Professional Documents
Culture Documents
Technical Data Demag Hoist Units Volume 2: Double-Rail Crab EZDH 600 - EZDH 1000 Double-Rail Crab EZLDH 600 - EZLDH 2000
Technical Data Demag Hoist Units Volume 2: Double-Rail Crab EZDH 600 - EZDH 1000 Double-Rail Crab EZLDH 600 - EZLDH 2000
Technical Data
Demag hoist units
Volume 1
DH 600 - DH 2000
see 203 702 44
24597.eps 24583-1.eps
The double-rail crabs fitted with DRS wheel blocks are designed for travelling on rails made of S 355 J2 G3 or a material with
a higher tensile strength.
For rail materials with a lower tensile strength, the permissible wheel loads of the DRS wheel blocks with travel wheels of
EN-GJS-700-2 cannot be used to the full extent.
Existing installations and refurbishments
For refurbishing existing crane installations and ordering a double-rail crab for an old crane installation, it is imperative to take
into account the existing rail material. If the existing rail material has a lower tensile strength than S 355 J2 G3, the new travel
wheel diameter must never be smaller than the existing diameter.
The drive combinations specified in this document apply for double-rail crabs running on welded rails.
When using bolted rails, floor clearance and dimensions must be verified.
For details, see the chapter on rail design in document 203 352 44 DRS Volume 1.
If an operating limit switch is fitted The effective hook path decreases by the values given in tables 2 and 3.
for the top hook position, hook
dimension C, for 1/1, 2/1 and 4/1
reeving, increases as follows:
With operating limit switch for the With operating limit switch for the
top hook position top and bottom hook positions
DH hoist unit DH hoist unit DH hoist unit
Table 1 Table 2 Table 3
20370644.indd / 2021-05-10
85 mm 50 mm 20 mm - 85 mm - 50 mm - 20 mm - 170 mm – 100 mm – 40 mm
24625-1.tif
Fig. 1
1 Electrical equipment cover 6 Rope guide 11 Main lifting motor brake
2 Electrical components 7 Planetary gearbox 12 Terminal box
3 Geared limit switch 8 Rope drum 13 Rope drum brake
4 Frame 9 Roller coupling 14 Wire rope
5 Journal shaft 10 Motor
Track gauge in mm
Four-fall reeving
Lifting speed
Size 1050
Range 1000
20370644.indd / 2021-05-10
L = Double-rail crab
(Hoist unit arranged longitudinally to the
crane bridge)
Z = Double-rail crab
E = Electric trolley
4
Selection criteria
The size of the hoist is determined by the load 1. What are the operating conditions? 5. Do the loads need to be lifted and lowered with
spectrum, average operating time per working day, 2. What is the specified maximum load capacity? high precision?
load capacity and reeving arrangement. 3. To what height must the load be lifted? 6. Is horizontal load travel required?
4. What is the required lifting speed? 7. How is the hoist to be controlled?
Small partial load 4 Very heavy up to 0.25 0.25-0.5 0.5-1 1-2 2-4
Small dead load
Group of mechanisms according to
1Bm 1Am 2m 3m 4m
FEM
Operating time
2 Medium Reeving arrangement Range Size
Hoist units which are usually subject to small loads
but rather often also to maximum loads. 4/2, 2/1 4/1
Load capacity in kg
Load capacity
Operating time/ 2 · 4 · 20 · 8
= 2.66 hours
Check the number of starts per hour when select- day = 60 · 8
ing motors for DH hoist units (see pages
7 to 9). For the “light” load spectrum and an average daily operating time of 2.66 hours,
refer to group 1 Am in the table. For a load capacity of 10,000 kg and 2/1 reeving,
DH hoist unit with pole-changing motor the diagram indicates hoist size DH 1050.
Main lifting speed = 80 starts per hour
Creep lifting speed = 160 starts per hour
20370644.indd / 2021-05-10
Load Reeving 2/1 4/2 Lifting speed 1) Load Reeving 4/1 Lifting speed 1)
capac- capac-
ity Size FEM Hook Hook path m/min ity Size FEM Hook m/min
path path
kg m m V1 V2 V3 kg m V1 V2 V3
3200 DH 616 4m 12; 20 5.1; 10 - 10 16 6300 DH 616 4m 6; 10 - 5 8
12500 DH 1063 1Bm 16; 24 7.4; 12.9 5 8 12.1 25000 DH 1063 1Bm 9; 13.5 2.5 4 6
40; 51 24.2; 32.4 - 8/1.3 11.2/1.8 23.5 - 4/0.6 5.6/0.9
DH 2063 3m 18; 27 6.1; 11.6 6.3 10 12.5 DH 2063 3m 9; 13.5 3.1 5 6.3
47 23.6 6.3/1 9/1.5 - 23.5 3.1/0.5 4.5/0.7 -
16000 DH 2080 2m 18; 27 6.1; 11.6 6.3 10 12.5 32000 DH 2080 2m 9; 13.5 3.1 5 6.3
47 23.6 6.3/1 9/1.5 - 23.5 3.1/0.5 4.5/0.7 -
20000 DH 2100 1Am 18; 27 6.1; 11.6 5 8 10 40000 DH 2100 1Am 9; 13.5 2.5 4 5
47 23.6 5/0.8 7.1/1.2 - 23.5 2.5/0.4 3.6/0.6 -
20370644.indd / 2021-05-10
1) The 1:6 main lifting/creep lifting speed specified is achieved with a 2/12-pole motor.
6 Mechanical microspeed unit speed 1:10.Other creep lifting speeds on request.
Determination table, squirrel-cage hoist motors
Frequency inverter controlled motors on request.
Range DH 600
2/1 m/min - - - - - - - - - -
Main lifting/creep lifting
speed F6 with reeving
4/1 m/min 2.5/0.6 4/0.6 - - - - - - - -
Range DH 1000
Size 1063 1050 1040 1032 1025
Main lifting/creep lifting 2/1 m/min - 8/1.3 11.2/1.8 6.3/1.0 10/1.7 14/2.3 8/1.3 12.5/2.1 18/3 8/1.3 12.5/2.1 18/3 10/1.7 16/2.7 22.4/3.7
speed F6 with reeving 4/1 m/min - 4/0.6 5.6/0.9 3.1/0.5 5/0.8 7/1.1 4/0.6 6.3/1 9/1.5 4/0.6 6.3/1 9/1.5 5/0.8 8/1.3 11.2/1.8
Main lifting motor
KBH...B 2/12 - 180 200 160 180 200 160 180 200 160 180 200 160 180 200
size
Motor type Main lifting and mechanical microspeed unit F10
Main lifting speed with 2/1 m/min 5 8 12.5 6.3 10 16 8 12.5 18 8 12.5 18 10 16 25
reeving 4/1 m/min 2.5 4 6.3 3.1 5 8 4 6.3 9 4 6.3 9 5 8 12.5
Creep lifting speed 2/1 m/min 0.5 0.8 1.25 0.63 1.0 1.6 0.8 1.25 1.8 0.8 1.25 1.8 1.0 1.6 2.5
(mechanical microspeed
unit F10) with reeving 4/1 m/min 0.25 0.4 0.63 0.31 0.5 0.8 0.4 0.63 0.9 0.4 0.63 0.9 0.5 0.8 1.25
Main lifting motor 140 160 200 140 160 200 140 160 200 140 160 200 140 160 200
KBH...B
size B4 B4 B6 B4 B4 B6 B4 B4 B6 B4 B4 B6 B4 B4 B6
Mechanical microspeed
FG... 08 10 08 10 08 10 08 10 08 10
unit Size
Creep lifting motor F10
KBA...B4 80 100 1) 112 1) 80 100 1) 112 1) 80 100 1) 112 1) 80 100 1) 112 1) 80 100 1) 112 1)
Size
20370644.indd / 2021-05-10
2/1 m/min 4/0.6 5.6/0.9 - 5/0.8 7.1/1.2 - 6.3/1.0 9/1.5 - 6.3/1.0 9/1.5 - 8/1.3 11.2/1.9 -
4/1 m/min 2/0.3 2.8/0.4 - 2.5/0.4 3.6/0.6 - 3.1/0.5 4.5/0.7 - 3.1/0.5 4.5/0.7 - 4/0.6 5.6/0.9 -
Main lifting /
creep lifting speed F6 2/2 m/min 8/1.3 11.2/1.8 - 10/1.7 14.2/2.4 - 12.5/2.1 18/3 - 12.5/2.1 18/3 - 16/2.7 22.4/3.7 -
with reeving
4/2 m/min 4/0.6 5.6/0.9 - 5/0.8 7.1/1.2 - 6.3/1.0 9/1.5 - 6.3/1.0 9/1.5 - 8/1.3 11.2/1.9 -
8/2 m/min 2/0.3 2.8/0.4 - 2.5/0.4 3.6/0.6 - 3.1/0.5 4.5/0.7 - 3.1/0.5 4.5/0.7 - 4/0.6 5.6/0.9 -
Main lifting motor
KBH...B 2/12 180 200 - 180 200 - 180 200 - 180 200 - 180 200 -
size
Motor type Main lifting and mechanical microspeed unit F10
2/1 m/min 0.4 0.63 0.8 0.5 0.8 1.0 0.63 1.0 1.25 0.63 1.0 1.25 0.8 1.25 1.6
4/1 m/min 0.2 0.31 0.4 0.25 0.4 0.5 0.31 0.5 0.63 0.31 0.5 0.63 0.4 0.63 0.8
Creep lifting speed
(mechanical microspeed 2/2 m/min 0.8 1.25 1.6 1 1.6 2 1.25 2 2.5 1.25 2 2.5 1.6 2.5 3.2
unit F10) with reeving
4/2 m/min 0.4 0.63 0.8 0.5 0.8 1.0 0.63 1.0 1.25 0.63 1.0 1.25 0.8 1.25 1.6
8/2 m/min 0.2 0.31 0.4 0.25 0.4 0.5 0.31 0.5 0.63 0.31 0.5 0.63 0.4 0.63 0.8
Main lifting motor 160 200 225 160 200 225 160 200 225 160 200 225 160 200 225
KBH...B
size B4 B6 B6 B4 B6 B6 B4 B6 B6 B4 B6 B6 B4 B6 B6
Mechanical microspeed
FG... 10 10 10 10 10
unit size
Creep lifting motor F10
KBA...B4 100 1) 112 1) 112 100 1) 112 1) 112 100 1) 112 1) 112 100 1) 112 1) 112 100 1) 112 1) 112
size
20370644.indd / 2021-05-10
160 B2/12 1) 80 50 50 10 1) 18 4 1) 44 4 1) 60
1) Only use motors with starting and braking circuitry. In this case, the voltage drop may be 10%. (See
description of functions 202 708 44 (714 IS 952)
2) Fuses also apply in conjunction with a cross-travel motor.
3) Earth-loop impedance of 100 m Ω required.
4) The cable lengths are calculated on the basis of an earth-loop impedance of 200 m Ω. 9
Main lifting
Size Group of P % CDF n Starts Rated current IN and start-up current IA for 50 Hz cos cos
mecha- per hour
nisms
according 230 V 400 V 500 V φN φA
to
KBH FEM kW rpm IN (A) IA (A) IN (A) IA (A) IN (A) IA (A)
1Bm
7.1 40 1410 240 33 135 19 78 15.2 62 0.78
1Am, 2m
125 B4 0.65
3m, 4m 5.7 60 1420 360 30 135 17.1 78 13.7 62 0.76
1Bm
11.4 40 1420 240 53 248 30 143 24 114 0.72
1Am, 2m
140 B4 0.59
3m, 4m 9.3 60 1440 360 45 248 26 143 21 114 0.68
1Bm
17.8 40 1440 240 76 425 44 244 35 195 0.78
1Am, 2m
160 B4 0.58
3m, 4m 14.2 60 1450 360 64 425 37 244 30 195 0.75
1Bm
28.5 40 955 240 119 496 68 285 55 228 0.71
1Am, 2m
200 B6 0.46
3m, 4m 22.5 60 965 360 99 496 57 285 46 228 0.66
1Bm
40 40 970 240 157 760 90 437 72 350 0.79
1Am, 2m
225 B6 0.60
3m, 4m 32 60 975 360 132 760 76 437 61 350 0.76
Size Mains connection delay fuses for 50 Hz 1) Supply lines for 5% voltage drop ∆U and start-up current IA for 50 Hz 3)
230 V 400 V 500 V 230 V (∆U 11.5 V) 400 V (∆U 20 V) 500 V (∆U 25 V)
140 B4 100 63 63 10 22 2) 4 15 4 23
160 B4 125 80 80 25 38 2) 6 21 6 33
Example for calculating the cross-sections of cables exceeding the length indi-
cated in the table:
KBH 125 B4, 230 V required length 25 m
Size Group of P % CDF n Starts per Rated current IN and start-up current IA for 50 Hz cos cos
mechanisms hour
according to 230 V 400 V 500 V
1Bm
3.5 25 1405 240 16.5 9.5 7.6 0.72
1Am, 2m
100 B 4 71 41 33 0.73
3m, 4m 3.0 40 1420 360 15.2 8.7 7.0 0.68
1Bm
100 B 4 1Am, 2m 2.3 100 1425 --- 10.8 56 6.2 32 5.0 26 0.71 0.72
3m, 4m
1Bm
5.2 25 1410 240 23 13.5 10.8 0.75
1Am, 2m
112 B 4 106 61 49 0.68
3m, 4m 4.5 40 1425 360 21 12.1 9.7 0.70
1Bm
112 B 4 1Am, 2m 3.5 100 1425 --- 15.6 83 9.0 48 7.2 38 0.73 0.70
3m, 4m
20370644.indd / 2021-05-10
11
Motor data travel motor EZDH, EZLDH (40% CDF)
Size PN nN MN IN cos IA / IN MA /MN MH Jmot A MB h Weight
230 V
kW min -1 Nm A φN Nm kgm2 h -1 Nm kg
0.06 675 0.85 1.15 0.59 1.40 2.20 1.7 720
ZBF 63 A8/2 B003 0.00459 1.4 10.0
0.25 2745 0.87 1.65 0.71 2.65 2.10 1.5 550
0.09 675 1.25 1.30 0.61 1.60 2.70 2.5 620
ZBF 71 A8/2 B003 0.00690 1.9 12.2
0.34 2785 1.15 1.75 0.73 3.50 2.60 2.5 500
0.13 630 1.95 2.40 0.64 1.20 2.10 3.5 620
ZBF 80 A8/2 B020 0.01275 3.3 19.5
0.50 2790 1.70 2.40 0.73 4.50 2.60 4.0 500
0.20 690 2.80 2.60 0.50 1.95 2.50 6.5 580
ZBF 90 B8/2 B020 0.02169 4.4 28.2
0.80 2765 2.80 4.00 0.79 3.60 2.40 6.2 450
0.29 685 4.00 3.70 0.50 1.80 2.50 9.0 460
ZBF 100 A8/2 B050 0.03092 8.3 35.0
1.20 2760 4.20 5.60 0.82 4.00 2.50 9.5 350
0.46 705 6.20 4.30 0.49 2.50 2.40 15.0 460
ZBF 112 A8/2 B050 0.04374 11 56.4
1.90 2855 6.40 7.50 0.85 5.30 2.40 14.5 350
12
20370644.indd / 2021-05-10
13
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R12) + (R21, R22)
EZDH 600 double-rail crab - DRS 112, 2/1 reeving (dimensions see page 30)
Wheel load from hoist load kg
Track
H12 H20
gauge
DH 640 DH 632 DH 625 DH 620 DH 616 DH 640 DH 632 DH 625 DH 620 DH 616
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1000 1532 2468 1206 1944 958 1542 766 1234 613 987 -
1400 1666 2334 1312 1838 1041 1459 833 1167 666 934 1466 2534 1154 1996 916 1584 733 1267 586 1014
2240 1791 2209 1410 1740 1119 1381 896 1104 716 884 1666 2334 1312 1838 1041 1459 833 1167 666 934
2800 1833 2167 1443 1707 1146 1354 916 1084 733 867 1733 2267 1365 1785 1083 1417 866 1134 693 907
Crab weight
Track gauge lka 1000 1400 2240 2800 Mechanical microspeed unit
Hook path H12 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 weight
DH size 640-620 616 640-620 616 640-620 616 640-620 616 FG 08 with KBA 71 B4 = 50 kg
KBH 112 445 485 470 510 510 550 545 585 585 625 650 690 690 730 FG 08 with KBA 80 B4 = 55 kg
Motor KBH 125 465 505 490 530 530 570 565 605 605 645 670 710 710 750
Travel drive see page 31
size KBH 140 495 535 520 560 560 600 595 635 635 675 700 740 740 780
KBH 160 565 605 590 630 630 670 665 705 705 745 770 810 810 850
EZDH 600 double-rail crab - DRS 125, 2/1 reeving (dimensions see page 31)
Wheel load from hoist load kg
Track
H12 H20
gauge
DH 640 DH 632 DH 625 DH 620 DH 640 DH 632 DH 625 DH 620
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1000 1532 2468 1206 1944 958 1542 766 1234 -
1400 1666 2334 1312 1838 1041 1459 833 1167 1466 2534 1154 1996 916 1584 733 1267
2240 1791 2209 1410 1740 1119 1381 896 1104 1666 2334 1312 1838 1041 1459 833 1167
2800 1833 2167 1443 1707 1146 1354 916 1084 1733 2267 1365 1785 1083 1417 866 1134
Crab weight
Track gauge lka 1000 1400 2240 2800 Mechanical microspeed unit weight
Hook path H12 H12 H20 H12 H20 H12 H20 FG 08 with KBA 71 B4 = 50 kg
20370644.indd / 2021-05-10
EZDH 600 double-rail crab - DRS 112, 4/2 reeving (dimensions see page 34)
Wheel load from hoist load kg
Track
H12 H20
gauge
DH 640 DH 632 DH 625 DH 620 DH 616 DH 640 DH 632 DH 625 DH 620 DH 616
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1000 -
1400
2000 1575 1250 1000 800
2240 2000 1575 1250 1000 800
2800
Crab weight
Track gauge lka 1000 1400 2240 2800 Mechanical microspeed unit
Hook path H12 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 weight
DH size 640-620 616 640-620 616 640-620 616 640-620 616 FG 08 with KBA 71 B4 = 50 kg
KBH 112 460 495 485 510 520 545 560 585 595 620 665 690 700 725 FG 08 with KBA 80 B4 = 55 kg
Motor KBH 125 480 515 505 530 540 565 580 605 615 640 685 710 720 745
Travel drive see page 35
size KBH 140 510 545 535 560 570 595 610 635 645 670 715 740 750 775
KBH 160 580 615 605 630 640 665 680 705 715 740 785 810 820 845
EZDH 600 double-rail crab - DRS 125, 4/2 reeving (dimensions see page 36)
Wheel load from hoist load kg
Track
H12 H20
gauge
DH 640 DH 632 DH 625 DH 620 DH 640 DH 632 DH 625 DH 620
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1000 -
1400
2000 1575 1250 1000
2240 2000 1575 1250 1000
2800
Crab weight
Track gauge lka 1000 1400 2240 2800 Mechanical microspeed unit weight
Hook path H12 H12 H20 H12 H20 H12 H20 FG 08 with KBA 71 B4 = 50 kg
20370644.indd / 2021-05-10
EZDH 600 double-rail crab - DRS 112, 4/1 reeving (dimensions see page 38)
Wheel load from hoist load kg
Track
H12 H20
gauge
DH 620 DH 616 DH 620 DH 616
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R12 R 22 R12 R 22 R12 R 22 R12 R 22
1000 2280 1720 1383 1767 -
1400 1826 2174 1438 1712 1757 2243 1384 1766
2240 2125 1875 1673 1477 1848 2152 1456 1695
2800 2100 1900 1654 1496 1879 2121 1479 1671
Crab weight
Track gauge lka 1000 1400 2240 2800 Mechanical microspeed unit
Hook path H12 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 weight
DH size 620 616 620 616 620 616 620 616 FG 08 with KBA 71 B4 = 50 kg
KBH 125 595 670 695 670 695 780 805 780 805 860 885 860 885 FG 08 with KBA 80 B4 = 55 kg
Motor
KBH 140 625 700 725 700 725 810 835 810 835 890 915 890 915
size Travel drive see page 39
KBH 160 695 770 795 770 795 880 905 880 905 960 985 960 985
EZDH 600 double-rail crab - DRS 125, 4/1 reeving (dimensions see page 40)
Wheel load from hoist load kg
Track
H12 H20
gauge
DH 625 DH 620 DH 616 DH 625 DH 620 DH 616
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R12 R 22 R12 R 22 R12 R 22 R12 R 22 R12 R 22 R12 R 22
1000 2850 2150 2280 1720 1383 1767 -
1400 2282 2718 1826 2174 1438 1712 2196 2804 1757 2243 1384 1766
2240 2656 2344 2125 1875 1673 1477 2311 2689 1848 2152 1456 1695
2800 2625 2375 2100 1900 1654 1496 2348 2652 1879 2121 1479 1671
Crab weight
Track gauge lka 1000 1400 2240 2800 Mechanical microspeed unit
Hook path H12 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 weight
20370644.indd / 2021-05-10
DH size 625-620 616 625-620 616 625-620 616 625-620 616 FG 08 with KBA 71 B4 = 50 kg
KBH 125 595 670 695 670 695 780 805 780 805 860 885 860 885 FG 08 with KBA 80 B4 = 55 kg
Motor
KBH 140 625 700 725 700 725 810 835 810 835 890 915 890 915
size Travel drive see page 41
KBH 160 695 770 795 770 795 880 905 880 905 960 985 960 985
16
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R12) + (R21, R22)
EZDH 632 double-rail crab - DRS 125, 4/1 reeving (dimensions see page 42)
Wheel load from hoist load kg Wheel load from dead load kg
Track
gauge H12 H20 H12 H20
DH 632 DH 632
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1000 2762 3488 - 192 118 -
1400 2866 3384 2683 3567 198 145 205 150
2240 2963 3287 2849 3401 217 184 214 180
2800 2996 3254 2904 3346 229 203 236 209
Crab weight
Track gauge lka 1000 1400 2240 2800 Mechanical microspeed unit weight
Hook path H12 H12 H20 H12 H20 H12 H20 FG 08 with KBA 71 B4 = 50 kg
DH size 632 FG 08 with KBA 80 B4 = 55 kg
KBH 125 595 670 695 780 805 860 885
Travel drive see page 43
Motor size KBH 140 625 700 725 810 835 890 915
KBH 160 695 770 795 880 905 960 985
EZDH 640 double-rail crab - DRS 125, 4/1 reeving (dimensions see page 44)
Wheel load from hoist load kg Wheel load from dead load kg
Track
H12 H20 H12 H20
gauge
DH 640 DH 640
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1000 3536 4464 - 199 125 -
1400 3669 4331 3434 4566 204 151 205 150
2240 3793 4207 3646 4354 229 196 224 190
Crab weight
Track gauge lka 1000 1400 2240 Mechanical microspeed unit weight
Hook path H 12 H 12 H 20 H 12 H 20 FG 08 with KBA 71 B4 = 50 kg
20370644.indd / 2021-05-10
17
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R12) + (R21, R22)
EZDH 1000 double-rail crab - DRS 112, 2/1 reeving (dimensions see page 46)
Wheel load from hoist load kg
Track
gauge H16 H24 H40
DH 1040 DH 1032 DH 1025 DH 1040 DH 1032 DH 1025 DH 1040 DH 1032 DH 1025
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1400 1557 2443 1226 1924 973 1527 2723 1277 2144 1006 1702 798 -
2240 1723 2277 1357 1793 1077 1423 1607 2393 1266 1884 1005 1495 2684 1316 2114 1036 1677 823
2800 1779 2221 1401 1749 1112 1388 1679 2321 1322 1828 1049 1451 1486 2514 1170 1980 929 1571
Crab weight
Track gauge lka 1400 2240 2800 1400 2240 2800 Mechanical microspeed unit
Hook path H16 H24 H16 H24 H40 H16 H24 H40 H16 H24 H16 H24 H40 H16 H24 H40
weight
DH size 1040-1032 1025 FG 08 with KBA 80 B4 = 55 kg
KBH 140 885 975 1000 1090 1290 1100 1190 1390 900 990 1015 1105 1305 1115 1205 1405 FG 10 with KBA 90 B4 = 160 kg
Motor KBH 160 955 1045 1070 1160 1360 1170 1260 1460 970 1060 1085 1175 1375 1185 1275 1475 FG 10 with KBA 100 B4 = 186 kg
size KBH 180 1025 1115 1140 1230 1430 1240 1330 1530 1040 1130 1155 1245 1445 1255 1345 1545
Travel drive see page 47
KBH 200 1085 1175 1220 1290 1490 1300 1390 1590 1110 1190 1235 1305 1505 1315 1405 1605
EZDH 1000 double-rail crab - DRS 125, 2/1 reeving (dimensions see page 48)
Wheel load from hoist load kg
Track
H16 H24 H40
gauge
DH 1050 DH 1040 DH 1032 DH 1025 DH 1050 DH 1040 DH 1032 DH 1025 DH 1050 DH 1040 DH 1032 DH 1025
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1400 1946 3054 1557 2443 1226 1924 973 1527 3404 1596 2723 1277 2144 1006 1702 798 -
2240 2154 2846 1723 2277 1357 1793 1077 1423 2009 2991 1607 2393 1266 1884 1005 1495 3355 1645 2684 1316 2114 1036 1678 823
2800 2223 2777 1779 2221 1401 1749 1112 1388 2098 2902 1679 2321 1322 1828 1049 1451 1857 3143 1486 2514 1170 1980 929 1571
Crab weight
Track gauge lka 1400 2240 2800 1400 2240 2800 Mechanical microspeed unit
20370644.indd / 2021-05-10
Hook path H16 H24 H16 H24 H40 H16 H24 H40 H16 H24 H16 H24 H40 H16 H24 H40 weight
DH size 1050-1032 1025 FG 08 with KBA 80 B4 = 55 kg
KBH 140 885 975 1000 1090 1290 1100 1190 1390 900 990 1015 1105 1305 1115 1205 1405 FG 10 with KBA 90 B4 = 160 kg
Motor KBH 160 955 1045 1070 1160 1360 1170 1260 1460 970 1060 1085 1175 1375 1185 1275 1475
FG 10 with KBA 100 B4 = 186 kg
size KBH 180 1025 1115 1140 1230 1430 1240 1330 1530 1040 1130 1155 1245 1445 1255 1345 1545
KBH 200 1085 1175 1220 1290 1490 1300 1390 1590 1110 1190 1235 1305 1505 1315 1405 1605
Travel drive see page 49
18
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R12) + (R21, R22)
EZDH 1063 double-rail crab - DRS 125, 2/1 reeving (dimensions see page 50)
Wheel load from hoist load kg Wheel load from dead load kg
Track
gauge H16 H24 H40 H16 H24 H40
DH 1063 DH 1063
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1400 2429 3821 4335 1915 - 331 243 385 234 -
2240 2690 3560 3881 2369 4247 2003 344 289 367 309 444 334
2800 2777 3473 3730 2520 4022 2228 354 310 378 330 434 375
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
Hook path H16 H24 H16 H24 H40 H16 H24 H40 FG 08 with KBA 80 B4 = 55 kg
DH size 1063
FG 10 with KBA 90 B4 = 160 kg
KBH 140 960 1030 1070 1150 1370 1150 1220 1440
FG 10 with KBA 100 B4 = 186 kg
Motor KBH 160 1030 1100 1140 1220 1470 1220 1290 1510
size KBH 180 1100 1170 1210 1290 1570 1290 1360 1580 Travel drive see page 51
KBH 200 1160 1230 1270 1350 1630 1350 1420 1640
EZDH 1000 double-rail crab - DRS 112, 4/2 reeving (dimensions see page 52)
Wheel load from hoist load kg
Track
H16 H24 H40
gauge
DH 1040 DH 1032 DH 1025 DH 1040 DH 1032 DH 1025 DH 1040 DH 1032 DH 1025
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1400 -
2240 2000 1575 1250 2000 1575 1250
2000 1575 1250
2800
Crab weight
Track gauge lka 1400 2240 2800 1400 2240 2800 Mechanical microspeed unit
20370644.indd / 2021-05-10
Hook path H16 H24 H16 H24 H40 H16 H24 H40 H16 H24 H16 H24 H40 H16 H24 H40 weight
DH size 1040-1032 1025 FG 08 with KBA 80 B4 = 55 kg
KBH 140 920 1010 1035 1125 1325 1135 1225 1425 965 1055 1080 1170 1370 1180 1270 1470 FG 10 with KBA 90 B4 = 160 kg
Motor KBH 160 990 1080 1105 1195 1395 1205 1295 1495 1035 1125 1150 1240 1440 1250 1340 1540
FG 10 with KBA 100 B4 = 186 kg
size KBH 180 1060 1150 1175 1265 1465 1275 1365 1565 1105 1195 1220 1310 1510 1320 1405 1605
KBH 200 1120 1210 1245 1325 1525 1345 1425 1625 1165 1255 1320 1370 1570 1380 1465 1665
Travel drive see page 53
19
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R12) + (R21, R22)
EZDH 1000 double-rail crab - DRS 125, 4/2 reeving (dimensions see page 54)
Wheel load from hoist load kg
Track
H16 H24 H40
gauge
DH 1050 DH 1040 DH 1032 DH 1025 DH 1050 DH 1040 DH 1032 DH 1025 DH 1050 DH 1040 DH 1032 DH 1025
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1400 -
2240 2500 2000 1575 1250 2500 2000 1575 1250
2500 2000 1575 1250
2800
Crab weight
Track gauge lka 1400 2240 2800 1400 2240 2800 Mechanical microspeed unit
Hook path H16 H24 H16 H24 H40 H16 H24 H40 H16 H24 H16 H24 H40 H16 H24 H40 weight
DH size 1050-1032 1025 FG 08 with KBA 80 B4 = 55 kg
KBH 140 920 1010 1035 1125 1325 1135 1225 1425 965 1055 1080 1170 1370 1180 1270 1470 FG 10 with KBA 90 B4 = 160 kg
Motor KBH 160 990 1080 1105 1195 1395 1205 1295 1495 1035 1125 1150 1240 1440 1250 1340 1540
FG 10 with KBA 100 B4 = 186 kg
size KBH 180 1060 1150 1175 1265 1465 1275 1365 1565 1105 1195 1220 1310 1510 1320 1405 1605
Travel drive see page 55
KBH 200 1120 1210 1245 1325 1525 1345 1425 1625 1165 1255 1320 1370 1570 1380 1465 1665
EZDH 1063 double-rail crab - DRS 125, 4/2 reeving (dimensions see page 56)
Wheel load from hoist load kg Wheel load from dead load kg
Track
H16 H24 H40 H16 H24 H40
gauge
DH 1063 DH 1063
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1400 - 341 221 392 214 -
2240 3125 3125 347 273 388 277 485 280
3125
2800 355 296 393 303 480 316
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
Hook path H16 H24 H16 H24 H40 H16 H24 H40 FG 08 with KBA 80 B4 = 55 kg
DH size 1063
20370644.indd / 2021-05-10
20
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R12) + (R21, R22)
EZDH 1000 double-rail crab - DRS 125, 4/1 reeving (dimensions see page 58)
Wheel load from hoist load kg
Track
H16 H24
gauge
DH 1040 DH 1032 DH 1025 DH 1040 DH 1032 DH 1025
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1400 3537 4463 2763 3487 2211 2789 -
2240 3711 4289 2899 3351 2319 2681 3604 4396 2815 3435 2252 2748
2800 3769 4231 2944 3306 2355 2645 3683 4317 2877 3373 2302 2698
Crab weight
Track gauge lka 1400 2240 2800 1400 2240 2800 Mechanical microspeed unit weight
Hook path H16 H16 H24 H16 H24 H16 H16 H24 H16 H24 FG 08 with KBA 80 B4 = 55 kg
DH size 1040-1032 1025 FG 10 with KBA 90 B4 = 160 kg
KBH 140 1215 1375 1460 1535 1620 1280 1540 1535 1600 1695
FG 10 with KBA 100 B4 = 186 kg
KBH 160 1285 1440 1530 1605 1690 1350 1610 1605 1670 1765
Motor size Travel drive see page 59
KBH 180 1355 1515 1600 1675 1760 1420 1670 1675 1740 1835
KBH 200 1415 1575 1660 1745 1820 1480 1730 1745 1800 1895
EZDH 1050 double-rail crab - DRS 160, 4/1 reeving (dimensions see page 60)
Wheel load from hoist load kg Wheel load from dead load kg
Track gauge H16 H24 H16 H24
DH 1050 DH 1050
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1400 4421 5579 - 445 306 -
2240 4638 5362 4504 5496 465 378 483 403
2800 4711 5289 4604 5396 497 427 515 451
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
Hook path H16 H16 H24 H16 H24 FG 08 with KBA 80 B4 = 55 kg
20370644.indd / 2021-05-10
21
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R12) + (R21, R22)
EZDH 1063 double-rail crab - DRS 200, 4/1 reeving (dimensions see page 62)
Wheel load from hoist load kg Wheel load from dead load kg
Track
H16 H24 H16 H24
gauge
DH 1063 DH 1063
R 11 R 21 R 11 R 21 R 11 R 21 R 11 R 21
lka
R 12 R 22 R 12 R 22 R 12 R 22 R 12 R 22
1400 5527 6973 7795 4705 445 306 491 303
2240 5798 6702 5631 6869 465 378 483 403
2800 5888 6612 5754 6746 497 427 515 451
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
Hook path H16 H24 H16 H24 H16 H24 FG 08 with KBA 80 B4 = 55 kg
DH size 1063 FG 10 with KBA 90 B4 = 160 kg
KBH 140 1430 1510 1620 1710 1780 1860
FG 10 with KBA 100 B4 = 186 kg
KBH 160 1500 1580 1690 1780 1850 1930
Motor size Travel drive see page 63
KBH 180 1570 1650 1760 1850 1920 2000
KBH 200 1630 1710 1830 1910 1980 2060
20370644.indd / 2021-05-10
22
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R21) + (R12, R22)
EZLDH 600 double-rail crab - DRS 112, 2/1 reeving (dimensions see page 64)
Wheel load from hoist load kg
Track
H12 H20
gauge
DH 640 DH 632 DH 625 DH 620 DH 616 DH 640 DH 632 DH 625 DH 620 DH 616
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 1890 1260 1500 1000 1200 800 960 640 2155 995 1710 790 1370 630 1095 505
2240 Not available. 1900 1250 1505 995 1215 785 970 630 Not available. 2170 980 1725 775 1380 620 1110 490
2800 1905 1245 1520 980 1220 780 985 615 2175 975 1730 770 1385 615 1120 480
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit
Hook path H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 weight
DH size 640 632-620 616 640 632-620 616 640 632-620 616 FG 08 with KBA 71 B4 = 50 kg
KBH 125 635 735 615 715 655 755 710 765 690 745 730 785 750 870 730 490 770 530 FG 08 with KBA 80 B4 = 55 kg
Motor
KBH 140 665 765 645 745 685 785 740 795 720 775 760 815 780 900 760 520 800 560
size Travel drive see page 65
KBH 160 735 835 715 815 755 855 810 865 790 845 830 885 850 970 830 590 870 630
20370644.indd / 2021-05-10
23
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R21) + (R12, R22)
EZLDH 600 double-rail crab - DRS 125, 2/1 reeving (dimensions see page 66)
Wheel load from hoist load kg
Track
H12 H20
gauge
DH 640 DH 632 DH 625 DH 620 DH 640 DH 632 DH 625 DH 620
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 2400 1600 2735 1265
2240 2405 1595 Not available. 2740 1260 Not available.
2800 2420 1580 2755 1245
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
Hook path H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 FG 08 with KBA 71 B4 = 50 kg
DH size 640 632-620 640 632-620 640 632-620 FG 08 with KBA 80 B4 = 55 kg
KBH 125 635 735 615 715 710 765 690 745 750 870 730 490
Motor Travel drive see page 67
KBH 140 665 765 645 745 740 795 720 775 780 900 760 520
size
KBH 160 735 835 715 815 810 865 790 845 850 970 830 590
EZLDH 600 double-rail crab - DRS 125, 4/1 reeving (dimensions see page 68)
Wheel load from hoist load kg
Track
H12 H20
gauge
DH 625 DH 620 DH 616 DH 625 DH 620 DH 616
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 2570 2430 2055 1945 1620 1530 3055 1945 2445 1555 1620 1530
2240 2580 2420 2060 1940 1625 1525 3070 1930 2450 1555 1625 1525
2800 2595 2405 2075 1925 1640 1510 3080 1920 2465 1535 1640 1510
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
20370644.indd / 2021-05-10
Hook path H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 H12 H20 FG 08 with KBA 71 B4 = 50 kg
DH size 625-620 616 625-620 616 625-620 616 FG 08 with KBA 80 B4 = 55 kg
KBH 125 630 700 705 775 675 785 750 860 755 865 830 940
Motor Travel drive see page 69
KBH 140 660 730 735 805 705 815 780 890 785 895 860 970
size
KBH 160 730 800 805 875 775 885 850 960 855 965 930 1040
24
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R21) + (R12, R22)
EZLDH 632 double-rail crab - DRS 125, 4/1 reeving (dimensions see page 70)
Wheel load from hoist load kg Wheel load from dead load kg
Track
H12 H20 H12 H20
gauge
DH 632 DH 632
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 3215 3035 3820 2430 200 165 225 175
2240 3230 3020 3835 2415 215 175 245 200
2800 3245 3005 3850 2400 235 195 265 220
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
Hook path H12 H20 H12 H20 H12 H20 FG 08 with KBA 71 B4 = 50 kg
DH size 632 FG 08 with KBA 80 B4 = 55 kg
KBH 125 630 700 675 785 755 865
Travel drive see page 71
Motor size KBH 140 660 730 705 815 785 895
KBH 160 730 800 775 885 855 965
EZLDH 640 double-rail crab - DRS 125, 4/1 reeving (dimensions see page 72)
Wheel load from hoist load kg Wheel load from dead load kg
Track H12 H20 H12 H20
gauge
DH 640 DH 640
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 4125 3875 4960 3040 230 190 250 195
2240 4120 3880 4945 3055 260 215 275 225
2800 4115 3885 4890 3110 280 245 300 250
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
20370644.indd / 2021-05-10
25
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R21) + (R12, R22)
EZLDH 1000 double-rail crab - DRS 125, 2/1 reeving (dimensions see page 74)
Wheel load from hoist load kg
Track
H16 H24
gauge
DH 1050 DH 1040 DH 1032 DH 1025 DH 1050 DH 1040 DH 1032 DH 1025
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 3175 1825 2540 1460 2000 1150 1585 915 3480 1520 2785 1215 2190 960 1740 760
2240 3180 1820 2555 1445 2010 1140 1595 905 3490 1510 2795 1205 2200 950 1750 750
2800 3195 1805 2560 1440 2025 1125 1600 900 3505 1495 2800 1200 2210 940 1765 735
Crab weight
Track gauge lka 1400 2240 2800 1400 2240 2800 Mechanical microspeed unit weight
Hook path H16 H24 H16 H24 H16 H24 H16 H24 H16 H24 H16 H24 FG 08 with KBA 80 B4 = 55 kg
DH size 1050-1032 1025
FG 10 with KBA 90 B4 = 160 kg
KBH 140 995 1195 1105 1285 1135 1335 1010 1210 1120 1300 1150 1350
FG 10 with KBA 100 B4 = 186 kg
Motor KBH 160 1065 1265 1175 1355 1205 1405 1080 1280 1190 1370 1220 1420
size KBH 180 1135 1335 1245 1425 1275 1475 1150 1350 1260 1440 1290 1490
Travel drive see page 75
KBH 200 1195 1395 1305 1485 1335 1535 1270 1410 1380 1500 1410 1550
EZLDH 1063 double-rail crab - DRS 125, 2/1 reeving (dimensions see page 76)
Wheel load from hoist load kg Wheel load from dead load kg
Track
H16 H24 H16 H24
gauge
DH 1063 DH 1063
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 3965 2285 4350 1900 340 260 400 300
2240 3980 2270 4355 1895 370 285 425 320
2800 3990 2260 4370 1880 375 295 435 335
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
20370644.indd / 2021-05-10
Hook path H16 H24 H16 H24 H16 H24 FG 08 with KBA 80 B4 = 55 kg
DH size 1063 FG 10 with KBA 90 B4 = 160 kg
KBH 140 995 1195 1105 1285 1135 1335
FG 10 with KBA 100 B4 = 186 kg
Motor KBH 160 1065 1265 1175 1355 1205 1405
size
Travel drive see page 77
KBH 180 1135 1335 1245 1425 1275 1475
EZLDH 1000 double-rail crab - DRS 125, 4/1 reeving (dimensions see page 78)
Wheel load from hoist load kg
Track
gauge H16 H24
DH 1040 DH 1032 DH 1025 DH 1040 DH 1032 DH 1025
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 4375 3625 3415 2835 2735 2265 4905 3095 3830 2420 3065 1935
2240 4380 3620 3430 2820 2740 2260 4920 3080 3840 2410 3070 1930
2800 4390 3610 3440 2810 2750 2250 4930 3070 3850 2400 3080 1920
Crab weight
Track gauge lka 1400 2240 2800 1400 2240 2800 Mechanical microspeed unit weight
