Download as pdf or txt
Download as pdf or txt
You are on page 1of 35

GTXGN□-24 Solid Insulated RMU

Installation & Operating Instructions

1
This manual contains the important information about packaging, transportation,
installation, testing, operation and maintenance. In order to ensure the personal safety
and the normal operation of the switchgear, please read this manual carefully before
any operation to this equipment.

 This switching device can only be installed in indoor environments that are
suitable for the normal operation of electrical equipments;
 The unpacking, installation, operation and maintenance of the switchgear should
be performed by the professional electrical staff;
 The electrical connection of the switchgear must comply with requirements of the
relevant design drawing and the standard or specifications;
 The operation of the switchgear must strictly abide by the rules of Power Supply
Bureau;
 The opening and closing operation and maintenance of the switchgear must
comply with the requirements of this manual;
 The load of actual running of the switchgear should be within the scope of
technical parameters shown on the data plate of the switchgear.
 The manual should be kept properly, and be ensured to be easily fetched by all
the installation, operation and maintenance staffs.
 The switchgear administrator should be responsible for safety issues and proper
management of the switchgear.

 In this manual, the cautions with △


! should be paid more attention.

2
Contents

1. General Introduction
1.1 Explanation of Model
1.2 Environmental Condition of Application
1.3 Technical Data
1.4 Standard Switch Module
1.4.1 Load Switch Module (Module C)
1.4.2 Load Switch and Fuse Combination Module (Module F)
1.4.3 Circuit Breaker Module (Module V)
1.5 Equipment Dimensions and Installation Dimensions
2. Package
2.1 Introduction of package
2.2 Unpacking
3. Installation
3.1 Combining Cabinets
3.2 Installation of Busbar
3.3 Installation of Cable
3.4 Precaution of Cable Installation
4. Operation
4.1 Operation of Circuit Breaker
4.2 Operation of Load Switch
4.3 Operation of Load Switch-Fuse Combination Module (Module F)
4.4 Installation and Uninstallation of High Voltage Current-Limiting Fuse
5. Accompanying documents and attachments.
6. Ordering Instruction

3
1. General Introduction
Solid Insulated RMU (hereinafter referred to as ring main unit) is a fully enclosed
power supply unit, using vacuum circuit breaker as the main switch component of
load switch and circuit breaker. It adopts the solid insulation embedded pole
technology. The vacuum circuit breaker and its connected electric conductor are
fully enclosed within the epoxy resin shell. The mechanism and 90% of
transmission components are all sealed within the mechanism box, which reaches
the best anti-corrosion effect, eliminates the possibility of faults occurred by
corrosion. It completely gets rid of SF6 gas and its degree of protection reaches
IP67, which ensures the reliability of operation and safety of staff and realizes the
maintenance-free as well.
The ring main unit is rated for use in the three-phase alternating current power
distribution system with 24kV, 50Hz. It is used for ring network power supply or
terminal power supply. It can be loaded into a compacted secondary substation
used for controlling and protecting the distribution transformer.
1.1 Explanation of Model

GT XGN□-24/ T(D)630-20
Rated short-time withstand current (kA)

Rated Current
Spring operating mechanism (Electromagne
Rated voltage (kV)
Indoor (“W” stands for outdoor)
Fixed type
Cabinet type
Solid type

1.2 Environmental Condition of Application


 Suitable for indoor environment;
 Ambient air temperature: indoor -50℃~+70℃, relative humidity of the air:
daily average is no higher than 95%, monthly average is no higher than 90%;
 The altitude is no more than 2000 meters;

4
 The ambient air should not be under the pollution of dust, water, salt fog,
corrosive gas or flammable gas.
 The installation place should not be under strenuous vibration and the seismic
intensity should be no more than 8 degrees.
1.3 Technical Data
Technical Data
Load Switch and Circuit Breaker
Load Switch
Item Name Unit Fuse Combination Module
Module
Module (Module V)
(Module C)
(Module F)
Rated Voltage kV 24
Rated Frequency Hz 50
Rated Current A 630 125 630/1250
Rated Closed-loop A
630
Breaking Current
Rated Short-time kA
20(4S) 20/25(4S)
Withstand Current
Rated Peak Withstand kA
50/63 50/63
Current
Rated Short-circuit kA
50 50
Making Current
1min Power Frequency kV 65
Withstand Voltage
Lightning Impulse kV 125 (phase to phase, phase to ground)/145(between the open
Withstand Voltage contact)
Cable Charging A
10
Breaking Current
5% Rated Active Load A
31.5
Breaking Current
Degree of Protection Switchgear Cabinet (enclosure): IP4X;
Electrical Main Circuit (conductive): IP67
Mechanical Endurance times 10000 10000 10000
Rated Transfer Current A 3700
Rated Short-circuit kA
20/25
Breaking Current

5
1.4 Standard Switch Module
1.4.1 Load Switch Module (Module C)

Basic Configuration:
 630A main busbar
 The vacuum load switch, 630A
 Disconnector
 Earthing switch
 Observation window, to observe the
disconnector/earthing switch status
 Spring operating mechanism
 Voltage presence indicator with phase concordance
function
 Independent busbar and cable compartment, and each
equipped with the pressure relief plates
 European type outgoing cable bushing
 Earthing busbar
 Load switch and disconnector/earthing switch
operation hole with padlock device, to prevent the
wrong operation
 “Five prevention” interlock function *

Optional Configuration:
 Incoming cable earthing forced locking device, to
prevent the wrong operation of the incoming cable
when energized
 American type incoming cable bushing
 Load switch motor operation, 24V/48V DC,
110V/220V DC/AC
 Short circuit and earthing fault indicator
 Install the current transformer and the ammeter on the
cable bushing
 Install the double incoming cables and the lightning
arrester
 Load switch auxiliary contacts: 2NO+2NC
 Disconnector/earthing switch auxiliary contacts:
1NO+1NC
Note: “five prevention” interlock indicates: to prevent mistakenly opening and closing
the circuit breaker; when the main switch energizes, to prevent opening or closing the
disconnector; to prevent closing the earthing switch when energizes; to prevent
entering the energized cubicles.

6
1.4.2 Load Switch and Fuse Combination Module (Module F)
Basic Configuration:
 630A main busbar, 125A branch busbar
 The vacuum load switch
 Disconnector
 Earthing switch
 Observation window, to observe the
disconnector/earthing switch status.
 Spring operating mechanism
 Voltage presence indicator with phase concordance
function
 Independent busbar and cable compartment, and each
equipped with the pressure relief plate
 European type outgoing cable bushing
 Earthing busbar
 Load switch and disconnector/earthing switch
operation hole with padlock device, to prevent the
wrong operation
 Fuse tube (enclosed compartment) and fuse tripping
device
 Fuse blow indicator
 Fuse tube cable side earthing switch which interacting
with disconnector/earthing switch
 Install high-voltage current-limiting fuse according to
user’s required specification and configuration
 “Five prevention” function

Optional Configuration:
 Load switch motor operation, 24V/48V DC,
110V/220V DC/AC
 Single cable outgoing
 Load switch auxiliary contacts: 2NO+2NC
 Disconnector/earthing switch auxiliary contacts:
1NO+1NC
 Fuse blow auxiliary contacts: 1NO
 Motor operation opening coil, 24V/48V DC,
110V/220V DC/AC

7
1.4.3 Vacuum Circuit Breaker Module (Module V)

Basic Configuration:
 630A main busbar
 The vacuum circuit breaker, 630A or 1250A
 Disconnector
 Earthing switch
 Observation window, to observe the
disconnector/earthing switch status.
 Spring operating mechanism
 Voltage presence indicator with phase concordance
function
 Independent busbar and cable compartment, and each
equipped with the pressure relief plate
 European type outgoing cable bushing
 Earthing busbar
 Vacuum circuit breaker and disconnector/earthing
switch operation hole with padlock device, to prevent
the wrong operation
 “Five prevention” function

Optional Configuration:
 Incoming cable earthing locking device, to prevent
the wrong operation of the incoming cable when
energized
 American type incoming cable bushing
 Electromagnetic operation mechanism
 Vacuum circuit breaker motor operation, 24V/48V
DC, 110V/220V DC/AC
 Short circuit and earthing fault indicator
 Install the current transformer and the ammeter on the
cable bushing
 Install the double incoming cable and the surge
arrester
 Vacuum circuit breaker auxiliary contacts: 4NO+4NC
 Disconnector/earthing switch auxiliary contacts:
4NO+4NC
 Protection relay
 Motor operation opening and closing coils, 24V/48V
DC, 110V/220V DC/AC

8
1.4.4 Cable Connecting Unit (Module D)

Basic Configuration:
 630A main busbar
 Voltage presence indicator with phase concordance
function
 Independent busbar and cable compartment, and each
equipped with the pressure relief plate
 European type outgoing cable bushing
 Earthing busbar
 “Five prevention” function

Optional Configuration:
 American type incoming cable bushing
 Short circuit and earthing fault indicator
 Install the current transformer and the ammeter on the
cable bushing
 Install the double incoming cable and the surge
arrester

9
1.4.5 Busbar Sectionalizing Switch (Circuit Breaker)

Basic Configuration:
 630A main busbar
 The vacuum circuit breaker, 630A or 1250A
 Disconnector
 Observation window, to observe the
disconnector/earthing switch status.
 Spring operating mechanism
 Voltage presence indicator with phase concordance
function
 Independent busbar and cable compartment, and each
equipped with the pressure relief plate
 Earthing busbar
 Vacuum circuit breaker and disconnector/earthing
switch operation hole with padlock device, to prevent
the wrong operation
 “Five prevention” function

Optional Configuration:
 Vacuum circuit breaker motor operation, 24V/48V
DC, 110V/220V DC/AC
 Electromagnetic operation mechanism
 Vacuum circuit breaker auxiliary contacts: 2NO+2NC
 Disconnector/earthing switch auxiliary contacts:
1NO+1NC
 Protection relay
 Motor operation opening and closing coils, 24V/48V
DC, 110V/220V DC/AC

10
1.4.6 Busbar Sectionalizing Switch (Load Switch)

Basic Configuration:
 630A main busbar
 The vacuum circuit breaker, 630A
 Disconnector
 Observation window, to observe the
disconnector/earthing switch status.
 Spring operating mechanism
 Voltage presence indicator with phase concordance
function
 Independent busbar and cable compartment, and each
equipped with the pressure relief plate
 Earthing busbar
 Load switch and disconnector switch operation hole
with padlock device, to prevent the wrong operation
 “Five prevention” function

Optional Configuration:
 Load switch motor operation, 24V/48V DC,
110V/220V DC/AC
 Load switch auxiliary contacts: 2NO+2NC
 Disconnector/earthing switch auxiliary contacts:
1NO+1NC

11
1.4.7 High Voltage Metering

Basic Configuration:
 630A main busbar
 Voltage presence indicator with phase concordance
function
 2 or 3 current transformer, 2 or 3 voltage transformer
 The protective fuse for voltage transformer
 Metering lock for the watt meter door
 Earthing busbar
 “Five prevention” function

12
1.4.8 Voltage Transformer (VT)

Basic Configuration:
 630A main busbar, 125A branch busbar
 Disconnector/earthing switch
 Observation window, to observe the
disconnector/earthing switch status.
 Spring operating mechanism
 Voltage presence indicator with phase concordance
function
 Voltage presence indicator with phase concordance
function
 Earthing busbar
 Disconnector/earthing switch operation hole with
padlock device, to prevent the wrong operation
 Fully enclosed and fully insulated voltage transformer
 Fuse tube (enclosed compartment) and fuse tripping
device
 “Five prevention” function

Optional Configuration:
 Disconnector/earthing switch auxiliary contacts:
1NO+1NC
 Voltmeter and voltage change-over switch

13
1.5 Equipment Dimensions and Installation Dimensions
 When the width of cabinet is 400 as shown below, suitable for module C, module F,
module V, module D and module PT;

 When the width of cabinet is 800, the dimension in the picture change from 400 to 800,
suitable for module VL, and module CL;
 Installation dimension (the dimension of the foundation bolt hole);

 The thickness of sideplate is 20mm after several cabinets are combined together; the
total width of cabinets is the width of all cabinets added together plus 40mm (2
sideplates).

 When need configures the low pressure chamber, the height of the low pressure chamber
would be different because of the different components in the low pressure chamber.
The low pressure chamber installed on the top of the cabinet.

14
2. Package
2.1 Introduction of package
 Usually, when shipping the cabinets, one package
includes two units or three units, but if the cabinet
width is 800mm, one package includes one unit
only. The cabinet is fixed on the wooden pallet
with bolts,.
 The whole cabinet is covered by a large plastic
bag to ensure that there is no moisture corrosion
when storing or transporting the goods.
 Cabinet external is covered by 20mm thickness
PE-foam. Using transparent scotch tape to wrap it
tightly, some parts are fastened by strapping tape.
 Each packing unit comes with a set of attachment documents, which are
placed in the plastic bags in front of the package and tightly fastened with
the PE-foam by scotch tape. Attachment
documents
 The first page of the attachment documents specifies the serial number
Indoor of(“W”
stands
this package with large fonts, such as 01/24. It clearly indicates that the total for
outdoor)
number of this batch is 24 packages and this package is the first package.
 Attachment documents of No.1 package include:
 A dispatch list of the whole batch, generally describes the product name,
specifications, quantity of goods. Its content should correspond with
purchase order.
 A summary of packing list of the whole batch shows the details of each
package.
 A set of the design documents of this batch, including simulation
diagram, secondary systematic diagram, etc.
 An installation instruction of the product.
 Packing list of this package shows the detail of the goods of this

15
package.
 Test report and certificate of quality of each unit in the package.
 Attachment documents of other packages include: In order to look into the
information conveniently, please
 Packing list of this package shows the details of
keep the files attached with the
the goods. package after unpacking.

 Test report and quality certificate of each module


in the package

2.2 Unpacking
 The inspection shall be processed as soon as receiving the goods, the
checking items include: if there is shortage of the amount of the package, if
the package appearance is completed;
 The entire module has been set the earthing switch to the earthing position
before packing;
 After receiving the goods, if the goods are not installed and used
immediately, in order to prevent damp and the dust pollution, please do not
unpack the goods and place them in a dry and ventilated place.
 When unpacking the package, No.1 package is suggested to be unpacked
firstly, then remove the tape, the binding film and the PE-foam layer by layer
 Take the hanging hooks out of the No.1 package in case to hang and carry
the cabinet. Left Protection Plate

Right Protection Plate

16
 According to different installation situations, the left and the right protection
plates of a cabinet may be installed on other cabinet, for this situation the
protection plates should be removed firstly.
 Remove cable compartment door firstly, and then remove the bottom bolts
which are fixed the cabinet, then the cabinet can be removed from the
wooden pallet. (When remove the cable compartment door, assigning the
position of switch could be convenient for user’s operation, otherwise the
interlocking might be destroyed.)

 △
! Holding up the hanging ring carefully with your hands to avoid injuring

or squeezing by hanging rings; when the cabinet has been lifted, the operator
should keep proper distance with the cabinet; often check the status of the
hanging ring, if there are cracks or serious deformations for the hanging ring,
then this hanging ring should be abandoned immediately.

17
3. Installation
 The cabinet can NOT be installed beside the wall neither in the transformer
room nor in the prefabricated substation.

3.1 Combining Cabinets


 The cabinet should be installed on the flat and solid foundation base; the
flatness of the foundation base should be 2mm per square meter. When
install the bolts or nuts of the foundation base, please refer to “installation
dimensions (the dimension of the foundation bolt hole) of chapter 1.5.

Busbar Compartment Cover

Control Box Door

Installation Hole

Installation Hole
Back Plate 1

Front Panel

Installation Hole

Back Plate 2

Cable Compartment Door

Back Plate 3

Installation Hole
Installation Hole

 Sequence of Combination:

18
1. According to the simulated diagram, put the cabinet in place one by one;
the foundation bolt hole on the bottom plate should correspond to the
bolts or nuts which have been set; panels of the neighboring cabinet
should be tightly and seamlessly laid together.
2. Remove the control box door, cable compartment door, back plate 1,
back plate 2 and back plate 3 shown on the picture.
3. Install the bolt set (bolt, nut, flat washer and spring washer) through the
mounting holes as shown on the picture; fasten all the cabinets, the
tightening torque are 30Nm.
4. Use the foundation bolts or nuts to fix the cabinet on the foundation base,
tightening torque is 40Nm. To this point, the process of cabinet
combination has been completed.

3.2 Install the Busbar


3.2.1 The Preparation Work
 After completing the process of the cabinet combination, it could start the
installation of busbar. This chapter only describes the installation of busbar
on the standard cabinet; for other special cabinets, the installation method
will not be narrated here.

 Remove the upper back plate


off the cabinet; you can see
the three-phase bushing for
installing the busbar, shown
as the picture above.
 Find the double-screw bolt in the package of busbar
installation accessories (one end is the M12 screw thread,
and the other end is the M16 screw thread), shown as the
right picture;

19
 Screw the double-screw bolt into the three-phase bushing screw hole, the
tool is flat screwdriver, the situation after screwed is shown as the below
picture.

