Download as pdf
Download as pdf
You are on page 1of 11
PROJECT CONSTRUCTION EHSS RISK Pte) PND es) aN) oum OCTET) Contractor: Radian Oil and Gas Services Co. Tet0500431645 ‘Sub-Contracor: National Blue Company LTD ‘Tel: 05995297340, Contractor Safety Rep: Anwar Iqbal Tet.0507387958 Maladen Responsible Person: Malik Qassim Tei0193508275 Project: On Site Dross Processing Facility- Early Site Preparation Works, installation of TSF, Grubbing and disposal of topsoil, back Description of | jon offence. fing, leveling and In ‘Area: in front of CRU Planned Start Date: 17-06-2022 Prenned Finish Date: 31-08-2022 In emergency, is anyone trained in frst aid? Ct yes, who? Prabhu Divakaran Safety Manager, NBC = [eae | ‘Special Job-Related EHS Hazards: Lifting, Hot work (Welding, Drill Machine), Falling object, Mobile Equipment, Personnel injury |+966 ss6452656 21-O6- 222 Shoaib Akhtar Project Manager Spat }+966 Sooss8917 2-06 ~ 2022] jeorgy Biju Daniel roject Engineer [+966-s4assao44 22-06 - 202. [Anwar Iqbal se Amma |+066-537387958, 22 -Ob- 2022 5 Work pertonmed above 1.8 meters ee & Mobo €uipment Hazards (3 Machine Guarding 1 Workon Roots Co Wet ley Singer Constions Lock Togivereaton Ci Noten meta Ci Hph votage © Extreme Weather Conations C AimospharicHazards congested Are 5 Burin, Weng, Cuting (5 Flannate Liquids or Gases Trenches deeper thant 2meters 5 Communicaon sues a Mobile Crane 1 Heavy Manual Labor 5a Potential for Rushing Bi Poor visit Actives Generate Erissions Waste Water Dseharge D2 Generate Lacitod Wastes Crete Asbestos Wastes Chemical Handing and Storage Land contamination Gi oi storage D1 Hazaraous Waste feo ua ‘Associated withthe Job PERMITS &SPECIAL, PERSONAL PROTECTIVE EQUIPMENT TOOLS AND EQUIPMENT "Stans AND TASS ees Sate Bos 3 Hoang Peteten hand Tools Caiewontor Werk Above cantar Say Doane Blea Het Ddvst Respirator Crowbar Cheater Bar Porate Leer | Wor Below 2 MSOSShoes| sete Gites chemical repiaor Sieg Hammer Hana Wren Seley Foes BILTVProceeues ark Stay isos i hirspnied Rep. Chest Ba Cheater Bar Beet winch anna ne en 1 Manfacue’sinswetene Goggles 1 Vertaing Eau Beatie Tos Towing Equipment Barcaees 3 Aa Sao ues 3 Face Shield Fire Extinguisher Bi Extension Cond Bi Fork Truck Bi Satety Cones Hot Work Permit Clteory Leather Gloves 8 FreBirvet Ar Tooes B Sosserut Sate Waring Sins 3 Excavaton Daging) Pot Eight Leater Goves Fal Heresies 1 Wetdng Equpmen ver it 1 nfraton Tags Confined Space Proetres B Coton Gives i Rese Eaipment Barge Cinder obi Cre o { Cenined Space Pat chemical Gloves LIV lng doce | Bench Gender Bway Tuck a (2 Fall Control lan Prtsiv Coverats BE iattck Ges Boner Ti coe Prowcor o Root hoes Pat special Gots o Pant Ci Pressure Washer a ow emt & High ve Cabin a Cl chemicals Ci AirPotution Conte Eauioment | C1 1. Ghanicals Rage Parnitor Noteaton fee ee eee ee) Liat abr ig 20K) Muinwot Fre LWeater coos NA Hazardous toads Uescening Work Above Sours Phen Ponts NAGeid ight NA Toxic Herd Tols \Aweward Posture yes onPath L Booing Sand L Depth NA HOU Suroes \ Blt Tools Neck Back L Eysen Task Slippery Sutacen Lctinting NARadan Heat 1 Noe Koes M Rushing Heat Lowering NALoad vation Hands, Pinch Gein 1 3oit Contat ed Rating NA ASbesas bast Beng Stop OverEsenson Ung NA NA Cause Substances igh Pressure twisting Stabity, Uneven sutace NA NA NA Gaal TarBtch NA Repetto Woton NA NA NA NA Biposue Assesment Evaluation Model of Risk Assessment seer) Tae Fa e flagman. red People shall not enter to the operational area. © The Equipment must have a valid Third- party Inspection Certificate & Sticker. SLNo. Project Steps Potential Aspects / Hazards Counter measures Risk Level ‘SPA bas Describe in Sequence Describe Hazards in each Step Describe Control measures to protect from hazards After Toolbox Talk to educate about the area * Unaware of site rules and rules and regulations ws Supervi regulations + Ensure all personnel attended MA Safety| ‘| meas Induction and Life Saving Rule. | | Preparation at the site and + Remove spilages, obstacles. ete. in 1 Install of Rest shelter * Slip, trip, and fall. walkways and pathways for ease of Low Supervisor {using scaffolding) access. + Acquire a Permit to work to identify the aspects of the job. + Wrong selection of tools, PPE, era jon oftools, PPE, and |. correct and Proper arrangement for Low copanieon iB 4) Manual Handling pee ontaa| ending © Properly material ins tions for avoid © Pinch Points re Pinch points + Tool box conduct prior to start the activity * Valid SAG Driving license and Third Party | Certified Operator Trained and identified flagman shall be + Heavy Vehicle Movement control the Movement. 