0" for GI pipe fixed with
AA 04 available 20mm x 6mm flat iron ( GI pipe & flat iron
measured separately) complete with tension J bolts and
tension cords.

Data per 240 Sq.ft.


240 Sq.ft. chain link (G10) 240.000 45.00
99 L.ft. tension coats 99.000 6.00
27 Nos. 3/5" J bolts and nuts 27.000 8.00
6 No. D bolts @ 6.000 35.00
Allow for scaffolding
Allow for puller (2 Nos.) 2.000 65.00
Allow for transport 2% of material cost

Labour

Engineering Organization W.P. Page 376 BSR Annalysis


Strengthening chain link
1 Day 2 Labour 2.000 770.00
Tensioning & fixing
1 Day 2 Skilled labourers 2.000 770.00
1 Day 2 Labourer 2.000 629.00

Rate per 300 Sq.ft.


Rate per Sq.ft.
Add O/H & P
Total Rate

Supplying & fixing PVC coated G.I. chain link fence (2" x
2") of gauge 10 height of 10'-0" for GI pipe fixed with
AA 05 available 20mm x 6mm flat iron ( GI pipe & flat iron
measured separately) complete with tension J bolts and
tension cords.

Data per 300 Sq.ft.


300 Sq.ft. chain link (G10) 300.000 45.00
99 L.ft. tension coats 99.000 6.00
27 Nos. 3/5" J bolts and nuts 27.000 8.00
6 No. D bolts @ 6.000 35.00
Allow for scaffolding
Allow for puller (2 Nos.) 2.000 65.00
Allow for transport 2% of material cost

Labour
Strengthening chain link
1 Day 2 Labour 2.000 629.00
Tensioning & fixing
1 Day 2 Skilled labourers 2.000 770.00
1 Day 2 Labourer 2.000 629.00

Rate per 300 Sq.ft.


Rate per Sq.ft.
Add O/H & P
Total Rate

Supplying and fixing 2" dia.x 3.6mm thick Medium


quality GI pipe 8'-0" clear height with excavation 1'-0"x
1'-0"x 3'-0" cement concrete base 1:2:4 (3/4") with 1/2"
dia. MS rods welded to bottom of G.I. Pipe and drilling 7
AA 06
Nos. holes to fixed the chain link (chain link measured
separately) and fiberglass coping on top. Rate to include
for application of one coat of anticorrosive paint and two
coats of enamel paint.

Data per 1 No. Pipe 2" dia. (11'0" L.ft.)


11 L.ft. GI Pipe 2" dia. 11.000 265.00

Engineering Organization W.P. Page 377 BSR Annalysis


4 L.ft. 1/2" M.S. rods - 1.083 kg 1.083 129.50
1 No. fibreglass coping 1.000 120.00
Allow for welding plant and rods
Allow for transport
1/4 Day Welder 0.250 770.00
1/4 Day Labourer 0.250 629.00

As per BSR
0.03 Cub. Excavation 0.030 1410.77
0.04 Cube Concrete 1:2:4(3/4") 0.040 27784.27
0.063 Sqr. Anticorrosive paint 0.063 962.50
0.063 Sqr. Enamel paint 0.063 1944.74

Rate per 11.00 L.ft.


Rate per L.ft.
Add O/H & P
Total Rate

Supplying and fixing 2" dia.x 3.6mm thick Medium


quality GI pipe 10'-0" clear height with excavation 1'-0"x
1'-0"x 3'-0" cement concrete base 1:2:4 (3/4") with 1/2"
dia. MS rods welded to bottom of G.I. Pipe and drilling 7
AA 07
Nos. holes to fixed the chain link (chain link measured
separately) and fiberglass coping on top. Rate to include
for application of one coat of anticorrosive paint and two
coats of enamel paint.

Data per 1 No. Pipe 2" dia. (13'0" L.ft.)


13 L.ft. GI Pipe 2" dia. 13.000 265.00
4 L.ft. 1/2" M.S. rods - 1.083 kg 1.083 129.50
1 No. fibreglass coping 1.000 120.00
Allow for welding plant and rods
Allow for transport
1/4 Day Welder 0.250 770.00
1/4 Day Labourer 0.250 629.00

As per BSR
0.03 Cub. Excavation 0.030 1410.77
0.04 Cube Concrete 1:2:4(3/4") 0.040 27784.27
0.075 Sqr. Anticorrosive paint 0.075 962.50
0.075 Sqr. Enamel paint 0.075 1944.74

Rate per 13.00 L.ft.


Rate per L.ft.
Add O/H & P
Total Rate

Engineering Organization W.P. Page 378 BSR Annalysis


Supplying and fixing 3" dia.x 4mm thick Medium quality
GI pipe 8'-0" clear height with excavation 1'-0"x 1'-0"x 3'-
0" cement concrete base 1:2:4 (3/4") with 1/2" dia. MS
rods welded to bottom of G.I. Pipe and drilling 7 Nos.
AA 08
holes to fixed the chain link (chain link measured
separately) and fiberglass coping on top. Rate to include
for application of one coat of anticorrosive paint and two
coats of enamel paint.

Data per 1 No. Pipe 3" dia. (11'0" L.ft.)


11 L.ft. GI Pipe 3" dia. 11.000 450.00
6 L.ft. 1/2" M.S. rods -1.62kg 1.620 129.50
1 No. fibreglass coping 1.000 120.00
Allow for welding plant and rods
Allow for transport
1/4 Day Welder 0.250 770.00
1/4 Day Labourer 0.250 629.00

As per BSR
0.03 Cub. Excavation 0.030 1410.77
0.04 Cube Concrete 1:2:4(3/4") 0.040 27784.27
0.092 Sqr. Anticorrosive paint 0.092 962.50
0.092 Sqr. Enamel paint 0.092 1944.74

Rate per 11.00 L.ft.


Rate per L.ft.
Add O/H & P
Total Rate

Supplying and fixing 3" dia.x 4mm thick Medium quality


GI pipe 10'-0" clear height with excavation 1'-0"x 1'-0"x
3'-0" cement concrete base 1:2:4 (3/4") with 1/2" dia. MS
rods welded to bottom of G.I. Pipe and drilling 7 Nos.
AA 09
holes to fixed the chain link (chain link measured
separately) and fiberglass coping on top. Rate to include
for application of one coat of anticorrosive paint and two
coats of enamel paint.

Data per 1 No. Pipe 3" dia. (13'0" L.ft.)


13 L.ft. GI Pipe 2" dia. 13.000 450.00
6 L.ft. 1/2" M.S. rods -1.62kg 1.620 129.50
1 No. fibreglass coping 1.000 120.00
Allow for welding plant and rods
Allow for transport
1/4 Day Welder 0.250 770.00
1/4 Day Labourer 0.250 629.00

As per BSR
0.03 Cub. Excavation 0.030 1410.77
0.04 Cube Concrete 1:2:4(3/4") 0.040 27784.27
0.109 Sqr. Anticorrosive paint 0.109 962.50
0.109 Sqr. Enamel paint 0.109 1944.74

Engineering Organization W.P. Page 379 BSR Annalysis


Rate per 13.00 L.ft.
Rate per L.ft.
Add O/H & P
Total Rate

Supplying and fixing 20mm x 6mm flat iron to existing GI


pipe (GI pipe measured separately) to fix the chain link,
AA 10 Rate inclusive of drilling 09 Nos. holes of 6mm dia. Rate
to include for application of one coat of anticorrosive
paint and two coats of enamel paint.

Date for 10'0" L.ft.


13 L.ft. 20mm x 6mm Flat iron 13.000 52.00
Allow for 9 No. Drilling holes
Allow for transport & scaffolding
1/8 day welder 0.125 770.00
1/8 day labour 0.125 629.00

As per BSR
0.02 Sqr Anticorrosive paint 0.020 962.50
0.02 Sqr. Enamel paint 0.020 1944.74

Rate per 10'0" L.ft.


Rate per L.ft.
Add O/H & P
Total Rate

Supplying and fixing 38mm x 38mm x 6mm angle iron


horizontal bracings welded to existing GI pipes. Rate to
AA 11
include for application of one coat of anticorrosive paint
and two coats of enamel paint.

Data per 20 L.ft.


20 L.ft. 1 1/2"x 1 1/2"x 6mm angle iron 20.000 125.00
10% Wastage
Allow for welding plant & rods
Allow for transport & Tools
1/8 day welder 0.125 770.00
1/8 day labour 0.125 629.00

0.10 Sqr. Anticorrosive paint 0.100 962.50


0.10 Sqr. Enamel paint 0.100 1944.74

Rate per 20 L.ft.

Engineering Organization W.P. Page 380 BSR Annalysis


Rate per L.ft.
Add O/H & P
Total Rate

Supplying and fixing 1" dia. x 3.2mm thick GI pipe


horizontal bracings welded to existing GI pipes. Rate to
AA 12
include for application of one coat of anticorrosive paint
and two coats of enamel paint.

Data per 20 L.ft.


20 L.ft. - 1" dia. GI pipe 20.000 130.00
5% Wastage
Allow for welding plant & rods
Allow for transport & Tools
1/8 day welder 0.125 770.00
1/8 day labour 0.125 629.00

0.115 Sqr. Anticorrosive paint 0.115 962.50


0.115 Sqr. Enamel paint 0.115 1944.74

Rate per 20 L.ft.


Rate per L.ft.
Add O/H & P
Total Rate

Supplying & fixing 14 gauge barbed wire 4 points, 3"


AA 13 apart on pre-cast concrete posts with hook bolts
including straining. ( Concrete Posts paid seperately)

Per 100 L.ft.


Material
100 L.ft. - Barbed wire (600L.ft = 25kg ) 100.000 6.100
Allow for hooks bolts

Labour
2 hrs Skill labourer 2.000 96.250
2 hrs Unskill labourer 2.000 78.625
Add 2.5% tools

Rate per 100'-0' L.ft.


Rate per L.ft.
Add 22%
Total Rate

Engineering Organization W.P. Page 381 BSR Annalysis


Supplying & fixing pre-cast concrete Intermediate Posts
of size (5" x 5") - (3" x 3") & 5'-9" high for 7 strands
AA 14
including necessary excavation and concreting at the
placing.

Per no
Material
1 no - Intermediate Post 1.000 845.000
Allow for concreting

Labour
1/8 day 2 labourers = 1/4 day 0.250 629.000

Rate per No
Add 22%
Total Rate

Supplying & fixing pre-cast concrete End Posts of size


AA 15 (5" x 5") & 6'-3" high for 7 strands including necessary
excavation and concreting at the placing.

Per no
Material
1 no - End Post 1.000 1530.000
Allow for concreting

Labour
1/8 day 2 labourers = 1/4 day 0.250 629.000

Rate per No
Add 22%
Total Rate

Supplying & fixing pre-cast concrete Struts of size (5" x


AA 16 4") - (3" x 3") & 6'-5" high for 7 strands including
necessary excavation and concreting at the placing.

Per no
Material
1 no - Struts 1.000 950.000
Allow for concreting

Labour
1/8 day 2 labourers = 1/4 day 0.250 629.000

Engineering Organization W.P. Page 382 BSR Annalysis


Rate per No
Add 22%
Total Rate

Supplying & fixing pre-cast concrete Intermediate Posts


of size (5" x 5") - (3" x 3") & 6'-9" high for 8 strands
AA 17
including necessary excavation and concreting at the
placing.

Per no
Material
1 no - Intermediate Post 1.000 1000.000
Allow for concreting

Labour
1/8 day 2 labourers = 1/4 day 0.250 629.000

Rate per No
Add 22%
Total Rate

Supplying & fixing pre-cast concrete End Posts of size


AA 18 (5" x 5") & 7'-3" high for 8 strands including necessary
excavation and concreting at the placing.

Per no
Material
1 no - End Post 1.000 1940.000
Allow for concreting

Labour
1/8 day 2 labourers = 1/4 day 0.250 629.000

Rate per No
Add 22%
Total Rate

Supplying & fixing pre-cast concrete Struts of size (5" x


AA 19 4") - (3" x 3") & 7'-5" high for 8 strands including
necessary excavation and concreting at the placing.

Per no
Material

Engineering Organization W.P. Page 383 BSR Annalysis


1 no - Struts 1.000 1070.000
Allow for concreting

Labour
1/8 day 2 labourers = 1/4 day 0.250 629.000

Rate per No
Add 22%
Total Rate

Supplying & fixing pre-cast concrete Intermediate Posts


of size (5" x 5") - (3" x 3") & 7'-9" high for 9 strands
AA 20
including necessary excavation and concreting at the
placing.

Per no
Material
1 no - Intermediate Post 1.000 1225.000
Allow for concreting

Labour
1/8 day 2 labourers = 1/4 day 0.250 629.000

Rate per No
Add 22%
Total Rate

Supplying & fixing pre-cast concrete End Posts of size


AA 21 (5" x 5") & 8'-3" high for 9 strands including necessary
excavation and concreting at the placing.

Per no
Material
1 no - End Post 1.000 2220.000
Allow for concreting

Labour
1/8 day 2 labourers = 1/4 day 0.250 629.000

Rate per No
Add 22%
Total Rate

Engineering Organization W.P. Page 384 BSR Annalysis


Supplying & fixing pre-cast concrete Struts of size (5" x
AA 22 4") - (3" x 3") & 8'-5" high for 9 strands including
necessary excavation and concreting at the placing.

Per no
Material
1 no - Struts 1.000 1175.000
Allow for concreting

Labour
1/8 day 2 labourers = 1/4 day 0.250 629.000

Rate per No
Add 22%
Total Rate

Supplying & fixing pre-cast concrete Intermediate Posts


of size (5" x 5") - (3" x 3") & 7'-7" + 1'-6" high for 12
AA 23
strands including necessary excavation and concreting
at the placing.

Per no
Material
1 no - Intermediate Post 1.000 1350.000
Allow for concreting

Labour
1.5 hrs 2 labourers = 3/8 day 0.375 629.000

Rate per No
Add 22%
Total Rate

Supplying & fixing pre-cast concrete End Posts of size


AA 24 (5" x 5") & 8'-1" + 1'-6" high for 12 strands including
necessary excavation and concreting at the placing.

Per no
Material
1 no - End Post 1.000 2525.000
Allow for concreting

Labour
1.5 hrs 2 labourers = 3/8 day 0.375 629.000

Engineering Organization W.P. Page 385 BSR Annalysis


Rate per No
Add 22%
Total Rate

Supplying & fixing pre-cast concrete Struts of size (5" x


AA 25 4") - (3" x 3") & 8'-1" + 1'-6" high for 12 strands including
necessary excavation and concreting at the placing.

Per no
Material
1 no - Struts 1.000 2170.000
Allow for concreting

Labour
1.5 hrs 2 labourers = 3/8 day 0.375 629.000

Rate per No
Add 22%
Total Rate

Supply & paving 80mm thick Uni-III (Approx. size 210mm


x 110mm ) natural colour precast interlocking paving
blocks of 40 N/mm2 compressive strengh , on 2" thick
compacted sand bed laid on top of a levelled and well
AB 11
compacted earth sub base for the high volume traffic
areas. Paving blocks should conferming to S.L.S. ......
and subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

Per Sqr - (No.of units for sq.ft.-3.7approx.)


Material
370 Sq.ft. Blocks 370.00 36.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Engineering Organization W.P. Page 386 BSR Annalysis


Supply & paving 80mm thick Uni-III (Approx. size 210mm
x 110mm ) natural colour precast interlocking paving
blocks of 30 N/mm2 compressive strengh , on 2" thick
compacted sand bed laid on top of a levelled and well
AB 12 compacted earth sub base for the Low volume traffic
areas or Pedestrian areas. Paving blocks should
conferming to S.L.S. ...... and subject to the approval of
the quality & colour. ( Transport cost of blocks paid
seperatly as per HSR )

Per Sqr - (No.of units for sq.ft.-3.7approx.)


Material
370 Sq.ft. Blocks 370.00 29.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Supply & paving 60mm thick Uni-II (Approx. size 210mm


x 110mm ) natural colour precast interlocking paving
blocks of 15 N/mm2 compressive strengh , on 2" thick
compacted sand bed laid on top of a levelled and well
AB 13
compacted earth sub base for the Pedestrian areas.
Paving blocks should conferming to S.L.S. ...... and
subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

Per Sqr - (No.of units for sq.ft.-3.7approx.)


Material
370 Sq.ft. Blocks 370.00 24.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Engineering Organization W.P. Page 387 BSR Annalysis


Supply & paving 80mm thick Priory-III (Approx. size
200mm x 100mm ) natural colour precast interlocking
paving blocks of 40 N/mm2 compressive strengh , on 2"
thick compacted sand bed laid on top of a levelled and
AB 14 well compacted earth sub base for the high volume
traffic areas. Paving blocks should conferming to
S.L.S. ...... and subject to the approval of the quality &
colour. ( Transport cost of blocks paid seperatly as per
HSR )

Per Sqr - (No.of units for sq.ft.- 4.5 approx.)


Material
450 Sq.ft. Blocks 450.00 35.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Supply & paving 80mm thick Priory-III (Approx. size


200mm x 100mm ) natural colour precast interlocking
paving blocks of 30 N/mm2 compressive strengh , on 2"
thick compacted sand bed laid on top of a levelled and
AB 15 well compacted earth sub base for the Low volume
traffic areas or Pedestrian areas. Paving blocks should
conferming to S.L.S. ...... and subject to the approval of
the quality & colour. ( Transport cost of blocks paid
seperatly as per HSR )

Per Sqr - (No.of units for sq.ft.- 4.5 approx.)


Material
450 Sq.ft. Blocks 450.00 28.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Engineering Organization W.P. Page 388 BSR Annalysis


Supply & paving 60mm thick Priory-II (Approx. size
200mm x 100mm ) natural colour precast interlocking
paving blocks of 15 N/mm2 compressive strengh , on 2"
thick compacted sand bed laid on top of a levelled and
AB 16
well compacted earth sub base for the Pedestrian areas.
Paving blocks should conferming to S.L.S. ...... and
subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

Per Sqr - (No.of units for sq.ft.- 4.5 approx.)


Material
450 Sq.ft. Blocks 450.00 23.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Supply & paving 80mm thick Uni-III (Approx. size 210mm


x 110mm ) colour precast interlocking paving blocks of
40 N/mm2 compressive strengh , on 2" thick compacted
sand bed laid on top of a levelled and well compacted
AB 17
earth sub base for the high volume traffic areas. Paving
blocks should conferming to S.L.S. ...... and subject to
the approval of the quality & colour. ( Transport cost of
blocks paid seperatly as per HSR )

Per Sqr - (No.of units for sq.ft.-3.7approx.)


Material
370 Sq.ft. Blocks 370.00 41.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Engineering Organization W.P. Page 389 BSR Annalysis


Supply & paving 80mm thick Uni-III (Approx. size 210mm
x 110mm ) colour precast interlocking paving blocks of
30 N/mm2 compressive strengh , on 2" thick compacted
sand bed laid on top of a levelled and well compacted
AB 18 earth sub base for the Low volume traffic areas or
Pedestrian areas. Paving blocks should conferming to
S.L.S. ...... and subject to the approval of the quality &
colour. ( Transport cost of blocks paid seperatly as per
HSR )

Per Sqr - (No.of units for sq.ft.-3.7approx.)


Material
370 Sq.ft. Blocks 370.00 34.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Supply & paving 60mm thick Uni-II (Approx. size 210mm


x 110mm ) colour precast interlocking paving blocks of
15 N/mm2 compressive strengh , on 2" thick compacted
sand bed laid on top of a levelled and well compacted
AB 19
earth sub base for the Pedestrian areas. Paving blocks
should conferming to S.L.S. ...... and subject to the
approval of the quality & colour. ( Transport cost of
blocks paid seperatly as per HSR )

Per Sqr - (No.of units for sq.ft.-3.7approx.)


Material
370 Sq.ft. Blocks 370.00 30.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Engineering Organization W.P. Page 390 BSR Annalysis


Supply & paving 80mm thick Priory-III (Approx. size
200mm x 100mm ) colour precast interlocking paving
blocks of 40 N/mm2 compressive strengh , on 2" thick
compacted sand bed laid on top of a levelled and well
AB 20
compacted earth sub base for the high volume traffic
areas. Paving blocks should conferming to S.L.S. ......
and subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

Per Sqr - (No.of units for sq.ft.- 4.5 approx.)


Material
450 Sq.ft. Blocks 450.00 40.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Supply & paving 80mm thick Priory-III (Approx. size


200mm x 100mm ) colour precast interlocking paving
blocks of 30 N/mm2 compressive strengh , on 2" thick
compacted sand bed laid on top of a levelled and well
AB 21 compacted earth sub base for the Low volume traffic
areas or Pedestrian areas. Paving blocks should
conferming to S.L.S. ...... and subject to the approval of
the quality & colour. ( Transport cost of blocks paid
seperatly as per HSR )

Per Sqr - (No.of units for sq.ft.- 4.5 approx.)


Material
450 Sq.ft. Blocks 450.00 33.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Engineering Organization W.P. Page 391 BSR Annalysis


Supply & paving 60mm thick Priory-II (Approx. size
200mm x 100mm ) colour precast interlocking paving
blocks of 15 N/mm2 compressive strengh , on 2" thick
compacted sand bed laid on top of a levelled and well
AB 22
compacted earth sub base for the Pedestrian areas.
Paving blocks should conferming to S.L.S. ...... and
subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

Per Sqr - (No.of units for sq.ft.- 4.5 approx.)


Material
450 Sq.ft. Blocks 450.00 29.00
0.25 cube Sand 0.25 11050.00
material wastage

Labour
2 Day Mason 2.00 770.00
2 Day Labour 2.00 629.00

Rate per Sqr


Add 22 %
Total Rate

Supply & paving pre cast concrete Curb ( Small ) size


75mm x 175mm x 540mm of 25 N/mm2 compressive
AB 23
strengh with 1:3 cement mortar on top of a well
compacted earth sub base.

Per 18 L.ft.
Material
10 Nos Curb 10.00 200.00
Allow for cement & sand

Labour
1 Day Mason 1.00 770.00
1 1/2 Day Labour 1.50 629.00

Rate per 18 L.ft


Rate per L.ft
Add 22 %
Total Rate

Supply & paving pre cast concrete Curb ( Half ) size


125mm x 255mm x 450mm of 25 N/mm2 compressive
AB 24
strengh with 1:3 cement mortar on top of a well
compacted earth sub base.

Per 15 L.ft.

Engineering Organization W.P. Page 392 BSR Annalysis


Material
10 Nos Curb 10.00 275.00
Allow for cement & sand

Labour
1 Day Mason 1.00 770.00
1 1/2 Day Labour 1.50 629.00

Rate per 15 L.ft


Rate per L.ft
Add 22 %
Total Rate

Supply & paving pre cast concrete Curb ( Full ) size


125mm x 255mm x 915mm of 25 N/mm2 compressive
AB 25
strengh with 1:3 cement mortar on top of a well
compacted earth sub base.

Per 30 L.ft.
Material
10 Nos Curb 10.00 520.00
Allow for cement & sand

Labour
2 Day Mason 2.00 770.00
3 Day Labour 3.00 629.00

Rate per 30 L.ft


Rate per L.ft
Add 22 %
Total Rate

Engineering Organization W.P. Page 393 BSR Annalysis


OVERHEAD
0.22
& PROFIT

629.00
26.64
655.64
144.24
799.88

943.50
26.64
970.14
213.43
1183.57

1022.13
26.64
47.50
1096.27
241.18
1337.44

1336.63
26.64
47.50
1410.77
310.37
1721.13

Engineering Organization W.P. Page 394 BSR Annalysis


2044.25
26.64
95.00
2165.89
476.50
2642.39

2673.25
26.64
142.50
2842.39
0.00
2842.39

6890.63
770.00
1887.00
9547.63
63.65
14.00
77.65

13781.25
1540.00
2516.00
17837.25
118.92
26.16
145.08

Engineering Organization W.P. Page 395 BSR Annalysis


20671.88
2310.00
3145.00
26126.88
174.18
38.32
212.50

12937.50
1540.00
1887.00
16364.50
109.10
24.00
133.10

25875.00
2310.00
2516.00
30701.00
204.67
45.03
249.70

38812.50
3080.00
3145.00
45037.50
300.25
66.06
366.31

Engineering Organization W.P. Page 396 BSR Annalysis


943.50
26.67
970.17
213.44
1183.60

11050.00
11050.00
2431.00
13481.00

62125.00
200.00
1250.00
3774.00
94.35
67443.35
9634.76
2119.65
11754.41

5750.00
25.00
330.00

Engineering Organization W.P. Page 397 BSR Annalysis


1258.00
31.45
7394.45
1626.78
9021.23

419.54
333.00
752.54
165.56
918.10

4845.00
1540.00

6385.00
15.96
1.28
17.24

4845.00
1540.00

Engineering Organization W.P. Page 398 BSR Annalysis


1596.25

7981.25
19.95
1.60
21.55

CONCRETE

8710.00
5856.50
5060.00
1666.67
55.00
21348.17

770.00
3774.00
113.60
4657.60

26005.77
5721.27
31727.04

31727.04

7931.76

7537.50
6188.00
6000.00
55.00
19780.50

770.00
5032.00
5802.00

Engineering Organization W.P. Page 399 BSR Annalysis


25582.50
5628.15
31210.65

5201.78

7537.50
6188.00
6000.00
55.00
19780.50

770.00
5032.00
5802.00

25582.50
5628.15
31210.65

12060.00
5525.00
6250.00
60.00
1666.67
1166.67
26728.33

770.00
3774.00
629.00
129.33
5302.33
32030.66
7046.74
39077.40

39077.40
1172.32
40249.73

Engineering Organization W.P. Page 400 BSR Annalysis


39077.40
1953.87
41031.27

15410.00
4641.00
5125.00
1665.00
1166.67
75.00
28082.67

770.00
3774.00
629.00
129.33
5302.33

33384.99
7344.70
40729.69

40729.69
1221.89
41951.58

40729.69
2036.48
42766.17

30373.33
15000.00
17680.00
80.00

Engineering Organization W.P. Page 401 BSR Annalysis


5000.00
3500.00
71633.33

3080.00
15096.00
629.00
470.13
19275.13

90908.46
11363.56
2499.98
13863.54

34170.00
16875.00
19890.00
85.00
5000.00
3500.00
79520.00

3080.00
15410.50
629.00
477.99
19597.49

99117.49
12389.69
2725.73
15115.42

37966.66
18750.00
22100.00
90.00
5000.00
3500.00
87406.66

3080.00
15725.00

Engineering Organization W.P. Page 402 BSR Annalysis


629.00
485.85
19919.85

107326.51
13415.81
2951.48
16367.29

42880.00
23125.00
24310.00
100.00
5000.00
3500.00
98915.00

3080.00
16039.50
629.00
493.71
20242.21

119157.21
14894.65
3276.82
18171.47

46900.00
25000.00
26520.00
110.00
5000.00
3500.00
107030.00

3272.50
16354.00
629.00
506.39
20761.89

127791.89
15973.99

Engineering Organization W.P. Page 403 BSR Annalysis


3514.28
19488.26

402.00
221.00
218.75
175.00
712.25 275
220.00 100
10.00
1959.00

192.50
157.25

192.50
157.25

192.50

157.25
1049.25

3008.25
300.83
66.18
367.01

367.01
11.01
378.02

367.01
18.35

Engineering Organization W.P. Page 404 BSR Annalysis


385.36

201.00 1.65 0.18


110.50
125.00
140.00 10
518.00
55.00
5.00
1154.50

192.50
157.25

192.50
157.25

192.50

157.25
1049.25

2203.75
220.38
48.48
268.86

268.86
8.07
276.92

268.86
13.44
282.30

Engineering Organization W.P. Page 405 BSR Annalysis


199.66 1.65 0.18
88.40 1.65 0.005
112.50 1.65 0.01
135.00 13.3
518.00 4.1384146341
55.00 0.3722560976
5.00
1113.56

192.50
157.25

192.50
157.25

192.50

157.25
1049.25

2162.81
216.28
47.58
263.86

263.86
7.92
271.78

263.86
13.19
277.06

Engineering Organization W.P. Page 406 BSR Annalysis


301.50 2.5 0.18
143.65 2.5 0.005
156.25 2.5 0.01
150.00 15
712.25 5.6432926829
110.00 0.3722560976
5.00
1578.65

192.50
157.25

192.50
157.25

192.50

157.25
1049.25

2627.90
262.79
57.81
320.60

320.60
9.62
330.22

320.60
16.03
336.63

Engineering Organization W.P. Page 407 BSR Annalysis


388.60
176.80
187.50
150.00 15
518.00
200.00
48.63
1669.53

192.50
235.88

192.50
157.25

96.25
26.23
874.38

2543.90
254.39
55.97
310.36

469.00
221.00
250.00
150.00
518.00
200.00
54.24
1862.24

192.50
235.88

192.50
157.25

96.25
26.23

Engineering Organization W.P. Page 408 BSR Annalysis


874.38

2736.62
273.66
60.21
333.87

753.75
342.55
393.75
230.00 23.40
1036.00
330.00
200.00
88.68
3374.73

192.50
314.50

192.50
157.25

288.75
34.37
1145.50

4520.23
452.02
99.45
551.47

18.00 0.1128472222 0.203


0.50 1.1284722222 0.006
134.00 1.00 0.011 0.011
66.30
68.75
60.00
246.05 1.881
200.00
23.25
798.35

Engineering Organization W.P. Page 409 BSR Annalysis


96.25
157.25

192.50
157.25
18.10
603.25

724.79 14 1.1666666667

2126.39
212.64
46.78
259.42

18.00 0.1388888889 0.250


0.50 1.3888888889 0.007
167.50 1.00 0.014 0.014
77.35
87.50
60.00
492.10 3.762
100.10 0.907
200.00
32.53
1217.08

96.25
157.25

192.50
157.25

96.25
20.99
603.25

805.32 15.5 1.2916666667

2625.65
262.57
57.76
320.33
0.2209821429 0.0625

Engineering Organization W.P. Page 410 BSR Annalysis


18.00 0.3876488095 0.698
0.50 3.8764880952 0.019
536.00 1.00 0.039 0.039
221.00
250.00
135.00
80.00
246.05 3.762
100.10 0.907
200.00
0.00
1768.15

192.50
157.25

192.50
157.25

96.25
23.87
699.50

991.16 24.142857143

3458.81
345.88
76.09
421.98

837.50
440.00
663.00
725.00
2665.50

770.00
943.50
1713.50

Engineering Organization W.P. Page 411 BSR Annalysis


4379.00
437.90
96.34
534.24

4379.00

167.50
192.50
331.50
483.33
2.00
40.00
1174.83

231.00
188.70
419.70

5973.53
597.35
131.42
728.77

5973.53
845.19
6818.72
681.87
7500.59
750.06
165.01
915.07

Engineering Organization W.P. Page 412 BSR Annalysis


369.20 0.64125

1398.09

2330.15

2973.52

6321.57

1398.78

564.97

2767.92

18124.20
1841.89

369.20

1398.78

2330.84

3171.75

6321.57

13592.15
1381.32

Engineering Organization W.P. Page 413 BSR Annalysis


918.45

2692.61

5592.35

5352.34

10357.38

2692.61

330.39

4077.47

32013.61
3253.42

918.45

2692.61

5592.35

5352.34

Engineering Organization W.P. Page 414 BSR Annalysis


10357.38

24913.13
2531.82

FORM WORK

4050.00
552.00
2250.00
122.00
6974.00

385.00
629.00
1014.00
7988.00
1997.00
199.70
2196.70

7920.00
4000.00
3600.00
840.00
16360.00

1636.00
163.60
1799.60
1349.70

770.00
1258.00
110.00
30.50
2168.50

1626.38

385.00
629.00
1014.00

Engineering Organization W.P. Page 415 BSR Annalysis


1014.00

6186.78
11248.68
2474.71
13723.39

18700.00
8712.00
244.00
27656.00

577.50
471.75
1049.25
28705.25
7176.31
1435.26
8611.58

49680.00
1800.00
51480.00

5148.00
1029.60
6177.60

770.00
2516.00
220.00
122.00
3628.00
3628.00

385.00
1258.00
1643.00
1643.00

20060.18
10030.09
2206.62
12236.71

Engineering Organization W.P. Page 416 BSR Annalysis


1572.50
855.00
370.76
91.50
2889.76

385.00
314.50
699.50
3589.26
897.32

36.00
110.00
252.00
398.00

192.50
157.25
349.75
747.75

192.50
157.25
349.75
349.75

1994.82
13298.77
2925.73
16224.50

5100.00
552.00
2250.00
1440.00

Engineering Organization W.P. Page 417 BSR Annalysis


122.00
9464.00

385.00
1258.00
1643.00
11107.00
2776.75
277.68
3054.43

7920.00
4000.00
3600.00
840.00
16360.00

1636.00
163.60
1799.60

770.00
1258.00
110.00
30.50
2168.50
2168.50

385.00
1258.00
1643.00
1643.00

8665.53
15755.50
3466.21
19221.71

18700.00

8712.00
244.00

Engineering Organization W.P. Page 418 BSR Annalysis


27656.00

577.50
471.75
1049.25
28705.25
7176.31
1435.26
8611.58

11040.00
43200.00
54240.00

5424.00
1084.80
6508.80

770.00
2516.00
220.00
122.00
3628.00
3628.00

385.00
1258.00
1643.00
1643.00

20391.38
10195.69
2243.05
12438.74

18700.00

8712.00
244.00
27656.00

577.50
471.75
1049.25

Engineering Organization W.P. Page 419 BSR Annalysis


28705.25
7176.31
1435.26
8611.58

11040.00
57600.00
68640.00

6864.00
1372.80
8236.80

770.00
2516.00
220.00
122.00
3628.00
3628.00

385.00
1258.00
1643.00
1643.00

22119.38
11059.69
2433.13
13492.82

5100.00
552.00
2250.00
1440.00
122.00
9464.00

385.00
1258.00
1643.00
11107.00
2776.75
277.68
3054.43

Engineering Organization W.P. Page 420 BSR Annalysis


2415.00
1932.00
3600.00
0.00
7947.00

794.70
79.47
874.17

962.50
1258.00
110.00
30.50
2361.00
2361.00

385.00
1258.00
1643.00
1643.00

7932.60
14422.90
3173.04
17595.94

REINFORCEMENT

6325.00 57.5
135.00
96.90
6556.90

770.00
629.00
1399.00

7955.90
138.36
30.44
168.80

Engineering Organization W.P. Page 421 BSR Annalysis


168.80
5.06
173.87

168.80
8.44
177.24

7446.25
135.00
113.72
7694.97

770.00
629.00
1399.00

9093.97
158.16
34.79
192.95

192.95
5.79
198.74

192.95
9.65
202.60

19425.00
291.38
19716.38

Engineering Organization W.P. Page 422 BSR Annalysis


1925.00
1925.00

21641.38
108.21
23.81
132.01

BRICK MASONRY

14355.00
1845.18
4143.75
75.00
20418.93

2310.00
2516.00
4826.00

25244.93
5553.88
30798.81

14355.00
1842.50
4143.75
75.00
20416.25

2310.00
3145.00
54.55
5509.55

25925.80
5703.68
31629.48

Engineering Organization W.P. Page 423 BSR Annalysis


31629.48
1581.47
33210.95

31629.48
2214.06
33843.54

11250.00
1563.11
3315.00
75.00
16203.11

2310.00
2516.00
48.26
4874.26

21077.37
4637.02
25714.39

25714.39
1285.72
27000.11

25714.39
1800.01
27514.40

Engineering Organization W.P. Page 424 BSR Annalysis


4950.00
495.00
871.00
1105.00
75.00
7496.00

1540.00
1258.00
27.98
2825.98

10321.98
2270.84
12592.82

12592.82
629.64
13222.46

12592.82
881.50
13474.31

990.00
469.00
442.00
50.00
1951.00

770.00
786.25
1556.25

3507.25
350.73
77.16
427.88

Engineering Organization W.P. Page 425 BSR Annalysis


2700.00
804.00
1215.50
20.00
4739.50

962.50
1572.50
2535.00

7274.50
1600.39
8874.89

8250.00
165.00
804.00
884.00
15.00
10118.00

1540.00
1258.00
2798.00

12916.00
2841.52
15757.52

15757.52
787.88
16545.40

15757.52
1103.03
16860.55

Engineering Organization W.P. Page 426 BSR Annalysis


16200.00
810.00
1675.00
1989.00
50.00
20724.00

1732.50
2358.75
40.91
4132.16

24856.16
5468.36
30324.52

30324.52
1516.23
31840.74

30324.52
2122.72
32447.23

1080.00
335.00
552.50
7.50
42.00
2017.00

385.00
314.50
699.50

2716.50
271.65

Engineering Organization W.P. Page 427 BSR Annalysis


59.76
331.41

13500.00
2541.50
2479.00
75.00
18595.50

3465.00
3931.25
73.96
7470.21

26065.71
5734.46
31800.17

31800.17
1590.01
33390.18

31800.17
2226.01
34026.18

BLOCK MASONRY

10080.00
504.00
502.50
663.00
11749.50

1155.00
1572.50
81.83

Engineering Organization W.P. Page 428 BSR Annalysis


2809.33

14558.83
3202.94
17761.77

7840.00
392.00
402.00
552.50
9186.50

962.50
1415.25
71.33
2449.08

11635.58
2559.83
14195.41

5376.00
268.80
268.00
331.50
6244.30

770.00
1258.00
60.84
2088.84

8333.14
1833.29
10166.43

Engineering Organization W.P. Page 429 BSR Annalysis


10080.00
504.00
402.00
552.50
11538.50

1155.00
1572.50
81.83
2809.33

14347.83
3156.52
17504.35

7616.00
380.80
268.00
331.50
8596.30

1155.00
1572.50
81.83
2809.33

11405.63
2509.24
13914.86

800.00
160.00

Engineering Organization W.P. Page 430 BSR Annalysis


385.00
314.50
1659.50
103.72
22.82
126.54

2655.00
132.75
96.25
78.63
2962.63

740.66
162.94
903.60

RUBBLE MASONRY

5850.00
3350.00
3315.00
50.00
12565.00

3080.00
3774.00
171.35
7025.35

19590.35
4309.88
23900.23

FLOORING

1507.50
1215.50
772.50
100.00

Engineering Organization W.P. Page 431 BSR Annalysis


5.00
3600.50

962.50
1572.50
2535.00

6135.50
1349.81
7485.31

1005.00
552.50
5.00
1562.50

770.00
1100.75
1870.75

3433.25
755.32
4188.57

3433.25
525.00
3958.25
870.82
4829.07

716.90
552.50
525.00
5.00
1799.40

770.00

Engineering Organization W.P. Page 432 BSR Annalysis


943.50
1713.50

3512.90
772.84
4285.74

3512.90
472.50
3040.40
668.89
3709.29

8430.96
2900.00
962.50
130.00

12423.46
5176.44
1138.82
6315.26

46.90
22.10
69.00

240.63
157.25
397.88

466.88
46.69
10.27
56.96

Engineering Organization W.P. Page 433 BSR Annalysis


46.90
22.10
35.70
104.70

240.63
157.25
397.88

502.58
50.26
11.06
61.31

67.00
33.15
100.15

288.75
196.88
485.63

585.78
58.58
12.89
71.46

67.00
33.15
52.50
152.65

288.75
196.56
485.31

637.96
63.80

Engineering Organization W.P. Page 434 BSR Annalysis


14.04
77.83

3420.00
1507.50
3591.25
27.50
8546.25

1732.50
2516.00
4248.50

12794.75
2814.85
15609.60

3420.00
1507.50
3591.25
27.50
525.00
9071.25

1732.50
2516.00
4248.50

13319.75
2930.35
16250.10

4020.00 25 0.18
2210.00 25 0.005
1500.00 25 0.01
27.50 25 1.2

Engineering Organization W.P. Page 435 BSR Annalysis


525.00 0.25 1
7757.50 0.25 7

1155.00
2516.00
3671.00

11428.50
2514.27
13942.77

3600.00
3417.00
2541.50
9558.50

4620.00
3774.00
8394.00

17952.50
179.53
39.50
219.02

603.00
482.40
331.50
1416.90

577.50
471.75
1049.25

2466.15
246.62
54.26
300.87

Engineering Organization W.P. Page 436 BSR Annalysis


2890.00

1155.00
943.50
2098.50

4988.50
2494.25
231.81
51.00
282.81

950.00
47.50
997.50

1347.50
1100.75
2448.25

3445.75
1837.73
170.73
37.56
208.29

Engineering Organization W.P. Page 437 BSR Annalysis


10250.00
14965.00
25215.00

20790.00
16983.00
37773.00

62988.00
2863.09
266.09
58.54
324.63

2760.00
840.00
755.00
217.75
4572.75

1540.00
2516.00
770.00
4826.00

9398.75
234.97
51.69
286.66

PLASTERING

938.00

Engineering Organization W.P. Page 438 BSR Annalysis


663.00
5.00
1606.00

770.00
943.50
1713.50
51.41
1764.91

3370.91
741.60
4112.50

536.00
504.00
773.50
5.00
1818.50

770.00
943.50
1713.50
51.41
1764.91

3583.41
788.35
4371.75

67.00
24.00
165.75
770.00
314.50
1341.25

74.51
16.39
90.91

Engineering Organization W.P. Page 439 BSR Annalysis


536.00
756.00
773.50
5.00
2070.50

1347.50
1100.75
2448.25
73.45
2521.70

4592.20
1010.28
5602.48

67.00
25.20
110.50
962.50
314.50
1479.70

82.21
18.09
100.29

536.00
504.00
552.50
7.50
1600.00

1925.00

Engineering Organization W.P. Page 440 BSR Annalysis


1572.50
3497.50
104.93
3602.43

5202.43
1144.53
6346.96

536.00
300.00
773.50
5.00
1614.50

1828.75
1415.25
3244.00
97.32
3341.32

4955.82
1090.28
6046.10

268.00
663.00
10.00
941.00

3080.00
2516.00
5596.00
167.88
5763.88

6704.88
67.05
14.75
81.80

Engineering Organization W.P. Page 441 BSR Annalysis


569.50
828.75
5.00
3800.00
5203.25

1925.00
1572.50
314.50
114.36
114.36
4040.72

9243.97
2033.67
11277.64

134.00
77.35
5.00
216.35

866.25
707.63
47.22
1621.09

1837.44
96.71
21.28
117.98

Engineering Organization W.P. Page 442 BSR Annalysis


201.00
110.50
5.00
316.50

1155.00
943.50
62.96
2161.46

2477.96
123.90
27.26
151.16

TILING

12750.00
1275.00
1675.00
1215.50
160.00
17075.50

2310.00
1887.00
4197.00

21272.50
4679.95
25952.45

15960.00
1596.00
1675.00
1215.50
160.00
20606.50

2310.00
1887.00
4197.00

24803.50

Engineering Organization W.P. Page 443 BSR Annalysis


5456.77
30260.27

20100.00
1005.00
1675.00
1215.50
160.00
24155.50

2310.00
1887.00
4197.00

28352.50
6237.55
34590.05

716.90
552.50
5.00
1274.40

770.00
943.50
1713.50

2987.90
657.34
3645.24

16056.00
802.80
1005.00
773.50
240.00
80.00

Engineering Organization W.P. Page 444 BSR Annalysis


18957.30

2310.00
1887.00
4197.00

23154.30
5093.95
28248.25

16300.00
815.00
1005.00
773.50
240.00
80.00
19213.50

2310.00
1887.00
4197.00

23410.50
5150.31
28560.81

16416.00
820.80
1005.00
773.50
240.00
80.00
19335.30

2310.00
1887.00
4197.00

23532.30

Engineering Organization W.P. Page 445 BSR Annalysis


5177.11
28709.41

26600.00
1330.00
1005.00
773.50
240.00
80.00
30028.50

2310.00
1887.00
4197.00

34225.50
7529.61
41755.11

28044.00
1402.20
1005.00
773.50
240.00
80.00
31544.70

2310.00
1887.00
4197.00

35741.70
7863.17
43604.87

23750.00

Engineering Organization W.P. Page 446 BSR Annalysis


1187.50
1005.00
773.50
240.00
80.00
27036.00

2310.00
1887.00
4197.00

31233.00
6871.26
38104.26

19000.00
950.00
1005.00
773.50
240.00
80.00
22048.50

2310.00
1887.00
4197.00

26245.50
5774.01
32019.51

15200.00
760.00
1005.00
773.50
240.00
80.00
18058.50

2310.00
1887.00
4197.00

Engineering Organization W.P. Page 447 BSR Annalysis


22255.50
4896.21
27151.71

15675.00
783.75
1005.00
773.50
240.00
80.00
18557.25

2310.00
1887.00
4197.00

22754.25
5005.94
27760.19

16200.00
810.00
1005.00
773.50
240.00
80.00
19108.50

2310.00
1887.00
4197.00

23305.50
5127.21
28432.71

Engineering Organization W.P. Page 448 BSR Annalysis


5379.00
268.95
134.00
110.50
120.00
6012.45

1540.00
943.50
2483.50

8495.95
84.96
18.69
103.65

5379.00
806.85
201.00
221.00
240.00
6847.85

1925.00
1572.50
3497.50

10345.35
103.45
22.76
126.21

10500.00
525.00
1005.00
773.50
240.00
80.00
13123.50

2310.00
1887.00
4197.00

Engineering Organization W.P. Page 449 BSR Annalysis


17320.50
3810.51
21131.01

12298.00
614.90
1005.00
773.50
240.00
80.00
15011.40

2310.00
1887.00
4197.00

19208.40
4225.85
23434.25

12255.00
612.75
1005.00
773.50
240.00
80.00
14966.25

2310.00
1887.00
4197.00

19163.25
4215.92
23379.17

Engineering Organization W.P. Page 450 BSR Annalysis


13725.00
686.25
1005.00
773.50
240.00
80.00
16509.75

2310.00
1887.00
4197.00

20706.75
4555.49
25262.24

18750.00
937.50
1005.00
773.50
240.00
80.00
21786.00

2310.00
1887.00
4197.00

25983.00
5716.26
31699.26

16796.00
839.80
1005.00
773.50
240.00
80.00
19734.30

2310.00

Engineering Organization W.P. Page 451 BSR Annalysis


1887.00
4197.00

23931.30
5264.89
29196.19

19250.00
962.50
1005.00
773.50
240.00
80.00
22311.00

2310.00
1887.00
4197.00

26508.00
5831.76
32339.76

15610.00
780.50
1005.00
773.50
240.00
80.00
18489.00

2310.00
1887.00
4197.00

22686.00
4990.92
27676.92

Engineering Organization W.P. Page 452 BSR Annalysis


13500.00
675.00
1005.00
773.50
240.00
80.00
16273.50

2310.00
1887.00
4197.00

20470.50
4503.51
24974.01

130000.00
6500.00
1005.00
773.50
240.00
80.00
138598.50

2310.00
1887.00
4197.00

142795.50
31415.01
174210.51

Engineering Organization W.P. Page 453 BSR Annalysis


130000.00
6500.00
1005.00
773.50
240.00
80.00
138598.50

2310.00
1887.00
4197.00

142795.50
31415.01
174210.51

39000.00
1950.00
1005.00
773.50
240.00
80.00
43048.50

2310.00
1887.00
4197.00

47245.50
10394.01
57639.51

39000.00
1950.00
1005.00
773.50
240.00

Engineering Organization W.P. Page 454 BSR Annalysis


80.00
43048.50

2310.00
1887.00
4197.00

47245.50
10394.01
57639.51

69000.00
3450.00
1005.00
773.50
240.00
80.00
74548.50

2310.00
1887.00
4197.00

78745.50
17324.01
96069.51

41300.00 7.1111111111 14.0625


2065.00
1005.00
773.50
240.00
80.00
45463.50

2310.00
1887.00
4197.00

49660.50

Engineering Organization W.P. Page 455 BSR Annalysis


10925.31
60585.81

33500.00 25
1675.00
1005.00
773.50
240.00
80.00
37273.50

2310.00
1887.00
4197.00

41470.50
9123.51
50594.01

26750.00 25
1337.50
1005.00
773.50
240.00
80.00
30186.00

2310.00
1887.00
4197.00

34383.00
7564.26
41947.26

26600.00 2.7777777778 36

Engineering Organization W.P. Page 456 BSR Annalysis


1330.00
1005.00
773.50
240.00
80.00
30028.50

2310.00
1887.00
4197.00

34225.50
7529.61
41755.11

23180.00 2.6666666667 37.5


1159.00
1005.00
773.50
240.00
80.00
26437.50

2310.00
1887.00
4197.00

30634.50
6739.59
37374.09

19575.00 2.25 44.444444444


978.75
1005.00
773.50
240.00
80.00
22652.25

2310.00
1887.00
4197.00

Engineering Organization W.P. Page 457 BSR Annalysis


26849.25
5906.84
32756.09

14535.00 1.7777777778 56.25


726.75
1005.00
773.50
240.00
80.00
17360.25

2310.00
1887.00
4197.00

21557.25
4742.60
26299.85

PAINTING

30.00
28.00
29.00
120.00
283.33
5.00
495.33

1925.00
1572.50
3497.50
104.93
3602.43

4097.76
409.78
90.15
499.93

Engineering Organization W.P. Page 458 BSR Annalysis


499.93
15.00
514.92

693.00
288.75
85.00
1066.75
234.69
1301.44

435.00
0.03
8.50
443.53

288.75
8.66
297.41

740.94
163.01
903.94

435.00
370.62
0.05
85.00
890.67

577.50
17.33
594.83

1485.50
326.81

Engineering Organization W.P. Page 459 BSR Annalysis


1812.30

435.00
0.03
8.50
443.53

385.00
11.55
396.55

840.08
184.82
1024.89

435.00
370.62
0.05
85.00
890.67

770.00
23.10
793.10

1683.77
370.43
2054.20

793.80
0.05
85.00
878.85

288.75
8.66
297.41

1176.26

Engineering Organization W.P. Page 460 BSR Annalysis


258.78
1435.04

1215.00
0.05
85.00
1300.05

577.50
17.33
594.83

1894.88
416.87
2311.75

3400.00
0.25
170.00
3570.25

770.00
23.10
793.10

4363.35
1818.06
399.97
2218.04

418.75
3.00
2.50
40.00
464.25

1540.00
1258.00
83.94

Engineering Organization W.P. Page 461 BSR Annalysis


2881.94

3346.19
334.62
73.62
408.24

516.00
85.00
601.00

288.75
8.66
297.41

898.41
197.65
1096.06

967.50
85.00
1052.50

866.25
25.99
892.24

1944.74
427.84
2372.58

1250.00
80.00

1540.00
77.00

Engineering Organization W.P. Page 462 BSR Annalysis


2947.00
648.34
3595.34

780.00
85.00
865.00

962.50
28.88
991.38

1856.38
408.40
2264.78

516.00
30.00
40.00
586.00

385.00
157.25
542.25

1128.25
248.22
1376.47

967.50
30.00
40.00
1037.50

577.50
157.25
734.75

1772.25

Engineering Organization W.P. Page 463 BSR Annalysis


389.90
2162.15

510.00
967.50
60.00
40.00
1577.50

577.50
157.25
734.75

2312.25
508.70
2820.95

2325.00
2250.00
2400.00
60.00
40.00
125.00
7075.00

1925.00
629.00
2554.00

9629.00
2118.38
11747.38

1494.00
150.00
10.00
1654.00

Engineering Organization W.P. Page 464 BSR Annalysis


385.00
314.50
699.50

2353.50
517.77
2871.27

157.50
10.00
130.00
40.00
337.50

235.88
235.88

573.38
126.14
699.52

510.00
150.00
660.00

235.88
235.88

895.88
197.09
1092.97

905.00
235.88
150.00
1290.88
283.99
1574.87

Engineering Organization W.P. Page 465 BSR Annalysis


393.75 0.7515
481.25
87.50
962.50
211.75
1174.25

656.25
673.75
106.40
1436.40
316.01
1752.41

1537.50
481.25
60.00
20.79
2099.54
461.90
2561.44

1118.75
770.00
60.00
19.49
1968.24
433.01
2401.25

Engineering Organization W.P. Page 466 BSR Annalysis


577.50
17.33
594.83
130.86
725.69

385.00
11.55
396.55
87.24
483.79

866.25
25.99
892.24
196.29
1088.53

DOORS / WINDOWS

" flush panel

6080.00
3220.00 13.5
1870.00 7.5
80.00
78.00
180.00
11508.00

20.00
20.00

3010.70 0.09375
729.64 3.90625
1.15625

Engineering Organization W.P. Page 467 BSR Annalysis


577.50
235.88
4553.72

16081.72
765.80
168.48
934.27

azed & paneled

6080.00 28 3.5
3220.00 10 1.75
560.00 18 5.25
660.00
544.00
80.00
78.00
30.00
11252.00

