Hi Alex,
Seismic load to that front wall is 5 kips. Nice to meet you too!
Thanks,
Senior Engineer/Principal
CIOTA ENGINEERING PC
156 Clear Creek Dr Suite 101
Cameron,
Thank you for following up. I will look out for the loading incoming.
Also, thank you all for meeting with me yesterday on such short notice!
Thank you,
WARNING: Do not click links or open attachments unless you recognize the source of the email and
know the contents are safe!
The afternoon got away from me. I’ll send the loading info tomorrow morning.
Cameron
Hi Alex,
Following our conversation today, you'll find DWG attached. If you need
anything else, just let me know.
Just to clarify, we would like Simpson to do the shop drawings and Travis to get 3
bids based on the Simpson shop drawings. Please let us know if our understanding
of the process is not correct.
Best,
Capucine Clément
Architectural Designer | capucine@arkitek.us
arkitek:design&architecture
426 A Street, Suite 101, Ashland, OR 97520
T. 541.880.8917 | www.arkitek.us
<21-002 Malmgren - DEMOLITION ELEVATION - WEST.dwg>
<21-002 Malmgren - FLOOR PLAN - LEVEL 0 & LEVEL 1.dwg>