Download as pdf
Download as pdf
You are on page 1of 2
Observation made by Sr, DEE/TRD/UMB di NBA\(In.) section on date:28,12.22 uring trolley inspection of KLSX(Ex.)- S.No. Observations Remarks/Action to be taken by 1 | Signal clearance from nearest OHE mast before & aller in OK between loc.70/6A-6 is 33.70m and 11.20m respectively, 2 At loc.69/18 ATD xy value checked at temperature 18°C RVNUUMB. found x-1.14m & y-2.74m, free movement checked found ok. ITR bond found open at above location, 3 AtATD loc.69/42 temperature. marking to be done. RVNUUMB 4 AtLC n0.53-C/E in between loc.67/30-32 rail level of UP &| RVNUUMB DN line was not same. 5 At loc.67/18 ATD *y value checked at temperature 23°C RVNUUMB found x-1.45m & y-2.81m, free movement checked found ok ATD Counter weight to be paint at above location. 6 Signal clearance from nearest OHE mast before & after in | OK between loc.67/12-10 is 31.20m and 18.50m respectively, 7 JAt LC n0.52-Ci2-E in between 106.67/2-4- contact height | OK measured was 5.70m,all bonds found ok. 8 At loc.66/32 structure bond found Open. RVNUUMB 9 CTWISSP in between loc.65/28-26 earth resistance of EP1 RVNUUMB checked Individual value-8.900hm Combined value-2. Ohm Treatment required, 10 [Signal clearance irom nearest OHE mast betore & aller OK between loc.65/10-12 is 41.80m and 16.50m respectively. 11 | Tree trimming required at loc. 64798 RVNUUMB 12 Kite and kite threads to be removed at loc. 64/10-12. RVNUUMB 18. At Tocs.63/24 & 63/26 ATD free movement checked and | OK found between 10-12kg, 14 Jn between loc-62/28-6372 Bridge no.125U bond wok is | RVNUUMB pending. 15, At loc.60/20 number plate found tilted. RVNUUMB 16 At loc.58/20 &55/38 ATO y value to be adjust. RVNUUMB 17 Tree trimming fequired at loc.56/32-34 and 56/10 RVNU/UMB 18 At loc, 55/18,20,14,12,10 foundation back soil filling to be | RVNUUMB done. 19 | Signal clearance fiom nearest OHE mast betors & aller WOK between loc.54/14-12 is 50.75m and 16.10m respectively, 20 | At loc:54/14 extension chair to be provided as the locction RVNUUMB is lying before signal post. 21 | Tree tfimming required at loo5a/1 RVNUUMB & scanned with OKEN Scanner 22 __| BM at CTWISSP & NBAISSP yet to be made fully functional, RVNUUMB 23 | NBA/SSP: RVNUUMB: i. New buried rail to be provided. New Schematic diagram to be provided. iii.Number plates of BM/CB to be provided. Yi: 230-fea / BA, /arraTe / 488 S ferIw:29.12.22 aR Heat 7 Bar tert /ararar orth Copy to:i, DRM/UMB: For kind information please. .RVNL/UMB:For kind information and necessary action please. & scanned with OKEN Scanner

You might also like