20.00
20.00

577.50
235.88

3010.70
880.60 1.40625
4704.68

15976.68
760.79
167.37
928.17

lush panel

6080.00
2870.00
1540.00
80.00
78.00
30.00
10678.00

20.00

Engineering Organization W.P. Page 468 BSR Annalysis


20.00

3080.00
729.64

866.25
393.13
5069.02

15767.02
750.81
165.18
915.99

ed & paneled

6080.00 28 3.5
2870.00 10 1.75
560.00 18 5.25
660.00
544.00
80.00
78.00
30.00
10902.00

20.00
20.00

577.50
235.88

3010.70
880.60
4704.68

15626.68
744.13
163.71
907.84

plywood door

3200.00
4220.00
80.00
72.00
30.00

Engineering Organization W.P. Page 469 BSR Annalysis


47.22
7649.22

770.00
629.00
96.25
78.63

315.70 0.40625
257.89
2147.47

9796.68
430.62
94.74
525.36

ood door - marine

3200.00
3820.00
80.00
72.00
30.00
47.22
7249.22

770.00
629.00
96.25
78.63

315.70
257.89
2147.47

9396.68
413.04
90.87
503.91

6400.00

Engineering Organization W.P. Page 470 BSR Annalysis


4590.00
980.00
700.00
540.00
680.00
80.00
78.00
180.00
14228.00
20.00
20.00

577.50
235.88

5293.75 6.875
1179.38
7286.50 1.875

21534.50
769.09
169.20
938.29

5440.00
2465.00
204.00
80.00
78.00
30.00
8297.00

2310.00
786.25
3096.25
20.00
20.00

11413.25
702.35
154.52
856.87

Engineering Organization W.P. Page 471 BSR Annalysis


1840.00
1855.00
204.00
16.00
3915.00

3080.00
786.25
3866.25

7781.25
532.96
117.25
650.21

1640.00
1855.00
3495.00

3080.00
786.25
3866.25

7361.25
504.20
110.92
615.12

3690.00
980.00
770.00
540.00
680.00
204.00
16.00
6880.00

5390.00
1258.00
6648.00

13528.00
547.69

Engineering Organization W.P. Page 472 BSR Annalysis


120.49
668.18

3330.00
980.00
770.00
540.00
680.00
204.00
16.00
6520.00

5390.00
1258.00
6648.00

13168.00
533.12
117.29
650.40

4220.00
4220.00

385.00
314.50
699.50

4919.50
224.25
49.34
273.59

5440.00
80.00
48.00
55.68
5623.68

Engineering Organization W.P. Page 473 BSR Annalysis


770.00
314.50
1084.50

6708.18
412.81
90.82
503.63

6080.00
4140.00
1120.00
700.00
540.00
680.00
80.00
24.00
45.00
13409.00
20.00

577.50
235.88
833.38

5293.75
1179.38
6473.13

20715.50
739.84
162.76
902.60

13409.00
4140.00
9269.00
3690.00
12959.00
833.38
6473.13

20265.50
723.77
159.23
883.00

Engineering Organization W.P. Page 474 BSR Annalysis


13409.00
4140.00
9269.00
3060.00
12329.00
833.38
6473.13

19635.50
701.27
154.28
855.55

6400.00
1240.00
200.00
59.00
31.00
3080.00
629.00
16.00
36.00

11691.00
487.13
107.17
594.29

2870.00
560.00
770.00
540.00
952.00
204.00
48.00
5944.00

3850.00
1258.00
5108.00

Engineering Organization W.P. Page 475 BSR Annalysis


11052.00
526.29
115.78
642.07

2590.00
560.00
770.00
540.00
952.00
204.00
48.00
5664.00

3850.00
1258.00
5108.00

10772.00
512.95
112.85
625.80

2380.00
560.00
770.00
540.00
952.00
204.00
48.00
5454.00

3850.00
1258.00
5108.00

10562.00
502.95
110.65
613.60

Engineering Organization W.P. Page 476 BSR Annalysis


30
10432.00 36 2.97
160.00 3.267
48.00
212.80
10852.80

1540.00
1258.00
96.25
78.63
2972.88

13825.68
460.86
101.39
562.24

BRASS FOUNDER

1790.00
128.00
1918.00

96.25
78.63
174.88

2092.88
460.43
2553.31

2225.00
128.00
2353.00

96.25
78.63
174.88

2527.88

Engineering Organization W.P. Page 477 BSR Annalysis


556.13
3084.01

2012.00
170.00
2182.00

96.25
78.63
174.88

2356.88
518.51
2875.39

5751.00
48.00
5799.00

770.00
770.00

6569.00
1445.18
8014.18

7495.00
48.00
7543.00

192.50
192.50

7735.50
1701.81
9437.31

Engineering Organization W.P. Page 478 BSR Annalysis


3644.00
3644.00

385.00
385.00

4029.00
886.38
4915.38

4080.00
4080.00

770.00
770.00

4850.00
1067.00
5917.00

3825.00
3825.00

314.50
314.50

4139.50
910.69
5050.19

900.00
48.00
948.00

Engineering Organization W.P. Page 479 BSR Annalysis


577.50
577.50

1525.50
335.61
1861.11

4815.00
48.00
4863.00

96.25
78.63
174.88

5037.88
1108.33
6146.21

975.00
13.00
988.00

19.25
19.25

1007.25
221.60
1228.85

1200.00
13.00
1213.00

19.25
19.25

Engineering Organization W.P. Page 480 BSR Annalysis


1232.25
271.10
1503.35

650.00
650.00

72.19
58.97
131.16

781.16
171.85
953.01

785.00
785.00

72.19
58.97
131.16

916.16
201.55
1117.71

975.00
975.00

72.19
58.97
131.16

1106.16
243.35
1349.51

Engineering Organization W.P. Page 481 BSR Annalysis


650.00
650.00

72.19
72.19

722.19
158.88
881.07

450.00
450.00

48.13
48.13

498.13
109.59
607.71

870.00
870.00

48.13
48.13

918.13
201.99
1120.11

750.00
750.00

96.25
78.63
174.88

924.88

Engineering Organization W.P. Page 482 BSR Annalysis


462.44
101.74
564.17

610.00
610.00

48.13
48.13

658.13
144.79
802.91

800.00
800.00

48.13
48.13

848.13
186.59
1034.71

1210.00
1210.00

48.13
48.13

1258.13
276.79
1534.91

1500.00
1500.00

Engineering Organization W.P. Page 483 BSR Annalysis


48.13
48.13

1548.13
340.59
1888.71

200.00
200.00

19.25
19.25

219.25
48.24
267.49

230.00
230.00

19.25
19.25

249.25
54.84
304.09

260.00
260.00

19.25
19.25

279.25
61.44
340.69

Engineering Organization W.P. Page 484 BSR Annalysis


690.00
32.00
722.00

48.13
48.13

770.13
169.43
939.55

280.00
52.00
332.00

72.19
58.97
131.16

463.16
101.89
565.05

285.00
52.00
337.00

72.19
58.97
131.16

468.16
102.99
571.15

Engineering Organization W.P. Page 485 BSR Annalysis


525.00
65.00
590.00

72.19
58.97
131.16

721.16
158.65
879.81

660.00
65.00
725.00

72.19
58.97
131.16

856.16
188.35
1044.51

355.00
39.00
394.00

48.13
48.13

442.13
97.27
539.39

560.00
52.00
612.00

Engineering Organization W.P. Page 486 BSR Annalysis


48.13
48.13

660.13
145.23
805.35

575.00
52.00
627.00

48.13
48.13

675.13
148.53
823.65

425.00
13.00
438.00

19.25
19.25

457.25
100.60
557.85

1300.00
1300.00

385.00
385.00

1685.00
370.70

Engineering Organization W.P. Page 487 BSR Annalysis


2055.70

1800.00
48.00
1848.00

385.00
385.00

2233.00
491.26
2724.26

400.00
400.00

96.25
96.25

496.25
109.18
605.43

50.00
50.00

7.99
7.99

57.99
12.76
70.75

Engineering Organization W.P. Page 488 BSR Annalysis


405.00

405.00
89.10
494.10

480.00

480.00
105.60
585.60

850.00

850.00
187.00
1037.00

35.00
7.99
42.99
9.46
52.45

ROOFING & CEILING

34500.00

2310.00
1887.00
4197.00

Engineering Organization W.P. Page 489 BSR Annalysis


38697.00
6449.50
1418.89
7868.39

23940.00
1080.00
25020.00

770.00
1258.00
2028.00

27048.00
7513.33
1652.93
9166.27

2500.00
240.00
2740.00

192.50
157.25
349.75

3089.75
231.79
50.99
282.78

468.00
223.33
221.00
168.00
105.00

Engineering Organization W.P. Page 490 BSR Annalysis


1185.33

192.50
157.25
349.75

1535.08
127.92
28.14
156.07

12500.00

1258.00
13758.00
3026.76
16784.76

12100.00
1200.00
118.00
244.00
13662.00

2310.00
3774.00
182.52
6266.52

19928.52
11071.40
2435.71
13507.11

6300.00
2700.00
1250.00

Engineering Organization W.P. Page 491 BSR Annalysis


25.00
816.00
11091.00

1155.00
1258.00
72.39
2485.39

13576.39
6962.25
1531.70
8493.95

8250.00
219.00
8469.00

288.75
393.13
20.46
702.33

9171.33
91.71
20.18
111.89

6050.00
219.00
6269.00

288.75
314.50
18.10
621.35

6890.35
68.90
15.16
84.06

Engineering Organization W.P. Page 492 BSR Annalysis


15225.00

385.00
314.50
699.50

15924.50
3503.39
19427.89

1820.00 0.3125
223.33 10.3125 0.859375
221.00 1.1636363636 13.963636364
105.00
2369.33

192.50
157.25
349.75

2719.08
226.59
49.85
276.44

1540.00 0.3125
1540.00

96.25
78.63
174.88

1714.88
142.91
31.44

Engineering Organization W.P. Page 493 BSR Annalysis


174.35

1610.00 0.3125
1610.00

96.25
78.63
174.88

1784.88
148.74
32.72
181.46

5120.00
293.75
67.00
84.00
110.50
6500.00
122.00
12297.25

770.00
629.00
1399.00

385.00
314.50
699.50

192.50
314.50
507.00

14902.75
993.52
218.57
1212.09

Engineering Organization W.P. Page 494 BSR Annalysis


2560.00
33.50
110.50
6500.00
122.00
293.75
9619.75

770.00
629.00
1399.00

385.00
96.25
471.75
953.00

11971.75
798.12
175.59
973.70

2560.00
33.50
110.50
2704.00

385.00
96.25
471.75
953.00

3657.00
243.80
53.64
297.44

Engineering Organization W.P. Page 495 BSR Annalysis


3840.00
33.50
110.50
3984.00

385.00
96.25
471.75
953.00

4937.00
329.13
72.41
401.54

7680.00
293.75
67.00
84.00
110.50
6500.00
122.00
14857.25

770.00
629.00
1399.00

385.00
314.50
699.50

192.50
314.50
507.00

17462.75
1164.18
256.12
1420.30

Engineering Organization W.P. Page 496 BSR Annalysis


3976.00
33.50
110.50
4120.00

385.00
96.25
471.75
953.00

5073.00
338.20
74.40
412.60

7952.00
293.75
67.00
84.00
110.50
6500.00
122.00
262.50
15391.75

770.00
629.00
1399.00

385.00
314.50
699.50

192.50
157.25

Engineering Organization W.P. Page 497 BSR Annalysis


349.75

17840.00
1189.33
261.65
1450.99

108800.00
19800.00
656.00
124.00
129380.00

34500.00

2340.00
1005.00
450.00
884.00
105.00
4784.00

5390.00
2516.00
1155.00
943.50
10004.50

2310.00
1887.00
4197.00

182865.50
30477.58
6705.07
37182.65

Engineering Organization W.P. Page 498 BSR Annalysis


42400.00
23940.00
1080.00
67420.00

1925.00
1887.00
770.00
1258.00
5840.00

73260.00
20350.00
4477.00
24827.00

17235.06
17313.67
3454.87

38003.60
8360.79
46364.39

Engineering Organization W.P. Page 499 BSR Annalysis


6300.00
2700.00
1250.00
25.00
816.00
25600.00
62.00
167.50
221.00
75.00
399.50
91.00
37707.00

385.00
2695.00
3145.00
186.75
6411.75

44118.75
22625.00
4977.50
27602.50

6300.00
2700.00
1250.00
25.00
816.00
9600.00
62.00
167.50
221.00
75.00
21216.50

385.00

Engineering Organization W.P. Page 500 BSR Annalysis


3080.00
2201.50
170.00
5836.50

27053.00
13873.33
3052.13
16925.46

20700.00
11825.00
17.95
442.00
236.00
33220.95

770.00
770.00
1887.00
3427.00

2310.00
2516.00
144.78
4970.78

41618.73
21342.94
4695.45
26038.38

11825.00

Engineering Organization W.P. Page 501 BSR Annalysis


153.40
11978.40

1540.00
1258.00
83.94
2881.94

5432.41
18776.55

39069.30
20035.54
4407.82
24443.36

72600.00
73.00
587.50
73260.50

770.00
629.00
41.97
41.97
1482.94

74743.44
747.43
4529.91
1132.48
5662.38
1245.72
6908.11

39600.00
73.00

Engineering Organization W.P. Page 502 BSR Annalysis


587.50
40260.50

385.00
314.50
34.98
734.48

40994.98
409.95
90.19
500.14

30800.00
73.00
587.50
31460.50

192.50
157.25
17.49
367.24

31827.74
318.28
70.02
388.30

409.95
3904.28
780.86
4685.14
1030.73
5715.87

Engineering Organization W.P. Page 503 BSR Annalysis


19800.00
73.00
587.50
20460.50

192.50
157.25
17.49
367.24

20827.74
208.28
45.82
254.10

6050.00
73.00
391.28
6514.28

192.50
157.25
34.98
384.73

6899.00
68.99
15.18
84.17

3300.00
61.00
293.75
3654.75

192.50
157.25

Engineering Organization W.P. Page 504 BSR Annalysis


17.49
367.24

4021.99
40.22
8.85
49.07

10875.00
543.75
595.00
12013.75

2310.00
1887.00
209.85
4406.85

16420.60
164.21
36.13
200.33

528.75
96.25
30.00
655.00
144.10
799.10

25.75
17.00
42.75

32.05
26.18
2.91

Engineering Organization W.P. Page 505 BSR Annalysis


24.06
19.66
104.86

147.61
32.48
180.09

GUTTERS & D/P

1632.00
146.00
142.50
132.00
646.00
203.00
75.00
234.00
3210.50

192.50
157.25
10.49
360.24

3570.74
148.78
32.73
181.51

1300.00
86.00
120.00
222.00
28.00
160.00
52.00
75.00
2043.00

192.50
157.25
192.50

Engineering Organization W.P. Page 506 BSR Annalysis


157.25
17.49
716.99

2759.99
115.00
25.30
140.30

SANITARY FITINGS

6610.00
1250.00
4020.00
21.00
51.00
11.95
11963.95

385.00
314.50
699.50

12663.45
2785.96
15449.41

9020.00
4465.00
760.00
14.00
34.00

Engineering Organization W.P. Page 507 BSR Annalysis


390.00
278.46
14961.46

770.00
629.00
1399.00

16360.46
3599.30
19959.76

2200.00
11.00
2211.00

48.13
39.31
87.44

2298.44
505.66
2804.09

5425.00
27.13
5452.13

48.13
39.31
87.44

5539.56
1218.70
6758.27

Engineering Organization W.P. Page 508 BSR Annalysis


8010.00
1250.00
4020.00
21.00
51.00
13.35
13365.35

385.00
314.50
699.50

14064.85
3094.27
17159.12

10520.00
5400.00
760.00
14.00
34.00
390.00
327.16
17445.16

770.00
629.00
1399.00

18844.16
4145.72
22989.88

Engineering Organization W.P. Page 509 BSR Annalysis


15670.00
1250.00
4020.00
21.00
51.00
21.01
21033.01

385.00
314.50
699.50

21732.51
4781.15
26513.66

19195.00
6385.00
760.00
14.00
34.00
390.00
260.18
27038.18

770.00
629.00
1399.00

28437.18
6256.18
34693.36

Engineering Organization W.P. Page 510 BSR Annalysis


13750.00
16.00
36.00
390.00
283.84
14475.84

577.50
471.75
1049.25

15525.09
3415.52
18940.61

9775.00
19.55
9794.55

48.13
39.31
87.44

9881.99
2174.04
12056.02

14465.00
57.86
14522.86

Engineering Organization W.P. Page 511 BSR Annalysis


48.13
39.31
87.44

14610.30
3214.27
17824.56

18480.00
16.00
36.00
37.06
18569.06

385.00
314.50
699.50

19268.56
4239.08
23507.65

4770.00
16.00
36.00
350.00
5172.00

96.25
78.63
96.25
78.63
96.25
78.63
26.23
550.86

5722.86

Engineering Organization W.P. Page 512 BSR Annalysis


1259.03
6981.88

3825.00
1215.00
5040.00

96.25
78.63
5.25
180.12

5220.12
1148.43
6368.55

2570.00
5.98
2575.98

96.25
96.25
157.25
349.75

2925.73
643.66
3569.39

2150.00
2150.00

Engineering Organization W.P. Page 513 BSR Annalysis


385.00
314.50
34.98
734.48

2884.48
634.58
3519.06

15985.00
79.93
16064.93

385.00
314.50
699.50

16764.43
3688.17
20452.60

4020.00
7.00
17.00
8.09
4052.09

48.13
39.31
87.44

4139.53
910.70
5050.22

1075.00

Engineering Organization W.P. Page 514 BSR Annalysis


10.75
1085.75

48.13
39.31
87.44

1173.19
258.10
1431.29

5200.00
6.00
5206.00

48.13
39.31
87.44

5293.44
1164.56
6457.99

2790.00
1485.00
4500.00
13.95
8788.95

48.13
39.31
87.44

8876.39
1952.81
10829.19

Engineering Organization W.P. Page 515 BSR Annalysis


7380.00
4225.00
1000.00
36.90
12641.90

48.13
39.31
87.44

12729.34
2800.45
15529.79

7235.00
72.35
7307.35

48.13
39.31
87.44

7394.79
1626.85
9021.64

6375.00
4225.00
31.88
10631.88

Engineering Organization W.P. Page 516 BSR Annalysis


48.13
39.31
87.44

10719.31
2358.25
13077.56

11205.00
1215.00
11205.00

96.25
78.63
96.25
78.63
34.98
384.73

11589.73
2549.74
14139.46

86365.00
1215.00
86365.00

96.25
78.63
96.25
78.63
34.98
384.73

86749.73
19084.94
105834.66

Engineering Organization W.P. Page 517 BSR Annalysis


4635.00
92.70
4635.00

96.25
96.25

4731.25
1040.88
5772.13

15615.00
51.00
24.00
470.70
15690.00

96.25
192.50
235.88
524.63

16214.63
3567.22
19781.84

1970.00
1970.00

24.06
19.66
8.74
52.46

2022.46
444.94
2467.40

Engineering Organization W.P. Page 518 BSR Annalysis


2610.00
17.00
7.00
2634.00

48.13
48.13

2682.13
590.07
3272.19

1655.00
17.00
7.00
1679.00

48.13
48.13

1727.13
379.97
2107.09

1655.00
17.00
7.00
1679.00

48.13
48.13

1727.13
379.97
2107.09

Engineering Organization W.P. Page 519 BSR Annalysis


1600.00
17.00
7.00
1624.00

48.13
48.13

1672.13
367.87
2039.99

1035.00
17.00
7.00
1059.00

48.13
48.13

1107.13
243.57
1350.69

2450.00
17.00
7.00
2474.00

48.13
48.13

2522.13
554.87
3076.99

Engineering Organization W.P. Page 520 BSR Annalysis


2715.00
17.00
7.00
2739.00

48.13
48.13

2787.13
613.17
3400.29

3020.00
17.00
7.00
3044.00

48.13
48.13

3092.13
680.27
3772.39

3715.00
17.00
7.00
3739.00

48.13
48.13

3787.13
833.17
4620.29

Engineering Organization W.P. Page 521 BSR Annalysis


6955.00
34.00
14.00
7003.00

48.13
48.13

7051.13
1551.25
8602.37

2620.00
34.00
14.00
2668.00

48.13
48.13

2716.13
597.55
3313.67

6550.00
14.00
34.00
6598.00

96.25
78.63
96.25
78.63
96.25

Engineering Organization W.P. Page 522 BSR Annalysis


78.63
26.23
550.86

7148.86
1572.75
8721.60

11205.00
5310.00
2835.00
14.00
34.00
390.00
169.53
19957.53

770.00
629.00
1399.00

21356.53
4698.44
26054.97

12420.00
51.00
21.00
12492.00

48.13
39.31
87.44

12579.44
2767.48
15346.91

Engineering Organization W.P. Page 523 BSR Annalysis


1890.00
17.00
7.00
1914.00

48.13
39.31
87.44

2001.44
440.32
2441.75

11700.00
51.00
21.00
11772.00

48.13
39.31
87.44

11859.44
2609.08
14468.51

11700.00
51.00
21.00
11772.00

48.13
39.31
87.44

11859.44
2609.08

Engineering Organization W.P. Page 524 BSR Annalysis


14468.51

1250.00
250.00
227.80
45.56
1773.36

192.50
157.25
349.75

2123.11
467.08
2590.19

1250.00
4.00
1254.00

192.50
157.25
385.00
314.50
52.46
1101.71

2355.71
518.26
2873.97

5130.00
28.00
51.00
11.96
5220.96

Engineering Organization W.P. Page 525 BSR Annalysis


385.00
314.50
699.50

5920.46
1302.50
7222.97

755.00
16.00
34.00
80.50
771.00

96.25
78.63
96.25
78.63
96.25
78.63
524.63

1295.63
285.04
1580.66

2250.00
850.00
575.00
14.00
34.00
186.15
3909.15

96.25
78.63
96.25
78.63
96.25
78.63

Engineering Organization W.P. Page 526 BSR Annalysis


524.63

4433.78
975.43
5409.21

5500.00
575.00
14.00
34.00
183.69
6306.69

96.25
78.63
96.25
78.63
349.75

6656.44
1464.42
8120.86

1950.00
28.00
650.00
2628.00

96.25
78.63
385.00
314.50
87.44
961.81

3589.81
789.76
4379.57

Engineering Organization W.P. Page 527 BSR Annalysis


2170.00
250.00
275.00
16.00
36.00
274.70
3021.70

385.00
314.50
699.50

3721.20
818.66
4539.86

1620.00
250.00
275.00
16.00
36.00
219.70
2416.70

288.75
235.88
524.63

2941.33
647.09
3588.42

Engineering Organization W.P. Page 528 BSR Annalysis


250.00
7.50
257.50

48.13
39.31
87.44

344.94
75.89
420.82

600.00
34.00
634.00

48.13
39.31
6.12
93.56

727.56
160.06
887.62

650.00
24.06
674.06
148.29
822.36

1200.00
187.00
1387.00

192.50
157.25

Engineering Organization W.P. Page 529 BSR Annalysis


69.95
419.70

50.87

1857.57
408.67
2266.23

PLUMBING

155.00
6.00
161.00

48.13
39.31
87.44

248.44
54.66
303.09

155.00
3.10
158.10

48.13
39.31
87.44

245.54
54.02
299.56

660.00
13.20
673.20

48.13

Engineering Organization W.P. Page 530 BSR Annalysis


39.31
87.44

760.64
167.34
927.98

715.00
14.30
729.30

48.13
39.31
87.44

816.74
179.68
996.42

460.00
9.20
469.20

48.13
39.31
87.44

556.64
0.00
556.64

375.00
7.50
382.50

48.13
48.13
96.25

Engineering Organization W.P. Page 531 BSR Annalysis


478.75
105.33
584.08

1375.00
6.00
1381.00

48.13
39.31
87.44

1468.44
323.06
1791.49

760.00
6.00
766.00

48.13
39.31
87.44

853.44
187.76
1041.19

1295.00
6.00
1301.00

48.13
39.31
87.44

1388.44
305.46

Engineering Organization W.P. Page 532 BSR Annalysis


1693.89

1135.00
6.00
1141.00

48.13
39.31
87.44

1228.44
270.26
1498.69

3000.00
6.00
3006.00

48.13
39.31
87.44

3093.44
680.56
3773.99

1250.00
25.00
1275.00

48.13
39.31
87.44

1362.44
299.74
1662.17

Engineering Organization W.P. Page 533 BSR Annalysis


1455.00
29.10
1484.10

48.13
39.31
87.44

1571.54
345.74
1917.28

1690.00
33.80
1723.80

48.13
39.31
87.44

1811.24
398.47
2209.71

4525.00
90.50
4615.50

48.13
39.31
87.44

4702.94
1034.65
5737.58

475.00

Engineering Organization W.P. Page 534 BSR Annalysis


23.75
498.75

48.13
39.31
87.44

586.19
128.96
715.15

870.00
43.50
913.50

48.13
39.31
87.44

1000.94
220.21
1221.14

1305.00
65.25
1370.25

48.13
39.31
87.44

1457.69
320.69
1778.38

1375.00
68.75
1443.75

48.13
39.31
87.44

Engineering Organization W.P. Page 535 BSR Annalysis


1531.19
336.86
1868.05

2730.00
136.50
2866.50

48.13
39.31
87.44

2953.94
649.87
3603.80

3705.00
185.25
3890.25

48.13
39.31
87.44

3977.69
875.09
4852.78

9695.00
484.75
10179.75

48.13
39.31
87.44

10267.19
2258.78
12525.97

Engineering Organization W.P. Page 536 BSR Annalysis


16280.00
814.00
17094.00

48.13
39.31
87.44

17181.44
3779.92
20961.35

390.00
7.80
397.80

24.06
19.66
43.72

441.52
97.13
538.65

650.00
13.00
663.00

24.06
19.66
43.72

706.72
155.48
862.20

390.00
7.80
397.80

48.13

Engineering Organization W.P. Page 537 BSR Annalysis


39.31
87.44

485.24
106.75
591.99

650.00
13.00
663.00

48.13
39.31
87.44

750.44
165.10
915.53

225.00
4.50
229.50

96.25
78.63
174.88

404.38
88.96
493.34

275.00
13.75
288.75

96.25
78.63
174.88

463.63
102.00
565.62

Engineering Organization W.P. Page 538 BSR Annalysis


110.00
5.50
115.50

48.13
39.31
87.44

202.94
44.65
247.58

200.00
10.00
210.00

48.13
39.31
87.44

297.44
65.44
362.87

215.00
10.75
225.75

48.13
39.31
87.44

313.19
68.90
382.09

330.00
16.50

Engineering Organization W.P. Page 539 BSR Annalysis


346.50

48.13
39.31
87.44

433.94
95.47
529.40

440.00
22.00
462.00

48.13
39.31
87.44

549.44
120.88
670.31

705.00
35.25
740.25

48.13
39.31
87.44

827.69
182.09
1009.78

1850.00
92.50
1942.50

48.13
39.31
87.44

Engineering Organization W.P. Page 540 BSR Annalysis


2029.94
446.59
2476.52

85.00
4.25
89.25

48.13
39.31
87.44

176.69
38.87
215.56

100.00
5.00
105.00

48.13
39.31
87.44

192.44
42.34
234.77

6015.00
300.75
6315.75

96.25
314.50
192.50
157.25
760.50

7076.25
1556.78
8633.03

Engineering Organization W.P. Page 541 BSR Annalysis


11660.00
612.15
12272.15

96.25
314.50
192.50
157.25
760.50

13032.65
2867.18
15899.83

20470.00
1023.50
21493.50

96.25
314.50
192.50
157.25
760.50

22254.00
4895.88
27149.88

49260.00
2463.00
51723.00

96.25
314.50
192.50
157.25
760.50

Engineering Organization W.P. Page 542 BSR Annalysis


52483.50
11546.37
64029.87

169.00
42.00
3.00
214.00

96.25
78.63
174.88

388.88
38.89
8.56
47.44

377.00
45.00
3.00
425.00

96.25
78.63
174.88

599.88
59.99
13.20
73.18

4800.00
480.00
144.00
240.00
48.00
560.00

Engineering Organization W.P. Page 543 BSR Annalysis


6272.00

577.50
471.75
1049.25

7321.25
73.21
16.11
89.32

6500.00
325.00
352.00
72.00
630.00
7879.00

577.50
471.75
1049.25

8928.25
89.28
19.64
108.92

9100.00
455.00
552.00
96.00
805.00
11008.00

577.50
471.75
1049.25

12057.25
120.57
26.53
147.10

Engineering Organization W.P. Page 544 BSR Annalysis


16000.00
800.00
872.00
168.00
840.00
18680.00

577.50
471.75
1049.25

19729.25
197.29
43.40
240.70

4400.00
440.00
242.00
5082.00

1415.25
770.00
629.00
2814.25

7896.25
78.96
17.37
96.33

5900.00
590.00
324.50
6814.50

1415.25

Engineering Organization W.P. Page 545 BSR Annalysis


770.00
629.00
2814.25

9628.75
96.29
21.18
117.47

10200.00
816.00
220.32
11236.32

1415.25
770.00
629.00
2814.25

14050.57
140.51
30.91
171.42

35700.00
1785.00
749.70
38234.70

1415.25
770.00
629.00
2814.25

41048.95
410.49
90.31
500.80

Engineering Organization W.P. Page 546 BSR Annalysis


35700.00
1785.00
374.85
37859.85

1925.00
1572.50
3497.50

39677.62

81034.97
810.35
178.28
988.63

73000.00
3650.00
766.50
77416.50

1925.00
1572.50
3497.50

55498.87

136412.87
1364.13
300.11
1664.24

7140.00
357.00
149.94
60.00
726.00
102.00
426.75
8961.69

Engineering Organization W.P. Page 547 BSR Annalysis


385.00
314.50
699.50

9661.19
483.06
106.27
589.33

14600.00
730.00
306.60
60.00
780.00
102.00
828.93
17407.53

385.00
314.50
699.50

18107.03
905.35
199.18
1104.53

7140.00
357.00
300.00
7797.00

385.00
314.50
699.50

8496.50
424.83
93.46
518.29

Engineering Organization W.P. Page 548 BSR Annalysis


Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.250
770.00
192.50 362.50 36.25 7.98
770.00
192.50 392.50 39.25 8.64
770.00
192.50 392.50 39.25 8.64
770.00
192.50 352.50 35.25 7.76
770.00
192.50 452.50 45.25 9.96
770.00
192.50 392.50 39.25 8.64
770.00
72.19 212.19 21.22 0.00

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.250
770.00
192.50 437.50 43.75 9.63
770.00
192.50 477.50 47.75 10.51
770.00
192.50 477.50 47.75 10.51
770.00
192.50 477.50 47.75 10.51
770.00
192.50 547.50 54.75 12.05
770.00
192.50 547.50 54.75 12.05
770.00
72.19 222.19 22.22 4.89

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.250
770.00
192.50 552.50 55.25 12.16
770.00
192.50 532.50 53.25 11.72
770.00
192.50 562.50 56.25 12.38
770.00
192.50 602.50 60.25 13.26

Engineering Organization W.P. Page 549 BSR Annalysis


770.00
192.50 692.50 69.25 15.24
770.00
192.50 732.50 73.25 16.12
770.00
72.19 232.19 23.22 5.11

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.250
770.00
192.50 722.50 72.25 15.90
770.00
192.50 802.50 80.25 17.66
770.00
192.50 862.50 86.25 18.98
770.00
192.50 852.50 85.25 18.76
770.00
192.50 1242.50 124.25 27.34
770.00
192.50 1062.50 106.25 23.38
770.00
72.19 252.19 25.22 5.55

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.250
770.00
192.50 1017.50 101.75 22.39
770.00
192.50 1047.50 104.75 23.05
770.00
192.50 1127.50 112.75 24.81
770.00
192.50 1297.50 129.75 28.55
770.00
192.50 1877.50 187.75 41.31
770.00
192.50 1687.50 168.75 37.13
770.00
72.19 302.19 30.22 6.65

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.250
770.00
192.50 1462.50 146.25 32.18
770.00
192.50 1572.50 157.25 34.60
770.00

Engineering Organization W.P. Page 550 BSR Annalysis


192.50 1612.50 161.25 35.48
770.00
192.50 2002.50 200.25 44.06
770.00
192.50 3252.50 325.25 71.56
770.00
192.50 2442.50 244.25 53.74
770.00
72.19 312.19 31.22 6.87

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.250
770.00
192.50 3112.50 311.25 68.48
770.00
192.50 9262.50 926.25 203.78
770.00
192.50 2932.50 293.25 64.52
770.00
192.50 6532.50 653.25 143.72
770.00
192.50 7592.50 759.25 167.04
770.00
192.50 8332.50 833.25 183.32
770.00
72.19 342.19 34.22 7.53

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.250
770.00
192.50 4432.50 443.25 97.52
770.00
192.50 9432.50 943.25 207.52
770.00
192.50 5292.50 529.25 116.44
770.00
192.50 11702.50 1170.25 257.46
770.00
192.50 12472.50 1247.25 274.40
770.00
192.50 14132.50 1413.25 310.92
770.00
72.19 772.19 77.22 16.99

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.125
770.00
96.25 1246.25 124.63 27.42

Engineering Organization W.P. Page 551 BSR Annalysis


770.00
96.25 1206.25 120.63 26.54
770.00
96.25 1176.25 117.63 25.88
770.00
96.25 1146.25 114.63 25.22
770.00
96.25 1106.25 110.63 24.34
770.00
96.25 976.25 97.63 21.48
770.00
96.25 946.25 94.63 20.82
770.00
96.25 836.25 83.63 18.40
770.00
96.25 766.25 76.63 16.86
770.00
96.25 746.25 74.63 16.42
770.00
96.25 686.25 68.63 15.10
770.00
96.25 626.25 62.63 13.78
770.00
96.25 546.25 54.63 12.02
770.00
96.25 486.25 48.63 10.70
770.00
96.25 436.25 43.63 9.60

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.125
770.00
96.25 2386.25 238.63 52.50
770.00
96.25 2316.25 231.63 50.96
770.00
96.25 2301.25 230.13 50.63
770.00
96.25 2291.25 229.13 50.41
770.00
96.25 2226.25 222.63 48.98
770.00
96.25 1516.25 151.63 33.36
770.00
96.25 1356.25 135.63 29.84
770.00
96.25 1286.25 128.63 28.30
770.00
96.25 1136.25 113.63 25.00
770.00
96.25 1026.25 102.63 22.58
770.00

Engineering Organization W.P. Page 552 BSR Annalysis


96.25 996.25 99.63 21.92
770.00
96.25 816.25 81.63 17.96
770.00
96.25 736.25 73.63 16.20
770.00
96.25 686.25 68.63 15.10
770.00
96.25 576.25 57.63 12.68

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.125
770.00
96.25 746.25 74.63 16.42
770.00
96.25 626.25 62.63 13.78
770.00
96.25 646.25 64.63 14.22

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.125
770.00
96.25 696.25 69.63 15.32
770.00
96.25 646.25 64.63 14.22
770.00
96.25 616.25 61.63 13.56

10300.00
450.00
10750.00

1155.00
943.50
2098.50

12848.50
1284.85
282.67
1567.52

Engineering Organization W.P. Page 553 BSR Annalysis


6450.00
450.00
6900.00

1155.00
943.50
2098.50

8998.50
899.85
197.97
1097.82

5100.00
450.00
5550.00

1155.00
943.50
2098.50

7648.50
764.85
168.27
933.12

5800.00
450.00
6250.00

1155.00
943.50
2098.50

8348.50
834.85
183.67
1018.52

Engineering Organization W.P. Page 554 BSR Annalysis


5750.00
450.00
6200.00

1155.00
943.50
2098.50

8298.50
829.85
182.57
1012.42

6900.00
450.00
7350.00

1155.00
943.50
2098.50

9448.50
944.85
207.87
1152.72

3600.00
450.00
4050.00

1155.00
943.50
2098.50

6148.50
614.85
135.27
750.12

Engineering Organization W.P. Page 555 BSR Annalysis


5500.00
450.00
5950.00

1155.00
943.50
2098.50

8048.50
804.85
177.07
981.92

8050.00
450.00
8500.00

1155.00
943.50
2098.50

10598.50
1059.85
233.17
1293.02

2950.00
450.00
3400.00

1155.00
943.50
2098.50

5498.50
549.85
120.97
670.82

Engineering Organization W.P. Page 556 BSR Annalysis


4900.00
450.00
5350.00

1155.00
943.50
2098.50

7448.50
744.85
163.87
908.72

3650.00
450.00
4100.00

1155.00
943.50
2098.50

6198.50
619.85
136.37
756.22

5400.00
450.00
5850.00

1155.00
943.50
2098.50

7948.50
794.85
174.87
969.72

Engineering Organization W.P. Page 557 BSR Annalysis


11150.00
450.00
11600.00

1155.00
943.50
2098.50

13698.50
1369.85
301.37
1671.22

550.00
75.00
625.00

96.25
78.63
174.88

799.88
79.99
17.60
97.58

800.00
75.00
875.00

96.25
78.63
174.88

1049.88
104.99
23.10
128.08

Engineering Organization W.P. Page 558 BSR Annalysis


1950.00
150.00
2100.00

962.50
786.25
1748.75

3848.75
384.88
84.67
469.55

1950.00
150.00
2100.00

962.50
786.25
1748.75

3848.75
384.88
84.67
469.55

1600.00
150.00
1750.00

962.50
786.25
1748.75

3498.75
349.88
76.97
426.85

Engineering Organization W.P. Page 559 BSR Annalysis


1400.00
150.00
1550.00

962.50
786.25
1748.75

3298.75
329.88
72.57
402.45

610.00
30.50
42.00
9.49
691.99

96.25
78.63
174.88

866.87
86.69
19.07
105.76

1200.00
60.00
48.00
23.73
1331.73

96.25
78.63
174.88

1506.60
150.66

Engineering Organization W.P. Page 560 BSR Annalysis


33.15
183.81

Plumber
( day ) Rate per 10 Add O/H &
Per 1 no
no Profit
0.125
770.00
96.25 501.17 50.12 11.03
770.00
96.25 2,456.08 245.61 54.03
770.00
96.25 591.17 59.12 13.01
770.00
96.25 2,606.08 260.61 57.33
770.00
96.25 761.17 76.12 16.75
770.00
96.25 3,256.08 325.61 71.63
770.00
96.25 761.17 76.12 16.75
770.00
96.25 4,606.08 460.61 101.33
770.00
96.25 631.17 63.12 13.89
770.00
96.25 631.17 63.12 13.89
770.00
96.25 4,136.08 413.61 90.99
770.00
12.03 3,561.86 356.19 78.36
770.00
96.25 2,206.08 220.61 48.53
770.00
96.25 3,986.08 398.61 87.69
770.00
96.25 461.17 46.12 10.15
770.00
96.25 1,736.08 173.61 38.19
770.00
96.25 6,641.17 664.12 146.11
770.00
96.25 5,291.17 529.12 116.41
770.00
96.25 5,941.17 594.12 130.71
770.00
96.25 7,186.08 718.61 158.09
770.00
96.25 3,791.17 379.12 83.41
770.00
96.25 5,691.17 569.12 125.21
770.00
96.25 3,141.17 314.12 314.12

