Professional Documents
Culture Documents
False Ceiling Clubhouse Office
False Ceiling Clubhouse Office
False Ceiling Clubhouse Office
6"
BEAM LEVEL · It should not be copied/used/published,etc., partly or
fully without the written permission from
Lines & Thoughts .
· All line out shall be checked and approved by the
6"
BEAM LEVEL "Clerk of Works" and/or site engineer / PMC /
Architect.
6" 6" All dimensions are in feet/inches.
· Only the written dimensions shall be followed and no
6"
drawing shall be scaled.
· Discrepancy, if any, shall be brought to the notice of
the Architects and clarified before Please refer all the
relevant Structural/ HVAC/ MEP, etc.drawings and
details during execution.
· Large scale details shall take precedence over small
LEVEL + 15" FROM scale details;
· Contractor shall return all the drawings issued to him
BEAM LEVEL
LEVEL + 15" FROM on completion of the project;
BEAM LEVEL
6"
TRAP DOOR
TRAP DOOR
BEAM LEVEL
BEAM LEVEL
COVE 01 COVE 04
4'-6"
4'-6"
NO DATE PRINTS ISSUED DISTRIBUTION
DISTRIBUTION OF COPY
LEVEL + 6" 6" LEVEL + 6" REVISIONS
FROM BEAM LEVEL FROM BEAM LEVEL NO DATE REMARKS BY
3'-2" 3'-2"
3'-6"
3'-6"
BEAM LEVEL
6"
BEAM LEVEL
6"
LEGEND :
6"
BEAM LEVEL
POP FALSE CEILING
6"
COVE COVER
LEVEL + 6"
LEVEL + 15" FROM FROM BEAM LEVEL 6"
BEAM LEVEL STRUCTURAL CONSULTANT:
HVAC CONSULTANT :
6" PLUMBING CONSULTANT :
ELECTRICAL CONSULTANT :
ISSUED FOR:
COVE 03 3'-2"
TRAP DOOR
COVE 02
4'-6"
3'-2"
N
BEAM LEVEL
LEVEL + 6"
FROM BEAM LEVEL
5'-5"
CLIENT:
ETH
BEAM LEVEL
PROJECT:
CLUBHOUSE
3'-2"
PROJECT NO: DWG. NO.
2021-001 A2-1-01
3'-6"
3'-6" DWG TITLE:
FALSE CEILING
CLUBHOUSE OFFICE
6"
BEAM LEVEL
6"
BEAM LEVEL SCALE : AS SHOWN
DATE : 10-06-2022
DEALT : YS
ARCHITECTS :