Hook path H16 H24 H16 H24 H16 H24 H16 H24 H16 H24 H16 H24 FG 08 with KBA 80 B4 = 55 kg
DH size 1040-1032 1025 FG 10 with KBA 90 B4 = 160 kg
KBH 140 1455 1605 1605 1770 1770 1975 1520 1680 1670 1770 1835 2050
FG 10 with KBA 100 B4 = 186 kg
Motor KBH 160 1525 1675 1675 1840 1840 2045 1590 1750 1740 1840 1905 2120
size Travel drive see page 79
KBH 180 1595 1745 1745 1910 1910 2115 1660 1820 1810 1910 1975 2190
KBH 200 1655 1805 1805 1970 1970 2175 1720 1880 1870 1970 2035 2250
EZLDH 1050 double-rail crab - DRS 160, 4/1 reeving (dimensions see page 80)
Wheel load from hoist load kg Wheel load from dead load kg
Track
H16 H24 H16 H24
gauge
DH 1050 DH 1050
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 5465 4535 6130 3870 455 375 505 400
2240 5480 4520 6140 3860 495 410 535 425
2800 5490 4510 6145 3855 495 410 595 495
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
20370644.indd / 2021-05-10
Hook path H16 H24 H16 H24 H16 H24 FG 08 with KBA 80 B4 = 55 kg
DH size 1050 FG 10 with KBA 90 B4 = 160 kg
KBH 140 1455 1605 1605 1695 1770 1975
FG 10 with KBA 100 B4 = 186 kg
Motor KBH 160 1525 1675 1675 1765 1840 2045
size KBH 180 1595 1745 1745 1835 1910 2115 Travel drive see page 81
KBH 200 1655 1805 1805 1895 1970 2175
27
Wheel loads from hoist load - Wheel load from dead load - Crab
weight in kg
Dead load = 4x (R11, R21, R12, R22)
hoist load = 2x (R11, R21) + (R12, R22)
EZLDH 1063 double-rail crab - DRS 200, 4/1 reeving (dimensions see page 82)
Wheel load from hoist load kg Wheel load from dead load kg
Track
H16 H24 H16 H24
gauge
DH 1063 DH 1063
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 6835 5665 7660 4840 450 380 510 390
2240 6840 5660 7665 4835 490 415 525 425
2800 6855 5645 7675 4825 500 405 590 500
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
Hook path H16 H24 H16 H24 H16 H24 FG 08 with KBA 80 B4 = 55 kg
DH size 1063 FG 10 with KBA 90 B4 = 160 kg
KBH 140 1455 1605 1605 1695 1770 1975
FG 10 with KBA 100 B4 = 186 kg
KBH 160 1525 1675 1675 1765 1840 2045
Motor size
KBH 180 1595 1745 1745 1835 1910 2115
Travel drive see page 83
KBH 200 1655 1805 1805 1895 1970 2175
EZLDH 2063 double-rail crab - DRS 200, 4/1 reeving (dimensions see page 84)
Wheel load from hoist load kg Wheel load from dead load kg
Track
H18 H27 H18 H27
gauge
DH 2063 DH 2063
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 6660 5840 7480 5020 815 665 905 710
2240 6655 5845 7470 5030 925 775 1010 830
2800 6650 5850 7455 5045 965 820 1055 870
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
Hook path H18 H27 H18 H27 H18 H27 FG 10 with KBA 90 B4 = 160 kg
DH size 2063 FG 10 with KBA 100 B4 = 186 kg
KBH 160 2710 2980 3150 3430 3320 3600
FG 10 with KBA 112 B4 = 212 kg
KBH 180 2790 3060 3230 3510 3400 3680
Motor size Travel drive see page 85
KBH 200 2855 3125 3295 3575 3465 3745
KBH 225 2960 3230 3400 3680 3570 3850
EZLDH 2080 double-rail crab - DRS 200, 4/1 reeving (dimensions see page 84)
Wheel load from hoist load kg Wheel load from dead load kg
Track
H18 H27 H18 H27
gauge
DH 2080 DH 2080
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 8525 7475 9575 6425 815 665 905 710
2240 8520 7480 9560 6440 925 775 1010 830
2800 8515 7485 9545 6455 965 820 1055 870
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
Hook path H18 H27 H18 H27 H18 H27 FG 10 with KBA 90 B4 = 160 kg
20370644.indd / 2021-05-10
EZLDH 2100 double-rail crab - DRS 250, 4/1 reeving (dimensions see page 86)
Wheel load from hoist load kg Wheel load from dead load kg
Track gauge H18 H27 H18 H27
DH 2100 DH 2100
R 11 R 12 R 11 R 12 R 11 R 12 R 11 R 12
lka
R 21 R 22 R 21 R 22 R 21 R 22 R 21 R 22
1400 10445 9555 11935 8065 805 680 905 715
2240 10630 9370 12085 7915 970 830 1065 880
2800 10800 9200 12235 7765 975 875 1100 925
Crab weight
Track gauge lka 1400 2240 2800 Mechanical microspeed unit weight
Hook path H18 H27 H18 H27 H18 H27 FG 10 with KBA 90 B4 = 160 kg
DH size 2100 FG 10 with KBA 100 B4 = 186 kg
KBH 160 2720 2990 3350 3640 3450 3800
FG 10 with KBA 112 B4 = 212 kg
KBH 180 2800 3070 3430 3720 3530 3880
Motor size Travel drive see page 87
KBH 200 2865 3135 3495 3785 3595 3945
KBH 225 2970 3240 3600 3890 3700 4050
20370644.indd / 2021-05-10
29
EZDH 600 double-rail crab - DRS 112 - 2/1 reeving
Load capacity 2500 kg to 8000 kg
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 14
Centre of Ika
42040344.eps 42043544.eps
61 a4 e
Rail width
40 - 45 50 - 55
169
1) Wheel tread
95
R12 R22 47 60
l12
Hook dimension C
32,5
DH 616 890
Hook dimensions C without overload
Size
R11 R21 cut-out
with creep lifting without creep lifting
a6
DH 640-620 645
a5 DH 616 820
l5 l3
l6 g1
l7 g2
549
d
79
2
Basic model U2
a7 lka a2 On request
42045144.eps 18602944.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 14
h
148
100
125
a3 a3
C
Centre of Ika
eka
42040344.eps 18601444.eps
65 a4 e Rail width
40 - 45 50 - 55
184
1) Wheel tread
110
R12 R22 47 60
l12
32,5
Hook dimension C
Centre of eka
Size Hook dimensions C with overload cut-out
Centre of hoist unit
with creep lifting without creep lifting
DH 640-620 690
Hook dimensions C without overload
Size
cut-out
R11 R21
with creep lifting without creep lifting
a6
DH 640-620 620
a5
18601744.eps
Hoist unit
Reeving Drive
2/1 Direct drive
Size AME 20-TD AMK 30-DD AMK 30-DD
Hook path Hook travel
ZBF 80 A 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
m m12 n12 a5 a6 a5 a6 a5 a6
H12 12 93 117
DH 600 573 238 625 263 625 279
H20 20 163 187
l16 14 84
Motor 112 125 140 160 112 125 140 160 - - 112 125 140 160 - -
a1 = F6 - 260 328 410 - 60 128 210 - - - 130 198 280 - -
a7 = F10 417 475 538 - 217 275 338 - - - 287 345 408 - - -
l5 l3
l6 g1
l7 g2
576
d
50
2
Basic model U2
a7 lka a2 On request
42045144.eps 18603044.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
3200 DH 616
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 15
Centre of lka Centre of hoist unit
l1 l3
d
60
a1 Ika a2
18601044.eps 42043644.eps
Rail width
40 - 45 50 - 55
61 a4 e Wheel tread
47 60
169
1)
95
R12 R22
Hook dimension C
l7 g2
549
d
79
2
Basic model U2
a7 lka a2 On request
42045144.eps 18602944.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 15
h
148
100
125
60
C
a3 a3
a1 Ika a2
eka
18601044.eps 18601644.eps
65 a4 e
Rail width
40 - 45 50 - 55
184
1)
110
Wheel tread
R12 R22 47 60
l12
Hook dimension C
32,5
a5
18601744.eps
Hoist unit
Reeving Drive
4/2 Direct drive
Size AME 20-TD AMK 30-DD AMK 30-DD
Hook path
ZBF 80 A 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
m a5 a6 a5 a6 a5 a6
H12 5.1
DH 600 573 238 625 279 625 279
H20 10
l5 l3
l6 g1
l7 g2
576
d
50
2
Basic model U2
a7 lka a2 On request
42045144.eps 18603044.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
3200 DH 616
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 16
Centre of hoist unit
l1 l3
l16 - H12
h
d
131
100
112
60
a3 a3
C
m14 n14
Centre of lka - H 12
l16 - H20
m14 n14
eka
Centre of lka - H 20
a1 Ika a2 42043744.eps
18601844.eps Rail width
61 a4 e 40 - 45 50 - 55
Wheel tread
1)
169
47 60
95
R12 R22
Hook dimension C
DH 616 815
a5 DH 616 745
Hoist unit 18601544.eps
Reeving Drive
4/1 Direct drive
Size AME 10-DD AMK 20-TD AMK 20-TD
Track gauge Hook path Hook travel
ZBF 71 A 8/2-B003 ZBF 63/71 A 8/2B003 ZBF 80 A 8/2-B020
Ika m m14 n14 a5 a6 a5 a6 a5 a6
DH 620 42 63
H12 1000
DH 616 6 7 98
498 216 509 228 565 238
H12 42 63
DH 620 - 616 1400-2800
H20 10 77 98
l5 l3
l6 g1
l7 g2
540
d
81
2
Basic model U2
a7 lka a2 On request
42045144.eps 18603144.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
6300 DH 616
AMK 20-TD AMK 20-TD AMK 20-TD
ZBF 71 A 8/2-B003 ZBF 80 A 8/2-B020 ZBF 80 A 8/2-B020
0.09/0.34 kW 0.13/0.5 kW 0.13/0.5 kW
i = 77.4 i = 61.4 i = 52.1
8000 DH 620 DH 600 with DRS 125 see pages 40-41
10000 DH 625
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 16
Centre of hoist unit
l1 l3
l16 - H12
h
d
148
100
125
60
a3 a3
C
m14 n14
Centre of lka - H 12
l16 - H20
m14 n14
eka
Centre of lka - H 20
a1 Ika a2
18601844.eps Rail width 18601244.eps
65 a4 e 40 - 45 50 - 55
Wheel tread