Engineering Organization W.P. Page 561 BSR Annalysis


15135.00
300.00
320.00
787.75
16542.75

385.00
314.50
699.50

48.05

17290.30
3803.87
21094.16

4000.00
200.00
4200.00

385.00
314.50
699.50

4899.50
1077.89
5977.39

Engineering Organization W.P. Page 562 BSR Annalysis


DRAINAGE

No. - WSS/10/01

65.89

238.96

692.60

201.49

377.39

185.46

125.60

128.31

157.10

20.55

2193.36

Engineering Organization W.P. Page 563 BSR Annalysis


No. - WSS/10/01

137.69

312.11

1432.43

238.13

446.01

382.52

175.42

151.64

222.79

27.49

3526.24

Engineering Organization W.P. Page 564 BSR Annalysis


No. - WSS/10/01

217.83

487.67

2125.04

274.76

514.63

584.21

233.55

174.97

952.77

68.06

5633.49

Engineering Organization W.P. Page 565 BSR Annalysis


No. - WSS/10/01

527.10

1261.69

5717.03

1611.94

1509.57

816.04

738.81

377.39

1397.39

125.68

14082.65

Engineering Organization W.P. Page 566 BSR Annalysis


No. - WSS/10/02

87.99

1388.71

823.40

259.65

117.51

124.11

151.95

19.68

2973.01

No. - WSS/10/02

Engineering Organization W.P. Page 567 BSR Annalysis


147.83

2105.38

686.17

428.89

165.84

147.44

216.62

26.50

3924.67

No. - WSS/10/02

298.75

427.24

4460.20

Engineering Organization W.P. Page 568 BSR Annalysis


1372.34

4697.04

888.37

460.03

297.80

945.14

85.15

13932.06

No. - WSS/10/03

427.36

1722.15

4767.66

1905.02

1416.25

732.82

54.86

Engineering Organization W.P. Page 569 BSR Annalysis


524.26

319.76

1042.05

94.30

13006.49

No. - WSS/10/03

530.11

1922.58

6444.65

2126.30

1531.53

903.21

67.29

609.61

348.57

1072.90
Engineering Organization W.P. Page 570 BSR Annalysis
101.55

15658.31

No. - WSS/10/04

943.93

2852.85

8229.06

2750.93

1955.58

1324.91

90.29

1041.05

454.59

1964.51 7.75 6

173.01

21780.70

Engineering Organization W.P. Page 571 BSR Annalysis


No. - WSS/10/05

1277.94

3862.32

9961.49

4000.55

2367.29

1759.59

116.15

1526.46

557.51

2518.02 10 6.25

230.10

28177.42

Engineering Organization W.P. Page 572 BSR Annalysis


No. - WSS/10/05

1916.91

3862.32

15938.39

4000.55

2367.29

2552.45

153.19

1526.46

557.51

2518.02 10 6.25

230.10

35623.19

Engineering Organization W.P. Page 573 BSR Annalysis


No. - WSS/10/06

2719.00

21915.28

9892.44

2596.47

3345.31

1000.00

1658.74

1526.46

557.51

2518.02 10

230.10

47959.34

Engineering Organization W.P. Page 574 BSR Annalysis


No. - WSS/10/07

1916.91

1931.16

15938.39

7363.65

2367.29

2552.45

962.10

1526.46

557.51

2518.02 10 6.25

230.10

37864.04

Engineering Organization W.P. Page 575 BSR Annalysis


No. - WSS/10/07

3727.33

1931.16

29884.47

7363.65

2367.29

4666.75

1498.22

1526.46

557.51

2518.02 10 6.25

230.10

56270.96

Engineering Organization W.P. Page 576 BSR Annalysis


No. - WSS/10/08

365.17

421.62

5587.37

2009.10

8024.28 10 6.25

664.94

85.36

356.50

217.43

854.40 5.16 4.16

71.42

18657.60

Engineering Organization W.P. Page 577 BSR Annalysis


No. - WSS/10/08

492.68

479.11

6225.52

2911.55

8973.78 10 6.25

903.21

99.93

414.53

237.03

854.40 6 4.16

75.30

21667.05

Engineering Organization W.P. Page 578 BSR Annalysis


No. - WSS/10/09

895.12

870.48

10671.86

3859.70

11415.04 10 6.25

1324.91

145.19

1041.05

454.59

1882.85 7.75 5.5

168.92

32729.71

Engineering Organization W.P. Page 579 BSR Annalysis


No. - WSS/10/08

1087.79

1057.85

13305.86

4888.96

14014.73 10 6.25

1759.59

180.57

1526.46

557.51

2518.02 10 6.25

230.10

41127.44

Engineering Organization W.P. Page 580 BSR Annalysis


No. - WSS/10/10

11.00
8.00

1629.97

1555.66

18068.41

7822.33

18442.82 10 6.25

2552.45

250.36

1526.46

557.51

2518.02 10 6.25

230.10

55154.10

390.77

Engineering Organization W.P. Page 581 BSR Annalysis


823.40

1016.28

58.71

68.68

2357.85
589.46

1085.00
3285.00
218.50
4370.00

770.00
629.00
139.90
1538.90

5908.90
1299.96
7208.86

No. - WSS/10/11

0.375

Engineering Organization W.P. Page 582 BSR Annalysis


100.25

1080.87

1095.13

636.66

224.37

385.00

31.37

149.47

139.98

205.65

24.76

4073.50

o. - WSS/SP/01

2265.13

4375.27

3073.06

3776.04

796.90

6896.73

1646.66

1554.37

485.22

Engineering Organization W.P. Page 583 BSR Annalysis


1597.02

436.39

26902.81

o. - WSS/SP/02

4969.77

7609.63

6425.49

8249.60

1542.39

9800.62

2404.41

3243.08

700.87

3266.62

1081.59

49294.07

o. - WSS/SP/03

15 3.75

8756.27

9744.93 4.375

8268.34

10306.57

Engineering Organization W.P. Page 584 BSR Annalysis


1953.69

12704.51

3162.17

5545.85

916.53

5516.97

1437.52

68313.35

o. - WSS/SP/04

5598.60

6562.91

4097.41

3328.29

1002.32

37932.04

1646.66

1554.37

485.22

1597.02

436.39

64241.24

Engineering Organization W.P. Page 585 BSR Annalysis


o. - WSS/SP/05

8747.81

10718.37

7881.15

7592.90

1939.98

53903.43

2404.41

3243.08

700.87

3266.62

1081.59

101480.21

o. - WSS/SP/06

15 3.75

14035.38

13774.78 4.375

10155.31

9649.87

2457.31

69874.81

3162.17

Engineering Organization W.P. Page 586 BSR Annalysis


5545.85

916.53

5516.97

1437.52

136526.50

o. - WSS/ST/01

4.50
2.50
3.00

6083.13

3803.80

9525.12

5371.78 13 6.6666666667

42415.74

3590.24 4.375

3362.23

14095.29

39575.12

912.50

3419.27 8.750

2810.55 13.375
1.1145833333
3702.17

607.82

1580.97

Engineering Organization W.P. Page 587 BSR Annalysis


140855.74

o. - WSS/ST/01

5.50
3.50
3.00

7330.95

4584.06

11478.99

6496.95 15.666666667 6.6666666667

48421.51

4176.40 4.375

3911.17

16469.24

46240.40

912.50

4200.82

3513.19

4627.72

759.77

1310.15

164433.82

o. - WSS/ST/01

6.50
3.50

Engineering Organization W.P. Page 588 BSR Annalysis


3.00

7954.86

4974.20

12455.92

6968.80 17 6.6666666667

53676.56

4616.02 4.375

4322.87

18991.55

53322.27

912.50

4591.59

4215.83

5553.26

911.72

1527.24

184995.20

o. - WSS/ST/01

8.50
4.50
3.50

10809.25

6451.83

16925.40

9536.73 21 7.3333333333

Engineering Organization W.P. Page 589 BSR Annalysis


62707.73

5495.26 4.375

5146.27

22663.75

63632.63

912.50

6484.41 14.75

4918.46

6478.81

1063.68

1894.54

225121.24

o. - WSS/ST/02

12.00
5.00
4.00

14786.69

9246.16

23153.36

12549.28 26.333333333 8

76948.91

6814.12 4.375

6381.38

29155.00

81858.01

Engineering Organization W.P. Page 590 BSR Annalysis


912.50

9158.77 14.75
18.75
7978.78

10344.31

1732.28

2921.41

293940.96

o. - WSS/ST/03

8.50
4.50
3.50

10341.55

6462.43

16866.86

9536.73

81746.01

73448.97

139878.10 13 30

5495.26

5146.27

22663.75

63632.63

912.50

6484.41 14.75

Engineering Organization W.P. Page 591 BSR Annalysis


4918.46

6478.81

1063.68

1894.54

456970.94

o. - WSS/ST/04

12.00
5.00
4.00

14217.48

8890.23

23203.38

12549.28 26.333333333 8

100608.95

90397.35

169862.58 13 38

6740.85 4.375

6312.76

29155.00

81858.01

912.50

9546.02 14.75
18.75
7978.78

10344.31

1732.28

Engineering Organization W.P. Page 592 BSR Annalysis


2960.14

577269.91

34605.00
8840.00
43445.00

385.00
629.00
629.00
1643.00

5078.75 235.71428571
5000.00

55166.75
12136.69
67303.44

11050.00
1629.00 36.205714286
12679.00

385.00
314.50
629.00
1328.50

3329.41 235.71428571
5000.00

22336.91

Engineering Organization W.P. Page 593 BSR Annalysis


4914.12
27251.02

o. - WSS/ST/04

5.00
2.50
2.50

34260.03

16206.88

84599.48

94566.78 36.833333333 23.666666667

213102.70

195270.14

303555.30 23.6 43.6

56885.64

29865.55

0.00

46231.11

23828.89

62629.40 72.666666667 27.25

265.38

1,161,267.28

ELECTRICAL

Engineering Organization W.P. Page 594 BSR Annalysis


595.50
0.00
0.00
29.78
625.28

96.25
78.63
174.88

800.16
176.03
976.19

794.00
0.00
0.00
39.70
833.70

96.25
78.63
174.88

1008.58
221.89
1230.47

992.50
0.00
0.00
49.63
1042.13

96.25
78.63
174.88

Engineering Organization W.P. Page 595 BSR Annalysis


1217.01
267.74
1484.75

1191.00
0.00
0.00
59.55
1250.55

96.25
78.63
174.88

1425.43
313.59
1739.02

1389.50
0.00
0.00
69.48
1458.98

96.25
78.63
174.88

1633.86
359.45
1993.30

Engineering Organization W.P. Page 596 BSR Annalysis


595.50
0.00
0.00
29.78
625.28

144.38
117.95
262.32

887.60
195.27
1082.87

794.00
0.00
0.00
39.70
833.70

144.38
117.95
262.32

1096.02
241.12
1337.14

992.50
0.00
0.00
49.63
1042.13

144.38
117.95
262.32

Engineering Organization W.P. Page 597 BSR Annalysis


1304.45
286.98
1591.42

1191.00
0.00
0.00
59.55
1250.55

144.38
117.95
262.32

1512.87
332.83
1845.70

1389.50
0.00
0.00
69.48
1458.98

144.38
117.95
262.32

1721.30
378.68
2099.98

Engineering Organization W.P. Page 598 BSR Annalysis


595.50
0.00
0.00
0.00
29.78
625.28

144.38
117.95
262.32

887.60
195.27
1082.87

794.00
0.00
0.00
0.00
39.70
833.70

144.38
117.95
262.32

1096.02
241.12
1337.14

992.50
0.00
0.00
0.00
49.63
1042.13

Engineering Organization W.P. Page 599 BSR Annalysis


144.38
117.95
262.32

1304.45
286.98
1591.42

1191.00
0.00
0.00
0.00
59.55
1250.55

144.38
117.95
262.32

1512.87
332.83
1845.70

1389.50
0.00
0.00
0.00
69.48
1458.98

144.38
117.95
262.32

1721.30
378.68
2099.98

Engineering Organization W.P. Page 600 BSR Annalysis


694.75
0.00
0.00
34.74
729.49

96.25
78.63
174.88

904.37
198.96
1103.33

694.75
0.00
0.00
34.74
729.49

144.38
117.95
262.32

991.81
218.20
1210.01

694.75
0.00

Engineering Organization W.P. Page 601 BSR Annalysis


0.00
0.00
34.74
729.49

144.38
117.95
262.32

991.81
218.20
1210.01

595.50
0.00
0.00
0.00
29.78
625.28

144.38
117.95
262.32

887.60
195.27
1082.87

595.50
0.00
0.00
0.00
29.78
625.28

144.38
117.95
262.32

887.60

Engineering Organization W.P. Page 602 BSR Annalysis


195.27
1082.87

595.50
884.25
0.00
0.00
29.60
1509.35

96.25
78.63
174.88

1684.23
370.53
2054.75

794.00
1179.00
0.00
0.00
39.46
2012.46

96.25
78.63
174.88

2187.34
481.21
2668.55

Engineering Organization W.P. Page 603 BSR Annalysis


992.50
1473.75
0.00
0.00
49.33
2515.58

96.25
78.63
174.88

2690.46
591.90
3282.36

1191.00
1768.50
0.00
0.00
59.19
3018.69

96.25
78.63
174.88

3193.57
702.59
3896.16

Engineering Organization W.P. Page 604 BSR Annalysis


1389.50
2063.25
0.00
0.00
69.06
3521.81

96.25
78.63
174.88

3696.69
813.27
4509.96

595.50
884.25
0.00
0.00
29.60
1509.35

144.38
117.95
262.32

1771.67
389.77
2161.43

794.00
1179.00
0.00
0.00

Engineering Organization W.P. Page 605 BSR Annalysis


39.46
2012.46

144.38
117.95
262.32

2274.78
500.45
2775.23

992.50
1473.75
0.00
0.00
49.33
2515.58

144.38
117.95
262.32

2777.90
611.14
3389.03

1191.00
1768.50
0.00
0.00
59.19
3018.69

144.38
117.95
262.32

Engineering Organization W.P. Page 606 BSR Annalysis


3281.01
721.82
4002.83

1389.50
2063.25
0.00
0.00
69.06
3521.81

144.38
117.95
262.32

3784.13
832.51
4616.63

595.50
884.25
0.00
0.00
0.00
29.60
1509.35

144.38
117.95
262.32

1771.67
389.77
2161.43

Engineering Organization W.P. Page 607 BSR Annalysis


794.00
1179.00
0.00
0.00
0.00
39.46
2012.46

144.38
117.95
262.32

2274.78
500.45
2775.23

992.50
1473.75
0.00
0.00
0.00
49.33
2515.58

144.38
117.95
262.32

2777.90
611.14
3389.03

Engineering Organization W.P. Page 608 BSR Annalysis


1191.00
1768.50
0.00
0.00
0.00
59.19
3018.69

144.38
117.95
262.32

3281.01
721.82
4002.83

1389.50
2063.25
0.00
0.00
0.00
69.06
3521.81

144.38
117.95
262.32

3784.13
832.51
4616.63

Engineering Organization W.P. Page 609 BSR Annalysis


694.75
884.25
0.00
0.00
78.95
1657.95

96.25
78.63
174.88

1832.83
403.22
2236.05

694.75
884.25
0.00
0.00
78.95
1657.95

144.38
117.95
262.32

1920.27
422.46
2342.73

Engineering Organization W.P. Page 610 BSR Annalysis


694.75
884.25
0.00
0.00
0.00
78.95
1657.95

144.38
117.95
262.32

1920.27
422.46
2342.73

595.50
884.25
0.00
0.00
0.00
73.99
1553.74

144.38
117.95
262.32

1816.06
399.53
2215.59

595.50
884.25
0.00
0.00
73.99
1553.74

Engineering Organization W.P. Page 611 BSR Annalysis


144.38
117.95
262.32

1816.06
399.53
2215.59

595.50
884.25
0.00
0.00
73.99
1553.74

144.38
117.95
262.32

1816.06
399.53
2215.59

1617.60
707.40
0.00
0.00
69.75
2394.75

144.38
117.95
262.32

2657.07
584.56
3241.63

Engineering Organization W.P. Page 612 BSR Annalysis


1617.60
707.40
0.00
0.00
69.75
2394.75

144.38
117.95
262.32

2657.07
584.56
3241.63

850.00
80.00
46.50
976.50

48.13
39.32
87.44

44.53 27.2

Engineering Organization W.P. Page 613 BSR Annalysis


65.09 2.8495238095 3.1344761905

1173.55
117.36
25.82
143.17

1300.00
80.00
69.00
1449.00

48.13
39.32
87.44

53.15 32.2
77.68 3.3733333333 3.7106666667

1667.27
166.73
36.68
203.41

2022.00
884.25
2906.25

288.75 500 174.88


235.89 2.8591033852
15.74
540.38

3446.63
68.93
15.17
84.10

Engineering Organization W.P. Page 614 BSR Annalysis


4581.00
2163.00
6744.00

433.13 800 174.88


353.84 4.5745654163
23.61
810.57

7554.57
151.09
33.24
184.33

4581.00
4581.00

433.13 800 174.88


353.84 4.5745654163
23.61
810.57

5391.57
107.83
23.72
131.55

9162.00
2163.00
11325.00

Engineering Organization W.P. Page 615 BSR Annalysis


577.50 1000 174.88
471.78 5.7182067704
31.48
1080.76

12405.76
248.12
54.59
302.70

7554.00
3562.50
11116.50

577.50 1000 174.88


471.78 5.7182067704
31.48
1080.76

12197.26
243.95
53.67
297.61

15108.00
3562.50
18670.50

673.75 1200 174.88


550.41 6.8618481244
36.72
1260.88

19931.38
398.63
87.70
486.33

Engineering Organization W.P. Page 616 BSR Annalysis


11518.50
5531.25
17049.75

673.75 1200 174.88


550.41 6.8618481244
36.72
1260.88

18310.63
366.21
80.57
446.78

23037.00
5531.25
28568.25

866.25 1500 174.88


707.67 8.5773101555
47.22
1621.14

30189.39
603.79
132.83
736.62

18483.00
5531.25
24014.25

Engineering Organization W.P. Page 617 BSR Annalysis


866.25 1500 174.88
707.67 8.5773101555
47.22
1621.14

25635.39
512.71
112.80
625.50

36966.00
5531.25
42497.25

1106.88 2000 174.88


904.25 11.436413541
60.33
2071.45

44568.70
891.37
196.10
1087.48

51429.00
5531.25
56960.25

1347.50 2500 174.88


1100.82 14.295516926
73.45
2521.77

59482.02
1189.64
261.72
1451.36

Engineering Organization W.P. Page 618 BSR Annalysis


141966.00
16259.25
158225.25

1636.25 3000 174.88


1336.71 17.154620311
89.19
3062.15

161287.40
3225.75
709.66
3935.41

730.50
730.50

96.25 200 174.88


78.63 1.1436413541
5.25
180.13

910.63
18.21
4.01
22.22

884.25
884.25

120.31 200 174.88


98.29 1.1436413541
6.56

Engineering Organization W.P. Page 619 BSR Annalysis


225.16

1109.41
22.19
4.88
27.07

2163.00
2163.00

120.31 200 174.88


98.29 1.1436413541
6.56
225.16

2388.16
47.76
10.51
58.27

3562.50
3562.50

120.31 200 174.88


98.29 1.1436413541
6.56
225.16

3787.66
75.75
16.67
92.42

5531.25
5531.25

Engineering Organization W.P. Page 620 BSR Annalysis


120.31 200 174.88
98.29 1.1436413541
6.56
225.16

5756.41
115.13
25.33
140.46

595.50
595.50

168.44 300 174.88


137.60 1.7154620311
9.18
315.22

910.72
18.21
4.01
22.22

2022.00
2022.00

216.56 400 174.88


176.92 2.2872827081
11.80
405.28

2427.28
48.55
10.68
59.23

Engineering Organization W.P. Page 621 BSR Annalysis


3160.50
3160.50

264.69 500 174.88


216.23 2.8591033852
14.43
495.35

3655.85
73.12
16.09
89.20

3160.50
1493.25
4653.75

336.88 600 174.88


275.21 3.4309240622
18.36
630.44

5284.19
105.68
23.25
128.93

6321.00
1493.25
7814.25

433.13 800 174.88

Engineering Organization W.P. Page 622 BSR Annalysis


353.84 4.5745654163
23.61
810.57

8624.82
172.50
37.95
210.45

4044.00
884.25
4928.25

385.00 700 174.88


314.52 4.0027447392
20.99
720.51

5648.76
112.98
24.85
137.83

3035.00
24.06
19.66

3078.72
677.32
3756.04

4325.00
24.06
19.66

4368.72
961.12
5329.84

Engineering Organization W.P. Page 623 BSR Annalysis


3200.00
24.06
19.66

3243.72
713.62
3957.34

4485.00
24.06
19.66

4528.72
996.32
5525.04

4840.00
24.06
19.66

4883.72
1074.42
5958.14

4840.00
24.06
19.66

4883.72
1074.42
5958.14

4795.00

Engineering Organization W.P. Page 624 BSR Annalysis


24.06
19.66

4838.72
1064.52
5903.24

4795.00
24.06
19.66

4838.72
1064.52
5903.24

4795.00
24.06
19.66

4838.72
1064.52
5903.24

6645.00
24.06
19.66

6688.72
1471.52
8160.24

6645.00
24.06
19.66

6688.72
1471.52
8160.24

Engineering Organization W.P. Page 625 BSR Annalysis


6670.00
24.06
19.66

6713.72
1477.02
8190.74

11985.00
24.06
19.66

12028.72
2646.32
14675.04

0.00
48.13
39.32

87.44
19.24
106.68

0.00
48.13
39.32

87.44
19.24
106.68

Engineering Organization W.P. Page 626 BSR Annalysis


0.00
48.13
39.32

87.44
19.24
106.68

7950.00
0.00
48.13
39.32

8037.44
1768.24
9805.68

7950.00
48.13
39.32

8037.44
1768.24
9805.68

10360.00
0.00
48.13
39.32

10447.44
2298.44
12745.88

10360.00
48.13
39.32

Engineering Organization W.P. Page 627 BSR Annalysis


10447.44
2298.44
12745.88

16075.00
0.00
72.19
58.97

16206.16
3565.36
19771.52

16075.00
72.19
58.97

16206.16
3565.36
19771.52

400.00
19.25
15.73

434.98
95.69
530.67

400.00
19.25
15.73

434.98
95.69
530.67

Engineering Organization W.P. Page 628 BSR Annalysis


915.00
19.25
15.73

949.98
208.99
1158.97

1090.00
24.06
19.66

1133.72
249.42
1383.14

1090.00
24.06
19.66

1133.72
249.42
1383.14

2365.00
24.06
19.66

2408.72
529.92
2938.64

1695.00
24.06

Engineering Organization W.P. Page 629 BSR Annalysis


19.66

1738.72
382.52
2121.24

1695.00
24.06
19.66

1738.72
382.52
2121.24

2365.00
24.06
19.66

2408.72
529.92
2938.64

3155.00
24.06
19.66

3198.72
703.72
3902.44

3155.00
24.06
19.66

3198.72
703.72
3902.44

Engineering Organization W.P. Page 630 BSR Annalysis


5560.00
24.06
19.66

5603.72
1232.82
6836.54

985.00
225.00
24.06
19.66

1028.72
226.32
1255.04

1100.00
225.00
24.06
19.66

1143.72
251.62
1395.34

2115.00
225.00
24.06
19.66

2158.72
474.92
2633.64

Engineering Organization W.P. Page 631 BSR Annalysis


1555.00
225.00
24.06
19.66

1598.72
351.72
1950.44

1705.00
225.00
24.06
19.66

1748.72
384.72
2133.44

3235.00
225.00
24.06
19.66

3278.72
721.32
4000.04

2100.00
225.00
24.06
19.66

2143.72
471.62
2615.34

Engineering Organization W.P. Page 632 BSR Annalysis


2285.00
225.00
24.06
19.66

2328.72
512.32
2841.04

4430.00
225.00
24.06
19.66

4473.72
984.22
5457.94

600.00
600.00

48.13
39.32
87.44

687.44
151.24
838.68

1000.00
1000.00

48.13

Engineering Organization W.P. Page 633 BSR Annalysis


39.32
87.44

1087.44
239.24
1326.68

1200.00
1200.00

48.13
39.32
87.44

1287.44
283.24
1570.68

3600.00
3600.00

48.13
39.32
87.44

3687.44
811.24
4498.68

3500.00
3500.00

Engineering Organization W.P. Page 634 BSR Annalysis


48.13
39.32
87.44

3587.44
789.24
4376.68

1200.00
1200.00

48.13
39.32
87.44

1287.44
283.24
1570.68

1450.00
1450.00

48.13
39.32
87.44

1537.44
338.24
1875.68

475.00
9.63

484.63

Engineering Organization W.P. Page 635 BSR Annalysis


106.62
591.24

0.00
0.00

48.13
39.32
87.44

87.44
19.24
106.68

0.00
0.00

48.13
39.32
87.44

87.44
19.24
106.68

850.00
42.50
892.50

48.13
39.32
87.44

979.94

Engineering Organization W.P. Page 636 BSR Annalysis


215.59
1195.53

1700.00
85.00
1785.00

48.13
39.32
87.44

1872.44
411.94
2284.38

740.00
37.00
777.00

48.13
39.32
87.44

864.44
190.18
1054.62

1200.00
60.00

Engineering Organization W.P. Page 637 BSR Annalysis


1260.00

48.13
39.32
87.44

1347.44
296.44
1643.88

805.00
40.25
845.25

48.13
39.32
87.44

932.69
205.19
1137.88

1300.00
65.00
1365.00

48.13
39.32
87.44

1452.44
319.54
1771.98

Engineering Organization W.P. Page 638 BSR Annalysis


670.00
33.50
703.50

48.13
39.32
87.44

790.94
174.01
964.95

1150.00
57.50
1207.50

48.13
39.32
87.44

1294.94
284.89
1579.83

0.00
0.00
0.00

48.13
39.32
87.44

Engineering Organization W.P. Page 639 BSR Annalysis


87.44
19.24
106.68

0.00
0.00
0.00

48.13
39.32
87.44

87.44
19.24
106.68

0.00
0.00
0.00

48.13
39.32
87.44

87.44
19.24
106.68

Engineering Organization W.P. Page 640 BSR Annalysis


0.00
0.00
0.00

48.13
39.32
87.44

87.44
19.24
106.68

750.00
37.50
787.50

48.13
39.32
87.44

874.94
192.49
1067.43

950.00
47.50
997.50

48.13
39.32
87.44

1084.94
238.69
1323.63

Engineering Organization W.P. Page 641 BSR Annalysis


550.00
27.50
577.50

48.13
39.32
87.44

664.94
146.29
811.23

850.00
42.50
892.50

48.13
39.32
87.44

979.94
215.59
1195.53

0.00
0.00
0.00

48.13
39.32

Engineering Organization W.P. Page 642 BSR Annalysis


87.44

87.44
19.24
106.68

0.00
0.00
0.00

48.13
39.32
87.44

87.44
19.24
106.68

0.00
0.00
0.00

48.13
39.32
87.44

87.44
19.24
106.68

Engineering Organization W.P. Page 643 BSR Annalysis


0.00
0.00
0.00

48.13
39.32
87.44

87.44
19.24
106.68

0.00
0.00
0.00

48.13
39.32
87.44

87.44
19.24
106.68

0.00
0.00
0.00

48.13
39.32
87.44

87.44

Engineering Organization W.P. Page 644 BSR Annalysis


19.24
106.68

1269.69
43.20
1025.75
175.65
19650.00

141.65
55.86
93.65

78.63

22534.07
4957.49
27491.56

43.20
1025.75
175.65
1320.00

141.65
55.86
93.65

78.63

2934.38
645.56
3579.94

Engineering Organization W.P. Page 645 BSR Annalysis


METAL STEEL

21460.00
21460.00

96.25
96.25

21556.25
4742.38
26298.63

7065.00
7065.00

96.25
96.25

7161.25
1575.48
8736.73

72.33

624.00
525.00
114.90
42.00
60.00

Engineering Organization W.P. Page 646 BSR Annalysis


50.00
1415.90

385.00
314.50
34.98
734.48

250.00
250.00

120.02

2520.39
315.05
69.31
384.36

496.00

2652.00
3500.00
615.20
128.00
160.00
200.00
7255.20

1540.00
1572.50
155.63
3268.13

1500.00
1500.00

961.87

12985.19
240.47
52.90
293.37

Engineering Organization W.P. Page 647 BSR Annalysis


142.67

3125.00 0.5416666667 13.541666667


2340.00 0.3333333333 8.6666666667
1872.00 0.1733333333 6.24
3325.00 0.0523809524 24.880952381
1080.00 18 18
1174.20 71.329285714
120.00
150.00
300.00
300.00
13786.20

2310.00
2201.50
225.58
4737.08

2000.00
2000.00

2052.33
180.17

22755.77
355.56
78.22
433.78

Engineering Organization W.P. Page 648 BSR Annalysis


142.67

3125.00 0.5416666667 13.541666667


2340.00 0.3333333333 8.6666666667
1015.00 0.0523809524 7.5952380952
1080.00 18 18
756.00 47.803571429
48.00
60.00
300.00
300.00
9024.00

1155.00
943.50
104.93
2203.43

1000.00
1000.00

1100.47
180.17

13508.07
500.30
110.07
610.36

1024.00
700.00
56.00

Engineering Organization W.P. Page 649 BSR Annalysis


136.00
100.00
2016.00

770.00
629.00
139.90
1538.90

250.00
250.00

190.25

3995.15
499.39
109.87
609.26

2700.00
1050.00
3000.00 96.9
260.00 1.58
1095.00 153.102
1000.00 46.677439024
100.00
552.30
276.15
10033.45

1925.00
1258.00
318.30
3501.30

500.00
500.00

Engineering Organization W.P. Page 650 BSR Annalysis


1690.57 0.0502857143 0.076
3.0171428571 1.14
15725.32
1572.53
345.96
1918.49

4200.00
1050.00
3000.00 96.9
260.00 1.58
1095.00 153.102
1000.00 46.677439024
100.00
535.25
321.15
11561.40

1925.00
1540.00
346.50
3811.50

500.00
500.00

1859.63 0.0502857143 0.076


3.0171428571 1.14
17732.53
1773.25
390.12
2163.37

Engineering Organization W.P. Page 651 BSR Annalysis


3975.00
3900.00
657.00 #VALUE!
1000.00 #VALUE!
100.00
288.96
9920.96

962.50
786.25
87.44
1836.19

375.00
375.00

1859.63 0.176 0.082


2.64 2.451
13991.77
1399.18
307.82
1707.00

2650.00
700.00
50.00
102.00
3502.00

Engineering Organization W.P. Page 652 BSR Annalysis


385.00
314.50
34.98
734.48

250.00
250.00

1014.34 0.176 0.076


1.936 0.760
5500.82
550.08
121.02
671.10

STRUCTURAL STEEL

1550.00
77.50
77.50
1705.00

192.50
157.25
349.75

102.74

2157.49
215.75
47.46
263.21

2200.00

Engineering Organization W.P. Page 653 BSR Annalysis


66.00
66.00
2332.00

192.50
157.25
349.75

134.09

2815.84
281.58
61.95
343.53

2500.00
75.00
75.00
2650.00

192.50
157.25
349.75

149.99

3149.74
314.97
69.29
384.27

4500.00
135.00
135.00
4770.00

Engineering Organization W.P. Page 654 BSR Annalysis


288.75
235.88
524.63

264.73

5559.36
555.94
122.31
678.24

6100.00
183.00
305.00
6588.00

288.75
235.88
524.63

355.63

7468.26
746.83
164.30
911.13

7500.00
225.00
375.00
8100.00

288.75
235.88
524.63

603.72

Engineering Organization W.P. Page 655 BSR Annalysis


9228.35
922.83
203.02
1125.86

31000.00
9270.00
2040.00
4027.00
46337.00

2310.00
1155.00
2516.00
299.05
6280.05

5261.71

57878.76
578.79
127.33
706.12

Engineering Organization W.P. Page 656 BSR Annalysis


44000.00
9476.00
2040.00
5347.60
60863.60

2310.00
1155.00
2516.00
299.05
6280.05

6714.37

73858.02
738.58
162.49
901.07

50000.00
9785.00
2040.00
5978.50
67803.50

2310.00
1155.00
2516.00
299.05
6280.05

11112.53

85196.08
851.96
187.43
1039.39

Engineering Organization W.P. Page 657 BSR Annalysis


20460.00
9270.00
2973.00
1400.00
500.00
34603.00 11418.99

770.00
629.00
770.00
1258.00
1540.00
1258.00
311.25
6536.25

2952.36 108.75 21
1000.00 129.75

45091.61
9920.15

Engineering Organization W.P. Page 658 BSR Annalysis


55011.76

17825.00
9785.00
2761.00
1400.00
500.00
32271.00 10649.43

770.00
629.00
770.00
1258.00
1540.00
1258.00
311.25
6536.25

2952.36 86.25 22.05


1000.00 108.3

42759.61

Engineering Organization W.P. Page 659 BSR Annalysis


9407.11
52166.72

9.2516666666667 12.7

24800.00
10557.50
3535.75
1400.00
500.00
40793.25 13461.7725
54255.02

770.00
629.00
770.00
1258.00
1540.00
1258.00
311.25
6536.25

3149.18 105 21
1000.00 126

Engineering Organization W.P. Page 660 BSR Annalysis


51478.68
11325.31
62803.99

8.55 12.7

21700.00
10300.00
3200.00
1400.00
500.00
37100.00 12243
49343.00

770.00
629.00
770.00
1258.00
1540.00
1258.00
311.25
6536.25

3149.18 105 21

Engineering Organization W.P. Page 661 BSR Annalysis


1000.00 126

47785.43
10512.79
58298.22

10.616666666667 15.58333333 1.30333333333 2.6


22 17 4 8

38500.00
5115.00
11330.00
4983.00
1400.00
800.00
62128.00 20502.24
82630.24

770.00

Engineering Organization W.P. Page 662 BSR Annalysis


629.00
1540.00
2516.00
1540.00
2516.00
951.10
10462.10

4330.12 131.25 21
2000.00 152.25

78920.22
17362.45
96282.67

9.85 15.58333333 0.51166666667 1.06166666667


20 17 2 4

35200.00
2170.00

Engineering Organization W.P. Page 663 BSR Annalysis


10815.00
4601.50
1400.00
800.00
54986.50 18145.545
73132.05

770.00
629.00
1540.00
2516.00
1540.00
2516.00
951.10
10462.10

4330.12 131.25 21
2000.00 152.25

71778.72
15791.32
87570.04

513.80
90.00
603.80

192.50
157.25
349.75

953.55
259.82
57.16
316.98

3150.00
1395.00
488.00
503.30
5536.30

770.00
629.00
770.00
629.00

Engineering Organization W.P. Page 664 BSR Annalysis


2798.00

583.40

8917.70
445.89
98.09
543.98

3640.00
447.00
1112.00
1112.00
872.00
128.00
365.55
7676.55

385.00
314.50
699.50
1399.00

9075.55
378.15
83.19
461.34

11000.00
8200.00
576.00
19776.00

3080.00
2516.00
5596.00

25372.00
253.72
55.82

Engineering Organization W.P. Page 665 BSR Annalysis


309.54

1500.00
2400.00
390.00
4290.00

385.00
314.50
20.99
720.49

175.37

5185.85
1140.89
6326.74

54670.00
900.00
555.70
56125.70

2310.00
1887.00
4197.00

60322.70
17235.06
3791.71
21026.77

Engineering Organization W.P. Page 666 BSR Annalysis


22550.00
1500.00
24050.00

1540.00
770.00
1258.00
178.40
3746.40

27796.40
277.96
61.15
339.12

26400.00
1500.00
27900.00

1540.00
770.00
1258.00
178.40
3746.40

31646.40
316.46
69.62
386.09

29370.00
1500.00
30870.00

1540.00
770.00
1258.00
178.40

Engineering Organization W.P. Page 667 BSR Annalysis


3746.40

34616.40
346.16
76.16
422.32

MAINTENANCE

3774.00

314.50

4088.50
12389.39
2725.67
15115.06

2516.00

314.50

2830.50
5661.00
1245.42
6906.42

786.25
23.59
809.84
178.16
988.00

943.50

Engineering Organization W.P. Page 668 BSR Annalysis


28.31
971.81
213.80
1185.60

943.50
28.31
971.81
364.43
80.17
444.60

314.50
157.25
471.75
103.79
575.54

157.25
157.25
15.73
3.46
19.18

1258.00
37.74
1295.74
285.06
1580.80

1100.75
1100.75
242.17

Engineering Organization W.P. Page 669 BSR Annalysis


1342.92

864.88
25.95
890.82
195.98
1086.80

707.63
707.63
155.68
863.30

471.75
14.15
485.90
106.90
592.80

235.88
7.08
242.95
53.45
296.40

707.63
21.23
728.85
160.35
889.20

Engineering Organization W.P. Page 670 BSR Annalysis


4950.00
495.00
871.00
1105.00
75.00
7496.00

1925.00
1572.50
34.98
3532.48

11028.48
2426.26
13454.74

716.90
552.50
525.00
5.00
1799.40

962.50
1179.38
2141.88

3941.28
867.08
4808.36

536.00
504.00
773.50
5.00
1818.50

962.50
1179.38
64.26
2206.13

Engineering Organization W.P. Page 671 BSR Annalysis


4024.63
885.42
4910.05

536.00
756.00
773.50
5.00
2070.50

1636.25
1336.63
89.19
3062.06

5132.56
1129.16
6261.72

314.50
314.50
69.19
383.69

314.50

157.25
14.15
485.90
106.90
592.80

314.50

314.50
18.87
647.87

Engineering Organization W.P. Page 672 BSR Annalysis


142.53
790.40

235.88
7.08
242.95
53.45
296.40

235.88

78.63
9.44
323.94
71.27
395.20

235.88

157.25
11.79
404.92
89.08
494.00

629.00
18.87
647.87
142.53
790.40

Engineering Organization W.P. Page 673 BSR Annalysis


786.25
23.59
809.84
178.16
988.00

943.50
28.31
971.81
213.80
1185.60

188.70
5.66
194.36
19.44
4.28
23.71

157.25
4.72
161.97
16.20
3.56
19.76

157.25
4.72
161.97
3.24
0.71
3.95

Engineering Organization W.P. Page 674 BSR Annalysis


235.88
7.08
242.95
4.86
1.07
5.93

314.50
9.44
323.94
6.48
1.43
7.90

314.50
9.44
323.94
6.48
1.43
7.90

393.13
11.79
404.92
8.10
1.78
9.88

Engineering Organization W.P. Page 675 BSR Annalysis


471.75
14.15
485.90
9.72
2.14
11.86

471.75
14.15
485.90
9.72
2.14
11.86

550.38
16.51
566.89
11.34
2.49
13.83

629.00
18.87
647.87
12.96
2.85
15.81

235.88
7.08
6.07
1.34
7.41

Engineering Organization W.P. Page 676 BSR Annalysis


314.50
9.44
8.10
1.78
9.88

314.50
9.44
8.10
1.78
9.88

471.75
14.15
12.15
3.11
15.26

314.50
7.86
1.73
9.59

393.13
11.79
10.12
2.23
12.35

Engineering Organization W.P. Page 677 BSR Annalysis


314.50
9.44
16.20
3.56
19.76

314.50
9.44
323.94
71.27
395.20

393.13
11.79
404.92
89.08
494.00

471.75
14.15
485.90
106.90
592.80

192.50
314.50
15.21
522.21
114.89
637.10

Engineering Organization W.P. Page 678 BSR Annalysis


240.63
393.13
19.01
652.76
143.61
796.37

288.75
471.75
22.82
783.32
172.33
955.64

96.25
78.63
5.25
7.63
3.75
0.83
4.58

288.75
78.63
7.35
449.68
98.93
548.62

1540.00
1729.75
390.00
98.09

Engineering Organization W.P. Page 679 BSR Annalysis


1043.85
229.65
1273.49

96.25
78.63
390.00
5.25
21.93
4.82
26.75

221.00
60.00
223.11
192.50
157.25
8.54
10.49
72.74
16.00
88.74

432.00
770.00
314.50
15.17
3.34
18.50

385.00
314.50
49.96
10.99
60.96

Engineering Organization W.P. Page 680 BSR Annalysis


72.00
80.00
96.25
78.63
25.14
5.53
30.68

96.25
629.00
21.76
747.01
164.34
911.35

96.25
629.00

314.50
31.19
1070.94
235.61
1306.55

96.25
78.63
5.25
180.12
39.63
219.75

Engineering Organization W.P. Page 681 BSR Annalysis


96.25
157.25
7.61
261.11
57.44
318.55

96.25
314.50
12.32
423.07
93.08
516.15

467.50
96.25
78.63
8.74
43.41
9.55
52.96

45.75
770.00
629.00
41.97
1486.72
327.08
1813.80

Engineering Organization W.P. Page 682 BSR Annalysis


1260.00
408.00
385.00
314.50
20.99
23.88
5.25
29.14

48.13
39.31
87.44
19.24
106.67

72.19
58.97
131.16
28.85
160.01

629.00
629.00
138.38
767.38

943.50
943.50
207.57
1151.07

Engineering Organization W.P. Page 683 BSR Annalysis


48.13
39.31
87.44
19.24
106.67

72.19
58.97
131.16
28.85
160.01

48.13
19.66
8.47
1.86
10.34

157.25
26.21
5.77
31.97

3080.00
577.50
471.75
31.48
416.07
91.54
507.61

Engineering Organization W.P. Page 684 BSR Annalysis


252.00
102.00
770.00
314.50
32.54
1471.04
323.63
1794.66

962.50
786.25
34.98
178.37
39.24
217.61

3100.00
1540.00
314.50
92.73
210.30
46.27
256.57

249.56
200.00
144.38
17.82
183.71
40.42
224.13

Engineering Organization W.P. Page 685 BSR Annalysis


288.75
235.88

96.25
78.63
5.25
211.64
46.56
258.20

385.00
314.50
167.50
867.00
190.74
1057.74

385.00
314.50
14.00
21.41
734.91
161.68
896.58

16.07
13.13
29.20
6.42
35.63

48.13
39.31
87.44
19.24
106.67

Engineering Organization W.P. Page 686 BSR Annalysis


385.00
314.50
20.99
720.49
158.51
878.99

385.00
314.50
16.00
36.00

96.25
78.63
5.25
931.62
204.96
1136.58

48.13
39.31
2.62
90.06
19.81
109.87

144.38
4.33
148.71
32.72
181.42

Engineering Organization W.P. Page 687 BSR Annalysis


760.00
48.13
15.20
823.33
181.13
1004.46

314.50
9.44
323.94
71.27
395.20

629.00
18.87
647.87
142.53
790.40

78.63
15.73
22.63
4.98
27.60

1258.00
1258.00
276.76
1534.76

Engineering Organization W.P. Page 688 BSR Annalysis


241.88 0.208 0.078125
18.00 0.208 0.2083333333
259.88 0.208 0
0.208 0
385.00 0.208 0.8333333333
78.63 0.208 0.2083333333
23.18
486.81

746.68
7.47
1.64
9.11

967.50
393.75
175.31
40.00
1576.56

3080.00
92.40
3172.40

4748.96
395.75
87.06
482.81

2500.00
125.00
78.63

2703.63
108.15
23.79
131.94

Engineering Organization W.P. Page 689 BSR Annalysis


1900.00
95.00
78.63

2073.63
82.95
18.25
101.19

288.75
288.75
63.53
352.28

385.00
629.00
20.28
1034.28
9.85
2.17
12.02

MISCELLANEOUS

10800.00
594.00
216.00
210.00
100.00
130.00
241.00
12291.00

Engineering Organization W.P. Page 690 BSR Annalysis


1540.00

1540.00
1258.00
4338.00

16629.00
69.29
15.24
84.53

13500.00
594.00
216.00
210.00
100.00
130.00
295.00
15045.00

1258.00

1540.00
1258.00
4056.00

19101.00
63.67
14.01
77.68

2915.00

Engineering Organization W.P. Page 691 BSR Annalysis


140.24
120.00
800.00
198.76
192.50
157.25
4523.75

42.32
1111.37
60.64
122.52
1336.85

5860.60
532.78
117.21
649.99

3445.00
140.25
120.00
800.00
225.26
192.50
157.25
5080.26

42.32
1111.37
72.19
145.86
1371.74

6452.00
496.31
109.19
605.50

Engineering Organization W.P. Page 692 BSR Annalysis


4950.00
209.79
120.00
800.00
303.99
192.50
157.25
6733.53

42.32
1111.37
88.55
178.92
1421.16

8154.69
741.34
163.09
904.43

5850.00
209.79
120.00
800.00
348.99
192.50
157.25
7678.53

42.32
1111.37
104.91
211.98

Engineering Organization W.P. Page 693 BSR Annalysis


1470.58

9149.11
703.78
154.83
858.61

676.00
135.20
24.34
96.25
78.63
1010.41

19.25
38.89
58.14

1068.56
106.86
23.51
130.36

2500.00
250.00
500.00
162.50
96.25
78.63
3587.38

96.25
194.47
290.72

3878.10

Engineering Organization W.P. Page 694 BSR Annalysis


193.90
42.66
236.56

2600.00
130.00
500.00
161.50
96.25
78.63
3566.38

110.69
223.64
334.33

3900.71
195.04
42.91
237.94

610.00
61.00
671.00

192.50
157.25
8.74
358.49

1029.49
10.29
2.26
12.56

Engineering Organization W.P. Page 695 BSR Annalysis


845.00
42.25
845.00

157.25
157.25

1002.25
220.50
1222.75

1530.00
76.50
1530.00

157.25
157.25

1687.25
371.20
2058.45

950.00
47.50
950.00

157.25
157.25

Engineering Organization W.P. Page 696 BSR Annalysis


1107.25
243.60
1350.85

1000.00
50.00
1000.00

157.25
157.25

1157.25
254.60
1411.85

1940.00
97.00
1940.00

157.25
157.25

2097.25
461.40
2558.65

Engineering Organization W.P. Page 697 BSR Annalysis


1070.00
53.50
1070.00

157.25
157.25

1227.25
270.00
1497.25

1225.00
61.25
1225.00

157.25
157.25

1382.25
304.10
1686.35

2220.00
111.00
2220.00

157.25
157.25

2377.25
523.00
2900.25

Engineering Organization W.P. Page 698 BSR Annalysis


1175.00
58.75
1175.00

157.25
157.25

1332.25
293.10
1625.35

1350.00
67.50
1350.00

235.88
235.88

1585.88
348.89
1934.77

2525.00
126.25
2525.00

235.88
235.88

Engineering Organization W.P. Page 699 BSR Annalysis


2760.88
607.39
3368.27

2170.00
108.50
2170.00

235.88
235.88

2405.88
529.29
2935.17

LANDSCAPING

13320.00
2762.50
804.13
16886.63

1540.00
1258.00
2798.00

19684.63
4330.62
24015.24

Engineering Organization W.P. Page 700 BSR Annalysis


10730.00
2762.50
674.63
14167.13

1540.00
1258.00
2798.00

16965.13
3732.33
20697.45

8880.00
2762.50
582.13
12224.63

1540.00
1258.00
2798.00

15022.63
3304.98
18327.60

Engineering Organization W.P. Page 701 BSR Annalysis


15750.00
2762.50
925.63
19438.13

1540.00
1258.00
2798.00

22236.13
4891.95
27128.07

12600.00
2762.50
768.13
16130.63

1540.00
1258.00
2798.00

18928.63
4164.30
23092.92

Engineering Organization W.P. Page 702 BSR Annalysis


10350.00
2762.50
655.63
13768.13

1540.00
1258.00
2798.00

16566.13
3644.55
20210.67

15170.00
2762.50
896.63
18829.13

1540.00
1258.00
2798.00

21627.13
4757.97
26385.09

Engineering Organization W.P. Page 703 BSR Annalysis


12580.00
2762.50
767.13
16109.63

1540.00
1258.00
2798.00

18907.63
4159.68
23067.30

11100.00
2762.50
693.13
14555.63

1540.00
1258.00
2798.00

17353.63
3817.80
21171.42

Engineering Organization W.P. Page 704 BSR Annalysis


18000.00
2762.50
1038.13
21800.63

1540.00
1258.00
2798.00

24598.63
5411.70
30010.32

14850.00
2762.50
880.63
18493.13

1540.00
1258.00
2798.00

21291.13
4684.05
25975.17

Engineering Organization W.P. Page 705 BSR Annalysis


13050.00
2762.50
790.63
16603.13

1540.00
1258.00
2798.00

19401.13
4268.25
23669.37

2000.00
200.00
2200.00

770.00
943.50
1713.50

3913.50
217.42
47.83
265.25

Engineering Organization W.P. Page 706 BSR Annalysis


2750.00
275.00
3025.00

770.00
943.50
1713.50

4738.50
315.90
69.50
385.40

5200.00
520.00
5720.00

1540.00
1887.00
3427.00

9147.00
304.90
67.08
371.98

Engineering Organization W.P. Page 707 BSR Annalysis


ITEM DESCRIPTION UNIT RATE

B - EXCAVATION & EARTH WORK

Excavation
B 01 Site preparation, Clearing site vegetation, removing bushes, Sqr.
shrubs & top soil to a depth not exceeding 6" and removing all
debris away from site.

