Download as pdf
Download as pdf
You are on page 1of 1
CAMERON HOW TO ORDER Port Body soe | pact ek vave oe Seal Bal and ‘Actuator fo) | FuiPon =F Type" Cove | Code | Stem coe Code asaya teas te cetense S Caton se c Conte hres caten sel or MS ence ca Besainessed St Sone as 2 bsp r-50°F a6" seven os se [esas el for etapa ‘I FiaGe «GOO ae 2 6soies sel oth sae Sell vim good for SP FLAS) Se Fe er 9 ie tb res AEE TID 01 re rE a ld Fe Pre 2° Homopehymer Aceta asic re ” ett Pir 8 wera fog TE 2 ceton rire 28 fied err ‘aa TF er oveum exe Godrmnt os 316 whic Alo HVOF raphe Sheugh 20119 eels sm 216 wCkome Cutie Grape ao jece Valve Type 310 Two-piece Valve Type ror 7 cs ° no) a sp ® rr rT EB 572 © a a Ee em mous) : a ee ee ee si3sonxae 2 Goa = ai ai 1 as) owe s12504xA 3x2 (0x5) R810 = ane B70 1 2) 3 a er : 4 Gop mF at = ana a0 2 ow S 4 Go ano = ames er" 2 0 # - Ome sigeee pros 3) ORP 5 6 G50 oo atts ze aimee = 3g) = 8 gop e100 stor = 122 ertaree errors = _ ig _ 100) 2 "ne (0 angers alae nin GAS WA ate in ay atc cae on (om geoapued oo NST thcoed enews NP eal ie teed nfl {Sefomance with ASME BB ond adea and Henooe AR NACE MRO175/S0 15156 Compliance ~ Materials of construction shall bein compliance with the pre-qualified material requirements spectfied by NACE MRO175/SO 15156. According to NACE 310 Three-piece Valve Type MROT75/SO 15156, itis the manufacturer’ responsibilty for Er meeting metallurgical requirements and the customertuser ts responsibilty to ensure that a material willbe satisfactory in the aa oa 103 intended environment. When given the application requirements ee ee — (environment by the customer/user, Cameron can make technical 1 oe 2105 recommendations in accordance with NACE MRO175/SO 15156, we wo) 03 but that in no way certifies or warrants the product or materials for 2 Soe 3108 ‘the application

You might also like