1) 47 60
184
110
R12 R22
Hook dimension C
Size Hook dimensions C with overload cut-out
l12
l5 l3
l6 g1
l7 g2
577
d
54
2
Basic model U2
a7 lka a2 On request
42045144.eps 18603244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 17
h
d
148
100
125
60
a3 a3
C
m14 n14
Centre of lka - H 12
l16 - H20
m14 n14
eka
Centre of lka - H 20
a1 Ika a2
18601844.eps Rail width 18601244.eps
40 - 45 50 - 55
65 a4 e
Wheel tread
47 60
201
110
R12 R22
Hook dimension C
a5
18602744.eps
Hoist unit
Reeving Drive
4/1 Direct drive
Size AMK 30-DD
AME 20-TD AME 20-DD AMK 30-TD
Hook path Hook travel ZBF 90 B 8/2-B020/
ZBF 71 A 8/2-B003 ZBF 90 B 8/2-B020 ZBF 80 A 2/8-B020
100 A 2/8-B050
m m14 n14 a5 a6 a5 a6 a5 a6 a5 a6
H12 6 42 63
DH 632 517 228 617 254 581 263 625 279
H20 10 77 98
l5 l3
l6 g1
l7 g2
577
d
54
2
Basic model U2
a7 lka a2 On request
42045144.eps 18603244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
6300 DH 616
10000 DH 625
AMK 30-TD 2 x AME 20-TD AMK 30-DD AMK 30-DD AMK 30-DD 2 x AME 20-DD
ZBF 80 A 8/2-B020 ZBF 71 A 8/2-B003 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050 ZBF 100 A 8/2-B050 ZBF 90 B 8/2-B020
12500 DH 632
0.13/0.5 kW 0.09/0.34 kW 0.2/0.8 kW 0.29/1.2 kW 0.29/1.2 kW 0.2/0.8 kW
i = 86.4 i = 70 i =55.7 i = 45.5 i = 36.1 i = 28
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 17
h
d
148
100
125
60
200 200
C
m14 n14
Centre of lka - H 12
l16 - H20
m14 n14
eka = 895
Centre of lka - H 20
a1 Ika a2
18601844.eps Rail width 18602844.eps
40 - 45 50 - 55
65 a4 e Wheel tread
47 60
201
110
R12 R22
l12
Hook dimension C
32,5
Centre of eka
Size Hook dimensions C with overload cut-out
Centre of hoist unit
with creep lifting without creep lifting
a5
18602744.eps
Hoist unit
Reeving Drive
4/1 Direct drive
Size AMK 30-DD/TD
AME 20-TD AME 20-DD
Hook path Hook travel ZBF 90 B 8/2-B020/
ZBF 80 A 8/2-B020 ZBF 100 A 8/2-B050
100 A 8/2-B050
m m14 n14 a5 a6 a5 a6 a5 a6
H12 6 42 63
DH 640 573 238 617 254 625 279
H20 10 77 98
l5 l3
l6 g1
l7 g2
577
d
50
2
Basic model U2
a7 lka a2 On request
42045144.eps 18603344.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
6300 DH 616
10000 DH 625
AMK 30-TD 2 x AME 20-TD AMK 30-DD AMK 30-DD 2 x AMK 30-DD 2 x AME 20-DD
ZBF 90 B 8/2-B020 ZBF 80 A 8/2-B020 ZBF 100 A 8/2-B050 ZBF 100 A 8/2-B050 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
16000 DH 640
0.2/0.8 kW 0.13/0.5 kW 0.29/1.2 kW 0.29/1.2 kW 0.2/0.8 kW 0.29/1.2 kW
i = 86.4 i = 70 i = 55.7 i = 45.5 i = 36.1 i = 28
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 18
Centre of hoist unit
Centre of lka
42040344.eps 42043544.eps
61 a4 e
Rail width
40 - 45 50 - 55
201
95
Wheel tread
R12 R22
47 60
l12
Hook dimension C
Centre of eka Size Hook dimensions C with overload cut-out
45
l5 l3
l6
l7
d
Basic model U2
a7 lka a2 On request
42045144.eps 42045244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 18
Centre of hoist unit
h
148
100
125
a3 a3
C
Centre of lka
eka
42040344.eps 18601444.eps
65 a4 e
Rail width
40 - 45 50 - 55
216
110
Wheel tread
R12 R22 47 60
l12
Hook dimension C
Size Hook dimensions C with overload cut-out
Centre of eka
45
Reeving Drive
2/1 Direct drive
Size Track gauge Hook path Hook travel AMK 30-TD AMK 30-DD AMK 30-DD
ZBF 80 A 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
Ika m m12 n12 a5 a6 a5 a6 a5 a6
H16 1400-2800 16 128 155
1400 253 165
H24 24
DH 1050 - 1025 2240-2800 193 225 581 263 625 279 625 279
2240 383 310
H40 40
2800 333 360
l5 l3
l6
l7
d
Basic model U2
a7 lka a2 On request
42045144.eps 42045244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
5000 DH 1025
AMK 30-DD
ZBF 90 B 8/2-B020
0.2/0.8 kW
i = 29.2
6300 DH 1032 DH 1000 with DRS 112 see pages 46-47
AMK 30-DD
ZBF 90 B 8/2-B020
0.2/0.8 kW
i = 36.1
8000 DH 1040
AMK 30-DD AMK 30-DD AMK 30-DD
ZBF 90 B 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
AMK 30-TD AMK 30-DD 0.2/0.8 kW 0.2/0.8 kW AMK 30-DD 0.29/1.2 kW
ZBF 80 A 8/2-B020 ZBF 80 A 8/2-B020 i =55.7 i = 45.5 ZBF 100 A 8/2-B050 i = 29.2
10000 DH 1050
0.13/0.5 kW 0.13/0.5 kW 0.29/1.2 kW
i = 86.4 i = 71.9 i = 36.1
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 19
Centre of hoist unit
h
148
100
125
a3 a3
C
Centre of lka
eka
42040344.eps 18601444.eps
65 a4 e
Rail width
40 - 45 50 - 55
216
110
Wheel tread
R12 R22 47 60
l12
Hook dimension C
a5
Hoist unit 18602044.eps
Reeving Drive
2/1 Direct drive
Size Track Hook path Hook travel AME 20-TD AME 20-TD AMK 30-TD AMK 30-DD
gauge ZBF 71 A 8/2-B003 ZBF 90 B 8/2-B020 ZBF 80 A 8/2-B020 ZBF 90 B 8/2-B020/
100 A 8/2-B050
Ika m m12 n12 a5 a6 a5 a6 a5 a6 a5 a6
H16 1400-2800 16 128 155
1400 253 165
H24 24
DH 1063 2240-2800 193 225 517 228 617 254 581 263 625 279
2240 383 310
H40 40
2800 333 360
Dimensions depending on track gauge lka
Range DH 1000 H16 DH 1000 H24 DH 1000 H40
Track gauge Ika Track gauge Ika Track gauge Ika
1400 2240 2800 1400 2240 2800 2240 2800
e 780 1050 1600
eka 1090 1090 1090 1090 1090 1090 1090 1090
a2 80 - - 225 - - 205 -
a3 200 200 200 200 200 200 200 200
20370644.indd / 2021-05-10
l5 l3
l6
l7
d
Basic model U2
a7 lka a2 On request
42045144.eps 42045244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
5000 DH 1025
10000 DH 1050
AMK 30-TD 2 x AME 20-TD AMK 30-DD AMK 30-DD AMK 30-DD 2 x AME 20-DD
ZBF 80 A 8/2-B020 ZBF 71 A 8/2-B003 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050 ZBF 100 A 8/2-B050 ZBF 90 B 8/2-B020
12500 DH 1063
0.13/0.5 kW 0.09/0.34 kW 0.2/0.8 kW 0.29/1.2 kW 0.29/1.2 kW 0.2/0.8 kW
i = 86.4 i = 70 i =55.7 i = 45.5 i = 36.1 i = 28
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 19
Centre of lka Centre of hoist unit
l1 l3
d
60
a1 Ika a2
18601044.eps 42043644.eps
Rail width
61 a4 e
40 - 45 50 - 55
Wheel tread
201
47 60
95
R12 R22
Hook dimension C
l12
a5
18601944.eps
Hoist unit
Reeving Drive
4/2 Direct drive
Size AME 10-DD AMK 20-TD AMK 20-TD
Hook path
ZBF 71 A 8/2-B003 ZBF 71 A 8/2-B003 ZBF 80 A 8/2-B020
m a5 a6 a5 a6 a5 a6
H16 7.4
DH 1040 - 1025 H24 12.9 498 216 509 228 565 238
H40 24.2
52 a7 = F10 480 683 - 831 60 263 411 131 615 818 - 966 195 398 - 546 118 266 470 673 - 821 190 393 - 541
EZDH 1000 double-rail crab - DRS 112 - 4/2 reeving
l5 l3
l6
l7
d
Basic model U2
a7 lka a2 On request
42045144.eps 42045244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
size size
d g1 H16 H24 H40 H16 H24 H40 g2 h4 h5 H16 H24 H40 l6 l7
KBH 140 V1 274 229 970 1105 1330 FG 08 KBA 80 141 630 - 1180 1315 1590 745 523
KBH 160 V2 314 247 1052 1187 1462 725 860 1135 KBA 90 151 1383 1518 1793 948 665
FG 10 770 139
KBH 200 V3 394 302 1205 1340 1615 KBA 100 176 1531 1666 1941 1096 702
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 20
Centre of lka Centre of hoist unit
l1 l3
h
d
148
100
125
60
C
a3 a3
a1 Ika a2
eka
18601044.eps 18601644.eps
Rail width
65 a4 e
40 - 45 50 - 55
Wheel tread
216
110
47 60
R12 R22
Hook dimension C
l12
18602044.eps
Hoist unit
Reeving Drive
4/2 Direct drive
Size AMK 30-TD AMK 30-DD AMK 30-DD
Hook path
ZBF 80 A 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
m a5 a6 a5 a6 a5 a6
H16 7.4
DH 1050 - 1025 H24 12.9 581 263 625 279 625 279
H40 24.2
54 a7 = F10 480 683 - 831 60 263 411 131 615 818 - 966 195 398 - 546 118 266 470 673 - 821 190 393 - 541
EZDH 1000 double-rail crab - DRS 125 - 4/2 reeving
l5 l3
l6
l7
d
Basic model U2
a7 lka a2 On request
42045144.eps 42045244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
5000 DH 1025
AMK 30-DD
ZBF 90 B 8/2-B020
0.2/0.8 kW
i = 29.2
6300 DH 1032 DH 1000 with DRS 112 see pages 52-53
AMK 30-DD
ZBF 90 B 8/2-B020
0.2/0.8 kW
i = 36.1
8000 DH 1040
AMK 30-DD AMK 30-DD AMK 30-DD
ZBF 90 B 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
AMK 30-TD AMK 30-DD 0.2/0.8 kW 0.2/0.8 kW AMK 30-DD 0.29/1.2 kW
ZBF 80 A 8/2-B020 ZBF 80 A 8/2-B020 i =55.7 i = 45.5 ZBF 100 A 8/2-B050 i = 29.2
10000 DH 1050
0.13/0.5 kW 0.13/0.5 kW 0.29/1.2 kW
i = 86.4 i = 71.9 i = 36.1
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 20
Centre of lka Centre of hoist unit
l1 l3
h
d
148
100
125
60
C
a3 a3
a1 Ika a2
eka
18601044.eps 18601644.eps