 Brushing a thin layer of silicone grease on the surface of the three-phase


bushing.
Note: clean the taper surface with absolute ethyl alcohol before applying.
The purpose of this procedure is to reduce the friction when install the
busbar bushing shoe.
The recommended silicon grease is the Eagle Silicone BESSIL 25 from
Spain;
3.2.2 Components of Busbar
 In each batch of the cabinets, there are a set of busbar components packed in
the paper box with individual package according to the contract. The details
are as follows:
Number
Name 2 3 4 5 6
n units
units units units units units
Double end Bolt 6 9 12 15 18 3n
Flat Washer ∅12 6 9 12 15 18 3n
Fastener Standard Spring
6 9 12 15 18 3n
Washer ∅12
Hex Nut M12 6 9 12 15 18 3n
630A Same
Direction 3 3 3 3 3 3
Straight Busbar
Busbar
630A Different
Direction 3 6 9 12 3(n-2)
Straight Busbar
Three-way
6 6 6 6 6 6
Bushing Bushing Shoe
Shoe Four-way
3 6 9 12 3(n-2)
Bushing Shoe

20
 Busbar. There are two types of busbars, shown in the following table. The
connection surface of conductors from both ends of the same direction
busbars are in the same dimension; the connection surface of conductors
from both ends of the different direction busbars are in different dimensions,
the vertical distance between the two ends of conductors is 10mm.

Same Direction Straight Busbar Different Direction Straight Busbar

 Bushing shoe back plugging and cover. There are two types of bushing shoe.
The three-way bushing shoe is installed at the two ends of the busbar, the
four-way bushing shoe is used to aligning the busbar. After fastened the
busbar, screw the back plugging into the end of the bushing shoe in order to
block the installation hole of the busbar.

Three-way bushing shoe Four-way bushing shoe Back Plugging Cover

3.2.3 Pre-assemble busbar and bushing shoe


 Before installing the busbar into the cabinet, the busbar and bushing shoe
should be pre-assembled;
 The picture below shows the basic principle of assembling the busbar, the

21
leftmost or rightmost busbar are same direction busbar, others are different
direction busbar. This point is very important.

Same Direction Busbar Different Direction Busbar Different Direction Busbar

Different Direction Busbar Different Direction Busbar Different Direction Busbar Same Direction Busbar

 At the silicon rubber surface of both ends of the unassembled busbars should
brushed with a thin layer of silicon grease (Spain EAGLE silicone
BESSIL25). The brushing length is 40mm. The purpose of this procedure is
to reduce the friction when insert busbar into the bushing shoe;
 As the order shown in the table below, insert the busbar into the bushing shoe
in turn. The sequence, shown in the table from left to right, corresponds to
the sequence of three phase bushing (facing to the back of cabinet);
 The cautions of pre-assemble: the busbar should be inserted in place, the
mounting holes of both ends of busbar should be aimed at the center of
bushing shoes; the direction of the conductors of both sides of busbar should
be in accordance with the diagram shown below;
 The following three charts below show the pre-assembly sequence of the
three-phase busbar, if there are more than 3 units, please follow this pattern
as well.

22
Solid Insulated RMU Installation & Operating Instructions

3.2.4 Busbar Installation


 The picture and procedure of busbar installation take 3 units of cabinets as the example, the
installation of other cabinets are as same as the following picture;
Phase A

Phase B

Phase C

 The picture on the right shows the situation after 3 cabinets


combined together.

 The picture below shows the procedure of 3 way busbar installation, install phase C busbar
first, and then install phase B busbar, install phase A busbar at the last.
Solid Insulated RMU Installation & Operating Instructions

 The weight of the pre-assembled busbars is very heavy. The more cabinets, the heavier the
weight is, and the larger the dimension is. Therefore, the number of assembly operators is
required according to the actual situation, we suggest at least two operators. When there are
more than 4 cabinets, then there should be three or 4 assembly operators.

 The installation procedures of busbar are as follows:


Step 1: Put the whole busbar vertically downward from the top of the cabinet.
Step 2: Aim the bushing shoe to the corresponded bushing, insert the bushing shoe to
the bushing; Try to insert all the bushing shoe at the same time, so to make sure it’s
vertical , and reduce the curve stress. Adjust the busbar appropriately, in order to make
the double-end bolt penetrates through the conductor installation hole, pushing the
bushing shoe hard, until busbar conductor contacted with the bushing conductive
surface. Use flat washer, elastic washer and nut to tighten the busbar, the tightening tool
is torque spanner, and the tightening torque is 40Nm.
Step 3: Brush the conical surface of the back plugging with a little silicone grease
(Spain Eagle’s silicone BESSIL25), and put it into the hole at the end of the bushing
shoe, tighten it on the double-end bolt, the tightening torque is torque spanner, and
tightening torque is 40Nm.
 After completed the above three steps, clean the silicone grease attached on the surface of
the bushing shoe and busbar with a clean cotton cloth.
 Assemble the upper back plate of the cabinets. The procedure of busbar installation has
been completed.
Solid Insulated RMU Installation & Operating Instructions
3.3 Installation of cable
 The outgoing bushing of cable is the European type bushing and the American type bushing,
as shown on the right picture;

