BILL OF QUANTITIES

Gabion wall construction for protection of TLC in different districts and locations
Page 1 of 5

Item Total Rate / Units (NPR) Amount


Kalika Shree
Shree Srijansil Gahate Ni Ma V,
Elementary Suryamukhi
Description LSS, Shakhauri, Bahuntipling,
No. School, Babala, Elementary Quantity Unit In Fig. In Words (NPR)
sindhuli sindhuli
Sindhuli School, Sindhuli

1 SITE CLEARANCE

1.1 Site Clearance (to make the bed surface of gabion 1 1 1 1 4.00 L.S
positioning)

2 EARTH WORK

2.2 E/W in excavation for structures in common


soil, lead 50.0 m, lift upto 3.0m, all complete 16 16 11 16 59.00 m³

3 GABION AND STONE WORKS

3.1 Supplying, fabrication, assembling, placing in


position of gabion box consisting of hexagonal
mesh size 100 x100mm, including rolling, cutting,
weaving with 10 SWG wire, binding the gabions
together and tying down the lids with binding wire
12 SWG, all complete.
2x1x1m Box 32 32 22 32 118.00 box

3.2 Supply and Filling stones in gabions, all complete 64 64 44 64 236.00 m³

Page Total :

Total Cost page 1:

Transportation cost page 1

Page 1 Total
BILL OF QUANTITIES
Gabion wall construction for protection of TLC in different districts and locations
Page 2 of 5

Item Total Rate / Units (NPR) Amount


Bishnu Pra Vi., Shanka Devi
Description
No. Gorkha Pra. Vi., Gorkha Quantity Unit In Fig. In Words (NPR)

1 SITE CLEARANCE

1.1 Site Clearance (to make the bed surface of gabion 1 1 2.00 L.S
positioning)

2 EARTH WORK

2.2 E/W in excavation for structures in common


soil, lead 50.0 m, lift upto 3.0m, all complete 16 26 42.00 m³

3 GABION AND STONE WORKS

3.1 Supplying, fabrication, assembling, placing in


position of gabion box consisting of hexagonal
mesh size 100 x100mm, including rolling, cutting,
weaving with 10 SWG wire, binding the gabions
together and tying down the lids with binding wire
12 SWG, all complete.
2x1x1m Box 32 52 84.00 box

3.2 Supply and Filling stones in gabions, all complete 64 104 168.00 m³

Page Total :

Total Cost page 2:

Transportation cost page 2

Page 2 Total
BILL OF QUANTITIES
Gabion wall construction for protection of TLC in different districts and locations
Page 3 of 5
Item Jankalyan Total Rate / Units (NPR) Amount
Dowongpokhari
Samaj Bikash Secondary Ganesh Ma Vi,
Basic School, Shree Janashakti
Description Pra V, School, Ganeshthan,
No. Sindhupalchow PS, Kavre Quantity Unit In Fig. In Words (NPR)
Sindhupalchowk Ghartichap, Nuwakot
k
Kavre

1 SITE CLEARANCE

1.1 Site Clearance (to make the bed surface of gabion 1 1 1 1 1 5.00 L.S
positioning)

2 EARTH WORK

2.2 E/W in excavation for structures in common


soil, lead 50.0 m, lift upto 3.0m, all complete 16 16 11 16 16 75.00 m³

3 GABION AND STONE WORKS

3.1 Supplying, fabrication, assembling, placing in


position of gabion box consisting of hexagonal
mesh size 100 x100mm, including rolling, cutting,
weaving with 10 SWG wire, binding the gabions
together and tying down the lids with binding wire
12 SWG, all complete.
2x1x1m Box 32 32 22 32 32 150.00 box

3.2 Supply and Filling stones in gabions, all complete 64 64 44 64 64 300.00 m³

Page Total :

Total Cost page 3:

Transportation cost page 3

Page 3 Total
BILL OF QUANTITIES
Gabion wall construction for protection of TLC in different districts and locations
Page 4 of 5
Item Shree Man Devistan Lower Chhiringe Basic Total Rate / Units (NPR) Amount
Bulungkhani Shree Mahadev
Mohan sikshya Secondary School,
Description Pra.vi, Bulung, Pra V, Sailung,
No. Sadan pra v, School, Bijulikot,Ramec Quantity Unit In Fig. In Words (NPR)
Dolakha Dolakha
Dolakha Okhaldhunga hhap.

1 SITE CLEARANCE

1.1 Site Clearance (to make the bed surface of gabion 1 1 1 1 1 5.00 L.S
positioning)

2 EARTH WORK

2.2 E/W in excavation for structures in common


soil, lead 50.0 m, lift upto 3.0m, all complete 11 11 11 16 16 65.00 m³

3 GABION AND STONE WORKS

3.1 Supplying, fabrication, assembling, placing in


position of gabion box consisting of hexagonal
mesh size 100 x100mm, including rolling, cutting,
weaving with 10 SWG wire, binding the gabions
together and tying down the lids with binding wire
12 SWG, all complete.
2x1x1m Box 22 22 22 32 32 130.00 box

3.2 Supply and Filling stones in gabions, all complete 44 44 44 64 64 260.00 m³

Page Total :

Total Cost page 4:

Transportation cost page 4

Page 4 Total
BILL OF QUANTITIES
Dismantling of TLCs Page 5 of 5

Item Total Rate / Units (NPR) Amount


Guru padam
Description Pra.vi, Jhyaku,
No. Dolakha Quantity Unit In Fig. In Words (NPR)

1 Dismantling cost of TLC (Lump sum) 1 1.00 No.

Page Total :

Total Cost :

Transportation cost if applicable

Page 5-1 Total

BILL OF QUANTITIES
Rectification of Existing TLC

Item Total Rate / Units (NPR) Amount


Chhiringe Basic
School,
Description
No. Bijulikot,Rame Quantity Unit In Fig. In Words (NPR)
chhap.

2 Remove MS pannel member (windows channel) from


the position and make straight and reposition it again and
do finishing works with bamboo batten, chicken
wiremesh, plaster and painting)
1 1.00 Lumpsum

Page Total :

Total Cost :

Transportation cost

Page 5-2 Total

Total cost for all the site development works mentioned above = Page 1 Total + Page 2 Total + Page 3 Total + Page 4 Total + Page 5-1 Total+ Page 5-2 Total
Grand Total In words: