This manual contains the important information about packaging, transportation,
installation, testing, operation and maintenance. In order to ensure the personal safety
and the normal operation of the switchgear, please read this manual carefully before
any operation to this equipment.
This switching device can only be installed in indoor environments that are
suitable for the normal operation of electrical equipments;
The unpacking, installation, operation and maintenance of the switchgear should
be performed by the professional electrical staff;
The electrical connection of the switchgear must comply with requirements of the
relevant design drawing and the standard or specifications;
The operation of the switchgear must strictly abide by the rules of Power Supply
Bureau;
The opening and closing operation and maintenance of the switchgear must
comply with the requirements of this manual;
The load of actual running of the switchgear should be within the scope of
technical parameters shown on the data plate of the switchgear.
The manual should be kept properly, and be ensured to be easily fetched by all
the installation, operation and maintenance staffs.
The switchgear administrator should be responsible for safety issues and proper
management of the switchgear.
2
Contents
1. General Introduction
1.1 Explanation of Model
1.2 Environmental Condition of Application
1.3 Technical Data
1.4 Standard Switch Module
1.4.1 Load Switch Module (Module C)
1.4.2 Load Switch and Fuse Combination Module (Module F)
1.4.3 Circuit Breaker Module (Module V)
1.5 Equipment Dimensions and Installation Dimensions
2. Package
2.1 Introduction of package
2.2 Unpacking
3. Installation
3.1 Combining Cabinets
3.2 Installation of Busbar
3.3 Installation of Cable
3.4 Precaution of Cable Installation
4. Operation
4.1 Operation of Circuit Breaker
4.2 Operation of Load Switch
4.3 Operation of Load Switch-Fuse Combination Module (Module F)
4.4 Installation and Uninstallation of High Voltage Current-Limiting Fuse
5. Accompanying documents and attachments.
6. Ordering Instruction
3
1. General Introduction
Solid Insulated RMU (hereinafter referred to as ring main unit) is a fully enclosed
power supply unit, using vacuum circuit breaker as the main switch component of
load switch and circuit breaker. It adopts the solid insulation embedded pole
technology. The vacuum circuit breaker and its connected electric conductor are
fully enclosed within the epoxy resin shell. The mechanism and 90% of
transmission components are all sealed within the mechanism box, which reaches
the best anti-corrosion effect, eliminates the possibility of faults occurred by
corrosion. It completely gets rid of SF6 gas and its degree of protection reaches
IP67, which ensures the reliability of operation and safety of staff and realizes the
maintenance-free as well.
The ring main unit is rated for use in the three-phase alternating current power
distribution system with 24kV, 50Hz. It is used for ring network power supply or
terminal power supply. It can be loaded into a compacted secondary substation
used for controlling and protecting the distribution transformer.
1.1 Explanation of Model
GT XGN□-24/ T(D)630-20
Rated short-time withstand current (kA)
Rated Current
Spring operating mechanism (Electromagne
Rated voltage (kV)
Indoor (“W” stands for outdoor)
Fixed type
Cabinet type
Solid type
4
The ambient air should not be under the pollution of dust, water, salt fog,
corrosive gas or flammable gas.
The installation place should not be under strenuous vibration and the seismic
intensity should be no more than 8 degrees.
1.3 Technical Data
Technical Data
Load Switch and Circuit Breaker
Load Switch
Item Name Unit Fuse Combination Module
Module
Module (Module V)
(Module C)
(Module F)
Rated Voltage kV 24
Rated Frequency Hz 50
Rated Current A 630 125 630/1250
Rated Closed-loop A
630
Breaking Current
Rated Short-time kA
20(4S) 20/25(4S)
Withstand Current
Rated Peak Withstand kA
50/63 50/63
Current
Rated Short-circuit kA
50 50
Making Current
1min Power Frequency kV 65
Withstand Voltage
Lightning Impulse kV 125 (phase to phase, phase to ground)/145(between the open
Withstand Voltage contact)
Cable Charging A
10
Breaking Current
5% Rated Active Load A
31.5
Breaking Current
Degree of Protection Switchgear Cabinet (enclosure): IP4X;
Electrical Main Circuit (conductive): IP67
Mechanical Endurance times 10000 10000 10000
Rated Transfer Current A 3700
Rated Short-circuit kA
20/25
Breaking Current
5
1.4 Standard Switch Module
1.4.1 Load Switch Module (Module C)
Basic Configuration:
630A main busbar
The vacuum load switch, 630A
Disconnector
Earthing switch
Observation window, to observe the
disconnector/earthing switch status
Spring operating mechanism
Voltage presence indicator with phase concordance
function
Independent busbar and cable compartment, and each
equipped with the pressure relief plates
European type outgoing cable bushing
Earthing busbar
Load switch and disconnector/earthing switch
operation hole with padlock device, to prevent the
wrong operation
“Five prevention” interlock function *
Optional Configuration:
Incoming cable earthing forced locking device, to
prevent the wrong operation of the incoming cable
when energized
American type incoming cable bushing
Load switch motor operation, 24V/48V DC,
110V/220V DC/AC
Short circuit and earthing fault indicator
Install the current transformer and the ammeter on the
cable bushing
Install the double incoming cables and the lightning
arrester
Load switch auxiliary contacts: 2NO+2NC
Disconnector/earthing switch auxiliary contacts:
1NO+1NC
Note: “five prevention” interlock indicates: to prevent mistakenly opening and closing
the circuit breaker; when the main switch energizes, to prevent opening or closing the
disconnector; to prevent closing the earthing switch when energizes; to prevent
entering the energized cubicles.
6
1.4.2 Load Switch and Fuse Combination Module (Module F)
Basic Configuration:
630A main busbar, 125A branch busbar
The vacuum load switch
Disconnector
Earthing switch
Observation window, to observe the
disconnector/earthing switch status.
Spring operating mechanism
Voltage presence indicator with phase concordance
function
Independent busbar and cable compartment, and each
equipped with the pressure relief plate
European type outgoing cable bushing
Earthing busbar
Load switch and disconnector/earthing switch
operation hole with padlock device, to prevent the
wrong operation
Fuse tube (enclosed compartment) and fuse tripping
device
Fuse blow indicator
Fuse tube cable side earthing switch which interacting
with disconnector/earthing switch
Install high-voltage current-limiting fuse according to
user’s required specification and configuration
“Five prevention” function
Optional Configuration:
Load switch motor operation, 24V/48V DC,
110V/220V DC/AC
Single cable outgoing
Load switch auxiliary contacts: 2NO+2NC
Disconnector/earthing switch auxiliary contacts:
1NO+1NC
Fuse blow auxiliary contacts: 1NO
Motor operation opening coil, 24V/48V DC,
110V/220V DC/AC
7
1.4.3 Vacuum Circuit Breaker Module (Module V)
Basic Configuration:
630A main busbar
The vacuum circuit breaker, 630A or 1250A
Disconnector
Earthing switch
Observation window, to observe the
disconnector/earthing switch status.
Spring operating mechanism
Voltage presence indicator with phase concordance
function
Independent busbar and cable compartment, and each
equipped with the pressure relief plate
European type outgoing cable bushing
Earthing busbar
Vacuum circuit breaker and disconnector/earthing
switch operation hole with padlock device, to prevent
the wrong operation
“Five prevention” function
Optional Configuration:
Incoming cable earthing locking device, to prevent
the wrong operation of the incoming cable when
energized
American type incoming cable bushing
Electromagnetic operation mechanism
Vacuum circuit breaker motor operation, 24V/48V
DC, 110V/220V DC/AC
Short circuit and earthing fault indicator
Install the current transformer and the ammeter on the
cable bushing
Install the double incoming cable and the surge
arrester
Vacuum circuit breaker auxiliary contacts: 4NO+4NC
Disconnector/earthing switch auxiliary contacts:
4NO+4NC
Protection relay
Motor operation opening and closing coils, 24V/48V
DC, 110V/220V DC/AC
8
1.4.4 Cable Connecting Unit (Module D)
Basic Configuration:
630A main busbar
Voltage presence indicator with phase concordance
function
Independent busbar and cable compartment, and each
equipped with the pressure relief plate
European type outgoing cable bushing
Earthing busbar
“Five prevention” function
Optional Configuration:
American type incoming cable bushing
Short circuit and earthing fault indicator
Install the current transformer and the ammeter on the
cable bushing
Install the double incoming cable and the surge
arrester
9
1.4.5 Busbar Sectionalizing Switch (Circuit Breaker)
Basic Configuration:
630A main busbar
The vacuum circuit breaker, 630A or 1250A
Disconnector
Observation window, to observe the
disconnector/earthing switch status.