2. | area Leveling using grader | ° Defected Equipment or Equipment | ¢ Operators must have direct vision of the tow Supervisor ‘© Daily Inspection Shall be conduct and dally ccheck list must be maintaining, Client inspection Sticker posted on the equipment, Soil Compaction by | Compactor, plate ler Hit, struck, crushing feet in between, fall of compactor on ‘men, injury from sharp objects. ‘© Competent & Trained operator only should operate the equipment & compactors. The equipment shall not have any physical damage or defect. © Provide ear plug or ear muffs the 3 | compactor and jumping | Noire Low tor. © Oilleakage. . Inspection Shall be conduct and daily ‘Supervisor '* Breakdown of vehicle/equipment check Net must be maintained, gloves. 4 Materials Using Boom vehicle/equipment ick-Up alar a a ae Low ‘Truck. Crushing Hazard due to Mobile pat op ctetors amatnaee Equipment Im rule for mobile equipment. a = eoom (irek Collapse Rest out rigger on proper wooden pad or Set of Be ‘truck: a cee Supervisor 5 | Setup of Boom truct * Unauthorized personal © Barricade lifting area Low Operator * Unauthorized movement Rigger Struck by / Struck with ‘+ Display safety sign boards © Deploy Flagman © Specialized training to craftsmen Conduct tool box before starting the lifting Use mandatory PPE, s Deploy rigger certified by according to loads. Use rigging gear with valid test certificate and valid color code Inspect rigging gear before each use Keep unwanted personnel out of lifting radius/area. Lifting operations Overloaded crane causing a ping hazard and injury to personal. ipping Fall of load due to sling failure, Poor rigging. Mechanical failure Training to employee for safe lifting oF loads A qualified Maaden approved third-party certified crane / boom truck operator and rigger shall assess the load and ensure that the crane / boom truck is suitable for the lift Periodical inspection of crane / Boom truck and rigging equipment to be done Over loaded shall be avoided. Maximum allowed loading shell be less than 80% of rated SWL No lifting if wind speed is more than 20, m/ph or 32k/ph Certified rigger shall be in charge of job ‘The rigger selects appropriate lifting gears. | for the intended lift Inspect sling and shackles and color coded prior to each lit Ensure all the lifting gears are in good Condition and having a valid inspection low Supervisor Operator Rigger certificate by and approved third-party agency. Tag line shall be used to control the suspending load, Lifting area shall be barricaded to prevent entry of un intended persons Sufficient safety posters shall be displayed, Laying down of portable fence and poles pieces one by one at identified boundary areas. * Manual Handling Pinch Points and hand injury. Each individual should carry only 25kgs. Avoid awkward posture, Use of appropriate gloves. low Supervisor Preparation of foundation (pad) and inst Generator and Electric distribution panel © Shuttering / form works & Steel Fixing. ‘© Placing and tying of rebar. Experienced and trained steel fixers & Carpenters shall be used with adequate supervision provided. Steel fixers will wear suitable gloves/footwear and eye protection, Re-bar willbe fitted into the work area ing equipment and using certificate tackle, Re-bar off cuts / wire order to alleviate slip in bar bending (type activities). Tool box talks will be conducted ‘emphasizing the hazards of bar bending (pinch points) and handling steel re-bar sharp edge: Exposed vertical bars e.g. pile CAPs that are sited in a manner that expose personnel to risk from implement will be bent, covered or protected by wooden block or other approved means. All the Tools shall be inspected and Color coded. Handmade tools are prohibited. Supervisor © Sufficient warning is to be given to | workers prior to starting or recommencing | the p '* The air hose is to be inspected prior to ‘and during the pour to ensure there is no damage or blockages. ‘* Hoses to be checked prior to pumping any concrete to ensure they are adequately secured with safety pins for lever ‘couplings in place and that brackets are not fixed too far apart to prevent the hose from moving excessively. * Being struck by concrete being ‘ejected from the concrete hose at first moment of delivery. Could cause body injuries; fall onto or off the deck, ‘© Experienced