Cargo Related Equipment Log-Test and Inspection Criteria

No.Check and Test execution criteria and records


4. TwoMonthly
Have thefollowing comparison bagaauried out between local and remote readings of
Ullage indicator
NTO BE COMPARED WITHIN 2 MONTHS

No.Chéckand Test execution criteria and records


Three
.1
Monthly
Check consistency against inventory (SOPEP/ SMPEP)

2 Check wilden pump for proper working

Inspect all tank cleaning equipment

Inspect tank cleaning line on deck

Check and inspect "Tank Cleaning Heater"

Continuity test of Butterworth hoses

Continuity test of portable flexible hose connecting IG to ballast tanks

Emergency operation of Cargo Handling Crane(procedureas per manufacturer'sinstructions)


Continuity test of portable emergency cargo discharge pump flexible hose (If aplicable)

10 Check condition of scupper plug for its sealing effectiveness.

11 Inspect deck cargo lines to ensure continuity is maintained. (Inspect bonding strips / washers)

.12 Inspect all deck lines for (including but not limited to cargo lines, crude oil washing lines,
vapour lines, inert gas lines and steam lines)
U-Clamps in position and no apparent damage visible.
Corrosion of bolts and flanges onthedressercoupling.
Inspect and test cargo, ballast and stripping pumps, eductors and their associated instruments
.13
and controls

No. Check and Test execution criteria and records


6. Six Monthly
1 Compare the local and remote readingof
Temperature Indicator AlL pO BE COMPARED WITHIN
MØNTHS
Compare the local and remote readings\pf
Pressure Indicator - Tanks aL TO BE COMPARED WITHIN
X oMONTHS
.3 Compare the local and remote readingsof
Pressure Indicator - Manifolds ALL TO BE COMPARED WITHIN
MONTHS
valves
4Emergency operation of cargoand/ballást line hydraulic
.5 Hydraulic valve operation time:
Check valve opening and closipg tne ALLT BE COMPARED
WITINN6 MONTHS
6Calibrate mani fold thermometers EVERY MNTHS

Revision
Title Reference Approved by Dateeffective Date revision
inspecuon Criteria SMS Ch 8 /18 /20 DPA 02.09.2019
Cargo Related Equipment LOg 1eST and SECTIONA Page S5
Cargo Related Equipment Log-Test and Inspection Criteria

REF. B 5. No. Check and Test execution criteria and records

Actions carried out


oficer's
Date (fillin columnwith date)
20.22 signgture
2 6 7 99 10 11 12 13
January
25 2525|25 08 08 o8 25 NA 2624 08 D
February

March

April 22 221818 18 2 NA 08 08 22 22
May

June

July

August

September

October

November

December

Date effective Revision Date Revision


Title Reference Approved by
20-03-2014
SMS Ch 8/18/20 DPA
Cargo Related Equipment Log-Test and Inspection Criteria Checksheet - SECTION BS
PageI of 2

You might also like