2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).

12M

A/L Dabhosa side

95.500 0.20

94.895
94.595
0.90

7 A 8 1.385 M

1.975 M
0.20
93.210
1.27 1:1
B 0.590 M
92.620
C 0.400 92.220
92.070
0.50 1.36

0.20 0.90 0.59


0.17
1.86
2.46
2.76

Width in Rt. Angle

A/R Kharoaroada side

95.500 0.26

94.895
94.595
0.90

7 A 8 1.835 M

2.625 M
0.26
92.760
1.39 1:1
B 0.790 M
91.970
C 0.400 91.570
91.420
0.56 1.62

0.26 0.90 0.79


0.23
2.18
2.78
3.08

Width in Rt. Angle


2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

CH.
ITEM ;- Excavation for foundation including shoring and
strutting as necessary and disposing off excavated
stuff as directed in earth,soils of all types,
sand,gravel,soft murum etc(excluding dewatering)

A/L 94.070 - 93.370 = 0.700 1 9.87 2.76 0.70 = 19.07

A/R 93.470 - 92.830 = 0.640 1 9.87 3.08 0.64 = 19.46

P1 94.400 - 93.650 = 0.750 1 11.33 2.15 0.75 = 18.27


av.
Add For Nalla training 0 18.00 10.00 0.52 = 0.00
---------------
56.80
ITEM ;- Excavation for foundation in hard murum including
shoring & strutting as necesary & disposing off
excavated stuff as directed(excluding dewatering)

A/L 93.370 - 93.370 = 0.000 1 9.87 2.76 0.00 = 0.00

A/R 92.830 - 92.830 = 0.000 1 9.87 3.08 0.00 = 0.00

P1 93.650 - 93.650 = 0.000 1 11.33 2.15 0.00 = 0.00

---------------
0.00
cum

ITEM ;- Excavation for foundation in hard murum and


boulders including shoring and strutting as
necessary and disposing off excavated stuff as
directed.(excluding dewatering.)

A/L 93.370 - 93.270 = 0.100 1 9.87 2.76 0.10 = 2.72

A/R 92.830 - 92.690 = 0.140 1 9.87 3.08 0.14 = 4.26

P1 93.650 - 93.530 = 0.120 1 11.33 2.15 0.12 = 2.92


---------------
9.90
cum
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

ITEM ;- Excavation for foundation in soft rock including


shoring and strutting as necessary and disposing
off excavated stuff as directed (excluding
dewatering)..

A/L 93.270 - 93.170 = 0.100 1 9.87 2.76 0.10 = 2.72

A/R 92.690 - 92.570 = 0.120 1 9.87 3.08 0.12 = 3.65

P1 93.530 - 93.400 = 0.130 1 11.33 2.15 0.13 = 3.17


---------------
9.54
cum

ITEM ;- Excavation for foundation including shoring and


strutting as necessary and disposing off(excavated
stuff as directed in hard rock(By Chiselled).

A/L 93.170 - 92.070 = 1.100 1 9.87 2.76 1.10 = 29.97

A/R 92.570 - 91.420 = 1.150 1 9.87 3.08 1.15 = 34.96

P1 93.400 - 92.200 = 1.200 1 11.33 2.15 1.20 = 29.23


---------------
94.16
cum

ITEM ;- Dewatering on BHP basis by using water pump


including diversion of stream, providing
cofferdams, earthern bunds etc. as may be
necessary for foundation and other parts of the the
works and pumping out water during and after
excavation as may be required by using 3.0 BHP
pump etc. complete. (prior approval of
Superintending Engineer will be necessary)

A/L 1 2 12.00 = 24.00

A/R 1 2 12.00 = 24.00

P1 1 3 12.00 = 36.00
---------------
84.00
Hours
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