European Type American Type


Bushing Bushing

Outgoing bushing Double End Bolt 630A Cable Nut Protective Cap
 Generally, the cable connector components (as Connector

shown on the right picture) are provided along with


the delivery. Operators should install according to
Back Plugging
the installation instruction inside the packing box
Terminal
(Attention: the double end bolt must be fastened).
Cable
 If users use the cable connector produced by other
Taper Bushing
manufacturers, then users should confirm the type
of bushing first, so to ensure the cable connector
match with the outgoing bushing, and then install the cable connector according to the
installation instruction.
 For three cores cables, when making the cable
connectors, operators should make sure the three
phase cable terminals are in a horizontal line, shown
as picture on the right;
 When making the cable connectors, operators should strictly follow the production standard
of the cable connector ;
 Before installation, the surface of cable terminal and the surface of outgoing bushing
conducting rod should be wiped clean by alcohol paper;
 Use alcohol paper to wipe the contact surface of the cable connector and each insulator of
the outgoing bushing, and then evenly apply silicon grease on the surface (Spain Eagle
silicone BESSIL25);
 The fastening tool is torque spanner, the fastening torque is 40Nm. (This fastening torque
Solid Insulated RMU Installation & Operating Instructions

should be the one that fastened the terminal to the bushing)


3.4 Precaution of Cable Installation
3.4.1 The cable connector must be installed by qualified personnel according to the "Product
Installation Manual" of cable connectors.
3.4.2 When producing cable mounted plugs, regardless of site status, it must be made to ensure
that the cable and cable connectors clean and free of stains. It must be cleaned with insulating
cleaning agent(or more than 95% of alcohol) before insulation. After treated with silicon grease,
insulation coordination site could be assembled.
3.4.3 Cable peeling length is about 800mm, depending on the user according to the actual needs.
3.4.4 The size of cable conductors, insulators, semiconductors, copper shields must be made in
accordance with the instructions provided by SOJO company.
3.4.5 When removing the cable semiconductive layer, the insulating layer is not allowed to be
scratched, especially longitudinal cuts, which will lead to creepage. Once scratch or cut occurs, it
should be promptly cleaned with abrasive paper to make it flat.
3.4.6 After removing the copper shield semiconductive layer, promptly winding semiconducting
band, the winding position is between the semiconducting layer copper shield, with semi-take
method: half on the copper shield, half on the semiconductive layer, but do not wound beyond
semiconductive layer of the cable itself, it should be wrapped around a certain slope to uniform
end electric field distribution.
3.4.7 After making the cable done, when installing the plug, firstly the tapered column should be in
place, then the cable connectors should be crimped onto the cable conductor. Note: The three
connectors per unit mounting surface must be horizontal (when crimping connectors, burrs must be
flattened with files, to avoid hurt the cable plug).
3.4.8 As the three-core cable is bifurcated from the third way bushing, so pay attention to two
issues, one is, from the third way bushing to the root of the cable plug must have enough length, to
maintain a reasonable cable bending radius. Otherwise it will cause the plug forcibly bending
deformation, breaking the sealing, and result creepage, lead to destruction of the equipment; the
other is, the length of the three cable out of the three way bushing should be different: the length of
phase A is same to phase C, phase B (middle position) is shorter (the length of shorter part
depends on bending radius of phase A and phase C), so as to guarantee a consistent horizontal level
Solid Insulated RMU Installation & Operating Instructions

of three-phase cables, and all outstretched;a better way to make it is firstly putting the connectors
into the combining seats and then saw off them according to the length of the cables, taking the
middle phase first, and then make the other two phases, the length is easier to handle in this way
(Note: the cable must be fastened first).
3.4.9 The cable accessories plug must be aligned to the fastening screws, after two buckles
fastened in a right way, other buckles should be fastened, back plug must be tighten (to ensure the
seal does not leak ) but not beyond the force, otherwise it will cause wrong buckle and loose,
affecting the electrical performance, lead to unnecessary accidents.
3.4.10 All parts must be in their places, screwing parts must be in place enough force. For example,
conductive rod and terminals and high-voltage cabinet seat must be affixed tightly, before
installing the surge arresters, the incoming cable must be installed as required, and then installing
the arrester. After installed arresters plugs should be cover tightly, then clip it up, and effectively
earthed(with cabinet earthing wires connected is also allowed) .
3.4.11 It is NOT allowed to take frequency voltage withstand test and frequency discharge voltage
test with surge arrester in the equipment.
3.4.12 Cable accessory device is NOT allowed to bear the weight of the cable itself, the weight is
borne by the cable bracket.
Solid Insulated RMU Installation & Operating Instructions

