Engineering Construction Industry Training Standard
Introduction
This training standard sets out the training necessary to develop the skills required to dismantle, prepare, secure and
reassemble mechanical joint connection systems. It does not form part of any recognised regulated qualification.
This Training Standard aligns with the training requirements of the following standards
ASME PCC-1-2013 Paragraphs BS EN 1591-4:2013 Tables
Appendix A A2.3 (not item (j) 2&3 Part 4 1
This is covered in MJI18) 8
A 2.3.1
This document has been developed by an industry-led working group. The companies which formed this working
group have developed this training standard to ensure consistent, high quality training which meets their needs and
that of the industry.
Training designed to this standard must include instruction that ensures that:
1. The learner is aware of the importance of health and safety in the workplace.
2. The learner understands relevant aspects of current health, safety and environmental legislation and
demonstrates this understanding at all times.
Instruction must include the particular risks, hazards and countermeasures associated with the activity.
3. The learner observes any specific safety requirements relating to the machines, equipment and methods of
working outlined in this document.
Qualifying comments
1. This document is structured so that each learning outcome is supported by ‘enabling objectives’ (the sentence)
and ‘key learning points’ (the list) which, when collectively achieved, will result in the fulfilment of the specified
learning outcome.
2. The key learning points are there to both contextualise the enabling objective and state what should be
known/understood or demonstrated by the learner upon completion of training.
3. Exercises and ‘real-life’ examples used in course materials related to this document must be contextualised to
the learners’ working environment e.g. the Engineering Construction Industry.
4. Practical elements of this training should be underpinned by practical instruction in addition to sufficient study
time for consolidation of learning.
5. All comments and queries relating to this document should be directed to the ECITB Product Development
Department via productdevelopment@ecitb.org.uk.
Version control
Version
Date Change Name
number
Learning ID Enabling Objectives (EO) and Key Learning Points (KLP) State where
Outcomes the EO is
Deliver training which will enable the learner to:
(LO) covered in
the course
1. Understand 1.1 Identify and describe clamp connectors, hub types and their appropriate Click or tap
tightening and seal rings. here to enter
torqueing
text.
sequences for
1.2 Identify and explain the tables and charts which are used to determine Click or tap
clamp
correct torque values. here to enter
connectors
text.
1.3 Explain hand torque tightening sequences relating to clamp connectors. Click or tap
here to enter
text.
1.4 Describe the safe operation of hand torque wrenches. Click or tap
here to enter
text.
2. Prepare 2.1 Identify and locate from engineering drawings the systems and Click or tap
work areas, components to be worked on. here to enter
equipment
text.
and materials
2.2 Confirm the isolation of the components to be worked on. Click or tap
for bolted
connection here to enter
tasks text.
2.3 Obtain relevant tools and equipment and describe the care, control, Click or tap
preparation and use, including: here to enter
a. Hand tools and inspection tools
text.
b. Hand torque wrenches
c. Proprietary backup wrenches and alignment tools, which may
improve safety and speed of assembly.
2.4 Obtain and prepare specified materials and consumables, to include: Click or tap
a. Tables and charts to identify correct stud bolts, torque values and here to enter
stud bolt load
text.
b. Lubricants.
Learning ID Enabling Objectives (EO) and Key Learning Points (KLP) State where
Outcomes the EO is
Deliver training which will enable the learner to:
(LO) covered in
the course
3. Perform 3.1 Safely carry out disassembly, component removal and inspection of Click or tap
hand torqued hand torqued clamp connectors, to include: here to enter
clamp a. Installing temporary support for heavy components
text.
connector b. Cleaning, preparation and checking of clamp connectors, centre
activities hubs and seal-rings
c. Cleaning, preparation and checking of joint groove/hub dimensions
and surface finish.
3.2 Safely assemble clamp connectors using hand torqueing methods Click or tap
including the setting and adjusting of the equipment, to include: here to enter
a. Accurate assembly techniques
text.
b. Accurate hand torque tightening sequences and torque values.
3.3 Describe and perform checks to ensure the clamp connection complies Click or tap
with the specification, to include: here to enter
a. Uniformity of clamp gap and clamp alignment
text.
b. Torque values
c. Inspection, test and record-keeping procedures.