ITEM ;- Providing and laying in situ / ready mix / ready mix


M10 cement concrete of trap/ granite/ quartzite/
gneiss metal in foundation including necessary
centering, formwork, bailing out water, compacting
and curing etc. complete. (with fully automatic micro
processor based PLC with SCADA enabled with
reversible drum type mixer/ concrete batch mix
plant (pan mixer) with natural /artifical sand)

A/L 92.220 - 92.070 = 0.150 1 9.87 2.76 0.15 = 4.09

A/R 91.570 - 91.420 = 0.150 1 9.87 3.08 0.15 = 4.56

P1 92.350 - 92.200 = 0.150 1 11.33 2.15 0.15 = 3.65


---------------
65.40 12.30
cum

ITEM ;- "Providing and laying in situ / ready mix M-20 plain


cement concrete of trap /granite/quartzite/ gneiss
metal for cast in citu piers, abutment, returns, wings
etc. including provision of '""V"" shaped false joints
to form suitable panels on the faces to approve
design with compacting by vibrating and curing
complete, including plywood/steel form work
centering ( excluding dewatering by means of
pump) and including 'bailling out water and curing
finishing in CM 1:3 etc. complete.
'as directed by engineer incharge

footing bed block


A/L
C 92.620 - 92.220 = 0.400 1 9.53 2.46 0.40 = 9.38
A/R
C 91.970 - 91.570 = 0.400 1 9.53 2.78 0.40 = 10.60

footing bed block

P1 92.950 - 92.350 Qty of Footing 1 x 11.03 x 1.85 x 0.60 = 12.24

---------------
103.28 32.22
cum
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

ITEM ;- "Providing and laying in situ / ready mix M-20 plain


cement concrete of trap /granite/quartzite/ gneiss
metal for cast in citu piers, abutment, returns, wings
etc. including provision of '""V"" shaped false joints
to form suitable panels on the faces to approve
design with compacting by vibrating and curing
complete, including plywood/steel form work
centering ( excluding dewatering by means of
pump) and including 'bailling out water and curing
finishing in CM 1:3 etc. complete.
'as directed by engineer incharge

A/L
A 94.595 - 93.210 = 1.385 1 9.180 0.90 + 1.27 1.39 = 13.84
2
B 93.210 - 92.620 = 0.590 1 9.180 1.27 + 1.86 0.59 = 8.48
2
A/R
A 94.595 - 92.760 = 1.835 1 9.180 0.90 + 1.39 1.83 = 19.24
2
B 92.760 - 91.970 = 0.790 1 9.180 1.39 + 2.18 0.79 = 12.95
2

P1 94.595 - 92.950 = 1.645

Qty of pier P1 1 9.180 0.90 1.645 = 13.59

1 0.7857 0.90 x 0.90 1.645 = 1.05

Riding Return

A/L 95.500 - 94.595 = 0.905 2 1.20 0.20 0.91 = 0.44

94.595 - 93.210 = 1.385 2 1.20 0.20 x 1 1.39 = 0.33


2
A/R 95.500 - 94.595 = 0.905 2 1.20 0.26 0.91 = 0.57

94.595 - 92.760 = 1.835 2 1.20 0.26 x 1 1.83 = 0.57


2
---------------
103.28 71.06
cum
ITEM Providing and laying in situ / ready mix / ready mix
M10 cement concrete of trap/ granite/ quartzite/
gneiss metal in foundation including necessary
centering, formwork, bailing out water, compacting
and curing etc. complete. (with fully automatic micro
processor based PLC with SCADA enabled with
reversible drum type mixer/ concrete batch mix
plant (pan mixer) with natural /artifical sand)
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