4. Operation
The operation of all the main switches (circuit breaker or load switch), will follow the interlocking
logic operation below:
 When the main switch is in the closing position, the disconnector/earthing switch cannot be
operated;
 When the main switch is in the opening position, the disconnector/earthing switch is in the
closing position, then the cable compartment door cannot be opened;
 When disconnector /earthing switch is in the earthing position, and the main switch is in the
closing position, then the cable compartment door can be opened;
 When the cable compartment door is opened, then both the main switch and the disconnector
/earthing switch cannot be operated;

 The logic diagram as below:

For load switch and fuse combination module (module F), because high-voltage current-limiting fuse
is added, so in the interlocking logic relations, the interlocking point of fuse cap is added between the
disconnector /earthing switch and the cable compartment door, the logic diagram is as follows:
Solid Insulated RMU Installation & Operating Instructions


! The following operation sequence are all operated as the interlock logic above, in the actual

operation, should be operated in strict accordance with requirements, the improper operation will
damage the switch equipment and may cause the injury to operator.

4.1 Operation of Circuit Breaker


 This operation is suitable for vacuum circuit breaker (module V) and circuit breaker busbar
sectionalizing switch (module VL);
Main switch
operation hole
Viewing window of the
disconnector contacts
position

Disconnector/earthing
switch operation hole

Padlock hole

Disconnector/earthing
switch status indicator

Main Switch status indicator


Main switch
opening/closing
operating button

 The picture above is a typical panel figure of circuit breaker, the padlock device in the
picture is located at the place where can hang the padlock, in order to lock the operation
hole and the operation knob.
 Closing operation
Solid Insulated RMU Installation & Operating Instructions

 The “closing operation” here means through mechanical or electrical operation, to close
the main switch of this switchgear (circuit breaker or load switch), so as to realize
electrical connections between switchgear and main busbar.
 Step 1: Make sure the cable compartment door has already been installed in place;
 Step 2: Manually turn clockwise opening knob of circuit breaker to the opening
position;
 Step 3: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn anti clockwise to the closing position, make the disconnector in the closing
position;
 Step 4: Insert the operation handle into the circuit breaker operation hole, turn it
anti-clockwise around 4 circles, to make the circuit breaker operation mechanism
charging indicator point at the “charged” position;
 Step 5: Manually turn clockwise closing knob of circuit breaker to the closing position,
the circuit breaker closes.
 Opening operation
 Step 1: Manually turn clockwise opening knob of circuit breaker to the opening
position.
 Step 2: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn clockwise to the opening position of disconnector and reach the
pre-earthing position;
 Step 3: Insert the operation handle into the circuit breaker operation hole, turn it
anti-clockwise around 4 circles, to make the circuit breaker operation mechanism
charging indicator point at the “charged” position;
 Step4: Manually clockwise turn the circuit breaker closing knob, then the outgoing
circuit is earthed; at this time the switchgear is already isolated from the main busbar,
quits the operation, and the cable side of the cabinet has been reliably earthed;
 Step 5: if necessary, the cable compartment door can be removed to inspect the cable
and to do other maintenance work;

4.2 Load switch operation


 This operation is suitable for load switch module (module C), load switch busbar
Solid Insulated RMU Installation & Operating Instructions

sectionalizing switch (module CL);

Main switch
operation hole
Viewing window of the
disconnector contacts
position

Disconnector/earthing
switch operation hole

Padlock hole

Disconnector/earthing
switch status indicator

Main Switch status indicator


Main switch
opening/closing
operating button

 Closing operation
 Step 1: Make sure the cable compartment door has already been installed in place;
 Step 2: Manually turn clockwise opening knob of load switch to the opening position
(earthing switch opens);
 Step 3: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn anti-clockwise to the closing position, make the disconnector in the closing
position;
 Step 4: Insert the operation handle into the closing operation hole of load switch, turn it
anti-clockwise around 4 circles, then the load switch is closed.
 Opening operation
 Step 1: Manually turn clockwise opening knob of load switch to the opening position.
 Step 2: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn clockwise to the opening position of disconnector and reach the
pre-earthing position;
 Step 3: Insert the operation handle into the closing operation hole of load switch,
turn it anti clockwise around 4 circles, then the outgoing circuit is earthed; at this time
the switchgear is already isolated from the main busbar, quit the operation, and the
cable side of the cabinet has been earthed reliably;
 Step 4: if necessary, then can remove the cable compartment door to inspect the cable
Solid Insulated RMU Installation & Operating Instructions

and do other maintenance work;

4.3 Load switch and fuse combination module (module F) operation


 Closing operation
 Step 1: Make sure the cable compartment door has already been installed in place;
 Step 2: Manually turn clockwise opening knob of load switch to the opening position
(earthing switch opens);
 Step 3: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn anti-clockwise to the closing position, make the disconnector in the closing
position;
 Step 4: Insert the operation handle into the closing operation hole of load switch, turn it
anti-clockwise around 4 circles, then the load switch is closed.