B 02 Manual Excavation over site to reduce level in any material Cube


(except rock requiring blasting) including depositing and
levelling as directed up to a distance not exceeding 30'.

B 03 Manual Excavation over site to reduce level in any material Cube


(except rock requiring blasting ) including depositing and
levelling as directed distance exceeding 30'-0" but not
exceeding 1/4 mile.

Shoring, dewatering and rock blasting if necessary for the


excavation, shall be paid for separately for item B04 - B06

B 04 Manual Excavation for column, wall, staircase foundations in Cube


any material (except rock requiring blasting) up to 5'-0" depth,
part return fill in and ram and surplus depositted within site as
directed.

B 05 Manual Excavation for column, wall, staircase foundations in Cube


any material (except rock requiring blasting) depth exceeding
5'-0" and not exceeding 10'-0", part return fill in and ram and
surplus depositted within site as directed.

B 06 Manual Excavation for column, wall, staircase foundations in Cube


any material (except rock requiring blasting) depth exceeding
10'-0" and not exceeding 15'-0", part return fill in and ram and
surplus depositted within site as directed.

B 07 Bulk excavation using machinery Cube

B 08 Bulk excavation using machinery including operator, Fuel, etc.. Per Hour
(Based on machine hours)

Earth Work Supports

Engineering organization, W.P. Page 708 BSR 2012


ITEM DESCRIPTION UNIT RATE
B 09 Supplying and installation of pre-cast cylinders for soil Item
improvement of 4'-0" dia. Hume pipes of wall thickness 2" and
height of 2'-0"( Nominal Reinforced type ) and lowering hume
pipes to loose soils with water table close to ground level to a
depth of 12'-0" below the ground level. Rate shall include for
removal of soil from inside the rings and lowering while de-
watering up to the required depth of 12'-0".(Rate per 12'-0"
depth per location)

B 10 Earth work supports, (Open planking) in trenches total depth up Sq.ft.


to 5'-0", distance between opposing faces not exceeding 6'-6"

B 11 Earth work supports, (Open planking) in trenches total depth Sq.ft.


exceeding 5'-0" and not exceeding 10'-0", distance between
opposing faces not exceeding 6'-6"

B 12 Earth work supports, (Open planking) in trenches total depth Sq.ft.


exceeding 10'-0" and not exceeding 15'-0", distance between
opposing faces not exceeding 6'-6"

B 13 Earth work supports, (Close planking) in trenches total depth up Sq.ft.


to 5'-0", distance between opposing faces not exceeding 6'-6"

B 14 Earth work supports, (Close planking) in trenches total depth Sq.ft.


exceeding 5'-0" and not exceeding 10'-0", distance between
opposing faces not exceeding 6'-6"

B 15 Earth work supports, (Close planking) in trenches total depth Sq.ft.


exceeding 10'-0" and not exceeding 15'-0", distance between
opposing faces not exceeding 6'-6"

Filling & Compaction

Note:-

Approved earth shall mean filling materials that comply to


the following :

The earth shall be free of vegetation, roots, boulders, easily


(a) decomposable materials, chemicals, industrial waste, plastic
etc.

(b) The maximum size of particle shall not exceed 75mm.

The earth shall be well graded and the silt and clay (fines)
(c)
content shall not be more than 25%

Engineering organization, W.P. Page 709 BSR 2012


ITEM DESCRIPTION UNIT RATE

(d) The Standerd proctor density shall be grater than 1.70g/cm 3

B 16 Approved hard Earth spreading , leveling watering and manual Cube


compaction, using standered cast iron stamper or equivalent and
filling in 150 mm thick layers (loose volume) in restricted area
(Earth available at site)

B 17 Approved earth supplying within 16 Km from the source and Cube


piled at site (measured at piled volume)

B 18 Transport of Earth per Km per cube for over and above 16km 1 km

B 19 River Sand supply within 16km from the source (for distances Cube
over 16km, add Rs. 90 per Cube per Killo Meter) subject to the
specific approval by the Divisional Engineer.
Rate is applicable for loose volume. *** In case of
measurements to be done on compacted volume multiply the rate
by 1.2.

B 20 Dense graded 37.5mm aggregate base course (ABC) supplying Cube


within 16Km, spreading , leveling , watering in 225mm thick
layers and compaction using machine Rammer. (loose volume).
Rate include hire charges of the machine rammer.

B 21 Graded Quarry dust 4.5mm downwords supplying within 16Km, Cube


spreading , leveling , watering in 225mm thick layers and
compaction using machine Rammer.(loose volume). Rate
include hire charges of the machine rammer.

B 22 Compaction of Earth including watering in 225mm thick layers Cube


(measured on piled volume) using machine Rammer. Rate
include hire charges of the machine rammer. *** This rate is
applicable for building construction with earth work not
exceeding 50 cubes. (earth available at site).

B 23 Manually spreading and leveling piled approved earth - H.S.R. Cube


item Ew -002 (applicable for filling out side the building area)
rate without compaction.

Test

B 24 Conducting a proctor density check on sample fill matearial. Per Test

Field density testing of the compacted earth fill using Sand cone
B 25 Per Test
method.

Engineering organization, W.P. Page 710 BSR 2012


ITEM DESCRIPTION UNIT RATE

Antitermite -Tretement
B 26 Antitermite-treatement for the new construction with applying Sq.ft.
Biflexthrine 10Tc (Biflex ) or approved equivalent , Dialuted
chemicals 1:200 ratio with water after supplying the sealed
bottle with lables to the site and should be followed the
manufacture standards of application including horizontal &
vertical barriers. It should be 10 years warranty on application.

B 27 Antitermite-treatement for the post construction (Existing Sq.ft.


building ) with applying Biflexthrine 10Tc (Biflex ) or approved
equivalent , Dialuted chemicals 1:200 ratio with water after
supplying the sealed bottle with lables to the site and should be
followed the manufacture standards of application including
horizontal & vertical barriers. It should be not less than 5 years
warranty on application.

Engineering organization, W.P. Page 711 BSR 2012


ITEM DESCRIPTION UNIT RATE

C - CONCRETE
Note:

The Quality of the concrete should confirm to the relevant


B.S., S.L.S. and ICTAD specification for Building works.

IN - SITU PLAIN CONCRETE

C 01 Cement concrete 1:3:6 (1 1/2") in foundation and under column Cube


footings (concrete mixer)

C 02 Cement concrete 1:3:6 (1 1/2") in foundation and under column Sqr.


footings (lean concrete of 3" thickness)

C 03 Cement concrete 1:3:6 (1") in foundation and under column Sqr.


footings (lean concrete of 2" thickness)

C 04 Cement concrete 1:3:6 (1") in foundation and under column Cube


footings

IN - SITU REINFORCED CONCRETE

C 05 Cement concrete 1:2:4 (3/4") in footings, beams, lintels, Cube


columns and concrete bedding in floors using mixer and vibrator
in ground floor.

C 06 Cement concrete 1:2:4 (3/4") in beams/lintols and columns in Cube


first floor using mixer and vibrator.

C 07 Cement concrete 1:2:4 (3/4") in beams/lintols and columns in Cube


second floor using mixer and vibrator.

C 08 Cement concrete 1:1 1/2:3 (3/4") using mixer and vibrator in Cube
ground floor.

C 09 Cement concrete 1:1 1/2:3 (3/4") using mixer and vibrator in Cube
first floor

C 10 Cement concrete 1:1 1/2:3 (3/4") using mixer and vibrator in Cube
second floor

C 11 4" Thick R.C.C slab in cement concrete 1:2:4(3/4") in first floor Sqr.
using mixer and vibrator.

C 12 4 1/2" thick R.C.C. slab in cement concrete 1:2:4(3/4") in first Sqr.


floor using mixer and vibrator.

C 13 5" thick R.C.C. slab in cement concrete 1:2:4(3/4") in first floor Sqr.
using mixer and vibrator.

Engineering organization, W.P. Page 712 BSR 2012


ITEM DESCRIPTION UNIT RATE
C 14 5 1/2" thick R.C.C. slab in cement concrete 1:2:4(3/4") in first Sqr.
floor using mixer and vibrator.

C 15 6" thick R.C.C. slab in cement concrete 1:2:4(3/4") in first floor Sqr.
using mixer and vibrator.

C 16 Pre-cast lintols size 9" x 6" deep in 1:2:4(3/4") cement concrete, L.ft.
reinforced with 3 nos of 10mm dia. tor steel bars and 6mm mild
steel stirrups @ 8" c/c including necessary formwork in ground
floor.

C 17 Pre-cast lintols size 9" x 6" deep in 1:2:4(3/4") cement concrete, L.ft.
reinforced with 3 nos of 10mm dia. tor steel bars and 6mm mild
steel stirrups @ 8" c/c including necessary formwork in first
floor.

C 18 Pre-cast lintols size 9" x 6" deep in 1:2:4(3/4") cement concrete, L.ft.
reinforced with 3 nos of 10mm dia. tor steel bars and 6mm mild
steel stirrups @ 8" c/c including necessary formwork in second
floor.

C 19 Pre-cast lintols size 4 1/2" x 6" deep in 1:2:4(3/4") cement L.ft.


concrete, reinforced with 2 nos of 10mm dia. tor steel bars and
6mm mild steel stirrups @ 6" c/c including necessary formwork
in ground floor.

C 20 Pre-cast lintols size 4 1/2" x 6" deep in 1:2:4(3/4") cement L.ft.


concrete, reinforced with 2 nos of 10mm dia. tor steel bars and
6mm mild steel stirrups @ 6" c/c including necessary formwork
in first floor.

C 21 Pre-cast lintols size 4 1/2" x 6" deep in 1:2:4(3/4") cement L.ft.


concrete, reinforced with 2 nos of 10mm dia. tor steel bars and
6mm mild steel stirrups @ 6" c/c including necessary formwork
in second floor.

C 22 Pre-cast lintols size 4" x 6" deep in 1:2:4(3/4") cement concrete, L.ft.
reinforced with 2 nos of 10mm dia. tor steel bars and 6mm mild
steel stirrups @ 6" c/c including necessary formwork in ground
floor.

C 23 Pre-cast lintols size 4" x 6" deep in 1:2:4(3/4") cement concrete, L.ft.
reinforced with 2 nos of 10mm dia. tor steel bars and 6mm mild
steel stirrups @ 6" c/c including necessary formwork in first
floor.

Engineering organization, W.P. Page 713 BSR 2012


ITEM DESCRIPTION UNIT RATE
C 24 Pre-cast lintols size 4" x 6" deep in 1:2:4(3/4") cement concrete, L.ft.
reinforced with 2 nos of 10mm dia. tor steel bars and 6mm mild
steel stirrups @ 6" c/c including necessary formwork in second
floor.

C 25 Pre-cast lintols size 6" x 6" deep in 1:2:4(3/4") cement concrete, L.ft.
reinforced with 3 nos of 10mm dia. tor steel bars and 6mm mild
steel stirrups @ 6" c/c including necessary formwork in ground
floor.

C 26 Pre-cast lintols size 6" x 6" deep in 1:2:4(3/4") cement concrete, L.ft.
reinforced with 3 nos of 10mm dia. tor steel bars and 6mm mild
steel stirrups @ 6" c/c including necessary formwork in first
floor.

C 27 Pre-cast lintols size 6" x 6" deep in 1:2:4(3/4") cement concrete, L.ft.
reinforced with 3 nos of 10mm dia. tor steel bars and 6mm mild
steel stirrups @ 6" c/c including necessary formwork in second
floor.

C 28 Stiffiner columns size 4" x 6" in 1:2:4 (3/4") reinforced cement L.ft.
concrete with 2 nos of 10mm dia. Tor steel bars , including
necessary form work.

C 29 Stiffiner columns size 4 1/2" x 6" in 1:2:4 (3/4") reinforced L.ft.


cement concrete with 2 nos of 10mm dia. Tor steel bars ,
including necessary form work.

C 30 Stiffiner columns size 9" x 6" in 1:2:4 (3/4") reinforced cement L.ft.
concrete with 2 nos of 10mm dia.Tor steel bars and 6mm mild
steel stirrups @ 6" c/c , including necessary form work.

C 31 Copings on the 4 1/2" thick walls, size of 6 1/2" x 3" in 1:2:4 L.ft.
(3/4") reinforced cement concrete with 1 no of 10mm dia. Tor
steel bar, including necessary form work & 1:3 cement
plastering , as per the Drawing No:- AR/DETAIL
DRG/2010/01/10 & Sheet No. 02

C 32 Copings on the 6" thick walls, size of 8" x 3" in 1:2:4 (3/4") L.ft.
reinforced cement concrete with 2 nos of 10mm dia. Tor steel
bars and 6mm mild steel @ 6" c/c, including necessary form
work & 1:3 cement plastering , as per the Drawing No:-
AR/DETAIL DRG/2010/01/10 & Sheet No. 02

Engineering organization, W.P. Page 714 BSR 2012


ITEM DESCRIPTION UNIT RATE
C 33 Copings on the 9" thick walls, size of 11" x 6" approx. in 1:2:4 L.ft.
(3/4") reinforced cement concrete with 2 nos of 10mm dia. Tor
steel bars and 6mm mild steel @ 6" c/c, including necessary
form work & 1:3 cement plastering , as per the Drawing No:-
AR/DETAIL DRG/2010/01/10 & Sheet No. 02

C 34 Cement concrete drains of internal size 9" wide and depth varies L.ft.
from 6" - 9" ,consist of 3" thick base and side walls in 1:3:6(1")
including 1/2" thick 1:3 rendering without ramp including
necessary formwork.

C 35 Cement concrete drains of internal size 9" wide and depth varies L.ft.
from 6" - 9" ,consist of 3" thick base and side walls in 1:3:6(1")
including 1/2" thick 1:3 rendering with 3" thick & 1'-6" width
concrete ramp, including necessary formwork.

C 36 Cement concrete drains of internal size 9" wide and depth varies L.ft.
from 6" - 9" ,consist of 3" thick base and side walls in 1:3:6(1")
including 1/2" thick 1:3 rendering with 3" thick & 2'-6" width
concrete ramp, including necessary formwork.

C 37 Construction of concrete drain 300mm width x 350mm depth L.ft.


and varies up to 400mm. Consists of necessary excavation in
hard earth, 75mm thick concrete base and walls in Grade 20
concrete, fair finish internal surface with size 450mm wide x
600mm long, 75mm thick Grade 20 removable cover slabs with
side formwork. Drain and cover slab reinforced with tor steel
10mm at 150m c/c both ways.

C 38 Construction of concrete drain 300mm width x 350mm depth L.ft.


and varies up to 400mm. Consists of necessary excavation in
hard earth, 75mm thick concrete base and walls in Grade 20
concrete, fair finish internal surface without cover slab. Drain
reinforced with tor steel 10mm at 150m c/c both ways.

C 39 Construction of concrete drain 450mm width x 600mm L.ft.


minimum depth and varies up to 750mm. Consists of necessary
excavation in hard earth, 100mm thick concrete base and walls
in Grade 20 concrete, fair finish internal surface with adequate
slope, 75mm thick Grade 20 removable cover slabs with side
formwork. Drain and cover slab reinforced with tor steel 10mm
at 150m c/c both ways.

Engineering organization, W.P. Page 715 BSR 2012


ITEM DESCRIPTION UNIT RATE
C 40 Construction of concrete drain 450mm width x 600mm L.ft.
minimum depth and varies up to 750mm. Consists of necessary
excavation in hard earth, 100mm thick concrete base and walls
in Grade 20 concrete, fair finish internal surface with adequate
slope without cover slab, with necessary formwork. Drain
reinforced with tor steel 10mm at 150m c/c both ways.

C 41 Casting of 6" x 6" x 6" concrete cubes on a steel mould, curing Nr.
for 7 days and testing for compressive strength at an approved
laboratory (rate includes transport of cubes from site to
laboratory ).

C 42 Continuous curing of reinforced concrete columns of size up to L.ft.


18" x 18" by covering with gunnies and spraying water and
keeping wet for a period of 5 days after removal of shuttering.

READY MIX CONCRETE

C 43 Ready mix concrete of grade 20(20 N/mm 2) confirming to SLS m3


1144-1997, transport 20km from batching plant.

C 44 Ready mix concrete of grade 25(25 N/mm 2) confirming to SLS m3


1144-1997, transport 20km from batching plant.

C 45 Ready mix concrete of grade 30(30 N/mm 2) confirming to SLS m3


1144-1997, transport 20km from batching plant.

Transport charges per Km per 5m 3 truck for over and above 20


C 46 5m3/Km
km.
m3
C 47 Placing , levelling , vibrating the concrete.

C 48 Pumping charge for quantites up to 30 m3 by pump car. Item

C 49 For more than 30 m3 additional pumping charges. (Rate for every m3


m3 over and above 30 m3)

D - FORM WORK
Note:

The rates given for items D 02, D 03 to D 08 herein are


applicable for plywood sheets of 15 mm thick. Hence the
(a) rate is valid only if the shuttering / formwork for footing ,
column , beams , lintel, walls, slabs are of 15 mm thick ply
boards.

Engineering organization, W.P. Page 716 BSR 2012


ITEM DESCRIPTION UNIT RATE

Any deviation from the specified materials, specified


thickness and the arrangement of formwork given in this
(b) document should require the written approval of the
Divisional Engineer. Rate for such deviation from the item
description will be decided by the D(B/SW)

For ordinary plywood of 15 mm thick boarding as


(c) shuttering, (Even for WBP sheets the same rate shall be
applicable).

D 01 Shuttering for sides of foundation with 1" thick rubber planking Sqr.
including dismantling

D 02 Shuttering for sides and bottom of plinth beams, ground beams Sqr.
including dismantling in 15mm thick plywood board.

D 03 Shuttering for floor slab including dismantling in 15mm thick Sqr.


Plywood board.

D 04 Shuttering for columns including dismantling in 15mm thick Sqr.


Plywood board.

D 05 Shuttering for Beams/Lintols including dismantling in 15mm Sqr.


thick plywood board.

D 06 Shuttering for floor slab including dismantling in 15mm thick Sqr.


Plywood board support by scaffolding up to 12'.

D 07 Shuttering for floor slab including dismantling in 15mm thick Sqr.


Plywood board support by scaffolding up to 16'.

D 08 Shuttering for Beams/Lintols including dismantling in 15mm Sqr.


thick Plywood Board support by G.I Jack.

Note:

The rates given in Items D09, D10, D11 herein are applicable
for Rubber planks. The rubber planks are allowed only for
minor works and should be used with the written approval
of the D.E.

D 09 Shuttering for Beams/Lintols including dismantling. Sqr.

D 10 Shuttering for stiffener columns between wall panels in 9" walls, Sqr.
4 1/2" walls and in boundary walls.

D 11 Shuttering for R.C.C. copings in top of balcony , stair and Sqr.


boundary walls and pre - cast lintel sides

Engineering organization, W.P. Page 717 BSR 2012


ITEM DESCRIPTION UNIT RATE

E - REINFORCEMENT
E 01 Mild steel reinforcement to slabs, beams, lintols, columns, Kg
footings & etc.. bent to shape, laid in position and tied with
16 B.W.G. Aneal binding wire in Ground floor .

E 02 Mild steel reinforcement to slabs, beams, lintols, columns, Kg


footings & etc.. bent to shape, laid in position and tied with
16 B.W.G. Aneal binding wire in first floor .

E 03 Mild steel reinforcement to slabs, beams, lintols, columns, Kg


footings & etc.. bent to shape, laid in position and tied with
16 B.W.G. Aneal binding wire in second floor .

E 04 Tor steel reinforcement to slabs, beams, lintols, columns, Kg


footings & etc.. bent to shape, laid in position and tied with
16 B.W.G. Aneal binding wire in Ground floor.

E 05 Tor steel reinforcement to slabs, beams, lintols, columns, Kg


footings & etc.. bent to shape, laid in position and tied with
16 B.W.G. Aneal binding wire in first floor.

E 06 Tor steel reinforcement to slabs, beams, lintols, columns, Kg


footings & etc.. bent to shape, laid in position and tied with
16 B.W.G. Aneal binding wire in second floor.

E 07 Rate for testing of Tor-steel specimen of 1m length for Sample


mechanical properties at an approved laboratory.

E 08 Application of two coats of Corrosion resistant primer of Sq.ft.


"BARRA ZINC SP" or equivalent to all exposed
reinforcements including preparing surfaces.

F - BRICK MASONRY
F 01 Brick work in cement and sand 1:8 in foundation up to D.P.C. Cube
level.

F 02 Brick work in cement and sand 1:8 in super Structure in ground Cube
floor. ( 9" thick brick work)

F 03 Brick work in cement and sand 1:8 in 1st floor level.(9" thick Cube
brick work)

F 04 Brick work in cement and sand 1:8 in 2nd floor level.(9" thick Cube
brick work)

F 05 Brick work in cement and sand 1:8 in superstructure in ground Cube


floor (8" thick brick work)

Engineering organization, W.P. Page 718 BSR 2012


ITEM DESCRIPTION UNIT RATE
F 06 Brick work in cement and sand 1:8 in 1st floor level.(8" thick Cube
brick work)

F 07 Brick work in cement and sand 1:8 in 2nd floor level.(8" thick Cube
brick work)

F 08 Brick work in cement and sand 1:5 in 4 1/2" thick walls in Sqr.
ground floor.

F 09 Brick work in cement and sand 1:5 in 4 1/2" thick walls in 1st Sqr.
floor

F 10 Brick work in cement and sand 1:5 in 4 1/2" thick walls in Sqr.
2nd floor

F 11 Brick drain internal size 9" x 9"(average depth) , including L.ft.


excavation, back filling , 3" thick plain concrete 1:3:6(1") base,
4 1/2" thick Brick side walls in cement and sand mortar 1:5 ,
rendering 1/2" thick cement and sand 1:3 and finish smooth with
cement putty.

F 12 3" thick brick paving in cement and sand 1:8 mix Sqr.

F 13 4 1/2" thick wire cut brick wall in cement and sand 1:5 in ground Sqr.
floor.

F 14 4 1/2" thick wire cut brick wall in cement and sand 1:5 in first Sqr.
floor.

F 15 4 1/2" thick wire cut brick wall in cement and sand 1:5 in second Sqr.
floor.

F 16 9" thick wire cut brick wall in cement and sand 1:5 in ground Sqr.
floor.

F 17 9" thick wire cut brick wall in cement and sand 1:5 in first floor. Sqr.

F 18 9" thick wire cut brick wall in cement and sand 1:5 in second Sqr.
floor.

F 19 Steps 1' - 1 1/2" in brick in cement and sand 1:5 with 1/2" thick L.ft.
rendering in cement and sand 1:2 including 6" high foundation.

F 20 Brick piers in cement and sand 1:5 in ground floor. Cube

F 21 Brick piers in cement and sand 1:5 in first floor. Cube

F 22 Brick piers in cement and sand 1:5 in second floor. Cube

Engineering organization, W.P. Page 719 BSR 2012


ITEM DESCRIPTION UNIT RATE

G - CELLULAR AND SOLID BLOCK MASONRY


G 01 8" thick cement sand Cellular block wall (blocks confirming to Sqr.
S.L.S. 855 and subject to the approval of the quality of the
blocks) in cement and sand mortar 1:5 in ground floor.

G 02 6" thick cement sand Cellular block wall (blocks confirming to Sqr.
S.L.S. 855 and subject to the approval of the quality of the
blocks) in cement and sand mortar 1:5 in ground floor.

G 03 4" thick cement sand Cellular block wall (blocks confirming to Sqr.
S.L.S.855 and subject to the approval of the quality of the
blocks) in cement and sand mortar 1:5 in ground floor.

G 04 6" thick cement sand Solid block wall (blocks confirming to Sqr.
S.L.S. and subject to the approval of the quality of the blocks) in
cement and sand mortar 1:5 in ground floor.

G 05 4" thick cement sand Solid block wall (blocks confirming to Sqr.
S.L.S and subject to the approval of the quality of the blocks) in
cement and sand mortar 1:5 in ground floor.

G 06 Supply and fixing 1'-0" x 1'-0" cement grill on wall. Sq.ft.

G 07 Supply and fixing glass blocks size 8" x 8" Sq.ft.

H - RUBBLE MASONRY
H 01 Random rubble (6"-9") masonry in cement mortar 1:5 in wall Cube
foundation and retaining walls.

J - FLOORING
J 01 3/4" thick D.P.C. in cement sand 1:2 finished with 2 coats of Sqr.
D.P.C. tar and blinded with sand.

J 02 Gauge 700 polythene damp proof membrane with 6" laps laid Sqr.
under floors.

J 03 Rendering 1/2" thick in cement and sand 1:2 in exposed concrete Sqr.
surfaces and garage floors finished smooth with neat cement
slurry.

J 04 Rendering 1/2" thick in cement and sand 1:2 in exposed concrete Sqr.
surfaces and garage floors finished smooth with colour pigment.
( Pigment added at 2.5 Kg / Sqr )

Engineering organization, W.P. Page 720 BSR 2012


ITEM DESCRIPTION UNIT RATE
J 05 Rendering 1/2" thick in cement and sand 1:3 in R.C.C. floors Sqr.
and paved floors finished smooth with neat cement slurry and
colour pigment.

J 06 Rendering 1/2" thick in cement and sand 1:3 in R.C.C. floors Sqr.
and paved floors finished smooth without colour pigment.

J 07 1/2" thick Rendering to the top surface of the sunshade with Sqr.
cement and sand 1:3 finished smooth and treated with two coats
of "Aqua Tuff " by M/s Lankem or approved equivalent and 1:80
slope should be made.

J 08 Skirting 4" x 1/2" thick in cement and sand 1:3 projected or L.ft.
flush to walls finished with cement floating including forming
groove.

J 09 Skirting 4" x 1/2" thick in cement and sand 1:3 projected or L.ft.
flush to walls finished with colour pigmented neat cement
including forming groove.

J 10 Skirting 6" x 1/2" thick in cement and sand 1:3 projected flush to L.ft.
walls finished with cement floating including forming groove in
neat cement slurry.

J 11 Skirting 6" x 1/2" thick in cement and sand 1:3 projected flush to L.ft.
walls finished with colour pigmented neat cement including
forming groove.

J 12 3" thick brick paving in cement sand 1:8 and 1/2" thick cement Sqr.
rendered in 1:3 floated with neat cement.

J 13 3" thick brick paving in cement sand 1:8 and 1/2" thick cement Sqr.
rendered in 1:3 floated with neat cement and colour pigment.

J 14 3" thick floor cement concrete in 1:2:4(3/4") and 1/2" thick Sqr.
rendering in cement sand 1:2 finished smooth with neat cement
& colour pigment and expansion joints filled with cement and
sand.

J 15 Brick work in cement 1:5 wearing & throating on 4 1/2" brick L.ft.
wall including 1/2" thick 1:3 cement rendering

J 16 Brick work in cement 1:5 wearing & throating on 9" brick wall L.ft.
including 1/2" thick 1:3 cement rendering

Water Proofing

The rates for Items J 17 to J 20 are strictly applicable,


subject to the fulfillment of the following conditions.

Engineering organization, W.P. Page 721 BSR 2012


ITEM DESCRIPTION UNIT RATE

The waterproofing contractor (or sub-contractor) should be


(a) a registered specialist contractor at the ICTAD in the
category of water proofing.

The Contractor shall submit a written warranty of at least 10


year to cover on the quality of the material, suitability of the
(b)
material for the situation and the workmanship including
water tightness.

The water proofing material shall conform to relevant


(c)
British, Euro or ASTM specifications

Application of liquid polymer cement water proofing agents


(d)
for the following areas:

J 17 Water Proofing the inner surface of walls and floor slab of Sq.ft.
toilets and balconies where a waterproofing is necessary before
tiling, Application of "Baralastic" polymer modified
cementitious waterproofing agent after cleaning the subtrate all
as per manufacturer's specifications with 10 years warranty on
application.Rate shall include for ponding test for a 300mm
water height kept for a period of 48 hours.

J 18 Flat roofs, concrete/masonry tanks, wet areas of toilets including Sq.ft.


bathrooms, exposed balconies, concrete gutters. "Smart flex",
"Tharoseal" or any other equivalent product marketed/installed
by specialist contractor registered at ICTAD.

Application of cementitious type agents

J 19 On newly cast under ground sumps, swimming pools basements. Sq.ft.


"Osmoseal", "Xypex", "Vandex" or any other equivalent
product marketed/installed by a specialist contractor registered
at ICTAD.

Application of membrane type agents

J 20 On large flat roofs, gutters, basements 3mm thick Torch-on Sq.ft.


membrane or any other equivalent product marketed/installed by
a specialist contractor registered at ICTAD, including 1 : 3
cement,sand protective screed laid to slope. Rate shall include
the formation of edges, torch welding and metal strip on vertical
walls.

Engineering organization, W.P. Page 722 BSR 2012


ITEM DESCRIPTION UNIT RATE

*** The above rates include the cost of surface preparation,


but do not include the cost of protective masonry screed.
The approving authority for equivalent products will be the
Deputy Chief Secretary (Engineering)

K - PLASTERING
K 01 5/8" thick plastering to plinth wall in cement sand 1:3 including Sqr.
cement floating.

K 02 Plastering 5/8" thick to walls in cement, lime or equivelent Sqr.


chemical product (Febmix) and sand 1:1:5 finished semi-rough
with wooden float. (Sand to be seived).

K 03 Plastering 5/8" thick to reveals width not exceeding 6" in L.ft.


cement, lime or equivelent chemical product (Febmix) and sand
1:1:5 finished semi-rough with wooden float.

K 04 Plastering 5/8" thick to walls in cement, lime or equivelent Sqr.


chemical product (Febmix) and sand 1:1:5 finished smooth with
lime putty.

K 05 Plastering 5/8" thick to reveals width not exceeding 6" in L.ft.


cement, lime or equivelent chemical product (Febmix) and sand
1:1:5 finished smooth with lime putty.

K 06 Plastering 3/8" thick to soffit of slab, sunshade, sides and soffit Sqr.
of beams, stair cases and sides of columns in cement and sand
1:3 including floating with lime putty.

K 07 Plastering 3/8" thick to soffit of slab, sunshade, sides and soffit Sqr.
of beams, stair cases and sides of columns in cement & sand 1:3
finished semi rough with wooden float.

K 08 Forming drip for sunshade edge cement & sand 1: 2 finish semi L.ft.
rough.

K 09 Plastering 3/4" thick to black board in cement & sand 1:3 finish Sqr.
semi rough and Rendering cement floating coat using black
cement finished smooth with carborandum stone. Including
preparation of border.

K 10 Plaster bands 6" x 1/2" in cement & sand 1:3 finished semi L.ft.
rough, extra over the plastering as per the Drawing No:-
AR/DETAIL DRG/2010/01/10 & Sheet No. 01

Engineering organization, W.P. Page 723 BSR 2012


ITEM DESCRIPTION UNIT RATE
K 11 Plaster bands 9" x 1/2" in cement & sand 1:3 finished semi L.ft.
rough, extra over the plastering as per the Drawing No:-
AR/DETAIL DRG/2010/01/10 & Sheet No. 01

L - TILING
Note:

Tiles should comply with European standard specification


CEN 177.

For Item L01 - L03 Should be tile range manufractured by


Lanka Wall Tile or approved equivalant.

Wall Tiling

L 01 Glazed ceramic wall tiling of size 8" x 12" approved colour, Sqr.
supplying and fixing to walls on a 1:3 cement sand mortar layer,
and pointed with tile grout to match the tile. *** (Rate does not
include the 1:3 cement sand mortar layer and is separately
measured under item L04)

L 02 Glazed ceramic wall tiling of size 12" x 16" approved colour, Sqr.
supplying and fixing to walls on a 1:3 cement sand mortar layer,
and pointed with tile grout to match the tile. *** (Rate does not
include the 1:3 cement sand mortar layer and is separately
measured under item L04)

L 03 Glazed porcelain wall tiling of size 24" x 12" approved colour, Sqr.
supplying and fixing to walls on a 1:3 cement sand mortar layer,
and pointed with tile grout to match the tile. *** (Rate does not
include the 1:3 cement sand mortar layer and is separately
measured under item L04)

L 04 Cement and sand 1:3 screed of 1/2" thick backing to receive Sqr.
wall tiles.

Engineering organization, W.P. Page 724 BSR 2012


ITEM DESCRIPTION UNIT RATE

Floor Tiling

Note :

For Item No. L05 to L17 Shall be Homogenous, Vitreous


porcelain floor tiles of industrial grade (heavy duty) Floor
tile range manufractured by Rocell or approved equivalant.
*** Rate includes the cost of 1:3 motar leveling bed.

L 05 Homogeneous vitreous porcelain glazed or unglazed floor tile 8" Sqr.


x 8" paving on 1:3 cement & sand bedding and pointed with tile
grout to match the tile. ( Heavy duty )

L 06 Homogeneous vitreous porcelain glazed or unglazed floor tile Sqr.


12" x 12" paving on 1:3 cement & sand bedding and pointed
with tile grout to match the tile. ( Heavy duty )

L 07 Homogeneous vitreous porcelain glazed or unglazed floor tile Sqr.


16" x 16" paving on 1:3 cement & sand bedding and pointed
with tile grout to match the tile. ( Heavy duty )

L 08 Homogeneous vitreous porcelain polished floor tile 12" x 12" Sqr.


paving on 1:3 cement & sand bedding and pointed with tile grout
to match the tile.( Heavy duty )

L 09 Homogeneous vitreous porcelain polished floor tile 16" x 16" Sqr.


paving on 1:3 cement & sand bedding and pointed with tile grout
to match the tile. ( Heavy duty )

L 10 Homogeneous vitreous porcelain rectified floor tile 24" x 12" Sqr.


paving on 1:3 cement & sand bedding and pointed with tile grout
to match the tile. ( Heavy duty )

L 11 Homogeneous vitreous porcelain rectified floor tile 24" x 16" Sqr.


paving on 1:3 cement & sand bedding and pointed with tile grout
to match the tile. ( Heavy duty )

L 12 Homogeneous vitreous porcelain rustic floor tile 12" x 12" for Sqr.
garage & balcony areas paving on 1:3 cement & sand bedding
and pointed with tile grout to match the tile. ( Heavy duty )

L 13 Homogeneous vitreous porcelain rustic floor tile 16" x 16" for Sqr.
garage & balcony areas paving on 1:3 cement & sand bedding
and pointed with tile grout to match the tile. ( Heavy duty )

Engineering organization, W.P. Page 725 BSR 2012


ITEM DESCRIPTION UNIT RATE
L 14 Porcelain glazed floor tile 18" x 18" paving on 1:3 cement & Sqr.
sand bedding and pointed with tile grout to match the tile.
( Heavy duty )

L 15 Supply and laying of 4" high skirting including tile grout to L.ft.
match the tile of tiling confirming to items L 05 to L 13

L 16 Supply and laying of 4" high skirting including tile grout to L.ft.
match the tile for staircases.

L 17 Supplying and laying homogeneous vitreous porcelain tiles at Sqr.


staircase treads including nosing type paving on 1:3 cement &
sand bedding and pointed with tile grout to match the tile.

Note :

The tiles specified in L18 to L24 are exclusively for


residential/non-public area as specified by an Architect. The
rate is applicable for tiles manufactured by Rocell or
equilant and are of coloured designed tiles.

L 18 Lay Ceramic glazed floor tiles 12" x 12" paving on 1:3 cement Sqr.
sand bedding and pointed with tile grout to match the tile.

L 19 Lay Ceramic glazed floor tiles 13" x 13" paving on 1:3 cement Sqr.
sand bedding and pointed with tile grout to match the tile.

L 20 Lay Ceramic glazed floor tiles 16" x 16" paving on 1:3 cement Sqr.
sand bedding and pointed with tile grout to match the tile.

L 21 Lay Ceramic glazed floor tiles 18" x 18" paving on 1:3 cement Sqr.
sand bedding and pointed with tile grout to match the tile.

L 22 Lay Ceramic glazed floor tiles 24" x 12" paving on 1:3 cement Sqr.
sand bedding and pointed with tile grout to match the tile.

L 23 Lay Ceramic glazed floor tiles 24" x 16" paving on 1:3 cement Sqr.
sand bedding and pointed with tile grout to match the tile.

L 24 Lay Ceramic glazed floor tiles 2'-0" x 2'-0" paving on 1:3 Sqr.
cement sand bedding and pointed with tile grout to match the
tile.

Note :

Rate for tiling should include for cement and sand 1:3
backing 20mm thick including pointing and grout to match
with tiles colours and sizes of tiles to approval by the
Architect.

Engineering organization, W.P. Page 726 BSR 2012


ITEM DESCRIPTION UNIT RATE
L 25 Rough porcelain bathroom floor tiles of size 8" x 8" of Rocell or Sqr.
equivalent, paving on 1:3 cement sand bedding and pointed with
tile grout to match the tiles.

L 26 Rough porcelain bathroom floor tiles of size 12" x 12" of Rocell Sqr.
or equivalent, paving on 1:3 cement sand bedding and pointed
with tile grout to match the tiles.

Engineering organization, W.P. Page 727 BSR 2012


ITEM DESCRIPTION UNIT RATE

Granite

The Granite specified sizes,colour and details of paving


decided by Architect and sample should be approved by the
Architect before the construction.

The rate is applicable for Granite manufactured by "Ally


Weerasinghe" or approved equivalent.

Granite should be without any defects from oils , detergents


& chemicals
L 27 Polished Granite size 1'-0" x 1'-0" x 3/4" thick absolutely black Sqr.
for vanity top of "Ally Weerasinghe" or approved equivalent ,
laid on 1/2" thick cement sand 1:3 screed level off using cement
slurry and 1mm joints to be absolutely in line and flush and
grout.

L 28 Polished Granite floor slabs of size 1'-0" x 1'-0" x 3/4" thick Sqr.
absolutely black of "Ally Weerasinghe" or approved equivalent ,
laid on 1/2" thick cement sand 1:3 screed level off using cement
slurry and 1mm joints to be absolutely in line and flush and
grout.

L 29 Granite floor slabs of size 1'-0" x 1'-0" x 3/4" thick rough finish Sqr.
of "Ally Weerasinghe" or approved equivalent , laid on 1/2"
thick cement sand 1:3 screed level off using cement slurry and
1mm joints to be absolutely in line and flush and grout.

L 30 Granite floor slabs of size 1'-0" x 1'-0" x 3/4" thick gloss finish Sqr.
of "Ally Weerasinghe" or approved equivalent , laid on 1/2"
thick cement sand 1:3 screed level off using cement slurry and
1mm joints to be absolutely in line and flush and grout.

L 31 Granite floor slabs of size 2'-0" x 1'-0" x 3/4" thick gloss finish Sqr.
of "Ally Weerasinghe" or approved equivalent , laid on 1/2"
thick cement sand 1:3 screed level off using cement slurry and
1mm joints to be absolutely in line and flush and grout.

Design Floor Tiles

L 32 Porcelain polished design floor tile 32" x 32" paving on 1:3 Sqr. 60585.00
cement & sand bedding and pointed with tile grout to match the
tile. ( Heavy duty )

L 33 Porcelain polished design floor tile 24" x 24" paving on 1:3 Sqr. 50595.00
cement & sand bedding and pointed with tile grout to match the
tile. ( Heavy duty )

Engineering organization, W.P. Page 728 BSR 2012


ITEM DESCRIPTION UNIT RATE
L 34 Porcelain matt & gloss design floor tile 24" x 24" paving on 1:3 Sqr. 41945.00
cement & sand bedding and pointed with tile grout to match the
tile. ( Heavy duty )

L 35 Porcelain matt & gloss design floor tile 20" x 20" paving on 1:3 Sqr. 41755.00
cement & sand bedding and pointed with tile grout to match the
tile. ( Heavy duty )

L 36 Porcelain matt & gloss design floor tile 24" x 16" paving on 1:3 Sqr. 37375.00
cement & sand bedding and pointed with tile grout to match the
tile. ( Heavy duty )

L 37 Porcelain matt & gloss design floor tile 18" x 18" paving on 1:3 Sqr. 32755.00
cement & sand bedding and pointed with tile grout to match the
tile. ( Heavy duty )

L 38 Ceramic design floor tile 16" x 16" paving on 1:3 cement & sand Sqr. 26300.00
bedding and pointed with tile grout to match the tile.
( Heavy duty )

M - COLOUR WASHING, PAINTING &


POLISHING
M 01 White washing walls two coats in single storied building Sqr.
including preparing surface.

M 02 White washing walls two coats in two storied building including Sqr.
preparing surface.

M 03 Painting walls with one coat of wall primer including preparing Sqr.
surface.

M 04 Painting walls with one coat of emulsion paint including Sqr.


preparing surface.

M 05 Painting walls with two coats of emulsion paint including Sqr.


preparing surface.

M 06 Painting soffit with one coat of emulsion paint including Sqr.


preparing surface..

M 07 Painting soffit with two coats of emulsion paint including Sqr.


preparing surface.

M 08 Painting walls with onecoat of weathershield paint including Sqr.


preparing surface.

M 09 Painting walls with two coats of weathershield paint including Sqr.


preparing surface.

Engineering organization, W.P. Page 729 BSR 2012


ITEM DESCRIPTION UNIT RATE

M 10 Painting walls & soffits with one coat of crack binder primer. Sqr.

M 11 Cement washing two coats to walls in single storied buildings Sqr.


including preparing surface.

M 12 Painting walls with one coat of enamel paint including preparing Sqr.
surface.

M 13 Painting walls with two coats of enamel paint including Sqr.


preparing surface.

M 14 Application of plaster coatings of thickness not less than 2mm Sqr.


using "Joint compound powder / Skimcoat ", or approved
equivalent to walls, slab, beam, column facings.Rate shall
include for sand papering and surface preparation.

M 15 Painting black boards with two coats of blackboard paint Sqr.


including preparing surface.

M 16 Preparing and painting old wood work with one coat of enamel Sqr.
paint.

M 17 Preparing and painting old wood work with two coats of enamel Sqr.
paint.

M 18 Preparing and painting new wood work with primer and two Sqr.
coats enamel paint.

M 19 Preparing and application of water based stain and two coats of Sqr.
water based sealant to new wood work. Rate shall include for
preparing the surface.

M 20 Varnishing two coats with polyurethane varnish after sand Sqr.


papering and application of sealer coat

M 21 Spray Painting for the wood work as per specified in SCA/4/1 Sqr.
clause 14.9 ( f ).

M 22 Wax polishing to timber in panels and floors. Sqr.

M 23 Applying one coat of approved type floor polish including Sqr.


smoothing.

M 24 Painting floors with one coat of quick drying floor paint Sqr.
including washing and cleaning surfaces.

M 25 Painting steel work with one coat of anti-corrosive paint with Sqr.
primer including removing corroded scale and wire brushing.

Engineering organization, W.P. Page 730 BSR 2012


ITEM DESCRIPTION UNIT RATE
M 26 Painting steel work with two coats of anti-corrosive paint with Sqr.
primer including removing corroded scale and wire brushing.

M 27 Painting steel work with one coat of "EPILACK EPOXY Sqr.


COALTAR" or approved equivalent as per manufacturer's
specifications.

M 28 Painting steel work with two coats of Zinc phospate primer Sqr.
including removing corroded scale and wire brushing.

M 29 Labour rate for two coats of Emulsion Painting walls including Sqr.
scaffolding (Paint & Brushes supplied by the client)

M 30 Labour rate for single coat of Emulsion Painting walls including Sqr.
scaffolding (Paint & Brushes supplied by the client)

M 31 Labour rate for two coats of enamel painting (Paint & Brushes Sqr.
supplied by the client)

N - DOORS & WINDOWS

Timber :

Refer preamble note for approved species. Finished door


1 sash size of less than 1" thicknesses not allowed. Glass
thickness to be 5mm.

2 Rate with out following heavy duty brass furniture.

(a) Doors :- 3 no. 4"x 3" Solid brass hinges

(b) Doors :- 2 no. 6" Solid brass barral bolts

(c) Windows of 4'-0" ht. abo :- 2 no. 4"x 2" Solid brass hinges

(d) Windows above 4'-0" ht. o:- 3 no. 4"x 2" Solid brass hinges

(e) Windows :- 1 no. 2" Solid brass Brass ring

(f) Windows :- 1 no. 10" Solid brass Casement Stay

(g) Windows :- 1 no. Solid brass Casement Fastner

Doors

Engineering organization, W.P. Page 731 BSR 2012


ITEM DESCRIPTION UNIT RATE
N 01 Door flush paneled 1 1/8" thick single sash hung on Sq.ft.
3 3/4" x 2 3/4" frame. Rate without brass furniture,
painting and lock.

N 02 Door glazed and paneled 1 1/8" thick single sash hung on Sq.ft.
3 3/4" x 2 3/4" frame. Rate without brass furniture,
painting and lock.

N 03 Door flush paneled 1" thick single sash hung on 3 3/4" x 2 3/4" Sq.ft.
frame. Rate without brass furniture, painting and lock.

N 04 Door glazed and paneled 1" thick single sash hung with Sq.ft.
3 3/4" x 2 3/4" frame . Rate without brass furniture,
painting and lock.

N 05 Door 30mm thick plywood ordinary sash single hung on Sq.ft.


3 3/4" x 2 3/4" frame. Rate without brass furniture,
painting and lock.

N 06 Door 30mm thick plywood (marine) sash single hung on Sq.ft.


3 3/4" x 2 3/4" frame. Rate without brass furniture,
painting and lock.

N 07 Door or window glazed and/or paneled 1 1/8" thick double sash Sq.ft.
hung on 3 3/4" x 2 3/4" frame. Rate without brass furniture,
painting and lock.