A/L 93.500 - 92.220 = 1.280 1 9.87 2.76 1.28 = 34.87

A/R 93.500 - 91.570 = 1.930 1 9.87 3.08 1.93 = 58.67

P1 93.500 - 92.350 = 1.150 1 11.33 2.15 1.15 = 28.01


---------------
121.55
cum
Deduction

Footing

A/L 92.620 - 92.220 = 0.400 1 9.530 2.460 0.40 = 9.38

93.500 - 92.620 = 0.880 1 9.180 0.980 + 1.86 0.88 = 11.47


2

A/R 91.970 - 91.570 = 0.400 1 9.53 2.780 0.40 = 10.60

95.030 - 93.500 = 1.530 1 9.18 0.650 + 2.18 1.53 = 19.87


2
Footing

P1 92.950 - 92.350 = 0.600 1 11.03 1.85 0.60 = 12.24

Pier portion
P1 93.500 - 92.950 = 0.550

Qty of Pier 1 9.18 0.90 0.55 = 4.54

2 0.7857 0.90 x 0.90 0.55 = 0.35


2
---------------
68.45

Net Qty 53.10


65.40 cum

ITEM ;- Providing and laying in situ / ready mix controlled


M-20 cement concrete of of trap / granite / quartzite
/ gniess metal for reinforced cement concrete caps
over piers and abutments including necessary
sacffolding plywood/steel formwork, compacting by
vibrating, finishing in CM 1:3 and curing etc complete
( Excluding reinforcement) with reverssible drum
tupe mixer with natural sand/ VSI standard artificial
sand

A/L 94.895 - 94.595 = 0.300 1 9.18 0.90 0.30 = 2.48

A/R 94.895 - 94.595 = 0.300 1 9.18 0.90 0.30 = 2.48

P1 94.895 - 94.595 = 0.300 1 9.18 x 0.90 x 0.30 = 2.48

Half round portion 2 0.7857 x 0.90 x 0.90 x 0.30 = 0.19


2
---------------
7.63
cum
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

ITEM ;- Providing and laying in situ / ready mix M20 RCC


of trap/ granite/ quartzite/ gneiss metal for RCC
work of ballast walls, kerbs and box returns
including scaffolding, compaction, formwork
finishing and curing etc. complete. (excluding
reinforcement, with fully automatic micro processor
based PLC with SCADA enabled concrete batch
mix plant / pan mixer with Natural / VSI standard
Artificial Sand)

A/L 95.500 - 94.895 = 0.605 1 9.18 0.30 0.605 + 0.505 = 1.53


2
A/R 95.500 - 94.895 = 0.605 1 9.18 0.30 0.605 + 0.505 = 1.53
2 ---------------
3.06
ITEM ;- Providing tar paper bearing including laying in proper
position etc. complete.

A/L 1 9.18 0.60 5.51

A/R 1 9.18 0.60 5.51

P1 1 9.18 0.90 8.26


---------------
19.28
sqm
ITEM ;- Providing expansion joints with 25mm thick bituminous
pad as per detailed drawings etc. complete.

A/L 1 9.18 0.53 4.87

A/R 1 9.18 0.53 4.87

P1 1 9.18 0.53 4.87


---------------
14.61
sqm
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

ITEM ;- Providing and laying in situ / ready mix M-25 controlled


cement concrete of trap/ granite/ quartzite/ gneiss
metal for RCC work in solid/ deck slab etc. including
ramming, vibrating, curing, formwork, centering and
finishing in cement plaster excluding reinforcement
etc. complete. (with fully automatic micro processor
based PLC with SCADA enabled concrete batch
mix plant / pan mixer and Natural / VSI standard
Artificial Sand)

S1 1 5.963 x 7.950 + 7.950 x 0.15 = 7.111


2 av.
1 5.963 7.950 + 7.500 x 0.330 = 15.201
2

S2 1 5.963 x 7.950 + 7.950 x 0.15 = 7.111


2 av.
1 5.963 7.950 + 7.500 x 0.330 = 15.201
2
---------------
Total 44.624
cum

ITEM ;- Providing and laying in situ / ready mix M-30 CC of


trap/ granite/ quartzite/ gneiss metal for wearing
course 8cm thick including compacting, finishing,
curing and filling in joints with bitumen etc. complete.
(with fully automatic micro processor based PLC with
SCADA enabled concrete batch mix plant / pan
mixer with Natural / VSI standard Artificial Sand)