Spring operating mechanism
Voltage presence indicator with phase concordance
function
Independent busbar and cable compartment, and each
equipped with the pressure relief plate
Earthing busbar
Vacuum circuit breaker and disconnector/earthing
switch operation hole with padlock device, to prevent
the wrong operation
“Five prevention” function
Optional Configuration:
Vacuum circuit breaker motor operation, 24V/48V
DC, 110V/220V DC/AC
Electromagnetic operation mechanism
Vacuum circuit breaker auxiliary contacts: 2NO+2NC
Disconnector/earthing switch auxiliary contacts:
1NO+1NC
Protection relay
Motor operation opening and closing coils, 24V/48V
DC, 110V/220V DC/AC
10
1.4.6 Busbar Sectionalizing Switch (Load Switch)
Basic Configuration:
630A main busbar
The vacuum circuit breaker, 630A
Disconnector
Observation window, to observe the
disconnector/earthing switch status.
Spring operating mechanism
Voltage presence indicator with phase concordance
function
Independent busbar and cable compartment, and each
equipped with the pressure relief plate
Earthing busbar
Load switch and disconnector switch operation hole
with padlock device, to prevent the wrong operation
“Five prevention” function
Optional Configuration:
Load switch motor operation, 24V/48V DC,
110V/220V DC/AC
Load switch auxiliary contacts: 2NO+2NC
Disconnector/earthing switch auxiliary contacts:
1NO+1NC
11
1.4.7 High Voltage Metering
Basic Configuration:
630A main busbar
Voltage presence indicator with phase concordance
function
2 or 3 current transformer, 2 or 3 voltage transformer
The protective fuse for voltage transformer
Metering lock for the watt meter door
Earthing busbar
“Five prevention” function
12
1.4.8 Voltage Transformer (VT)
Basic Configuration:
630A main busbar, 125A branch busbar
Disconnector/earthing switch
Observation window, to observe the
disconnector/earthing switch status.
Spring operating mechanism
Voltage presence indicator with phase concordance
function
Voltage presence indicator with phase concordance
function
Earthing busbar
Disconnector/earthing switch operation hole with
padlock device, to prevent the wrong operation
Fully enclosed and fully insulated voltage transformer
Fuse tube (enclosed compartment) and fuse tripping
device
“Five prevention” function
Optional Configuration:
Disconnector/earthing switch auxiliary contacts:
1NO+1NC
Voltmeter and voltage change-over switch
13
1.5 Equipment Dimensions and Installation Dimensions
When the width of cabinet is 400 as shown below, suitable for module C, module F,
module V, module D and module PT;
When the width of cabinet is 800, the dimension in the picture change from 400 to 800,
suitable for module VL, and module CL;
Installation dimension (the dimension of the foundation bolt hole);
The thickness of sideplate is 20mm after several cabinets are combined together; the
total width of cabinets is the width of all cabinets added together plus 40mm (2
sideplates).
When need configures the low pressure chamber, the height of the low pressure chamber
would be different because of the different components in the low pressure chamber.
The low pressure chamber installed on the top of the cabinet.
14
2. Package
2.1 Introduction of package
Usually, when shipping the cabinets, one package
includes two units or three units, but if the cabinet
width is 800mm, one package includes one unit
only. The cabinet is fixed on the wooden pallet
with bolts,.
The whole cabinet is covered by a large plastic
bag to ensure that there is no moisture corrosion
when storing or transporting the goods.
Cabinet external is covered by 20mm thickness
PE-foam. Using transparent scotch tape to wrap it
tightly, some parts are fastened by strapping tape.
Each packing unit comes with a set of attachment documents, which are
placed in the plastic bags in front of the package and tightly fastened with
the PE-foam by scotch tape. Attachment
documents
The first page of the attachment documents specifies the serial number
Indoor of(“W”
stands
this package with large fonts, such as 01/24. It clearly indicates that the total for
outdoor)
number of this batch is 24 packages and this package is the first package.
Attachment documents of No.1 package include:
A dispatch list of the whole batch, generally describes the product name,
specifications, quantity of goods. Its content should correspond with
purchase order.
A summary of packing list of the whole batch shows the details of each
package.
A set of the design documents of this batch, including simulation
diagram, secondary systematic diagram, etc.
