ICT in Construction

Md. Tareq Hossain Khondoker


Assistant Professor
Department of Building Engineering and Construction Management (BECM)
Khulna University of Engineering and Technology

Course Title: Information Technology in Construction


Course Code: BECM 4203
Earthwork Construction Simulation

Department of Building Engineering and Construction Management (BECM) 2


Volume of areas (red- fill, cut- black)

Department of Building Engineering and Construction Management (BECM) 3


Excavator

Department of Building Engineering and Construction Management (BECM) 4


Loader

Department of Building Engineering and Construction Management (BECM) 5


Truck

Department of Building Engineering and Construction Management (BECM) 6


Dozer

Department of Building Engineering and Construction Management (BECM) 7


Towed Vibrating Rollers

Department of Building Engineering and Construction Management (BECM) 8


1.0 CUBIC 1.25 CUBIC 0.90 CUBIC
YARD IN YARD AFTER YARD AFTER
NATURAL DIGGING COMPACTED
CONDITION (LOOSE (COMPACTE
(IN-PLACE YARDS) D YARDS)
YARD)

1.25

1.0
0.90

In place Loose Compacted

Department of Building Engineering and Construction Management (BECM) 9


Transportation Simplex Method: Example

There are three warehouses to supply goods to four


retailers, warehouse No. 1 has 250 items of this kind of
goods, warehouse No. 2 has 450 items and warehouse No.
3 has 500 items. retailer No.1 needs 200 items of this kind
of goods, retailerNo.2 needs 400 items, retailer No.3
needs 300 items and retailer No.4 needs 300 items.
Transport one item from warehouse No.1 to retailer No.1
cost $4.Transport one item from warehouse No.1 to
retailers No.2 cost $2, so long and so for. Assume that
the total supply equals the total demand.

Department of Building Engineering and Construction Management (BECM) 10


Transportation Model

Department of Building Engineering and Construction Management (BECM) 11


Allocation of Maximum Possible Units

Department of Building Engineering and Construction Management (BECM) 12


Exhausted Column 4 Deleted

Department of Building Engineering and Construction Management (BECM) 13


Exhausted Row 1 Deleted

Department of Building Engineering and Construction Management (BECM) 14


Reduced Matrix

Department of Building Engineering and Construction Management (BECM) 15


Exhausted Row 3 Deleted

Department of Building Engineering and Construction Management (BECM) 16


Initial Basic Feasible Solution Using LCM Method

Department of Building Engineering and Construction Management (BECM) 17


Cost

Transportation Cost = (2 × 250)+ (3 × 200) + (7 × 150) + (5 × 100)+

( 3 × 200) +(1 × 300) = 500 + 600 + 1050 + 500 + 600 + 300 = $ 3550

Department of Building Engineering and Construction Management (BECM) 18


Project introduction

In our project the site is about 375,000 m2 (375mX1000m)


with a rectangle shape. The contractor divided the total
area into 24 (125mX125m) sub areas for materials
handling. The total earthwork for rough grading has been
designed as: bank cut volume 149,775 cu.m and bank fill
volume is also 149,775cum. So, the cut and fill are
balanced. The following figure shows the cut and fills area
in the site: Black indicates that area is a cut area (denote
by C1,C2…) and red indicates a fill area (denote by F1,
F2….).

Department of Building Engineering and Construction Management (BECM) 19


Volume of areas (Red- fill, cut- black)

Department of Building Engineering and Construction Management (BECM) 20


Temporary Road

The speed for temporary road


will be 27km/h and rough road
18km/h regardless the truck
haul or return.
Department of Building Engineering and Construction Management (BECM) 21
Department of Building Engineering and Construction Management (BECM) 22
Department of Building Engineering and Construction Management (BECM) 23
Temporary Road

The speed for temporary road


will be 27km/h and rough road
18km/h regardless the truck
haul or return.
Department of Building Engineering and Construction Management (BECM) 24
Distance matrix (in meter)

Department of Building Engineering and Construction Management (BECM) 25


Time matrix (in second) for round trip

Department of Building Engineering and Construction Management (BECM) 26


Minimum Haul Route

Department of Building Engineering and Construction Management (BECM) 27


Minimum Haul Route

Department of Building Engineering and Construction Management (BECM) 28


Volume of areas (Red- fill, cut- black)

Department of Building Engineering and Construction Management (BECM) 29


Haul path

Department of Building Engineering and Construction Management (BECM) 30


Earthwork construction cycles

Department of Building Engineering and Construction Management (BECM) 31


Cycle Time

CT = LT + HT + DT + RT + ST

CT = Cycle Time

LT = Loading Time

HT = Hauling Time

DT = Dumping Time

RT = Returning Time

ST = Spotting Time

The returning haul unit may need to join a waiting line before it can be
loaded again, and it may have to wait for assistance to be spotted in a
position where it can be loaded. If this time is considered at all, it is
generally assumed to be a fixed time known as spotting time (ST).
Department of Building Engineering and Construction Management (BECM) 32
Equipment List

Department of Building Engineering and Construction Management (BECM) 33


Cycle Time Calculation

Department of Building Engineering and Construction Management (BECM) 34


Minimum Haul Route

Department of Building Engineering and Construction Management (BECM) 35


Total number of truck cycle

Department of Building Engineering and Construction Management (BECM) 36


Total loading, hauling, dumping and returning
time for two loaders and single truck (min)

Department of Building Engineering and Construction Management (BECM) 37


Execution Plan

Department of Building Engineering and Construction Management (BECM) 38


Sample Bar chart and resource allocation of work

Department of Building Engineering and Construction Management (BECM) 39


Assignment

 Use 2 Loader and 1 Truck

Department of Building Engineering and Construction Management (BECM) 40


Thank You