S1 1 5.96 7.50 0.075 = 3.35

S2 1 5.96 7.50 0.075 = 3.35


---------------
Total 6.70
cum
ITEM ;- Providing and laying of filter media with granular
/ W.B.M. materials/ stone crushed aggregates satisfying the
requirements laid down in clause 2504.2.2 of Morth
specifications to a thickness of not less than 600 mm
with smaller size towards the soil and bigger size
towards the wall and provided over the entire
surface behind abutment, wing wall and return
wall to the full height compacted to a firm condition
as per drawing and technical specifications etc.
complete.

A/L 95.250 - 94.070 = 1.180 1 6.78 x 0.60 x 1.18 = 4.80

A/R 95.250 - 93.470 = 1.780 1 6.78 x 0.60 x 1.78 = 7.24

Behind returns

Dabhosa side
g.l.
U/S 95.250 - 94.200 = 1.050 1 15.00 x 0.60 x 1.05 = 9.45

D/S 95.250 - 94.300 = 0.950 1 15.00 x 0.60 x 0.95 = 8.55


2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

Kharoaroada side

U/S 95.250 - 94.500 = 0.750 1 25.00 x 0.60 x 0.75 = 11.25

D/S 95.250 - 94.500 = 0.750 1 25.00 x 0.60 x 0.75 = 11.25


---------------
52.54
cum
ITEM Providing selected hard murum / filling
including laying in layers of 15cm.to 20cm.
watering and compacting etc.complete.

Dabhosa side Av.g.l.


95.020 - 94.550 = 0.470 1 15.00 5.77 + 5.61 x 0.470 = 40.10
2
Kharoaroada side
95.020 - 94.590 = 0.430 1 25.00 5.77 + 5.62 x 0.43 = 61.20
2
---------------
101.30
cum

ITEM ;- 27 Providing vent holes 100mm diameter GI pipe in the


slab and wearing course with iron grill at the top and
GI pipe at bottom as per drawing etc. complete.

10 10
---------------
10
Nos
ITEM ;- 28 Providing rubble filling of trap/ granite/ quartzite
gneiss stones for foundations including filling
voids with sand/grit and compaction etc
complete."

Dabhosa side
95.250 - 95.020 = 0.23 1 15.00 6.97 + 6.89 x 0.230 = 23.91
2
Kharoaroada side
95.250 - 95.020 = 0.23 1 25.00 6.97 + 6.89 x 0.23 = 39.85
2
---------------
63.76
cum
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

ITEM ;- 28 Providing and laying in situ / ready mix cement


concrete of M-10 proportion with trap/ granite/
quartzite/ gneiss metal in foundation including
necessary form work, compacting and curing etc.
complete. (with reversible drum type mixer with
SCADA with fine agreegates of required
specifications (Natural sand / VSI sand finely
washed etc )
Dabhosa side
95.350 - 95.250 = 0.10 1 15.00 7.00 + 6.97 x 0.100 = 10.48
2
Kharoaroada side
95.350 - 95.250 = 0.10 1 25.00 7.00 + 6.97 x 0.100 = 17.47
2
---------------
27.95
cum

ITEM ;- 28 Providing and laying in situ / ready mix M-20 cement


concrete of trap /granite /quartzite /gneiss metal
for approach slab / Rigid pavement including
compacting, finishing, curing etc. complete.
(excluding reinforcement) (with reversible drum
type mixer/ concrete batch mix plant (pan mixer)
with SCADA with fine agreegates of required
specifications (Natural sand / VSI sand finely
washed etc ), cement..6.40 bags/ cum