An installation instruction of the product.
Packing list of this package shows the detail of the goods of this
15
package.
Test report and certificate of quality of each unit in the package.
Attachment documents of other packages include: In order to look into the
information conveniently, please
Packing list of this package shows the details of
keep the files attached with the
the goods. package after unpacking.
2.2 Unpacking
The inspection shall be processed as soon as receiving the goods, the
checking items include: if there is shortage of the amount of the package, if
the package appearance is completed;
The entire module has been set the earthing switch to the earthing position
before packing;
After receiving the goods, if the goods are not installed and used
immediately, in order to prevent damp and the dust pollution, please do not
unpack the goods and place them in a dry and ventilated place.
When unpacking the package, No.1 package is suggested to be unpacked
firstly, then remove the tape, the binding film and the PE-foam layer by layer
Take the hanging hooks out of the No.1 package in case to hang and carry
the cabinet. Left Protection Plate
16
According to different installation situations, the left and the right protection
plates of a cabinet may be installed on other cabinet, for this situation the
protection plates should be removed firstly.
Remove cable compartment door firstly, and then remove the bottom bolts
which are fixed the cabinet, then the cabinet can be removed from the
wooden pallet. (When remove the cable compartment door, assigning the
position of switch could be convenient for user’s operation, otherwise the
interlocking might be destroyed.)
△
! Holding up the hanging ring carefully with your hands to avoid injuring
or squeezing by hanging rings; when the cabinet has been lifted, the operator
should keep proper distance with the cabinet; often check the status of the
hanging ring, if there are cracks or serious deformations for the hanging ring,
then this hanging ring should be abandoned immediately.
17
3. Installation
The cabinet can NOT be installed beside the wall neither in the transformer
room nor in the prefabricated substation.
Installation Hole
Installation Hole
Back Plate 1
Front Panel
Installation Hole
Back Plate 2
Back Plate 3
Installation Hole
Installation Hole
Sequence of Combination:
18
1. According to the simulated diagram, put the cabinet in place one by one;
the foundation bolt hole on the bottom plate should correspond to the
bolts or nuts which have been set; panels of the neighboring cabinet
should be tightly and seamlessly laid together.
2. Remove the control box door, cable compartment door, back plate 1,
back plate 2 and back plate 3 shown on the picture.
3. Install the bolt set (bolt, nut, flat washer and spring washer) through the
mounting holes as shown on the picture; fasten all the cabinets, the
tightening torque are 30Nm.
4. Use the foundation bolts or nuts to fix the cabinet on the foundation base,
tightening torque is 40Nm. To this point, the process of cabinet
combination has been completed.
19
Screw the double-screw bolt into the three-phase bushing screw hole, the
tool is flat screwdriver, the situation after screwed is shown as the below
picture.
20
Busbar. There are two types of busbars, shown in the following table. The
connection surface of conductors from both ends of the same direction
busbars are in the same dimension; the connection surface of conductors
from both ends of the different direction busbars are in different dimensions,
the vertical distance between the two ends of conductors is 10mm.
Bushing shoe back plugging and cover. There are two types of bushing shoe.
The three-way bushing shoe is installed at the two ends of the busbar, the
four-way bushing shoe is used to aligning the busbar. After fastened the
busbar, screw the back plugging into the end of the bushing shoe in order to
block the installation hole of the busbar.
21
leftmost or rightmost busbar are same direction busbar, others are different
direction busbar. This point is very important.
Different Direction Busbar Different Direction Busbar Different Direction Busbar Same Direction Busbar
At the silicon rubber surface of both ends of the unassembled busbars should
brushed with a thin layer of silicon grease (Spain EAGLE silicone
BESSIL25). The brushing length is 40mm. The purpose of this procedure is
to reduce the friction when insert busbar into the bushing shoe;
As the order shown in the table below, insert the busbar into the bushing shoe
in turn. The sequence, shown in the table from left to right, corresponds to
the sequence of three phase bushing (facing to the back of cabinet);
The cautions of pre-assemble: the busbar should be inserted in place, the
mounting holes of both ends of busbar should be aimed at the center of
bushing shoes; the direction of the conductors of both sides of busbar should
be in accordance with the diagram shown below;
The following three charts below show the pre-assembly sequence of the
three-phase busbar, if there are more than 3 units, please follow this pattern
as well.
