Risk Assessment For Shutdown Job - 21
PEC-HS-FRM-X-30015 Rev 0
Work Location : Well Pad - 04 Company : Petrofac Projects and Services Private Limited
Page 1 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
Residual
Gross Risk
Risk Risk
Risk Categor
Activity Hazard Hazard Effect Risk Control Measures Evaluati Category
Evaluation y
on R
R
L C L C
Obtain Permit to • Working without PTW • Illegal Operation • Strict compliance to the PTW procedure and
Work • Performing Authority • Clash of activities requirements.
not available at work • Injury to working • PTW must be kept visible at work location.
location personnel. • Permit issuer and receiver must conduct
• Relevant Documents work site inspection.
not taken • Prior issuing the permit including gas test to
be performed.
2 1 2 • Necessary certificate to be obtained prior 1 1 1
start of activities.
• Approved lifting plan based on the lift load
to be ensured.
• Ensure to keep P & ID mark-ups and LOTO
compliances.
• Vedanta fatal risk control procedure should
be in place.
Job preparatory • Slippery surface • WRULD ➢ Obtain permit to work and relevant NOC as
activities • Defective tools • Back Pain applicable.
• Floor Opening • Personal injury ➢ Inspection of work area Prior to commence
• Un-even ground • Multiple bone of work.
• Awkward access broken/Fatality ➢ Effective TBT on job specific.
• Combustible • Property ➢ Floor opening, hole or open excavated area
material damage shall be covered/barricaded properly.
• Vehicle movement • Fire 3 2 6 ➢ Provision of safe access and egress. 2 1 2
➢ Identifying and removal of combustible
materials.
➢ Competent Driver/Operator with valid
documents as per Vedanta’s RTSO
requirement.
➢ Availability of Flagman/Banks man.
➢ No simultaneous activity permitted.
Controlling Document Number: PEC-HS-PRO-X-30024
Page 2 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
Page 3 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
• Fall from height • Personal injury • Ground selection for safe scaffold erection
• Drop object • Multiple bone • Provision of standard scaffold materials
• Incompetent crew broken/Fatality • Ensure deployment of trained scaffolder,
• Restricted access • Property supervisor and inspecter.
• Material handling damage • 3rd party competency certificate of
• Defective scaffolding Supervisor/Inspector.
material / • Ensure double lanyard full body safety
construction harness is used.
• 100 % tie off while moving at height.
• Three point contact while
Erection and
ascending/descending ladder
alteration,
• Ensure the scaffolding is certified by
dismantling of
3 2 6 competent person and tagged. 2 2 4
scaffolding
• Top to bottom approach to be followed
And
while dismantling
Work at height
• Routine housekeeping to remove loose
object at height
• Don’t stand on structure/beam etc.
• Proper anchorage of lanyard
• Uses of lanyard/rope for proper securing
of spanner/hammer etc.
• Relevant training as work at height,
vertigo, phobia etc.
• Ensuring green tag prior accessing to the
scaffold platform
• Gas Leak • Personal Injury • Trained person for the job
• Improper Isolation • Fatality • Ensure proper LOTO in place
• Sudden release of • Fire/Explosion • Approved drawing from P & ID
containment with • Property damage • Positive isolation approved/signed by
Isolation Activity 4 2 8 3 2 6
pressure • Adverse Operation/concerned team/person
• Spillage environmental • All blinds flanges to be provided with
impact engineering design and tested.
• Proper supervision
Page 4 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
• Working in direct line Personal Injury • Joint Site walk prior to work plan
of fire Property damage • PTW system shall be strictly followed
• Human error • Ensure drawing and NOC prior to
• Property damage commence of work
• Clashes of work • Clashes/conflict of task shall be assessed
• by Issuing authority/performing
authority. Ensure communication during
TBT.
• Ensure job specific TBT prior start of job
• Barricade and signage in place.
• informed in case of emergency
SIMOPS
(Simultaneous 3 2 6 • Ensure emergency vehicle arrangement 2 1 2
Operations) is in place
• Designated muster point.
• Proper In and Out system to be
maintained in register
• Ensure stand by Ambulance and first
aider
• Provision of resting shelter and potable
water
• Reservoir drilling shall be ongoing.
Although no harm anticipated. Mock
Drill shall be arranged by SLB prior to
s/d.
Page 5 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
Page 6 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
Page 7 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
Page 8 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
Radiographic Test • Radiation Hazard • Chronic health • Ensure only AERB certified radiographer
• Radioactive effect shall handle the radioactive source.
contamination • Environmental • Ensure valid documents are available with
effect the radiography crew
• Ensure cordoning off of the area
3 2 6 • Ensure proper signage are in place and 1 3
3
PAGA system
• Ensure the radiographer uses calibrated
survey meter and radiation is within
limits.
• Ensure radiation source is handled safely
as per guidelines.
Pressure testing • High pressure • Personal
• Area to be barricaded and secured and
release injury/Fatality
sign boards are in place
• Snapping of high- • Environmental
• Ensure certified tools and equipment are
pressure hose impact
used
• Manual material • Property
3 3 9 • Ensure entry is restricted to authorized 1 3
handling damage 3
person only
• Pinch points
• Ensure the pressure is raised in steps as
• Failure to secure
defined in procedure
• Uncertified hydro
• Ensure only competent crew is
test manifold
employed for the job
• Uncertified pumps
Page 9 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
Page 10 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
Page 11 of 12
Risk Assessment Form
PEC-HS-FRM-X-30015 Rev 0
Use of pressurized • Gas leak • Personal • Ensure trolleys are provided for all cylinders
gas cylinders • Explosion injury • Ensure availability of
• Fire • Property • PESO certificate
• Toppling of cylinders damage 3 3 9 • Soap test and other inspection as applicable 2 2 4
• Proper manual handling procedure followed
• Provision of Fire extinguisher
• Display of MSDS
• Poor illumination • Poor visibility • Ensure adequate lighting arrangement are
• Reptiles and insects • Stress and made
• Extreme weather fatigue • Ensure competent person are employed
• Lack of supervision • Ensure effective night shift supervision
• Improper job
• Eating at site • No work in case adverse weather
execution 2 2 4 2 1 2
Night Shift • Working without • Ensure proper job rotation
permit • Health hazard • Ensure rest shelter are in place.
• Extension • Personal
• Sleeping/resting injury/Fatality
other than designated
areas
• Tripping and • Physical • Ensure work area is cleared after the
slipping hazard. injury completion of job
Improper disposal • Good housekeeping being a first line defence
of waste. against accident and injury
• Tools and equipments are kept in safe
manner to prevent any tripping hazard.
• All the waste material on the ground should
House keeping 3 2 6 be collected and disposed of in a safe way. 2 1 2
• While disposing, the waste material must be
segregated and disposed to designated dust
bins.
• Inform control room the completion status
of the job.
Page 12 of 12