Dabhosa side
95.500 - 95.350 = 0.15 1 15.00 7.05 + 7.00 x 0.150 = 15.81
2
Kharoaroada side
95.500 - 95.350 = 0.15 1 25.00 7.05 + 7.00 x 0.150 = 26.36
2
---------------
42.17
cum
ITEM ;- 28 Providing Stream line Guard Stone

1 28 28

1 28 28
---------------
56.00
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

1 Excavation for foundation in earth, soil of all types,


sand, gravel and soft murum, including removing
the excavated material up to a distance of 50 m.
beyond the building area and stacking and sprea-
ding as directed, dewatering, preparing the bed
for the foundation and necessary back filling,
ramming, watering including shoring and strutting
etc. complete. (Lift upto 1.5 m.)

EXCAVATION FOR FOUNDATION (total)

94.200 - 93.320 In soil 1 x 15.30 1.45 0.88 = 19.52


------------- cum
0.880

94.300 - 93.250 In soil 1 x 15.30 1.43 1.05 = 22.97


------------- cum
1.050

94.500 - 93.600 In soil 1 x 25.30 1.33 0.90 = 30.28


------------- cum
0.900

94.500 - 93.560 In soil 1 x 25.30 1.35 0.94 = 32.11


------------- cum
0.940 -----------
104.88
cum

2 Excavation for foundation in hard murum including


including removing the excavated material up to
a distance of 50 m. beyond the building area and
stacking and sprea-ding as directed, dewatering
, preparing the bed for the foundation and
necessary back filling, ramming, watering including
shoring and strutting etc. complete. (Lift upto 1.5 m.)

93.320 - 93.120 in H.M. 1 x 15.30 1.45 0.20 = 4.44


------------- cum
0.200

93.250 - 93.150 in H.M. 1 x 15.30 1.43 0.10 = 2.19


------------- cum
0.100

93.600 - 93.450 in H.M. 1 x 25.30 1.33 0.15 = 5.05


------------- cum
0.150

93.560 - 93.360 in H.M. 1 x 25.30 1.35 0.20 = 6.83


------------- cum
0.200 -----------
18.51
cum
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

3 Excavation for foundation in hard murum and boulder


including removing the excavated material up to
a distance of 50 m. beyond the building area and
stacking and sprea-ding as directed, dewatering
, preparing the bed for the foundation and
necessary back filling, ramming, watering including
shoring and strutting etc. complete. (Lift upto 1.5 m.)

93.120 - 92.920 in H.M.& B. 1 x 15.30 1.45 0.20 = 4.44


------------- cum
0.200

93.150 - 92.900 in H.M.& B. 1 x 15.30 1.43 0.25 = 5.47


------------- cum
0.250

93.450 - 93.200 in H.M.& B. 1 x 25.30 1.33 0.25 = 8.41


------------- cum
0.250

93.360 - 93.060 in H.M.& B. 1 x 25.30 1.35 0.30 = 10.25


------------- cum
0.300 -----------
28.57
cum

4 Excavation for foundation in soft rock including


including removing the excavated material up to
a distance of 50 m. beyond the building area and
stacking and sprea-ding as directed, dewatering
, preparing the bed for the foundation and
necessary back filling, ramming, watering including
shoring and strutting etc. complete. (Lift upto 1.5 m.)

92.920 - 92.800 in S.R. 1 x 15.30 1.45 0.12 = 2.66


------------- cum
0.120

92.900 - 92.750 in S.R. 1 x 15.30 1.43 0.15 = 3.28


------------- cum
0.150

93.200 - 93.000 in S.R. 1 x 25.30 1.33 0.20 = 6.73


------------- cum
0.200

93.060 - 92.900 in S.R. 1 x 25.30 1.35 0.16 = 5.46


------------- cum
0.160 -----------
18.13
cum
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

5 Excavation for foundation in Hard rock by Chiselling


including trimming and leveling the bed by chiseling
where necessary and removing the excavated
material and stacking it in measurable heaps within
a distance of 50 metres from the building area
including dewatering and back filling with available
earth/murum, watering, ramming, etc. complete.
(Lift upto 1.5m) By Mechanical Means

