This document provides specifications for solar photovoltaic systems to power telecommunications towers with different load capacities. It includes calculations for the solar modules, batteries, and charge controllers needed based on the power consumption and autonomy requirements. A table lists the components and quantities required for systems sized to power a tower with a 450 Watt-hour, 650 Watt-hour or 950 Watt-hour load. Services such as site surveys, installation, testing and maintenance are also specified.
This document provides specifications for solar photovoltaic systems to power telecommunications towers with different load capacities. It includes calculations for the solar modules, batteries, and charge controllers needed based on the power consumption and autonomy requirements. A table lists the components and quantities required for systems sized to power a tower with a 450 Watt-hour, 650 Watt-hour or 950 Watt-hour load. Services such as site surveys, installation, testing and maintenance are also specified.
This document provides specifications for solar photovoltaic systems to power telecommunications towers with different load capacities. It includes calculations for the solar modules, batteries, and charge controllers needed based on the power consumption and autonomy requirements. A table lists the components and quantities required for systems sized to power a tower with a 450 Watt-hour, 650 Watt-hour or 950 Watt-hour load. Services such as site surveys, installation, testing and maintenance are also specified.
Equipment Load 1.500 Wa4 Power Needed per Day 39.075 Wa4.Hour Operasional hours 24 Hours Total kapasitas PV Module 11.164 WaH Peak Sun Hours/Day 3,5 Hrs Total Jumlah PV Module-1 43,00 Module FALSE Discharge Hours/Day 20,5 Hrs Total Jumlah PV Module-Final 44,00 Module Luas Area Solar PV Module 71,44 m2 Power ConsumpRon during Sun Hours 5.250 Wa4.Hour Series ConnecRon PV Module 2 Module Power ConsumpRon during Discharge Hours 30.750 Wa4.Hour Paralel ConnecRon PV Module 22 Module Equipment Losses 10 % DoD 80 % 2. PERHITUNGAN BATTERY Otonomous Days 1,5 Days Based on Otonomous Days Power ConsumpRon per day 39.600 Wa4.Hour Input Spesifikasi Perangkat : Capacity ba4ery will used 1.628,29 Ah PV module will used 265 Wa4peak Capacity ba4ery available 100 Ah PV module length 1.640 mm QuanRty ba4ery will be used 17 Unit PV module wide 990 mm Capacity baHery needed 1700 Ah PV module large 1,62 m2 Open Circuit Voltage (Voc) 38,26 Volt 3. PERHITUNGAN CHARGE CONTROLLER Max Power Voltage (Vmp) 31,11 Volt Minimum Capacity Charge Controller 187,44 Ampere Short Circuit Current (Isc) 9,00 Ampere Proposed Charge Controller > min Capacity CC 80 Ampere Max Power Current (Imp) 8,52 Ampere QuanRty Charge Controller-1 3 Unit Nominal Voltage Ba4ery will used 48 Volt Quan-ty Charge Controller-Final 4 Unit System Volt 48 Volt Efficiency ba4ery 95 % SPS Capacity Load 450 WaHhour (BTS 1 sector) SPS Capacity Load 650 WaHhour (BTS 2 sector) SPS Capacity Load 950 WaHhour (BTS 3 sector) No Item Specifica-on Satuan Qty Specifica-on Satuan Qty Specifica-on Satuan Qty A MATERIAL 1 Modul Solarcell Monocristalyn, cap. 265 WP Unit 16 Monocristalyn, cap. 265 WP Unit 22 Monocristalyn, cap. 265 WP Unit 32 2 Baterai OPzV, 2V 1000 AH Unit 24 OPzV, 2V 1500 AH Unit 24 OPzV, 2V 2400 AH Unit 24 3 Charge Controller MPPT, 80 A Unit 1 MPPT, 80 A Unit 2 MPPT, 80 A Unit 2 4 Rangka Support Metal galvanish, IWF 150 LOT 1 Metal galvanish, IWF 150 LOT 1 Metal galvanish, IWF 150 LOT 1 5 JuncRon Box PowdercoaRng LOT 1 PowdercoaRng LOT 1 PowdercoaRng LOT 1 6 Rak Outdoor & fan untuk ba4ery - Unit 1 - Unit 1 - Unit 1 7 Rak Outdoor & fan untuk perangkat - Unit 1 - Unit 1 - Unit 1 8 Komponen Pendukung - LOT 1 - LOT 1 - LOT 1 - Nameplate Alumunium atau Stainless steel UNIT 1 Alumunium atau Stainless steel UNIT 1 Alumunium atau Stainless steel UNIT 1 - Cabling NYAF (DC) & NYY (AC) LOT 1 NYAF (DC) & NYY (AC) LOT 1 NYAF (DC) & NYY (AC) LOT 1 - Kabel tray/conduit/duct - LOT 1 - LOT 1 - LOT 1 - Grounding system SNI LOT 1 SNI LOT 1 SNI LOT 1 - MCB SNI / IEC LOT 1 SNI / IEC LOT 1 SNI / IEC LOT 1 - Arrester SNI / IEC LOT 1 SNI / IEC LOT 1 SNI / IEC LOT 1 B JASA 1 Survey & pengukuran - Site 1 - Site 1 - Site 1 2 Pembersihan lahan & penebangan pohon sesuai hasil survey Site 1 sesuai hasil survey Site 1 sesuai hasil survey Site 1 3 Delivery & Instalasi - Site 1 - Site 1 - Site 1 4 TesRng & commisioning - Site 1 - Site 1 - Site 1 5 Pemeliharaan perangkat 2x1 tahun Site 1 2x1 tahun Site 1 2x1 tahun Site 1