Rail width
65 a4 e
40 - 45 50 - 55
Wheel tread
216
110
47 60
R12 R22
l12
a5
18602044.eps
Hoist unit
Reeving Drive
4/2 Direct drive
Size AMK 30-DD
AME 20-TD AME 20-TD AMK 30-TD
Hook path ZBF 90 B 8/2-B020 /
ZBF 71 A 8/2-B003 ZBF 90 B 8/2-B020 ZBF 80 A 8/2-B020
100 A 8/2-B050
m a5 a6 a5 a6 a5 a6 a5 a6
H16 7.4
DH 1063 H24 12.9 517 228 617 254 581 263 625 279
H40 24.2
56 a7 = F10 480 683 - 831 60 263 411 131 615 818 - 966 195 398 - 546 118 266 470 673 - 821 190 393 - 541
EZDH 1063 double-rail crab - DRS 125 - 4/2 reeving
l5 l3
l6
l7
d
Basic model U2
a7 lka a2 On request
42045144.eps 42045244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
5000 DH 1025
10000 DH 1050
AMK 30-TD 2 x AME 20-TD AMK 30-DD AMK 30-DD AMK 30-DD 2 x AME 20-DD
ZBF 80 A 8/2-B020 ZBF 71 A 8/2-B003 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050 ZBF 100 A 8/2-B050 ZBF 90 B 8/2-B020
12500 DH 1063
0.13/0.5 kW 0.09/0.34 kW 0.2/0.8 kW 0.29/1.2 kW 0.29/1.2 kW 0.2/0.8 kW
i = 86.4 i = 70 i =55.7 i = 45.5 i = 36.1 i = 28
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 21
Centre of hoist unit
l1 l3
h
d
148
100
l16
125
60
230 230
C
m14 n14
Centre of lka
a1 Ika a2
eka =1150
18601145.eps 18602144.eps
Rail width
65 a4 e
40 - 45 50 - 55
Wheel tread
216
110
47 60
R12 R22
Hook dimension C
620
DH 1025 1075
Hook dimensions C without overload
Size
cut-out
R11 R21 with creep lifting without creep lifting
DH 1025 995
a5
18602344.eps
Hoist unit
Reeving Drive
4/1 Direct drive
Hook Hook travel AME 20-TD AME 20-TD AME 20-DD/TD AMK 30-DD/TD AMK 30-DD
Size path ZBF 71 A 8/2-B003 ZBF 80 A 8/2-B020 ZBF 90 B 8/2-B020/ ZBF 80 A 8/2-B020 ZBF 90 B 8/2-B020/
100 A 8/2-B050 100 A 8/2-B050
m m14 n14 a5 a6 a5 a6 a5 a6 a5 a6 a5 a6
DH 1040 60 81
H16 8
DH 1032 -1025 50 91
517 228 573 238 617 254 581 263 625 279
DH 1040 98 111
H24 12
DH 1032 -1025 88 121
58 a7 = F10 475 678 - 826 258 406 126 95 298 446 166
EZDH 1000 double-rail crab - DRS 125 - 4/1 reeving
l5 l3
l6
l7
d
42045144.eps 42045244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 21
h
d
187
100
l16 160
65
230 230
C
m14 n14
Centre of lka
a1 Ika a2
eka =1150
18602644.eps 18602244.eps
Rail width
70 a4 e
50 - 55
Wheel tread
137,5
244
65
R12 R22
Hook dimension C
620
a5
18602444.eps
Hoist unit
Reeving Drive
4/1 Direct drive
Size AME 30-DD AMK 40-DD/TD
Hook path Hook travel ZBF 90 B 8/2-B020/ ZBF 90 B 8/2-B020/
100 A 8/2-B050 100 A 8/2-B050
m m14 n14 a5 a6 a5 a6
60 81
H16 8
50 91
DH 1050 642 279 651 295
98 111
H24 12
88 121
l5 l3
l6
l7
d
Basic model U2
a7 lka a2 on request
42045144.eps 42045244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
10000 DH 1025
16000 DH 1040
AMK 40-TD AMK 40-TD AMK 40-TD AMK 40-DD 2 x AME 30-DD 2 x AME 30-DD
ZBF 90 B 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050 ZBF 100 A 8/2-B050 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
20000 DH 1050
0.2/0.8 kW 0.2/0.8 kW 0.29/1.2 kW 0.29/1.2 kW 0.2/0.8 kW 0.29/1.2 kW
i = 115 i = 91.1 i = 73.8 i = 55.7 i = 45.5 i = 36.1
size size
d g1 H16 H24 H16 H24 g2 h4 h5 H16 H24 l6 l7
KBH 140 V1 274 229 970 1105 FG 08 KBA 80 141 672 - 1180 1315 745 523
KBH 160 V2 314 247 1052 1187 725 860 KBA 90 151 1383 1518 948 665
FG 10 812 96
KBH 200 V3 394 302 1205 1340 KBA 100 176 1531 1666 1096 702
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 22
Centre of hoist unit
l1 l3
d
h
238
100
l16 200
65
280 280
m14 n14
C
Centre of lka
a1 Ika a2
eka =1250
18602645.eps 18602544.eps
Rail width
80 a4 e
50 - 60
Wheel tread
296
65
170
R12 R22
Rail height
min.40
670
Hook dimension C
Centre of eka
45
a5
18602445.eps
Hoist unit
Size Track gauge Reeving Drive
4/1 Direct drive
ADE 50-TD
ADK 50-TD
Hook path Hook travel ZBF 90 B 8/2-B020/
ZBF 112 A 8/2-B050
100 A 8/2-B050
Ika m m14 n14 a5 a6 a5 a6
H16 1400-2800 8 60 81
DH 1063 1400 173 36 666 328 808 363
H24 12
2240-2800 89 111
l5 l3
l6
l7
d
Basic model U2
a7 lka a2 on request
42045144.eps 42045244.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
10000 DH 1025
16000 DH 1040
ADK 50-TD ADK 50-TD ADK 50-TD ADK 50-TD ADK 50-DD
ZBF 90 B 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050 ZBF 112 A 8/2-B050 ZBF 112 A 8/2-B050
25000 DH 1063 -
0.2/0.8 kW 0.2/0.8 kW 0.29/1.2 kW 0.46/1.9 kW 0.46/1.9 kW
i = 142 i = 112 i = 87.4 i = 78 i = 56.4
KBH 140 V1 274 229 970 1105 FG 08 KBA 80 141 624 - 1180 1315 745 523
KBH 160 V2 314 247 1052 1187 725 860 KBA 90 151 1383 1518 948 665
FG 10 764 144
KBH 200 V3 394 302 1205 1205 KBA 100 176 1531 1666 1096 770
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 23
Centre of hoist unit
Centre of eka
l1 l3
d
565
278
149
X
C
a1 a3 a3 a2 80 133
m12 n12 80 X
lka
95 eka
R11 R12
Rail width
40 - 45 50 - 55
a4 e
Wheel tread
l12
47 60
42055044.eps
41
Hook dimension C
Centre of lka
Size Hook dimensions C with overload cut-out
Centre of hoist unit
with creep lifting without creep lifting
DH 632-620 580
DH 616 755
a5
Hoist unit
Reeving Drive
2/1 Direct drive
Size AME 10-DD AMK 20-TD AMK 20-DD/TD
Hook path Hook travel
ZBF 63/71 A 8/2-B003 ZBF 63/71 A 8/2-B003 ZBF 80 A 8/2-B020
m m12 n12 a5 a6 a5 a6 a5 a6
H12 12 107 103
DH 600 498 161.5 509 174 565 182.5
H20 20 247 103
l5 l3
l6
l7
684
d
a7 eka a2 lka
42065444.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 24
580
278
149
X
C
a1 a3 a3 a2 80 133
m12 n12 80 X
lka
110 eka
R11 R12
Rail width
40 - 45 50 - 55
a4 e
Wheel tread
l12
47 60
42055144.eps
41
Centre of lka
Centre of hoist unit Hook dimension C
Size Hook dimensions C with overload cut-out
DH 640-620 565
a6 DH 640-620 495
Hoist unit
Reeving Drive
2/1 Direct drive
Size AME 20-TD AMK 30-DD AMK 30-DD
Hook path Hook travel
ZBF 80 A 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
m m12 n12 a5 a6 a5 a6 a5 a6
H12 12 107 103
DH 600 573 182.5 625 227.5 625 227.5
H20 20 247 103
l5 l3
l6
l7
699
d
a7 eka a2 lka
42065544.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
3200 DH 616
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 24
Centre of hoist unit
Centre of eka
l1 l3
d
580
278
149
X
C
a1 a3 a3 a2 80 133
m14 n14 80 X
lka
110 eka
R11 R12
Rail width
40 - 45 50 - 55
a4 e
Wheel tread
l12
47 60
42055244.eps
14
Hook dimension C
Centre of lka
Size Hook dimensions C with overload cut-out
Centre of hoist unit
with creep lifting without creep lifting
DH 616 665
a5
DH 616 595
a6
Hoist unit
Reeving Drive
4/1 Direct drive
Size AMK 30-DD
AME 20-TD AMK 30-DD/TD
Hook path Hook travel ZBF 90 B 8/2-B020/
ZBF 80 A 8/2-B020 ZBF 80 A 8/2-B020
100 A 8/2-B050
m m14 n14 a5 a6 a5 a6 a5 a6
H12 6 6 99
DH 600 573 182.5 581 208 625 227.5
H20 10 116 59
l5 l3
l6
l7
699
d
a7 eka a2 lka
42065544.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 25
580
278
149
X
C
a1 a3 a3 110 80 133
m14 n14 80 X
lka
110 eka
R11 R12
Rail width
40 - 45 50 - 55
a4 e
Wheel tread
l12
47 60
42055344.eps
14
Centre of lka
Centre of hoist unit Hook dimension C
Hoist unit
Reeving Drive
4/1 Direct drive
Size AMK 30-DD
AME 20-TD AME 20-DD AMK 30-TD
Hook path Hook travel ZBF 90 B 8/2-B020/
ZBF 71 A 8/2-B003 ZBF 90 B 8/2-B020 ZBF 80 A 8/2-B020
100 A 8/2-B050
m m14 n14 a5 a6 a5 a6 a5 a6 a5 a6
H12 6 6 99
DH 632 517 174 617 202 581 208 625 227.5
H20 10 116 59
l5 l3
l6
l7
699
d
42065644.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
6300 DH 616
10000 DH 625
AMK 30-TD 2 x AME 20-TD AMK 30-DD AMK 30-DD AMK 30-DD 2 x AME 20-DD
ZBF 80 A 8/2-B020 ZBF 71 A 8/2-B003 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050 ZBF 100 A 8/2-B050 ZBF 90 B 8/2-B020
12500 DH 632
0.13/0.5 kW 0.09/0.34 kW 0.2/0.8 kW 0.29/1.2 kW 0.29/1.2 kW 0.2/0.8 kW
i = 86.4 i = 70 i =55.7 i = 45.5 i = 36.1 i = 28
KBH 140 V3 274 229 842 982 571 642 711 782 FG 08 KBA 80 989 1129 672
141 523
KBA 80 1052 1192 735
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 25
l1 l3
d
585
298
197
X
C
a1 153 153 a2 70 90
m14 n14 70 X
lka
110 eka
R11 R12
Rail width
a4 e 40 - 45 50 - 55
l12
Wheel tread
47 60
14
42050344.eps
Centre of lka
Hoist unit
Reeving Drive
4/1 Direct drive
Size AMK 30-DD/TD
AME 20-TD AME 20-DD
Hook path Hook travel ZBF 90 B 8/2-B020/
