Kampili 1map Layout1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

INDEX NO.

: P6 - 1

IMPLEMENTATION MAP OF CP-6 BILI-BILI IRRIGATION PROJECT

REHABILITATION OF KAMPILI 1 IRRIGATION SYSTEM N


To
Makassar
MAKASSAR

To Makassar
BILI-BILI SYSTEM

RAIT
(REHABILITATION)

SAR ST
MAKAS
Kajenjeng Weir

CP.3

Bontomanai Weir

Koccikang Weir

JE
Pakatto Weir

l
na
Ca
ain
CP.6

NE
ngM
bu
Lim

Bt. 11 ka
BBt.10 Bt. 10 ka GOWA
Rindam Weir CP.1
Bili-Bili Dam
12.70 ha 17.15 l/s

BE
Kampili Weir

12.00 ha 16.20 l/s CP.2 Bili-B


ili Main
Cana
l
Bili-Bili Weir

K. 15 ka CP.5 Bissu
a Ma
in Ca
nal

RA
KAMPILI SYSTEM
Bt. 11 ki P. 11 ki GOWA Bissua Weir

79.70 ha 107.60 l/s (REHABILITATION)

28.00 ha 37.80 l/s Bt. 8 ka 59.80 ha 80.73 l/s al

N
n
Ca
in
Ma

BBt.9
gin
an
tto
Ma

G
33.10 ha 44.69 l/s
CP.4
K. 14 ka

RI
K. 15 ki BBt.8 TAKALAR
BISSUA SYSTEM
(NEW CONSTRUCTION)

87.40 ha 117.99 l/s Bt. 8 ki

VE
21.70 ha 29.30 l/s
BK.15 16.00 ha 21.60 l/s BP.11 SUNGGUMINASA
Kadaro Bobo

R
CP.7
Bt. 6 ki BBt.7
K. 14 ki TAKALAR

53.20 ha 71.82 l/s


BK.14 K. 13 ki BP.10
67.60 ha 91.26 l/s SP.Borong Utia P. 10 ki
57.00 ha 76.95 l/s
53.60 ha 72.36 l/s

K. 13 ka
BK.13 Bontomanai
Bt. 6 ki BBt.6
P. 9 ki
13.10 ha 17.69 l/s
33.80 ha 45.63 l/s
BBM.2 53.20 ha 71.82 l/s
SP.Tamanyeleng Bt. 3 ki To SCALE 1 : 25000
Bt. 5 ki BP.9 Jeneponto

C. 3 ka 37.50 ha 50.63 l/s


19.40 ha 26.19 l/s P. 8 ki GENERAL MAP OF PROJECT
C. 1 ka BBM.1 BBt.4
46.70 ha 63.05 l/s BBT.5 64.30 ha 86.81 l/s Bb. 3 ka
BC.3 C. 2 ki 84.60 ha 114.21 l/s BP.8
Bt. 2 ki 54.70 ha 73.85 l/s
BBt.3
23.20 ha 31.32 l/s
BK.12 Bontoala 28.10 ha 37.94 l/s P. 7 ki 1
SP.Barombong D.Bontorea BBt.2 17.40 ha 23.49 l/s
C. 3 ki BC.1
K. 11 ka Bt. 3 ki BBt.1
D. 10 ka BC.2 Bt. 1 ki BP.7
44.60 ha 60.21 l/s 28.10 ha 37.94 l/s Bb. 3 ka
C. 1 ki 19.40 ha 26.19 l/s
TRAIT

91.50 ha 123.53 l/s


Cilallang 18.40 ha 24.84 l/s
20.90 ha 28.22 l/s
54.70 ha 73.85 l/s
BBb.3
D. 10 ki K. 10 ka
BP.6
20.90 ha 28.22 l/s BD.10 60.20 ha 81.27 l/s P. 6 ka
Bb. 2 ka
21.70 ha 29.30 l/s
T1
SAR S

27.40 ha 36.99 l/s


Pa. 2 ka BK.11 BBb.1 BBb.2
76.00 ha 102.60
Panciro BK.10
BTb.3 BTb.2 Borong Bulo
Pc. 2 Br. 4 ka
SP.Bontoa
D. 9 ki 1
BPa.5 103.70 ha 140.00 l/s
BPc.2 K. 9 ka
Taipa Batu P. 5 ka
BP.5
Bb. 1 ki Br. 4 ki
42.60 ha 57.51 l/s
MAKAS

74.10 ha 100.04 l/s BK.9 24.70 ha 33.35 l/s 33.60 ha 45.36 l/s
BD.9 Pc. 1 ki 18.20 ha 24.57 l/s 48.60 ha 65.61 l/s
14.70 ha 19.85 l/s BP.5 b
D.TaipaKodong P. 3 ki Br. 3 ki BBr.4
D. 8 ki BPc.1
66.30 ha 89.51 l/s BD.8 BPa.2 BPa.1 BK.8
16.40 ha 22.14 l/s
BP.4
63.40 ha 85.59 l/s N
Pa. 3 ka
D.BontoSunggu BTb.1 Bo. 1 ka
32.40 ha 43.74 l/s Pa. 1 ki BBr.3
D. 7 ki 1
D. 6 ka
BPa.3
26.50 ha 35.78 l/s BK.7 Boka BTk.1 BBo.1 28.90 ha 39.02 l/s