92.800 - 92.800 in H.R. 1 x 15.30 1.45 0.00 = 0.00


------------- cum
0.000

92.750 - 92.750 in H.R. 1 x 15.30 1.43 0.00 = 0.00


------------- cum
0.000

93.000 - 93.000 in H.R. 1 x 25.30 1.33 0.00 = 0.00


------------- cum
0.000

92.900 - 92.900 in H.R. 1 x 25.30 1.35 0.00 = 0.00


------------- cum
0.000

Providing and laying in situ / ready mix cement


concrete of M-10 proportion with trap/ granite/
quartzite/ gneiss metal in foundation including
necessary form work, compacting and curing etc.
complete. (with reversible drum type mixer with
SCADA with fine agreegates of required
specifications (Natural sand / VSI sand finely
washed etc )

Dabhosa side
U/S

BED CONCRETE

93.100 - 92.800 1 x 15.30 1.45 0.30 = 6.66


------------- cum
0.300

Dabhosa side
D/S

BED CONCRETE

93.150 - 92.850 1 x 15.30 1.43 0.30 = 6.56


------------- cum
0.300
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

Kharoaroada side
U/S

BED CONCRETE

93.450 - 93.150 1 x 25.30 1.33 0.30 = 10.09


------------- cum
0.300

Kharoaroada side
D/S

BED CONCRETE

93.400 - 93.100 1 x 25.30 1.35 0.30 = 10.25


------------- cum
0.300 -----------
33.56
cum

Providing cast in situ / ready mix M15 grade cement


concrete for head walls of CD work / retaining walls
etc. including necessary form work, compaction,
finishing and curing etc. complete. (with reversible
drum type mixer/ concrete batch mix plant (pan
mixer) with SCADA with fine agreegates of required
specifications (Natural sand / VSI sand finely
washed etc ), cement 4.05 bags/cumt)

Dabhosa side
U/S
Main concrete in m-15

1 x 15.00 x 0.45 + 1.15 x 2.10 = 25.20


2

Dabhosa side
D/S

Main concrete in m-15

1 x 15.00 x 0.45 + 1.13 x 2.05 = 24.29


2

Kharoaroada side
U/S

Main concrete in m-15

1 x 25.00 x 0.45 + 1.03 x 1.75 = 32.38


2

Kharoaroada side
D/S

Main concrete in m-15

1 x 25.00 x 0.45 + 1.05 x 1.80 = 33.75


2
-----------
115.62
cum
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

NAME OF WORK :- U/S

Dabhosa side
U/S
0.450
95.200

3 w U/S
0.82 2.100 0.64

93.100
92.800

1.15

1.45

NAME OF WORK :-
Dabhosa side
D/S

0.450
95.200

3 w D/S
0.80 2.050 0.63

93.150
92.850

1.13

1.43
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

NAME OF WORK :- U/S


Kharoaroada side
U/S

0.450
95.200

3 w U/S
0.70 1.750 0.58

93.450
93.150

1.03

1.33

EXCAVATION FOR FOUNDATION (total)

NAME OF WORK :-
Kharoaroada side
D/S D/S

0.450
95.200

3 w D/S
0.72 1.800 0.59

93.400
93.100

1.05

1.35
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

---------------------------------------------------------------------------- -----------------------------------------------
8 10
mm mm
---------------------------------------------------------------------------- -----------------------------------------------
ABUTMENT CAP.
A/L
A) type 10 mm 110 x 2.71 298.10