N 08 Door/Window ledged, braced & battened with 3 3/4" x 2 3/4" Sq.ft.


frames and 7/8" thick sash made out of GINISAPU. Rate
without brass furniture, painting and lock.

N 09 Supply & fixing 1 1/8" thick flush paneled door sash only. Rate Sq.ft.
without brass furnitures, door lock and painting.

N 10 Supply & fixing 1" thick flush paneled door sash only. Rate Sq.ft.
without brass furnitures, door lock and painting.

N 11 Supply & fixing 1 1/8" thick glazed & paneled door sash only. Sq.ft.
Rate without brass furnitures, door lock and painting.

N 12 Supply & fixing 1" thick glazed & paneled door sash only. Rate Sq.ft.
without brass furnitures, door lock and painting.

N 13 Supply & fixing 30mm thick plywood door sash only. Rate Sq.ft.
without brass furnitures, door lock and painting.

N 14 Door frame 3 3/4" x 2 3/4" in approved timber supplying & Sq.ft.


fixing in position.

Engineering organization, W.P. Page 732 BSR 2012


ITEM DESCRIPTION UNIT RATE

Windows

N 15 Window glazed 1 1/8" sash and 3 3/4" x 2 3/4" frame. Rate Sq.ft.
without brass furniture, painting.

N 16 Window glazed 1" sash and 3 3/4" x 2 3/4" frame. Rate without Sq.ft.
brass furniture, painting.

N 17 Window glazed 7/8" sash and 3 3/4" x 2 3/4" frame. Rate Sq.ft.
without brass furniture, painting.

N 18 Timber slats with 3 3/4" x 1 3/4" frame , 1" x 2 1/2" vertical Sq.ft.
slats at 2 1/2" centers. Painting measured separately.

N 19 Supply & fixing 1 1/8" thick glazed window sash only. Rate Sq.ft.
without brass furnitures and painting.

N 20 Supply & fixing 1" thick glazed window sash only. Rate without Sq.ft.
brass furnitures and painting.

N 21 Supply & fixing 7/8" thick glazed window sash only. Rate Sq.ft.
without brass furnitures and painting.

N 22 Window frame 3 3/4" x 2 3/4" in approved timber supplying & Sq.ft.


fixing in position.

P - BRASS FOUNDER
Note:

All Iron mongary shall be heavy duty and samples should be


approved by the D.E. Prior to installation.

In view of the variety of door locks available in the market, it


has become necessary to prescribe the exact quality
requirements in terms of performance and durability
1
aspects. The "Union" brand and respective model numbers
have been choosen as a bench mark to establish the said
requirements.

The brand name and model number appearing in the


respective BSR items are purely meant to describe the
performance standard of the said fitting/item and does not
2
imply in any manner that only the "Union" brand is
recommended or considered to be restricted to the "Union"
brand.

Any other make/brand that has equivalent performance


3 characteristics are considered as equivalent provided such
fittings met with following criteria.

Engineering organization, W.P. Page 733 BSR 2012


ITEM DESCRIPTION UNIT RATE

(a) has an authorized local agent in Sri Lanka

The local agent has been in the trade of the offered make for
(b)
not less than 5 years.

The fittings are manufactured in conformity to BS, JIS,


(c)
A.S.T.M., A.S. or S.L.S. standards.

The dimensions are/and performance characteristics are in


(d)
par with the stated model.

The brands that may be considered as equivalent are "Miva"


of Japan "Whitco" of Australian make or "Dorma" of
European make.or any other approved make which prior
4
approval to be obtained from Deputy Chief Secretary
(Engineering) after producing necessary catalogues
documents.

The BSR Items Nos. P 01 - P 12 are payable only after


5 producing an original invoice from the authorized agent for
"Union" brand.

Union Brand

P 01 Supply and fixing Stainless Steel hinges of size 102 x 76 x 2mm Pair
of Union Brand & Model no.- X8203-BB-2 or approved
equivalent.

P 02 Supply and fixing Stainless Steel hinges of size 102 x 76 x 3mm Pair
of Union Brand & Model no.- X8203-BB-3 or approved
equivalent.

P 03 Supply and fixing Stainless Steel hinges of size 127 x 89 x 3mm Pair
of Union Brand & Model no.- X8205-BB-3 or approved
equivalent.

P 04 Supplying and fixing Night - latch lock of Union Brand & Nr.
Model No. -1028 WEPL or approved equivalent.

P 05 Supplying and fixing Night - latch lock of Union Brand & Nr.
Model No. -1022 SEPL or approved equivalent.

P 06 Supplying and fixing two lever Mortice door lock for single sash Nr.
of Union Brand & Model no.-678.24.95 CH or approved
equivalent.

Engineering organization, W.P. Page 734 BSR 2012


ITEM DESCRIPTION UNIT RATE
P 07 Supplying and fixing two lever Mortice door lock for double Nr.
sash of Raniyo Brand & Model no.- 965.41.94 CH or approved
equivalent.

P 08 Supplying and fixing cylindrical door lock of Union Brand & Nr.
Model no. -96300-SS.or approved equivalent

P 09 Supplying & fixing rim lock of Raniyo Brand & Model no. Nr.
- 1445 or approved equivalent.

P 10 Supplying & fixing hydraulic door closer of Union Brand Nr.


& Model no. - 8823 SIL or approved equivalent.
P 11 Supplying & fixing stainless steel Male or Female Symbol Nr.
of Union Brand & Model no. - 200SS or approved
equivalent.
P 12 Supplying & fixing stainless steel Disabled Symbol of Nr.
Union Brand or approved equivalent.

M.M.Noorbhoy Fittings

P 13 Supplying and fixing 4" x 2 1/2" x 2.5mm thick solid brass Nr.
hinges with-out ball bearing inclusive of brass screws marketted
by M.M.Noorbhoy & company or approved equivalent.

P 14 Supplying and fixing 4" x 3" x 2.5mm thick solid brass hinges Nr.
with-out ball bearing inclusive of brass screws marketted by
M.M.Noorbhoy & company or approved equivalent.

P 15 Supplying and fixing 5" x 3" x 2.5mm thick solid brass hinges Nr.
with-out ball bearing inclusive of brass screws marketted by
M.M.Noorbhoy & company or approved equivalent.

P 16 Supplying and fixing heavy duty solid brass casement fastener Nr.
inclusive of brass screws marketted by M.M.Noorbhoy &
company or approved equivalent.

P 17 Supplying and fixing heavy duty solid brass casement stay - 6" Nr.
inclusive of brass screws marketted by M.M.Noorbhoy &
company or approved equivalent.

P 18 Supplying and fixing heavy duty solid brass casement stay - 12" Nr.
inclusive of brass screws marketted by M.M.Noorbhoy &
company or approved equivalent.

P 19 Supplying and fixing heavy duty solid brass 4" centre pivot Pair
inclusive of brass screws marketted by M.M.Noorbhoy &
company or approved equivalent.

Engineering organization, W.P. Page 735 BSR 2012


ITEM DESCRIPTION UNIT RATE
P 20 Supplying and fixing 4" long heavy duty solid brass tower bolt Nr.
inclusive of brass screws marketted by M.M.Noorbhoy &
company or approved equivalent.

P 21 Supplying and fixing 6" long heavy duty solid brass tower bolt Nr.
inclusive of brass screws marketted by M.M.Noorbhoy &
company or approved equivalent.

P 22 Supplying and fixing 8" long heavy duty solid brass tower bolt Nr.
inclusive of brass screws marketted by M.M.Noorbhoy &
company or approved equivalent.

P 23 Supplying and fixing 10" long heavy duty solid brass tower bolt Nr.
inclusive of brass screws marketted by M.M.Noorbhoy &
company or approved equivalent.

P 24 Supplying and fixing solid brass Door or Window pull ring of 1" Nr.
dia. ( Small )

P 25 Supplying and fixing solid brass Door or Window pull ring of 1 Nr.
1/4" dia. ( Medium )

P 26 Supplying and fixing solid brass Door or Window pull ring of 2" Nr.
dia. ( Large )

P 27 Supplying and fixing solid brass fanlight catch. Nr.

Other Fittings

P 28 Supplying & fixing polished brass hinges of 4" x 2 1/2" Nr.


thickness 4.0mm ± 0.2mm with a weight not less than 265g
± 5g with a smooth surface finish.

P 29 Supplying & fixing polished brass hinges of 4" x 3" Nr.


thickness 4.2mm ± 0.2mm with a weight not less than 310g
± 5g with a smooth surface finish.

P 30 Supplying & fixing polished brass hinges of 5" x 2 1/2" Nr.


thickness 5.0mm ± 0.2mm with a weight not less than 345g
± 5g with a smooth surface finish.

P 31 Supplying & fixing polished brass hinges of 5" x 3" Nr.


thickness 4.3mm ± 0.2mm with a weight not less than 380g
± 5g with a smooth surface finish.

P 32 Supplying & fixing polished brass barrel bolt of 4" with a Nr.
weight not less than 210g ± 5g with a smooth surface
finish.

Engineering organization, W.P. Page 736 BSR 2012


ITEM DESCRIPTION UNIT RATE
P 33 Supplying & fixing polished brass barrel bolt of 6" with a Nr.
weight not less than 300g ± 5g with a smooth surface
finish.
P 34 Supplying & fixing polished brass tower bolt of 10" with a Nr.
weight not less than 345g ± 5g with a smooth surface
finish.
P 35 Supplying & fixing polished brass 1 1/4" dia. Pull ring with Nr.
a weight not less than 100g ± 5g with a smooth surface
finish.

P 36 Supplying and fixing mortice lock - Imported chinese Nr.

P 37 Supplying and fixing Yale mortice lock - (Italy make) Nr.

P 38 Supplying and fixing cupboard door lock - 808 Nr.

P 39 Supplying and fixing magnet lock Nr.

P 40 Supplying and fixing 1" padlock Nr.

P 41 Supplying and fixing 1 1/2" padlock Nr.

P 42 Supplying and fixing 2" padlock Nr.

P 43 Supplying and fixing hasp & staple Nr.

Q - ROOFING AND CEILING


Q 01 Roof covering with calicut pattern clay tiles. (Timber frame Sqr.
work and ridge covering measured separately)

Q 02 Roof covering with corrugated asbestos sheets. (Timber frame Sqr.


work and ridge covering measured separately)

Q 03 Asbestos close fitting ridges fixed complete with roofing screws L.ft.
or hook bolts.

Q 04 Ridging with calicut pattern tiles bedded in cement, lime & sand L.ft.
mortar 1:1:4 and coloured to match the tiles.

Q 05 One layer of half round tiles over existing corrugated sheets. Sqr.

Q 06 3/4" x 6" wide tongued and grooved lunumidella ceiling planks Sqr.
fixed to underside of existing rafters with brass screws including
leveling with timber strip where necessary.

Q 07 Asbestos eaves ceiling with approved timber coves & fillets. Sqr.
Under side to existing rafter size of fillet to be 1 1/2" x 1/2" size
of cove moulding 2" x 2"

Engineering organization, W.P. Page 737 BSR 2012


ITEM DESCRIPTION UNIT RATE

Q 08 Supplying and Fixing finished size 4" x 2" Coconut Rafters. L.ft.

Q 09 Supplying and Fixing planned finished size 3 1/2 "x1 1/2" L.ft.
Coconut Rafters.

DSI TILES ( NIVASI PRODUCT )

Item Q10 - Q14 are using for the laying of DSI


(NIVASI Tiles or approved equivelant as per the M/s
Samson Rajarata Tiles (pvt)ltd. Manufactures specifications.

Timber frame work sizes specified as follows.

a) Ridge plate - 45mm x 190mm

b) Wall plate - 117mm x 190mm

c) Rafters - 45mm x 117mm maximum lengh 10'-0" @ 18"


C/C

d) Reepers - 45mm x 25mm @ 10" C/C


Q 10 Roof covering with Natural type main tiles of "Nivasi" or Sqr.
approved equivelant with approx. size 310mm x 310mm and unit
weight of 3.1Kg. (Specified Timber frame work and ridge
covering measured separately)

Q 11 Ridging with Natural type ridge tiles bedded in cement, sand L.ft.
mortar 1:5 and coloured to match the tiles.

Q 12 Roof covering with Natural type gable left tiles or approved L.ft.
equivelant .

Q 13 Roof covering with Natural type gable right tiles or approved L.ft.
equivelant .

Q 14 Roof covering with Natural type corner tiles or approved L.ft.


equivelant .

Flashing

Q 15 Aluminium Valley gutter of 3'-0" wide in gauge 24 sheets L.ft.


including 3/4" thk. Ginisapu timber boarding finished with two
coats of wood preservative.

Q 16 Aluminium flashing of 1'- 6" wide in gauge 24 sheets including L.ft.


3/4" thk. Ginisapu timber boarding finished with two coats of
wood preservative.

Engineering organization, W.P. Page 738 BSR 2012


ITEM DESCRIPTION UNIT RATE
Q 17 Aluminium flashing of 1'-6" wide in gauge 24 sheets, bent to L.ft.
shape and fix to wall. (without timber boarding)

Q 18 G.I. Flashing 20 B.W.G. of 1'6" girth with end laps not less than L.ft.
6" , turned and tuck up not less 6" in wall and pointed in cement
motor 1:2

Q 19 G.I. Valley gutter of 3'-0" wide in gauge 18 sheets including 3/4" L.ft.
thk. Ginisapu timber boarding including two coats of anti-
corrosive paint and wood preservative to sheet and boarding.
(Only to be specified when repairing an existing G.I. gutter)

Q 20 Zincalum flashing (0.47mm thick) and 1'6" wide bent to shape L.ft.
and fixed to wall (without timber coating)

Q 21 Zincalum Valley gutter of 3'-0" wide in 0.47mm thick sheets L.ft.


including 3/4" thk. Ginisapu timber boarding including wood
preservative boarding.

Roof Timber

Note :

During the past two years, Divisional Engineers have


reported that exact imperial sizes on the timber on
following categories are not readily available in the
market, unless logs are being purchased and sawn to the
exact size. Contractor's Association has also made
representation indicating that the imperial size specified
in the BSR is not available on imported timber varieties,
and due to scarcity of the local timber, small scale
Contractors are unable to purchase logs and seasoned
the timber and sawn to the imperial sizes. Market
survey has confirmed the same. Accordingly, it has
been decided to indicate the cross sectional size roof
timber in the following manner to be in par with
sectional sizes readly available in the local market, as it
may not be worthwhile to prescribe timber sizes and,
then request Contractors to by a large section and
produce it to the required size, since there is no
standardization of the timber imports. This has been
done to avoid subjective decision taken by the Divisional
Engineers during the project implementation phase.

Engineering organization, W.P. Page 739 BSR 2012


ITEM DESCRIPTION UNIT RATE

Accordingly, the following imperial sizes are being now


replaced by the following Metric sizes.
1" to be replaced by 22mm

2” to be replaced by 45mm
3” to be replaced by 70mm
4” to be replaced by 94mm
5” to be replaced by 117mm
6” to be replaced by 140mm
7” to be replaced by 165mm
8” to be replaced by 190mm

Hence, timber will now be prescribed as


2"x 1" as 45mm x 22mm
2”x 2” as 45mm x 45mm
4”x 2” as 94mm x 45mm
5”x 2” as 117mm x 45mm
5”x 3” as 117mm x 70mm
4”x 3” as 94mm x 70mm
6”x 2” as 140mm x 94mm
6”x 3” as 140mm x 70mm
6”x 4” as 140mm x 94mm
8”x 4” as 190mm x 94mm

Refer preamble note for approved timber species. The rate


for timber items will remain same irrespective of timber
species.

All Timber should be treated as an approved klin. Timber


preservation paid separately as Item No:Q37.

Q 22 Roofing with calicut pattern tiles on local Micro (Eucalyptus Sqr.


Microcoris) or Balau , Bitis or Kempas timber frame work
complete with ridge hips etc. comprising of 165mm x 45mm
ridge plate , 94mm x 70mm wall plate , 94mm x 45mm rafters
@ 18" c/c and 45mm x 22mm reepers @ 12" c/c. Rate shall
include for applying of wood preservative.

Q 23 Roofing with asbestos corrugated sheets on local Micro Sqr.


(Eucalyptus Microcoris) or Balau , Bitis, or Kempas timber
frame work (Ridging measured separately).Comprising of
165mm x 45mm ridge plate , 94mm x 70mm wall plate , 94mm
x 45mm rafters @ 30" c/c and 45mm x 45mm battens @ 3'-0"
c/c.Rate shall include for applying of wood preservative.

Engineering organization, W.P. Page 740 BSR 2012


ITEM DESCRIPTION UNIT RATE
Q 24 Supply and installation of Zn/Alum profile sheets of total Sqr.
thickness 0.47mm , fixed to the roof timber frame work
comprising of 140mm x 45mm hip rafters/valley rafters, 94mm
x 70mm wall plates, 117mm x 94mm purling , 94mm x 45mm
rafters @ 2'-0" spacing and 45mm x 22mm reepers @ 3'-6"
spacing including ridge capping , end capping and other
accessories required to complete the roof to working order.
(Ceiling and thermal installation measured separately.) Rate
shall include for routing , planing and sand papering hip/valley
rafters, purlings and rafters and application of waterbased stain
and two coats of water based sealants. Rate shall include for
applying of wood preservative.

Q 25 Asbestos flat ceiling fixed with coves & fillets to local Micro Sqr.
(Eucalyptus Microcoris) or Balau , Bitis or Kempas timber
frame work of 94mm x 45mm @ 4' - 0" c/c , 45mm x 45mm @
2' - 0" c/c, fillet size to be 1 1/2" x 1/2" and cove moulding size
to be 2" x 2". Rate shall include for applying of wood
preservative.

Q 26 Asbestos flat eaves ceiling fixed with coves and fillets to local Sqr.
Micro (Eucalyptus Microcoris) timber work. or Balau , Bitis or
Kempas.fillet size to be 1 1/2" x 1/2" cove moulding size to be
2" x 2". Rate shall include for applying of wood preservative.

Q 27 3/4" thick x 6" wide tongued and grooved lunumidella ceiling Sqr.
planks fixed flat on 94mm x 45mm local Micro (Eucalyptus
Microcoris) or Balau , Bitis or Kempas.and timber joist at every
2' - 0" c/c. cove moulding size to be 2" x 2". Rate shall include
for applying of wood preservative.

Q 28 Supply and fixing of tongued and grooved 3/4"x 6" lunumidella Sqr.
ceiling planks on top of existing rafters , with double sided
aluminium foil fixed on top. Rate shall include for sand papering
and smoothing one side of the planks , application of water
based staining and two coats of water based sealant. Rate shall
include for applying of wood preservative.

Q 29 Supplying and fixing 190mm x 94mm , 165mm x 45mm , Cu.ft.


140mm x 94mm , 140mm x 70mm , 140mm x 45mm , 117mm x
190mm and 45mm x 190mm local micro or Balau , Kempas or
Bitis timber purling , hip/valley rafters etc. with applying of
wood preservative.

Q 30 Supplying and fixing 117mm x 70mm purling up to 12'-0" L.ft.


length Balau, Kempas , Micro. with applying of wood
preservative.

Engineering organization, W.P. Page 741 BSR 2012


ITEM DESCRIPTION UNIT RATE
Q 31 Supplying and fixing 94mm x 70mm wall plates up to 12'-0" L.ft.
length, Balue, Kempas, Micro. with applying of wood
preservative.

Q 32 Supplying and fixing 117mm x 70mm , 117mm x 45mm , 94mm Cu.ft.


x 70mm local Micro (Eucalyptus Microcoris) Balau ,
Bitis ,Kempas timber purlins, wall plates, rafters etc. with
applying of wood preservative.

Q 33 Supplying and fixing 94mm x 45mm local Micro (Eucalyptus L.ft.


Microcoris) or Balau Kempas or Bitis timber purling, rafters
etc. with applying of wood preservative.

Q 34 Supplying and fixing 45mm x 45mm local Micro (Eucalyptus L.ft.


Microcoris) or Balau, Kempas or Bitis timber bearers. with
applying of wood preservative.

Q 35 Supplying and fixing 45mm x 22mmlocal micro (Eucalyptus L.ft.


Microcoris)or Balau, Kempas or Bitis. timber reapers with
applying of wood preservative.

Q 36 Timber valance/barge board in GINISAPU timber finished size L.ft.


9" x 3/4" thick fixed to roof frame with brass screws and
applying of wood preservative.

Q 37 Treating of timber by vacuum pressure impregnation technique Cu.ft.


or approved kiln treatment by "Finlays Rentokil Ceylon (Pvt)
Ltd." or any other Authorized company. Rate shall include
transport charges.

Q 38 Applying two coats of wood preservative (Clear) to wood work. Sqr.

Q 39 Supply and fixing 20mm x 6mm x 12" long flat iron bracket for Nr.
fixing valance board/barge board. Rate shall include for two
coats of anti-corrosive paint.

Test

Q 40 Testing of a timber sample for identification from the Timber Per Test
corporation laboratory.

R - GUTTERS AND DOWN PIPES


R 01 P.V.C. eaves gutter 4 1/2" square type fixed to valance board L.ft.
with P.V.C. brackets @ 1' - 6" c/c including necessary mitre
joints , gutter joiners , running heads & end caps.

Engineering organization, W.P. Page 742 BSR 2012


ITEM DESCRIPTION UNIT RATE
R 02 P.V.C. down pipes 3 1/2" dia. fixed to wall with P.V.C. clips @ L.ft.
4'-0" c/c including necessary sockets, bends, elbows.

S - SANITARY FITTINGS

Note :

In view of the variety of sanitary ware and fittings available


in the market, it has become necessary to prescribe the exact
quality requirements in terms of performance and durability
1
aspects. The "Rocell & American Standard" brands and
respective model numbers have been chosen as a bench mark
to establish the said requirements.

The brand name and model number appearing in the


respective BSR items are purely meant to describe the
performance standard of the said fitting/item and does not
2
imply in any model that only the "Rocell & American
Standard" brands are recommended or considered to be
restricted to the "Rocell & American Standard" brands.

Any other make/brand that has equivalent performance


3 characteristics are considered as equivalent provided such
fittings met with following criteria.

(a) Has an authorized local agent in Sri Lanka

The local agent has been in the trade of the offered make for
(b)
not less than 5 years.

The offered sanitary fittings has a 10 Year manufacturer's


(c)
warranty issued by the agent.

The cistern mechanism shall have an assurance for the


(d)
availability of spares for the next 3 years.

The fittings are manufactured in conformity to BS, JIS,


(e)
A.S.T.M., A.S. or S.L.S. standards.

The dimensions are and performance characteristics are in


(f)
par with the stated model.

The brands that may be considered as equivalent are "Ideal"


4 brand, or "Twyford" brand or any other approved make
which prior approval to be obtained.

Engineering organization, W.P. Page 743 BSR 2012


ITEM DESCRIPTION UNIT RATE

In case where wash basin outlet directly falls on to an open


5 (a)
drain, the bottle trap may be omitted.

For wash basins fixed on open areas plastic tap of item T 01


5 (b)
be specified.

Normal Range

S 01 Supply and fix white vitreous china floor standing wash basin Nr.
and pedestal with overflow hole and single tap hole in center of
"Rocell" brand & model "Urban D" or approved equivalent
complete to working order inclusive of the 1 1/4" chromium
plated waste outlet of "Rocell" brand & model "A706" and 1
1/4" chromium plated siphon cleanable bottale trap of "Rocell"
brand & model "A186".

S 02 Supply and fix white vitreous china floor standing close coupled Nr.
semi back to wall water closet suite with wash down flushing
with 6/3 liters dual flushing has horizontal outlet with vario
drain bend and two lateral holes for bottom water connection ,
cistern with water inlet from rear of "Rocell" brand & model
"Urban D" or approved equivalent complete to working order
inclusive of universal bend of "Rocell" brand & model "Vario
Joint".

S 03 Supply and fix Chromium plated piller tap for wash basin only Nr.
cold water of "American Standard" brand model No.
4604.415.50 or approved equivalent.

S 04 Supply and fix Chromium plated single level wash basin mixer Nr.
tap without pop-up waste with connection flex of "Rocell" brand
model No.Duca - 16495 or approved equivalent with 5 year
written warranty from the authorized agent.

Engineering organization, W.P. Page 744 BSR 2012


ITEM DESCRIPTION UNIT RATE

Semi - Luxuary Range

S 05 Supply and fix white vitreous china floor standing wash basin Nr.
and pedestal with overflow hole and single tap hole in center of
"Rocell" brand & model "Dune" or approved equivalent
complete to working order inclusive of the 1 1/4" chromium
plated waste outlet of "Rocell" brand & model "A706" and 1
1/4" chromium plated siphon cleanable bottale trap of "Rocell"
brand & model "A186".

S 06 Supply and fix white vitreous china floor standing close coupled Nr.
semi back to wall water closet suite with wash down flushing
with 6/3 liters dual flushing has horizontal outlet with vario
drain bend and two lateral holes for bottom water connection ,
cistern with water inlet from rear of "Rocell" brand & model
"Dune" or approved equivalent complete to working order
inclusive of universal bend of "Rocell" brand & model "Vario
Joint".

S 07 Supply and fix Chromium plated piller tap for wash basin only Nr.
cold water of "American Standard" brand model No.
4604.415.50 or approved equivalent.

S 08 Supply and fix Chromium plated single level wash basin mixer Nr.
tap without pop-up waste with connection flex of "Rocell" brand
model No.Duca - 16495 or approved equivalent with 5 year
written warranty from the authorized agent.

Luxuary Range

S 09 Supply and fix white vitreous china floor standing wash basin Nr.
and pedestal with overflow hole and single tap hole in center of
"Rocell" brand & model "Intense" or approved equivalent
complete to working order inclusive of the 1 1/4" chromium
plated waste outlet of "Rocell" brand & model "A706" and 1
1/4" chromium plated siphon cleanable bottale trap of "Rocell"
brand & model "A186".

S 10 Supply and fix white vitreous china floor standing close coupled Nr.
semi back to wall water closet suite with wash down flushing
with 6/3 liters dual flushing has horizontal outlet with vario
drain bend and two lateral holes for bottom water connection ,
cistern with water inlet from rear of "Rocell" brand & model
"Intense" or approved equivalent complete to working order
inclusive of universal bend of "Rocell" brand & model "Vario
Joint".

Engineering organization, W.P. Page 745 BSR 2012


ITEM DESCRIPTION UNIT RATE
S 11 Supply and fix white vitreous china floor standing Bidet with Nr.
overflow hole of "Rocell" brand & model "Intense" or approved
equivalent complete to working order.

S 12 Supply and fix Chromium plated piller tap for wash basin only Nr.
cold water of "American Standard" brand model No.A-1500N or
approved equivalent.

S 13 Supply and fix Chromium plated single level wash basin mixer Nr.
tap with pop-up waste with connection flex of "Rocell" brand
model No.Sprint - 29500 or approved equivalent with 5 year
written warranty from the authorized agent.

Other Fittings for Normal / Semi-Luxury / Luxury

S 14 Supply and fix wall hung wash basin with half pedestal and Nr.
single tap hole in center of "Rocell" brand model No."Dew
Point" or approved equivalent complete to working order.

S 15 Supply and fix wall hung ceramic corner wash basin of Nr.
"American Standard" brand, model New Codie TF 0940 or
approved equivalent complete to working order.Rate inclusive of
brackets and connection to pipe line, but without tap and bottle
trap.

S 16 Supply and installation of vanity type wash basin of "American Nr.


Standard" brand, model Ceros - TF0477 with A-8006 waste &
plug or approved equivalent. On concrete vanity slab finished
with 3/4" thick approved polished granite tile in black colour.
( Vanity top concrete slab & Granite tile laying measured
separatly.)

S 17 Supply and fix squatting pan with foot rest of "Rocell" brand Nr.
model No. SP3F013 or approved equivalent.

S 18 Supply and fix low level plastic cistern for squatting pan of Nr.
"Rocell" brand or approved equivalent including connecting pipe
between tank and squatting pan.

S 19 Supply and fix ceramic urinal with flush valve of "Rocell" brand Nr.
model DP70013 or approved equivalent complete to working
order.

S 20 Supply and fix Chromium plated 1 1/4" dia.siphon cleanable Nr.


bottale trap of "Rocell" brand model No.A186 or approved
equivalent.

Engineering organization, W.P. Page 746 BSR 2012


ITEM DESCRIPTION UNIT RATE
S 21 Supply and fix Chromium plated 1/2" dia. angle valve brass Nr.
fitting with zink head of "Rocell" brand model No.A280 or
approved equivalent.

S 22 Supply and fix hand held chromium plated bidet spray of Nr.
"American Standard" brand model A4700 or approved
equivalent.

S 23 Supply and fix Chromium plated 4 function shower head of Nr.


"American Standard" brand model No. A-6080 with shower arm
of "American Standard" brand model No. A-6110-974-845 &
concealed valve of "American Standard" brand model No. A-
7002C-B JAZZ or approved equivalent for cold water.

S 24 Supply and fix Chromium plated hand shower of "American Nr.


Standard" brand model No. A-2003-A-MR with adjustable
shower rod with soap tray of "American Standard" brand model
No. Viola 11 - A-6110-978-777 & angle valve of "American
Standard" brand model No. 9113.005.50 or approved equivalent
for cold water.

S 25 Supply and fix Chromium plated shower level built-in-shower Nr.


mixer with auto diverter shower arm jointed shower head of
"Rocell" brand model No.Pony Z - Z6955 or approved
equivalent.

S 26 Supply and fix Chromium plated shower mixer of "American Nr.


Standard" brand model No. Saga - 1512.701.50 with adjustable
shower rod of "American Standard" brand model No. Viola 11 -
A-6110-978-777 or approved equivalent.

S 27 Supply and fix service sink (Lab sink) of "American Standard" Nr.
brand, model TF-8124 with A-8006 waste & plug or approved
equivalent for the school building complete to working order.

S 28 Supply and fix fully chemical resistant laboratory sink of Nr.


"American Standard" brand, model Larch - S594501 or
approved equivalent specially for the operating theatres.

S 29 Supply and fix brass chromium plated elbow operated pillar tap Nr.
for the operating theatres of "American Standard" brand, model
ML30 or approved equivalent.

S 30 Supply and fix automatic hand dryer of "American Standard" Nr.


brand, model Kingsway - HK1800PA or approved equivalent
including electrical connection.

Engineering organization, W.P. Page 747 BSR 2012


ITEM DESCRIPTION UNIT RATE
S 31 Supply and fix 5mm thick mirror of size 18" x 24" double coated Nr.
with pencelage back strecher.

Bathroom Accessories

S 32 Supply and fix chromium plated Soap Basket of "Rocell" brand Nr.
& model "Charming" or approved equivalent. (Normal &
Semi-luxuary range )

S 33 Supply and fix chromium plated brass body and galss Soap Dish Nr.
of "Rocell" brand & model "Charming" - DP 6703 or approved
equivalent. ( Luxuary range )

S 34 Supply and fix chromium plated brass body and galss Tumbler Nr.
Holder of "Rocell" brand & model "Charming" or approved
equivalent.

S 35 Supply and fix chromium plated Towel Ring of "Rocell" brand Nr.
& model "Charming" or approved equivalent.

S 36 Supply and fix chromium plated Robe Hook of "Rocell" brand & Nr.
model "Charming" or approved equivalent.

S 37 Supply and fix chromium plated Toilet Paper Holder of "Rocell" Nr.
brand & model "Charming" or approved equivalent.

S 38 Supply and fix chromium plated Toilet Cup Holder of "Rocell" Nr.
brand & model "Charming" or approved equivalent.

S 39 Supply and fix chromium plated 600mm long Single Towel Bar Nr.
of "Rocell" brand & model "Charming" or approved equivalent.

S 40 Supply and fix chromium plated 600mm long Double Towel Nr.
Bars of "Rocell" brand & model "Charming" or approved
equivalent.

S 41 Supply and fix chromium plated 600mm long Towel Rack of Nr.
"Rocell" brand & model "Charming" or approved equivalent.

S 42 Supply and fix chromium plated brass body 450mm long Glass Nr.
Shelf of "Rocell" brand & model "Charming" or approved
equivalent.

Disable Fittings & Accessories

Engineering organization, W.P. Page 748 BSR 2012


ITEM DESCRIPTION UNIT RATE
S 43 Supply and fix ceramic wall hung wash basin for disabled of Nr.
"American Standard" brand, model Kimera - TF995 with waste
& plug A-8006 or approved equivalent.

S 44 Supply and fix white ceramic water closet suite for the disabled Nr.
of "American Standard" brand & model Ventura - 3200.001.09 ,
Cygnet tank - PP.4041.020.03C and Seat and cover - 390000N
or approved equivalent complete to working order.

S 45 Supply and fix hand grip rails for disabled of "American Nr.
Standard" brand, model Me-tu -MTJT26 or approved equivalent.

S 46 Supply and fix grip bar for disabled of "American Standard" Nr.
brand, model Apex - AR-065-18 S/S or approved equivalent.

S 47 Supply and fix hand grip-shower angle for disabled of Nr.


"American Standard" brand, model Me-tu - MTJT22-5 or
approved equivalent.

S 48 Supply and fix hand grip-shower for disabled of "American Nr.


Standard" brand, model Me-tu - MTJT22-10 or approved
equivalent.

Indian & Malasian Origins

S 49 Supply and fix footrest squatting pan and trap including laying Nr.
flush pipe laid on concrete base. (Indian Origin)

S 50 Supply and fix ceramic urinal bowl with trap fixed to wall as Nr.
directed with inlet and outlet connection. (Indian Origin )

S 51 Supply and fix wash basin with pedestal model no.BSWBA Nr.
620x470 VCP - manufactured by Mascon or equivalant complete
to work in order. Rate without pillar tap & bottle trap.

S 52 Supply and fix wall hung corner wash basin model Nr.
no.BSWBA16x16CC manufactured by Mascon or equivalant
complete to work in order. Rate inclusive of brackets and
connection to pipe line, but without pillar tap & bottle trap.

S 53 Supply and fix wash basin only with steel brackets including Nr.
1/2" angle valve and 1/2" pillar tap marketed by M/s.
"Rajabdeen" or approved equivalent. ( Indian Origin )

Engineering organization, W.P. Page 749 BSR 2012


ITEM DESCRIPTION UNIT RATE
S 54 Supply and fix low level water closet with cistern of Indian Nr.
Origin with angle valve, "P" or "S" trap, all complete to working
order. ( Indian Origin )

S 55 High-level plastic cistern supplied and fixed to wall rawl plug & Nr.
screws complete with P.V.C. flush pipe, stop cock, water supply
connection etc. (Malaysian make)

S 56 Supply and fix 36" x 18" stainless steel kitchen sink with single Nr.
bowl & single drain of "Sealcore" by mascons or approved
equivelant with 5 year written warranty from the authorized
agent. including PVC bottle trap and water connection with
flexible hose, all complete to working order. ( Swan neck tap
paid separately.)

S 57 Supply and fix 17" x 18" stainless steel kitchen sink with single Nr.
bowl of "Sealcore" by mascons or approved equivelant with 5
year written warranty from the authorized agent. including PVC
bottle trap and water connection with flexible hose, all complete
to working order. ( Swan neck tap paid separately.)

S 58 Supplying and fixing 1 1/4" (40 mm) dia. PVC Bottle Trap. Nr.
(Malaysian make )

S 59 Shower rose chromium plated 4" dia. Fixed vertically with 1/2" Nr.
valve socket including water connection.

S 60 Supply and fixing plastic seat cover Nr.

S 61 Mirror bevelled rectangular 20"x 15" with hard wood back 3/4" Nr.
thickness finished with 2 coats of enamel paint. Aluminium clips
and key hole hanging plate including glass shelves.

Engineering organization, W.P. Page 750 BSR 2012


ITEM DESCRIPTION UNIT RATE

T - PLUMBING

ACCESSORIES

"Water - Tec" Brand or Approved Equivalent Fittings


( T 0 - T 12 )

T 01 Supplying and fixing 1/2" Bib tap of "Water Tec" brand & Nr.
model no.6872 or approved equivalent.

T 02 Supplying and fixing 1/2" Angle valve of "Water Tec" brand & Nr.
model no.14548 or approved equivalent.

T 03 Supplying and fixing 1/2" Pillar Sink tap (Swan-neck tap) of Nr.
"Water Tec" brand & model no.14527 or approved equivalent.

T 04 Supplying and fixing 1/2" Wall Sink tap of "Water Tec" Nr.
"Water Tec" brand & model no.14516 or approved equivalent.

T 05 Supplying and fixing Health foucet (Bidet Spray) of "Water Nr.


Tec" brand & model no.10107 or approved equivalent.

T 06 Supplying and fixing Shower rose of "Water Tec" brand & Nr.
model no.6814 or approved equivalent.

"Plumber" Brand or Approved Equivalent Fittings


( T 13 -T17 )

T 07 Supply and fixing 1/2" dia. chromium plated Concealed stop Nr.
cock of "Plumber" brand & model no: NCE-0405 or approved
equivalent.

T 08 Supply and fixing 1/2" dia. chromium plated Angle cock of Nr.
"Plumber" brand & model no: NCE-0507 or approved
equivalent.

T 09 Supply and fixing 1/2" dia. chromium plated Pillar cock , foam Nr.
flow of "Plumber" brand & model no : NCE-0101 or approved
equivalent.

T 10 Supply and fixing 1/2" dia. chromium plated Bib cock , foam Nr.
flow of "Plumber" brand & model no : NCE-0202 or approved
equivalent.

T 11 Supply and fixing 1/2" dia. chromium plated Sink cock with Nr.
swivel spout deck mounted, foam flow of "Plumber" brand &
model no : NCE-0104 or approved equivalent. (Swan-neck
Type)

Engineering organization, W.P. Page 751 BSR 2012


ITEM DESCRIPTION UNIT RATE

"Pegler" Brand or Approved Equivalent Fittings


( T 13 -T23 )

T 12 Supplying and fixing 1" wheel valve "Pegler" Brand or Nr.


approved equivalent.

T 13 Supplying and fixing 1 1/4" wheel valve "Pegler" Brand or Nr.


approved equivalent.

T 14 Supplying and fixing 1 1/2" wheel valve "Pegler" Brand or Nr.


approved equivalent.

T 15 Supplying and fixing 2" wheel valve "Pegler" Brand or Nr.


approved equivalent.

T 16 Supply and fixing 1/2" dia Brass Ball valve "Pegler" Brand or Nr.
approved equivalent.

T 17 Supply and fixing 3/4" dia Brass Ball valve "Pegler" Brand or Nr.
approved equivalent.

T 18 Supply and fixing 1" dia Brass Ball valve "Pegler" Brand or Nr.
approved equivalent.

T 19 Supply and fixing 1 1/4" dia Brass Ball valve "Pegler" Brand Nr.
or approved equivalent.

T 20 Supply and fixing 1 1/2" dia Brass Ball valve "Pegler" Brand Nr.
or approved equivalent.

T 21 Supply and fixing 2" dia Brass Ball valve "Pegler" Brand or Nr.
approved equivalent.

T 22 Supply and fixing 3" dia Brass Ball valve "Pegler" Brand or Nr.
approved equivalent.

T 23 Supply and fixing 4" dia Brass Ball valve "Pegler" Brand or Nr.
approved equivalent.

Brass Fittings

T 24 Supplying and fixing 1/2" stop cock. Nr.

T 25 Supplying and fixing 3/4" stop cock. Nr.

T 26 Supplying and fixing 1/2" Handle valve Nr.

T 27 Supplying and fixing 3/4" Handle valve Nr.

T 28 Supply and fixing 1/2" dia flexible hose - 12" length. Nr.

Engineering organization, W.P. Page 752 BSR 2012


ITEM DESCRIPTION UNIT RATE

T 29 Supply and fixing 1/2" dia flexible hose - 18" length. Nr.

PVC Fittings

T 30 Supply and fixing 1/2" dia PVC Compact Ball valve. Nr.

T 31 Supply and fixing 3/4" dia PVC Compact Ball valve. Nr.

T 32 Supply and fixing 1" dia PVC Compact Ball valve. Nr.

T 33 Supply and fixing 1 1/4" dia PVC Compact Ball valve. Nr.

T 34 Supply and fixing 1 1/2" dia PVC Compact Ball valve. Nr.

T 35 Supply and fixing 2" dia PVC Compact Ball valve. Nr.

T 36 Supply and fixing 3" dia PVC Compact Ball valve. Nr.

T 37 Supply and fixing 1/2" dia PVC Union. Nr.

T 38 Supply and fixing 1" dia PVC Union. Nr.

Water Tanks

T 39 Supplying and installing "Plastishell" or any other water tank Nr.


500 Ltr. capacity (fittings paid separately) at an average height
of 12'-0". Tank shall have a 5 year warranty from the
manufracture.

T 40 Supplying and installing "Plastishell" or any other water tank Nr.


1000 Ltr. capacity (fittings paid separately) at an average height
of 12'-0". Tank shall have a 5 year warranty from the
manufracture.

T 41 Supplying and installing 2000 ltr. "Plastishell" or any other Nr.


water tank at average 12 ft. height including transporting and
hoisting in position Tank shall have a 5 year warranty from the
manufracture.

T 42 Supplying and installing 5000 ltr. "Plastishell" or any other Nr.


water tank at average 12 ft. height including transporting and
hoisting in position Tank shall have a 5 year warranty from the
manufracture.

P.V.C. PIPES

All P.V.C. pipes should confirm to S.L.S. 147

Engineering organization, W.P. Page 753 BSR 2012


ITEM DESCRIPTION UNIT RATE

Water Supply Pipes.

T 43 Supplying laying and/or fixing 1/2" dia. P.V.C. pipes Type L.ft.
1000 (Specials paid separately).

T 44 Supplying laying and/or fixing 3/4" dia. P.V.C. pipes Type L.ft.
1000 (Specials paid separately).

T 45 Supplying laying and/or fixing 1" dia. P.V.C. pipes Type 1000 L.ft.
(Specials paid separately).

T 46 Supplying laying and/or fixing 1 1/4" dia. P.V.C. pipes Type L.ft.
1000 (Specials paid separately).

T 47 Supplying laying and/or fixing 1 1/2" dia. P.V.C. pipes Type L.ft.
1000 (Specials paid separately).

T 48 Supplying laying and/or fixing 2" dia. P.V.C. pipes Type 1000 L.ft.
(Specials paid separately).

Waste Water Pipes.

T 49 Supplying and Fixing 1 1/4" dia P.V.C. waste pipe (type 600) L.ft.

T 50 Supplying and fixing 1 1/2" dia P.V.C. waste pipe (type 600) L.ft.

T 51 Supplying and fixing 2" dia. P.V.C waste pipe (type 600) L.ft.

T 52 Supplying and fixing 4" dia. P.V.C waste pipe (type 600) L.ft.

Sewer Pipes.

T 53 Supplying and laying 4" dia.P.V.C. sewer pipes (type 600) L.ft.
Including cement concrete surrounding 1:3:6: ( 1") as per Drg.
No:- WSS 270 - Type I . Excavation paid separately.

T 54 Supplying and laying 6" dia.P.V.C. sewer pipes (type 600) L.ft.
Including cement concrete surrounding 1:3:6: ( 1") as per Drg.
No:- WSS 270 - Type II . Excavation paid separately.

T 55 Supplying and laying 4" dia.P.V.C. sewer pipes (type 600) fixed L.ft.
to wall and floor slab with clips.

T 56 Supplying and laying 6" dia. P.V.C. sewer pipes (type 600) fixed L.ft.
to wall and floor slab with clips.

T 57 Supplying and laying 4" dia. P.V.C. perforated pipes (type 600) L.ft.
with 10mm dia. Holes @ 3" c/c as per details. Necessary
excavation & rubble packing paid seperatly.

Engineering organization, W.P. Page 754 BSR 2012


ITEM DESCRIPTION UNIT RATE

P.V.C. Specials.

T 58 Supplying and fixing 1/2" dia PVC Socket Nr.

T 59 Supplying and fixing 1/2" dia. PVC Valve Socket Nr.

T 60 Supplying and fixing 1/2" dia. PVC Faucet Socket Nr.

T 61 Supplying and fixing 1/2" dia. PVC Elbow Nr.

T 62 Supplying and fixing 1/2" dia. PVC Bend Nr.

T 63 Supplying and fixing 1/2" dia. PVC Equal Tee Nr.

T 64 Supplying and fixing 1/2" dia. PVC Clips Nr.

T 65 Supplying and fixing 3/4" dia PVC Socket Nr.

T 66 Supplying and fixing 3/4" dia. PVC Valve Socket Nr.

T 67 Supplying and fixing 3/4" dia. PVC Faucet Socket Nr.

T 68 Supplying and fixing 3/4" dia. PVC Elbow Nr.

T 69 Supplying and fixing 3/4" dia. PVC Bend Nr.

T 70 Supplying and fixing 3/4" dia. PVC Equal Tee Nr.

T 71 Supplying and fixing 3/4" dia. PVC Clips Nr.

T 72 Supplying and fixing 1" dia PVC Socket Nr.

T 73 Supplying and fixing 1" dia. PVC Valve Socket Nr.

T 74 Supplying and fixing 1" dia. PVC Faucet Socket Nr.

T 75 Supplying and fixing 1" dia. PVC Elbow Nr.

T 76 Supplying and fixing 1" dia. PVC Bend Nr.

T 77 Supplying and fixing 1" dia. PVC Equal Tee Nr.

T 78 Supplying and fixing 1" dia. PVC Clips Nr.

T 79 Supplying and fixing 1 1/4" dia PVC Socket Nr.

T 80 Supplying and fixing 1 1/4" dia. PVC Valve Socket Nr.

Engineering organization, W.P. Page 755 BSR 2012


ITEM DESCRIPTION UNIT RATE

T 81 Supplying and fixing 1 1/4" dia. PVC Faucet Socket Nr.

T 82 Supplying and fixing 1 1/4" dia. PVC Elbow Nr.

T 83 Supplying and fixing 1 1/4" dia. PVC Bend Nr.

T 84 Supplying and fixing 1 1/4" dia. PVC Equal Tee Nr.

T 85 Supplying and fixing 1 1/4" dia. PVC Clips Nr.

T 86 Supplying and fixing 1 1/2" dia PVC Socket Nr.

T 87 Supplying and fixing 1 1/2" dia. PVC Valve Socket Nr.

T 88 Supplying and fixing 1 1/2" dia. PVC Faucet Socket Nr.

T 89 Supplying and fixing 1 1/2" dia. PVC Elbow Nr.

T 90 Supplying and fixing 1 1/2" dia. PVC Bend Nr.

T 91 Supplying and fixing 1 1/2" dia. PVC Equal Tee Nr.

T 92 Supplying and fixing 1 1/2" dia. PVC Clips Nr.