22
Solid Insulated RMU Installation & Operating Instructions
Phase B
Phase C
The picture below shows the procedure of 3 way busbar installation, install phase C busbar
first, and then install phase B busbar, install phase A busbar at the last.
Solid Insulated RMU Installation & Operating Instructions
The weight of the pre-assembled busbars is very heavy. The more cabinets, the heavier the
weight is, and the larger the dimension is. Therefore, the number of assembly operators is
required according to the actual situation, we suggest at least two operators. When there are
more than 4 cabinets, then there should be three or 4 assembly operators.
Outgoing bushing Double End Bolt 630A Cable Nut Protective Cap
Generally, the cable connector components (as Connector
of three-phase cables, and all outstretched;a better way to make it is firstly putting the connectors
into the combining seats and then saw off them according to the length of the cables, taking the
middle phase first, and then make the other two phases, the length is easier to handle in this way
(Note: the cable must be fastened first).
3.4.9 The cable accessories plug must be aligned to the fastening screws, after two buckles
fastened in a right way, other buckles should be fastened, back plug must be tighten (to ensure the
seal does not leak ) but not beyond the force, otherwise it will cause wrong buckle and loose,
affecting the electrical performance, lead to unnecessary accidents.
3.4.10 All parts must be in their places, screwing parts must be in place enough force. For example,
conductive rod and terminals and high-voltage cabinet seat must be affixed tightly, before
installing the surge arresters, the incoming cable must be installed as required, and then installing
the arrester. After installed arresters plugs should be cover tightly, then clip it up, and effectively
earthed(with cabinet earthing wires connected is also allowed) .
3.4.11 It is NOT allowed to take frequency voltage withstand test and frequency discharge voltage
test with surge arrester in the equipment.
3.4.12 Cable accessory device is NOT allowed to bear the weight of the cable itself, the weight is
borne by the cable bracket.
Solid Insulated RMU Installation & Operating Instructions
4. Operation
The operation of all the main switches (circuit breaker or load switch), will follow the interlocking
logic operation below:
When the main switch is in the closing position, the disconnector/earthing switch cannot be
operated;
When the main switch is in the opening position, the disconnector/earthing switch is in the
closing position, then the cable compartment door cannot be opened;
When disconnector /earthing switch is in the earthing position, and the main switch is in the
closing position, then the cable compartment door can be opened;
When the cable compartment door is opened, then both the main switch and the disconnector
/earthing switch cannot be operated;
For load switch and fuse combination module (module F), because high-voltage current-limiting fuse
is added, so in the interlocking logic relations, the interlocking point of fuse cap is added between the
disconnector /earthing switch and the cable compartment door, the logic diagram is as follows:
Solid Insulated RMU Installation & Operating Instructions
△
! The following operation sequence are all operated as the interlock logic above, in the actual
operation, should be operated in strict accordance with requirements, the improper operation will
damage the switch equipment and may cause the injury to operator.
Disconnector/earthing
switch operation hole
Padlock hole
Disconnector/earthing
switch status indicator
The picture above is a typical panel figure of circuit breaker, the padlock device in the
picture is located at the place where can hang the padlock, in order to lock the operation
hole and the operation knob.
Closing operation
Solid Insulated RMU Installation & Operating Instructions
The “closing operation” here means through mechanical or electrical operation, to close
the main switch of this switchgear (circuit breaker or load switch), so as to realize
electrical connections between switchgear and main busbar.
Step 1: Make sure the cable compartment door has already been installed in place;
Step 2: Manually turn clockwise opening knob of circuit breaker to the opening
position;
Step 3: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn anti clockwise to the closing position, make the disconnector in the closing
position;
Step 4: Insert the operation handle into the circuit breaker operation hole, turn it
anti-clockwise around 4 circles, to make the circuit breaker operation mechanism
charging indicator point at the “charged” position;
Step 5: Manually turn clockwise closing knob of circuit breaker to the closing position,
the circuit breaker closes.
Opening operation
Step 1: Manually turn clockwise opening knob of circuit breaker to the opening
position.