Load switch
operation hole Viewing window of the
disconnector contacts
position

Disconnector/earthing
switch operation hole

Padlock hole

Disconnector/earthing switch
open/close indicator

Load switch open/close


indicator

Opening operating button Fuse tube earthing open/close


indicator

 Opening operation
 Step 1: Manually turn clockwise opening knob of load switch to the opening position.
 Step 2: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn clockwise to the opening position of disconnector and reach the
pre-earthing position;
 Step 3: Insert the operation handle into the closing operation hole of load switch,
turn it anti clockwise around 4 circles, then the outgoing circuit is earthed; at this time
the switchgear is already isolated from the main busbar, quit the operation, and the
Solid Insulated RMU Installation & Operating Instructions

cable side of the cabinet has been earthed reliably;


 Step 4: if necessary, then can remove the cable compartment door to inspect the cable
and do other maintenance work;

4.4 Install and remove the high voltage current-limiting fuse.


 This chapter is a part of operation of load switch and fuse combination module (Module F);
 When there is a short circuit failure between the outgoing cable side and the transformer
high-voltage side of module F or the transformer is overloaded, the high-voltage
current-limiting fuse for protection use will be blown. After blown, the fuse striker will
pop-up, which will push the striker pin popping up so as to pushing the tripping device to
open the load switch eventually. The process is as follows:

 After the fuse blown, through the “fuse blown indication” observation hole on the left
corner of the module F panel, you can see that the indication sign of fuse status has already
turned red. This means that the fuse has been blown. In the mean time, through the load
switch status observation hole you can find that the load switch has been already opened.
 After observing the fuse been blown, either all the three phases of the fuses have been
blown or just one or two phases of fuses have been blown, all the three phases of fuses
should be replaced together;

Striker Pin
 The removed fuse and striker pin mechanism combination is Mechanism
Fastening
Clamps
shown as the right picture;
 Use the straight screwdriver to loose the screw of the hose clamp Fuse
Solid Insulated RMU Installation & Operating Instructions

after which the fuse can be separated from striker pin mechanism;
 Replace the old fuse with the new fuse, and put the new fuse into the striker pin
mechanism; use the straight screwdriver fasten the screw of the hose clamp.


! Caution: the current specifications of the new fuse should be the same with the one of the old

fuse; the fuse striker should face towards the striker pin mechanism.
 Through pressing the “tripping panel of striker pin 撞 针 机 构 脱 撞
扣板 针
mechanism”, to reset the “striker pin” of the striker pin
mechanism, shown as the picture below;
 Apply a few insulating silicone grease(BESSIL 25) evenly 卡

on the rubber surface of the striker pin mechanism to reduce
the friction when screwing in;

 Put the new fuse and striker pin mechanism 撞针机构锁


Striker Pin Mechanism Locking Shaft

combination into the fuse tube, when putting in,
make the “striker pin tripping panel” face
towards the cabinet; insert the “striker pin
mechanism locking shaft” into the slots on both
sides of the strike pin mechanism.

锁The轴locking
已卡 入snapped
shaft 卡 槽into the bottom of the neck
 Set the striker operation handle upright which is 撞针机构已被
The striker pin has been locked
底部,
锁住
inserted into the hexagon projection on the operation
mechanism, then turn clockwise the striker pin about
60°, when heard the Click sound, which means the
striker pin mechanism and the fuse have installed in
place.
Solid Insulated RMU Installation & Operating Instructions
5. The RMU comes with following documents and accessories:
 Installation and Operation Manual
 Product out-factory test report.
 Product Qualification Certificate.
 Packing Lists
 Operation Handle
 Other accessories

6. Order Requirement
 The name and type of the RMU or the scheme and quantity.
 The primary schematic and the main components.
 The layout chart of the RMU
 Manual operation or motor operation, the operating voltage under motor operation.
 The replacement part and quantity.
 Other requirements.