T 93 Supplying and fixing 2" dia PVC Socket Nr.

T 94 Supplying and fixing 2" dia. PVC Valve Socket Nr.

T 95 Supplying and fixing 2" dia. PVC Faucet Socket Nr.

T 96 Supplying and fixing 2" dia. PVC Elbow Nr.

T 97 Supplying and fixing 2" dia. PVC Bend Nr.

T 98 Supplying and fixing 2" dia. PVC Equal Tee Nr.

T 99 Supplying and fixing 2" dia. PVC Clips Nr.

T 100 Supplying and fixing 2 1/2" dia PVC Socket Nr.

T 101 Supplying and fixing 2 1/2" dia. PVC Valve Socket Nr.

T 102 Supplying and fixing 2 1/2" dia. PVC Faucet Socket Nr.

T 103 Supplying and fixing 2 1/2" dia. PVC Elbow Nr.

T 104 Supplying and fixing 2 1/2" dia. PVC Bend Nr.

Engineering organization, W.P. Page 756 BSR 2012


ITEM DESCRIPTION UNIT RATE

T 105 Supplying and fixing 2 1/2" dia. PVC Equal Tee Nr.

T 106 Supplying and fixing 2 1/2" dia. PVC Clips Nr.

T 107 Supplying and fixing 3" dia PVC Socket Nr.

T 108 Supplying and fixing 3" dia. PVC Valve Socket Nr.

T 109 Supplying and fixing 3" dia. PVC Faucet Socket Nr.

T 110 Supplying and fixing 3" dia. PVC Elbow Nr.

T 111 Supplying and fixing 3" dia. PVC Bend Nr.

T 112 Supplying and fixing 3" dia. PVC Equal Tee Nr.

T 113 Supplying and fixing 3" dia. PVC Clips Nr.

T 114 Supplying and fixing 2" - 1 1/2" dia. PVC. Reducing Socket Nr.

T 115 Supplying and fixing 2" - 1 1/4" dia. PVC. Reducing Socket Nr.

T 116 Supplying and fixing 2" - 1" 1/2 dia. PVC. Reducing Socket Nr.

T 117 Supplying and fixing 2" - 3/4" 2 dia. PVC. Reducing Socket Nr.

T 118 Supplying and fixing 2" - 1/2" 2 dia. PVC. Reducing Socket Nr.

Supplying and fixing 1 1/2" - 1 1/4" dia. PVC. Reducing


T 119 Nr.
Socket

Supplying and fixing 1 1/2" - 1" 1/2 dia. PVC. Reducing


T 120 Nr.
Socket

Supplying and fixing 1 1/2" - 3/4" 2 dia. PVC. Reducing


T 121 Nr.
Socket

Supplying and fixing 1 1/2" - 1/2" 2 dia. PVC. Reducing


T 122 Nr.
Socket

Supplying and fixing 1 1/4" - 1" 1/2 dia. PVC. Reducing


T 123 Nr.
Socket

Supplying and fixing 1 1/4" - 3/4" 2 dia. PVC. Reducing


T 124 Nr.
Socket

Supplying and fixing 1 1/4" - 1/2" 2 dia. PVC. Reducing


T 125 Nr.
Socket

Engineering organization, W.P. Page 757 BSR 2012


ITEM DESCRIPTION UNIT RATE

T 126 Supplying and fixing 1" - 3/4" 2 dia. PVC. Reducing Socket Nr.

T 127 Supplying and fixing 1" - 1/2" 2 dia. PVC. Reducing Socket Nr.

T 128 Supplying and fixing 3/4" - 1/2" dia. PVC. Reducing Socket Nr.

T 129 Supplying and fixing 2" - 1 1/2" dia. PVC. Reducing Tee. Nr.

T 130 Supplying and fixing 2" - 1 1/4" dia. PVC. Reducing Tee. Nr.

T 131 Supplying and fixing 2" - 1" 1/2 dia. PVC. Reducing Tee. Nr.

T 132 Supplying and fixing 2" - 3/4" 2 dia. PVC. Reducing Tee. Nr.

T 133 Supplying and fixing 2" - 1/2" 2 dia. PVC. Reducing Tee. Nr.

T 134 Supplying and fixing 1 1/2" - 1 1/4" dia. PVC. Reducing Tee. Nr.

T 135 Supplying and fixing 1 1/2" - 1" 1/2 dia. PVC. Reducing Tee. Nr.

T 136 Supplying and fixing 1 1/2" - 3/4" 2 dia. PVC. Reducing Tee. Nr.

T 137 Supplying and fixing 1 1/2" - 1/2" 2 dia. PVC. Reducing Tee. Nr.

T 138 Supplying and fixing 1 1/4" - 1" 1/2 dia. PVC. Reducing Tee. Nr.

T 139 Supplying and fixing 1 1/4" - 3/4" 2 dia. PVC. Reducing Tee. Nr.

T 140 Supplying and fixing 1 1/4" - 1/2" 2 dia. PVC. Reducing Tee. Nr.

T 141 Supplying and fixing 1" - 3/4" 2 dia. PVC. Reducing Tee. Nr.

T 142 Supplying and fixing 1" - 1/2" 2 dia. PVC. Reducing Tee. Nr.

T 143 Supplying and fixing 3/4" - 1/2" dia. PVC. Reducing Tee. Nr.

Supplying and fixing 1" - 3/4" 2 dia. PVC. Reducing Foucet


T 144 Nr.
Tee.

Supplying and fixing 1" - 1/2" 2 dia. PVC. Reducing Foucet


T 145 Nr.
Tee.

Supplying and fixing 3/4" - 1/2" dia. PVC. Reducing Foucet


T 146 Nr.
Tee.

T 147 Supplying and fixing 1" - 3/4" 2 dia. PVC. Reducing Elbow. Nr.

Engineering organization, W.P. Page 758 BSR 2012


ITEM DESCRIPTION UNIT RATE

T 148 Supplying and fixing 1" - 1/2" 2 dia. PVC. Reducing Elbow. Nr.

T 149 Supplying and fixing 3/4" - 1/2" dia. PVC. Reducing Elbow. Nr.

Engineering organization, W.P. Page 759 BSR 2012


ITEM DESCRIPTION UNIT RATE

Special Pipe fittings

All Special Pipe fittings should be "Anton" / "Slon" Brand


or approved equivalent.

Supplying and fixing 4" (110 mm) dia. Double access branch
T 150 Nr.
with cleaning eye.

Supplying and fixing 4" (110 mm) dia Single access branch
T 151 Nr.
with cleaning eye.

T 152 Supplying and fixing 4" (110 mm) dia single branch. Nr.

Supplying and fixing 4" (110 mm) dia Swept bend with cleaning
T 153 Nr.
eye.

T 154 Supplying and fixing 4" (110 mm) dia Swept bend. Nr.

Supplying and fixing 4" (110 mm) dia Swept tee with cleaning
T 155 Nr.
eye.

T 156 Supplying and fixing 4" (110 mm) dia Swept tee. Nr.

T 157 Supplying and fixing 4" (110 mm) dia " P " trap. Nr.

T 158 Supplying and fixing 4" (110 mm) dia " S " trap. Nr.

T 159 Supplying and fixing 4" (110 mm) Multi floor trap (Catch pit). Nr.

T 160 Supplying and fixing 4" (110 mm) dia Tee with cleaning eye. Nr.

T 161 Supplying and fixing 4" (110 mm) dia.Bend. Nr.

T 162 Supplying and fixing 6" (160mm) dia. Bend. Nr.

T 163 Supplying and fixing Reducing Tee 6" x 4" (160mm x 110mm) Nr.

T 164 Supplying and fixing 2" (63 mm)dia.Vent Cowl (Wire Dome) Nr.

T 165 Supplying and fixing 4" (110mm) dia.Vent Cowl (Wire Dome) Nr.

Supplying and fixing 1 1/2" (50 mm) dia Swept tee with
T 166 Nr.
cleaning eye.

T 167 Supplying and fixing 1 1/2" (50 mm) dia Swept tee. Nr.

T 168 Supplying and fixing 1 1/2" (50 mm) dia Equal tee. Nr.

Engineering organization, W.P. Page 760 BSR 2012


ITEM DESCRIPTION UNIT RATE

Supplying and fixing 1 1/2" (50 mm) dia Bend with cleaning
T 169 Nr.
eye.

Hot water Pipes & Fittings

T 170 Supplying , laying and/or fixing 1/2" dia. CPVC - SDR pipes. L.ft.
(Specials paid separately).

T 171 Supplying , laying and/or fixing 1" dia. CPVC - SDR pipes. L.ft.
(Specials paid separately).

T 172 Supplying and fixing 1/2" dia. CPVC Socket. Nr.

T 173 Supplying and fixing 1" dia. CPVC Socket. Nr.

T 174 Supplying and fixing 1/2" dia. CPVC Valve Socket. Nr.

T 175 Supplying and fixing 1" dia. CPVC Valve Socket. Nr.

T 176 Supplying and fixing 1/2" dia. CPVC Faucet Socket. Nr.

T 177 Supplying and fixing 1" dia. CPVC Faucet Socket. Nr.

T 178 Supplying and fixing 1/2" dia. CPVC Tee. Nr.

T 179 Supplying and fixing 1" dia. CPVC Tee. Nr.

T 180 Supplying and fixing CPVC Elbow 1/2" x 45o Nr.

T 181 Supplying and fixing CPVC Elbow 1/2" x 90o Nr.

T 182 Supplying and fixing CPVC Elbow 1" x 45o Nr.

T 183 Supplying and fixing CPVC Elbow 1" x 90o Nr.

T 184 Supplying and fixing CPVC Reducing Socket 1" x 1/2" Nr.

T 185 Supplying and fixing CPVC Reducing Tee 1" x 1/2" Nr.

T 186 Supplying and fixing 1/2" dia. CPVC End Cap. Nr.

T 187 Supplying and fixing 1" dia. CPVC End Cap. Nr.

T 188 Supplying and fixing 1/2" dia. CPVC Tap End Plug. Nr.

T 189 Supplying and fixing 1/2" dia. CPVC Union. Nr.

Engineering organization, W.P. Page 761 BSR 2012


ITEM DESCRIPTION UNIT RATE

T 190 Supplying and fixing 1/2" dia. CPVC Elbow Holder. Nr.

T 191 Supplying and fixing 1" dia. CPVC Elbow Holder. Nr.

T 192 Supplying and fixing 1/2" dia. CPVC Brass Male Adapter. Nr.

T 193 Supplying and fixing 1/2" dia. CPVC Brass Female Adapter. Nr.

T 194 Supplying and fixing 1/2" dia. CPVC Brass Elbow. Nr.

Engineering organization, W.P. Page 762 BSR 2012


ITEM DESCRIPTION UNIT RATE

Pumps & Accessories

T 195 Supplying and fixing water pump single phase manufactured by Nr.
" Jinasena" Model no:- N110T/1 ,size 1" x 1" , 0.75 H.P. , total
head 80'-0" , out put 1000 I.g/hr. as per manufacturer's
specifications. Rate include for fixing 1" dia. Foot valve
approved make, Positioning and mount the pump on a concrete
bed 9" x 9" x 3" thick in 1:2:4(3/4") with 10mm dia. hexagonal
bolts to required lengh , Nuts & Washers 1/16" thick complete in
working order using necessary P.V.C. pipes, specials...etc. &
electrical supply from the closest DB. Pipes , specials &
electricity connection paid separatly.

T 196 Supplying and fixing 1" Deep Well Kit by " Jinasena" Model Nr.
no:- Type A as per manufacturer's specifications and complete in
working order using necessary P.V.C. pipes, specials...etc. &
electrical supply from the closest DB. (Pipes , specials &
electricity connection paid separatly.)

Test

T 197 Water Pressure testing for PVC pipes. Item

T 198 Testing of Water tanks & Sumps as per clause 3.8.6 of SCA/4/11 Item

U - DRAINAGE

Waste Water Manhole - Brick


U 01 Construction of waste water brick manhole internal size of Nr.
1'-0" x 1'-0" & depth upto 1'-3", consist of 3" thick Grade 15
concrete base and 4 1/2" thick brick masonry side walls in 1:3
cement sand mix , 1/2" thick cement rendering in 1:2 to internal
& external exposed faces of walls finished smooth with neat
cement floating, with 2" thick Grade 20 RCC cover slab with
6mm dia. M.S. rods @ 4" c/c both ways. Rate to include for
excavation, necessary formwork , lifting hooks & 3" thick
concrete pad as per Drawing No:-WSS/10/01

Engineering organization, W.P. Page 763 BSR 2012


ITEM DESCRIPTION UNIT RATE
U 02 Construction of waste water brick manhole internal size of Nr.
1'-3" x 1'-3" & depth upto 2'-0", consist of 3" thick Grade
15 concrete base and 4 1/2" thick brick masonry side walls in 1:3
cement sand mix , 1/2" thick cement rendering in 1:2 to internal
& external exposed surfaces of walls finished smooth with neat
cement floatings, with 2" thick Grade 20 RCC cover slab with
6mm dia. M.S. rods @ 4" c/c both ways. Rate to include for
excavation, necessary formwork , lifting hooks & 3" thick
concrete pad as per Drawing No:- WSS/10/01

U 03 Construction of waste water brick manhole internal size of Nr.


1'-6" x 1'-6" & depth 2'-0"to 3'-0", consist of 3" thick Grade
15 concrete base and 4 1/2" thick brick masonry side walls in 1:3
cement sand mix , 1/2" thick cement rendering in 1:2 to internal
& external exposed surfaces of walls finished smooth with neat
cement floatings, with 3" thick Grade 20 RCC cover slab with
10mm dia.tor steel @ 6" c/c both ways. Rate to include for
excavation, necessary formwork, lifting hooks & 6" thick
concrete pad as per Drawing No:-WSS/10/01

U 04 Construction of waste water brick manhole internal size of Nr.


2'-0" x 2'-0" & depth vary from 2'-0"-3'-0", consist of 4"
thick Grade 15 concrete base and 9" thick brick masonry side
walls in 1:3 cement sand mix ,1/2" thick cement sand rendering
in 1:2 to all internal surfaces and external exposed surfaces of
walls finished smooth with neat cement floating , with 3" thick
Grade 20 RCC cover slab with 10mm dia. tor steel @ 6" c/c both
ways.Rate to include for excavation, necessary formwork,
lifting hooks and 6" thick concrete pad as per Drawing No:-
WSS/10/01

Waste Water Manhole - Concrete


U 05 Construction of waste water concrete manhole internal size of Nr.
1'-0" x 1'-0" & depth up to 1'-3", consist of 4" thick Grade 20
concrete base and sides ,with 2" thick Grade 20 RCC cover slab
with 6mm dia.M.S. rods @ 4" c/c both ways. Rate to include for
excavation, necessary formwork, lifting hooks and 1/2" thick
cement sand rendering in 1:2 mix trowel smooth with neat grey
cement to all internal surfaces and external exposed surfaces as
per Drawing No:-WSS/10/02

Engineering organization, W.P. Page 764 BSR 2012


ITEM DESCRIPTION UNIT RATE
U 06 Construction of waste water concrete manhole internal size of Nr.
1'-3" x 1'-3" & depth up to 2'-0", consist of 4" thick
Grade 20 concrete base and sides ,with 2" thick Grade 20 RCC
cover slab with 6mm dia.M.S. rods @ 4" c/c both ways. Rate to
include for excavation, necessary formwork, lifting hooks and
1/2" thick cement sand rendering in 1:2 mix trowel smooth with
neat grey cement to all internal surfaces and external exposed
surfaces as per Drawing No:-WSS/10/02

U 07 Construction of waste water concrete manhole internal size of Nr.


1'-6" x 1'-6" & depth vary from 2'-0' - 3'-
0", consist of 3" thick Grade15 lean concrete & 5" thick Grade
20 RCC base and side walls with 10mm dia.tor steel @ 6" c/c
both ways and 3" thick Grade 20 RCC cover slab with 10mm
dia. tor steel @ 6" c/c both ways. Rate to include for excavation,
necessary formwork, lifting hooks and 1/2" thick cement &
sand rendering in 1:2 mix trowel smooth with neat grey cement
to all internal surfaces and external exposed surfaces as per
Drawing No:- WSS/10/02

Engineering organization, W.P. Page 765 BSR 2012


ITEM DESCRIPTION UNIT RATE

Sewer Manhole - Brick


U 08 Construction of brick sewer manhole internal size of Nr.
2'-1" x 1'-7" & depth vary from 1'-6" - 3'-0", consist of 6" thick
Grade 15 lean concrete base and 9" thick brick masonry side
walls in 1:3 cement sand mix ,with 3" thick Grade 20 RCC cover
slab with 10mm dia.tor steel @ 6" c/c both ways.Rate to include
for excavation, necessary formwork, lifting hooks, concrete pad
and 1/2" thick cement & sand rendering in 1:2 mix trowel
smooth with neat grey cement to all internal surfaces , exposed
external surfaces and forming channel with 1:6 benching as per
Drawing No:- WSS/10/03

U 09 Construction of brick sewer manhole internal size of Nr.


2'-6" x 1'-7" & depth vary from 2'-0" - 3'-0", consist of 6"
thick Grade 15 lean concrete base and 9" thick brick masonry
side walls in 1:3 cement sand mix ,with 3" thick Grade 20 RCC
cover slab with 10mm dia.tor steel @ 6" c/c both ways. Rate to
include for excavation, necessary formwork, lifting hooks ,
concrete pad and 1/2" thick cement & sand rendering in 1:2 mix
trowel smooth with neat grey cement to all internal surfaces ,
exposed external surfaces and forming channel with 1:6
benching as per Drawing No:- WSS/10/03

U 10 Construction of brick sewer manhole internal size of Nr.


3'-4 1/2" x 2'-3" & depth vary from 2'-0" - 3'-0", consist of
6" thick Grade 15 lean concrete base and 9" thick brick
masonery side walls in 1:3 cement sand mix ,with 3" thick Grade
20 RCC cover slab with 10mm dia.tor steel @ 6" c/c both
ways.Rate to include for excavation, necessary formwork,
lifting hooks , concrete pad and 1/2" thick cement & sand
rendering in 1:2 mix trowel smooth with neat grey cement to all
internal surfaces , exposed external surfaces and forming
channel with 1:6 benching as per Drawing No:- WSS/10/04

Engineering organization, W.P. Page 766 BSR 2012


ITEM DESCRIPTION UNIT RATE
U 11 Construction of brick sewer manhole internal size of Nr.
4'-6" x 2'-7 1/2" & depth vary from 2'-0" - 3'-0", consist of
6" thick Grade 15 lean concrete base and 9" thick brick masonry
side walls in 1:3 cement sand mix ,with 3" thick Grade 20 RCC
cover slab with 10mm dia.tor steel @ 6" c/c both ways.Rate to
include for excavation, necessary formwork, lifting hooks,
concrete pad and 1/2" thick cement & sand rendering in 1:2
mix trowel smooth with neat grey cement to all internal
surfaces , exposed external surfaces and forming channel with
1:6 benching as per Drawing No:- WSS/10/05

U 12 Construction of brick sewer manhole internal size of Nr.


4'-6" x 2'-7 1/2" & depth vary from 3'-0" - 5'-0", consist of 6"
thick Grade 15 lean concrete base and 9" thick brick masonery
side walls in 1:3 cement sand mix ,with 3" thick Grade 20 RCC
cover slab with 10mm dia.tor steel @ 6" c/c both ways.Rate to
include for excavation, necessary formwork, lifting hooks,
concrete pad and 1/2" thick cement & sand rendering in 1:2 mix
trowel smooth with neat grey cement to all internal surfaces ,
exposed external surfaces and forming channel with 1:6
benching as per Drawing No:- WSS/10/05

U 13 Construction of brick Interceptor manhole internal size Nr.


4'-6"x 2'-7 1/2" depth up to 5'-6" Consists of 3" thick grade
15 lean concrete & 6" thick Grade 20 conrete base , 9" thick
brick masonry side walls in 1:3 cement sand mix ,with 3" thick
Grade 20 RCC cover slab with 10mm dia.tor steel @ 6" c/c both
ways.Rate to include for excavation, necessary formwork, lifting
hooks concrete pad and 1/2" thick cement & sand rendering in
1:2 mix trowel smooth with neat grey cement to all internal
surfaces , exposed external surfaces including interceptor with
stopper and forming channels with 1:6 benching including
working spaces as per Drawing No:- WSS/10/06

Engineering organization, W.P. Page 767 BSR 2012


ITEM DESCRIPTION UNIT RATE
U 14 Construction of brick drop manhole internal size Nr.
4'-6"x 2'-7 1/2" and depth up to 5'-0", Consists of 6" thick
Grade 20 conrete base with 10mm dia. tor steel @ 8" c/c
bothways on 3"thick Grade 15 lean concrete and 9" thick brick
masonry side walls in 1:3 cement sand mix ,with 3" thick Grade
20 RCC cover slab with 10mm dia. tor steel @ 6" c/c both ways.
Rate to include for excavation, necessary formwork, lifting
hooks , concrete pad and 1/2" thick cement & sand rendering in
1:2 mix trowel smooth with neat grey cement to all internal
surfaces , exposed external surfaces and forming channels with
1:6 benching including P.V.C. specials , M.S. foot steps &
working spaces as per Drawing No:-WSS/10/07

U 15 Construction of brick drop manhole internal size Nr.


4'-6"x 2'-7 1/2" and depth vary from 5'-0" - 10'-0",
Consists of 6" thick Grade 20 conrete base with 10mm dia. tor
steel @ 8" c/c bothways on 3"thick Grade 15lean concrete and
9" thick brick masonery side walls in 1:3 cement sand mix ,with
3" thick Grade 20 RCC cover slab with 10mm dia.tor steel @ 6"
c/c both ways.Rate to include for excavation, necessary
formwork, lifting hooks , concrete pad and 1/2" thick cement &
sand rendering in 1:2 mix trowel smooth with neat grey cement
to all internal surfaces , exposed external surfaces and forming
channel with 1:6 benching including P.V.C. specials, M.S. foot
step & working spaceas per Drawing No:- WSS/10/07

Sewer Manhole - Concrete


U 16 Construction of RCC sewer manhole internal size of Nr.
2'-1" x 1'-7" & depth up to 2'-0", consist of 2" thick Grade 15
lean concrete and 6" thick Grade 20 concrete base and side walls
r/f with 10mm dia. tor steel @ 8" c/c bothways , with 3" thick
Grade 20 RCC cover slab with 10mm dia.tor steel @ 6" c/c both
ways.Rate to include for excavation, necessary formwork,
lifting hooks and 1/2" thick cement & sand rendering in 1:2 mix
trowel smooth with neat grey cement to all internal surfaces ,
exposed external surfaces and forming channel with 1:6
benching.as per Drawing No:- .WSS/10/08

Engineering organization, W.P. Page 768 BSR 2012


ITEM DESCRIPTION UNIT RATE
U 17 Construction of RCC sewer manhole internal size of Nr.
2'-6" x 1'-7" & depth vary from 2'-0" - 3'-0" , consist of 2"
thick Grade 15 lean concrete and 6" thick Grade 20 concrete
base and side walls r/f with 10mm dia. tor steel @ 8" c/c
bothways , with 3" thick Grade 20 RCC cover slab with 10mm
dia.tor steel @ 6" c/c both ways. Rate to include for excavation,
necessary formwork, lifting hooks and 1/2" thick cement , sand
rendering in 1:2 mix trowel smooth with neat grey cement to all
internal surfaces , exposed external surfaces and forming
channel with 1:6 benching as per Drawing No:- WSS/10/08

U 18 Construction of RCC sewer manhole internal size of Nr.


3'-4 1/2" x 2'-3" & depth vary from 2'-0" - 3'-0" , consist of
2" thick Grade 15 lean concrete and 6" thick Grade 20 concrete
base and side walls r/f with 10mm dia. tor steel @ 8" c/c
bothways , with 3" thick Grade 20 RCC cover slab with 10mm
dia.tor steel @ 6" c/c both ways.Rate to include for excavation,
necessary formwork, lifting hooks and 1/2" thick cement , sand
rendering in 1:2 mix trowel smooth with neat grey cement to all
internal surfaces , exposed external surfaces and forming
channel with 1:6 benching as per Drawing No:-WSS/10/09

U 19 Construction of RCC sewer manhole internal size of Nr.


4'-6" x 2'-7 1/2" & depth vary fro0m 2'-0" - 3'-0" , consist
of 2" thick Grade 15 lean concrete and 6" thick Grade 20
concrete base and side walls r/f with 10mm dia. tor steel @ 8"
c/c bothways , with 3" thick Grade 20 RCC cover slab with
10mm dia.tor steel @ 6" c/c both ways.Rate to include for
excavation, necessary formwork, lifting hooks and 1/2" thick
cement & sand rendering in 1:2 mix trowel smooth with neat
grey cement to all internal surfaces , exposed external surfaces
and forming channel with 1:6 benching as per Drawing No:-
WSS/10/08

Engineering organization, W.P. Page 769 BSR 2012


ITEM DESCRIPTION UNIT RATE
U 20 Construction of RCC sewer manhole internal size of Nr.
4'-6" x 2'-7 1/2" & depth vary from 3'-0" - 5'-0" , consist of 2"
thick Grade 15 lean concrete and 6" thick Grade 20 concrete
base and side walls r/f with 10mm dia. tor steel @ 8" c/c
bothways , with 3" thick Grade 20 RCC cover slab with 10mm
dia.tor steel @ 6" c/c both ways.Rate to include for excavation,
necessary formwork, lifting hooks and 1/2" thick cement , sand
rendering in 1:2 mix trowel smooth with neat grey cement to all
internal surfaces , exposed external surfaces and forming
channel with 1:6 benching as per Drawing No:- WSS/10/10

Manhole Covers
U 21 RCC Manhole cover size of 2'-0" x 2'-0" approx. & 3" thick Sq.ft.
Consist of 1:2:4(3/4") concrete & 10mm dia. Tor steel bars @
6" C/C both ways. Rate include necessary formwork and lifting
hooks.

U 22 Supplying & fixing heavy duty Cast Iron manhole cover size of Nr.
24" x 18" including cover frame.

Gulleys
U 23 Gulley S.W. 4" supplied and fixed including 1:2:4(3/4")concrete Nr.
gully box.

U 24 Construction of gully internal size of 1'-2" x 1'-2" & depth up to Nr.


1'-4" , consist of 3" thick Grade 20 concrete base and 4 1/2"
thick brick masonary side walls in 1:3 cement sand mix , with 2"
thick Grade 20 RCC cover slab with 6mm dia.M S rods @ 4" c/c
both ways.Rate to include for excavation, necessary formwork,
lifting hooks,,supplying P.V.C.gully trap infill with grade 20
concreate and 1/2" thick cement & sand rendering in 1:2 mix
trowel smooth with neat grey cement to all internal surfaces ,
exposed external surfaces and forming channel with 1:6
benching as per Drawing No:-WSS/10/11

Soakage Pits
U 25 Construction of 4'-0" dia. soakage pit in hard soil including Nr.
necessary excavation as per Drawing No:- WSS/SP/01.

U 26 Construction of 6'-0" dia. soakage pit in hard soil including Nr.


necessary excavation as per Drawing No:- WSS/SP/02.

U 27 Construction of 8'-0" dia. soakage pit in hard soil including Nr.


necessary excavation as per Drawing No:- WSS/SP/03.

Engineering organization, W.P. Page 770 BSR 2012


ITEM DESCRIPTION UNIT RATE
U 28 Construction of 4'-0" dia. soakage pit in loose soil including Nr.
necessary excavation as per Drawing No:- WSS/SP/04.

U 29 Construction of 6'-0" dia. soakage pit in loose soil including Nr.


necessary excavation as per Drawing No:- WSS/SP/05.

U 30 Construction of 8'-0" dia. soakage pit in loose soil including Nr.


necessary excavation as per Drawing No:- WSS/SP/06.

Septic tanks
U 31 Construction of 30 person Septic tank (Brick) including Nr.
necessary excavation as per Drawing No:- WSS/ST/01.

U 32 Construction of 50 person Septic tank (Brick) including Nr.


necessary excavation as per Drawing No:- WSS/ST/01.

U 33 Construction of 70 person Septic tank (Brick) including Nr.


necessary excavation as per Drawing No:- WSS/ST/02.

U 34 Construction of 100 person Septic tank (Brick) including Nr.


necessary excavation as per Drawing No:- WSS/ST/01.

U 35 Construction of 150 person Septic tank (Brick) including Nr.


necessary excavation as per Drawing No:- WSS/ST/02.

U 36 Construction of 100 person RCC Septic tank soil including Nr.


necessary excavation as per Drawing No:-WSS/ST/03.

U 37 Construction of 150 person RCC Septic tank soil including Nr.


necessary excavation as per Drawing No:- WSS/ST/04.

U 38 Supplying and fixing 4'-0" dia.x 8'-0" Pre-cast Septic tank Nr.
manufactured by "SEC" or approved equivalent including
excavation depth not exeeding 8'-0" and sand fill upto 2'-0" hight
sorrounding the tank. Rate shall include hire charges of
boomtruck for placing and subject to specified approved by the
Divisional Engineer.

U 39 Supplying and fixing 3'-0" internal dia.x 4'-0" depth & 3" thick Nr.
walls, Pre-cast Soakage pit with perporated holes manufactured
by "SEC" or approved equivalent including necessary excavation
including working space and 6" thick rubble packing
sorrounding the tank. Rate shall include hire charges of
boomtruck for placing and subject to specified approved by the
Divisional Engineer.

V - ELECTRICAL INSTALLATION.
Note:

Engineering organization, W.P. Page 771 BSR 2012


ITEM DESCRIPTION UNIT RATE

Work shall be done in accordance with specifications for


electrical and mechanical works(ICTAD Publication
No.SCA/8 of Nov.1987

Internal lighting wiring shall comply with the drawings and


1 shall be in 230/440 volt single core PVC insulated copper
cables

All switches and socket outlets shall be plated type "Clipsal",


2
" Orange"or Cabtree make.

All Fluorescent fittings of powder coated gauge 24 GI should


be complete with choke (Make:-"Atco","BG" original or -
3
Equivalent) starter and the tube should be Thron, Philips,
or Osram

All ceiling fans should be KDK, National, Mitsubishi,


4 Hittachi (Original Japan)with guarantee card from the
authorized dealer.

Rate to include switch boxes, plugs, round or square blocks,


Chromium plated M.S. chains, brass hooks, ceiling roses,
5
holders (angle batten and ordinary battens) and any other
item necessary.

All distribution boards should be incorporated with multi 9


genuine Merlin Gerin, A.B.B. , Hager, F & G , clipsal make
MCB's ( Miniature circuit Breaker ) and cabtree, F & G,
6 Clipsal , Merlin Gerin make R.C.C.B.'s (Residual Current
circuit Breaker) and Terrasaki, Merlin Gerin, , Dormans
Smith ,Biticano , Clockner moeller make M.C.C.B.'s
(Moulded Case Circuit Breakers)

The whole installation shall be carried out according to


7
CEB/IEE wiring regulations.

All the M.C.C.B.'s for the distribution boards should be


purchased from the following authorized agents or from
8 their dealers and a certificate or invoice along with their
Company seal and Part No., numbers should be produced at
the time of payment.

Type Agent

1. Merlin Gerin M.C.C.B.'s Figaro Ltd.

Engineering organization, W.P. Page 772 BSR 2012


ITEM DESCRIPTION UNIT RATE

2. F & G, M.C.B.'s and R.C.C.B.'s Rotex Ltd.

3. Terrasaki M.C.C.B.'s Rotex Ltd.

4. Cabtree R.C.C.B.'s Nawaloka Ltd.

5. Moeller MCB,MCCB,RCCB Richardson .


Electrical (Pvt) Ltd.

6. Orange,Switches and Socket outlet OS Projects


. (Pvt) Ltd.

7. Steel Enclosures Rotax Ltd./ Magline Ltd. / .


Figaro Ltd./MSS(Pvt) Ltd.

9 The height of the light bracket from floor level is 2.5m

10 Height of the switches from floor level is 1.5m

No ceiling fan should be installed at a height of less than


11
2.7m from floor level

The distance of a light source from the wall should be equal


to one half the distance between two adjacent light sources
12
and also the distance between light fittings should not
exceed 1.5 times the Mounting height.

Point wiring only with and including switches (Rate includes


13 wiring from MCB through switch to lamp point and includes
the switch, switch box, lamp holder wire and conduit)

POINT WIRING WITHOUT EARTHWIRE.

Items V 01 - V 20 shall be used for light point wiring with


Non-Metal casing lamp fittings.
V 01 Light point wired through a 5Amp one gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
in fully concealed/surface P.V.C. conduits.

V 02 Light points wired through a 5 Amp two gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
in fully concealed/surface P.V.C. conduits.

Engineering organization, W.P. Page 773 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 03 Light points wired through a 5 Amp three gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
in fully concealed/surface P.V.C. conduits.

V 04 Light points wired through a 5 Amp four gang one way plate Per Point
switch using 2x1/1.13mm (2x1/044) P.V.C. insulated copper
wire in fully concealed/surface P.V.C. conduits.

V 05 Light points-wired through a 5Amp 5 gang one way plate switch Per Point
using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire in
fully concealed/surface P.V.C. conduits.

V 06 Light point wired through a 5 Amp one gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
in fully surface plastic casing and capping.

V 07 Light points wired through a 5 Amp two gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
in fully surface plastic casing and capping.

V 08 Light points wired through a 5 Amp three gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
in fully surface plastic casing and capping.

V 09 Light points wired through a 5 Amp four gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
in fully surface plastic casing and capping.

V 10 Light points wired through a 5 Amp. 5 gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
in fully surface plastic casing and capping.

V 11 Light point wired through a 5 Amp one gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044)P.V.C. insulated copper wire
first half in surface plastic casing & capping and other half in
conduit.

V 12 Light points wired through a 5 Amp two gang one way using Per Point
2x1/1.13mm(2x1/044)P.V.C. insulated copper wire first half in
surface plastic casing & capping and other half in conduit.

V 13 Light points wired through a 5 Amp three gang one way using Per Point
2x1/1.13mm(2x1/044)P.V.C. insulated copper wire first half in
surface plastic casing & capping and other half in conduit.

Engineering organization, W.P. Page 774 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 14 Light points wired through a 5 Amp four gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044)P.V.C. insulated copper wire
first half in surface plastic casing & capping and other half in
conduit.

V 15 Light points wired through a 5 Amp. five gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044)P.V.C. insulated copper wire
first half in surface plastic casing & capping and other half in
conduit.

V 16 Light point wired through a 5Amp one gang two way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
in fully concealed/surface P.V.C. conduits.

V 17 Light point wired through a 5Amp one gang two way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
in fully surface plastic casing and capping.

V 18 Light point wired through a 5Amp one gang two way plate Per Point
switch using 2x1/1.13mm(2x1/044)P.V.C. insulated copper wire
first half in surface plastic casing & capping and other half in
conduit.

V 19 Electric Bell with Bell press switch using 2x1/1.13mm (2x1.044) Per Point
PVC/insulated copper wire in fully concealed/ surface PVC
conduits.

V 20 Electric Bell with bell press switch using flexible wire (twisted Nr.
twin wire) only in the table legs and floor crossings.

POINT WIRING WITH EARTHWIRE.

Items V 21 - V 39 shall be used for light point wiring with


Metal casing lamp fittings.
V 21 Light point wired through a 5Amp one gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully
concealed/surface P.V.C. conduits.

V 22 Light point wired through a 5Amp two gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully
concealed/surface P.V.C. conduits.

Engineering organization, W.P. Page 775 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 23 Light point wired through a 5Amp three gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully
concealed/surface P.V.C. conduits.

V 24 Light point wired through a 5Amp four gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully
concealed/surface P.V.C. conduits.

V 25 Light point wired through a 5Amp five gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully
concealed/surface P.V.C. conduits.

V 26 Light point wired through a 5Amp one gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully surface
plastic casing and capping.

V 27 Light point wired through a 5Amp two gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully surface
plastic casing and capping.

V 28 Light point wired through a 5Amp three gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully surface
plastic casing and capping.

V 29 Light point wired through a 5Amp four gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully surface
plastic casing and capping.

V 30 Light point wired through a 5Amp five gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully surface
plastic casing and capping.

V 31 Light point wired through a 5Amp one gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire first half in
surface plastic casing & capping and other half in conduit.

Engineering organization, W.P. Page 776 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 32 Light point wired through a 5Amp two gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire first half in
surface plastic casing & capping and other half in conduit.

V 33 Light point wired through a 5Amp three gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire first half in
surface plastic casing & capping and other half in conduit.

V 34 Light point wired through a 5Amp four gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire first half in
surface plastic casing & capping and other half in conduit.

V 35 Light point wired through a 5Amp five gang one way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire first half in
surface plastic casing & capping and other half in conduit.

V 36 Light point wired through a 5Amp one gang two way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully
concealed/surface P.V.C. conduits.

V 37 Light point wired through a 5Amp one gang two way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire in fully surface
plastic casing and capping.

V 38 Light point wired through a 5Amp one gang two way plate Per Point
switch using 2x1/1.13mm(2x1/044) P.V.C. insulated copper wire
& & 1x7/0.67 P.V.C. insulated copper earth wire first half in
surface plastic casing & capping and other half in conduit.

V 39 Electric Bell with Bell press switch using 2x1/1.13mm (2x1.044) Per Point
P.V.C. insulated copper wire & & 1x7/0.67 P.V.C. insulated
copper earth wire in fully concealed/surface P.V.C. conduits.

SWITCH SOCKET WIRING ( V 40 - V 44 )

Engineering organization, W.P. Page 777 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 40 5 Amp Switch socket outlet wired using 2x1/1.13mm (2x1/044) Nr.
P.V.C. insulated copper wire & 1x7/0.67(7/029) copper earth
wire in fully concealed/surface P.V.C. conduits.

V 41 5 Amp Switch socket outlet wired using 2x1/1.13mm (2x1/044) Nr.


P.V.C. insulated copper wire & 1x7/0.67(7/029)copper earth
wire in fully surface plastic casing and capping.

V 42 15 Amp switch socket outlet wired using 2x7/0.67(2x7/029) Nr.


insulated copper wire & 1x7/0.67(7/029) copper earth wire in
fully concealed/surface P.V.C. conduits.

V 43 15 Amp switch socket outlet wired using 2x7/0.67(2x7/029) Nr.


insulated copper wire & 1x7/0.67(7/029) copper earth wire in
surface plastic casing and capping.

V 44 Flush mounted 13 Amp. non-reversible type square pin Nr. Rate as


switched socket outlets wired in ring circuit using 4x1x7/0.67 following
PVC insulated copper wire and 2x7/0.67 PVC insulated copper formula
earth wire in casing and capping.

R = 650/= x L+400/= x N

R = Rate per circuit (to be calculated as per formula.

L = Distance from DB to last socket ( in Meter)

N = Number of 13 Amp. sockets

FANS WIRING , FITTINGS & ACCESSORIES


( V 45 - V 61 )
V 45 Fan regulator wired without a switch using 2x1/1.13 mm P.V.C. Nr.
insulated copper wire & 1x7/0.67 P.V.C. insulated copper earth
wire in fully concealed/surface P.V.C. conduits.

V 46 Fan regulator wired through a 5 Amp plate one gang one way Nr.
switch using 2x1/1.13 mm P.V.C. insulated copper wire &
1x7/0.67 P.V.C. insulated copper earth wire in fully
concealed/surface P.V.C.conduits.

Engineering organization, W.P. Page 778 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 47 Fan regulator wired without a switch using 2x1/1.13 mm P.V.C. Nr.
insulated copper wire & 1x7/0.67 P.V.C. insulated copper earth
wire in fully surface plastic casing and capping.

V 48 Fan regulator wired through a 5 Amp plate one gang one way Nr.
switch using 2x1/1.13 mm P.V.C. insulated copper wire &
1x7/0.67 P.V.C. insulated copper earth wire in fully surface
plastic casing and capping

V 49 Fan regulator wired without a switch using 2x1/1.13 mm P.V.C. Nr.


insulated copper wire & 1x7/0.67 P.V.C. insulated copper earth
wire in half surface with plastic casing and copping and other
half in conduit.

V 50 Fan regulator wired through a 5 Amp plate one gang one way Nr.
switch using 2x1/1.13 mm P.V.C. insulated copper wire
1x7/0.67 P.V.C. insulated copper earth wire in half surface with
plastic casing and copping and other half in conduit.

V 51 Two Fan regulator wired through a 5Amp plate two gang one Nr.
way switch using 2x1/1.13 mm P.V.C. insulated copper wire &
1x7/0.67 P.V.C. insulated copper earth wire in fully concealed/
surface PVC conduit

V 52 Three Fan regulator wired through a 5Amp plate three gang one Nr.
way switch using 2x1/1.13 mm P.V.C. insulated copper wire &
1x7/0.67 P.V.C. insulated copper earth wire in fully concealed/
surface PVC conduit

Supply install and wiring the following (Rate includes


wiring from MCB through switch and regulator to the fan
point and includes the cost of fan)

V 53 Supply and install a electrical fan and fan regulator wired Nr.
through a 5Amp plate one gang one way switch using 2x1/1.13
mm P.V.C. insulated copper wire 1x7/0.67 P.V.C. insulated
copper earth wire in fully concealed surface P.V.C. conduit.

V 54 Supply and install a electrical fan and fan regulator wired Nr.
through a 5Amp plate one gang one way switch using 2x1/1.13
mm P.V.C. insulated copper wire 1x7/0.67 P.V.C. insulated
copper earth wire in fully concealed surface casing and capping.

Engineering organization, W.P. Page 779 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 55 Supply and install a electrical fan and fan regulator wired Nr.
through a 5Amp plate one gang one way switch using 2x1/1.13
mm P.V.C. insulated copper wire 1x7/0.67 P.V.C. insulated
copper earth wire in fully surface with plastic casing and
capping and other half in conduit.

Supply & Install only the following V 56 - V 59

V 56
Ceiling fan 56" Sweep (KDK, National, Mitsubishi, Hittachi ) Nr.

V 57 Dimmer type fan regulator with a switch (Clipsal, KDK or


Nr.
equivalent)
V 58
Exhaust or blower fan 12" dia. (K.D.K. or Equivalent ) Nr.

V 59
Wall mounted fan - European make (K.D.K. or Equivalent ) Nr.

V 60 Supply & Fixing heavy duty 3/4" dia. x 3.2mm thick GI pipes to L.ft.
extend the ceiling fan rod with applying 2 coats of anti-corrosive
paint and one coat of "EPILACK EPOXY COALTAR" or
approved equivalent as per manufacturer's specifications.

V 61 Supply & Fixing heavy duty 1" dia. x 3.2mm thick GI pipes to L.ft.
extend the ceiling fan rod with applying 2 coats of anti-corrosive
paint and one coat of "EPILACK EPOXY COALTAR" or
approved equivalent as per manufacturer's specifications.

CABLE WIRING.
V 62 Supplying and wiring 2 x 2.5mm2 (7/.029") PVC/PVC/Cu cable L.ft.
+ 2.5mm2 (7/.029) earth wire to working order excluding
conduit.

V 63 Supplying and wiring 2 x 6mm2 (7/.044") PVC/PVC/ Cu cable + L.ft.


6mm2 (7/.044") earth wire complete to working order excluding
conduit/casing

V 64 Supplying and wiring 2 x 6mm2 (7/.044") PVC/PVC/ Cu cable L.ft.


complete to working order excluding conduit/casing

V 65 Supplying and wiring 4 x 6mm2 (7/.044") PVC/PVC/ Cu cable + L.ft.


6mm2 (7/.044") earth wire complete to working order excluding
conduit/casing

Engineering organization, W.P. Page 780 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 66 Supplying and wiring 2 x 10mm2 (7/.052") PVC/PVC/ Cu cable L.ft.
+ 10mm2 (7/.052") earth wire complete to working order
excluding conduit/casing

V 67 Supplying and wiring 4 x 10mm2 (7/.052") PVC/PVC/ Cu cable L.ft.


+ 10mm2 (7/.052") earth wire complete to working order
excluding conduit/casing

V 68 Supplying and wiring 2 x 16mm2 (7/.064") PVC/PVC/ Cu cable L.ft.


+ 16mm2 (7/.064") earth wire complete to working order
excluding conduit/casing

V 69 Supplying and wiring 4 x 16mm2 (7/0.064") PVC/PVC/ Cu cable L.ft.


+ 16mm2 (7/.064") earth wire complete to working order
excluding conduit/casing

V 70 Supplying and wiring 2 x 25mm2 PVC/PVC/Cu cable + 16 mm2 L.ft.


earth wire complete to working order excluding conduit/casing.

V 71 Supplying and wiring 4 x 25mm2 PVC/PVC/Cu cable + 16 mm2 L.ft.


earth wire complete to working order excluding conduit/casing.

V 72 Supplying and wiring 4 x 35mm2 PVC/PVC/Cu cable + 16 mm2 L.ft.


earth wire complete to working order excluding conduit/casing.

V 73 Supplying and wiring 4 x 95mm2 PVC/PVC/Cu cable + 50 mm2 L.ft.


earth wire complete to working order excluding conduit/casing.

V 74
Supplying and fixing 2 core flexible (0.5mm 2) . L.ft.

V 75 Supplying and wiring 2.5mm2 (7/.029") earth wire complete to L.ft.


working order excluding conduit/casing.

V 76 Supplying and wiring 6 mm2 (7/.044") earth wire complete to L.ft.


working order excluding conduit/casing.

V 77 Supplying and wiring 10 mm2 (7/.052") earth wire complete to L.ft.


working order excluding conduit/casing.

V 78 Supplying and wiring 16 mm2 (7/.064") earth wire complete to L.ft.


working order excluding conduit/casing.

V 79 Supplying and wiring 1mm2 (1/.044") PVC/PVC/ Cu two wire L.ft.


complete to working order excluding conduit/casing.

Engineering organization, W.P. Page 781 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 80 Supplying and wiring 2.5mm2 (7/.029") PVC/PVC Cu two wire L.ft.
complete to working order excluding conduit/casing.

V 81 Supplying and wiring with 4mm2 (7/.036") PVC/PVC/Cu two L.ft.


wire complete to working order excluding conduit/casing.

V 82 Supplying and wiring with 2 x 4mm2 (7/.036") PVC/PVC/Cu L.ft.


cable+4mm2(7/.036) earth wire complete to working order
excluding conduit/casing.

V 83 Supplying and wiring with 4 x 4mm2 (7/.036") PVC/PVC/Cu L.ft.


cable+4mm2(7/.036) earth wire complete to working order
excluding conduit/casing.

