Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction
Calibration Certificate,
every 6 QCS 2010 Sec. 1 Part 8
1.1 Survey Instrument Calibration Calibration Certificate Lab. Test Checklist (3433-HGERL-1- H I/R S/R
months Cl. 8.7.7
25-0001-F01)
AFC drawing 3433-
Establishment of Temporary Bench Checklist (3433-HGERL-1-
HGERL-1-64-0001-001, , *QP Civil Spec Sect. 1
1.2 Mark Pillars (TBM) w.r.t. Reference Survey 100% 25-0001-F02 &3433- H I/R R
*QP Specification Sect. CL.1.7, 1.8 & 1.9
Bench Mark (RBM) HGERL-1-25-0001-F03)
1 CL.1.7, 1.8 & 1.9
Comment/s:
NAME
DATE
EPIC for Power Supply Project through
Submarine Cables
from Ras Laffan to Halul
CONTRACT NUMBER GC11106800 DOC. NO. 3433-HGERL-1-25-0001-F02
PROJECT NUMBER 3433 REV. A
CLIENT QATAR PERTROLEUM DATE 22/09/2013
CONTRACTOR LSC&S/ L&T
SURVEY REPORT
NAME
DATE
EPIC for Power Supply Project through
Submarine Cables from Ras Laffan to
Halul
CONTRACT NUMBER GC11106800 DOC. NO. 3433-HGERL-1-25-0001-F03
PROJECT NUMBER 3433 REV. A
CLIENT QATAR PERTROLEUM DATE 22/09/2013
CONTRACTOR LSC&S/ L&T
SURVEY REPORT
MARK ELEVATION
DESCRIPTION REMARKS
NO. Design Actual Diff
SIGNATURE
NAME
DATE