COOLING TOWER & CHILLER CALCULATION FOR KATANGA PLASTIQU

MACHINE

MACHINE HEAT EXCHANGER QTY MACHINE TOTAL


SL.NO DESCRIPTION FEED THROAT LPM LPM M/CS LPM
1 950-Ton CLF TX 40 295 4 1340
2 850-Ton JW 30 200 1 230
3 775-Ton OMEGA 30 200 1 230
4 600-Ton CLF TX 25 220 1 245
5 450-Ton WINDSOR 25 150 1 175
6 450 Ton OMEGA 25 150 3 525
7 350 Ton OMEGA 20 130 2 300
8 250 Ton OMEGA 20 130 1 150
9 240-Ton TEN 20 80 1 100
10 HAITIAN MA 2500 20 60 1 80
11 HAITIAN MA 1600 10 45 1 55
12 TEN-150 10 70 1 80
13 HYDRON-150 10 55 1 65
14 CLF-150 TX 10 60 1 70
15 CLF-120 TX 10 50 1 60
16 PUMAO-140 10 60 1 70
17 CMP 10 40 1 50
23 3825

COOLING TOWER CALCULATION FOR MACHINE HEAT EXCHANGER AND FEED THROT

Description Values
Flow rate For Machines 4207.5
Differential Temperature 50c
Total
Total Heat loadof
Tonnage tothe
be cooling
extracted (MST)
tower 21037.5
required (TR) 417

Formula Remarks
Q=MST M = lpm
Q= Total Heat to be extracted S=1(Calorie) for water
M= Mass Flow rate 1TR =50.4 Kcal/Min.
S= Specific heat of water
specific heat of water = 1 calory per gram celcious degree
AVAILABLE VS REQUIRED CHILLER CAPACITY

Required TR Existing
Cooling Tower FRIGO-4 Frigo-3 Frigo-6 Frigo-5

Tonnage of 665 125 TR 100 TR 100TR 50 TR


Refrigeration

AVAILABLE Vs REQUIRED LITER PER MINUTE OF PUMP CAPACITY

Required LPM Existing LPM OF Pump


pump-1 pump-2 pump-3
For Machines LPM 3825
For Molds LPM 2268

Total LPM 6093 1300 1300 1300


ANGA PLASTIQUE
MOLD

MOLD
MOLD IN/OUT TOTAL
CHANNLES LPM
65 910
50 175
50 175
30 105
30 105
26 273
22 154
22 77
12 42
10 35
10 35
10 35
12 42
8 28
8 28
10 35
4 14
2268

Description Values
Flow rate For Molds 2494.8
Differential Temperature 50c
Total
Total Heat loadof
Tonnage tothe
be cooling
extracted 12474 K Cal/min
tower required (TR) 248
Add FINAL
Total-Avl C/T3 after addition

375 290 665

PUMP CAPACITY

LPM OF Pump
pump-4 Total AVL Shortage of LPM

1300 5200 893