68.70 ha 92.75 l/s


77.40 ha 104.49 l/s Pa. 4 ki
BPa.4
BTk.2 Bokong
BD.7 124.90 ha 168.62 l/s
Parappa K. 6 ki
Taipa Kodong Br. 2 ki
BBr.2
P. 3 ki 11.40 ha 15.39 l/s
l
D. 7 ka BD.6 22.10 ha 29.84 l/s 16.40 ha 22.14 l/s a na L. 1 ka
BK.6 Pallangga C BL.2 10.80 ha 14.58 l/s
101.40 ha 136.89 l/s
BP.3 Berua Ma
in

CP.6
P. 2 ki
SP.ParangBerua g
D.BontoBalang Kalukuang 14.30 ha 19.31 l/s
b un L. 2 ka BL.1
D. 5 ka BD.5 D.Tamancina K. 5 ka
BP.2 a
P. 1 ki
BP.2 L. 4 ka
19.00 ha 25.65 l/s
Br. 1 ki
50.10 ha 67.64 l/s
Lim 20.60 ha 27.81 l/s

D.BontoLebang
50.60 ha 68.31 l/s
(7,415 ha) BK.5 78.10 ha 105.44 l/s BJT.3 45.60 ha 61.56 l/s BP.1
BBr.1 BL.3 SCALED TO FIT
D.MoncongBalang L. 6 ka

dR
D.Raja Raja 13.50 ha 18.23 l/s L. 5 ka

PB
T1 63.70 ha 86.00 l/s
BL.6

.1
BD.4 Pare-Pare D.Limbung
BJT.1
BL.4
Moncong Balang Tompo Balang Labakkang BL.7 BL.5
D.BontoBila
BTb.1 BK.4
BBn.1 K. 3 ka BJT.2
Bala Tabua BD.3 BTp.3 26.10 ha 35.24 l/s
L. 9 ka
KAMPILI WEIR
14.30 ha 19.31 l/s
BBtb.1 BK.3 (17.4 m³/s, 10,540 ha)
SP.Pamujuang BBtb.2 K. 2 ka BL.8
Tp. 3 ki L. 10 ka
BD.2 27.90 ha 37.67 l/s D.Kalukua BL.9 L. 8 ka
D. 2 ki 50.90 ha 68.72 l/s ng 81.20 ha 109.62 l/s
BK.2 14.20 ha 19.17 l/s
5.00 ha 6.75 l/s BD.1
Timpopo BTp.2
K. 1 ka
BL.11
BL.10

dR
BPt.1 Pat. 1 ka
Patarungan Tp. 2 ka

TC
10.00 ha 13.50 l/s
Pat. 3 ka L. 11 ka
50.30 ha 67.91 l/s

.1
10.80 ha 14.58 l/s
35.50 ha 47.93 l/s SP.Doang BK.1 23.40 ha 31.59 l/s
BPt.2
Pat. 2 ka Mg. 6 ka
Doang Tp. 1 ki
52.20 ha 70.47 l/s BTp.1
BL.12
BL.13 L. 12 ka
117.00 ha 157.95 l/s 51.90 ha 70.07 l/s 59.20 ha 79.92 l/s
BPt.3 L. 14 ka BL.14
Mg. 4 ki L. 13 ki
T1 BMg.6 BMg.5 8.20 ha 11.07 l/s dRD
67.00 ha 90.45 l/s O. 8.50 ha 11.48 l/s
Pat. 3 ki 1
SP.Parang 37.10 ha 50.09 l/s BMg.4
Mg. 2 ki
GOWA Mg. 5 ki
Mg. 5 ki
41.70 ha 56.30 l/s
BMg.3 63.20 ha 85.32 l/s BL.15 L. 15 ka
43.10 ha 58.19 l/s

41.70 ha 56.30 l/s BMg.2

BL.16
Majannang BMg.1 Mg. 1 ki
46.00 ha 62.10 l/s 1
.
Pm. 5 ki dRMJ
Pm. 6 ka
88.50 ha 119.48 l/s
25.20 ha 34.02 l/s Pammase Pm. 1 ka
BPm.5
BPm.4 16.10 ha 21.74 l/s
BPm.6
Pm. 6 ki Pm. 4 ki BPm.2 LEGEND
76.10 ha 102.74 l/s
56.50 ha 76.28 l/s
Pm. 3 ki BL.17
BPm.3 River Weir
46.60 ha 62.91 l/s Pm. 2 ki BPm.1
8.40 ha 11.34 l/s
Kampili Main Road Division Structure

Bonto Sallang
Administrative Border Tertiary Canal

Project Boundary Secondary Canal

Dam Primary Canal

You might also like