Step 2: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn clockwise to the opening position of disconnector and reach the
pre-earthing position;
Step 3: Insert the operation handle into the circuit breaker operation hole, turn it
anti-clockwise around 4 circles, to make the circuit breaker operation mechanism
charging indicator point at the “charged” position;
Step4: Manually clockwise turn the circuit breaker closing knob, then the outgoing
circuit is earthed; at this time the switchgear is already isolated from the main busbar,
quits the operation, and the cable side of the cabinet has been reliably earthed;
Step 5: if necessary, the cable compartment door can be removed to inspect the cable
and to do other maintenance work;
Main switch
operation hole
Viewing window of the
disconnector contacts
position
Disconnector/earthing
switch operation hole
Padlock hole
Disconnector/earthing
switch status indicator
Closing operation
Step 1: Make sure the cable compartment door has already been installed in place;
Step 2: Manually turn clockwise opening knob of load switch to the opening position
(earthing switch opens);
Step 3: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn anti-clockwise to the closing position, make the disconnector in the closing
position;
Step 4: Insert the operation handle into the closing operation hole of load switch, turn it
anti-clockwise around 4 circles, then the load switch is closed.
Opening operation
Step 1: Manually turn clockwise opening knob of load switch to the opening position.
Step 2: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn clockwise to the opening position of disconnector and reach the
pre-earthing position;
Step 3: Insert the operation handle into the closing operation hole of load switch,
turn it anti clockwise around 4 circles, then the outgoing circuit is earthed; at this time
the switchgear is already isolated from the main busbar, quit the operation, and the
cable side of the cabinet has been earthed reliably;
Step 4: if necessary, then can remove the cable compartment door to inspect the cable
Solid Insulated RMU Installation & Operating Instructions
Load switch
operation hole Viewing window of the
disconnector contacts
position
Disconnector/earthing
switch operation hole
Padlock hole
Disconnector/earthing switch
open/close indicator
Opening operation
Step 1: Manually turn clockwise opening knob of load switch to the opening position.
Step 2: Insert the operation handle into the operation hole of disconnector/earthing
switch, turn clockwise to the opening position of disconnector and reach the
pre-earthing position;
Step 3: Insert the operation handle into the closing operation hole of load switch,
turn it anti clockwise around 4 circles, then the outgoing circuit is earthed; at this time
the switchgear is already isolated from the main busbar, quit the operation, and the
Solid Insulated RMU Installation & Operating Instructions
After the fuse blown, through the “fuse blown indication” observation hole on the left
corner of the module F panel, you can see that the indication sign of fuse status has already
turned red. This means that the fuse has been blown. In the mean time, through the load
switch status observation hole you can find that the load switch has been already opened.
After observing the fuse been blown, either all the three phases of the fuses have been
blown or just one or two phases of fuses have been blown, all the three phases of fuses
should be replaced together;
Striker Pin
The removed fuse and striker pin mechanism combination is Mechanism
Fastening
Clamps
shown as the right picture;
Use the straight screwdriver to loose the screw of the hose clamp Fuse
Solid Insulated RMU Installation & Operating Instructions
after which the fuse can be separated from striker pin mechanism;
Replace the old fuse with the new fuse, and put the new fuse into the striker pin
mechanism; use the straight screwdriver fasten the screw of the hose clamp.
△
! Caution: the current specifications of the new fuse should be the same with the one of the old
fuse; the fuse striker should face towards the striker pin mechanism.
Through pressing the “tripping panel of striker pin 撞 针 机 构 脱 撞
扣板 针
mechanism”, to reset the “striker pin” of the striker pin
mechanism, shown as the picture below;
Apply a few insulating silicone grease(BESSIL 25) evenly 卡
槽
on the rubber surface of the striker pin mechanism to reduce
the friction when screwing in;
锁The轴locking
已卡 入snapped
shaft 卡 槽into the bottom of the neck
Set the striker operation handle upright which is 撞针机构已被
The striker pin has been locked
底部,
锁住
inserted into the hexagon projection on the operation
mechanism, then turn clockwise the striker pin about
60°, when heard the Click sound, which means the
striker pin mechanism and the fuse have installed in
place.
Solid Insulated RMU Installation & Operating Instructions
5. The RMU comes with following documents and accessories:
Installation and Operation Manual
Product out-factory test report.
Product Qualification Certificate.
Packing Lists
Operation Handle
Other accessories
6. Order Requirement
The name and type of the RMU or the scheme and quantity.
The primary schematic and the main components.
The layout chart of the RMU
Manual operation or motor operation, the operating voltage under motor operation.
The replacement part and quantity.
Other requirements.