V 84 Supplying and wiring with 4 x 2.5mm2(7/.029") PVC/PVC/Cu L.ft.


cable+2.5mm2(7/.036) earth wire complete to working order
excluding conduit/casing.

V 85 3/4" - 1" PVC conduits laying in the slab including placing L.ft.
binding wire to draw through conduits.

V 86
Supplying and fixing 5/8" PVC conduit including clips. L.ft.

V 87
Supplying and fixing 3/4" PVC conduit including clips. L.ft.

V 88
Supplying and fixing 1" PVC conduit including clips. L.ft.

V 89
Supplying and fixing 1 1/4" dia. PVC conduit pipe L.ft.

V 90
Supplying and fixing 1 1/2" dia. PVC conduit pipe L.ft.

V 91
Supplying and fixing 2" dia. PVC conduit pipe L.ft.

V 92 Supplying and fixing 1 1 /4" dia. type 400 PVC pipe including L.ft.
clips.

V 93 Supplying and fixing 1 1 /2" dia. type 400 PVC pipe including L.ft.
clips.
V 94 Supplying and fixing 3" dia. type 400 PVC pipe including clips.
L.ft.

V 95
Supplying and fixing 3/4" dia. PVC conduit bend Nr.

V 96
Supplying and fixing 1" dia. PVC conduit bend Nr.

V 97
Supplying and fixing 1 1/4" dia. PVC conduit bend Nr.

V 98
Supplying and fixing 1 1/2" dia. PVC conduit bend Nr.

Engineering organization, W.P. Page 782 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 99
Supplying and fixing 2" dia. PVC conduit bend Nr.

V 100
Supplying and fixing 3/4" or 1" PVC conduit junction box. Nr.

V 101
Supplying and fixing 1" PVC casing L.ft.

V 102
Supplying and fixing 1 1/4" PVC casing L.ft.

V 103
Supplying and fixing 1 1/2" PVC casing L.ft.

V 104
Supplying and fixing 2" PVC casing L.ft.

V 105
Supplying and fixing 2"x 2: box casing. PVC casing L.ft.

DB / RCCB / MCCB / MCB

V 106 4-8 ways SP&N Distribution Board with thermo plastic frame Nr.
and door, earth and neutral bars din trail type (protection rating
IP40)

V 107 8-10 ways SP&N Distribution board with thermo plastic frame Nr.
and door, earth and neutral bars din trail type (protection rating
IP40)

V 108 10-12 ways SP&N Distribution board with thermo plastic frame Nr.
and door, earth and neutral bars din trail type (protection rating
IP40)

V 109 14-16 ways SP&N distribution board with thermo plastic frame Nr.
and door, earth and neutral bars din trail type (protection rating
IP40)

V 110 16-19 ways SP&N Distribution board with thermo plastic frame Nr.
and door, earth and neutral bars din trail type (protection rating
IP40)

Note:

Supply, install and wire with enclosure the following makes :

Cabtree, F & G, Genuine, Merlin & Gerin, Terrasaki,.

V 111 40Amp, 30 mA Double Pole ELCB (RCCB) Nr.

V 112 40Amp, 100 mA Double Pole ELCB (RCCB) Nr.

Engineering organization, W.P. Page 783 BSR 2012


ITEM DESCRIPTION UNIT RATE

V 113 40Amp, 300 mA Double Pole ELCB (RCCB) Nr.

V 114 63Amp, 30 mA Double Pole ELCB (RCCB) Nr.

V 115 63Amp, 100 mA Double Pole ELCB (RCCB) Nr.

V 116 63Amp, 300 mA Double Pole ELCB (RCCB) Nr.

V 117 40Amp, 30 mA Four Pole ELCB (RCCB) Nr.

V 118 40Amp, 100 mA Four Pole ELCB (RCCB) Nr.

V 119 40Amp, 300 mA Four Pole ELCB (RCCB) Nr.

V 120 63Amp, 30 mA Four Pole ELCB (RCCB) Nr.

V 121 63Amp, 100 mA Four Pole ELCB (RCCB) Nr.

V 122 63Amp, 300 mA Four Pole ELCB (RCCB) Nr.

V 123 100Amp, 300 mA Four Pole ELCB (RCCB) Nr.

V 124 30 Amp Double Pole Main Switch Nr.

V 125 30 Amp Four Pole Main Switch Nr.

V 126 60 Amp Four Pole Main Switch Nr.

30,40,60,100 Amp , 25KA Three Pole MCCB with metal


V 127 enclosure. Nr.

30,40,60,100 Amp , 25KA Three Pole MCCB without metal


V 128 enclosure. Nr.

30,40,60,100 Amp , 25KA Four Pole MCCB with metal


V 129 enclosure. Nr.

30,40,60,100 Amp , 25KA Four Pole MCCB without metal


V 130 enclosure. Nr.

V 131 160 Amp , 25KA Four Pole MCCB with metal enclosure. Nr.

V 132 160 Amp , 25KA Four Pole MCCB without metal enclosure. Nr.

V 133 6 - 32 Amp Single Pole MCB Nr.

V 134 40 Amp Single Pole MCB Nr.

Engineering organization, W.P. Page 784 BSR 2012


ITEM DESCRIPTION UNIT RATE

V 135 63 Amp Single Pole MCB Nr.

V 136 6 - 32 Amp Double Pole MCB Nr.

V 137 40 Amp Double Pole MCB Nr.

V 138 63 Amp Double Pole MCB Nr.

V 139 6 - 32 Amp Three Pole MCB Nr.

V 140 40 Amp Three Pole MCB Nr.

V 141 63 Amp Three Pole MCB Nr.

V 142 6 - 32 Amp Four Pole MCB Nr.

V 143 40 Amp Four Pole MCB Nr.

V 144 63 Amp Four Pole MCB Nr.

V 145 40 Amp Double Pole Isolator with plastic enclosure. Nr.

V 146 63 Amp Double Pole Isolator with plastic enclosure. Nr.

V 147 100 Amp Double Pole Isolator with plastic enclosure. Nr.

V 148 40 Amp Three Pole Isolator with plastic enclosure. Nr.

V 149 63 Amp Three Pole Isolator with plastic enclosure. Nr.

V 150 100 Amp Three Pole Isolator with plastic enclosure. Nr.

V 151 40 Amp Four Pole Isolator with plastic enclosure. Nr.

V 152 63 Amp Four Pole Isolator with plastic enclosure. Nr.

V 153 100 Amp Four Pole Isolator with plastic enclosure. Nr.

Engineering organization, W.P. Page 785 BSR 2012


ITEM DESCRIPTION UNIT RATE

LIGHT FITTINGS

Note:

Rate for items V 154 - V 186 shall include the cost of


adapter,connecting 2core 1mm2 cable of length not exceeding
1.5m , galvanized hanging chain. (incase the cable length
exceed 1.5m refer item ….. Payment for additional length.)

Supply & Install only the following fittings.

V 154 Inner diameter of 5" recess mounted down light with polished Nr.
aluminum reflector of "Simy" Brand & Model No:SIYDL125R
or approved equivalent.

V 155 Inner diameter of 5" surface mounted down light with polished Nr.
aluminum reflector of "Simy" Brand & Model No:SIYDL125S
or approved equivalent.

V 156 Inner diameter of 4" wall mounted cylindrical shaped upward Nr.
light fitting of "Simy" Brand & Model No:SIYWB937 or
approved equivalent.

V 157 Weatherproof IP65 rated wall mounted cylindrical shaped up Nr.


down ward light fitting of "Simy" Brand & Model
No:SIYWB3027 or approved equivalent.

V 158 Weatherproof IP65 rated wall mounted 2'-0" single fluorescent Nr.
light fitting with 18W bulb of "Simy" Brand & Model
No:SIYWP120 or approved equivalent.

V 159 8" clear transparent glass globe pendent type light fitting of Nr.
"Simy" Brand & Model No:SIYWB937 or approved equivalent.

V 160 Spot light with bulbs of "Simy" Brand & Model Nr.
No:SIYSP120PAR or approved equivalent.

V 161 Nr.
Pendent Lamp

V 162 20W CFL lamp with one year warranty - Osram , Philips or
Nr.
Approved Equivelant.
V 163 Mercury Vapour Lamp bracket complete 125 watts with clamps Nr.
(equivalent to Siemens SNA 395)

V 164 Mercury Vapour Lamp bracket complete 250 watts with clamps Nr.
(equivalent to Siemens SNA 395)

Engineering organization, W.P. Page 786 BSR 2012


ITEM DESCRIPTION UNIT RATE

Note:

In all fluorescent lamp complete fittings incorporating,


choke-Atco, BG and starter, Bulb-Philips, Osram, Thorn
Choke-Atco, Starter - BG and Bulbs - Philips, osram, Thorn

V 165 4'-0" long single fluorescent lamp fitting , suspension - opal Nr.
white/diamond cut diffuser with 1 no of 36W fluorescent bulb
of "Simy" Brand & Model No:SIYBD140BD or approved
equivalent.

V 166 4'-0" long Twin fluorescent lamp fitting , suspension - opal Nr.
white/diamond cut diffuser with 2 nos of 36W fluorescent bulbs
of "Simy" Brand & Model No:SIYBD240BD or approved
equivalent.

V 167 2'-0" long single fluorescent lamp fitting , suspension - opal Nr.
white/diamond cut diffuser with 1 no of 18W fluorescent bulb
of "Simy" Brand & Model No:SIYBD120BD or approved
equivalent.

V 168 2'-0" long Twin fluorescent lamp fitting , suspension - opal Nr.
white/diamond cut diffuser with 2 nos of 18W fluorescent bulbs
of "Simy" Brand & Model No:SIYBD220BD or approved
equivalent.

V 169 4'-0" long single fluorescent lamp fitting , suspension - polished Nr.
aluminium reflector with 1 no of 36W fluorescent bulb of
"Simy" Brand & Model No:SIYBR140M or approved
equivalent.

V 170 4'-0" long Twin fluorescent lamp fitting , suspension - polished Nr.
aluminium reflector with 2 nos of 36W fluorescent bulbs of
"Simy" Brand & Model No:SIYBR240M or approved
equivalent.

V 171 2'-0" long single fluorescent lamp fitting , suspension - polished Nr.
aluminium reflector with 1 no of 18W fluorescent bulb of
"Simy" Brand & Model No:SIYBR120M or approved
equivalent.

V 172 2'-0" long Twin fluorescent lamp fitting , suspension - polished Nr.
aluminium reflector with 2 nos of 18W fluorescent bulbs of
"Simy" Brand & Model No:SIYBR220M or approved
equivalent.

V 173 4'-0" long single fluorescent lamp fitting , suspension - round Nr.
prismatic diffuser with 1 no of 36W fluorescent bulb of "Simy"
Brand & Model No:SIYBLD140 or approved equivalent.

Engineering organization, W.P. Page 787 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 174 4'-0" long Twin fluorescent lamp fitting , suspension - round Nr.
prismatic diffuser with 2 nos of 36W fluorescent bulbs of
"Simy" Brand & Model No:SIYBLD240 or approved equivalent.

V 175 2'-0" long single fluorescent lamp fitting , suspension - round Nr.
prismatic diffuser with 1 no of 18W fluorescent bulb of "Simy"
Brand & Model No:SIYBLD120 or approved equivalent.

V 176 2'-0" long Twin fluorescent lamp fitting , suspension - round Nr.
prismatic diffuser with 2 nos of 18W fluorescent bulbs of
"Simy" Brand & Model No:SIYBLD220 or approved equivalent.

V 177 4'-0" long single fluorescent lamp fitting , batton type with 1 no Nr.
of 36W fluorescent bulb of "Simy" Brand & Model
No:SIYBF140 or approved equivalent.

V 178 4'-0" long Twin fluorescent lamp fitting , batton type with 2 nos Nr.
of 36W fluorescent bulbs of "Simy" Brand & Model
No:SIYBF240 or approved equivalent.

V 179 2'-0" long single fluorescent lamp fitting , batton type with 1 no Nr.
of 18W fluorescent bulb of "Simy" Brand & Model
No:SIYBF120 or approved equivalent.

V 180 2'-0" long Twin fluorescent lamp fitting , batton type with 2 nos Nr.
of 18W fluorescent bulbs of "Simy" Brand & Model
No:SIYBF220 or approved equivalent.

V 181 2'-0" x 2'-0" Recessed mounted fluorescent lamp fittings with Nr.
full parabolic polished aluminium mirror louver and 2 nos of
18W fluorescent bulbs of "Simy" Brand & Model
No:SIYPL220R/S or approved equivalent.

V 182 2'-0" x 2'-0" Recessed mounted fluorescent lamp fittings with Nr.
full parabolic polished aluminium mirror louver and 3 nos of
18W fluorescent bulbs of "Simy" Brand & Model
No:SIYPL320R/S or approved equivalent.

V 183 2'-0" x 2'-0" Recessed mounted fluorescent lamp fittings with Nr.
full parabolic polished aluminium mirror louver and 4 nos of
18W fluorescent bulbs of "Simy" Brand & Model
No:SIYPL420R/S or approved equivalent.

V 184 2'-0" x 4'-0" Recessed mounted fluorescent lamp fittings with Nr.
full parabolic polished aluminium mirror louvered diffuser and 2
nos of 36W fluorescent bulbs of "Simy" Brand & Model
No:SIYPL240R/S or approved equivalent.

Engineering organization, W.P. Page 788 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 185 2'-0" x 4'-0" Recessed mounted fluorescent lamp fittings with Nr.
full parabolic polished aluminium mirror louvered diffuser and 3
nos of 36W fluorescent bulbs of "Simy" Brand & Model
No:SIYPL340R/S or approved equivalent.

V 186 2'-0" x 4'-0" Recessed mounted fluorescent lamp fittings with Nr.
full parabolic polished aluminium mirror louvered diffuser and 4
nos of 36W fluorescent bulbs of "Simy" Brand & Model
No:SIYPL440R/S or approved equivalent.

others
V 187 Provide an earth electrode copper plate 2'-0" x 2'-0" x 3mm thick Item
at 3.0m depth including excavation and backfilling. Rate shall
include connection to the main panel, sub main, earth clips &
etc. with 1'-0" x 1'-0" x 1'-0" earth pit consist of 4 1/2" brick
work , 3" thick G20 concrete cover slab.( Earth wire paid
separetly )

V 188 Provide an earth electrode 6'-0" long , 2" dia. x 3.6mm thick Item
medium duty GI pipe. Rate shall include connection to the main
panel, sub main, earth clips& etc. with 1'-0" x 1'-0" x 1'-0" earth
pit consist of 4 1/2" brick work , 3" thick G20 concrete cover
slab.( Earth wire paid separetly )

V 189
D'Bracket complete set (small size) Nr.

V 190 Supply and install complete "D" shape bracket including Per Set
insulator, Nuts, bolts ect. fixed to working order.
V 191 Supply and install 50mm x 50mm x 6mm "L" Iron, L.ft.
including drilling 12mm holes, 10mm G.I. bolt, and
application of anticorrosive paint all complete to working
order.
V 192 Supply and installation and connection of 25 x 3mm copper tape L.ft.
with necessary accessories. Rate shall include for connection of
both ends with brass.

V 193 Supply and installation and connection of 30A - 60A three phase Nr.
with powder coated locable bus bar box including neutral bar
and earth bar.

V 194 Supply and installation and connection of 100A - 125A three Nr.
phase with powder coated locable bus bar box including neutral
bar and earth bar.

V 195 Supply and installation and connection of 30A - 60A single Nr.
phase with powder coated locable bus bar box including neutral
bar and earth bar.

Engineering organization, W.P. Page 789 BSR 2012


ITEM DESCRIPTION UNIT RATE
V 196 Testing of the electrical installation and submission of certificate Item
from a chartered Electrical Engineer registerd at CEB.

W - METAL WORK

Note:

Aluminium doors, windows and partitions shall confirm to


the following requirements:

Aluminium alloy should confirm to- BS 1474:1972 Surface


1
treatment shall confirm to BS 1615 and BS 3987

2 Anodized coating thickness should be 25 ± 5 microns

Minimum section thickness 1.6mm door frame , 1.5 mm


3
window frame and 1.2 mm partition.

Most of the aluminium extrusions available in the Local


Market are being manufactured in Sri Lanka by the
following leading companies and both companies are
changing the extrusion profiles and thicknesses from time
to time. Hence it has become very difficult t o specify
4 standard section sizes that are to be used for door /window
frames and sash members. Hence the rates given herein are
based on the recommended minimum sizes and thicknesses
and profiles as per their hand books published by M/S
ALUMAX (PVT) LTD and by M/S LANKA ALUMINIUM
INDUSTRIES LTD and M/S HEMALCO LTD.

At the time of bidding, all the Bidders shall specifically be


5
requested to submit the following information.

The specifications and thickness of Aluminium extrusions


(a)
bidder proposes to use on the works.

(b) Full size cross sections

Documentary evidence from the Profile Manufacture to the


(c) effect that the proposed profile will serve for the intended
purpose.

A Manufacturer's test certificate be produced as evidence


(d)
that the powder coating is of required thickness.

Engineering organization, W.P. Page 790 BSR 2012


ITEM DESCRIPTION UNIT RATE

6 Physical properties :-

(a) Minimum tensile strength 150 Mpa

(b) Elongation 7%

7 All screws should be stainless steel

But hinges and bar type hinges should be Aluminium or


8
Stainless Steel.

The item descriptions should be read along with the annexed


9 detail drawings. Drawing no:- AR/TYPE PLAN/DOORS &
WINDOWS/2010.07.07/DETAIL 1 - 19 ( Sheet 1 - 19 )

Doors - 100mm x 1.6mm thick,


Casement - 70mm x 1.5mmthick,
Sliding -
80mm x 1.5mm thick,
Partition - 76mm x 1.2mm
thick
Shop drawing should be provided prior to fabrication.

The rates and hence the item description shall include 5mm
10 thick Clear glass, Neoprene gasket, pop revets, Rawl plugs,
Screws, Aluminium cleats etc.

11 The rates given herein are for Natural aluminium profiles.

For powder coated aluminium profiles (minimum powder


12 coating thickness of 60 ± 5 microns) the rates shall be
increased by 15%.

For Bronze anodized aluminium profiles, the rates shall be


13
increased by 5%.

14 For using Tinted glass, the rates shall be increased by 2%.

Where using floor hinged type doors deduct 5% of the


15 related rate. Floor hinge & Door closer paid separetly as W-
63& W-64.

Doors

Openable Single Sash Door (Aluminium Composite Panel &


W 01
Glazed ) with Louvers on Top

Engineering organization, W.P. Page 791 BSR 2012


ITEM DESCRIPTION UNIT RATE
Natural aluminium single sash butt hinged openable door with Sq.ft.
middle rail and louvers on top , panelling with 4mm thick
aluminium composite panel on both sides ( Two pannels kept
back to back ) and glazed with 5mm thick clear glass panes,
neoprene and wooled beading, gaskets, pop rivots, threaded bar
with nut and approved quality lock, butt hinges, door handle
with cap nut. As per the members , sizes and details given in
Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/2010.07.07/ DETAIL 02 - D1

Openable Single Sash Door (Aluminium Composite Panel &


W 02
Glazed ) with Fixed Glass on Top
Natural aluminium single sash butt hinged openable door with Sq.ft.
middle rail and fixed glass on top , panelling with 4mm thick
aluminium composite panel on both sides ( Two pannels kept
back to back ) and glazed with 5mm thick clear glass panes,
neoprene and wooled beading, gaskets, pop rivots, threaded bar
with nut and approved quality lock, butt hinges, door handle
with cap nut. As per the members , sizes and details given in
Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/2010.07.07/ DETAIL 02 - D2

Openable Single Sash Door (Aluminium Composite Panel &


W 03
Glazed )
Natural aluminium single sash butt hinged openable door with Sq.ft.
middle rail , panelling with 4mm thick aluminium composite
panel on both sides ( Two pannels kept back to back ) and
glazed with 5mm thick clear glass panes, neoprene and wooled
beading, gaskets, pop rivots, threaded bar with nut and approved
quality lock, butt hinges, door handle with cap nut. As per the
members , sizes and details given in Drawing No:- AR/TYPE
PLAN/DOORS & WINDOWS/2010.07.07/ DETAIL 02 - D3

Openable Single Sash Door (Fully Glazed ) with Louvers on


W 04
Top

Engineering organization, W.P. Page 792 BSR 2012


ITEM DESCRIPTION UNIT RATE
Natural aluminium single sash butt hinged openable door with Sq.ft.
middle rail and louvers on top , glazed with 5mm thick clear
glass panes, neoprene and wooled beading, gaskets, pop rivots,
threaded bar with nut and approved quality lock, butt hinges,
door handle with cap nut. As per the members , sizes and details
given in Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/2010.07.07/ DETAIL 03 - D4

Openable Single Sash Door (Fully Glazed ) with Fixed Glass


W 05
on Top
Natural aluminium single sash butt hinged openable door with Sq.ft.
middle rail and fixed glass on top , glazed with 5mm thick clear
glass panes, neoprene and wooled beading, gaskets, pop rivots,
threaded bar with nut and approved quality lock, butt hinges,
door handle with cap nut. As per the members , sizes and details
given in Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/2010.07.07/ DETAIL 03 - D5

W 06 Openable Single Sash Door ( Fully Glazed )

Natural aluminium single sash butt hinged openable door with Sq.ft.
middle rail and glazed with 5mm thick clear glass panes,
neoprene and wooled beading, gaskets, pop rivots, threaded bar
with nut and approved quality lock, butt hinges, door handle
with cap nut. As per the members , sizes and details given in
Drawing No:- AR/TYPE PLAN/DOORS & WINDOWS/
2010.07.07/ DETAIL 03 - D6

Openable Single Sash Door ( Fully panelled with Aluminium


W 07
Composite Panel )
Natural aluminium single sash butt hinged openable door with Sq.ft.
middle rail and fully panelling with 4mm thick aluminium
composite panel on both sides ( Two pannels kept back to
back ), neoprene and wooled beading, gaskets, pop rivots,
threaded bar with nut and approved quality lock, butt hinges,
door handle with cap nut. As per the members , sizes and details
given in Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/ 2010.07.07/ DETAIL 04 - D7 & D8

Sliding Single Sash Door (Aluminium Composite Panel &


W 08
Glazed )

Engineering organization, W.P. Page 793 BSR 2012


ITEM DESCRIPTION UNIT RATE
Natural aluminium single sash sliding door with middle rail , Sq.ft.
panelling with 4mm thick aluminium composite panel on both
sides ( Two pannels kept back to back ) and glazed with 5mm
thick clear glass panes, neoprene and wooled beading, gaskets,
pop rivots, threaded bar with nut roller, flush bolt and approved
quality lock , door handle with cap nut. As per the members ,
sizes and details given in Drawing No:- AR/TYPE
PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL 05 - D9

Engineering organization, W.P. Page 794 BSR 2012


ITEM DESCRIPTION UNIT RATE

W 09 Sliding Single Sash Door ( Fully Glazed )

Natural aluminium single sash fully glazed sliding door with Sq.ft.
middle rail , glazed with 5mm thick clear glass panes, neoprene
and wooled beading, gaskets, pop rivots, threaded bar with nut
roller, flush bolt and approved quality lock , door handle with
cap nut. As per the members , sizes and details given in Drawing
No:- AR/TYPE PLAN/DOORS & WINDOWS/ 2010.07.07/
DETAIL 05 - D10

Sliding Single Sash Door ( Fully panelled with Aluminium


W 10
Composite Panel )

Natural aluminium single sash sliding door with middle rail , Sq.ft.
fully panelling with 4mm thick aluminium composite panel on
both sides ( Two pannels kept back to back ), neoprene and
wooled beading, gaskets, pop rivots, threaded bar with nut roller,
flush bolt and approved quality lock , door handle with cap nut.
As per the members , sizes and details given in Drawing No:-
AR/TYPE PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL
05 - D11

Openable Double Sash Door (Aluminium Composite Panel &


W 11
Glazed ) with Fixed Glass on Top

Natural aluminium double sash butt hinged openable door with Sq.ft.
middle rail and fixed glass on top , panelling with 4mm thick
aluminium composite panel on both sides ( Two pannels kept
back to back ) and glazed with 5mm thick clear glass panes,
neoprene and wooled beading, gaskets, pop rivots, threaded bar
with nut and approved quality lock, butt hinges, door handle
with cap nut. As per the members , sizes and details given in
Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/2010.07.07/ DETAIL 06 - D12

Openable Double Sash Door (Aluminium Composite Panel &


W 12
Glazed ) with Louvers on Top

Engineering organization, W.P. Page 795 BSR 2012


ITEM DESCRIPTION UNIT RATE
Natural aluminium double sash butt hinged openable door with Sq.ft.
middle rail and louvers on top , panelling with 4mm thick
aluminium composite panel on both sides ( Two pannels kept
back to back ) and glazed with 5mm thick clear glass panes,
neoprene and wooled beading, gaskets, pop rivots, threaded bar
with nut and approved quality lock, butt hinges, door handle
with cap nut. As per the members , sizes and details given in
Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/2010.07.07/ DETAIL 06 - D13

Engineering organization, W.P. Page 796 BSR 2012


ITEM DESCRIPTION UNIT RATE

Openable Double Sash Door (Aluminium Composite Panel &


W 13
Glazed )

Natural aluminium double sash butt hinged openable door with Sq.ft.
middle rail , panelling with 4mm thick aluminium composite
panel on both sides ( Two pannels kept back to back ) and
glazed with 5mm thick clear glass panes, neoprene and wooled
beading, gaskets, pop rivots, threaded bar with nut and approved
quality lock, butt hinges, door handle with cap nut. As per the
members , sizes and details given in Drawing No:- AR/TYPE
PLAN/DOORS & WINDOWS/2010.07.07/ DETAIL 06 - D14

Openable Double Sash Door (Fully Glazed ) with Fixed


W 14
Glass on Top
Natural aluminium double sash butt hinged openable door with Sq.ft.
middle rail and fixed glass on top , fully glazed with 5mm thick
clear glass panes, neoprene and wooled beading, gaskets, pop
rivots, threaded bar with nut and approved quality lock, butt
hinges, door handle with cap nut. As per the members , sizes and
details given in Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/2010.07.07/ DETAIL 07 - D15

Openable Double Sash Door (Fully Glazed ) with Louvers on


W 15
Top
Natural aluminium double sash butt hinged openable door with Sq.ft.
middle rail and louvers on top , fully glazed with 5mm thick
clear glass panes, neoprene and wooled beading, gaskets, pop
rivots, threaded bar with nut and approved quality lock, butt
hinges, door handle with cap nut. As per the members , sizes and
details given in Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/2010.07.07/DETAIL 07 - D16

W 16 Openable double Sash Door ( Fully Glazed )

Natural aluminium double sash butt hinged openable door with Sq.ft.
middle rail and fully glazed with 5mm thick clear glass panes,
neoprene and wooled beading, gaskets, pop rivots, threaded bar
with nut and approved quality lock, butt hinges, door handle
with cap nut. As per the members , sizes and details given in
Drawing No:- AR/TYPE PLAN/DOORS & WINDOWS/
2010.07.07/DETAIL 07 - D17

Engineering organization, W.P. Page 797 BSR 2012


ITEM DESCRIPTION UNIT RATE

Engineering organization, W.P. Page 798 BSR 2012


ITEM DESCRIPTION UNIT RATE

Sliding Double Sash Door (Aluminium Composite Panel &


W 17
Glazed )

Natural aluminium double sash sliding door with middle rail , Sq.ft.
panelling with 4mm thick aluminium composite panel on both
sides ( Two pannels kept back to back ) and glazed with 5mm
thick clear glass panes, neoprene and wooled beading, gaskets,
pop rivots, threaded bar with nut roller, flush bolt and approved
quality lock , door handle with cap nut. As per the members ,
sizes and details given in Drawing No:- AR/TYPE
PLAN/DOORS & WINDOWS/ 2010.07.07/DETAIL 08 - D18

Sliding Double Sash Door ( Fully Glazed ) with Fixed Glass


W 18
on Top
Natural aluminium double sash fully glazed sliding door with Sq.ft.
middle rail , fully glazed with 5mm thick clear glass panes,
neoprene and wooled beading, gaskets, pop rivots, threaded bar
with nut roller, flush bolt and approved quality lock , door
handle with cap nut. As per the members , sizes and details
given in Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/ 2010.07.07/DETAIL 08 - D19

Openable Single Sash Door for Toilets ( with Aluminium


W 19
Sheet )

Natural aluminium single sash butt hinged openable door with Sq.ft.
middle rail and gauge 24 aluminium sheet, neoprene and wooled
beading, gaskets, pop rivots, threaded bar with nut and approved
quality lock, butt hinges, door handle with cap nut. As per the
members , sizes and details given in Drawing No:- AR/TYPE
PLAN/DOORS & WINDOWS/2010.07.07/ DETAIL 04 - D20

Windows

W 20 Casement Window with Louvers on Top ( 1 Bay )

Engineering organization, W.P. Page 799 BSR 2012


ITEM DESCRIPTION UNIT RATE
Natural aluminium casement window single sash with louvers on Sq.ft.
top, consisting of 5mm thick clear glass panes, casement lock,
pull rings , screws, pop rivots, gaskets, hinges, weather strip
etc.As per the members , sizes and details given in Drawing No:-
AR/TYPE PLAN/DOORS & WINDOWS/ 2010.07.07/DETAIL
09 - W1

Engineering organization, W.P. Page 800 BSR 2012


ITEM DESCRIPTION UNIT RATE

W 21 Casement Window with Fixed Glass on Top ( 1 Bay )

Natural aluminium casement window single sash with fixed Sq.ft.


glass on top, consisting of 5mm thick clear glass panes,
casement lock, screws, pop rivots, gaskets, hinges, weather strip
etc.As per the members , sizes and details given in Drawing No:-
AR/TYPE PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL
09 - W2

W 22 Casement Window ( 1 Bay )

Natural aluminium casement window single sash , consisting of Sq.ft.


5mm thick clear glass panes, casement lock, screws, pop rivots,
gaskets, hinges, weather strip etc.As per the members , sizes and
details given in Drawing No:- AR/TYPE PLAN/ DOORS &
WINDOWS/2010.07.07/DETAIL 09 - W3

W 23 Casement Window with Louvers on Top ( 2 Bays )

Natural aluminium casement window double sash with louvers Sq.ft.


on top, consisting of 5mm thick clear glass panes, casement
lock, screws, pop rivots, gaskets, hinges, weather strip etc.As per
the members , sizes and details given in Drawing No:-
AR/TYPE PLAN/ DOORS & WINDOWS/2010.07.07/ DETAIL
10 - W4

W 24 Casement Window with Fixed Glass on Top ( 2 Bays )

Natural aluminium casement window double sash with fixed Sq.ft.


glass on top, consisting of 5mm thick clear glass panes,
casement lock, screws, pop rivots, gaskets, hinges, weather strip
etc.As per the members , sizes and details given in Drawing No:-
AR/TYPE PLAN/ DOORS & WINDOWS/2010.07.07/ DETAIL
10 - W5

W 25 Casement Window ( 2 Bays )

Natural aluminium casement window double sash , consisting of Sq.ft.


5mm thick clear glass panes, casement lock, screws, pop rivots,
gaskets, hinges, weather strip etc. As per the members , sizes
and details given in Drawing No:- AR/TYPE PLAN/ DOORS &
WINDOWS/2010.07.07/ DETAIL 10 - W6

Engineering organization, W.P. Page 801 BSR 2012


ITEM DESCRIPTION UNIT RATE

Engineering organization, W.P. Page 802 BSR 2012


ITEM DESCRIPTION UNIT RATE

W 26 Sliding Window with Louvers on Top ( 2 Bays )

Natural aluminium sliding window with louvers on top Sq.ft.


consisting of 5mm thick clear glass panes , lock, roller, screws,
gaskets, nut felt, pop rivots, cap, plastic guide etc. As per the
members , sizes and details given in Drawing No:- AR/TYPE
PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL 11 - W7

W 27 Sliding Window with Fixed Glass on Top ( 2 Bays )

Natural aluminium sliding window with fixed glass on top Sq.ft.


consisting of 5mm thick clear glass panes , lock, roller, screws,
gaskets, nut felt, pop rivots, cap, plastic guide etc. As per the
members , sizes and details given in Drawing No:- AR/TYPE
PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL 11 - W8

W 28 Sliding Window ( 2 Bays )

Natural aluminium sliding window ,consisting of 5mm thick Sq.ft.


clear glass panes , lock, roller, screws, gaskets, nut felt, pop
rivots, cap, plastic guide etc. As per the members , sizes and
details given in Drawing No:- AR/ TYPE PLAN/ DOORS &
WINDOWS/ 2010.07.07/ DETAIL 11 - W9

W 29 Casement Window with Louvers on Top ( 3 Bays )

Natural aluminium casement window with louvers on top, Sq.ft.


consisting of 5mm thick clear glass panes, casement lock,
screws, pop rivots, gaskets, hinges, weather strip etc.As per the
members , sizes and details given in Drawing No:- AR/ TYPE
PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL 12 - W10

W 30 Casement Window with Fixed Glass on Top ( 3 Bays )

Engineering organization, W.P. Page 803 BSR 2012


ITEM DESCRIPTION UNIT RATE
Natural aluminium casement window with fixed glass on top, Sq.ft.
consisting of 5mm thick clear glass panes, casement lock,
screws, pop rivots, gaskets, hinges, weather strip etc.As per the
members , sizes and details given in Drawing No:- AR/ TYPE
PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL 12 - W11

Engineering organization, W.P. Page 804 BSR 2012


ITEM DESCRIPTION UNIT RATE

W 31 Casement Window ( 3 Bays )

Natural aluminium casement window, consisting of 5mm thick Sq.ft.


clear glass panes, casement lock, screws, pop rivots, gaskets,
hinges, weather strip etc. As per the members , sizes and details
given in Drawing No:- AR/ TYPE PLAN/DOORS &
WINDOWS/ 2010.07.07/ DETAIL 12 - W12

W 32 Sliding Window with Louvers on Top ( 3 Bays )

Natural aluminium sliding window with louvers on top Sq.ft.


consisting of 5mm thick clear glass panes , lock, roller, screws,
gaskets, nut felt, pop rivots, cap, plastic guide etc. As per the
members , sizes and details given in Drawing No:- AR/ TYPE
PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL 13 - W13

W 33 Sliding Window with Fixed Glass on Top ( 3 Bays )

Natural aluminium sliding window with fixed glass on top Sq.ft.


consisting of 5mm thick clear glass panes , lock, roller, screws,
gaskets, nut felt, pop rivots, cap, plastic guide etc. As per the
members , sizes and details given in Drawing No:- AR/ TYPE
PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL 13 - W14

W 34 Sliding Window ( 3 Bays )

Natural aluminium sliding window ,consisting of 5mm thick Sq.ft.


clear glass panes , lock, roller, screws, gaskets, nut felt, pop
rivots, cap, plastic guide etc. As per the members , sizes and
details given in Drawing No:- AR/ TYPE PLAN/DOORS &
WINDOWS/ 2010.07.07/ DETAIL 13 - W15

Top Hung Casement Window with Fixed Louvers on Top &


W 35
Fixed Glass at Bottom (3 Bays )
Natural aluminium top hung casement window with fixed glass Sq.ft.
on top and fixed glass at bottom, consisting of 5mm thick clear
glass panes, casement lock, screws, pop rivots, gaskets, hinges,
weather strip etc.As per the members , sizes and details given in
Drawing No:- AR/ TYPE PLAN/DOORS & WINDOWS/
2010.07.07/ DETAIL 14 - W16

Engineering organization, W.P. Page 805 BSR 2012


ITEM DESCRIPTION UNIT RATE

Engineering organization, W.P. Page 806 BSR 2012


ITEM DESCRIPTION UNIT RATE

Top Hung Casement Window with Fixed Louvers on Top &


W 36
Fixed Glass at Bottom (2 Bays )

Natural aluminium top hung casement window with fixed glass Sq.ft.
on top and fixed glass at bottom, consisting of 5mm thick clear
glass panes, casement lock, screws, pop rivots, gaskets, hinges,
weather strip etc.As per the members , sizes and details given in
Drawing No:- AR/ TYPE PLAN/DOORS & WINDOWS/
2010.07.07/ DETAIL 14 - W17

W 37 Casement Window with Louvers on Top ( 4 Bays )

Natural aluminium casement window with louvers on top, Sq.ft.


consisting of 5mm thick clear glass panes, casement lock,
screws, pop rivots, gaskets, hinges, weather strip etc.As per the
members , sizes and details given in Drawing No:- AR/ TYPE
PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL 15 - W18

W 38 Casement Window with Fixed Glass on Top ( 4 Bays )

Natural aluminium casement window with fixed glass on top, Sq.ft.


consisting of 5mm thick clear glass panes, casement lock,
screws, pop rivots, gaskets, hinges, weather strip etc.As per the
members , sizes and details given in Drawing No:- AR/ TYPE
PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL 15 - W19

W 39 Louver Panel 1

Natural aluminium framed lovers, consisting of screws, pop Sq.ft.


rivots, etc. As per the members , sizes and details given in
Drawing No:- AR/ TYPE PLAN/DOORS & WINDOWS/
2010.07.07/ DETAIL 16 - W20

W 40 Louver Panel 2

Natural aluminium framed lovers, consisting of screws, pop Sq.ft.


rivots, etc. As per the members , sizes and details given in
Drawing No:- AR/ TYPE PLAN/DOORS & WINDOWS/
2010.07.07/ DETAIL 16 - W21

Engineering organization, W.P. Page 807 BSR 2012


ITEM DESCRIPTION UNIT RATE

W 41 Top Hung Fanlight with Lover panel on top

Natural aluminium top hung type fanlight with louver on top Sq.ft.
consisting of locks, screws, pop rivots, gaskets, hinges, weather
strip etc. As per the members , sizes and details given in
Drawing No:- AR/ TYPE PLAN/DOORS & WINDOWS/
2010.07.07/ DETAIL 17 - FL1

W 42 Top Hung Fanlight with Fixed Glass on top

Natural aluminium top hung type fanlight with fixed glass on top Sq.ft.
consisting of locks, screws, pop rivots, gaskets, hinges, weather
strip etc. As per the members , sizes and details given in
Drawing No:- AR/ TYPE PLAN/DOORS & WINDOWS/
2010.07.07/ DETAIL 17 - FL2

W 43 Centre Pivot Fanlight with Lover panel on top

Natural aluminium centre pivot type fanlight with louver on top Sq.ft.
consisting of locks, screws, pop rivots, gaskets, hinges, weather
strip etc. As per the members , sizes and details given in
Drawing No:- AR/ TYPE PLAN/DOORS & WINDOWS/
2010.07.07/ DETAIL 17 - FL3

W 44 Top Hung Fanlight with Fixed Glass on top

Natural aluminium centre pivot type fanlight with fixed glass on Sq.ft.
top consisting of locks, screws, pop rivots, gaskets, hinges,
weather strip etc. As per the members , sizes and details given
in Drawing No:- AR/ TYPE PLAN/DOORS & WINDOWS/
2010.07.07/ DETAIL 17 - FL4

W 45 Top Hung Fanlight ( 3 bays )

Natural aluminium top hung type fanlight 3 bays, consisting of Sq.ft.


locks, screws, pop rivots, gaskets, hinges, weather strip etc. As
per the members , sizes and details given in Drawing No:- AR/
TYPE PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL 18
- FL5

W 46 Top Hung Fanlight ( 2 Bays + 1 Bay )

Engineering organization, W.P. Page 808 BSR 2012


ITEM DESCRIPTION UNIT RATE
Natural aluminium top hung type fanlight 2 bays + 1 bay, Sq.ft.
consisting of locks, screws, pop rivots, gaskets, hinges, weather
strip etc. As per the members , sizes and details given in
Drawing No:- AR/ TYPE PLAN/DOORS & WINDOWS/
2010.07.07/ DETAIL 18 - FL6

Fixed Glazed Window

W 47 Natural aluminium fixed glaxed window with 5mm thick clear Sq.ft.
glass and screws, pop rivots, gasket and wool felt etc.

Engineering organization, W.P. Page 809 BSR 2012


ITEM DESCRIPTION UNIT RATE

Partitions

Fully Board Partition with Emboss Decorative Plywood

W 48 Natural aluminium partition frame top and bottom with 2.5mm Sq.ft.
thick emboss laminated plywood boarding both side kept back to
back ( Total thickness 5mm ) with necessary pop rivots, gasket
and GI channels & etc. work complete in order.

W 49 Natural aluminium partition frame top and bottom with 3mm Sq.ft.
thick emboss decorative plywood boarding both side kept back
to back ( Total thickness 6mm ) with necessary pop rivots,
gasket and GI channels & etc. work complete in order.

Full Board Partition with Aluminium Composite Panel

W 50 Natural aluminium partition frame top and bottom with 4mm Sq.ft.
thick pvdf coated aluminium composite both side kept back to
back ( Total thickness 8mm ) with necessary pop rivots, gasket
and GI channels & etc. work complete in order.

W 51 Natural aluminium partition frame top and bottom with 4mm Sq.ft.
thick polyester coated aluminium composite both side kept back
to back ( Total thickness 8mm ) with necessary pop rivots,
gasket and GI channels & etc. work complete in order.

Glazed & Board Partition with Emboss Decorative Plywood


& 5mm Tinted Glass

W 52 Natural aluminium partition frame top part with 5mm thick clear Sq.ft.
glass and bottom part with 2.5mm thick emboss laminated
plywood boarding both side kept back to back ( Total thickness
5mm ) with necessary pop rivots, gasket and GI channels & etc.
work complete in order.

W 53 Natural aluminium partition frame top part with 5mm thick clear Sq.ft.
glass and bottom part with 3mm thick emboss decorative
plywood boarding both side kept back to back ( Total thickness
6mm ) with necessary pop rivots, gasket and GI channels & etc.
work complete in order.

Engineering organization, W.P. Page 810 BSR 2012


ITEM DESCRIPTION UNIT RATE
W 54 Natural aluminium partition frame top & bottom part with Sq.ft.
2.5mm thick emboss laminated plywood boarding both side kept
back to back ( Total thickness 5mm ) and middle part with 5mm
thick clear glass with necessary pop rivots, gasket and GI
channels & etc. work complete in order.

W 55 Natural aluminium partition frame top & bottom part with 3mm Sq.ft.
thick emboss decorative plywood boarding both side kept back
to back ( Total thickness 6mm ) and middle part with 5mm thick
clear glass with necessary pop rivots, gasket and GI channels &
etc. work complete in order.

Fully Glazed Partition with 5mm Tinted Glass

W 56 Natural aluminium partition frame top and bottom with 5mm Sq.ft.
thick tinted glass with necessary pop rivots, gasket & etc. work
complete in order.

Gypsum Board Partition

W 57 Fabricating and installing gypsum board partitioning with Sq.ft.


necessary GI channel member frame work fixed on to wall and
floors and 9mm thick gypsum board fixed to both sides of the
frame work all completed with board joints taped and finished
with gypsum compound to get wall finish. Rate to include for
applying one coat of Acrylic filler to boards.

Partition Doors

Fully Board Partition Doors with Emboss Decorative


Plywood
W 58 Natural aluminium single sash butt hinged openable door with Sq.ft.
middle rail and fully panelling with 3mm thick emboss
decorative plywood on both sides ( Two pannels kept back to
back ), neoprene and wooled beading, gaskets, pop rivots,
threaded bar with nut and approved quality lock, butt hinges,
door handle with cap nut. As per the members , sizes and details
given in Drawing No:- AR/TYPE PLAN/DOORS &
WINDOWS/ 2010.07.07/ DETAIL 19 - D21

Engineering organization, W.P. Page 811 BSR 2012


ITEM DESCRIPTION UNIT RATE
W 59 Natural aluminium single sash sliding door with middle rail and Sq.ft.
fully panelling with 3mm thick emboss decorative plywood on
both sides ( Two pannels kept back to back ), neoprene and
wooled beading, gaskets, pop rivots, threaded bar with nut, flush
bolts, rollers and approved quality lock, door handle with cap
nut. As per the members , sizes and details given in Drawing
No:- AR/TYPE PLAN/DOORS & WINDOWS/ 2010.07.07/
DETAIL 19 - D22

Glazed & Board Partition Doors with Emboss Decorative


Plywood
W 60 Natural aluminium single sash butt hinged openable door with Sq.ft.
middle rail , panelling with 3mm thick emboss decorative
plywood on both sides ( Two pannels kept back to back ) and
glazed with 5mm thick clear glass panes, neoprene and wooled
beading, gaskets, pop rivots, threaded bar with nut and approved
quality lock, butt hinges, door handle with cap nut. As per the
members , sizes and details given in Drawing No:- AR/TYPE
PLAN/DOORS & WINDOWS/2010.07.07/ DETAIL 19 - D23

W 61 Natural aluminium single sash sliding door with middle rail Sq.ft.
middle rail , panelling with 3mm thick emboss decorative
plywood on both sides ( Two pannels kept back to back ) and
glazed with 5mm thick clear glass panes, neoprene and wooled
beading, gaskets, pop rivots, threaded bar with nut, flush bolts,
rollers and approved quality lock, door handle with cap nut. As
per the members , sizes and details given in Drawing No:-
AR/TYPE PLAN/DOORS & WINDOWS/ 2010.07.07/ DETAIL
19 - D24

Door Pull Handle

W 62 Supplying and fixing " Hexzagon type "stainless steel door pull Nr.
handle fixed complete to working order.(12" )

Floor Hinge

W 63 Supplying & fixing heavy duty floor hinge of Union Brand & Nr.
Model no. - 8300 or approved equivalent with one year written
warranty from authorized agent.

Door closer

Engineering organization, W.P. Page 812 BSR 2012


ITEM DESCRIPTION UNIT RATE
W 64 Supplying & fixing heavy duty door closer of Union Brand & Nr.
Model no. - 8573 or approved equivalent.***This is necessary
where floor hinge used.

CEINING

W 65 Supply and installation of Concealed type metal false ceiling of Sq.ft.


600mm x 600mm out of 0.5mm average thickness epoxy powder
painted steel sheets ( Paint film thickness of average 80
microns ) suspended to the roof frame work with hot dip
galvanized " T " bars of 14mm x 38mm and wall angles of
19mm x 24mm suspended with 4mm dia. galvanized hanger
rods.

W 66 Supply and installation of Exposed grid type metal false ceiling Sq.ft.
of 600mm x 600mm out of 0.5mm average thickness epoxy
powder painted steel sheets ( Paint film thickness of average 80
microns ) suspended to the roof frame work with hot dip
galvanized " T " bars of 14mm x 38mm and wall angles of
19mm x 24mm suspended with 4mm dia. galvanized hanger
rods.

Engineering organization, W.P. Page 813 BSR 2012


ITEM DESCRIPTION UNIT RATE

IRON GRILL

W 67 Supply , fabrication and installation of welded Diamond shaped Sq.ft.