ZBF 80 A 8/2-B020 ZBF 100 A 8/2-B050
100 A 8/2-B050
m m14 n14 a5 a6 a5 a6 a5 a6
H12 6 6 99
DH 640 573 182.5 617 202 625 227.5
H20 10 116 59
704
d
a7 eka a2 lka
42065744.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
6300 DH 616
10000 DH 625
AMK 30-TD 2 x AME 20-TD AMK 30-DD AMK 30-DD 2 x AMK 30-DD 2 x AME 20-DD
ZBF 90 B 8/2-B020 ZBF 80 A 8/2-B020 ZBF 100 A 8/2-B050 ZBF 100 A 8/2-B050 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
16000 DH 640
0.2/0.8 kW 0.13/0.5 kW 0.29/1.2 kW 0.29/1.2 kW 0.2/0.8 kW 0.29/1.2 kW
i = 86.4 i = 70 i = 55.7 i = 45.5 i = 36.1 i = 28
141 523
KBA 80 1052 1192 735
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 26
750
278
149
X
a1 a3 a3 110 80 133
C
m12 n12 X
80
lka
110 eka
R11 R12
Rail width
a4 e 40 - 45 50 - 55
l12
Wheel tread
47 60
57
e 780
Motor 140 160 180 200 140 160 180 200 140 160 180 200
a7 = F10 539 742 - 890 535 738 - 886 533 736 - 884
74
EZLDH 1000 double-rail crab - DRS 125 - 2/1 reeving
l5 l3
l6
l7
h4
d
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
5000 DH 1025
AMK 30-DD
ZBF 90 B 8/2-B020
0.2/0.8 kW
i = 29.2
6300 DH 1032 Not available with DRS 112
AMK 30-DD
ZBF 90 B 8/2-B020
0.2/0.8 kW
i = 36.1
8000 DH 1040
AMK 30-DD AMK 30-DD AMK 30-DD
ZBF 90 B 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
AMK 30-TD AMK 30-DD 0.2/0.8 kW 0.2/0.8 kW AMK 30-DD 0.29/1.2 kW
ZBF 80 A 8/2-B020 ZBF 80 A 8/2-B020 i =55.7 i = 45.5 ZBF 100 A 8/2-B050 i = 29.2
10000 DH 1050
0.13/0.5 kW 0.13/0.5 kW 0.29/1.2 kW
i = 86.4 i = 71.9 i = 36.1
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 26
Centre of hoist unit
Centre of eka
l1 l3
d
750
298
188
X
a1 a3 a3 110 80 148
C
m12 n12 X
80
lka
110 eka
R11 R12
Rail width
a4 e 40 - 45 50 - 55
l12
Wheel tread
47 60
57
Hoist unit
Reeving Drive
2/1 Direct drive
Size AMK 30-DD
AME 20-TD AME 20-TD AMK 30-TD
Hook path Hook travel ZBF 90 B 8/2-B020/
ZBF 71 A 8/2-B003 ZBF 90 B 8/2-B020 ZBF 80 A 8/2-B020
100 A 8/2-B050
m m12 n12 a5 a6 a5 a6 a5 a6 a5 a6
H16 16 182
DH 1063 101 517 174 617 202 581 208 625 227.5
H24 24 317
e 780 1050
Motor 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200
a1 = F6 - - 456 533 - - 451 528 - - 456 533 - - 456 533 - - 451 528 - - 456 533
a7 = F10 508 711 - 859 503 706 - 854 508 711 - 859 508 711 - 859 503 706 - 854 508 711 - 859
76
EZLDH 1063 double-rail crab - DRS 125 - 2/1 reeving
l5 l3
l6
l7
h4
d
42050044eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
5000 DH 1025
10000 DH 1050
AMK 30-TD 2 x AME 20-TD AMK 30-DD AMK 30-DD AMK 30-DD 2 x AME 20-DD
ZBF 80 A 8/2-B020 ZBF 71 A 8/2-B003 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050 ZBF 100 A 8/2-B050 ZBF 90 B 8/2-B020
12500 DH 1063
0.13/0.5 kW 0.09/0.34 kW 0.2/0.8 kW 0.29/1.2 kW 0.29/1.2 kW 0.2/0.8 kW
i = 86.4 i = 70 i =55.7 i = 45.5 i = 36.1 i = 28
KBH 140 V1 274 229 970 1105 FG 08 KBA 80 141 818 1180 1315 745 523
KBH 160 V2 314 247 1052 1187 725 860 KBA 90 151 1383 1518 948 665
FG 10 958
KBH 200 V3 394 302 1205 1205 KBA 100 176 1531 1666 1096 702
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 27
Centre of hoist unit
Centre of eka
l1 l3
d
750
298
197
X
a1 153 153 110 70 90
C
m14 n14
70
X
lka
110 eka
R11 R12
a4 e
l12
Rail width
22
Centre of lka
40 - 45 50 - 55
Wheel tread
Centre of hoist unit
47 60
42050144.eps
Hook dimension C
a5
e 780 1050
l16 - - 20 - - 20
Motor 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200
a1 = F6 - 431 507 584 - 421 497 574 - 411 487 564 - 431 507 584 - 421 497 574 - 411 487 564
a7 = F10 559 762 - 910 549 752 - 900 539 742 - 890 559 762 - 910 549 752 - 900 539 742 - 890
78
EZLDH 1000 double-rail crab - DRS 125 - 4/1 reeving
l5 l3
l6
l7
h4
d
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
KBH 160 V2 314 247 1052 1187 725 860 KBA 90 151 1383 1518 948 665
FG 10 958
KBH 200 V3 394 302 1205 1205 KBA 100 176 1531 1666 1096 702
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 27
Centre of hoist
unit Centre of eka
l1 l3
d
795
382
278
a1 a3 a3
X
C
75 100
137,5
m14 n14
75
lka
137,5 eka
R11 R12 X
400 e
l12
22
Centre of lka
Rail width
Centre of hoist unit 55
Wheel tread
65
42050544.eps
Hook dimension C
Size Hook dimensions C with overload cut-out
a5
e 780 1050
Motor 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200
a1 = F6 - 262 338 415 - 262 338 415 - 262 338 415 - 262 338 415 - 262 338 415 - 262 338 415
80 a7 = F10 390 593 - 741 390 593 - 741 390 593 - 741 390 593 - 741 390 593 - 741 390 593 - 741
EZLDH 1050 double-rail crab - DRS 160 - 4/1 reeving
h4
d
42050644.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
10000 DH 1025
16000 DH 1040
AMK 40-TD AMK 40-TD AMK 40-TD AMK 40-DD 2 x AME 30-DD 2 x AME 30-DD
ZBF 90 B 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050 ZBF 100 A 8/2-B050 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050
20000 DH 1050
0.2/0.8 kW 0.2/0.8 kW 0.29/1.2 kW 0.29/1.2 kW 0.2/0.8 kW 0.29/1.2 kW
i = 115 i = 91.1 i = 73.8 i = 55.7 i = 45.5 i = 36.1
KBH 200 V3 394 302 1205 1205 KBA 100 176 1531 1666 1096 702
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 28
Centre of hoist unit Centre of eka
l1 l3
d
840
433
227
X
C
a1 a3 a3 170 80 100
m14 n14
80
lka
170 eka
X
R11 R12
a4 e
l12
Rail width
22
Centre of lka 55
Centre of hoist unit
Wheel tread
65
42050744.eps
Hook dimension C
Size Hook dimensions C with overload cut-out
a5
e 780 1050
a4 400 470
Motor 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200 140 160 180 200
a1 = F6 - - 262 338 - - 262 338 - - 262 338 - - 268 345 - - 268 345 - - 268 345
a7 = F10 390 593 - 741 390 593 - 741 390 593 - 741 320 523 - 671 320 523 - 671 320 523 - 671
82
EZLDH 1063 double-rail crab - DRS 200 - 4/1 reeving
l5 l3
l6
l7
d
h4
a7 eka 170 lka
42050844.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
10000 DH 1025
16000 DH 1040
ADK 50-TD ADK 50-TD ADK 50-TD ADK 50-TD ADK 50-DD
ZBF 90 B 8/2-B020 ZBF 90 B 8/2-B020 ZBF 100 A 8/2-B050 ZBF 112 A 8/2-B050 ZBF 112 A 8/2-B050
25000 DH 1063 -
0.2/0.8 kW 0.2/0.8 kW 0.29/1.2 kW 0.46/1.9 kW 0.46/1.9 kW
i = 142 i = 112 i = 87.4 i = 78 i = 56.4
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 28
Centre of hoist unit
l1 l3 Centre of eka
d
1040
493
302
X
a1 a3 a3 170
80 120
C
m14 n14
80
R11 R12
Rail width
55 X
a4 e
Wheel tread
65
l12
42050944a.eps
30
Size
cut-out
with creep lifting without creep lifting
R21 R22
DH 2080 750 770
a6
DH 2063 910
Hoist unit
Reeving Drive
4/1 Direct drive
Size Hook Hook travel AMK 50-TD AMK 50-TD AME 30-DD AME 40-TD AME 40-DD/TD AME 40-DD
path ZBF 90 B8/2-B020/ ZBF 112 A 8/2-B050 ZBF 80 A 8/2-B020 ZBF 80 A 8/2-B020 ZBF 90 B8/2-B020/ ZBF112 A 8/2-B050
100 A 8/2-B050 100 A 8/2-B050
m m14 n14 a5 a6 a5 a6 a5 a6 a5 a6 a5 a6 a5 a6
H18 9 31 122
DH 2063 666 303 808 303 608 210 - - - - - -
H27 13.5 176 54
H18 9 31 122
DH 2080 - - - - - - 620 225 664 243 806 275
H27 13.5 176 54
Dimensions depending on track gauge lka
Range DH 2000 H18 DH 2000 H27
e 910 1220
Motor 160 180 200 225 160 180 200 225 160 180 200 225 160 180 200 225 160 180 200 225 160 180 200 225
a1 = F6 - 682 749 - - 672 739 - - 662 729 - - 682 749 - - 672 739 - - 662 729 -
a7 = F10 943 - 1075 1130 933 - 1065 1120 923 - 1055 1110 943 - 1075 1130 933 - 1065 1120 923 - 1055 1110
l5 l3 g1
l6 g2
l7
d
h4
a7 eka 170 lka
42051044.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
Wheel load from hoist load - Wheel load from dead load - Crab weights see page 29
1085
556
259
X
a1 a3 a3 193
80 120
C
m14 n14 80
193 eka
lka
R11 R12
Rail width
a4 e 55 X
Wheel tread
65
l12
30
e 910 1220
Motor 160 180 200 225 160 180 200 225 160 180 200 225 160 180 200 225 160 180 200 225 160 180 200 225
a1 = F6 - 682 749 - - 672 739 - - 662 729 - - 682 749 - - 672 739 - - 662 729 -
a7 = F10 943 - 1075 1130 933 - 1065 1120 923 - 1055 1110 943 - 1075 1130 933 - 1065 1120 923 - 1055 1110
l5 l3
l6
l7
d
h4
a7 eka 193 lka
42051544.eps
12.5 1) 16 1) 20 1) 25 1) 31.5 1) 40 1)
Reproduction in whole or in part only with prior consent of Demag Cranes & Components GmbH, 58286 Wetter (Germany) Subject to change. Not liable for errors or omissions.