operators of the pump to be « + Being struck by concrete or piece Eoin SONCRETE WORKS Trucks pe whi ueee ara - Or ipe whih could cause body |, erever possible workers should not (Pouring concrete out of De meee walk backwards. Low oe Mechanical Mixer) * Care should be taken at all times, “Eyes on ae | + Slip on wet ply or reinforcement. rar Pumping Concrete eects aa # There must be rebar caps on the ends of | Sealing concrete/curing | 6 Cuts from reinforcement bar ends | | {ne einforcement bar | ees + Tiewire must be turned down into | reinforcement cage + Safety or steel cap rubber boots tobe | worn | + Correct PPE to be utilized ie. breathing | masks, gloves, goggles long sleeves etc. | ‘+ MSDS Sheets to be availabe to all employees, ‘+ Adequate ventilation and exhaust fans to be provided in enclosed areas. + Workers in area to be notified and should wear correct PPE also, Skin rashes and or allergies from contact with sprayed sealing compound. Incompetent Workers + Ensure the Workers were wained and Dust experienced, Supervisor + Ensure applicable PPEs Low + Disposables cloths + Cartridge type respiratory Mask Surface Cleaning and Coating MSDS to be provided and accessible to all crews. 1 Trenching activities for rounding wire and rod Hand / fingers injury Slip/tripping hazards Underground Utilities ‘© Tools shall be inspected and duly color- coded for the current month, ‘© Supervisor should ensure that the work is executed by trained workers. * Isolate the area and provide signboards © Ensure the exact location where the direct buried conduits are to be installed in accordance with the approved drawing, © Ensure area is clear of underground utilities If found any cables, Treat itas live Low Supervisor 12 Cable Laying, cable connections and termination of Armored cables. Pinch Point Physical harm Nips, Cuts and abrasion ‘© Only qualified and authorized personnel shall be permitted to work with the ‘© Donot put your hand or other body parts between two hard objects ‘© Maintain enough spacing between each cable drum, © Don't adjust unstable load by hand or put hand between drums during lifting or unloading process. * Tools shall be inspected and duly color- coded for the current month. © Sultable PPE shall be worn at during manual handling, * Ensure enough persons are moving/pushing the cable drum if any movement needed on site to the location during installation. ‘© Ensure during moving the cable drum al persons easily pushing according to their capabilities. © Use of adequate tools. Use appropriate loves. electrical connections to be both times | Low Supervisor mechanically and electrically sound, No twisted up wired and tapped up joints. ‘Acquire clearance permit from MAC electrical and mechanical department. Remove spillages, obstacles.ete. in Excavation (<1m) by using . ’ walkways and pathways for ease of backhoe mounted auger © Sil, trip and fal per - 13 © Ergonomics © Avoid repetitive motion, Low machine for poles machine fo Pinch points + Repeat the task in shifts. + Fire + Use of adequate tools Use appropriate supenisor loves, + Acquire hot work permit. + Fire extinguisher with fire watch man, © Avoid repetitive mation. 4 Manual clearing of the © Ergonomics © — Repeat the task in shifts. iow material + inch Point + Use of adequate tools. Supervisor E - + _Use appropriate gloves. 15. | installation of poles, Manual handling. . Each individual should carry only 25kgs. toe + Pinch Point + Avoid awkward posture Supervisor * Use Correct Manual lifting techniques Installation of string Razor * Full PPE including Leather Gloves shall be and barb wire. Tie off & | * Pinch by Sharp edge worn tg | Tension Galvanized wire on | « Cuts braises # Ladders shall inspect prior to the use and a eee top, middle & bottom of . ip, Trip & fe says placed on stable ground. the fence Posts, Fence | « Defective tools + Ensure each tools ae checked and color mesh installation, coded ~ ¢ Sufficient Drinking Water shall be . . available onsite 17 | welfere cae + Sanitation faites must be available tow Bee © — Rest shelter + Clear the area of any unwanted materials. 18 | General Housekeeping | SIP. trip and all Timely lsposal of unwanted wastes low Supervisor Waste Management eda ah aoc LEVEL AFTER IMPLEI ES High Risk Task description: Potential Incident Reese U LO OcUM ea eco creat No. Name Position Signature Date Phone 1 2 3 4 5 6 7 8 9 10 Re een arctan eet Name Position Signature Date Phone 1

You might also like