Observation made by Sr, DEE/TRD/UMB di
NBA\(In.) section on date:28,12.22
uring trolley inspection of KLSX(Ex.)-
S.No. Observations Remarks/Action to
be taken by
1 | Signal clearance from nearest OHE mast before & aller in OK
between loc.70/6A-6 is 33.70m and 11.20m respectively,
2 At loc.69/18 ATD xy value checked at temperature 18°C RVNUUMB.
found x-1.14m & y-2.74m, free movement checked found
ok.
ITR bond found open at above location,
3 AtATD loc.69/42 temperature. marking to be done. RVNUUMB
4 AtLC n0.53-C/E in between loc.67/30-32 rail level of UP &| RVNUUMB
DN line was not same.
5 At loc.67/18 ATD *y value checked at temperature 23°C RVNUUMB
found x-1.45m & y-2.81m, free movement checked found ok
ATD Counter weight to be paint at above location.
6 Signal clearance from nearest OHE mast before & after in | OK
between loc.67/12-10 is 31.20m and 18.50m respectively,
7 JAt LC n0.52-Ci2-E in between 106.67/2-4- contact height | OK
measured was 5.70m,all bonds found ok.
8 At loc.66/32 structure bond found Open. RVNUUMB
9 CTWISSP in between loc.65/28-26 earth resistance of EP1 RVNUUMB
checked
Individual value-8.900hm
Combined value-2. Ohm
Treatment required,
10 [Signal clearance irom nearest OHE mast betore & aller OK
between loc.65/10-12 is 41.80m and 16.50m respectively.
11 | Tree trimming required at loc. 64798 RVNUUMB
12 Kite and kite threads to be removed at loc. 64/10-12. RVNUUMB
18. At Tocs.63/24 & 63/26 ATD free movement checked and | OK
found between 10-12kg,
14 Jn between loc-62/28-6372 Bridge no.125U bond wok is | RVNUUMB
pending.
15, At loc.60/20 number plate found tilted. RVNUUMB
16 At loc.58/20 &55/38 ATO y value to be adjust. RVNUUMB
17 Tree trimming fequired at loc.56/32-34 and 56/10 RVNU/UMB
18 At loc, 55/18,20,14,12,10 foundation back soil filling to be | RVNUUMB
done.
19 | Signal clearance fiom nearest OHE mast betors & aller WOK
between loc.54/14-12 is 50.75m and 16.10m respectively,
20 | At loc:54/14 extension chair to be provided as the locction RVNUUMB
is lying before signal post.
21 | Tree tfimming required at loo5a/1 RVNUUMB
& scanned with OKEN Scanner22 __| BM at CTWISSP & NBAISSP yet to be made fully functional, RVNUUMB
23 | NBA/SSP: RVNUUMB:
i. New buried rail to be provided.
New Schematic diagram to be provided.
iii.Number plates of BM/CB to be provided.
Yi: 230-fea / BA, /arraTe / 488 S
ferIw:29.12.22
aR Heat 7
Bar tert /ararar orth
Copy to:i, DRM/UMB: For kind information please.
.RVNL/UMB:For kind information and necessary action please.
& scanned with OKEN Scanner