Professional Documents
Culture Documents
Causeway Bil Jawhar
Causeway Bil Jawhar
12M
95.500 0.20
94.895
94.595
0.90
7 A 8 1.385 M
1.975 M
0.20
93.210
1.27 1:1
B 0.590 M
92.620
C 0.400 92.220
92.070
0.50 1.36
95.500 0.26
94.895
94.595
0.90
7 A 8 1.835 M
2.625 M
0.26
92.760
1.39 1:1
B 0.790 M
91.970
C 0.400 91.570
91.420
0.56 1.62
CH.
ITEM ;- Excavation for foundation including shoring and
strutting as necessary and disposing off excavated
stuff as directed in earth,soils of all types,
sand,gravel,soft murum etc(excluding dewatering)
---------------
0.00
cum
P1 1 3 12.00 = 36.00
---------------
84.00
Hours
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M
---------------
103.28 32.22
cum
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M
A/L
A 94.595 - 93.210 = 1.385 1 9.180 0.90 + 1.27 1.39 = 13.84
2
B 93.210 - 92.620 = 0.590 1 9.180 1.27 + 1.86 0.59 = 8.48
2
A/R
A 94.595 - 92.760 = 1.835 1 9.180 0.90 + 1.39 1.83 = 19.24
2
B 92.760 - 91.970 = 0.790 1 9.180 1.39 + 2.18 0.79 = 12.95
2
Riding Return
Footing
Pier portion
P1 93.500 - 92.950 = 0.550
Behind returns
Dabhosa side
g.l.
U/S 95.250 - 94.200 = 1.050 1 15.00 x 0.60 x 1.05 = 9.45
Kharoaroada side
10 10
---------------
10
Nos
ITEM ;- 28 Providing rubble filling of trap/ granite/ quartzite
gneiss stones for foundations including filling
voids with sand/grit and compaction etc
complete."
Dabhosa side
95.250 - 95.020 = 0.23 1 15.00 6.97 + 6.89 x 0.230 = 23.91
2
Kharoaroada side
95.250 - 95.020 = 0.23 1 25.00 6.97 + 6.89 x 0.23 = 39.85
2
---------------
63.76
cum
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M
Dabhosa side
95.500 - 95.350 = 0.15 1 15.00 7.05 + 7.00 x 0.150 = 15.81
2
Kharoaroada side
95.500 - 95.350 = 0.15 1 25.00 7.05 + 7.00 x 0.150 = 26.36
2
---------------
42.17
cum
ITEM ;- 28 Providing Stream line Guard Stone
1 28 28
1 28 28
---------------
56.00
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M
Dabhosa side
U/S
BED CONCRETE
Dabhosa side
D/S
BED CONCRETE
Kharoaroada side
U/S
BED CONCRETE
Kharoaroada side
D/S
BED CONCRETE
Dabhosa side
U/S
Main concrete in m-15
Dabhosa side
D/S
Kharoaroada side
U/S
Kharoaroada side
D/S
Dabhosa side
U/S
0.450
95.200
3 w U/S
0.82 2.100 0.64
93.100
92.800
1.15
1.45
NAME OF WORK :-
Dabhosa side
D/S
0.450
95.200
3 w D/S
0.80 2.050 0.63
93.150
92.850
1.13
1.43
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M
0.450
95.200
3 w U/S
0.70 1.750 0.58
93.450
93.150
1.03
1.33
NAME OF WORK :-
Kharoaroada side
D/S D/S
0.450
95.200
3 w D/S
0.72 1.800 0.59
93.400
93.100
1.05
1.35
2022-23 Br bil cau 2 sp 6.00 m Jawhar std Recording 22 12 01 (1).12M
---------------------------------------------------------------------------- -----------------------------------------------
8 10
mm mm
---------------------------------------------------------------------------- -----------------------------------------------
ABUTMENT CAP.
A/L
A) type 10 mm 110 x 2.71 298.10
A/R
A) type 10 mm 110 x 2.71 298.10
P1
Ring 10 mm 111 x 2.16 239.76
-------------------------------- -----------------------------------------------
Rmt. 1861.86
0.60
-------------------------------- -----------------------------------------------
Wt. in k.g. 1117.12
---------------------------------------------------------------------------- ---------------------------------------------------------------------------------------
8 10 12 16 20
mm mm mm mm mm
---------------------------------------------------------------------------- ---------------------------------------------------------------------------------------
Steel for slab
A Bar
Main bar @ bottom 20 mm 43 x 5.88 252.84
B Bar
Main bar @ bottom 20 mm 43 x 6.30 270.90
D Bar
Main bar 10 mm 49 x 5.88 288.12
Distr.bar @ top av
Main bar
A Bar
Main bar @ bottom 20 mm 43 x 5.88 252.84
B Bar
Main bar @ bottom 20 mm 43 x 6.30 270.90
D Bar
Main bar 10 mm 49 x 5.88 288.12
Distr.bar @ top av
10 mm 4 x 5.9 23.60
WEARING COAT
WIDTH WISE @
21 11.9 0.22 54.98 KG.
ADDITIONAL
AT SUPPORT 8 11.9 0.22 20.94 KG.
WIDTH WISE
21 11.90 0.22 54.98 KG.
ADDITIONAL
AT SUPPORT 8 11.90 0.22 20.94 KG.