PDO Audit PDO Audit Date: 20-22 Nov 2022

Findings & Observations Audit Ref.: Audit # QA.22.53

QC Findings Date of Close-out: 13 Dec 2022

Audit Finding: GS_PDO Audit_QC_Point 14

Findings:

1) Facility does not have any NDT procedures / NDT activities.

Action:
1) Gulf Studs have portable XRF Analyzer for Positive Material Identification and while checking all
incoming raw materials the material grade is verified with supplier MTC’s by means of PMI and all
records are maintained.
2) Dye penetrant testing is introduced for surface testing for detecting surface defects.

Evidence:
1) PMI Photos
2) PMI Records
3) DP Testing Photos

Prepared by Reviewed by Approved by

Sign:

Name: Mohammed Saifuddin Dr. Nasser Al Araimi


Shoaib Pathan

Designation: QA/QC Supervisor Audit Focal Point CEO