B) type 10 mm 56 x 0.85 47.60

C) type 10 mm 10 x 11.90 119.00

D) straight bar @ top 10 mm 9 x 11.90 107.10

E) straight bar @ bottom 10 mm 9 x 11.90 107.10

A/R
A) type 10 mm 110 x 2.71 298.10

B) type 10 mm 56 x 0.85 47.60

C) type 10 mm 10 x 11.90 119.00

D) bar @ top 10 mm 9 x 11.90 107.10

E) bar @ bottom 10 mm 9 x 11.90 107.10

PIER CAP RINGS

P1
Ring 10 mm 111 x 2.16 239.76

straight bar @ top 10 mm 9 x 11.90 107.10

straight bar @ bottom 10 mm 9 x 11.90 107.10

Links 10 mm 167 x 0.30 50.10

-------------------------------- -----------------------------------------------
Rmt. 1861.86

0.60
-------------------------------- -----------------------------------------------
Wt. in k.g. 1117.12

Total wt. in k.g.= 1117.12 K.G.

Total wt. in M.T.= 1.117 M.T.


2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

STEEL FOR RECORDING

---------------------------------------------------------------------------- ---------------------------------------------------------------------------------------
8 10 12 16 20
mm mm mm mm mm
---------------------------------------------------------------------------- ---------------------------------------------------------------------------------------
Steel for slab

1 st slab ( End slab )

A Bar
Main bar @ bottom 20 mm 43 x 5.88 252.84

B Bar
Main bar @ bottom 20 mm 43 x 6.30 270.90

D Bar
Main bar 10 mm 49 x 5.88 288.12
Distr.bar @ top av
Main bar

C Bar 10 mm 47 x 11.17 524.99


Distr.bar @ top av

E Bar 10 mm 25 x 11.92 298.00


av
End Ring

End ring both side 10 mm 42 x 2.00 84.00

Straight bar for end ring 16 mm 14 x 5.88 82.32


both side

2 nd slab ( End slab )

A Bar
Main bar @ bottom 20 mm 43 x 5.88 252.84

B Bar
Main bar @ bottom 20 mm 43 x 6.30 270.90

D Bar
Main bar 10 mm 49 x 5.88 288.12
Distr.bar @ top av

C Bar 10 mm 47 x 11.17 524.99


Distr.bar @ top av

E Bar 10 mm 25 x 11.92 298.00


av
End Ring

End ring both side 10 mm 42 x 2.00 84.00

Straight bar for end ring 16 mm 14 x 5.88 82.32


both side

End ring both side 10 mm 42 x 2 84.00

Straight bar for end ring 16 mm 14 x 5.88 82.32


both side

Kerb Ring 1 st slab 10 mm 21 x 1.48 31.08

Straight bar 10 mm 4 x 5.90 23.60

Kerb Ring 2 nd slab 10 mm 21 x 1.48 31.08

10 mm 4 x 5.9 23.60

Stopper 10 mm 4 x 1.100 4.40

Chairs 16 mm 12 x 2.20 26.40

Oerlap 10 mm 65 x 0.500 32.50


-------------------------------- ---------------------------------------------------------------------------------------
Rmt. 0.00 2620.48 0.00 273.36 1047.48

0.40 0.60 0.90 1.60 2.50


-------------------------------- ---------------------------------------------------------------------------------------
Wt. in k.g. 1572.29 437.38 2618.70

Total wt. in k.g.= 4628.37 K.G.

Total wt. in M.T.= 4.628 M.T.


2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M

WEARING COAT

BETWEEN ABUTMENT & PIER


6 MM DIA.
@ 300 MM C/C

WIDTH WISE @
21 11.9 0.22 54.98 KG.
ADDITIONAL
AT SUPPORT 8 11.9 0.22 20.94 KG.

LENGTHWISE 41 5.86 0.22 52.88 KG.


----------------
128.80 KG.
BETWEEN ABUTMENT & PIER

WIDTH WISE
21 11.90 0.22 54.98 KG.
ADDITIONAL
AT SUPPORT 8 11.90 0.22 20.94 KG.

LENGTHWISE 41 5.86 0.22 52.88 KG.


----------------
128.80 KG.

Total 257.60 i.e. 0.258