Iron grill, consisting 20mm x 6mm thick flat iron frame and
5mm dia M.S. rods at 3" centers to form 3" x 6" diamond shape
grill. Rate shall include for fixing with No.10, 1" counter sunk
iron screws and application of two coats of Anti- Corrosive
paint. (Based on 2'-0"x4'-0" area) Details as per the Drawing
No:- AR/DETAIL DRG/2011/08/22- Type 1

W 68 Supply , fabrication and installation of welded Diamond shaped Sq.ft.


iron grill, consisting 20mm x 6mm thick flat iron frame,
mullions and isolated mid rails without intermediate joints, 5mm
dia. M.S. rods welded to form 3" x 6" diamond shaped isolated
panels. Rate shall include for fixing with No.10, 1" counter sunk
iron screws and application of two coats of Anti-Corrosive paint.
(Based on 9'-0"x6'-0" area) Details as per the Drawing No:-
AR/DETAIL DRG/2011/08/22- Type 2

W 69 Supply , fabrication and installation of welded openable Iron Sq.ft.


grill door and fixed Iron grill to window. The door frame
fabricated with 38mm x 38mm x 6mm thick angle iron to an
over-all size of 3'-0" x 9"-0" high inclusive of 2'-3" high Iron
grill on top formed with 5mm dia. m.s.rods welded to form 3" x
6" diamond shape. Door sash outer frame fabricated with 25mm
x 25mm x 3mm thick hollow sections and two cross members,
top part of the sash fixed with 5mm dia. m.s.rods welded to form
3" x 6" diamond shape and bottom part fixed with gauge 22 G.I.
sheet, sash fixed to the frame with 3 No. 4" x 3" M.S. butt
hinges and locking arrangement comparising of a Iron tower bolt
and Hasp & plate. The fixed window grill fabricated with 20mm
x 6mm thick flat iron outer frame and two mullions, 5mm dia.
m.s.rods welded to form 3" x 6" diamond shape, All details as
per Drawing No:- AR/DETAIL DRG/2011/08/22- Type 3 Rate
shall include the formation of 9" x 9" x 6" holes to insert the
door frame legs filled with grade 20 concrete , application of two
coats of anti-corrosive paint and one coat of enamel paint.

Engineering organization, W.P. Page 814 BSR 2012


ITEM DESCRIPTION UNIT RATE
W 69a Supply , fabrication and installation of welded openable Iron Sq.ft.
grill door without window. The door frame fabricated with
38mm x 38mm x 6mm thick angle iron to an over-all size of 3'-
0" x 9"-0" high inclusive of 2'-3" high Iron grill on top formed
with 5mm dia. m.s.rods welded to form 3" x 6" diamond shape.
Door sash outer frame fabricated with 25mm x 25mm x 3mm
thick hollow sections and two cross members, top part of the
sash fixed with 5mm dia. m.s.rods welded to form 3" x 6"
diamond shape and bottom part fixed with gauge 22 G.I. sheet,
sash fixed to the frame with 3 No. 4" x 3" M.S. butt hinges and
locking arrangement comparising of a Iron tower bolt and Hasp
& plate. All details as per Drawing No:- AR/DETAIL
DRG/2011/08/22- Type 3 Rate shall include the formation of 9"
x 9" x 6" holes to insert the door frame legs filled with grade 20
concrete , application of two coats of anti-corrosive paint and
one coat of enamel paint.

W 70 Welded Iron grill of rectangular pattern , consisting of a flat Iron Sq.ft.


frame of 25mm x 6mm thick with out intermediate joints, 2 nos
of 25mm x 6mm thick horizontal members , 12mm dia. M.S.
round bars as vertical members @ 4" c/c , vertical round bars to
be drilled through horizontal flat Irons, fixed complete with
counter sunk screws and rawl plugs to the masonry opening or
timber. Rate shall include for applying two coats of anti-
corrosive paint and two coats of enamal paint. ( for window
openings of size 2'-0" x 4'-0" ). Details as per the Drawing No:-
AR/DETAIL DRG/2010/01/10 & Sheet No. 05

COLLAPSIBLE DOOR

W 71 Fabricating and Installation of open type collapsible Iron door Sq.ft.


consisting with 20mm x 6mm flat iron codling cover and
necessary screws, etc.. Rate shall include for applying two coats
of anti-corrosive paint.

ROLLER SHUTTERS & ROLLER DOORS

W 72 Supply and fixing natural aluminium roller shutter consisting Sq.ft.


aluminium slats to the thickness of 1.2mm, centre bar, pulleys,
side plate with the racers, fabricating the mechanical box with
M.S. square tubes and covering the box and fixing on site with
the bottom bars and necessary U channels. ( Approx. Size: 10'-6"
width x 9'-8" high )

Engineering organization, W.P. Page 815 BSR 2012


ITEM DESCRIPTION UNIT RATE
W 73 Supply and fixing powder coated zink alum roller doors Sq.ft.
consisting heavy duty powder coated aluminium slats bearing a
thickness of 1.2mm and height of the slat to be 83mm, centre
bar, pulleys, springs, dust seal, nylon strip, side plate with the
racers & work complete in order.

W 74 Supply and fixing the motor with two remotes for the roller Item
shutter & roller door.

Engineering organization, W.P. Page 816 BSR 2012


ITEM DESCRIPTION UNIT RATE

MILD STEEL BALUSTRADE

W 75 Supplying , fabricating & fixing mild steel and timber hand L.ft.
rail, consisting of 16mm M.S. round bars @ 4" c/c as
vertical members fixed to steps with the 8" x 1 1/2" x
12mm thick M.S. plate connecting with 2 nos of 10mm
anchor bolts, 4" x 2" approved timber rail fixed to 30mm x
6mm flat iron aling to the stair & 20mm x 6mm flat iron as
the horizontal members to connecting the two vertical
members finished smooth and work complete in order with
necessary nuts & bolts. Rate Shall include for applying two
coats of anti-corrosive paint and two coats of enamel paints.
All sizes & details as per Drawing No:- AR/DETAIL
DRG/2010/01/10 & Sheet No. 03 - Type 1-A

W 76 Supplying , fabricating & fixing mild steel and timber hand L.ft.
rail, consisting of 16mm M.S. round bars @ 4" c/c as
vertical members fixed to steps with the 8" x 1 1/2" x
12mm thick M.S. plate connecting with 2 nos of 10mm
anchor bolts, 4" x 2" approved timber decorative rail fixed
to 30mm x 6mm flat iron aling to the stair & 20mm x 6mm
flat iron as the horizontal members to connecting the two
vertical members finished smooth and work complete in
order with necessary nuts & bolts. Rate Shall include for
applying two coats of anti-corrosive paint and two coats of
enamel paints. All sizes and details as per Drawing No:-
AR/DETAIL DRG/2010/01/10 & Sheet No. 03 - Type 1-B

W 77 Supplying , fabricating & fixing GI pipe hand rail, L.ft.


consisting of 2" dia. GI pipe as hand rail and 3/4" dia. GI
pipes @ 11" c/c as vertical members fixed to steps with the
4" x 1 1/2" x 12mm thick M.S. plate connecting with 2 nos
of 10mm anchor bolts, work complete in order with
necessary nuts & bolts. Rate Shall include for applying two
coats of anti-corrosive paint and two coats of enamel paints.
All sizes and details as per Drawing No:- AR/DETAIL
DRG/2010/01/10 & Sheet No. 04 - Type 2

Engineering organization, W.P. Page 817 BSR 2012


ITEM DESCRIPTION UNIT RATE
W 78 Supplying , fabricating & fixing GI pipe hand rail top of the L.ft.
9" thick brick wall ( Brick work measured separately )
consisting of 2" dia. GI pipe as hand rail and fixed to wall
with 30mm x 6mm flat iron @ 18" c/c work complete in
order. Rate Shall include for applying two coats of anti-
corrosive paint and two coats of enamel paints. All sizes
and details as per Drawing No:- AR/DETAIL
DRG/2010/01/10 & Sheet No. 04 - Type 3

W 79 Fabricate, supply and fix stainless steel pipe hand rail at L.ft.
staircase comprising 1 1/4" dia. uprights at 1'-0" c/c, 2" dia.
top rail and 1" dia. middle rail. Uprights fixed to steps
with 100 x 100 x 8mm thick S.S. base plate with 8mm dia.
S.S. nuts and bolts complete as per working order.

Y - STRUCTURAL STEEL WORK


Y 01 Supplying and fixing 50mm x 50mm x 6mm thick angle iron L.ft.
purling at maximum spacing of 4'-0" centers upto maximum
span of 10'-0" including nuts, necessary bolds & washers etc.
and application of two coats of Anti-Corrosive paint.

Y 02 Supplying and fixing 65mm x 65mm x 6mm thick angle iron L.ft.
purling at maximum spacing of 4'-0" centers maximum span of
11'-0" (not less than 10'-0") for a asbestos purling roof without
covering tiles on top. Rate shall include for necessary nuts,
bolds & washers,etc. and applying two coats of Anti-Corrosive
paint.

Y 03 Supplying and fixing 75mm x 75mm x 6mm thick angle iron L.ft.
purling at maximum spacing of 4'-0" centers maximum span of
12'-0" (not less than 11'-0") for a asbestos purling roof without
covering tiles on top. Rate shall include necessary nuts, olds &
washers etc, and applying two coats of Anti -Corrosive paint.

Y 04 Supplying and fixing 100mm x 50mm x 6mm thick channel Iron L.ft.
purling up to 14'-0" span at 4'-0" c/c. Rate shall include for
applying two coats of anti-corrosive paint.

Y 05 Supplying and fixing 125mm x 65mm x 6mm thick channel Iron L.ft.
purling up to 16'-0" span at 4'-0" c/c. Rate shall include for
applying two coats of anti-corrosive paint.

Y 06 Supplying and fixing 150mm x 75mm x 6mm thick channel Iron L.ft.
purling up to 18'-0" span at 4'-0" c/c. Rate shall include for
applying two coats of anti-corrosive paint.

Engineering organization, W.P. Page 818 BSR 2012


ITEM DESCRIPTION UNIT RATE
Y 07 Supply, installation and fixing of angle iron sleepers over the L.ft.
walls to support purlins formed with 50mm x 50mm x 6mm
thick angles welded back to back with 75mm x 50mm x 10mm
thick seperators @ 2'-0" c/c, fixed to the concrete pad laid on the
wall with 9" x 6" x 10mm thick base plate and 2 No. 10mm dia.
bolts @ 6'-0" c/c. Rate shall include for applying two coats of
anti-corrosive paint and one coat of enamel paint.

Y 08 Supply, installation and fixing of angle iron sleepers over the L.ft.
walls to support purlins formed with 65mm x 65mm x 6mm
thick angles welded back to back with 75mm x 65mm x 10mm
thick seperators @ 2'-0" c/c, fixed to the concrete pad laid on the
wall with 9" x 6" x 10mm @ 6'-0" c/c. thick base plate and 2 No.
10mm dia. bolts. Rate shall include for applying two coats of
anti-corrosive paint and one coat of enamel paint.

Y 09 Supply, installation and fixing of angle iron sleepers over the L.ft.
walls to support purlins formed with 75mm x 75mm x 6mm
thick angles welded back to back with 75mm x 75mm x 10mm
thick seperators @ 2'-0" c/c, fixed to the concrete pad laid on the
wall with 9" x 6" x 10mm thick base plate @ 6'-0" c/c.and 2 No.
10mm dia. bolts. Rate shall include for applying two coats of
anti-corrosive paint and one coat of enamel paint.

Mild steel Roof truss

Y 10 Mild steel Roof truss for Calicut tile roofing 20'-0" (6.0m) span Nr.
centre to centre, Maximum spacing 10'-0" , 25 0 pitch maximum
and 180 pitch minimum, with 4'-0" wide eaves at both sides.
Consisting of 2 Nos. 50mm x 50mm x 6mm thick angles as top
and bottom chords, 1 No. 50mm x 50mm x 6mm thick angles as
struts & ties, 10mm thick gusset plates, base plates & sole
plates, mild steel rag bolts, purling cleats, etc.. & all details as
per the Drawing No:- WP/TYPE/STR/2011/RT1. Rate shall
include for fabricating , transporting , hoisting , fixing in
position and applying two coats of Zinc Phosphate paint.

Engineering organization, W.P. Page 819 BSR 2012


ITEM DESCRIPTION UNIT RATE
Y 11 Mild steel Roof truss for Asbestos roofing 20'-0" (6.0m) span Nr.
centre to centre, Maximum spacing 10'-0", 12 0 pitch with 4'-0"
wide eaves at both sides. Consisting of 2 Nos. 50mm x 50mm x
6mm thick angles as top and bottom chords, 1 No. 50mm x
50mm x 6mm thick angles as struts & ties, 10mm thick gusset
plates, base plates & sole plates, mild steel rag bolts, purling
cleats, etc.. & all details as per the Drawing
No:-WP/TYPE/STR/2011/RT2. Rate shall include for
fabricating , transporting , hoisting , fixing in position and
applying two coats of Zinc Phosphate paint.

Y 12 Mild steel Roof truss for Calicut tile roofing 25'-0" (7.5m) span Nr.
centre to centre, Maximum spacing 10'-0", 25 0 pitch maximum
and 180 pitch minimum, with 4'-0" wide eaves at both sides.
Consisting of 2 Nos. 50mm x 50mm x 6mm thick angles as top
and bottom chords, 1 No. 50mm x 50mm x 6mm thick angles as
struts & ties, 10mm thick gusset plates, base plates & sole
plates, mild steel rag bolts, purling cleats, etc.. & all details as
per the Drawing No:- WP/TYPE/STR/2011/RT3. Rate shall
include for fabricating , transporting , hoisting , fixing in
position and applying two coats of Zinc Phosphate paint.

Y 13 Mild steel Roof truss for Asbestos roofing 25'-0" (7.5m) span Nr.
centre to centre, Maximum spacing 10'-0", 12 0 pitch with 4'-0"
wide eaves at both sides. Consisting of 2 Nos. 50mm x 50mm x
6mm thick angles as top and bottom chords, 1 No. 50mm x
50mm x 6mm thick angles as struts & ties, 10mm thick gusset
plates, base plates & sole plates, mild steel rag bolts, purling
cleats, etc.. & all details as per the Drawing
No:-WP/TYPE/STR/2011/RT4. Rate shall include for
fabricating , transporting , hoisting , fixing in position and
applying two coats of Zinc Phosphate paint.

Engineering organization, W.P. Page 820 BSR 2012


ITEM DESCRIPTION UNIT RATE
Y 14 Mild steel Roof truss for Calicut tile roofing 30'-0" (9.0m) span Nr.
centre to centre, Maximum spacing 10'-0", 25 0 pitch maximum
and 180 pitch minimum, with 4'-0" wide eaves at both sides.
Consisting of 2 Nos. 65mm x 65mm x 6mm thick angles as top
and bottom chords, 2 Nos. 50mm x 50mm x 6mm thick angles
as struts , 1 No. 65mm x 65mm x 6mm thick angles as ties,
10mm thick gusset plates, base plates & sole plates, mild steel
rag bolts, purling cleats, etc.. & all details as per the Drawing
No:- WP/TYPE/STR/2011/RT5. Rate shall include for
fabricating , transporting , hoisting , fixing in position and
applying two coats of Zinc Phosphate paint.

Y 15 Mild steel Roof truss for Asbestos roofing 30'-0" (9.0m) span Nr.
centre to centre, Maximum spacing 10'-0", 12 0 pitch, with 4'-0"
wide eaves at both sides. Consisting of 2 Nos. 65mm x 65mm x
6mm thick angles as top and bottom chords, 2 Nos. 50mm x
50mm x 6mm thick angles as struts , 1 No. 65mm x 65mm x
6mm thick angles as ties, 10mm thick gusset plates, base plates
& sole plates, mild steel rag bolts, purling cleats, etc.. & all
details as per the Drawing No:- WP/TYPE/STR/2011/RT6. Rate
shall include for fabricating , transporting , hoisting , fixing in
position and applying two coats of Zinc Phosphate paint.

Steel Scaffolding Set

Y 16 Supplying and erecting steel scaffolding sets. Rate to include for Set per day
dismantling same after completion of work.

Zinc Alum Roofing

Y 17 Supplying and fixing zinc aluminium color bond standard ridge L.ft.
cap to existing sheet roof using new fasteners.

Y 18 Supply and fix proprietary coated zincalum gutter (minimum L.ft.


base metal thickness of sheet 0.4mm and minimum total
thickness 0.47mm) complete with end caps, running joints etc.
All joints to be properly connected with an adequate side laps
not less than 225mm length and with sealant to ensure water
tightness along the entire length of the gutter and including angle
iron gutter brackets 25mm x 25mm x 3mm at 450mm centers
with an adequate slope as directed and including application of
two coats of each anticorrosive paint and enamel paint to all
steel surfaces to match the gutter fix in position.( Inner size of
150mm x 175mm )

Engineering organization, W.P. Page 821 BSR 2012


ITEM DESCRIPTION UNIT RATE
Y 19 Supply and fix proprietary coated zincalum square down pipe L.ft.
(minimum base metal thickness of sheet 0.40mm and minimum
total thickness 0.47mm) complete with necessary socket , elbow
& bend. All joints to be properly connected and with sealant to
ensure water tightness along the entire length. Down pipe
brackets @ 1.0m c/c .

Y 20 Color bonded wall cladding 0.40mm thick fixed to external wall Sq.ft.
boxed out at down pipes including sills, flashing, removable
sections at access points such as cleaning eyes etc. completely
covering the surface as directed by the Engineer.

Y 21 Supply and fix Composite wall clading of 0.4mm thickness Sq.ft.


including inner frame work to vertical walls up to 30'-0". Rate
shall include for scaffolding.

Y 22 Supply and lay 3mm thick double sided aluminium foil heat Sqr.
reflecting material to underside of roof, supported with Gauge
18, 3" x 3" GI mesh and complete to working order. Rate shall
include for scaffolding.

Y 23 Supply and fix zinc alum profile roofing sheet (minimum base Sqr.
metal thickness of 0.4mm) and minimum thickness of 0.47mm,
laid on existing purlings with joints to be properly connected
with an adequate side lap to ensure water tightness along the
entire length and complete to working order.

Y 24 Supply and fixing high tensile Galvanized iron "C" channels of L.ft.
100 x 50 x 15 x 2.0mm thick

Y 25 Supply and fixing high tensile Galvanized iron "C" channels of L.ft.
125 x 60 x 20 x 2.0mm thick

Y 26 Supply and fixing high tensile Galvanized iron "C" channels of L.ft.
150 x 65 x 20 x 2.0mm thick

Z - MAINTANANCE WORK

Demolishing
Z 01 Demolishing reinforced cement concrete in suspended floors up Cube
to 4" thick , removing reinforcement and clearing debris.

Z 02 Demolishing cement concrete and clearing debris in floors from Cube


4" to 6" thick floors.

Z 03 Demolishing reinforced cement, concrete in lintol of 9" x 6" L.ft.


removing reinforcement and clearing debris.

Engineering organization, W.P. Page 822 BSR 2012


ITEM DESCRIPTION UNIT RATE
Z 04 Demolishing reinforced cement, concrete in lintol of 4 1/2"x 6" L.ft.
removing reinforcement and clearing debris.

Z 05 Demolishing brick piers, stacking brick and clearing debris Cube


away.

Z 06 Demolishing 9" thick brick walls stacking brick and clearing Cube
debris away.

Z 07 Demolishing 4 1/2" thick brick walls stacking brick and clearing Sqr.
debris away.

Z 08 Demolishing 3" thick brick paved floors and clearing debris Sqr.
away.

Z 09 Demolishing drains and clearing debris away. L.ft.

Z 10 Demolishing rubble masonry built in cement and sand, stacking Cube


rubble and clearing debris away.

Z 11 Demolishing floor tiles and clearing debris away. Sqr.

Z 12 Demolishing wall tiles and clearing debris away. Sqr.

Z 13 Chipping cement rendering and clearing debris away. Sqr.

Z 14 Chipping cement plastering and clearing debris away. Sqr.

Z 15 Chipping lime plastering and clearing debris away. Sqr.

Z 16 Chipping cement plaster in soffits and clearing debris away. Sqr.

Masonary work - Small Quantities Up to 1 Square


Z 17 4 1/2" thick brick work in cement and sand 1:5 up to a 1 square. Sqr.

Z 18 1/2" thick Rendering in cement and sand 1:3 up to a 1 square Sqr.


finished smooth with neat cement slurry and colour pigments.

Z 19 5/8" thick Plastering to walls in cement, lime or equivelent Sqr.


chemical product (Febmix) and sand 1:1:5 up to a 1 square
finished semi-rough with wooden float. (Sand to be seived).

Z 20 5/8" thick Plastering to walls in cement, lime or equivelent Sqr.


chemical product (Febmix) and sand 1:1:5 up to a 1 square
finished smooth with lime putty. (Sand to be seived).

Roof work

Engineering organization, W.P. Page 823 BSR 2012


ITEM DESCRIPTION UNIT RATE
Z 21 Removing and stacking calicut tile or half round tile from roof in Sqr.
single storied building.

Z 22 Removing and stacking calicut tile or half round tile from roof in Sqr.
two storied building.

Z 23 Removing and stacking calicut tile or half round tile from roof in Sqr.
three storied building.

Z 24 Removing and stacking corrugated asbestos sheet from roof in Sqr.


single storied building.

Z 25 Removing and stacking corrugated asbestos sheet from roof in Sqr.


two storied building.

Z 26 Removing and stacking corrugated asbestos sheet from roof in Sqr.


three storied building.

Z 27 Removing roof tiles/asbestos sheets and timber frame work, Sqr.


stacking serviceable materials and clearing debris away in single
storied building.

Z 28 Removing roof tiles/asbestos sheets and timber frame work, Sqr.


stacking serviceable materials and clearing debris away in two
storied building.

Z 29 Removing roof tiles/asbestos sheets and timber frame work, Sqr.


stacking serviceable materials and clearing debris away in three
storied building.

Z 30 Removing and stacking calicut ridge tile. L.ft

Z 31 Removing and stacking asbestos ridging. L.ft

Z 32 Removing 2" x 1" reepers , 2" x 2" battens ,stacking at site and L.ft
clearing debris away in single storied building.

Z 33 Removing 2" x 1" reepers , 2" x 2" battens ,stacking at site and L.ft
clearing debris away in two storied building.

Z 34 Removing 2" x 1" reepers , 2" x 2" battens ,stacking at site and L.ft
clearing debris away in three storied building.

Z 35 Removing 2" x 4" rafters , 4" x 3" wall plates , stacking at site L.ft
and clearing debris away in single storied building.

Z 36 Removing 2" x 4" rafters , 4" x 3" wall plates , stacking at site L.ft
and clearing debris away in two storied building.

Engineering organization, W.P. Page 824 BSR 2012


ITEM DESCRIPTION UNIT RATE
Z 37 Removing 2" x 4" rafters , 4" x 3" wall plates , stacking at site L.ft
and clearing debris away in three storied building.

Z 38 Removing 5" x 3" / 5" x 2" purlings , stacking at site and L.ft
clearing debris away in single storied building.

Z 39 Removing 5" x 3" / 5" x 2" purlings , stacking at site and L.ft
clearing debris away in two storied building.

Z 40 Removing 5" x 3" / 5" x 2" purlings , stacking at site and L.ft
clearing debris away in three storied building.

Z 41 Removing and stacking valance/Barge board materials and L.ft


clearing debris away in single storied building.

Z 42 Removing and stacking valance/Barge board materials and L.ft


clearing debris away in two storied building.

Z 43 Removing and stacking eaves gutter from roof of single storied L.ft
buildings.

Z 44 Removing and stacking eaves gutter from roof of two storied L.ft
building.

Z 45 Removing and stacking down pipes from roof of single storied L.ft
building.

Z 46 Removing and stacking down pipe from roof of two storied L.ft
building.

Z 47 Removing and stacking G.I. Valley gutter and flashing. L.ft

Z 48 Re-laying available calicut tiles on the roof in single storied Sqr.


building.

Z 49 Re-laying available calicut tiles on the roof in two storied Sqr.


building.

Z 50 Re-laying available calicut tiles on the roof in three storied Sqr.


building.

Z 51 Re-laying available asbestos sheets on the roof in single storied Sqr.


building.

Z 52 Re-laying available asbestos sheets on the roof in two storied Sqr.


building.

Z 53 Re-laying available asbestos sheets on the roof in three storied Sqr.


building.

Z 54 Fixing available Reepers with wire nails. L.ft

Engineering organization, W.P. Page 825 BSR 2012


ITEM DESCRIPTION UNIT RATE
Z 55 Fixing sorted out & cut to required size available timber to roof C.ft
or other carpentry work.

Z 56 Fixing available corrugated asbestos sheet with hooks , nuts and Sqr.
bolts to roofing.

Z 57 Supply and fixing hooks, nuts & bolts for existing asbestos roof. Nr.

Z 58 Ridge tile bedded in lime cement motor 1:1:4 and coloured to L.ft
match tiles.( Ridge tile available at site )

Z 59 Fixing of available barge/Valance boards & fascia including L.ft


cutting and minor repairs.

Z 60 Refixing existing G.I. Valley gutter and flashing including L.ft


making good.

Z 61 Fixing of existing gutter and down pipe with making goods and L.ft
including brackets.

Ceiling work
Z 62 Removing asbestos ceiling including timber frame work, Sqr.
stacking serviceable materials and clearing debris away in single
storied building.

Z 63 Removing asbestos ceiling including timber frame work, Sqr.


stacking serviceable materials and clearing debris away in two
storied building.

Z 64 Removing ceiling timber frame work,(with out asbestos sheet) Sqr.


stacking serviceable materiel and clearing debris away in single
storied buildings.

Z 65 Removing ceiling timber frame work,(with out asbestos sheet) Sqr.


stacking serviceable materiel and clearing debris away in two
storied buildings.

Z 66 Removing existing ceiling sheet stacking materials at the site Sqr.


and clearing debris away.

Z 67 Renewing in small quantities of 6" x 5/8" - 3/4" lunumidella L.ft


ceiling including scaffolding up to 30'-0" hight.

Z 68 Fixing available lunumidella ceiling planks with new wire nails. Sqr.

Engineering organization, W.P. Page 826 BSR 2012


ITEM DESCRIPTION UNIT RATE
Z 69 Supplying and fixing 1 1/2" x 1/2" thick Beading , Halmilla or L.ft.
equivalant, planning & chamfering complete with brass screws.

Doors & Windows


Z 70 Removing and stacking door sash only up to 40 S.ft from Nr.
existing walls.

Z 71 Removing and stacking door sash only over 40 S.ft from existing Nr.
walls.

Z 72 Removing and stacking door or window frame size up to 40 S.ft Nr.


from existing walls.

Z 73 Removing and stacking door or window frame size over 40 S.ft Nr.
from existing walls.

Z 74 Removing and stacking window sash only up to 40 S.ft from Nr.


existing walls.

Z 75 Removing and stacking window sash only over 40 S.ft from Nr.
existing walls.

Z 76 Removing and stacking trellis work Sq.ft.

Z 77 Removing and stacking glass panes in doors, windows and Sq.ft.


fanlights.

Z 78 Renewing in short lengths with approved timber in existing door L.ft.


or window frames .

Z 79 Door or window frame altering existing rebate fillet using Nr.


approved quality timber with screws and fixing available sashes.

Z 80 Fixing available door or window frame. Sq.ft.

Z 81 Fixing available door or window sash. Sq.ft.

Z 82 Removing damage sashes of door or window and preparing & Per sash
re-fixing.

Z 83 Supply and fixing Trellis work 1/2" x 1/2" laths with 2" apart Sq.ft.
diagonally, horizontally or vertically on existing timber framing.

Z 84 Supply and fixing 3mm thick glass panes for the existing door / Sq.ft.
window or fanlight sashes with approved timber beading.

Sanitary

Engineering organization, W.P. Page 827 BSR 2012


ITEM DESCRIPTION UNIT RATE
Z 85 Removing wash basin , sink or urinals including all fittings and Nr.
making walls good.

Z 86 Removing squatting pan & standing types water closet with Nr.
plugging sewer connection and reparing the wall & floor.

Z 87 Disconnecting flushing cistern and removing with plugging Nr.


water connection and making good of all damaged walls, floors
& etc.

Z 88 Removing 1/2" to 1 1/2" dia. bib tap or stop cock. Nr.

Z 89 Fixing available ball valve. Nr.

Z 90 Fixing lavatory type basin to existing brackets. ( Tap , waste Nr.


pipe and basin are available)

Z 91 Fixing of wash basin, leveling and connecting to existing water Nr.


connections and making good (Basin, bracket and fittings are
available)

Z 92 Repairing bib taps and stop cocks by fixing leather washers. Nr.

Z 93 Removing & repairing pillar tap and re-fixing to the wash basin Nr.
carefully without any damaged.

Z 94 Supply & fixing Universal bend of "Rocell" brand & model Nr.
"Vario Joint" or approved equivalent.

Painting

Z 95 Removing painting from walls and clearing debris away. Sqr.


Z 96 Removing enamel paint from door or window frame and Sqr.
clearing debris away.

Z 97 Removing paint from painted glass panes with caustic soda Sq.ft.
solution or other paint remover.

Z 98 Removing water proof treatment or hot bitumen from floors or Sqr


flat roof and clearing debris away.

Z 99 Painting ceiling beading with two coats of enamal paint. L.ft

Z 100 Painting existing ceiling fan with one coat of anti-corrosive paint Nr.
& two coats of enemel paint including removing corroded scale
and wire brushing.

Electrical

Engineering organization, W.P. Page 828 BSR 2012


ITEM DESCRIPTION UNIT RATE
Z 101 Supply & replacing one gang one way switch without wiring Nr.
including removing old one.

Z 102 Supply & replacing two gang one way switch without wiring Nr.
including removing old one.

Z 103 Supply & replacing three gang one way switch without wiring Nr.
including removing old one.

Z 104 Supply & replacing four gang one way switch without wiring Nr.
including removing old one.

Z 105 Supply & replacing five gang one way switch without wiring Nr.
including removing old one.

Z 106 Supply & replacing 5 Amp. Switch socket outlet without wiring Nr.
including removing old one.

Z 107 Supply & replacing 15 Amp. Switch socket outlet without wiring Nr.
including removing old one.

Z 108 Supply & replacing 13 Amp. Switch socket outlet without wiring Nr.
including removing old one.

Other

Z 109 Supplying and placing 4" dia.PVC (Type 250) wheep holes. L.ft

Z 110 Supplying and placing 2" dia.PVC (Type 400) wheep holes. L.ft

Z 111 Removing existing mortice lock repairing and re-fixing. Nr.

Z 112 Removing and stacking partitions at site including making good Sq.ft.
to walls & floors.

Transporting
Z 113 Transporting debris cleared away from site by tractor (approx.. Per Load
10 Miles away).

Z 114 Transporting debris cleared away from site by 3.5 Cubes Per Load
capacity heavy vehicle. Rate to inclusive of loading with JCB
machine (approx.. 20 Miles away).

Engineering organization, W.P. Page 829 BSR 2012


ITEM DESCRIPTION UNIT RATE

AA - MISCELLANEOUS

The following AA 01 & AA 02 items are exclusively for


estimating purposes for which a standard work norm is not
immediately available and at the same time it is impossible to
arrive at a realistic break-up of labour component involved
at the time of preparation of the estimate. The rate is not to
be used for engaging labourers on routine work and the
mere appearance of this rate on BSR is not a sanction to pay
the daily labourers at this rate. Skilness of the Craftman to
be verified by a trade test certificate at the time of
engagement.

Engaging special skilled labour services in the trades of fitter, Per 8 Hour
AA 01 electrician, welder, mason, carpenter, bar bender, painter on 8 day Per
hour day basis. Person

Per 8 Hour
Engaging labour services in un-skilled category of any type of
AA 02 day Per
manual work on a 8 hour day basis.
Person

Per 8 Hour
AA 03 Pumping water using 2" dia. water pump.
Day

P.V.C. Coated Chain Link Fence

AA 04 Supplying & fixing PVC coated G.I. chain link fence (2" x 2") of Sq.ft.
gauge 10 height of 8'-0" for GI pipe fixed with available 20mm
x 6mm flat iron ( GI pipe & flat iron measured separately)
complete with tension J bolts and tension cords.

AA 05 Supplying & fixing PVC coated G.I. chain link fence (2" x 2") of Sq.ft.
gauge 10 height of 10'-0" for GI pipe fixed with available 20mm
x 6mm flat iron ( GI pipe & flat iron measured separately)
complete with tension J bolts and tension cords.

AA 06 Supplying and fixing 2" dia.x 3.6mm thick Medium quality GI L.ft.
pipe 8'-0" clear height with excavation 1'-0"x 1'-0"x 3'-0" cement
concrete base 1:2:4 (3/4") with 1/2" dia. MS rods welded to
bottom of G.I. Pipe and drilling 7 Nos. holes to fixed the chain
link (chain link measured separately) and fiberglass coping on
top. Rate to include for application of one coat of anticorrosive
paint and two coats of enamel paint.

Engineering organization, W.P. Page 830 BSR 2012


ITEM DESCRIPTION UNIT RATE
AA 07 Supplying and fixing 2" dia.x 3.6mm thick Medium quality GI L.ft.
pipe 10'-0" clear height with excavation 1'-0"x 1'-0"x 3'-0"
cement concrete base 1:2:4 (3/4") with 1/2" dia. MS rods welded
to bottom of G.I. Pipe and drilling 7 Nos. holes to fixed the
chain link (chain link measured separately) and fiberglass coping
on top. Rate to include for application of one coat of
anticorrosive paint and two coats of enamel paint.

AA 08 Supplying and fixing 3" dia.x 4mm thick Medium quality GI L.ft.
pipe 8'-0" clear height with excavation 1'-0"x 1'-0"x 3'-0" cement
concrete base 1:2:4 (3/4") with 1/2" dia. MS rods welded to
bottom of G.I. Pipe and drilling 7 Nos. holes to fixed the chain
link (chain link measured separately) and fiberglass coping on
top. Rate to include for application of one coat of anticorrosive
paint and two coats of enamel paint.

AA 09 Supplying and fixing 3" dia.x 4mm thick Medium quality GI L.ft.
pipe 10'-0" clear height with excavation 1'-0"x 1'-0"x 3'-0"
cement concrete base 1:2:4 (3/4") with 1/2" dia. MS rods welded
to bottom of G.I. Pipe and drilling 7 Nos. holes to fixed the
chain link (chain link measured separately) and fiberglass coping
on top. Rate to include for application of one coat of
anticorrosive paint and two coats of enamel paint.

AA 10 Supplying and fixing 20mm x 6mm flat iron to existing GI pipe L.ft.
(GI pipe measured separately) to fix the chain link, Rate
inclusive of drilling 09 Nos. holes of 6mm dia. Rate to include
for application of one coat of anticorrosive paint and two coats
of enamel paint.

AA 11 Supplying and fixing 38mm x 38mm x 6mm angle iron L.ft.


horizontal bracings welded to existing GI pipes. Rate to include
for application of one coat of anticorrosive paint and two coats
of enamel paint.

AA 12 Supplying and fixing 1" dia. x 3.2mm thick GI pipe horizontal L.ft.
bracings welded to existing GI pipes. Rate to include for
application of one coat of anticorrosive paint and two coats of
enamel paint.

Barbed Wire Fence

AA 13 Supplying & fixing 14 gauge galvanized barbed wire 4 points, 3" L.ft.
apart on pre-cast concrete posts with hook bolts including
straining. ( Concrete Posts paid seperately)

Engineering organization, W.P. Page 831 BSR 2012


ITEM DESCRIPTION UNIT RATE
AA 14 Supplying & fixing pre-cast concrete Intermediate Posts of size Nr.
(5" x 5") - (3" x 3") & 5'-9" high for 7 strands including
necessary excavation and concreting at the placing.

AA 15 Supplying & fixing pre-cast concrete End Posts of size (5" x 5") Nr.
& 6'-3" high for 7 strands including necessary excavation and
concreting at the placing.

AA 16 Supplying & fixing pre-cast concrete Struts of size (5" x 4") - Nr.
(3" x 3") & 6'-5" high for 7 strands including necessary
excavation and concreting at the placing.

AA 17 Supplying & fixing pre-cast concrete Intermediate Posts of size Nr.


(5" x 5") - (3" x 3") & 6'-9" high for 8 strands including
necessary excavation and concreting at the placing.

AA 18 Supplying & fixing pre-cast concrete End Posts of size (5" x 5") Nr.
& 7'-3" high for 8 strands including necessary excavation and
concreting at the placing.

AA 19 Supplying & fixing pre-cast concrete Struts of size (5" x 4") - Nr.
(3" x 3") & 7'-5" high for 8 strands including necessary
excavation and concreting at the placing.

AA 20 Supplying & fixing pre-cast concrete Intermediate Posts of size Nr.


(5" x 5") - (3" x 3") & 7'-9" high for 9 strands including
necessary excavation and concreting at the placing.

AA 21 Supplying & fixing pre-cast concrete End Posts of size (5" x 5") Nr.
& 8'-3" high for 9 strands including necessary excavation and
concreting at the placing.

AA 22 Supplying & fixing pre-cast concrete Struts of size (5" x 4") - Nr.
(3" x 3") & 8'-5" high for 9 strands including necessary
excavation and concreting at the placing.

AA 23 Supplying & fixing pre-cast concrete Intermediate Posts of size Nr.


(5" x 5") - (3" x 3") & 7'-7" + 1'-6" high for 12 strands including
necessary excavation and concreting at the placing.

AA 24 Supplying & fixing pre-cast concrete End Posts of size (5" x 5") Nr.
& 8'-1" + 1'-6" high for 12 strands including necessary
excavation and concreting at the placing.

AA 25 Supplying & fixing pre-cast concrete Struts of size (5" x 4") - Nr.
(3" x 3") & 8'-1" + 1'-6" high for 12 strands including necessary
excavation and concreting at the placing.

Engineering organization, W.P. Page 832 BSR 2012


ITEM DESCRIPTION UNIT RATE

AB - LANDSCAPINGS

Turfing

AB 01 Supply , laying & turfing Buffalo grass after the levelling Sq.ft.
ground with necessary soil filling and laying refuse of coir layer
and watering. Also fertilizing with using waer and maintain the
turfing area for a 1 year period.

AB 02 Supply , laying ,turfing & planting Blue grass after the levelling Sq.ft.
ground with necessary soil filling and laying refuse of coir layer
and watering. Also fertilizing with using waer and maintain the
turfing area for a 1 year period.

ROOT BOLL PLANTS

AB 03 Supply & Planting maximum 5'-0" girth and 10'-0" - 12'-0" high Nr.
Atteria Plant with the fertilizing , watering & plant should be
maintain for a 1 year period.

AB 04 Supply & Planting maximum 5'-0" girth and 10'-0" - 12'-0" high Nr.
Ehala with the fertilizing , watering & plant should be maintain
for a 1 year period.

AB 05 Supply & Planting maximum 5'-0" girth and 10'-0" - 12'-0" high Nr.
Araliya Plant with the fertilizing , watering & plant should be
maintain for a 1 year period.

AB 06 Supply & Planting maximum 5'-0" girth and 10'-0" - 12'-0" high Nr.
Kiripalu Plant with the fertilizing , watering & plant should be
maintain for a 1 year period.

AB 07 Supply & Planting maximum 5'-0" girth and 7'-0" - 8'-0" high Nr.
Foxtail Palm with the fertilizing , watering & plant should be
maintain for a 1 year period.

AB 08 Supply & Planting maximum 5'-0" girth and 8'-0" - 10'-0" high Nr.
Kentiya Palm with the fertilizing , watering & plant should be
maintain for a 1 year period.

AB 09 Supply & Planting maximum 5'-0" girth and 6'-0" - 8'-0" high Nr.
Red Palm with the fertilizing , watering & plant should be
maintain for a 1 year period.

AB 10 Supply & Planting maximum 5'-0" girth and 6'-0" - 8'-0" high Nr.
Queen Palm with the fertilizing , watering & plant should be
maintain for a 1 year period.

Engineering organization, W.P. Page 833 BSR 2012


ITEM DESCRIPTION UNIT RATE

Paving Blocks

Natural Colour Blocks - Item No. AB 11 - AB 16

AB 11 Supply & paving 80mm thick Uni-III (Approx. size 210mm x Sqr. 24015.00
110mm ) natural colour precast interlocking paving blocks of 40
N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the high volume traffic areas. Paving blocks should conferming
to S.L.S. ...... and subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

AB 12 Supply & paving 80mm thick Uni-III (Approx. size 210mm x Sqr. 20695.00
110mm ) natural colour precast interlocking paving blocks of 30
N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the Low volume traffic areas or Pedestrian areas. Paving blocks
should conferming to S.L.S. ...... and subject to the approval of
the quality & colour. ( Transport cost of blocks paid seperatly as
per HSR )

AB 13 Supply & paving 60mm thick Uni-II (Approx. size 210mm x Sqr. 18325.00
110mm ) natural colour precast interlocking paving blocks of 15
N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the Pedestrian areas. Paving blocks should conferming to
S.L.S. ...... and subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

AB 14 Supply & paving 80mm thick Priory-III (Approx. size 200mm Sqr. 21730.00
x 100mm ) natural colour precast interlocking paving blocks of
40 N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the high volume traffic areas. Paving blocks should conferming
to S.L.S. ...... and subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

Engineering organization, W.P. Page 834 BSR 2012


ITEM DESCRIPTION UNIT RATE
AB 15 Supply & paving 80mm thick Priory-III (Approx. size 200mm Sqr. 23095.00
x 100mm ) natural colour precast interlocking paving blocks of
30 N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the Low volume traffic areas or Pedestrian areas. Paving blocks
should conferming to S.L.S. ...... and subject to the approval of
the quality & colour. ( Transport cost of blocks paid seperatly as
per HSR )

AB 16 Supply & paving 60mm thick Priory-II (Approx. size 200mm Sqr. 20210.00
x 100mm ) natural colour precast interlocking paving blocks of
15 N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the Pedestrian areas. Paving blocks should conferming to
S.L.S. ...... and subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

Coloured Blocks - Item No. AB 17 - AB 22

AB 17 Supply & paving 80mm thick Uni-III (Approx. size 210mm x Sqr. 26385.00
110mm ) coloured precast interlocking paving blocks of 40
N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the high volume traffic areas. Paving blocks should conferming
to S.L.S. ...... and subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

AB 18 Supply & paving 80mm thick Uni-III (Approx. size 210mm x Sqr. 23065.00
110mm ) coloured precast interlocking paving blocks of 30
N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the Low volume traffic areas or Pedestrian areas. Paving blocks
should conferming to S.L.S. ...... and subject to the approval of
the quality & colour. ( Transport cost of blocks paid seperatly as
per HSR )

AB 19 Supply & paving 60mm thick Uni-II (Approx. size 210mm x Sqr. 21170.00
110mm ) coloured precast interlocking paving blocks of 15
N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the Pedestrian areas. Paving blocks should conferming to
S.L.S. ...... and subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

Engineering organization, W.P. Page 835 BSR 2012


ITEM DESCRIPTION UNIT RATE
AB 20 Supply & paving 80mm thick Priory-III (Approx. size 200mm Sqr. 30010.00
x 100mm ) coloured precast interlocking paving blocks of 40
N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the high volume traffic areas. Paving blocks should conferming
to S.L.S. ...... and subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

AB 21 Supply & paving 80mm thick Priory-III (Approx. size 200mm Sqr. 25975.00
x 100mm ) coloured precast interlocking paving blocks of 30
N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the Low volume traffic areas or Pedestrian areas. Paving blocks
should conferming to S.L.S. ...... and subject to the approval of
the quality & colour. ( Transport cost of blocks paid seperatly as
per HSR )

AB 22 Supply & paving 60mm thick Priory-II (Approx. size 200mm Sqr. 23670.00
x 100mm ) coloured precast interlocking paving blocks of 15
N/mm2 compressive strengh , on 2" thick compacted sand bed
laid on top of a levelled and well compacted earth sub base for
the Pedestrian areas. Paving blocks should conferming to
S.L.S. ...... and subject to the approval of the quality & colour.
( Transport cost of blocks paid seperatly as per HSR )

CONCRETE CURB

AB 23 Supply & paving pre cast concrete Curb ( Small ) size 75mm x L.ft.
175mm x 540mm of 25 N/mm2 compressive strengh with 1:3
cement mortar on top of a well compacted earth sub base.

AB 24 Supply & paving pre cast concrete Curb ( Half ) size 125mm x L.ft.
255mm x 450mm of 25 N/mm2 compressive strengh with 1:3
cement mortar on top of a well compacted earth sub base.

AB 25 Supply & paving pre cast concrete Curb ( Full ) size 125mm x L.ft.
255mm x 915mm of 25 N/mm2 compressive strengh with 1:3
cement mortar on top of a well compacted earth sub base.

CEMENT POTS

Engineering organization, W.P. Page 836 BSR 2012


ITEM DESCRIPTION UNIT RATE
AB 26 Supply & placing of 12" dia. Cement pots 4'-0" high ( size Nr.
approximate )

AB 27 Supply & placing of 18" dia. Cement pots 4'-0" high ( size Nr.
approximate )

AB 28 Supply & placing of 24" dia. Cement pots 4'-0" high ( size Nr.
approximate )

AB 29 Supply & placing of 28" dia. Cement pots 4'-0" high ( size Nr.
approximate )

AB 30 Supply & placing of 48" dia. Cement pots 4'-0" high ( size Nr.
approximate )

Engineering organization, W.P. Page 837 BSR 2012


N 01 Door flush paneled 1 1/8" thick single sash hung on 1 1/8" flush panel
Per Door 3'-0"x 7'-0" = 21.00 Sq.ft.
1.9 Cu.ft. Timber for frame 1.9 3200 6080
14 Sq.ft. Timber planks ( 1 1/4") 14 230 3220
11 Sq.ft. timber planks (3/4") 11 170 1870
2 No. Spur stone 2 40 80
6 No. Rawl plug and screws 2" 6 13 78
12 No. Dowels 12 15 180
Sub Total 11508

Fittings
3 nos hinge 4"x 5" 0 975 0
6 nos Brass screws 1" 0 8 0
Allow for sand paper 20
20
Labour for sash
4 Days Carpenter ( Excluding Iron mongery fixing) 3.91 770 3010.7
1.25 Day Labourer 1.16 629 729.64
Labour for frame
0.750 Day Carpenter 0.75 770 577.5
0.375 Day labourer 0.375 629 235.875
Sub Total 4553.715

Rate per 21.00 Sq.ft. 16081.72


Rate per Sq.ft. 765.796
Add 22% 168.4751
Total 934.2711